Loading...
HomeMy WebLinkAbout2001.10.02_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE OWASSO PUBLIC WORKS AUTHORITY TYPE OF MEETING: Regular DATE: October 2, 2001 TIME: 6.30 p.m. PLACE: Council Chambers, Owasso Community Center Notice and agenda filed in the office of the City Clerk and posted at City flail at 4:00 pm. on Friday, September 28, 2001. Marci outwell, Aut ority Secretary AGENDA I. Call to Order Chairman Barnhouse 2. Flag Salute 3. Roll Call 4. Consideration and Appropriate Action Relating to a Request for Approval of the Consent Agenda. All matters listed under "Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee may, however, remove an item from consent by request. A motion to adopt the Consent Agenda is non-debatable. A. Approval of the Minutes of September 18, 2001 Regular Meeting. Attachment #4 ®A Owasso Public Works Authority October 2, 2001 Page 2 B. Approval of Claims. Attachment #4 -B 5a Consideration and Appropriate Action relating to a bequest for Trustee Approval of Amendment 41 to an Agreement Between the Owasso Public Works Authority and Garver Engineers for Engineering; Services for the Owasso Wastewater Treatment Plant expansion (Phase 11). Mr Carr Attachment Y-5 The staff will recommend 'Trustee approval of the proposed amendment with Garver Engineers in an amount not to exceed $179,950. 6, Report from OPWA Manager, T Deport from OPWA Attorney. & New Business. Owasso Public Works Authority October 2, 2001 Page 3 Adjournment. SZ $y OWASSO PUBLIC WORKS AUTHORITY MINUTES OF REGULAR MEETING Tuesday, September 18, 2001 The Owasso Public Works Authority met in regular session on Tuesday, September 18, 2001 in the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, September 14, 2001. ITEM 1: CALL TO ORDER Chairman 1 arnhouse called the meeting to order at 7:50 p.m. ITEM 2: FLAG SALUTE The flag salute was held during the City Council meeting preceding this meeting. ITEM 3: ROLL CALL STAFF Larry Mitchell, City Manager Donald D Cates, Authority Attorney Marcia Boutwell, Authority Secretary A quorum was declared present. ITEM 4: ENDA. A. Approval of the Minutes of September 4, 2001 Regular Meeting. B. Approval of Claims. The consent agenda included minutes of the September 4, 2001 regular meeting, by reference made a part hereto. Item B on the consent agenda included the following claims: (1) Owasso Public Works Authority $75,310.79; (2) OPWA Capital Improvements $159,330.43; (3) OPWA Sewer Line Extension $23,000.00; (4) July Transfers from OPWA $47,591.67 [City Garage $6,916.67; Workers Comp $3,841.67; General Fund $36,833.33]; (5) August Transfers from OPWA $47,591.67 [City Garage $6,916.67; Workers Comp $3,841.67; General Fund $36,833.33]; (6) Payroll $41,026.09. Ms Armstrong moved, seconded by Mr Williams, to approve the consent agenda Owasso Public Works Authority September 18, 2001 AYE: Armstrong, Williams, Helm, Brogdon, Bamhouse NAY: None Motion carried 5-0. ITEM 5; CONSIDERATION AND A PROPRIA'TE ACTION RELATING TO A YAI WASTE; ACTION � PLAN � SUBMITTED BY THE YAR WASTE COMMITTEE Mr Roberts said that on August 21, 2001 the OPWA_ Trustees accepted a report horn the citizens committee appointed to review existing yardwaste handling procedures, identify needed improvements and develop an action plan for implementing suggested modifications, 'The action plan is now being presented to the 'Trustees for approval, The plan consists of permanently closing the yardwaste disposal station to public access effective October 15, 2001, cleaning up the disposal station, and continuing curbside yardwaste collection through mid - October 2001 The next phase of the plan, which would occur from February to April 2002, would initiate a community outreach and education program, and sponsor a spring clean up event. The third phase, occurring from April through October of 2002 would continue to provide curbside yardwaste collection by city personnel and sponsor a fall clean up event, There was discussion concerning the requirement that brush and woody materials be placed in a red polycart for curbside collection, and whether or not that requirement would place an undue burden on senior citizens. It was also suggested that the implementation date of October 15, 2001 be changed to November 1 to allow sufficient time for all citizens to be notified on their utility bills. Mr Williams moved, seconded by Mayor Barnhouse, to approve the Yardwaste Action flan, with the implementation date changed to November 1, 2001, AYE: Williams, Barnhouse, Helm, Armstrong, Brogdon NAY: Done Motion carried 5 -0, lic gjl� ED 'f. s -2- Owasso public Works Authority ITEM 9: ADJOURNMENT Mr Williams moved, seconded by Mr Helm to adjourn. AYE. Williams, Helm, Armstrong, Bro