HomeMy WebLinkAbout2012.03.20_City Council AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO CITY COUNCIL
TYPE OF MEETING: Regular
DATE: March 20, 2012
TIME: 6:30 p.m.
PLACE: Council Chambers, Old Central Building
109 N. Birch
Notice and agenda filed in the office of the City Clerk and posted at City Hall at 6;00 p.m, on
Friday, March 16, 2012.
Sherry Bishor&ity Clerk
AGENDA
1. Call to Order
Mayor Doug Bonebrake
2. Invocation
Reverend Robert Miller of New Life Church
3. Flag Salute
4. Roll Call
5. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. All matters listed under "Consent" are considered by the City Council to be
routine and will be enacted by one motion. Any Councilor may, however, remove an item
from the Consent Agenda by request. A motion to adopt the Consent Agenda is non -
debatable.
A. Approval of Minutes of the March 6, 2012 Regular Meeting and the March 13, 2012
Special Meeting
Attachment # 5 -A
B. Approval of Claims
Attachment # 5 -13
C. Acknowledge receipt of the monthly budget status report
Attachment # 5 -C
6. Consideration and appropriate action relating to items removed from the Consent Agenda
7. Consideration and appropriate action relating to a request for approval to retain Cole &
Reed, P.C. as auditors for the fiscal year ending June 30, 2012
Ms. Janet Isaacs
Attachment # 7
Staff recommends approval to retain Cole & Reed, P.C. as auditors for the fiscal year
ending June 30, 2012.
Owasso City Council
March 20, 2012
Page 2
8. Consideration and appropriate action relating to a request for approval of Ordinance No.
1002, amending Chapter 9 of the zoning code, Off - Street Parking
Mr. Bronce Stephenson
Attachment # 8
Staff recommends approval of Ordinance No, 1002,
9. Consideration and appropriate action relating to a request for approval of a partial utility
easement closure in the Nottingham Estates neighborhood located at 13804 East 93rd Court
North, Lot 34, Block 5, Nottingham Estates III
Mr. Bronce Stephenson
Attachment # 9
Staff recommends approval of the utility easement closure request.
PUBLIC HEARING
10. The City Council will conduct a public hearing for the purpose of receiving citizen
comments and input relating to the US - 169 Overlay District zoning code amendment
Mr. Bronce Stephenson
Attachment # 10
A public hearing will be held for the purpose of receiving comments and citizen input
regarding a recommendation from City staff to amend the zoning code for the US - 169
Overlay District.
PUBLIC HEARING
11. The City Council will conduct a public hearing to receive recommendations on community
development needs for the City of Owasso as a member of the Tulsa County CDBG Urban
County. The amount of funds allocated to the City of Owasso is $113,845
Mr. Karl Fritschen
Attachment # 11
A public hearing will be held for the purpose of receiving comments and citizen input
regarding a recommendation from City staff to use Community Development Block Grant
funds for repair, installation, and rehabilitation of sidewalks, curb, and gutter.
12. Consideration and appropriate action relating to a request for approval to purchase a
CNG truck contingent upon award of the Congestion Mitigation and Air Quality (CMAQ)
grant
Mr. Larry White
Attachment # 12
Staff recommends approval to purchase a 2012 model dedicated CNG truck contingent
upon award of the Congestion Mitigation and Air Quality (CMAQ) grant.
13. Consideration and appropriate action relating to the Police Multi -Use Firearms Training
Facility construction bid
Mr, Dwayne Henderson
Attachment # 13
Staff recommends rejection of all bids due to the cost exceeding the Police Department's
available funding.
Owasso City Council
March 20, 2012
Page 3
14. Consideration and appropriate action relating to a request for approval of the FY 2011-
2012 Street Rehabilitation Program Construction Contract Bid
Mr. John Feary
Attachment # 14
Staff recommends award of contract for the FY 2011-2012 Street Rehabilitation Program to
Tri -Star Construction of Tulsa, Oklahoma in the amount of $368,059,20,
15. Consideration and appropriate action relating to a request for approval of the 116th Street
North Bridge Replacement Material Bid
Mr. Dwayne Henderson
Attachment # 15
Staff recommends award of contract for the 116th Street North Bridge Replacement
Material to Apex Precast Products of Tulsa, Oklahoma in the amount of $39,014.
16. Report from City Manager
17. Report from City Attorney
18. Report from City Councilors
19. New Business (New Business is any item of business which could not have been foreseen at
the time of posting of the agenda)
20. Adjournment
OWASSO CITY COUNCIL
MINUTES OF REGULAR MEETING
Tuesday, March 6, 2012
The Owasso City Council met in regular session on Tuesday, March 6, 2012 in the Council
Chambers at Old Central per the Notice of Public Meeting and Agenda posted on the City Hall
bulletin board at 6:00 p.m. on Friday, March 2, 2012.
ITEM 1 CALL TO ORDER
Mayor Bonebrake called the meeting to order at 6:30 p.m.
ITEM 2 INVOCATION
The invocation was offered by Pastor Jeff Smith, Youth Pastor of Friendship Baptist Church
ITEM 3 FLAG SALUTE
Councilor Stovall led the flag salute
ITEM 4 ROLL CALL
PRESENT ABSENT
Doug Bonebrake, Mayor
Bryan Stovall, Vice Mayor
Steve Cataudella, Councilor
Charlie Brown, Councilor
Patrick Ross, Councilor
A quorum was declared present
STAFF
Warren Lehr, Assistant City Manager
Julie Lombardi, City Attorney
ITEM 5 PRESENTATION OF THE CHARACTER TRAIT OF COMPASSION
Scott Pallett, Character Council Member, presented to the City Council "Compassion," the
Character Trait of the Month for March 2012,
ITEM 6 CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR COUNCIL
APPROVAL OF THE CONSENT AGENDA
A. Approval of Minutes of the February 21, 2012 Regular Meeting
B. Approval of Claims
Mr. Brown requested item B be removed from the consent agenda for separate consideration.
Mr. Brown moved, seconded by Mr. Cataudella, to approve item A of the Consent Agenda.
YEA: Cataudella, Ross, Stovall, Brown, Bonebrake
NAY: None
Motion carried 5 -0
Owasso City Council March 6, 2012
ITEM 7 CONSIDERATION AND APPROPRIATE ACTION RELATING TO ITEMS REMOVED FROM
THE CONSENT AGENDA
Ms, Michele Dempster and Mr. Warren Lehr responded to questions relating to item B, Approval
of Claims, on the consent agenda. After discussion, Mr. Brown moved, seconded by Mr. Stovall,
to approve item B of the consent agenda with claims totaling $167,604.62, Also included for
review were the payroll payment reports for pay period 02/25/2012.
YEA: Ross, Brown, Stovall, Cataudella, Bonebrake
NAY: None
Motion carried 5 -0
ITEM 8 CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST TO DECLARE
VEHICLES AS SURPLUS TO THE NEEDS OF THE CITY OF OWASSO
Mr, Warren Lehr presented the item recommending City Council declare one 1994 Chevrolet
Caprice and one 1991 Chevrolet Corsica as surplus and approve the minimum value to be
utilized for eBay auctioning. After discussion, Mr. Cataudella moved, seconded by Mr. Stovall to
declare vehicles surplus, as recommended.
YEA: Stovall, Cataudella, Ross, Brown, Bonebrake
NAY: None
Motion carried 5 -0
ITEM 9 CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST TO APPROVE
A WORKERS' COMPENSATION SETTLEMENT
Ms. Michele Dempster presented the item recommending City Council approval and
authorization for payment of the court- ordered workers' compensation settlement for Matthew
Morton in the total amount of $35,900. After discussion, Mr. Cataudella moved, seconded by
Mr. Stovall to approve the settlement and authorize payment, as recommended.
YEA: Brown, Stovall, Ross, Cataudella, Bonebrake
NAY: None
Motion carried 5 -0
ITEM 10 REPORT FROM CITY MANAGER
Mr. Roger Stevens provided a Status Report on Public Works Projects.
ITEM 11 REPORT FROM CITY ATTORNEY
No report
ITEM 12 REPORT FROM CITY COUNCILORS
Mayor Bonebrake recognized the 2012 Economic Summit held on March 2.
ITEM 13 NEW BUSINESS
None
Owasso City Council
ITEM 14 ADJOURNMENT
Mr. Ross moved, seconded by Mr. Cataudella, to adjourn
YEA: Cataudella, Stovall, Ross, Brown, Bonebrake
NAY: None
Motion carried 5 -0 and the meeting was adjourned at 7:02 p.m.
Ashley Hickman, Minute Clerk
March 6, 2012
Doug Bonebrake, Mayor
OWASSO CITY COUNCIL, OPWA, AND OPGA
MINUTES OF JOINT SPECIAL MEETING
TUESDAY, MARCH 13, 2012
The Owasso City Council, Owasso Public Works Authority, and Owasso Public Golf Authority met
in a special meeting on Tuesday, March 13, 2012 in the Council Chambers at Old Central, 109 N.
Birch Street, per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board
at 6:00 PM on Friday, March 9, 2012.
ITEM 1: CALL TO ORDER
Mayor Doug Bonebrake called the meeting to order at 6:05 p.m.
PRESENT ABSENT
Doug Bonebrake, Mayor /Chairman
Bryan Stovall, Vice Mayor /Vice Chairman
Steve Cataudella, Councilor /Trustee
Charlie Brown, Councilor /Trustee
Patrick Ross, Councilor /Trustee
A quorum was declared present
ITEM 2: DISCUSSION RELATING TO OPERATIONAL ITEMS
A. Street Rehabilitation Bid Update
B. 106th Street Water Line material Bid Review
C. 116th Street North Box Replacement Material Bid Review
D. Multi -Use Firearms Training Facility -Bid Review for Phase I
Roger Stevens presented each item and discussion was held. It was further explained that each
item will be placed on the March 20 agenda for consideration and appropriate action.
ITEM 3: DISCUSSION RELATING TO CITY MANAGER ITEMS
A. Utility Easement Closure Process Review
B. CDBG Process Discussion
C. Parking Chapter Amendments Proposed Ordinance
D. Highway 169 Overlay District
E. Wind Tower Ordinance
F. Capital Improvements Committee Recommendation Update
G. City Manager Report
Sales Tax Report
Bronce Stephenson presented item A, Utility Easement Closure Process Review, and discussion
was held.
Karl Fritschen presented item B and discussion was held. A Public Hearing will be held at the
March 20 City Council Meeting.
Bronce Stephenson presented item C and discussion was held. It was further explained that this
item will be placed on the March 20 agenda for consideration and appropriate action.
Councilor Cataudella left the meeting at 7:05 p.m.
Karl Fritschen and Bronce Stephenson presented item D and discussion was held. A Public
Hearing will be held at the March 20 Council Meeting.
Owasso City Council
March 13, 2012
Karl Fritschen presented item E and discussion was held. This item will be brought back to the
April work session for further review.
Warren Lehr presented item F and discussion was held. A Capital Improvements Committee
meeting is scheduled for March 19.
Sherry Bishop presented item G and discussion was held. Ms. Bishop gave an update on the
OWRB refinancing.
ITEM 4: REPORT FROM CITY COUNCILORS
Councilor Brown asked for an update on the CNG project
ITEM 5: ADJOURNMENT
Mr. Stovall moved for adjournment, seconded by Mr. Brown
YEA: Ross, Stovall, Brown, Bonebrake
NAY: None
Motion carried 4 -0.
Meeting adjourned at 7:55 p.m.
Juliann M. Stevens, Deputy City Clerk
%i
Doug Bonebrake, Mayor /Chairman
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
GENERAL
TREASURER PETTY CASH
CC REFUND - HUDSON
50.00
TREASURER PETTY CASH
CC REFUND - GARRELTS
50.00
TREASURER PETTY CASH
OC REFUND- RICARDO GLORIA
100.00
TREASURER PETTY CASH
CC REFUND - TESTERMAN
50.00
AEP /PSO
STREET LIGHTS
15.06
TOTAL GENERAL 265.06
GF - SEP ARRA CNG GRANT JBILUE ENERGY FUELS, LLC CNG FUEL STA & FUEL CONVE 91,500.00
TOTAL GF - SEP ARRA CNG GRANT 91,500.00
MUNICIPAL COURT IYOUTH SERVICES OF TULSA IYOUTH COURT 3,750.00
TOTAL MUNICIPAL COURT 3,750.00
MANAGERIAL
WAL -MART CORP SAMS CLUB 77150903608
OPERATING SUPPLIES
21.48
JPMORGAN CHASE BANK
PIKEPASS -FEES
9.70
TREASURER PETTY CASH
MILAGE REIMBURSEMENT
281.51
TREASURER PETTY CASH
MEETING EXPENSE
6.90
TREASURER PETTY CASH
CHAMBER LUNCH
10.00
JPMORGAN CHASE BANK
MEETING EXPENSE
47.67
JPMORGAN CHASE BANK
MEETING EXPENSE
36.69
JPMORGAN CHASE BANK
CENTER EXEC - CONFERENCE
195.00
JPMORGAN CHASE BANK
MEETING EXPENSE
73.21
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
50.00
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
86.23
TOTAL MANAGERIAL 818.39
FINANCE
JPMORGAN CHASE BANK
LANDMARK - CALCULATOR REPAI
75.00
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
50.00
JPMORGAN CHASE BANK
OFFICE EVRYTHNG -CALC TAPE
45.22
JPMORGAN CHASE BANK
TRAINING EXPENSE
336.00
TOTAL FINANCE 506.22
HUMAN RESOURCES
JPMORGAN CHASE BANK
CLAREMORE DAILY - ADVERTISI
418.31
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
30.38
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
19.79
JPMORGAN CHASE BANK
TULSA WORLD- ADVERTISING
2,711.68
TREASURER PETTY CASH
CHAMBER LUNCH
10.00
JPMORGAN CHASE BANK
MEETING EXPENSE
12.96
JPMORGAN CHASE BANK
NORMAN TRANS - ADVERTISING
191.48
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
11.64
COMMUNITYCARE EAP
EMPLOYEE ASSISTANCE PROGR
227.00
JPMORGAN CHASE BANK
SAFETY COUNCIL MEETING
10.66
Page 1
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
IPayment Amouni
TOTAL HUMAN RESOURCES 3,643.90
GENERAL GOVERNMENT
AT &T
CONSOLIDATED PHONE BILL
694.49
CINTAS CORPORATION
CARPET /MAT CLEANING
39.53
COMMUNITY PUBLISHERS INC
PUBLICATION FEES
152.60
HEARTLAND CONSULTING, INC
CONSULTING SERVICES FY12
10,500.00
JPMORGAN CHASE BANK
OWASSO COPIER - CONTRACT
360.00
TULSA COFFEE SERVICE INC
JAVA DAVES COFFEE
107.77
TULSA COUNTY CLERK
FILING FEES
57.00
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
697.83
TREASURER PETTY CASH
FILING FEE REFUND
-17.00
JPMORGAN CHASE BANK
AMER WASTE- REFUSE SERVICE
139.77
TREASURER PETTY CASH
FILING FEE
23.00
TOTAL GENERAL GOVERNMENT
12,754.99
COMMUNITY DEVELOPMENT
JPMORGAN CHASE BANK
TRAVEL EXPENSE
5.20
JPMORGAN CHASE BANK
TRAVEL EXPENSE
9.47
VERIZON WIRELESS
WIRELESS CONNECTION
38.01
CITY GARAGE
LABOR/OVERHEAD - FEB, 201
150.00
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
293.46
CITY GARAGE
VEH & TRK PARTS - FEB, 20
22.00
TOTAL COMMUNITY DEVELOPMENT
518.14
ENGINEERING
CITY GARAGE
VEH & TRK PARTS - FEB, 20
147.21
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
509.49
SAV -ON PRINTING & SIGNS LLC
BUSINESS CARDS
30.00
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
191.67
UNITED STATES CELLULAR CORPORATION
CELL BILL
59.57
JPMORGAN CHASE BANK
MEETING EXPENSE
46.00
VERIZON WIRELESS
WIRELESS CONNECTION
88.29
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
13.20
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
13.20
JPMORGAN CHASE BANK
WALMART - SAFETY GEAR
42.00
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
17.09
TOTAL ENGINEERING 1,157.72
INFORMATION TECHNOLOGY
JPMORGAN CHASE BANK
FEDEX- SHIPPING
42.09
JPMORGAN CHASE BANK
COX - INTERNET SERVICES
1,550.00
JPMORGAN CHASE BANK
BEST BUY - BATTERY BACKUP
149.99
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
34.05
VERIZON WIRELESS
WIRELESS CONNECTION
76.02
JPMORGAN CHASE BANK
TECHSICO -PHONE SUPPORT
160.00
JPMORGAN CHASE BANK
PIKEPASS -FEES
9.00
JPMORGAN CHASE BANK
BEST BUY - BATTERY BACKUP
89.99
Page 2
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
INFORMATION TECHNOLOGY
MCCI
LASERFISCHE SUPPORT
9,470.40
JPMORGAN CHASE BANK
GODADDY.COM- CREDIT
- 299.99
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
66.67
TOTAL INFORMATION TECHNOLOGY 11,348.22
SUPPORT SERVICES
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
166.67
JPMORGAN CHASE BANK
ROTO- ROOTER - SUPPLIES
141.30
A PLUS SERVICE INC
REPAIRS
450.00
CITY GARAGE
VEH & TRK PARTS - FEB, 20
17.08
AT &T
CONSOLIDATED PHONE BILL
65.44
JPMORGAN CHASE BANK
MURPHY SANITARY -HAND SOAP
116.88
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEE
21.43
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEE
19.25
COX COMMUNICATIONS
INTERNET SVCS OC BLDG - M
69.95
OKLAHOMA DEPT OF CORRECTIONS TULSA
DOC WORKER FEES - FEB2012
1,050.00
JPMORGAN CHASE BANK
PIKEPASS -FEES
8.25
VERIZON WIRELESS
WIRELESS CONNECTION
38.01
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
295.04
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
225.22
WAL -MART CORP SAMS CLUB 77150903608
OPERATING SUPPLIES
32.94
WAL -MART CORP SAMS CLUB 77150903608
OPERATING SUPPLIES
425.38
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
4.99
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
25.18
JPMORGAN CHASE BANK
FEDEX- SHIPPING
26.02
JPMORGAN CHASE BANK
HORIZON- BOILER REPAIR
1,368.37
JPMORGAN CHASE BANK
LIGHTING INC -BULBS
194.40
JPMORGAN CHASE BANK
LIGHTING INC -BULBS
119.20
TOTAL SUPPORT SERVICES 4,881.00
CEMETERY IVERDIGRIS VALLEY ELECTRIC COOP CEMETERY ELECTRIC 33.81
TOTAL CEMETERY 33.81
POLICE SERVICES
JPMORGAN CHASE BANK
OWASSO COPIER - CONTRACT
360.00
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
4,833.33
JPMORGAN CHASE BANK
NTOA- MEMBERSHIP DUES
150.00
JPMORGAN CHASE BANK
DRY CLEAN - UNIFORMS
1,040.07
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
9,012.72
CITY GARAGE
VEH & TRK PARTS - FEB, 20
4,033.16
SIMMONS LAW ENFORCEMENT, INC
SHIPPING
313.08
JPMORGAN CHASE BANK
RAY ALLEN - REFLECT STRIPS
15.95
JPMORGAN CHASE BANK
OWASSO FITNESS -GYM USE
180.00
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORM
119.98
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORM
460.91
JPMORGAN CHASE BANK
SPECIAL OPS -LIGHT BULB
9.50
Page 3
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
POLICE SERVICES...
AT &T
CONSOLIDATED PHONE BILL
462.23
SIMMONS LAW ENFORCEMENT, INC
PROTECTIVE GEAR
28,173.70
JPMORGAN CHASE BANK
PERFORMANCE K- 9- TRAINING
1,000.00
JPMORGAN CHASE BANK
OFFICE EVERYTHING -TONER
428.30
WAL -MART CORP SAMS CLUB 77150903608
OPERATING SUPPLIES
64.80
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
249.75
VERIZON WIRELESS
WIRELESS CONNECTION
462.65
JPMORGAN CHASE BANK
AUTO PRIDE -CAR WASH
5.00
JPMORGAN CHASE BANK
USPS- POSTAGE
0.32
JPMORGAN CHASE BANK
G2G MEETING
24.65
JPMORGAN CHASE BANK
PIKEPASS -FEES
36.65
TOTAL POLICE SERVICES
51,436.75
TULSA CTY DA REVOLV DRU(JPMORGAN CHASE BANK WORLDEYE- RETURN - 599.00
TOTAL TULSA CTY DA REVOLV DRUG
- 599.00
POLICE COMMUNICATIONS IDEPARTMENT OF PUBLIC SAFETY JOLETS USER FEE 450.00
TOTAL POLICE COMMUNICATIONS
450.00
ANIMAL CONTROL
FULLERTON HYDRO -TEST INC.
OXYGEN
38.50
FULLERTON HYDRO -TEST INC.
MEDICAL OXYGEN LEASE
200.00
WORKHEALTH SOLUTIONS, LLC
HEP A +B VACCINES
260.00
JPMORGAN CHASE BANK
DRY CLEAN - UNIFORMS
72.80
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
166.67
AT &T
CONSOLIDATED PHONE BILL
47.17
JPMORGAN CHASE BANK
DISCOUNT RAMPS -DOG RAMP
102.99
JPMORGAN CHASE BANK
MED VET- SUPPLIES
99.97
JPMORGAN CHASE BANK
COMPANIONS- CREMATIONS
610.00
VERIZON WIRELESS
WIRELESS CONNECTION
76.02
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
191.91
TOTAL ANIMAL CONTROL 1,866.03
FIRE SERVICES
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
2,843.61
WAL -MART CORP SAMS CLUB 77150903608
OPERATING SUPPLIES
40.92
A N Z SIGNS & SHIRTS, INC
FIRE HELMET LETTERING
20.00
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
1,332.38
VERIZON WIRELESS
WIRELESS CONNECTION
306.06
JPMORGAN CHASE BANK
PIKEPASS -FEES
13.50
JPMORGAN CHASE BANK
AIR CLEANING TECH - REPAIR
1,417.00
JPMORGAN CHASE BANK
CONRAD FIRE - HELMETS
340.00
JPMORGAN CHASE BANK
MAIL THIS - SHIPPING
24.11
JPMORGAN CHASE BANK
CONRAD FIRE -PARTS
85.65
JPMORGAN CHASE BANK
THOMPSON'S -PEST CONTROL
4.99
JPMORGAN CHASE BANK
ASPEN ELECTRICAL - LIGHTS
1,621.57
Page 4
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
FIRE SERVICES...
JPMORGAN CHASE BANK
ASPEN ELEC -LIGHT REPAIRS
1,600.00
AT &T
CONSOLIDATED PHONE BILL
245.41
JPMORGAN CHASE BANK
NFPA- ANNUAL DUES
165.00
JPMORGAN CHASE BANK
LOWES- FILTER
13.82
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
1,166.67
JPMORGAN CHASE BANK
LOWES- SCREWS
2.72
JPMORGAN CHASE BANK
BMI IMAGENET- RENTAL
323.81
JPMORGAN CHASE BANK
LOWES- REPAIR PARTS
44.20
TULSA OVERHEAD DOOR
DOOR REPAIR
721.00
CITY GARAGE
VEH & TRK PARTS - FEB, 20
634.12
JPMORGAN CHASE BANK
LIBERTY FLAGS -FLAGS
195.60
TOTAL FIRE SERVICES 13,162.14
EMERGENCY PREPAREDNES
AT &T
CONSOLIDATED PHONE BILL
24.86
VERDIGRIS VALLEY ELECTRIC COOP
STORM SIREN ELECTRIC BILL
16.41
VERDIGRIS VALLEY ELECTRIC COOP
STORM SIREN ELECTRIC BILL
20.40
VERDIGRIS VALLEY ELECTRIC COOP
STORM SIREN ELECTRIC BILL
20.40
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
4.53
VERIZON WIRELESS
WIRELESS CONNECTION
38.01
TOTAL EMERGENCY PREPAREDNESS 124.61
STREETS
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
1,406.32
AEP /PSO
STREET LIGHTS
5,625.11
JPMORGAN CHASE BANK
LOWES -DRILL
199.00
SHERWOOD CONSTRUCTION CO, INC
CONCRETE
348.00
SHERWOOD CONSTRUCTION CO, INC
CONCRETE
1,827.00
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
20.89
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
20.89
JPMORGAN CHASE BANK
WALMART - SAFETY GEAR
70.00
JPMORGAN CHASE BANK
QUALITY TIRE -TUBE
12.00
JPMORGAN CHASE BANK
KIMS INTERNATIONAL -VALVE
99.38
TWIN CITIES READY MIX, INC
CONCRETE
903.00
JPMORGAN CHASE BANK
BUMPER2BUMPER- SUPPLIES
12.99
TWIN CITIES READY MIX, INC
CONCRETE
3,948.00
JPMORGAN CHASE BANK
BUMPER TO BUMPER - BATTERY
50.00
JPMORGAN CHASE BANK
LOWES- PLYWOOD
112.36
JPMORGAN CHASE BANK
ARMOR PPE - SAFETY APPAREL
54.05
AMERICAN ELECTRIC POWER
MAIN STREET LIGHTING
1,000.00
AMERICAN ELECTRIC POWER
SILVER CREEK LIGHTING
513.00
JPMORGAN CHASE BANK
SPRAY EQUIPMENT- REPAIR
284.35
CITY GARAGE
VEH & TRK PARTS - FEB, 20
631.67
JPMORGAN CHASE BANK
HOME DEPOT - HARDWARE
72.04
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
1,166.67
Page 5
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
IPayment Amouni
TOTAL STREETS 18,376.72
STORMWATER
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
1,166.67
CITY GARAGE
VEH & TRK PARTS - FEB, 20
108.03
JPMORGAN CHASE BANK
ARMOR PPE - SAFETY APPAREL
54.05
JPMORGAN CHASE BANK
WALMART - SAFETY GEAR
84.00
JPMORGAN CHASE BANK
P & K EQUIPMENT- HARNESS
54.57
JPMORGAN CHASE BANK
OWASSO FENCE -POST CAPS
120.00
JPMORGAN CHASE BANK
E /REPLACEMENTPARTS -PARTS
14.94
JPMORGAN CHASE BANK
QUALITY TIRE -TIRE
80.00
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
1,346.31
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
43.16
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
43.16
JPMORGAN CHASE BANK
ATWOODS- MACHETE
19.98
VERIZON WIRELESS
WIRELESS CONNECTION
38.01
TOTAL STORMWATER
3,172.88
PARKS
VERIZON WIRELESS
WIRELESS CONNECTION
38.01
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
381.74
JPMORGAN CHASE BANK
LOWES- SUPPLIES
47.96
JPMORGAN CHASE BANK
LOWES- CONCRETE
10.65
JPMORGAN CHASE BANK
GLOBALGOV- NETWORK SWITCH
44.29
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
5.69
RANDY G. MISER
CONCRETE
3,850.00
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
12.75
OKLAHOMA WILDLIFE CONTROL, LLC
INSPECTION OF ELM CREEK
75.00
RANDY G. MISER
DIRT
330.00
OWASSO REPORTER
MOWING ADVERTISEMENT
32.20
OKLAHOMA WILDLIFE CONTROL, LLC
BEAVER REMOVAL
150.00
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
333.33
JPMORGAN CHASE BANK
LOWES- SUPPLIES
4.98
AT &T
CONSOLIDATED PHONE BILL
199.49
PLAY BY DESIGN, INC.
WOOD FIBER FOR PARK PLAYG
4,000.00
TOTAL PARKS 9,516.09
COMMUNITY CENTER
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
50.00
AT &T
CONSOLIDATED PHONE BILL
132.03
JPMORGAN CHASE BANK
TUCKER JANT'L- SUPPLIES
108.00
JPMORGAN CHASE BANK
TUCKER - SUPPLIES
106.75
JPMORGAN CHASE BANK
LIGHTING INC- BALLASTS
271.90
JPMORGAN CHASE BANK
TARGET -SPRAY BOTTLES
9.58
JPMORGAN CHASE BANK
TARGET -FILE DIVIDERS
7.32
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
453.68
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
149.83
Page 6
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
jPayment Amouni
TOTAL COMMUNITY CENTER 1,289.09
HISTORICAL MUSEUM
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
186.43
AT &T
CONSOLIDATED PHONE BILL
25.16
TOTAL HISTORICAL MUSEUM 211.59
ECONOMIC DEV
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
50.00
CITY GARAGE
VEH & TRK PARTS - FEB, 20
177.48
JPMORGAN CHASE BANK
WEBSCRIBBLE- HOSTING
19.99
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
53.63
JPMORGAN CHASE BANK
MEETING EXPENSE
30.28
VERIZON WIRELESS
WIRELESS CONNECTION
44.67
TOTAL ECONOMIC DEV 376.05
FUND GRAND TOTAL 230,560.4
AMBULANCE SERVICE AMERICAN MUNICIPAL SERVICES CORP. COLLECTION SERVICES 620.44
TRAILBLAZER HEALTH ENTERPRISES JAMBULANCE REFUND 267.15
TOTAL AMBULANCE SERVICE 887.59
AMBULANCE
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
1,877.80
CITY GARAGE
VEH & TRK PARTS - FEB, 20
548.92
CITY GARAGE
LABOR /OVERHEAD - FEB, 201
1,333.33
MEDICAL COMPLIANCE SPECIALTY INC
MEDICAL WASTE DISPOSAL
134.00
MEDICAL COMPLIANCE SPECIALTY INC
MEDICAL WASTE DISPOSAL
67.00
MEDICAL COMPLIANCE SPECIALTY INC
MEDICAL WASTE DISPOSAL
67.00
JPMORGAN CHASE BANK
PHARM SYSTEMS - SUPPLIES
132.15
SAINT FRANCIS HOSPITAL, INC
SAFETY TRAINING
450.00
JPMORGAN CHASE BANK
PHARM SYSTEMS - SUPPLIES
15.50
FLEETCOR TECHNOLOGIES
FUELMAN - FEB, 2012
2,082.44
EXCELLANCE, INC
REAR DOOR HANDLE
39.08
WILLIAM GALE HUMPHREY
12 LEAD EKG TRAINING
600.00
TOTAL AMBULANCE 7,347.22
FUND GRAND TOTAL 8,234.8
E911 COMMUNICATIONS
INCOG -E911
E911 MAPPING & MSAG MAINT
414.52
JPMORGAN CHASE BANK
TOTAL RADIO - MAINTENENCE
285.00
AT &T
CONSOLIDATED PHONE BILL
287.56
AT &T
E911 MAPPING FEES - MARCH
355.35
TOTAL E911 COMMUNICATIONS 1,342.43
Page 7
Claims List
3/20/2012
Budget Unit Title
I Vendor Name
Payable Description
Payment Amouni
FUND GRAND TOTAL 1,342.4
HOTEL TAX JPMORGAN CHASE BANK DOC- NEIGHBORHOOD SIGNS 143.40
JPMORGAN CHASE BANK DOC- NEIGHBORHOOD SIGNS 47.80
TOTAL HOTEL TAX 1720
HOTEL TAX - ECON DEV ITREASURER PETTY CASH JECONOMIC SUMMIT EXPENSE 48.00
TOTAL HOTEL TAX - ECON DEV 48.00
STRONG NEIGHBORHOODS
JPMORGAN CHASE BANK
CARTRIDGE WORLD -INK
69.99
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
29.98
VERIZON WIRELESS
WIRELESS CONNECTION
38.01
JPMORGAN CHASE BANK
GLOBALGOV - NETWORK SWITCH
44.28
ATLAS COMPUTERS, INC.
PHONE LINE INSTALLATION
125.00
TOTAL STRONG NEIGHBORHOODS 307.26
FUND GRAND TOTAL 546.4
CITY GARAGE
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
497.97
JPMORGAN CHASE BANK
FLEET DISTRIBUTORS -PARTS
379.62
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
4.53
JPMORGAN CHASE BANK
PEPBOYS -BRAKE PARTS
500.14
JPMORGAN CHASE BANK
CRIMINALISTICS- SOLENOID
127.74
JPMORGAN CHASE BANK
B &M OIL CO -PARTS
946.00
T & W TIRE, LP
TIRES
769.52
T & W TIRE, LP
TIRES
1,170.00
JPMORGAN CHASE BANK
PRUITTS- PAINT /BODY REPAIR
3,297.96
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
33.72
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
30.61
AT &T
CONSOLIDATED PHONE BILL
47.17
TOTAL CITY GARAGE 7,804.98
FUND GRAND TOTAL 7,804.9
WORKERS' COMP SELF -INS
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
289.00
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
289.00
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
289.00
TOTAL WORKERS' COMP SELF -INS 867.00
WORKERS' COMP SELF -INS
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
1,524.53
STATE OF OKLAHOMA WORKERS
WC- APPLICATION FEE
1,000.00
UNITED SAFETY & CLAIMS INC
TPA ADMIN FEES FOR WORKER
186.60
Page 8
Claims List
3/20/2012
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
WORKERS' COMP SELF - INS...
UNITED SAFETY & CLAIMS INC
TPA ADMIN FEES FOR WORKER
1,610.00
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
1,807.25
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
1,672.65
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIM PAYMEN
556.86
TOTAL WORKERS' COMP SELF -INS
8,357.89
FUND GRAND TOTAL
9,224.8
rGRAND TOTAL
$257,713.97
Page 9
CITY OF OWASSO
HEALTHCARE SELF INSURANCE FUND
CLAIMS PAID PER AUTHORIZATION OF ORDINANCE #789 AS OF 3/20/12
VENDOR DESCRIPTION
AETNA HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE DEPT TOTAL
DELTA DENTAL DENTAL MEDICAL SERVICE
ADMIN FEES
DENTAL DEPT TOTAL
VSP ADMIN FEES
VISION DEPT TOTAL
AMOUNT
46,391.79
34,186.31
21,085.89
27, 354.03
129,018.02
3,987.80
2,191.93
6,179.73
1,250.79
1,250.79
HEALTHCARE SELF INSURANCE FUND TOTAL 136,448.54
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 3/10/2012
Department Payroll Expenses Total Expenses
Municipal Court
4,586.31
6,566.39
Managerial
19,419.14
27,170.23
Finance
12,543.91
19,750.70
Human Resources
5,984.82
10,024.93
Community Development
10,618.52
16,359.08
Engineering
14,704.46
22,125.48
Information Systems
9,363.03
14,655.48
Support Services
6,231.50
8,954.20
Police
94,243.65
149,089.16
Central Dispatch
16,820.61
28,532.31
Animal Control
2,258.40
3,664.18
Fire
95,865.60
141,724.51
Fire -Safer Grant
9,988.90
15,758.26
Emergency Preparedness
2,818.43
4,410.01
Streets
4,463.60
7,579.22
Stormwater /ROW Maint.
4,832.18
7,079.75
Park Maintenance
8,763.87
13,123.42
Community- Senior Center
3,102.30
4,832.37
Historical Museum
600.00
673.68
Economic Development
2,876.92
3,822.70
General Fund Total
330,086.15
505,896.06
Garage Fund Total 4,103.60 6,896.10
Ambulance Fund Total 23,484.87 35,677.34
Emergency 911 Fund Total -
Worker's Compensation Total 2,754.24 3,239.81
Strong Neighborhoods 2,102.12 3,188.66
CITY OF OWASSO
GENERALFUND
FISCAL YEAR 2011 -2012
Statement of Revenues & Expenditures
As of February 29, 2012
MONTH
YEAR
PERCENT
TO -DATE
TO -DATE
BUDGET
OF BUDGET
REVENUES:
Taxes
$ 1,963,894
$ 13,451,294
$ 19,631,900
68.52%
Licenses & permits
23,429
106,348
201,400
52.80%
Intergovernmental
202,038
719,604
2,540,926
28.32%
Charges for services
49,369
315,965
517,600
61.04%
Fines & forfeits
84,712
468,145
910,300
51.43%
Other
2,799
107,523
146,700
73.29%
TOTAL REVENUES
2,326,242
23,948,826
63.34%
15,168,879
EXPENDITURES:
Personal services
1,047,724
8,852,119
13,976,995
63.33%
Materials & supplies
60,385
471,131
750,602
62.77%
Other services
107,335
1,037,357
1,705,829
60.81%
Capital outlay
152,972
493,253
2,143,954
23.01%
TOTAL EXPENDITURES
1,368,416
18,577,380
58.43%
10,853,860
REVENUES OVER EXPENDITURES
957,825
5,371,446
4,315,019
80.33%
TRANSFERS IN (OUT):
Transfers in
1,087,170
7,907,086
11,601,600
68.16%
Transfers out
(1,748,430)
(12,325,154)
(17,965,700)
68.60%
TOTAL TRANSFERS
(661,260)
(4,418,068)
(6,364,100)
69.42%
NET CHANGE IN FUND BALANCE
296,566
(992,654)
(103,049)
FUND BALANCE (GAAP Basis)
Beginning Balance
3,944,512
Ending Balance
$ 3,841,462
FUND BALANCE (Budgetary Basis)
Beginning Balance
2,344,066
2,344,066
Ending Balance
$ 2,241,017
$ 1,351,413
0 The City Wit out Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Angela Hess
Finance Director
SUBJECT: Fiscal Year 2012 Audit Recommendation
DATE: March 16, 2012
BACKGROUND:
City charter and state statutes require that an independent accountant perform an annual
audit of the City's finances. In April 2006, the city accepted proposals for auditing services from
public accounting firms. Those proposals included a fixed fee for each of five years. The firm of
Cole & Reed, P.C. was selected and contracts were approved by City Council for each of the
next five years.
On June 30, 2010 the Owasso Audit Committee met and agreed that an additional two year
extension of the contract with Cole & Reed, P.C. would be in the best interest of the City
provided that Cole & Reed would agree to not increase fees for the FYI 1 audit and accept a
3% increase for the FY 2012 audit year.
Approval of a contract allows the firm to schedule their audit plan for the coming fiscal year
end. The Audit Arrangement Letter is attached. The fee for services described in the letter will
be as follows:
• Audit of financial statements
• OMB Circular A -133 audit requirements, only if required:
• Department of Energy - 81.041 ARRA $ 2,000
• EPA - 66.458 and 66.458 ARRA $ 2,000
• Additional major Federal programs $ 2,000 per program
The Audit Committee is satisfied with the quality, expertise and cooperation provided by the firm
and wishes to continue to utilize the services of Cole & Reed, P.C. as auditors for the City and its
trust authorities. The Audit Committee met on March 9, 2012 and voted to recommend Cole &
Reed as auditors for FY 2012. A memorandum signed by the chairman of the audit committee is
attached.
RECOMMENDATION:
Staff recommends City Council approval of Cole and Reed, P.C. as auditors for the fiscal year
ending June 30, 2012.
ATTACHMENT:
A. City of Owasso Audit Committee Memorandum dated March 9, 2012
B. Cole & Reed, P.C. Audit Arrangement letter dated February 6, 2012
cool
-- -- ..........
O, T City 1Nit out Limits.
TO:
The Honorable Mayor and City Council
City of Owasso
FROM:
Kevin Cavanah
City of Owasso Audit Committee, Chair
SUBJECT:
Fiscal Year2012 Audit Recommendation
DATE:
March 9, 2012
BACKGROUND:
City charter and state statutes require that an independent accountant perform an annual
audit of the City's finances. In April 2006, the city accepted proposals for auditing services from
public accounting firms. Those proposals included a fixed fee for each of five years. The firm of
Cole & Reed, P.C. was selected and a one year contract was approved by City Council.
On June 30, 2010 the Owasso Audit Committee met and agreed that an additional two year
extension of the contract with Cole & Reed, P.C. would be in the best interest of the City
provided that Cole & Reed would agree to not increase fees for the FYI I audit and accept a
3% increase the FY 2012 audit year.
Cole & Reed were contacted and agreed to hold the base fees at the current rate of $41,500
for FYI 1 with an increase of 3% in the second year of the extended contract. Additional fees
would be negotiated in the event of further single -audit requirements.