don, Bamhouse NAY; None Motion carried 5 -0, and the inecting was adjourned at 8:07 p.m. Marcia Boutwell, authority Secretary -3w September 18, 2001 Mary Lou Barnhouse, Chair i;i, General Juvenile Court Ambulance E -911 Capital Improvements Bond Projects owffi Refunds 105 Municipal Court 110 Managerial 120 Finance 150 General Government 160 Community Development 170 Engineering 175 Information Systems 191 Support Services 190 Cemetery 201 Police Services 215 Police Communications 221 Animal Control 250 Fire Services 230 Emergency Preparedness 300 Streets 516 Part Maintenance 550 Community Center 710 Economic Development 1!1A st ir-O" 50.00 312.63 521.91 69.67 3,685.26 440.01 404.57 350.41 976.61 57.99 2,101.45 1,371.47 339.45 2,764.85 32€3.31 3,474.91 902.54 344.19 50.00 13,496.23 75.00 75.00 5,151.35 9,531.77 9,531.77 114141B ? 463.33 225,427.02 225, 427.02 1,550. 947. k} OPWA 400 Administration 1,107.69 405 Utility Billing 4,224.95 420 Water 253,744.53 450 Wastewater treatment plant 4,919.34 455 Wastewater Collection 4,975.72 TOTAL 263,972.23 PWA Capital Improvements Debt Service 153,586.96 TOTAL 153,505.95 City Garage 185 City Garage 3,904.04 TOTAL 8,904.04 Workers' Comp Self Insurance 150 Workers' Comp 3,202.38 TOTAL 3,202.38 759,131741 OWASSO PUBLIC WORKS AUTHORITY PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 09/22/01 DEPARTMENT OVERTIME TOTAL. EXPENSES EXPENSES Wastewater 678.18 5,582.97 .. . . ......... . . APPROVED: October 2, 2001 TO. HONORABLE CHAIR AND TRUSTEES OWASSO PUBLIC WORKS AUTHORITY FROM. F. ROBERT CA RR, JR., P.E. PUBLIC WORKS DIRECTOR SUBJECT: AMENDMENT NO, I TO AGREEMENT FOR ENGINEERING DESIGN SERVICES - WASTEWATER TREATMENT PLANT EXPANSION DATE: September 27, 2001 BACKGROUND. The Oklahoma Water Resources Board (0WRB) administers the State Revolving Fund (SRF) loan program for municipal wastewater collection and treatment improvements. An approved Facilities Plan serves as the mechanism for selection of the most cost-eff-ective treatment system for a 20-year planning period. The document is the basis for detailed engineering design and construction of the needed improvements. The selected alternative in the approved Facilities Plan for the City of Owasso recommended a two-phased approach to increase plant capacity and improve performance to meet long-term discharge criteria. Phase I improvements designed to treat an average daily flow of 2.15 million gallons per day (MGD) to meet changes in water quality criteria were completed in 1998. Current average daily flow is approaching the original design capacity of the treatment plant and new effluent limitations are being proposed by the Oklahoma Department of Environmental Quality (ODEQ) that require increasing the treatment capabilities. Design for Phase 11 of the Wastewater Treatment Plant Improvements has been performed by Garver Engineers. Council approved a contract for engineering design services for expansion of the wastewater treatment plant with Garver Engineers on February 2, 1999. The scope of work defined at that time detailed work tasks to perform engineering services under one (1) phase of construction. Largely due to extreme accumulation of solids at the treatment plant, the project was divided into two (2) sub-phases. Phase IIA improvements involved construction of sludge dewatering facilities, sludge digestion, and modifications to the influent structure, ultraviolet disinfection system and main lift station. This portion of the plant expansion was completed in March 2001. Page 2 Amendment to Engineering Services Agreement Phase IIB improvements includes expansion of the treatment facility to handle additional hydraulic flog and organic loading. The plant is designed to be expanded from 2.15 MGD to 3.3 MGD by construction of additional clarification, blower building and conversion of the oxidation ditch to conventional activated sludge. Design plans and specifications have been completed and a permit to construct has been issued by ODEQ Some adjustments to the original engineering fee allocation have occurred as a result of phasing the project. Engineering fees for preliminary design and final design were split between both phases. Bidding, construction services, a majority of resident inspection and O&M manual preparation fees were upended during the construction of Phase IIA. In order to continue with Phase II, some of the sue engineering services are required. Kidding, construction services and resident inspection will be needed. Dividing the project into two phases results in needing the same the type of engineering services, however such items as separate bid documents, construction submittals and inspection is needed. `therefore, Garver, Engineers has provided