Terms of the audit agreed to for FYI 2:
Audit of financial statements
OMB Circular A -133 audit requirements, only if required:
o Department of Energy - 81.041 ARRA
o EPA - 66.458 and 66.458 ARRA $ 2,000
o Additional major Federal programs $ 2,000
The Audit Committee is satisfied with the quality, expertise and cooperation provided by the firm
and wishes to continue to utilize the services of Cole & Reed, P.C. as auditors for the City and its
trust authorities.
RECOMMENDATION:
The Audit Committee recommends that the City Council retain Cole & Reed, P.C. as auditors for
th=ending 0, L201
Kevin Cavanah
City of Owasso Audit Committee, Chair
February 6, 2012
Ms. Angela Hess
Director of Finance -.
City of Owasso
111 N. Maine
Owasso, Oklahoma 74055
Dear Angela:
Enclosed are the following:
1. Arrangement letter for the FY 2012 audit
2.. Pre -Audit required communications in accordance with SAS No. 114
3. Proposed audit calendar
Please let me know if you have any questions concerning any of this information. We
appreciate the opportunity to be of service, and look forward to working with you again in
upcoming year.
Very truly yours,
Digiblly signed by Mike Gibson
Mike G bso n �N:cn= MikeGibsaRO.Cate &Peed,ou,
',I emaU =mgihsan�coleandreed.can, c =US
Date: 2072.02.06 19:54:77 -06'00'
Mike Gibson
}++-+ f->- Y- F- h' F• F•• k^ i` k• F• hi•- F{•'}• b•{.- i-+• I`+- F- F- F^.-' tYfi-+-f•-k-+++-F-F.1- +4+++++ 531 Couch Drive TEL. 405.239.7961
1-+' F•^+' E+° I- +'F'b +T':° + + +-++ ++ + + +' +-I'.1. 1 - + +'{ +-{-++ + + +'I" t-'+'•S'i",' H- ++ ++ An lndependerrtly Owned Memher,
-. +.. +- +.. - -i -• .r..s +- - + ++ t + +• + +, -v t..r.t .t ..+ t + + ++ t• + + ; a +- +t Oklahoma City r =Ax 405.235.0042
. + +++ > + + + + ++ 4-++++++++++- +•.T + + +' +- + ++ + + ++- a + + + + + + - + + + ++
r+++ ,•'a ++ + + + + +- r.+ + + + + + 73102 -2231 vnr s www.coleandreed.com McGladrey Alliance
February 6, 2012
City Council and
Audit Committee
City of Owasso
Owasso, Oklahoma
Attention: Ms. Angela Hess
This letter is intended to communicate certain matters related to the planned scope and timing
of our audit of City of Owasso's financial statements and compliance as of and for the year
ended June 30, 2012.
Communication
Effective two -way communication between our Firm and the members of the audit committee is
important to understanding matters related to the audit and in developing a constructive
working relationship.
Your insights may assist us in understanding the City of Owasso and its environment, in
identifying appropriate sources of audit evidence, and in providing information about specific
transactions or events. We will discuss with you your oversight of the effectiveness of internal
control and any -areas where you request additional procedures to be undertaken. We expect
that you will timely communicate with us any matters you consider relevant to the audit. Such
matters might include strategic decisions that may significantly affect the nature, timing, and
extent of audit procedures, your suspicion or detection of fraud, or any concerns you may have
about the integrity or competence of senior management.
We will timely communicate to you any fraud involving senior management and other fraud
that causes a material misstatement of the financial statements, illegal acts, instances of
noncompliance, or abuse that come to our attention (unless they are clearly inconsequential),
and disagreements with management and other serious difficulties encountered in performing
the audit. We also will communicate to you and to management any significant deficiencies or
material weaknesses in internal control that become known to us during the course of the audit.
Other matters arising from the audit that are, in our professional judgment, significant and
relevant to you in your oversight of the financial reporting process will be communicated to
you in writing after the audit.
+ r -I rr « r r+ r s +++4+++ + 4 4,++
++ 3 + + + -+ 3.4 i f r s 4,+ rrr r : f+++++ S31 Couch Drive TR. 405.239.7961
4 s i < s r + . + + + ++ r + --+ i + 144 Oklahoma City x 405.235.0042
AnInde
Independently Owned Member,
73102 -2251 vres www.coleandreed.com McGladrey Alliance
Independence
Our independence policies and procedures are designed to provide reasonable assurance that
our firm and its personnel comply with applicable professional independence standards. Our
policies address financial interests, business and family relationships, and non -audit services
that may be thought to bear on independence. For example, without our permission no partner
or professional employee of Cole & Reed is permitted to own any direct financial interest or a
material indirect financial interest in a client or any affiliates of a client. Also, if an immediate
family member or close relative of a partner or professional employee is employed by a client in
a key position, the incident must be reported and resolved in accordance with Firm policy. In
addition, our policies restrict certain non -audit services that may be provided by Cole & Reed
and require audit clients to accept certain responsibilities in connection with the provision of
permitted non - attest services.
Audit Planning Process
Our audit approach places a strong emphasis on obtaining an understanding of how your entity
functions. This enables us to identify key audit components and tailor our procedures to the
unique aspects of your entity. The development of a specific audit plan will begin by meeting
with you and with management to obtain an understanding of business objectives, strategies,
risks, and performance.
We will obtain an understanding of internal control over financial reporting and compliance
with laws, regulations, and provisions of contracts and grant agreements to assess the impact of
internal control on determining the nature, timing, and extent of audit procedures, and we will
establish an overall materiality limit for audit purposes. We will conduct formal discussions
among engagement team members to consider how and where your financial statements might
be susceptible to material misstatement due to fraud or error or to instances of noncompliance.
We will use this knowledge and understanding, together with other factors, to first assess the
risk that errors or fraud may cause a material misstatement at the financial statement level. The
assessment of the risks of material misstatement at the financial statement level provides us
with parameters within which to design the audit procedures for specific account balances and
classes of transactions. Our risk assessment process at the account- balance or class -of-
transactions level consists of:
An assessment of inherent risk (the susceptibility of an assertion relating to an account
balance or class of transactions to a material misstatement, assuming there are no related
controls); and
An evaluation of the design effectiveness of internal control over financial reporting and
our assessment of control risk (the risk that a material misstatement could occur in an
assertion and not be prevented or detected on a timely basis by the City of Owasso's
internal control).
Similar assessments will also be made relative to compliance with laws, regulations, and
provisions of contracts and grant agreements.
We will then determine the nature, timing and extent of tests of controls and substantive
procedures necessary given the risks identified and the controls as we understand them.
The Concept of Materiality in Planning and Executing the Audit
In planning the audit, the materiality limit is viewed as the maximum aggregate amount of
misstatements, which if detected and not corrected, would cause us to modify our opinion on
the financial statements. The materiality limit is an allowance not only for misstatements that
will be detected and not corrected but also for misstatements that may not be detected by the
audit. Our assessment of materiality throughout the audit will be based on both quantitative
and qualitative considerations. Because of the interaction of quantitative and qualitative
considerations, misstatements of a relatively small amount could have a material effect on the
current financial statements as well as financial statements of future periods. At the end of the
audit, we will inform you of all individual unrecorded misstatements aggregated by us in
connection with our evaluation of our audit test results.
Internal Control and Compliance
Our audit of the financial statements will include obtaining an understanding of internal control
sufficient to plan the audit and to determine the nature, timing, and extent of audit procedures
to be performed. An audit is not designed to provide assurance on internal control or to identify
significant deficiencies or material weaknesses. Our review and understanding of the entity's
internal control is not undertaken for the purpose of expressing an opinion on the effectiveness
of internal control.
We will issue reports on internal control related to the financial statements and major programs.
These reports describe the scope of testing of internal control and the results of our tests of
internal controls. Our reports on internal control will include any significant deficiencies and
material weaknesses in the system, of wluch we become aware as a result of obtaining an
understanding of internal control and performing tests of internal control consistent with the
requirements of the Government Auditing Standards issued by the Comptroller General of the
United States, the Single Audit Act, and the U.S. Office of Management and Budget, (OMB)
Circular No. A -133.
We will issue reports on compliance with laws, regulations, and the provisions of contracts or
grant agreements. We will report on any noncompliance which could have a material effect on
the financial statements and any noncompliance which could have a direct and material effect
on each major program. Our reports on compliance will address material errors, fraud, abuse,
violations of compliance requirements, and other responsibilities imposed by state and federal
statutes and regulations and assumed contracts; and any state or federal grant, entitlement or
loan program questioned costs of which we become aware, consistent with the requirements of
the standards and circular identified above.
Timing of the Audit
We have scheduled preliminary audit fieldwork for June 2012 with final fieldwork commencing
in October 2012. We expect to issue the final audit reports in early December 2012 and to meet
with the City Council at its December .11, 2012 work session. Management's adherence to its
closing schedule and timely completion of information used by us in performance of the audit is
essential to meeting this schedule and completing our audit on a timely basis.
Closing
This letter is intended solely for the information and use of the members of the City Council
and Audit Committee, and management, of the City of Owasso and is not intended to be and
should not be used by anyone other than the specified parties.
We will be pleased to respond to any questions you have about the foregoing. We appreciate
the opportunity to be of service to the City of Owasso.
Very truly yours,
Dlgitallysigned by Mike Gibson
c �` DN, cn =Mike Gibson, o- Cole &Reed, ou,
Mike G i JO 1 email =m gibson@coleandreed.com,c =US
Date: 2012.02.06
Cole & Reed
Mike Gibson, Partner
CITY OF OWASSO, OKLAHOMA
June 30, 2012
PROPOSED AUDIT CALENDAR
Planning, System Walk - Throughs and Tests of Controls
May
In May 2012, the City will provide Cole & Reed with a preliminary schedule of expenditures of
federal awards that includes expenditures by CFDA No. through April 30, if available, or
otherwise through March 31.
June /July —
By June 1, 2012, the City will provide Cole & Reed with all of the Fund Trial Balances as
of April 30, 2012.
We will also provide you with the year -end "PBC" listing and the format of
confirmations that are required.
The Confirmation requests will be provided to you around the end of June.
The PBC Listing will be provided to you no later than July 31.
We have tentatively scheduled the week of June 25, 2012 to perform most of the above
procedures.
We will perform selected tests of controls, transactions and account balances at this time.
Year -End Audit Fieldwork
We will tentatively plan to start year -end audit fieldwork in our office the week of October 8,
2012. This presumes that we receive all of the adjusted trial balances and other PBC Items from
City offices by October 4th, 2012. We will perform the majority of on -site fieldwork during the
week of October 15, 2012.
Audit Wrap -Up
Following is the proposed calendar for the audit wrap -up:
• Draft of basic financial statements provided by November 12, 2012
• Draft of financial statement notes and MD&A by November 14, 2012
• City response to draft November 21, 2012
• Meeting with Audit Committee — November 30 (a.m.) or December 3 (a.m. or late
afternoon)
• Meeting with City Council (work session) — December 11, 2012
�4
.. w•.;... ': .:'; : -::. ...,.. "1':" :' +;:L2dk%Y '°o .+r..a....+x�vr'"X. , win. . -.,' .
.. ..� --.�.. sR�YYtlSk&'%IX.'k'F.ii3X:i:kTa .nX„s.._.,�;, J,4'fln>J. >.rY:Cx. a :SriB•Xi� N#. i' J,:' St��, ��. �q. �dY2�X^ SS�iFNF ""Xfn�1:l�".'fXLk:lPm'P°[Cti .,J+P...._.
February 6, 2012
City Council and Audit Committee
�o � J.A`
City of Owasso
Owasso, Oklahoma
This letter is to explain our understanding of the arrangements for the services we are to
perform for the City of Owasso for the year ending June 30, 2012. We ask that you either
confirm or amend this understanding.
Audit Services
We will perform an audit of the City of Owasso's governmental activities, business -type
activities, aggregate- discretely presented component units, each major fund, and aggregate
remaining fund. information as of and for the year ended June 30, 2012 which collectively
comprise the basic financial statements. We understand that these financial statements will be
prepared in accordance with accounting principles generally accepted in the United States of
America. The objective of an audit of financial statements is to express an opinion on those
statements.
We are responsible for forming and expressing an opinion about whether the financial
statements that have been prepared by management with the oversight of the audit committee
are presented fairly, in all material respects, in conformity with accounting principles generally
accepted in the United States of America.
We will also perform the audit of the City of Owasso as of June 30, 2012 so as to satisfy the audit
requirements imposed by the Single Audit Act and the U.S. Office of Management and Budget
(OMB) Circular No. A -133.
We will conduct the audit in accordance with auditing standards generally accepted in the
United States of America and Government Auditing Standards issued by the Comptroller General
of the United States and the provisions of the Single Audit Act, OMB Circular A -133 and OMB's
Compliance Supplement. Those standards, circulars, supplements or guides require that we
plan and perform the audit to obtain reasonable rather than absolute, assurance about whether
the financial statements are free of material misstatement whether caused by error or fraud.
Accordingly, a material misstatement may remain undetected. Also, an audit is not designed to
detect errors or fraud that are immaterial to the financial statements. The determination of
abuse is subjective; therefore, Government Auditing Standards do not expect us to provide
reasonable assurance of detecting abuse.
An audit of financial statements includes obtaining an understanding of the entity and its
environment, including its internal control, sufficient to assess the risks of material
misstatement of the financial statements, and to design the nature, timing, and extent of further
audit procedures. An audit is not designed to provide assurance on internal control or to
++++- 5- + ++-+• + + +- + + + + + +' +'t. +. },4 - +r + .L.� + + +. + +a + + + + + + + + + + + + + + + + + ++� S31 Couch Drive �rc:L 405.239.7961
+.+.+,+.+.}-:. t'}'+. b.+.... L' j'-+.' P. �l++.. �.' i..i+•.t.,..' + ++ +L.F'I.Y' .'I..t.• 1 .;.
++ r.4- ' + + +'+-' +...r.+' ++ r :..�. +.+. + +;.. + +.i- +,t. + +- + -t- rt ...++ ;,+ r r-+ + + >'t• ; + a- Oklahoma Clty r.�x 405.235.0092 An Independently Owned Member,
+ ++ ++ + +++ +i- 1 + +: ++ +' i-'f•+' 4,- i' �+++'- F�F + +'f +'+4, ++ + ++' +'Fi+ +i- -,-�t �+. ++
+++++++-. r+++- s-' a. + + + +- + +.+4- + + + +++..r. + + = +' +i; .4- i- +-+ + + +- - 4- .4 + + +, + ++ 73102.22S1 wEa www.coleandreed.com McGiadreyAlliance
identify significant deficiencies or material weaknesses. However, we will communicate to
management and the audit committee any significant deficiencies or material weaknesses that
we become aware of during the course of the audit.
We will also communicate to the audit committee (a) any fraud involving senior management
and fraud (whether caused by senior management or other employees) that causes a material
misstatement of the financial statements, (b) any illegal acts, violations of provisions of
contracts or grant agreements, and abuse that come to our attention- (unless they are clearly
inconsequential), (c) should any arise, any disagreements with management and other serious
difficulties encountered in performing the audit, and (d) various matters related to the entity's
accounting policies and financial statements.
In addition to our report on the City's financial statements, we will also issue the following
reports or types of reports:
A report on the fairness of the presentation of the City's schedule of expenditures of
federal awards for the year ending June 30, 2012.
Reports on internal control related to the financial statements and major programs.
These reports will describe the scope of testing of internal control and the results of our
tests of internal controls.
Reports on compliance with laws, regulations, and the provision of contracts or grant
agreements. We will report on any noncompliance which could have a material effect
on the financial statements and any noncompliance which could have a direct and
material effect on each major program.
A schedule of findings and questioned costs.
The funds that you have told us are maintained by the City of Owasso and that are to be
included as part of our audit are as follows:
1. General Fund —1
2. Special Revenue Funds — 8
3. Capital Projects Funds — 4
4. Enterprise Funds — 2
5. Internal Service Funds — 4
The component unit whose financial statements you have told us are to be included as part of
the City of Owasso's financial statements is the Owasso Economic Development Authority.
The Major Federal programs to be audited include, but are not limited to:
U.S. Department of Energy (Passed through Oklahoma Department of Commerce) -
81.041ARRA
2. U.S. Environmental Protection Agency (Passed through Oklahoma Water Resources
Board) - 66.458 and 66.458ARRA
We may conclude that we are not otherwise associated with the proposed offering and that our
association with the proposed offering is not necessary, providing the City agrees to clearly
indicate that we are not associated with the contents of the official statement. The City agrees
that the following disclosure will be prominently displayed in the official statement:
Cole & Reed, P.C., our independent auditor, has not been engaged to perform, and has
not performed, since the date of its report included herein, any procedures on the
financial statements addressed in that report. Cole & Reed, P.C. also has not performed
any procedures relating to this official statement.
Our association with an official statement is a matter for which separate arrangements will be
necessary. The City agrees to provide us with printer's proofs or masters of such offering
documents for our review and approval before printing, and with a copy of the final
reproduced material for our approval before it is distributed. In the event our auditor /client
relationship has been terminated when the City seeks such consent, we will be under no
obligation to grant such consent or approval.
Our professional standards require that we perform certain additional procedures, on current
and previous years' engagements, whenever a partner or professional employee leaves the firm
and is subsequently employed by or associated with a client. Accordingly, the City of Owasso
agrees it will compensate Cole & Reed, P.C. for any additional costs incurred as a result of the
employment of a partner or professional employee of Cole & Reed, P.C.
During the course of our engagement, we may accumulate records containing data which
should be reflected in your books and records. You will determine that all such data, if
necessary, will be so reflected. Accordingly, you will not expect us to maintain copies of such
records in our possession.
The assistance to be supplied by organization personnel, including the preparation of schedules
and analyses of accounts, will be discussed and coordinated with Ms. Angela Hess, Director of
Finance. The timely and accurate completion of this work is an essential condition to our
completion of the audit and issuance of our audit report.
Other Terms of our Engagement
Our fees are based on the time required by the individuals assigned to the engagement, plus
direct expenses. Interim billings will be submitted as work progresses and as expenses are
incurred. Our fee for the services described in this letter will be as follows:
• Audit of financial statements $12,7N
• OMB Circular A -133 audit requirements, only if required:
• Department of Energy - 81.041ARRA $ 2,000
• EPA - 66.458 and 66.458ARRA $ 2,000
• Additional major Federal programs $ 2,000 per program
Our report(s) on internal control will include any significant deficiencies and material
weaknesses in controls of which we become aware as a result of obtaining an understanding of
internal control and performing tests of internal control consistent with requirements of the
standards and circulars identified above. Our report(s) on compliance will address material
errors, fraud, abuse, violations of compliance requirements, and other responsibilities imposed
by state and federal statutes and regulations and assumed by contracts; and any state or federal
grant, entitlement of loan program questioned costs of which we become aware, consistent with
requirements of the standards and circulars identified above.
City of Owasso's Responsibilities
Management is responsible for the financial statements, including the selection and application
of accounting policies, adjusting the financial statements to correct material misstatements, and
for making all financial records and related information available to us. Management is
responsible for providing us with a written management representation letter confirming
certain representations made during the course of our audit of the financial statements and
affirming to Lis that it believes the effects of any uncorrected misstatements aggregated by us
during the current engagement and pertaining to the latest period presented are immaterial,
both individually and in the aggregate, to the financial statements taken as a whole and to the
opinion units of the financial statements.
Management is responsible for establishing and maintaining effective internal control over
financial reporting and for informing us of all significant deficiencies and material weaknesses
in the design or operation of such controls of which it has knowledge.
Management is responsible for identifying and ensuring that the entity complies with the laws
and regulations applicable to its activities, and for informing us about all known material
violations of such laws or regulations. In addition, management is responsible for the design
and implementation of programs and controls to prevent and detect fraud, and for informing us
about all known or suspected fraud affecting the entity involving management, employees who
have significant roles in internal control, and others where the fraud could have a material
effect on the financial statements. Management is also responsible for informing us of its
knowledge of any allegations of fraud or suspected fraud affecting the entity received in
communications from employees, former employees, analysts, regulators, or others.
Management is also responsible for (a) making us aware of significant vendor relationships
where the vendor is responsible for program compliance, (b) following up and taking corrective
action on audit findings, including the preparation of a summary schedule of prior audit
findings, and a corrective action plan, and (c) report distribution including submitting the
reporting package(s).
The audit committee is responsible for informing us of its views about the risks of fraud within
the entity, and its knowledge of any fraud or suspected fraud affecting the entity.
The City agrees that it will not associate us with any public or private securities offering
without first obtaining our consent. Therefore, the City agrees to contact us before it includes
our reports or otherwise makes reference to us, in any public or private securities offering.
Note that the fees related to the OMB Circular A -133 audit requirements are only billed on an
"if performed /if required" basis.
In the event we are requested or authorized by City of Owasso or are required by government
regulation, subpoena, or other legal process to produce our documents or our personnel as
witnesses with respect to our engagements for City of Owasso, City of Owasso will, so long as
we are not a party to the proceeding in which the information is sought, reimburse us for our
professional time and expenses, as well as the fees and expenses of our counsel, incurred in
responding to such requests.
The working papers for this engagement are the property of Cole & Reed, P.C. However, you
acknowledge and grant your assent that representatives of the cognizant or oversight agency or
their designee, other government audit staffs, and the U.S. Government Accountability Office
shall have access to the audit working papers upon their request; and that we shall maintain the
working papers for a period of at least three years after the date of the report, or for a longer
period if we are requested to do so by the cognizant or oversight agency. Access to requested
working papers will be provided under the supervision of Cole & Reed, P.C. audit personnel
and at a location designated by our Firm.
From time to time and depending upon the circumstances, we may use third -party service
providers to assist us in providing professional services to you. In such circumstances, it may
be necessary for us to disclose confidential client information to them. We enter into
confidentiality agreements with all third -party service providers and we are satisfied that they
have appropriate procedures in place to prevent the unauthorized release of your confidential
information to others.
If circumstances arise relating to the condition of your records, the availability of appropriate
audit evidence, or indications of a significant risk of material misstatement of the financial
statements because of error, fraudulent financial reporting, or misappropriation of assets which
in our professional judgment prevent us from completing the audit or forming an opinion, we
retain the unilateral right to take any course of action permitted by professional standards,
including declining to express an opinion or issue a report, or withdrawal from the
engagement.
The two overarching principles of the independence standards of the "Government Auditing
Standards" issued by the Comptroller General of the United States provide that management is
responsible for the substantive outcomes of the works, and therefore, has a responsibility and is
able to make any informed judgment on the results of the services described above. We
currently do not anticipate providing any non -audit services to the City of Owasso. Should that
change, however, the services to be performed will be subject to a separate arrangement letter.
Further, the City of Owasso agrees to the following with respect to any such non -audit services:
Ms. Angela Hess will be accountable and responsible for overseeing any non -audit
services provided by Cole & Reed P.C.
The City of Owasso will establish and monitor the performance of any such non -audit
services to ensure that they meet management's objectives.
The City of Owasso will make any decisions that involve management functions related
to any such non -audit services and accepts full responsibility for such decisions.
The City of Owasso will evaluate the adequacy of services performed and any findings
that result.
In accordance with Government Auditing Standards, a copy of our most recent peer review report
is enclosed, for your information.
If this letter defines the arrangements as you understand them, please sign the enclosed copy,
and return it to us. We appreciate your business.
Very truly yours,
Digitally signed by Mike Gibson
Mike G i b s o n.,DN: n=Mike Gibson, andr l . Reed, ou,
email =mgibson@coleandreed.com, c =US
t Date: 2012.02.0619:55:30 - 06'00'
Mike Gibson
For The Firm
Cole & Reed, P.C.
Confirmed on behalf of the addressee:
Signature
Title
0 d Oe T City Witt Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
City Planner
SUBJECT: Proposed Zoning Code Amendment - New Off - Street Parking Chapter - Chapter
9 of the Owasso Zoning Code
DATE: March 16, 2012
BACKGROUND:
The Community Development Department is currently working on a comprehensive update of
the Owasso Zoning Code. Chapter 9 of the Zoning Code addresses off - street parking
requirements and was identified as one of the key areas needing an update. The current
Chapter 9 lacks a comprehensive approach for the safe development of off - street parking
areas in commercial and residential areas, lacks key information critical to site designers, and is
antiquated in many areas. The new chapter provides the needed updates to the current
Chapter 9 and outlines opportunities for alternative design methods and construction materials.
The information specified within the proposed new parking chapter will facilitate the efficient
design of driveways, aisles, pedestrian walkways, and parking stalls; and promote the safe
movement of traffic in commercial areas. Additionally, these changes encourage the use of
`green' materials and methods establishing Owasso as a progressive and environmentally
responsible community in Oklahoma.
The proposed new parking chapter also proposes language that will provide opportunities and
alternatives to parking situations which have arisen in older portions of Owasso where off - street
parking is limited, forcing some residents to park in yard areas, which are subject to code
enforcement. Much like the recently adopted landscape chapter, these proposed changes
offer a variety of choices for those designing parking areas while at the same time ensuring that
Owasso provides for the health, safety, and welfare of drivers, bicyclists, and pedestrians.
This proposed new chapter complements the principles outlined in the recently adopted Quality
of Life Initiative. Additionally, this chapter provides design alternatives that allow for more
'green' development complementing the `Go- Green' Initiative. The City of Owasso adopted
the `Go Green' Initiative in 2009, with a goal of bringing about positive change in the way the
City operates and develops. The language contained within the new proposed Chapter 9
complements the recently adopted Landscape Chapter of the Owasso Zoning Code, works
with existing plans and initiatives and other planned updates of the Owasso Zoning Code.
This new chapter has been taken to the OEDA multiple times for review and input and has been
taken to the Planning Commission twice for their comment. Additionally, this new language has
been available for public review and comment on the City webpage for over forty five (45)
days. The City Council has seen this item at two (2) work sessions as well. All of the comments
and input received have been incorporated into the document presented to the Council for its
review at this meeting.
PROPOSED AMENDMENT TO THE ZONING CODE:
The proposed amendment to the City of Owasso Zoning Code replaces the existing Chapter 9
with a new Chapter 9, Off - Street Parking.
PLANNING COMMISSION
The Owasso Planning Commission reviewed this item at their regular meeting on February 13,
2012. At that meeting, the Planning Commission made minor language changes and
unanimously recommended approval of the zoning code amendment to the City Council.
RECOMMENDATION:
Staff recommends City Council approval of Ordinance No. 1002 for the new parking chapter,
replacing the existing chapter 9 of the Owasso Zoning Code.
ATTACHMENTS:
Ordinance No.] 002 New Proposed Chapter 9 - Off - Street Parking Requirements
CITY OF OWASSO, OKLAHOMA
ORDINANCE NO. 1002
AN ORDINANCE AMENDING THE CITY OF OWASSO ZONING CODE AS CODIFIED IN THE
OWASSO CODE OF ORDINANCES, PART 12, PLANNING, ZONING AND DEVELOPMENT, CHAPTER
2, ZONING REGULATIONS, SUB - CHAPTER 9, OFF - STREET PARKING REQUIREMENTS.
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF OWASSO, OKLAHOMA, THAT:
SECTION ONE (1): AMENDED LANGUAGE
The Owasso Zoning Code, contained within the Owasso Code of Ordinances in Part 12,
Chapter 2, Sub - Chapter 9 shall be amended to read as follows:
CHAPTER 9
OFF - STREET PARKING REQUIREMENTS
9.1 GENERAL PROVISIONS
The purpose of these off - street parking requirements is to provide standards that will
protect the health, safety and general welfare of the public and achieve the following:
• Provide and maintain an orderly system of parking lots that provide safe and
adequate access to drivers and vehicles.
• Create a network of public and private streets, driveways, aisles and parking lots
that provide a safe means of travel within Owasso.
• Provide for 'green' design opportunities.
• Augment existing regulations.
9. 1.1 PARKING STANDARDS
A. The standards and diagrams provided within this chapter are designed to create
an ingress and egress system that provides Owasso citizens and visitors with a safe
environment on public roads and in private parking areas. Any deviation from
these requirements must be approved by the officials from the Community
Development and Public Works Departments, or through variance or appeal to
the Owasso Board of Adjustment.
B. Provided parking calculations found within this chapter are designed to provide a
minimum number of parking stalls that will meet customer demand for certain
types of businesses as well as provide adequate parking for employees and other
persons integral to operating those specific businesses.
C. All off - street parking lots for any use shall be designed based upon the criteria
listed in this chapter. Any parking lots that are expanded or altered excluding
routine or regular maintenance, shall meet the requirements of this chapter. Any
expansion of any current business by more than twenty five percent (25/) shall
trigger a requirement to meet the requirements set forth in this chapter.
D. All required parking for any use shall be provided on the some lot as the use. Off -
site parking arrangements shall not be allowed unless the parking lot is contiguous
to the subject property and evidence of a shared parking agreement shall be
provided to the City of Owasso.
E. The regulations found within this chapter are designed to be in accordance with
and supplement the other chapters of the Owasso Zoning Code. Wherever these
regulations may be in conflict with other sections of Owasso City Code, the more
restrictive shall apply.
F. Failure to maintain parking lots, parking spaces, driveways or any vehicle drives,
loading areas, storage areas, or parking areas as outlined in this chapter shall
constitute a Zoning Code violation and shall be subject to enforcement.
G. No person shall park or place an automobile, trailer, vessel or any other type of
vehicle upon a public or private street, parking lot or any public or private
property for the purpose of displaying such automobile, trailer, vessel or any other
type of vehicle for sale, hire, or rental, or for other advertising purposes, unless said
property is zoned by the City for such purpose and the vendor is duly licensed to
transact such business at that location. This prohibition shall not apply to the sale
of a vehicle on private residential property belonging to the owner of any such
vehicle.
9.1.2 DUTY TO PROVIDE AND MAINTAIN OFF - STREET PARKING
The duty to provide and maintain the paved off - street parking spaces herein required
shall be the responsibility of the operator and owner of the use or business on a site
and /or the owner of the land on which the use or uses exists. Each standard parking
space shall have adequate space for ingress and egress. No land shall be used or
occupied, no structure shall be built, altered, used, or occupied, and no use shall be
operated unless the off - street parking spaces herein required are provided in at least the
amount specified, and maintained in the manner herein set forth.
9.1.3 SURFACING
All parking stalls shall be constructed of concrete or asphalt. 'Green' design alternatives
to concrete or asphalt such as permeable paving systems shall also be allowed upon
approval by the Community Development Administrator. Documentation of how
permeable paving systems would be installed shall be provided for review and approval.
Permeable paving systems include but are not limited to systems such as pavers,
'grasscrete', permeable asphalt, and other approved applications.
All private parking lot surfaces shall be maintained in such a way as to ensure a safe and
flat travel surface. Potholes, large cracks, and pieces of paving that are missing shall be
2
replaced and /or repaired. Curbing shall be repaired or replaced whenever it becomes
broken. Failure to maintain parking lots in a safe manner shall constitute a Zoning Code
violation and shall be subject to enforcement.
9.1.3 STRIPING
All parking spaces, required ADA improvements, drive lanes, no- parking areas, and all
other required components shall be clearly striped or delineated. All striping shall be
clearly maintained and visible. If striping is faded or becomes removed, it shall be
replaced in the exact layout as approved. Failure to meet these criteria shall be
handled as a Zoning Code violation and shall be subject to enforcement.
All required striping shall be yellow or white surface markings at least four (4) inches in
width. One -way or two -way drives and required turning areas shall be identified with
directional arrows.
9.2 NUMBER OF OFF - STREET PARKING SPACES REQUIRED
9.2.1 GENERAL PROVISIONS
A. If not otherwise specified within this chapter, all parking calculations shall be based
on gross square footage of the building or the use.
B. If a classification is not specified within this chapter, the Administrator shall calculate
parking requirements for that use based upon national and regional parking
standards.
C. All existing parking situations shall not be required to comply with these standards.
However, any additions or new development that increase the square footage of
the building by 25% or increase the number of parking spaces by 25% shall be
required to comply with these standards.
D. If a lot has multiple uses, each use shall provide the minimum number of parking
spaces as outlined in this chapter.
E. Bicycle parking shall be provided as shown in Table 9.1. Bicycle parking shall be
provided in a bike rack or other structure affixed to the ground that holds a bicycle
vertical and allows a lock or chain to be connected from the bike to the rack. A
minimum of two (2) bicycle spaces shall be provided for any business requiring
bicycle parking.
F. Off - street parking spaces for motor vehicles shall be provided in at least the amount
shown in Table 9.1. A minimum of four (4) parking spaces shall be provided for any
business.
3
Table 9.1
Parking Requirements by Type of Use
USE PARKING REQUIRMENT
AGRICULTURAL
BICYCLE
Agricultural Implement Sales
1 per 500 s . ft. of sales area N/A
ANIMAL RELATED
Kennel
1 per 750 s . ft., plus 1 per employee
N/A
Veterinarian
1 per 250 s . ft. of gross area
N/A
EDUCATIONAL /CHILD CARE
Child Care / Day Care
1 per 400 s . ft.
10%
Colle e/Universit /Junior College
1 per 6 students
25%
Elementary School
2 per classroom
100%
Extra School Stadium Requirements
1 per 4 seats
15%
Fraternity or Sorority
1 per bed within the building
25%
Library
1 per 500 s . ft.
25%
Middle School
2 per classroom
100%
High School
5 spaces per classroom
60%
Trade School
1 per 2 students, plus 1 per employee
25%
FINANCIAL
Automatic Teller Machines
Not required for drive -thru, 2 required for walk-upN/A
Banks and Financial Institutions
1 per 400 s . ft.
N/A
FOOD /BEVERAGE
Coffee Shop
1 per 100 s . ft. of customer service area
25%
Ice Cream/Yogurt Shop
1 per 100 s . ft. of customer service area
25%
Restaurant with Drive -thru
1 per 100 s . ft. , including outdoor areas
10%
Restaurant - Drive -In
1 per 100 s . ft. of dining area indoor /outdoor
10%
Restaurant
1 per 100 s . ft. , including outdoor areas
5%
Restaurant - Take -out only
1 per 100 s . ft. of customer service area
10/
Tavern/Bar/Nightclub
1 per 100 gross s . ft.
5%
INDUSTRIAL
Equipment Rental
1 per 300 gross s . ft.
N/A
Manufacturing
1 per 750 s . ft.
N/A
LODGING
Bed and Breakfast
I per guestroom, plus 2 for primary residence
N/A
Boarding or Rooming Houses
1 per bedroom + 2 spaces
10%
Hotel / Motel
I per 1.5 per guest rooms, plus 1 per 300 sq. ft. of meeting /restaurant
area, plus 1 per employee of largest shift N/A
MEDICAL /CARE
Funeral Home
1 per 4 seats of assembly area
N/A
Halfway Houses / Sober Living
1 per 2 beds, plus 2
25%
Hospital
1.25 per 2 beds, plus 1 for each employee of largest shift
N/A
Medical Office
1 per 200 gross s . ft.
N/A
Nursing Home / Care Home
1 per 3 beds, plus 1 per employee of largest shift
N/A
Social Assistance
1 per 250 s . ft.
10%
OFFICE
Professional Office
1 per 250 gross s . ft. N/A
Radio /TV Studio
1 per 250 gross s . ft.
N/A
Research and Development
1 per 500 s . ft.
N/A
OTHER
.75 spaces per bedroom
Airport
1 per 100 s . ft. of waiting area N/A
RECREATION /ENTERTAINM ENT
20%
Amusement
1 per 600 s . ft. of site area
10%
Arcade /Game Room
1 per 300 s . ft.
25%
Athletic /Recreation Facility - Indoor
1 per 3 persons at max capacity, plus 1 per employee of largest shift
10%
Athletic /Recreation Facility - Outdoor
1 per 5 seats
10%
Auditorium /Arena
1 per 5 seats
5%
Billiard Parlor
2 per billiard table
10%
Bowling Alley
2 per lane, plus 1 per employee of largest shift
10%
Campground
1 per campsite
N/A
Community Center
1 per 250sq. ft.
20%
Dance Hall
1 per 100 gross s . ft.
5%
Day Use Area
Min. of 5 spaces
10%
Golf Course
40 per 9 holes, plus 1 per 300 s . ft. of clubhouse
5%
Golf Driving Range
1 per tee, plus 1 per 300 s . ft. of shop
5%
Mini Golf Course
2 per hole
20%
Museum / Gallery
1 per 400 s . ft.
10%
Skating Rink
1 per 500 s . ft.
25%
Swimming Pool
1 per 200 s . ft. of facility
25%
Theater
1 per 3.5 seats
10%
RESIDENTIAL
Mobile / Manufactured Home
2 off- streets aces can include garage)
N/A
Residential Single-Family
2 off - streets aces can include garage)
N/A
Residential - Duplex / Triplex
2 off - streets aces per unit can include garage)
N/A
Residential Multi- Family
-2- bedroom unit
2 per unit
10%
-3- bedroom unit
2.5 spaces per unit
10%
-4- bedroom unit and above
.75 spaces per bedroom
10%
- Studio or 1- bedroom unit
1 space per unit
20%
RETAIL & PERSONAL SERVICES
Convenience Stores
1 per 200 s . ft., plus I adjacent to each gas pump
10%
Drug Store
1 per 300 s . ft.
10%
Furniture Store
1 per 500 s . ft.
N/A
General Retail
1 per 300 gross s . ft.
5%
Grocery Store
1 per 250 gross s . ft.
5%
Gym / Workout Facility / Health Club
1 per 200 s . ft.
10%
Hardware /Home Improvement Store
1 per 250 gross s . ft.
N/A
Liquor Store
1 per 300 s . ft.
5%
Nurse / Greenhouse
1 space per 500 s . ft.
N/A
Outdoor / Uncovered Retail
1 per 500 s . ft. of sales area
N/A
Personal Services
1 per 200 s . ft. of gross area
N/A
Wholesale Retail
1 per 500 s . ft. of gross area
N/A
UTILITY
Utility Office
1 per 200 sq. ft. of customer area, plus 1 per employee of largest
shift
N/A
VEHICLE
Car /Vehicle Wash
2 plus boys for each wash unit and 1 bay per vacuum
N/A
Vehicle Rental
1 per 300 s . ft. of office area, plus 1 per rental car
N/A
Vehicle Sales
1 per 400 s . ft. gross area
N/A
Vehicle Service/Repair
1 per 300 s . ft., repair boys shall not be counted
N/A
WAREHOUSE /PARCEL /FREIGHT
Self-Storage / Mini-Storage
1 per 300 s . ft. of office area
N/A
Warehouse
1 per 1500 s . ft., plus 1 per employee of largest shift
N/A
WORSHIP
Church /Place of Worship - Multi Use
1 per 4 seat in assembly area, plus 1 per 150 s . ft in other areas
5�
Church /Place of Worship - Single Use
1 per 4 seats in assembly area
5%
9.3 DESIGN OF COMMERCIAL PARKING STALLS AND PARKING LOTS
9.3.1 GENERAL PROVISIONS
A. Plans - Any applicant submitting a site plan for approval must submit plans
showing the off - street parking areas required by this ordinance. These plans must
show location, arrangement, and dimensions of the off - street parking, turning
spaces, drives, aisles, and ingress and egress in a manner satisfactory for the
safety and convenience of pedestrian, as well as vehicular, traffic. A title block
will accompany the plan showing: scale, date, north arrow, name and address of
property owner, and name and address of the company preparing site plan.
B. All parking lot lighting shall comply with Chapter 19 of the Owasso Zoning Code.
C. All parking lots shall comply with the requirements of Chapter 20 of the Owasso
Zoning Code - Landscaping, Screening, and Buffering
D. All parking lots shall be designed to meet all applicable ADA guidelines.
E. All parking lots and parking stalls are encouraged to be designed to incorporate
Low- Impact Design (LID) principles and 'green' building materials and techniques
are encouraged to be used as well.
F. All parking lots and parking stalls shall be fully installed and striped prior to
issuance of any Certificate of Occupancy.
G. All parking areas are encouraged to be built at the rear of lots or beside
buildings, with buildings brought to the front of lots, especially when abutting an
arterial, a frontage road, or a highway.
H. For all approvals not requiring City Council or Planning Commission approval, the
Community Development Administrator shall be the approving authority for
parking design. The City of Owasso Fire Marshall shall have approving authority
for any and all plans dealing with Fire safety. Any appeals of any Administrative
Official shall be taken to the Owasso Board of Adjustment.
rel
F. All parking lots and parking stalls shall be fully installed and striped prior to
issuance of any Certificate of Occupancy.