an amendment to the original contract reflecting these fees. The following table is a summary of work tasks shoving the original contract and elements of work performed and /or remaining to be performed: INURRIU1119 Funds have been allocated and budgeted for , Plant Phase IlB expansion in the following categories: Page 3 Amendment to Engineering Services Agreement Construction $2,400,000 Engineering Design 160,000 Construction Phase Engineering 60,000 Resident Inspection 110,000 Contingency 170,000 0,000 Expenses (Bond, Legal, Financial) _--A5-604 `dotal $2,985,604 Based on the above allocation, sufficient funds have been budgeted in the 0VVRB loan for the needed engineering services. RECOMMENDATION: Approval of Amendment loo. 1. to the Agreement for Engineering Services for the Owasso Wastewater Treatment Plant Expansion (Phase 11) with Garver Engineers in an amount not to exceed $179,950.00. - Amendment No 2 - Graver Engineers letter dated September 13, 2001 detailing phasing fees 3 Graph of phasing of improvements (fi °om Facility Plan amendment dated September 1993) AMENDMENT NO. I TO THE AGREEMENT FOR ENGINEERING SERVICES OWASSO WASTEWATER TREATMENT PLANT EXPANSION — PHASE 11 This is AMENDMENT NCB. 1. made this —_ day of -- ____9 2001 to the Agreement for Engineering Services dated the 2nd day of February 1999 between the Owasso Public Works Authority, hereinafter referred to as the CITY and Garver Engineers, hereinafter referred to as the ENGINEER. WHEREAS, the Phase 11. improvements to the Owasso Wastewater Treatment Plant were split in two phases entitled Phase IIA and 1113, and WHEREAS, the construction of the improvements under Phase I has been completed, and WHEREAS, the final design of Phase EB has been completed, and WHEREAS, the Agreement provided that the ENGINEER provide Bidding Phase, Construction Phase Services, and Resident Inspection Services for one construction contract, and WHEREAS, the CITY desires that the ENGINEER provide said services for a second construction contract entitled Phase UB: NOW THEREFORE, it is mutually agreed as follows: 1. SCOPE OF WORK The ENGINEER shall provide the following services for the Wastewater Treatment Plant Expansion – Phase 1113. Prepare all bidding documents and related materials. Assist the Authority in publishing public notices as required by local, state, and federal laws. Respond to contractor's questions during the bid process. All bidding procedures will conform to the requirements of the Oklahoma Water Resources Board SIZE program. 2. Conduct a pre-bid conference. 3. Assist the Authority in obtaining and evaluating bids, negotiating proposals and preparing construction contracts. Assist the Authority in answering questions during the bidding phase. 4. Attend the bid opening and tabulate the bid proposals, make an analysis of the bids, and make recommendations for awarding contracts for construction. 1. Conduct a pre - construction conference with the Authority and the selected construction contractor(s). 2. Provide general engineering inspection of the work of the construction contractor(s) as construction progresses for a period of 11 months. 3. Provide horizontal and vertical controls in the form of a benchmark circuit as appropriate to the type of project to be constructed. 4. Check and approve any necessary shop and working drawings furnished by contractor(s). 5. Interpret the intent of the design drawing, documents, and specifications to protect the Authority against defects in deficiencies in construction on the part of the contractor(s). The ENGINEER will not, however, guarantee the performance of any contractor(s). 6. Review and approve requests for partial and final payments. `I. Make final inspection for the Authority of all construction and a written certification of final inspection for the Authority, ODEQ, and other agencies as appropriate. 8. Provide the Authority with record (as- built) drawings. Provide full time resident inspection for an 1 ! -month construction contract period. ScoFe /Section A B C Phase Bidding Phase Construction Phase Resident Inspection Total Lump Sum Fee bump Sum Fee $ 11,200.00 ,, • 1t The above fees are based on the manhours, salaries and direct costs as set out in Attachment A. ENGINEER has designated Jay Updike, P.E. as project Manager in the performance of the ,Services hereunder. ENGINEER agrees that no change will be made in the assignment of this position without prior approval of CITY. IN WITNESS WHEREOF, the parties have executed this AGREEMENT ENT in multiple copies on the respective dates herein below reflected to be effective on the date executed by the Chairman of the Owasso public Works .Authority. .Secretary APPROVED AS TO FORM: Authority Attorney GARVE . ENGINEERS Jay Updike, `lice president Date: OWASSO PUBLIC WORKS AUTHORITY Chairman Date: ISM[ '.... A. Bi in phase Prepare all bidding documents and related materials. assist the authority in publishing public notices as required by local, state, and federal laws. Respond to contractor's questions during the bid process. all bidding procedures will conform to the requirements of the ODEQ ,SRS' program. 