G. All parking areas are encouraged to be built at the rear of lots or beside
buildings, with buildings brought to the front of lots, especially when abutting an
arterial, a frontage road, or a highway.
H. For all approvals not requiring City Council or Planning Commission approval, the
Community Development Administrator shall be the approving authority for
parking design. The City of Owasso Fire Marshall shall have approving authority
for any and all plans dealing with Fire safety. Any appeals of any Administrative
Official shall be taken to the Owasso Board of Adjustment.
9.3.2 STANDARD PARKING STALL DESIGN
A. All parking lots in the City of Owasso shall be designed according to the criteria
contained within this chapter. All parking stalls and parking lot aisles shall meet
the minimum standards contained in Table 9.2.
B. Each standard parking space shall be at least nine (9) feet wide and twenty (20)
feet long. A parking space may be reduced to eighteen (18) feet long if a
minimum two (2) foot overhang is provided. The overhang area shall not
encroach into any required sidewalk area and shall not interfere with any
required landscaping. See Table 9.2 for all parking space design criteria.
C. Wheel or bumper guards shall be located so that no part of any vehicle extends
beyond the parking area, intrudes on pedestrian ways, or comes in contact with
walls, fences or planting areas.
CITY OF OWASSO PARKING SPACE DESIGN CRITERIA
Angle Width Aisle Width One -Wav
900 9 ft. 24 ft.
Aisle Width Two -Way
24 ft.
600
9 ft.
18 ft.
23 ft.
450
9 ft.
13 ft.
22 ft.
300
9 ft.
1 1 ft.
22 ft.
00 (parallel)
8.5 ft.
12 ft.
24 ft.
Table 9.2
7
9.3.3 COMPACT PARKING SPACE DESIGN
Compact parking is an option for new development, but is not required. For any parking
lot, up to 10% of the parking stalls may be constructed as compact parking spaces.
Compact parking spaces shall be a minimum of eight and a half (8.5) feet wide and a
minimum of seventeen (17) feet long. All compact parking areas shall provide a
landscape strip or raised area with stamped concrete at least 8.5 feet wide and 3 feet
deep at the front of each space. The rear of the compact parking spaces shall align
with all other parking spaces in the row. Signage shall be provided for each compact
space. See Figure 9.1.
i
20'
17'
Figure 9.1
Compact Parking Design
9.3.4 MOTORCYCLE PARKING
A. Motorcycle parking is encouraged to be provided for all businesses.
Parking spaces designed to be used only as motorcycle spaces shall be designed
according to these standards. Signage and appropriate striping shall be
provided for ail motorcycle parking areas. Any business that provides a
motorcycle parking space may reduce the number of required automobile
parking space by one (1), up to a maximum of ten (10) spaces.
B. Motorcycle parking spaces shall be provided in vehicular parking lots and no
sidewalks shall be used for the parking or storage of motorcycles. Motorcycles
shall not be parked in bicycle parking areas.
C. A motorcycle parking space shall be designed at a minimum of four (4) feet in
width and nine (9) feet in length. Motorcycle parking spaces should be clustered
together and shall be designed so that the rear of the stalls are in line with
standard parking stalls in the aisle.
9.3.5 OVERSIZED VEHICLE PARKING
A. Any use which requires heavy traffic of oversized vehicles such as recreational
vehicles or tractor trailers shall provide pull -thru parking areas for these vehicles.
Aisles of sufficient size and means of ingress and egress shall be designed to
accommodate these vehicles. Said parking areas shall be provided with
signage and properly delineated. Each oversize parking space should be
designed to be a minimum of ten (10) feet in width and a minimum of seventy
(70) feet in length.
9.3.6 PARKING LOT DESIGN
A. Access - Adequate access drives shall be provided for all parking spaces not
abutting a public street or alley. Ingress and egress driveways shall be designed
to meet City of Owasso Public Works Design Standards.
B. All parking lots shall comply with the standards outlined in Table 9.1 and designed
in accordance with Figures 9.2, 9.3, 9.4, 9.5 or 9.6.
C. All drive aisles shall meet the standards set forth in Table 9.2 above.
D. Parking lots may encroach into required setbacks, provided that no vehicle is
placed within a sight triangle or other area that may cause a public safety
concern.
9
12' t. 24'
8'6" I
1 " -,
Parallel Parking
Figure 9.2
MMMI
Wwv
11'
20-6"
21'
13'
20'
301 Parking
Figure 9.3
450 Parking
Figure 9.4
- WA
20,
is, 20.78'
600 Parking One Way
Figure 9.5
I L
25' 61,
20.78' 18,
600 Parking Two-Way
Figure 9.6
901 Parking
9.3.7 QUEUING REQUIREMENTS Figure 9.7
A. For all food and /or beverage service uses, a minimum of five (5) queuing spaces
shall be required from the point of service. The point of service shall mean the
location where a driver comes face to face with an employee of the business
and remits payment and /or is provided with goods purchased.
B. All other non -food or beverage related commercial services with a drive -thru shall
maintain a queue of two (2) spaces per lane.
C. Each queuing space shall be at least eight (8) feet in width and at least twenty
(20) feet in length. A proper turning radius shall be provided at all corners and
turns in a queuing line.
C. Queuing lines or spaces shall not be used for thru- traffic and shall not be
calculated into any required driveways or aisles for any parking lot. These lanes
shall be designed to not impact traffic -flow in a parking lot. All queuing lanes
shall be clearly striped or shall be surrounded by curbing.
12
9.4 AMERICANS WITH DISABILITIES ACT COMPLIANCE
All new parking lots and parking stalls shall be designed in accordance with ADA
requirements. ADA requirements shall be set by the State of Oklahoma in adopted
building codes. The required number of accessible parking spaces shall be provided
and the spaces provided shall meet the accessible standards.
All required ADA parking stalls shall be striped and shall be provided with signage in
accordance with State building codes. Said parking stalls shall be maintained to meet
these standards at all times.
The number of required parking spaces shall be consistent with adopted State building
code standards.
9.5 RESIDENTIAL OFF - STREET PARKING SPACES - RS AND RE DISTRICTS
A. GENERAL PROVISIONS
1. In a residential district, no unenclosed part of a front yard, side yard, or rear yard
shall be used as a parking space for a motor vehicle, boat, trailer, or other vehicle
except upon a hard - surfaced driveway or parking pad.
2. All driveways and parking areas shall be fully paved, have driveway ribbons, or use
permeable material as defined in this chapter.
Curbs cuts for all residential driveways shall meet the City of Owasso standards.
Driveways shall be a minimum of ten (10) and a maximum of thirty -five (35) feet in
width. All driveways or other improvements that require cutting or modifying a City
sidewalk, curb, gutter, storm water conveyance system or street shall require a
curb cut permit through the City of Owasso. All curb cuts or association
modifications shall follow City of Owasso Design Standards.
4. One (1) additional parking pad may be constructed on lots that have the required
two (2) off - street parking spaces. The parking pad shall be designed to cover the
entire undercarriage of the vehicle placed upon it. The parking pad shall be
accessible only from a driveway. Parking pads shall not be accessed by driving
over existing curbs or through lawn areas. The additional parking pad may be
constructed with any concrete, asphalt, permeable paving system or with clean
washed gravel upon approval by the Community Development Administrator. In
any application that uses gravel, the area shall be constructed on a stable base,
shall have an underlayment or filter fabric beneath all gravel, and shall have
edging that keeps all gravel in the parking area. These areas shall be properly
maintained with sufficient gravel and shall be kept free of weeds and other
vegetation. All gravel shall be kept off sidewalks and out of public rights -of -way.
B. DRIVEWAYS
Ribbon Driveways or Paving Strips. Driveways can be constructed with concrete or
hard - surfaced paving strips placed for vehicle wheel travel. These ribbons can be
constructed of concrete, asphalt, pavers or other materials approved by the
13
Community Development Administrator. The areas outside the ribbons can be
filled with landscaping, grass, mulch, gravel or other approved materials. All areas
containing grass or vegetation shall be maintained according to City Code.
Areas containing mulch, gravel or other material shall contain proper edges or
barriers to keep the material in the specified area and shall be maintained free of
grass and weeds. See Figure 9.7 below.
2. Access to the driveway shall be limited to properly approved curb cuts or other
approved access points.
3. All portions of the driveway, sidewalk and driveway apron located within the right -
of -way shall be constructed of contiguous concrete or asphalt and shall meet all
City standards.
i
Figure 9.8
Driveway Ribbons
14
9.6 DEFINITIONS
ADMINISTRATOR: The term 'Administrator' shall be used to define the Community
Development Director, the City Planner or their designee.
COMPACT PARKING: A parking stall that is designed to accommodate smaller vehicles.
The stall is designed to be six (6) inches narrower and three (3) feet shorter than standard
parking stalls.
EGRESS: A means or place of going out. An exit.
INGRESS: A means or place of entering. The act of coming in. An entrance.
PAVEMENT. Surface constructed of double bituminous concrete or asphaltic concrete.
PERMEABLE PAVING: Systems such as pavers, 'grasscrete', permeable asphalt, and
other approved applications.
POINT OF SERVICE. The location where a driver comes face to face with an employee of
the business and remits payment and /or is provided with goods purchased. In locations
with two service windows, the first in line shall be considered the point of service.
QUEUING: A place where a vehicle awaits service in a line designated only for that use.
SIGHT TRIANGLE. A triangle at an intersection, formed by the two roads or rights -of -way
and a third line, which must be kept clear of obstructions such as hedges so that people
in one road can see cars approaching on the other.
SECTION TWO (2): REPEALER
All ordinances or parts of ordinances in conflict with this ordinance are hereby repealed to the
extent of the conflict only.
SECTION THREE (3): SEVERABILITY
If any part or parts of this ordinance are deemed unconstitutional, invalid or ineffective, the
remaining portion shall not be affected but shall remain in full force and effect.
SECTION FOUR (4): DECLARING AN EFFECTIVE DATE
The provisions of this ordinance shall become effective thirty (30) days from the date of final
passage as provided by state law.
SECTION FIVE (5): CODIFICATION
The City of Owasso Zoning Code, Chapter 9, Off - Street Parking Requirements, as codified in the
Owasso Code of Ordinances, Part 12, Planning, Zoning and Development, Chapter 2, Zoning
Regulations, is hereby amended as set forth above.
15
PASSED AND APPROVED this _day of , 2012.
ATTEST:
Sherry Bishop, City Clerk
(SEAL)
APPROVED AS TO FORM:
Julie Lombardi, City Attorney
16
Doug Bonebrake, Mayor
Oe T City Wit out Limits.
TO: Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
City Planner
SUBJECT: Partial Utility Easement Closure Request
DATE: March 16, 2012
BACKGROUND:
The City of Owasso has received a request from Bryan and Lisa Wilson for the closing of a
portion of a utility easement in the Nottingham Estates neighborhood located at13804 E. 93rd
Cf. N, further described as Lot 34, Block 5, Nottingham Estates III.
The property owners, Bryan and Lisa Wilson, approached the City of Owasso when a survey
performed on their property revealed that a structure was partially located within a utility
easement. A pool and spa were constructed on the property with the proper permits, but
during construction a mistake was made and a small portion of the spa encroached into the
17.5 foot utility easement located at the rear of the property. Staff notified the applicants that
the appropriate process was to proceed through the closing and vacation of the portion of
the easement where the structure was located. The applicants are requesting to close an
area of the easement approximately two (2) feet by ten (10) feet, thus clearing the title issues
associated with having a structure within an easement.
Required notice was sent to all franchise utility companies and to property owners adjacent
to the subject property. The City of Owasso Public Works Department was also notified of the
proposed closing of the portion of the easement. After inspection, Public Works staff workers
indicated that they could still service the City utilities located within the easement and don't
foresee any issues with the closing of this portion of the easement. No other utilities appear to
be affected by the closing of this portion of the easement.
The Technical Advisory Committee reviewed the request at their February 22, 2012 meeting.
No comments or concerns were expressed at the meeting. If this item is approved by the
City Council, staff will prepare a closing ordinance for Council consideration.
RECOMMENDATION:
Staff recommends City Council approval of the utility easement closure request located at
13804 E. 93rd Cf. N, Lot 34, Block 5, Nottingham Estates III.
ATTACHMENTS:
1. Location Map
2. Legal Description Exhibits
3. Survey of Record
13804 East 93rd Court North
T
77
71
O O
31 i
F
I �
HI
-
e
w.
i`
1" = 376 ft
Partial Easement
Closure
02/08/2012
,lit
'£
his map represents a visual display of related geographic information- Data provided hereon is not a guarantee of actual field conditions. To be sure of complete accuracy,
please contact Owasso staff for the most up-to -date information-
UTILITY EASEMENT LEGAL DESCRIPTION
reel
BRYAN & LISA WILSON
13804 E. 93RD CT. N.
OWASSO, OK 74055
THIS DESCRIPTION IS CREATED FOR THE PURPOSE OF VACATING THE PLATTED 17.5' UTILITY EASEMENT
ON THE EAST SIDE OF LOT 34, BLOCK 5, NOTTINGHAM ESTATES III, AND CREATING A NEW, SMALLER
UTILITY EASEMENT ALLOWING FOR 8.0' OF HORIZONTAL DISTANCE FROM THE UNDERGROUND
SANITARY SEWER LINE AS DEFINED BY THE CENTERLINE OF THE FOUND SANITARY SEWER MANHOLES.
THE FOLLOWING DESCRIPTION WAS CREATED BY ANDY FRITZ, OK PLS 1694 OF FRITZ LAND SURVEYING,
LLC ON DECEMBER 11, 2011. THE BASIS OF BEARING IS PER THE RECORDED PLAT.
A TRACT OF LAND THAT IS PART OF LOT THIRTY -FOUR (34), BLOCK FIVE (5), NOTTINGHAM ESTATES III,
AN ADDITION TO THE CITY OF OWASSO, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO THE
RECORDED PLAT NO. 5384 BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHERN MOST CORNER OF SAID LOT 34, BLOCK 5, NOTTINGHAM ESTATES III;
THENCE SOUTH 62 °59'36" EAST ALONG THE NORTHEASTERLY LOT LINE A DISTANCE OF 15.69 FEET TO
THE NORTHEASTERLY CORNER OF SAID LOT; THENCE SOUTH 00 °08'49" WEST ALONG THE EAST LOT LINE
A DISTANCE OF 208.88 FEET TO THE SOUTHEAST CORNER OF SAID LOT; THENCE NORTH 68 °36'22" WEST
ALONG THE SOUTH LOT LINE A DISTANCE OF 13.66 FEET; THENCE NORTH 00 °11'46" WEST A DISTANCE
OF 191.35 FEET; THENCE NORTH 62°59'36" WEST A DISTANCE OF 16.87 FEET TO THE NORTHWESTERLY
LOT LINE; THENCE NORTH 51 °14'00" EAST ALONG THE NORTHWESTERLY LOT LINE A DISTANCE OF 19.19
FEET TO THE POINT OF BEGINNING.
o "_ ........... -.TAA
An •''•..
` Fritz
ANDY FRITZ, PLS 1694
OK LIC.# 1694
City of Owasso
Attn: Bronce Stevenson
111 N. Main
Owasso, OK. 74055
Dear Mr. Stevenson,
January 4, 2012
Please find included in this letter a utility easement legal description and plat of survey for our home
residence located at 13804 E. 93`d Ct N. Owasso, OK. As we discussed in our meeting, we are requesting
a closing of a portion of the easement that is currently running through our back yard. The attached
legal description outlines the amount of variance that we are requesting. Once the closing is approved,
we will be filing with the District Court to vacate the easement.
If you need any additional information from me, please feel free to email or call. My email address is
lisa.wilson @oaktreesoftware.com. My cell phone is 918 -697 -5774 and work number is 918 - 584 -7900.
Si c rely,,
Lisa Wilson
PLAT OFSURVEY
PROPERTY ADDUS.g: 13804 EAST 93RD COURT NORTH, OWASSO, OK 74055
HD4MB2VS'.S4M BRYAN & LISA WILSON
SURVEXQM-fLFP.rtT: BRYAN & LISA WILSON
LAND D WJRln O ..A_ PROVJD_W: LOT THIRTY -FOUR (34), BLOCK FIVE (5), NOTTINGHAM ESTATES III, AN ADDITION TO
THE CITY OF OWASSO, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO THE RECORDED PLAT NO. 5384.
FOUND 3/8' IRON
FOUND 1/2' IRON PIN WITH ORANGE CAP
PIN WITH YELLOW CAP S, -
sURVEYDRIMTF F ?S
DATE OF LAST SITE VISIT WAS NOV. 30, 2011.
- BASIS OF BEARING IS PER THE RECORDED PLAT, NO,
- UNDERGROUND UTILITIES ARE SHOWN AS LOCATED BY OKIE TICKET #1111 1010450863.
THE SURVEYOR WAS NOT CONTRACTED TO PERFORM A RECORDS SEARCH NOR WAS THE SURVEYOR
PROVIDED ANY ADDITIONAL DOCUMENTATION PERTAINING TO THE SUBJECT PROPERTY. EASEMENTS
/ 2 �
AND OTHER RECORDED DOCUMENTS MAY EXIST THAT AFFECT THE SUBJECT PROPERTY. i I
E - E - E = UNDERGROUND ELECTRIC_
T - T - T = UNDERGROUND TELEPHONE / FIBER OPTICS. I
- - SS - SS - SS -®= UNDERGROUND SANITARY SEWER AND MANHOLES.
X - X - X - 6' WOOD PRIVACY FENCING AS SHOWN. p
�.a DECORATIVE WROUGHT IRON FENCING AS SHOWN"
CL - CL - CL = CENTERLINE OF EXISTING CONCRETE FOOTINGS. •
`ktt0 = ELECTRIC PEDESTAL.
M - TELEPHONE PEDESTAL.
DRAWING SCALE
FOUND 3/8' IRON
' PIN WITH ORANGE CAP ::'
O ,
E. 93RD CT. N.
`
CUL -DE -SAC
i
tCAP
� N
�
czi
Iz
FOUND 3/8' IRON
PIN WITH ORANGE
.�
\
\
18' BRICK
RETAINING WALL
_ -
SURVEYDR S TATEHENT
FRITZ LAND SURVEYING, LLC AND THE UNDERSIGNED PROFESSIONAL LAND
SURVEYOR, UNDEKCERTIFICATE OF AUTHORIZATION CA 95848, DO HEREBY STATE
THAT THIS PLAT OF SURVEY IS A TRUE AND ACCURATE REPRESENTATION OF THE
SURVEY MADE ON THE GROUND BY ANDY FRITZ, PLS AND OF THE FACTS AS FOUND AT
THE TIME OF THE SURVEY AND THAT THIS PLAT MEETS OR EXCEEDS THE MINIMUM
TECHNICAL STANDARDS ADOPTED BY THE OKLAHOMA STATE BOARD OF LICENSURE
FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS.
PBEPAMD-a
FRITZ LAND SURVEYING, LLC
PO BOX 54372
TULSA, OK 74155
PH.' 918.231.0575
FRITZPLSr@YAHOO.COM
FLS# 11130 WLSON
JI'ITNESS MY HAND AND SEAL THIS
IITHDAYOFDF.CF"MBER" 2011.
z
IR
I°
I�
NEW UTILITY
ESMNT. SEE
\ x ATTACHED
x\
�k\\
x
18' BRICK � � \ j
RETAINING WALL `Y
I
I �
a
i I
a a
I I
p
f
i
4
I
i
I
I
I
•T
0
N
W
0
g
N
N sg36
FOUND 3/8' IRON
PIN WITH ORANGE CAP
Andy
Fritz
�KLAKOV,�
AND'-" RITZ, PLS
OK LIC. 1694
Oe T 0 CO. Wit out Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
City Planner
SUBJECT: Proposed Zoning Code Amendment- US -169 North Overlay- Public Hearing
DATE: March 16, 2012
BACKGROUND:
Overlay districts are flexible land use control tools that establish additional development
standards over the base zoning districts. Typically, overlay districts are used to protect areas from
undesirable uses, control architecture and design, require additional landscaping beyond the
base standards, or encourage mixing residential and business activity to support pedestrian
oriented development. The Community Development Department has been working on an
overlay for the northern portion of the US -169 corridor for over a year. The purpose of this overlay
is to develop a basic set of design standards that will ensure the orderly development of the
area, while protecting the investments made by businesses in the area and making the area
attractive to new industry.
The proposed Overlay District for the US -169 North Corridor is situated between East 86th Street
North and East 126th Street North in consideration of the belief that there should be protections
and standards in place for an area that will likely see the next wave of rapid growth and
development, that will be an important for Owasso's future. This overlay continues building on
the Quality of Life Plan principles and encourages sustainable development that will become a
long term asset to Owasso. Being along the major corridor in Owasso, this overlay is designed to
protect an area that represents a significant opportunity for business and corporate investment,
important to the long term economic health of Owasso. Great opportunities abound within this
corridor and this overlay proposes to establish uses and regulations that promote an
environment of business, learning, and growth.
Overall, this proposed US -169 North Corridor Overlay District - North seeks to establish regulations
that protect the investment of landowners as well as new businesses and corporations, from
unattractive, non - compatible uses and ensure the area is visually pleasing, sustainable, and
developed in a coordinated fashion. Further, the overlay will ensure consistency in
development, which will ensure property values are maintained and continue to increase.
PROPOSED AMENDMENT TO THE ZONING CODE:
The proposed amendment to the City of Owasso Zoning Code will add new Section 870, US -169
North Overlay to Chapter 8, Planned Unit Developments and Overlay Districts.
PUBLIC INPUT:
On March 5, 2012, the Community Development Department held an open house for the
general public to present information about the overlay and answer questions. Most of the
concerns were related to a perception that the overlay was an attempt to annex properties
within the overlay that are currently outside City limits. Staff answered these questions and
explained that this overlay is intended to protect homes in the area, ensure that quality
development occurs in the northern portions of Owasso, and ensure that Owasso remain an
attractive place for retail and corporate development. In addition to the public meeting, staff
created a Facebook page for the overlay and also posted the proposed ordinance on the
City's website for review and comment.
The City Council will hold a public hearing at their regular meeting on March 20. This will allow
the public to express their concerns and /or support for the proposed overlay. Staff will be
available to answer any questions from the City Council. Once the public hearing is concluded,
no action will be required. An ordinance will be brought to a future City Council meeting for
consideration.
PLANNING COMMISSION:
The Owasso Planning Commission reviewed this item at their regular meeting on March 12, 2012.
At that meeting, the Planning Commission held a public hearing. Upon closing the public
hearing, the Planning Commission voted 5 -0 to recommend that the City Council approve the
US -169 North overlay.
ATTACHMENTS:
New Proposed Section 870, US -169 North Overlay
CITY OF OWASSO ZONING ORDINANCE ArticleXX
860.4 US -169 CORRIDOR OVERLAY DISTRICT -NORTH
Definition. An overlay district is the application of an additional layer of development
standards, regulations or exceptions that modifies existing land use regulations. It
acts as a supplement to the underlying zoning designation.
860.4.1. PURPOSE
• Encourage sustainable development that will become a long term asset to
Owasso
• Protect an area that represents a significant opportunity for business and
corporate investment, important to the long term economic health of
Owasso
• Establish uses and regulations that promote the development of this area
as a corridor that promotes an environment of business, learning and
growth
• Protect the area around Tulsa Technology Center from uses that may have
a detrimental impact on the facility and the City's ability to attract
quality development
• Establish regulations that protect the investment of existing and new
businesses and corporations from unattractive, non - compatible uses
• Ensure the area is visually pleasing, sustainable, and developed in a
coordinated fashion
• Ensure a high quality of development that will ultimately generate an
economically enhanced and pedestrian friendly area for Owasso.
• Follow the principals of the Quality of Life Initiative
860.4.2 US -169 CORRIDOR OVERLAY DESIGNATED
The District covers an area roughly 1/a to 1/2 mile on either side of US -169 from
86th Street North to 126th Street North, and is depicted in figure 860.2 -1 and
defined on the official zoning map.
860.4.3 PERMITTED USES
The base zoning districts of properties fully or partially within the designated
overlay district shall not be affected except as noted in this chapter. All
applicable regulations for use, yard, area, lot dimensions, utility placement,
and landscaping shall be those specified for each district, including planned
I Adopted XXX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
development stipulations. Where any of the above regulations conflict with
those of the overlay district, the more restrictive shall apply.
it. N.
v
z
- 126th St. N.
116th St. N
v
w
m
N
106th St. N.
.c'
r-
TulsaTechnolegy; r '
Tulsa COMMUlliity
College
�1 !j
� l
5,i i rS L'ti
86th St. N.
N
.
3,400 1,700 0 3,400 Feet j . ,:'
It i�-.; —!
Figure 860.2 -1
US -169 Overlay
2
Adapted XXX
ri
�
Q
w
.c'
r-
TulsaTechnolegy; r '
Tulsa COMMUlliity
College
�1 !j
� l
5,i i rS L'ti
86th St. N.
N
.
3,400 1,700 0 3,400 Feet j . ,:'
It i�-.; —!
Figure 860.2 -1
US -169 Overlay
2
Adapted XXX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
A. USE RESTRICTIONS
1. In AG districts, only existing agricultural uses shall be permitted and shall
be subject to all applicable standards and regulations in Section 300 -330.
No Specific Use Permits shall be issued for any land zoned AG and no new
AG uses or businesses shall be allowed.
2. In each zoning district, all uses respective to that district shall be
permitted by right or with the issuance of a Specific Use Permit, except for
those listed below in Section 860.2.3 A.3.
3. Allowed Uses. Within the US -169 North Overlay, unless otherwise restricted,
any use permitted, or with a specific use permit in the underlying zoning
district shall be permitted. All uses shall be defined by the most recent
version of the NAICS (North American Industry Classification System) book.
Upon annexation all tracts of land shall be zoned commercial, office or in
conformity to the existing adopted land use plan in effect at the time of
the annexation. New residential development of any kind shall be
developed as a Planned Unit Development (PUD)
4. The following By -Right and Specific Use Permit uses shall be prohibited in
the US -169 North Overlay District.
• Industrial Uses in the IH and IM District
• Any new agricultural uses or businesses
• Chick hatchery
• Halfway house
• Landfill
• Bindery
• Casino /Gaming Center
• Juvenile Delinquency Center
• Pre - Release Center
• Animal and Poultry Raising
• Power Plant
• Sexually- oriented businesses
• Bottled Gas Sales
• Outdoor Kennels (not a part of veterinary or grooming business)
• Taxidermist
• Cemetery
• Oil Well Drilling and Cleaning Establishment
• Fuel oil sales woes not include gas station or convenience store)
• Race tracks (auto, dog, horse)
• Mini - storage warehouses
• Truck stop
• Shooting range (outdoor)
3 Adopted XXX
CITY OF OWASSO ZONING ORDINANCE ArdcleXX
• Drag strip
• Outdoor storage of any kind as the principal use
• Portable building sales
• Cesspool Cleaning
• Concrete Construction Service
5. The following uses shall be permitted with the issuance of a Specific Use
Permit, subject to compliance with the provisions of this section.
• Auctioneer
• Auto wash
• Agricultural implement sales
• Appliance store and repair
• Woodworking shop
• Aircraft sales
• Boat and Recreational Vehicle sales
• Fence construction company
• Golf Driving range
• Truck rentals
• Monument sales
• Camper Sales
• Disinfecting Services
• Lumber yard
• Cabinet Maker
• Plastic material sales
• Construction equipment sales
• Go -kart track
• Outdoor Recreation including amusement parks
• Auto Sales (5 Acre Maximum Parcel Size)
• Auto Rental
• Motor vehicle repair
• Retail greenhouse
• Janitorial service Vending sales and service
• Exterminating services
• Bus station
• Any retail use with primarily outdoor sales
• Park and ride lots
• Motorcycle Sales
860.4.4 NON - CONFORMING USES
Existing, but non - conforming properties, which existed as of the date these
regulations became effective, shall be allowed to continue in the same
manner after the adoption of these regulations. However, such non-
conforming properties must be brought into compliance with these
regulations when:
1. A property is annexed into the City;
4 Adopted XXX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
2. A property owner requests any zoning change;
3. The principle use on the property is discontinued for a period of six
calendar months;
4. The property is destroyed or significantly altered (60% or greater);
5. Existing access connections are altered or new access connections are
requested;
6. Enlargements or improvements are made to the property that increase
the gross square footage by 25 %; or
7. When any change as identified above occurs, the property owner must
demonstrate that the change to the property shall not significantly impair
the safe and efficient flow of traffic within the study area. The
Administrator may require the property owner to provide a site specific
traffic study to determine the potential impacts of the proposed changes
as part of the site development plan.
860.4.5 EXISTING USES
A_ . SINGLE FAMILY RESIDENTIAL - The US -169 North Overlay shall not affect
existing single family residential uses, neighborhoods, or platted residential
developments. Said uses may continue to exist in perpetuity until such time
as they may be redeveloped or rezoned for another use.
B. PROPERTIES OUTSIDE OWASSO CITY LIMITS - This overlay covers areas
that are currently outside of Owasso City Limits. Until these properties are
annexed into Owasso City Limits, they shall not be required to comply with
the regulations of this chapter. Once annexed, these properties shall be
subject to the regulations set forth in this chapter.
860.4.6 LANDSCAPE REQURRMENTS
Development and or redevelopment shall comply with Chapter 20 of the
Owasso Zoning Code with the following additional requirement:
1. All signage shall have shrubs and /or perennial flowers at the base. Said
shrub /flower bed shall and be enclosed with an edging material such as
brick, stone, steel edging, concrete or similar material.
860.4.7 GENERAL REQUIREMENTS
1. All development shall follow City of Owasso procedures and requirements
described in Section 2, General Provision, except as noted in this Section.
2. Architectural details and /or drawings shall be submitted to the
Community Development Department at the time of site plan submittal.
Architectural plans shall depict architectural details outlined in this
Section and shall consist of:
5 Adopted XXX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
a. Preliminary renderings or drawings of building elevations plus typical
cross sections to clearly define the character of the project and to
ensure these provisions are met; and
b. Exterior building materials inventory to indicate compliance with this
Section. The Administrator shall review the proposed building
materials for compliance.
860.4.8 DESIGN CONSIDERATIONS
Developments shall be evaluated using the following criteria
A. COMPATABILITY
Adjacent buildings shall relate in similarity of architectural style, roof style,
and configuration.
B. PROPORTIONS
Windows, doors, columns, piers, projections, ribs, awnings, cornices,
parapets, eaves, and other building components shall be proportional to the
overall scale of the building. Windows should be greater in height than width,
unless otherwise required by a specific design feature or architectural style.
860.4.9 BUILDING AND SITE DESIGN STANDARDS
A. BUILDING ENTRANCE
Primary building entrances shall be clearly defined, and shall be recessed or
framed by a sheltering element such as an awning, arcade, overhang, or
portico (in order to provide weather protection for pedestrians). Public
entrances flush with the building wall with no cover are not allowed. (See
Figure 860.2 -3)
Figure 860.2 -3
6 Adopted XXX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
B. BOULEVARD ENTRANCE
For developments containing total floor area in excess of 50,000 square feet,
the principal access into the site shall be a boulevard incorporating a 10 -foot
wide landscaped center median.
C. OFF STREET PARKING
Off street parking areas are encouraged to be located to the side or rear of
buildings or in the interior of a block whenever possible. See Figure 860.2 -4.
Off- street parking located between the front of the building and the street
right -of -way shall be limited to two rows plus the drive aisle. See figure 860.2-
5. Loading areas shall be located behind the main building and screened in
accordance with Chapter 20. All parking lots, drives, aisles and other elements
shall comply with Chapter 9 of the Owasso Zoning Code.
Al
�r
.i.
.a. � ■�� Vii'.:.
od
+ I .i
pn,
1� a� rim 46F
Figure 860.2 -4
Preferred Off- Street Parking
Configurations
7 Adopted X)Y
CITY OF OWASSO ZONING ORDINANCE ArticleXX
Figure 860.2 -5
Acceptable Front Yard Parking
Configuration
D. BUILDING SETBACK
It is the intent of this chapter to enhance and preserve the character of the
overlay by placing parking areas to the rear of lots or along the sides of
buildings and bring visually pleasing building architecture to the front,
therefore building setbacks along highway frontage roads may be reduced to 20
feet.
E. TRANSIT STOPS
All transit stops shall be covered to offer shade and shelter from the elements.
F. OUTDOOR SPACE
Each site with a building larger than 10,000 square feet shall be designed to
include public pedestrian walkways internally and throughout the development,
linking all areas and buildings facilities open to the public, and shall include
one (1) or more plazas or courtyards with benches, or patios /seating areas.
For single developments containing total floor area in excess of 80,000 square
feet, at least one (1) outdoor space or site amenity shall be required on the
site or on adjacent land, in addition to the required plaza or courtyard area.
8 Adopted XXX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
All features shall be accessible, useable spaces. Outdoor Space or Site
Amenities may include, but are not limited to:
1. Window shopping walkway
2. Water feature
3. Clock tower
4. Seating walls
5. Benches
6. Courtyards or plazas
7. Fountains
8. Sculpture or public art
The Administrator may approve any other such deliberately shaped area or
focal feature or amenity that, in the judgment of the Administrator,
adequately enhances such community and public spaces.
G. SIDEWALKS
All buildings, parking areas, public spaces, amenity features, and adjoining
developments of similar use, shall be linked with sidewalks. Sidewalks shall be
provided along public streets that provide access to the development.
Sidewalks shall be constructed in accordance with the standards for sidewalks
as set forth in City of Owasso Engineering Standards.
H. EXTERIOR MATERIALS
Exterior building materials shall include brick, split -faced concrete block,
stone, stucco, synthetic stucco, or cement -board or wood siding. Metal may be
used as accent material, and cumulatively may not exceed 20 percent of the
area of any individual exterior wall. All windows and doors to customer service
areas along building frontages at the ground floor level on any retail building
shall be transparent.
1. MULTIPLE BUILDINGS IN COMMERCIAL CENTERS
In order to achieve unity between all buildings in a commercial
development consisting of more than one building, all buildings in such a
development, including pad site buildings, shall employ a consistent
architectural style or theme, be constructed of similar exterior materials,
and feature similar colors. Design criteria for large and multi -phase
developments shall be provided for review.
I. ROOF PITCH
Flat roofs and roofs with a pitch of less than 3:12 require a parapet wall. Eaves
a minimum of one (1) foot from the building face shall profile a pitched roof.
Roofing for pitched roofs greater than 6:12 shall be wood, tile, slate,
architectural asphalt shingles, or low - reflectivity metal (flat or matte finish).
Applied mansard roofs shall not be permitted.
9 Adopted XVY
CITY OF OWASSO ZONING ORDINANCE ArtideXX
J. PARAPET WALLS
Parapet walls shall be a minimum of 2 feet and a maximum of 6 feet in height.
K. ELECTRICAL AND SERVICES EQUIPMENT
HVAC and similar types of incidental machinery or equipment shall be screened
from view in accordance with Chapter 20. Utility meters, aboveground tanks,
satellite dishes and antennas shall also be screened from view. Wall- mounted
mechanical equipment that extends six inches (6 ") or less from the outer
building wall shall be designed to blend in with the color and architectural
design of the subject building. Unless a waiver is authorized by the City
Council, all electrical and telephone lines and wires including, but not limited
to, street lighting, shall be placed underground. Feeder and other major
transmission lines may remain overhead. All utility installation shall conform to
the City's adopted Technical Standards and Specifications.
L. WALL ARTICULATION
Facades shall have a recognizable "base" consisting of (but not limited to):
walls, ledges, sills, integrally textured materials (such as stone or other
masonry), integrally colored and patterned materials, or planters. Facades
shall also have a recognizable "top" consisting of (but not limited to): cornice
treatments with integrally textured materials (other than colored "stripes" or
"bands "), sloping roofs (with overhangs and brackets), or stepped parapets. All
sides of a building and any accessory structure shall utilize materials and design
characteristics consistent with those of the front facade. In order to prevent
large flat expanses of featureless exterior walls, structures having single walls
exceeding fifty feet (50') in length shall incorporate two or more of the
following features at least every fifty feet (50') in length (See Figure 860.2 -6):
1. Changes in color, graphical patterning, changes in texture, or changes in
material
2. Projections, recesses, and reveals, expressing structural bays or other
aspects of the architecture with a minimum change of plane of twelve
inches (12 ")
3. Windows and fenestration
4. Gable projections
5. Horizontal /vertical breaks
6. Other similar techniques
The Administrator may approve variations or alternate treatments, so long
as the intent of the ordinance is met.
10 Adopted XAX
CITY OF OWASSO ZONING ORDINANCE ArticleAN
Figure 860.2.6
M. SIGNAGE
Signs shall be permitted in accordance with Chapter 18 of the Owasso Zoning
Code, with the following exceptions:
1. Pole signs of any type over twenty five (25) feet in height are
prohibited. Pole signs shall only be allowed on parcels adjacent to
US -169.
2. All signs not attached to buildings shall be of monument form and
constructed of materials that compliment the main building(s).
3. All signs not attached to buildings shall be set in a landscaped bed.
4. Maximum height shall be twenty five (25) feet for property with
frontage on US -169 and SH -20.
11 Adopted XAX
CITY OF OWASSO ZONING ORDINANCE ArticleXX
5. Maximum height shall be twenty (20) feet for property with frontage
on all arterial roads.
6. Maximum height for signage shall be ten (10) feet for all other public
roads.
7. Full video message boards and signs are prohibited within the Overlay
District.
N. BUILDING ORIENTATION
All primary buildings on lots or tracts with frontage on the highway shall be
oriented towards the highway. If any such building is on a lot or tract with a
second frontage, it shall have equally detailed and prominent facades,
constructed of equally high quality materials, facing both the highway and
the secondary street. All buildings should be oriented towards the front of
the lot, with parking lots towards the rear or alongside buildings.
0. COMMERICIAL DRIVE THROUGH LANES
Drive - through facilities associated with commercial uses shall be
architecturally integrated with the building.
Q. OUTDOOR DISPLAY AND SALES
All outdoor display or sales areas shall be shown on the site plan and shall
encompass less than 20% of the area of the building footprint. Said display
area shall be landscaped to provide definition of the area.
R. SCREEENING OF REFUSE COLLECTION AND LOADING AREAS
Refuse collection areas shall be screened in accordance with Chapter 20. In
order to reduce the visual and acoustic impacts of these functions on
adjacent properties and public streets, non - enclosed service, storage, and
off - street loading areas shall be screened with opaque sight - obscuring walls
and /or fences of between six feet (6') and eight feet (8') in height made of
durable materials. Screening materials shall be the same as, or of equal
quality to, the materials used for the primary building and landscaping.
12 Adopted X X
9 Oe T City Wit out Limits.
TO:
The Honorable Mayor and City Council
City of Owasso
FROM:
Karl Fritschen
Community Development Director
SUBJECT:
Public Hearing for the Utilization of 2012 CDBG Funding
DATE:
March 16, 2012
BACKGROUND:
As a member of the Tulsa Urban County Community Development Block Grant (CDBG) program,
the City of Owasso is eligible to apply for CDBG funds for 2012. INCOG has provided staff with the
application for the 2012 CDBG funding cycle, which indicates the City will receive $113,845.
The primary National Objective of the Community Development Block Grant (CDBG) Program is the
"development of viable urban communities by providing decent housing and a suitable living
environment, particularly for persons of low and moderate incomes." All project proposals
submitted for funding through the CDBG Program must document the achievement of at least one
of the following national objectives:
➢ Provide benefit to low and moderate income persons
➢ Aid in the prevention or elimination of slums or blight
➢ Meet other community development needs having particular urgency, posing a serious or
immediate threat to the health or welfare of a community
To qualify for CDBG funding under the National Objective of benefit to low and moderate income
persons, the proposed project activities must show a positive or general improvement of living
conditions in a definable geographic target area where at least 51% of the occupied households
are of low and moderate income families. Low and moderate income families have an income
equal to or less than the current Section 8 low income limits established by the United States
Department of Housing and Urban Development (HUD). Each activity proposed for funding with
Community Development Block Grant(CDBG) dollars claiming the National Objective of benefit to
low and moderate income persons, must provide data indicating the percentage of low and
moderate income beneficiaries. In the past, Owasso has utilized CDBG monies for making sidewalk
improvements, sewer improvements, and the Rayola Park project. Last year's allocation was used
for a major upgrade to the Owasso skate park located near South Main and East 5t" Avenue.