2. Conduct a pre -bid conference. I assist the authority in obtaining and evaluating bids, negotiating proposals, and preparing construction contracts. assist the authority in answering questions during the bidding phase. 4. attend the bid opening and tabulate the bid proposals, male an analysis of the bids, and make recommendations for awarding contracts for constriction. _ � 1 _ 2 3 4 Total Flours Project manager 18 8 ..e.��� 12 � _.. l � 50 �- Sr. Design Engineer 6 8 8 0 22 Design Engineer 0 8 36 0 44 Drafter/Technician 0 0 0 0 0 Clerical 36 6 20 12 74 Personnel Flours Rate Markq Total Flours Project Manager 50 $31.82 2.80 $4,454 Sr. Design Engineer 22 $28.54 2.80 1,758 Design Engineer 44 $18.38 2.80 2,264 Drafter/Technician 0 $ 15.44 2.80 0 Clerical 74 $ 12.37 2.80 24563 Subtotal for Labor NBIWMI payee ]Jescri Lion Total Printing $80 Survey Supplies 0 Mileage/ Travel 81 Subtotal for Expenses 161 Total Lump Sum Fee $11,200 1. Conduct a pre construction conference with the .Authority and the selected construction contractor(s). 2. Provide general engineering inspection of the wwrork of the construction contractor(s) as construction progresses for a period of 12 months. 3. Provide horizontal and vertical control in the form of a benchmark circuit as appropriate to the type of project to be constructed. 4. Check and approve any necessary shop and working drawings furnished by contractor(s). 5. Interpret the intent of the design drawings, documents, and specifications to protect the .Authority against defects and deficiencies in construction on the part of the contractor(s). ENGINEER will not, however, guarantee the performance of any contractor(s). 6. Review and approve requests for partial and final payments. 7. bake final inspection for the Authority of all construction and a written certification of final inspection for the .Authority, ODE, and other agencies as appropriate. 8. Provide the Authority with record (as- built) drawings. Personnel 1 2 3 415 6 7/8 Total Hours Project Manager 12 80 12 30� 48 16 198 Sr. Design Engineer 48 64 6 40 18 4 180 Design Engineer 12 24 14 70 40 32 192 Drafter/Technician 10 10 10 50 10 80 170 Construction Observer 8 10 10 10 0 8 46 Clerical 0 0 4 16 16 6 42 Survey Crew 10 10 12 0 0 0 32 Personnel Hours Rate Markup otal Project Manager 198 $31.82 2.80 17,641 Sr. Design Engineer 180 $28.54 2.80 14,384 Design Engineer 192 $18.38 2.80 9,881 Drafter/Technician 170 $ 15.44 2.80 7,349 Construction Observer 46 $20.48 2.80 2,638 Clerical 42 $ 12.37 2.80 1,455 Survey Crew 32 $39.48 2.80 3,537 Subtotal for Labor $56,886 Expenses: Mee Descr 'Total Printing $900 Survey Supplies 50 Mika age/TraYe 664. Subtotal for Expenses 19614 Total Lump Sum Fee Co Resident Ingnerflan $58,500 Provide full time resident inspection for 11 month construction period. (48 hour work week for a construction period of 48 weeks.) Total resident inspection hours = 2,250° Construction Observer Fee m 2,250 hr-s x $17.50/hr x 2.80 overhead/profit* m $110,250 *Includes all direct costs for travel, meals, communication, etc. t By: HUB INC ; Qmrver, Inc, r1)g'1'r'q1A 1251t) EHM Ave Tutga, UK 7,11 A6-6POO, 9 18-2 FAX '-j I bl 250-fiC, ;N September 13, 2001 Memn to: F. Robert Cam From: Jay Updike Re�' Owvc ixj Phases ZIA &TIR 9186B27811; Sep-13-01 3,.48PM; Page 1/2 Our contract for dog gn, bidding and construction phase services dated February 2, 1.999 anticipated one, constmction contract nth a construction time of 1.4 Tnonths, Phase 1113 includes the hydraulic and organic expansion of the plant from 2,2 to 3.3 nigd. The project includes a 31d charifier, blower building, and conversation of the oxidation ditch to conventional actuated sludge, The construction time has been set at 11 manths, Brofftmoul. TN o FjVottovillil, 1H ® I Uitti,illo, AL - U14 Runk, AR - M96RO11, MS 0 TOMM. K' - Tulsa, OK nt By: HUB INC ; 9186B27BI1; Sep-13-01 3-,40PM; Page 2/2 Memo Scotember 1 200 A summary of our engineering fees on the project are presented below: We divided design fthe project into two phases without requesting additional compensation. The construedon time will end up being 23 months in lieu of 14 months as set otit on the original agreement. Pleme let xac know if you n", any additional information, m m m INITIME FUTURE PLAWNG ® MGD 2 D Ll I E® x1i PHASING OF IMPROVEMENTS viP