PUBLIC MEETING:
In accordance with the Department of Housing and Urban Development (HUD) guidelines, a public
meeting was held at the Owasso Community Center on February 23, 2012 to educate citizens
about the CDBG program and solicit input for potential projects. One citizen and four
representatives of a non - profit group, Hope Hospice, were in attendance. The Neighborhood
Coordinator, Jerry Fowler, along with various other City staff members, and a representative from
INCOG were also in attendance. At the meeting, the following projects were presented:
➢ Representatives from Hope Hospice expressed interest in utilizing the CDBG money for a
permanent manned facility to care for the terminally ill
➢ One citizen mentioned using the money for purchasing new, updated playground
equipment for Rayola Park to replace the old, outdated equipment
➢ Neighborhood Coordinator, Mr. Fowler, mentioned that he had been approached by a
few citizens asking about street repair and sidewalk repair
CIP MEETING:
On February 27, 2012 staff presented to the
presentation as the one given to the public on
also provided a list of projects that the citizen s
funding.
CITY COUNCIL WORK SESSION:
CIP Committee the same CDBG funding process
February 23. At that meeting, the committee was
mentioned they would like to see considered for
At the March 13, 2012 City Council Work Session, Staff presented a summary of the public meeting
results and CIP Committee meeting comments. Of the various projects discussed, the following was
suggested for utilization of the 2012 CDBG funds:
➢ Repair, installation, and rehabilitation of sidewalks, curb, and gutter
The specific locations of the suggested project improvements will be defined in the coming months
and coordinated with input from the Public Works Department.
Other projects that were considered include the following: new playground equipment in Rayola
Park, street rehabilitation, and Hope Hospice facility.
The second part of the process to receive funding through the CDBG program is the approval of a
resolution, whereby the City of Owasso requests CDBG funds for fiscal year 2012 and authorizes the
Mayor to sign the application for the approved project. Once a Public Hearing has been held and
citizen comments have been received and reviewed, staff intends to bring the necessary resolution
before the City Council for consideration and appropriate action at the April 3, 2012 Regular
Meeting.
RECOMMENDATION:
The next step of the CDBG process is for the City of Owasso to conduct a public hearing for a
proposed project as to how the grant funds should be utilized. At this time, based on the
aforementioned meetings and application criteria, staff recommends the 2012 CDBG funds be
utilized for the following project:
➢ Repair, installation, and rehabilitation of sidewalks, curbing and gutter within the CDBG
qualifying areas
ATTACHMENTS:
A. Notice of Public Hearing
B. 2012 CDBG Grant Application
C. Map of Qualifying Areas
aaa4f1il00ge
Notice filed in the office of the City Clerk and posted at City Hall 9L %S ,MKpo't %
Monday, March 12, 2012. ® ®® G� ° °•• °' ° °'° 0° ®i®
Juliann Stevens, De uty Cry rk
r y
�+ .•��
0 �e'4
NOTICE OF TULSA COUNTY °a® OMA o >�
COMMUNITY DEVELOPMENT BLOCK GRANT 111,11s°°°aaO,
OWASSO FY 2012 NEEDS PUBLIC HEARING
A Public Hearing will be held at 6:30 PM on March 20, 2012 in the City Council
Meeting Room at 109 North Birch, Owasso, to receive recommendations on
community development needs for the City of Owasso as a member of the Tulsa
County CDBG Urban County. The amount of funds allocated to the City of
Owasso is $113,845.00
Recommendations received will be considered by the Owasso City Council, the
CDBG Urban County Policy Committee and the INCOG staff in developing
Owasso's annual Metro City application. Comments or proposals, where
feasible, will be incorporated into the FY 2012 application to be submitted to
INCOG.
Anyone requiring special accommodations pursuant to the Americans with
Disabilities Act should notify Brian Dempster at 918/3761544.
FY2012 METRO CITY APPLICATION GUIDANCE
Due date for this Application is April 4, 2012
The CDBG program is authorized under Title I of the Housing and Community
Development Act of 1974, as amended.
The purpose of this Application Guidance is to provide assistance in preparing a
Community Development Block Grant- Metro City application for the FY2012
Tulsa County CDBG Urban County Program.
Eligible Entities
Cities included in the Tulsa County CDBG Urban County Metro City designation,
the funding allocation to the city, and the percentage of low and moderate
income population for each is listed below:
Percentage
Applications should be submitted to:
INCOG
Claudia Brierre
2 West 2nd Street, Suite 800
Tulsa, OK 74103
cbrierre .incog.org
Section One
National Objective
The primary National Objective of the Community Development Block Grant
(CDBG) Program is the "development of viable urban communities by providing
decent housing and a suitable living environment, particularly for persons of low
and moderate incomes." All project proposals submitted for funding through the
CDBG Program must document the achievement of at least one of the following
National objectives:
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 1 of 6
Allocation
Low /Mod
Amount
Population
Broken Arrow
$414,583
24.0
Bixby
$54,853
26.9
Jenks
$42,748
25.9
Owasso
$113,845
30.2
Sand Springs
$68,248
38.4
Sapulpa
$134,888
49.0
Applications should be submitted to:
INCOG
Claudia Brierre
2 West 2nd Street, Suite 800
Tulsa, OK 74103
cbrierre .incog.org
Section One
National Objective
The primary National Objective of the Community Development Block Grant
(CDBG) Program is the "development of viable urban communities by providing
decent housing and a suitable living environment, particularly for persons of low
and moderate incomes." All project proposals submitted for funding through the
CDBG Program must document the achievement of at least one of the following
National objectives:
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 1 of 6
• Provide benefit to low and moderate income persons.
• Aid in the prevention or elimination of slums or blight.
• Meet other community development needs having particular urgency,
posing a serious or immediate threat to the health or welfare of a
community.
Most CDBG applicants qualify their project activities under the National Objective
of benefit to low and moderate income persons. Applicants are cautioned that
qualifying a project under slum or blight or urgent need is a difficult process that
has very limited application and can only be used under special conditions and
circumstances. Therefore, you are urged to qualify your proposal under benefit to
low and moderate income persons. Applicants who qualify a proposal using slum
and blight or urgent need must receive guidance and approval from INCOG.
To qualify for CDBG funding under the National Objective of benefit to low and
moderate income persons, the proposed project activities must show a positive
or general improvement of living condition in a definable geographic target area
where at least 51 % of the occupied households /homes are of low and moderate
income families. Low and moderate income families have an income equal to or
less than the current Section 8 low income limits established by the United
States Department of Housing and Urban Development (HUD). Each activity
proposed for funding with Community Development Block Grant(CDBG) dollars
claiming the National Objective of benefit to low and moderate income persons,
must provide data indicating the percentage of low and moderate income
beneficiaries.
Application Criteria
1. No matching funds are required.
2. No administration expenses will be funded with CDBG funds
3. Engineering is a permissible use of CDBG funds.
4. Income surveys of the project target area must be conducted. The use of
Census Tract or Block Group data to document the percentage of low and
moderate income beneficiaries for any CDBG funded activity should receive prior
INCOG review and approval.
5. Applicants must hold an application phase Public Hearing informing citizens of
the proposed project and submit documentation of the Public Hearing with this
application. Notice must be given at least 7 days prior to the public hearing by
publication in jurisdiction newspapers; or by posting at city halls. Acceptable
documentation consists of the affidavit of publication or a copy of the newspaper
article announcing the public hearing, or copy of certified posted notice. Tulsa
County has prepared a Citizen Participation Plan on behalf of the Urban County
communities; therefore, the individual community does not need to prepare a full
Citizen Participation plan.
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 2 of 6
6. Specific projects identified in the application must have cost estimates derived
from professional sources. Water and wastewater projects that require
Oklahoma Department of Environmental Quality construction permitting must
have certified cost estimates from a professional engineer licensed to work in
Oklahoma. For other types of projects, professional cost estimates may be
derived from architects, engineers, vendors, construction companies, or
appropriate personnel qualified to make such estimates.
Use of Funds
The CDBG Program funds a broad array of projects and activities including but
not limited to the following:
• Water and wastewater system improvements
• Solid waste
• Fire protection
• Streets
• Neighborhood Parks
• Housing activities including construction, emergency repair, rehabilitation
• Acquisition of real property for eligible public purposes
• Clearance, demolition and removal of buildings and improvements
• Senior citizen centers
• Gas and electrical system improvements
• Removal of architectural barriers associated with handicapped areas
• Storm water drainage improvements
• Economic Development
• Social services- (City of Broken Arrow only)
Guidance regarding eligibility requirements can be found in 24CFR 570.201 of
the Federal Housing and Community Development Act of 1974, as amended.
Proposal Guidance
Applicants are encouraged to contact the staff persons listed below with
questions regarding program requirements, project conceptualization, or any
portion of the Application Packet and /or Guidelines.
Claudia Brierre
579 -9431
Barbara Albritton
579 -9420
Steve Boettcher
579 -9453
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 3 of 6
Required Application Documents
1. Application Summary
This form contains information about the specific project and includes a
certification from the local government attesting to the accuracy and
completeness of the application. The certification form must be completed and
signed by the chief elected official of the local government.
2. Line Item Budget (Application Form Attachment A)
The description of project activities along with a budget (form provided as
Attachment A) should be as specific as possible as they will form the basis of
your contract. This Budget should match Professional Cost Estimates submitted
with the application.
3. Direct Project Beneficiary Income Survey (Survey Summary
Form Attachment B)
Income surveys for each proposed CDBG funded activity are a requirement
unless using census tract or block group data.
Determination of project beneficiaries:
City -wide- An activity which will serve the entire city (such as wastewater
treatment), provided that the city has a low and moderate income percentage at
or above 51 %. If the LMI percentage is below 51 %, an income survey with a
75% response rate must be provided.
Area benefit- An activity which benefits all the residents in a particular area
where at least 51 percent of the residents are low and moderate income
persons. Examples would include resurfacing of a collector street or
construction of a fire department substation.
Direct benefit- An activity which requires information on household size and
income so that it is evident that at least 51 percent of the clientele are persons
whose household income does not exceed the low and moderate income limit; or
an activity which has income eligibility requirements which limit the activity
exclusively to low and moderate income persons.
Presumed benefit- Benefit a clientele that is generally presumed to be
principally low and moderate income persons. Activities that exclusively serve a
group of persons in any one or a combination of the following categories may be
presumed to benefit 51 percent low- and moderate - income persons: abused
children, battered spouses, elderly persons, adults meeting the Bureau of the
Census' Current Population Reports definition of "severely disabled," homeless
persons, illiterate adults, persons living with AIDS, and migrant farm workers.
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 4 of 6
Guidelines to identify specific beneficiaries for various activities:
• Water or Wastewater Line Replacement or Rehabilitation. Those
households directly tapped to or receiving improved service from the lines.
Generally, beneficiaries are considered those persons residing in houses who
receive their water through new, replaced or upgraded lines, or houses that
discharge sewage into or through an improved collection line or main en route to
the treatment plant.
• New Wastewater or Water Extensions to Previously Un- served Areas. The
households /homes that will actually be connected to the wastewater or water line
extensions. Service to newly- constructed subdivisions will not be funded due to
environmental review requirements.
• Flood and Drainage Improvements. Households /homes within the recognized
drainage basin.
• Fire Protection. Households /homes (buildings, vehicles and equipment)
residing within the response area of the fire station; or using actual residential
calls made by a fire station over the prior 12 month period, conduct a survey of
those residences obtaining no less than 75% response rate.
• Senior Citizen Centers and Community Centers. Households /homes within
the designated service area of the proposed center. If there is only one center in
the community, the service area can be considered to be the entire community. If
there is more than one center, then the Applicant must delineate the service area
of each center. Senior Citizen Centers are presumed to benefit low and
moderate income persons.
• Demolition /Clearance /Removal of Junk and Debris and/or Abandoned
Inoperative Vehicles. Households /homes within the geographic area
designated to receive the focus of the demolition, clearance and /or removal
activities. Typically, the properties located within the geographic area designated
to receive the demolition /removal activities are considered to be beneficiaries.
• Provision of Accessibility for the Handicapped to Public Buildings.
The households /homes within the geographic area that receive services from the
assisted public building(s). Providing handicapped access to a city hall would
provide benefit to the households /homes in the entire city. Proposed
handicapped access activities in connection with limited clientele facilities are
presumed to benefit low and moderate income persons.
• Street Improvements /Sidewalk Improvements. The households /homes that
have at least one property line abutting the improvement.
4. Identification of Other Project Funding Sources (Application
Form Attachment C)
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 5 of 6
Match and leverage are not required for the grant, but should be identified if
applicable to the project.
5. Certified Engineering Reports and Professional Cost
Estimates (Application Form Attachment D)
Water and wastewater projects that require Oklahoma Department of
Environmental Quality construction permitting must have certified cost estimates
from a professional engineer licensed to work in Oklahoma. For projects not
requiring DEQ permits, professional cost estimates must be derived from
architects, engineers, vendors, construction companies, or appropriate personnel
to make such estimates, and submitted with the application.
6. Applicant Resolution (Application Form Attachment E)
Applications must include a Resolution passed by the governing body requesting
CDBG assistance from the Tulsa County Urban County program. A sample
Resolution is provided as Attachment E of the application.
Guidance
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 6 of 6
1
2
3
TULSA COUNTY URBAN COUNTY
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
Name of Unit of Local Government City of Owasso
Mailing Address 111 North Main Owasso, OK
Zip Code +4 74055 -0180
Phone Number (918) 376 -1500 Fax # (918) 376 -1599
FEW 73- 6069613
DUNS 736069613
Chief Elected Official Mayor Doug Bonebrake
Clerk Sherry Bishop
Name of Staff Contact Brian Dempster
Phone Number (918) 376 -1544 E -mail bdempster @cityofowasso.com
Project Title and Detailed Description of Project
(Attach additional detail as needed)
4. Number of population served
• Census Tract /Block Group
• Household Income Survey
5 Project Budget Summary:
CDBG Funds
Other Sources
Total
Application
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 1 of 2
1,181
58.01/2,3
$ 113, 845.00
$ 113,845.00
TULSA COUNTY URBAN COUNTY
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
APPLICATION CERTIFICATION
The Applicant hereby certifies that all of the information contained in this application for
community development assistance through the Tulsa County CDBG Urban County
Program is true and accurate to the best of my knowledge and that all documentation
supporting the information in this application is on file in the official offices of this unit of
local government, available for review by Tulsa County /HUD during normal business
hours. The Applicant also affirms that none of the activities set forth in this application
have been initiated, nor shall they be initiated unless a grant has been awarded, a
contract fully executed, and notice has been issued by Tulsa County that release of
funds requirements have been met.
(Type) Name and Title of Chief Elected Official
x
[S E A L]
Signature of Chief Elected Official
State of Oklahoma
County of
Attest:
Subscribed and sworn to before me , 20
Clerk
Application
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Page 2 of 2
Date
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
2012 TULSA COUNTY URBAN COUNTY
BUDGET
Name of Applicant: City Of Owasso
ATTACHMENT A
Itemized Description of
Funding Source
Funding Source Funding Source
Total Project
Construction Activity
CDBG Grant
City Other
Expenditures
Sidewalks & Curb Repair
$113,845.00
$113,845.00
Total Construction Activity
$ -
Professional & Non Construction
X Engineering /Architect Funds
$
x Inspection Funds
Other: Survey
Other:
Other:
Total Professional & Non Const.
$ -
$ - $ - $
-
Administrative Costs
Public Administrative Funds
$ - - - - - --
$
Direct Administrative Funds
$ - - - - - --
Total Administrative Costs
$ -
$ - $
-
Total Project Costs
$0.00
$0.00 $0.00
$0.00
2012 Tulsa County CDBG Urban County
If additional is space needed, attach additional sheet(s)
Budget
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
TULSA COUNTY URBAN COUNTY
DIRECT PROJECT BENEFICIARY INCOME SURVEY SUMMARY FORM
Activity Name:
ATTACHMENT B
COMPLFTF THIS SFCTION RY PI ACING THE TOTAI NI IMRFR nF HC)I ISFHni nS nRTAINFn FRAM THE Hni ISFHnI n CI IRVFV IN FACW APPC?nPPIATF rn1 I Innn1
Insert County Income Levels
$33,850
$38,650
$43,500
$48,300
$52,200
$56,050
$59,900
$63,800
Number of People in Each Household
1
2
3
4
5
6
7
8
Below or Above the County
Income Levels
Below Above
Below Above
Below Above
Below Above
Below Above
Below Above
Below Above
Below Above
Total Number Of Households
23 13
73 38
48 11
16 8
4
5
3
0
0 0
0 0
Total Number of Occupied Households /Homes in Activity Target Area = 492
Total Number of Persons in Activity Target Area = 1,181
Total Number of Occupied Households /Homes Surveyed in Activity Target Area = 251
Total Number of Persons Accounted for by the Survey in the Activity Target Area = 601
Total Number of Households Below the Low and Moderate Income Level in the Activity Target Area = 176
Percentage of Total Households Below the Low and Moderate Income Level in the Activity Target Area = 77.11 %
I hereby certify that the above information was obtained from the occupants of the addresses listed and the information is accurate:
City -wide Low and Moderate Income Level
(For use only when projects are of City -wide benefit.)
x
Signature of Chief Executive Official
[Seal]
Subscribed and sworn to before me
Commission N
Community Development Block Grant (CDBG)
2012 Tulsa County Urban County
Beneficiary Income Survey Summary — Attachment B
Date
20 . My commission expires
Clerk /Notary Signature
HUD Census Data for Low and Moderate Income
Level for Block Groups, Enumeration Districts
or Census Tracts as Provided by HUD (For use
only when a project's target area boundaries are
identical to BG, ED or Tracts) %
20
Attachment C
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
TULSA COUNTY URBAN COUNTY
INDENTIFICATION OF OTHER PROJECT FUNDING SOURCES
Federal /State participation, if any (loans, grants, etc.) provide commitment letters.
Agency Purpose Amount Present Status Comment
Other sources and amount of project financing including applicant's local contribution, if any.
Agency
Purpose
Amount
Present Status Comment
x
Chief Elected Signature
Other Funding Sources —Attachment C
Community Development Block Grant
2012 Tulsa County Urban County
Page ] of 1
Date
ATTACHMENT D
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
2012 TULSA COUNTY URBAN COUNTY
Attach Certified Professional Cost Estimates /Engineering Report (where
applicable)
ATTACHMENT E
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
2012 TULSA COUNTY URBAN COUNTY
RESOLUTION
WHEREAS, the Housing and Community Development Act of 1974, as amended (24 U.S.C. 93-
383 et seq.), (the "Act "), provides that Community Development Block Grant, ( "CDBG "), funds may
be used for the support of activities that provide decent housing and suitable living environments
and expanded economic opportunities principally for persons of low- and moderate - income; and,
WHEREAS, CDBG Regulations 24 CFR 570.307(a) allow counties having a total combined
population of 200,000 or more from the unincorporated areas and participating incorporated areas
to qualify as an urban county; and,
WHEREAS, Title I of the Housing and Community Development Act of 1974, Public Law 93 -383, as
amended, authorized the Secretary of Housing and Urban Development, as a representative of the
United States of America, to grant to Tulsa County funds and administrative responsibility for the
Tulsa County CDBG Urban County program; and
WHEREAS, a Cooperation Agreement between Tulsa County and the City has been executed for the
purpose of participation in the Tulsa County Urban County Community Development Block Grant
Program for Federal Fiscal Years 2011 -2013; and,
NOW THEREFORE, BE IT RESOLVED by the that the City of desires to obtain
assistance in addressing community development needs and hereby requests the Tulsa County
CDBG Urban County program to provide assistance.
NOW THEREFORE, BE IT FURTHER RESOLVED by the City Commission that the City of
affirms its commitment to take all action within its power to facilitate the receipt of the
assistance of community development funds, and upon receipt to administer said grant by the rules
and regulations established by the United States of America, the State of Oklahoma, Tulsa County
and all empowered agencies thereof.
ADOPTED this day of , 2012, at a (regularly or specially) scheduled meeting of the
governing body, in compliance with the Open Meeting Act, 25 O.S. §§ 301 -314 (2001).
(Type) Name and Title of Chief Elected Official
Signature of Chief Elected Official (S E A L)
Attest:
Subscribed and sworn to before me 20
Clerk Signature
City of Owass
Low & Moder2
Income Area
By Year ZOO(
Census Block Gr
Bbdi Group
Census rad er
N w ber
Legend
Percent Low -Mod
QLess than 51.00%
5100% or Greater
Owasso Corporate Urr
Streets
Y
Prepaid by INCOG
APN2003
Data Source: www.hud4c
4...14
Oe- T City Wit out Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Larry White
Support Services Director
SUBJECT: Purchase of CNG Truck with CMAQ Grant Money and City Matching Funds
DATE: March 16, 2012
BACKGROUND:
The City of Owasso submitted an application on March 14, 2012, for the Congestion Mitigation
and Air Quality (CMAQ) grant money available through INCOG's Public Fleet Conversion
project. This grant has funding available in three categories:
➢ alternative fuel refueling or recharging infrastructure
➢ dedicated alternative fuel vehicles and hybrid vehicles
➢ dedicated alternative fuel off -road equipment such as propane or compressed natural
gas commercial mowers and forklifts
The City applied for this grant to assist with the purchase of a dedicated CNG truck. The
funding available under the grant is $150,000.00. INCOG anticipates awarding this amount
among approximately 5 to 8 separate grants.
The deadline for ordering a 2012 model dedicated CNG truck is March 22, 2012. Staff hopes to
receive grant approval prior to that date. Because of the time required to complete the
contract for these funds, it is anticipated the funding will be available after July 1, 2012. That will
allow the City time to budget the matching funds for the Fiscal Year 2012 -2013 budget.
PROJECT FUNDING:
Funding for this project could be as much as 80% federal Congestion Mitigation and Air Quality
(CMAQ) funds. This project would require a minimum of 20% local funds. These matching funds
would be budgeted by the appropriate City department for Fiscal Year 2012 -2013. The required
matching funds are estimated to be between $7,500.00 and $10,000.00.
RECOMMENDATION:
Staff recommends approval of the purchase of a 2012 model dedicated CNG truck contingent
upon the receipt of the Congestion Mitigation and Air Quality (CMAQ) grant money available
through INCOG's Public Fleet Conversion project. The order would be placed by March 22,
2012, with expected delivery after July 1, 2012.
V
nTh.City Wit out Limits.
TO: Honorable Mayor and City Council
City Of Owasso
FROM: H. Dwayne Henderson, P.E.
City Engineer
SUBJECT: Owasso Police Multi -Use Training Facility Project
Construction Bid Review
DATE: March 16, 2012
BACKGROUND:
On September 16, 2011, City Council approved the Owasso Multi -Use Firearms Training Facility
Project. The project consists of a multi -use training facility to be constructed on nineteen acres,
owned by the City of Owasso, located south of the Waste Water Treatment Plant. The proposal
is to build this facility over a four -year time period providing unlimited access to meet a variety of
training needs for the Police Department. The FY 2011 -2012 budget allocated $82,500 for the
construction of the first phase of the four phase project.
The City's Engineering Department designed the earthwork portion for the facility, to include the
construction of the berms necessary to facilitate the firearms range, as well as a water line to the
site (see Attachment A). The Engineering staff worked with the Police Department in laying out
the range so that a phased approach could be constructed as funds are made available.
BID PROCESS:
An advertisement for bids was published February 9 and February 16 for the construction of
Phase I. The bid opening occurred on March 9, 2012, with twelve (12) bidders participating. The
bid results are shown below:
Bidder
Base Bid
1. D -Kerns Construction, Claremore
$117,140.64
2. Tri -Star Construction, Tulsa
$155,250.00
3. Earth Smart Construction
$158,777.00
4. Ira M. Green Construction
$159,924.40
5. RRY Services
$164,306.00
6. Lowry and Hemphill
$169,130.50
7. North Central Construction
$171,066.00
8. Cherokee Pride Construction
$241,558.00
9. CP3 Enterprises
$243,008.16
10. Helterbrand Builders
$293,728.63
11. CEI
$305,150.66
12. A&A Asphalt
$392,892.60
BID ANALYSIS:
After bid opening, staff visited with the lowest bidder, D -Kerns Construction. D -Kerns
Construction explained that their bid was based on previous experience constructing a firing
range and no imported materials needed for the project. Bidders 1 -7 quoted a 50% lower
earthwork cost than the highest bidders, 8 -12, which accounts for the wide range of bids.
FUNDING:
The budgeted amount for these improvements is $82,500, which is based on a previous quote
provided to the Police Department for budgeting purposes. There are currently no additional
funds available in the budget to provide the $34,640.64 needed to award the project.
RECOMMENDATION:
Staff recommends City Council reject all bids due to the cost exceeding the Police
Department's available funding.
ATTACHMENT:
A. Location Map
s�
�O
I
PARKING LOT
(GRADING ONLY)
PISTOL RANG
i� ?M^_.C'E:S%F g•�' �`IA`.�r ".�i_. - � i3a'£ -� -K7 ..' t?ia.�Al� k r.� '..
1 AW,_
66TH STREET NORTH
Owasso Public Works
Department
Engineering Div.
P.O. 180
Owasso, OK 74055
918.272.4959
www.cityofowasso.com
OWASSO WWTP
.,,'
0
RIFLE RANGE —
PROJECT LOCATION
Ox
SOT AROUND
POLICE FIRING RANGE
PROJECT
LOCATION MAP
NG ONLY)
N;�F-
IrO
i�
SCALE: 1 " = 200'
N
W E
S
03/06/2012
�s
N;�F-
IrO
i�
SCALE: 1 " = 200'
N
W E
S
03/06/2012
OCi ty Wiut Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: John W. Feary
Project Administrator
SUBJECT: FY 2011 -2012 Street Rehabilitation Program
Construction Contract Bid Update
DATE: March 16, 2012
BACKGROUND:
The FY 2011-2012 Budget, allows for the expenditure of $585,000 in the Capital Improvements
Fund for maintenance, repair, and /or resurfacing of residential and non - residential roadways
throughout the City as part of the Annual Street Rehabilitation Program. Roadway preservation
and rehabilitation sites are evaluated and ranked yearly based on a comprehensive assessment
of roadway conditions (both residential and non - residential). In addition, the evaluation process
identifies maintenance methods that will increase roadway lifecycle and minimize future
maintenance costs, while enhancing overall roadway driving conditions and public safety. On
January 17, 2012, the City Council approved the street rehabilitation sites for 2012. As in previous
years, the City of Owasso approved an Interlocal Agreement on February 21, 2012 between the
City of Owasso and Tulsa County in order to further maximize the return on investment.
Specifically, the agreement consists of the use of Tulsa County labor and equipment for
roadway segments receiving a two (2) inch asphalt overlay.
During the January 10, 2012 City Council Work Session, staff advised City Council that the Public
Works Engineering Division would compile bid documents for the street repair, fog seal, and
micropave projects not included in the Interlocal Agreement. In February, 2012, Public Works
staff finalized the plans for rehabilitation services not included in the Interlocal Agreement with
Tulsa County. The scope of work for this portion of the project entails milling or removal of the top
layer of asphalt, fog sealing, crack sealing, micropaving, and striping where warranted.
BIDS ANALYSIS:
Advertisements for bids were published in accordance with state law and a mandatory pre -bid
meeting was held at City Hall on March 1, 2012 with eight contractors in attendance. Bids were
publicly opened on March 12, 2012 at 2:00 pm at the Owasso City Hall with one bid received. Tri-
Star Construction submitted a bid in the amount of $368,059.20. The engineer's estimate of
probable project cost was $484,226.
City staff has examined the submitted bid package for any improper or unbalanced bids and
none were discovered. Tri -Star Construction, the low bidder, has successfully completed
municipal projects for the City of Owasso with very positive results. Examples of past projects are
Sports Park Restrooms, Rayola Park Channel and Trail Improvements, and the 2009 -2010 Street
Rehabilitation Project.
FUNDING SOURCE:
Funding for this project is included in the FY 2011-2012 Capital Improvements Fund budget.
RECOMMENDATION:
Staff recommends award of the FY 2011 -2012 Street Rehabilitation Contract to Tri -Star
Construction of Tulsa, Oklahoma for the bid amount of $368,059.20.
ATTACHMENTS:
A. Location Map
B. Construction Agreement
4
I
SECTION 00300
THIS AGREEMENT is dated as of the day of ,
by and between
and
(hereinafter called OWNER)
(hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows:
STREET REPAIR PROJECT FY 2011 -2012
CITY OF OWASSO, OKLAHOMA
The project for which the Work under the contract documents may be the whole or only a part, is
described as follows:
Onsite Earthwork to build a Firing Range.
ARTICLE 2. DEPARTMENT
The PROJECT has been assigned by the OWNER to the DEPARTMENT (City of Owasso
Public Works). The DEPARTMENT Director, Project Administrator and City Engineer are the
duly authorized representatives of the OWNER who will assume the duties and responsibilities
and will have the rights and authority assigned to DEPARTMENT in the Contract Documents in
connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIME
3.1 The Work will be substantially completed within six 60 calendar days from the
date of Notice to Proceed; and completed and ready for final payment in accordance with the
General Conditions within nine 90 calendar days from the date of Notice to Proceed, which
will be on or before ,
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in paragraph 3.1 above, plus any extensions
thereof allowed in accordance with the General Conditions. They also recognize the delays,
AGREEMENT
0212 00300 - Page 1 of 13
expense and difficulties involved in proving in a legal or arbitration proceeding the actual loss
suffered by OWNER, if the Work is any such proof. OWNER and CONTRACTOR agree that
as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Two
Hundred Dollars ($200.00) for each consecutive calendar day that expires after the time
specified in paragraph 3.1 for substantial completion until the Work is substantially complete.
After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the
remaining Work within the time specified in paragraph 3.1 for completion and readiness for final
payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay
OWNER Two Hundred Dollars ($200.00) for each consecutive calendar day that expires after
the time specified in paragraph 3.1 for completion and readiness for final payment.
ARTICLE 4. CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with
the Contract Documents in current funds the amount agreed upon in CONTRACTOR'S bid.
4.2 CONTRACTOR understands that the estimated quantities are not guaranteed and that
the determination of actual quantities and their classification is to be made by the OWNER at the
time of application for payment.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with the General
Conditions on the Pay Estimate Forms included as Exhibit "A" to this Agreement. Applications
for Payment will be processed by OWNER as provided in the General Conditions.
5.1 Progress Payments. OWNER shall make progress payments on account of the
Contract Price on the basis of CONTRACTOR"s Applications for Payment in accordance with
the City of Owasso's Payment Schedule included as Exhibit "B" to this Agreement during
construction as provided below. All progress payments will be on the basis of the progress of the
Work.
5.1.1 Progress payments shall not exceed an amount equal to 90% of the WORK
completed until such time as CONTRACTOR shall complete in excess of fifty percent (50 010) of
the contract amount.
5.1.2 Upon completion in excess of fifty percent (50 %) of the total contract amount,
OWNER shall pay an amount sufficient to increase total payments to CONTRACTOR to 95% of
the WORK completed, less such amounts as OWNER shall determine in accordance with the
General Conditions, provided that OWNER has determined that satisfactory progress is being
made, and upon approval by the Surety.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance
with the General Conditions, OWNER shall pay the remainder of the Contract Price.
ARTICLE 6. CONTRACTOR'S REPRESENTATIONS
AGREEMENT
0212 00300 - Page 2 of 13
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following
representations:
6.1 CONTRACTOR has familiarized himself/herself with the nature and extent of
Contract Documents, Work, locality, and with all local conditions and federal, state and local
laws, ordinances, rules and regulations that in any manner may affect cost, progress or
performance of the Work.
6.2 CONTRACTOR has studied carefully all reports or explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical conditions in or
relating to existing surface or subsurface structures at or contiguous to the site (except
underground facilities) which have been identified in the Supplementary Conditions as provided
in the General Conditions. Contractor accepts the determination set forth in the General
Conditions of the extent of the "technical data" contained in such reports and drawings upon
which Contractor is entitled to rely. Contractor acknowledges that such reports and drawings are
not Contract Documents and may not be complete for Contractor's purposes. Contractor
acknowledges that Owner and Consultants do not assume responsibility for the accuracy or
completeness of information and data shown or indicated in the Contract Documents with
respect to underground facilities at or continuous to the site. Contractor has obtained and
carefully studied (or assume responsibility for having done so) all such additional supplementary
examinations, investigations, explorations, tests, studies and data concerning conditions (surface,
subsurface and underground facilities) at or contiguous to the site or otherwise which may affect
cost, progress, performance or furnishing of the Work or which relate to any aspect of the means,
methods, techniques, sequences and procedures of construction to be employed by Contractor,
and safety precautions and programs incident thereto. Contractor does not consider that any
additional examinations, investigations, explorations, tests, studies, or data are necessary for the
performance and furnishing of the Work at the Contract Price, within the Contract Times and in
accordance with the other terms and conditions of the Contract Documents.
6.3 CONTRACTOR has made or caused to be made examinations, investigations, tests
and studies of such reports and related data in addition to those referred to in paragraph 6.2 as
(s)he deems necessary for the performance of the Work at the Contract price, within the Contract
Time and in accordance with the other terms and conditions of the Contract Documents; and no
additional examinations, investigations, tests, reports or similar data are or will be required by
CONTRACTOR for such purposes.
6.4 CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract Documents with respect to existing Underground Facilities at or
contiguous to the site and assumes responsibility for the accurate location of said Underground
Facilities. No additional examinations, investigations, explorations, tests, reports, studies or
similar information or data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price within the
Contract Time and in accordance with the other terms and conditions of the Contract Documents,
including the General Conditions.
6.5 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Contract Documents,
AGREEMENT
0212 00300 - Page 3 of 13
6.6 CONTRACTOR has given OWNER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents, and the written resolution
thereof by OWNER is acceptable to CONTRACTOR.
6.7 CONTRACTOR has obligated himself/herself to the OWNER to be responsible for
the workmanship, labor and materials used in the project for two (2) years after the project has
been accepted by the OWNER.
6.8 CONTRACTOR understands that (s)he will be exempt from all sales tax on materials
and other items necessary for the completion of the project. The OWNER has issued him a
Certification of Tax Exempt Project enclosed as Exhibit "C" of this Agreement.
ARTICLE 7. CONTRACT DOCUMENTS
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR are attached to this Agreement, made a part hereof, and consist of the
following:
7.1 This Agreement (pages 1 to 6 inclusive).
7.2 Exhibits "A ", "B ", "C" and "D" to this Agreement.
7.3 Advertisement for Bids (Section 00100).
7.4 Requirements for Bidders (Section 00110).
7.5 Instructions to Bidders (Section 00120).
7.6 Bid (Section 00200).
7.7 Bid Bond (Section 00210).
7.8 Bid Affidavits (Section 00220).
7.9 Statement of Bidders Qualifications (Section 00230).
7.10 Certificate of Non- Discrimination (Section 00240).
7.11 Performance Bond (Section 00410).
7.12 Maintenance Bond (Section 00420).
7.13 Statutory payment Bond (Section 00430).
7.14 Notice of Award (Section 00510).
AGREEMENT
0212 00300 - Page 4 of 13
7.15 Notice to Proceed (Section 00520).
7.16 Change Order (Section 00600).
7.17 General Conditions (Section 00700).
7.18 Project Specifications (Section 00800).
7.19 Special Provisions (Section 00900).
7.20 Project Drawings, consisting of Sheets 1 to 6, inclusive, and Standard Drawings.
7.21 Addendum Numbers _ to _, inclusive.
7.22 Documentation submitted by CONTRACTOR prior to Notice of Award (pages _ to
inclusive).
7.23 Any Modification, including Change Orders, duly delivered after execution of
Agreement.
There are no Contract Documents other than those listed above in this Article 7. The Contract
Documents may only be altered, amended or repealed by a Modification (as defined in the
General Conditions).
ARTICLE 8. MISCELLANEOUS
8.1 Terms used in this Agreement which are defined in the General Conditions shall have
the meanings indicated in the General Conditions.
8.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and specifically, but without limitation, monies that may become due and
monies that are due may not be assigned without such consent (except to the extent that the
effect of this restriction may be limited by law) and unless specifically stated to the contrary in
any written consent to an assignment, no assignment will release or discharge the assignor from
any duty or responsibility under the Contract Documents.
8.3 OWNER and CONTRACTOR each binds himself/herself, his /her partners,
successors, assigns, and legal representatives to the other party hereto, his/her partners,
successors, assigns and legal representatives in respect to all covenants, agreements and
obligations contained in the Contract Documents.
8.3 The Agreement (or remaining portions thereof) should continue in effect, be valid and
binding upon both parties even if a provision or part of the Contract Documents should be held
void or unenforceable by law.
AGREEMENT
0212 00300 - Page 5 of 13
IN WITNESS WHEREOF, the parties hereby have signed this Agreement in duplicate.
One counterpart has been delivered to CONTRACTOR, the other belongs to OWNER. All
portions of the Contract Documents have been signed by OWNER and CONTRACTOR.
This Agreement will be effective on ,
OWNER:
By
(SEAL)
ATTEST:
Title
Address for giving notices:
CONTRACTOR:
(SEAL)
Title
AGREEMENT
0212 00300 - Page 6 of 13
V Md�
The City Wit out Limits.
TO: Honorable Mayor and City Council
City Of Owasso
FROM: H. Dwayne Henderson, P.E.
City Engineer
SUBJECT: 11 6th Street North Bridge Replacement
Materials Bid Review
DATE: March 16, 2012
BACKGROUND:
On November 15, 2011, City Council approved a budget amendment in the General Fund,
increasing the appropriation for expenditures in the Streets Division Budget by $133,000 for the
repair and replacement of a reinforced concrete box culvert underneath 116th Street North, just
east of the SK&O Railroad crossing. An inspection by Guy Engineering and Tulsa County
Engineers found the culvert to be structurally unsound. Tulsa County informed the City of Owasso
about the structure's condition and volunteered to assist the City with replacing the box.
In addition, City Council approved an inter -local agreement between the City of Owasso and
Tulsa County for the repair of the structure. More specifically, the agreement includes the use of
Tulsa County labor and equipment to replace the concrete box and headwall, and resurface
the affected roadway section. The City of Owasso will be responsible for purchasing materials,
providing traffic control, installing sod, contracting striping, guard rail installation, and clean -up
of the project area.
BID PROCESS:
An advertisement for bids was published March 1 and March 8 for the purchase of an 8'x 3'
double cell pre -cast reinforced concrete box and precast wing walls and headwalls. In
addition, an e -mail containing the bid specifications was sent to three (3) potential vendors. The
bid opening occurred on March 9, 2012, with only one bidder participating. The bid is shown
below:
Bidder Base Bid
Apex Precast Products, Tulsa, OK. $39,014.00
This cost is within $1,000 of the estimate quoted when the budget was prepared in 2011.
BID ANALYSIS:
The reason for the one (1) bid is that the other invited companies do not construct pre -cast
headwalls and wing -walls for 8' x 3' boxes, which was preferred by Tulsa County. Pre -cast
headwalls and wing walls will save at least two (2) weeks of construction time since the county
would have to construct the boxes and would have to form the headwalls and wing walls, tie
reinforcing steels, pour the structures, allow them to cure for a minimum of seven (7) days, and
strip the forms before the roadway could be reopened. The precast structures will be delivered
to the site by Tulsa County and installed in just a few days.
FUNDING:
Funding for this project is available in the FY 2011 -2012 Streets Department Operating Budget,
supplemented by the City Council on November 15, 2011.
RECOMMENDATION:
Staff recommends City Council award the 116th Street North Bridge Replacement Material
Contract to Apex Precast Products, Tulsa, OK for the amount of $39,014.00
ATTACHMENT:
A. Location Map
,or
�. .
eA
4F Fj�
war. wffl&�a
for
K
ma
_s
v fi '� _ � � _ _, - •sue
U.
Dupwkpm
Euginming Div.
PA ]so
olwaspol OK 7405:5
MARCH 2012
11 '1''1 STREE " BOX
E r rt R IKE P
PROJECT