HomeMy WebLinkAbout2001.08.28_City Council Agenda_SpecialPUBLIC NOTICE OF THE MEETING OF THI
OWASSO CITY COUNCIL
TYPE OF MEETING:
Special
DATE:
August 28, 2001
TIME:
6:00 p.m.
PLACE:
Owasso City Fall
Lower Level Conference Room
Notice and agenda filed in the office of the City Clerk and posted on the City Stall bulletin board
at 2:30 pony. on Friday, August 24, 2001,
I
1 o gall to Order
Mayor Barnhouse
Marcia outwell, City erg
2, Discussion Relating to Water System Improvements Financing Options
Ms Bishop
Mr Mitchell
Attachment #2
3, Discussion Relating to Engineering for Phase I & Phase II of Water System Improvements.
Mr Carr
Attachment #3
Owasso City Council
August 28, 2001
Page 2
4. Report from City Manager
A. Replacement Vehicle for City Manager/Transfer to Police Department
B. Employee Wage & Benefit Summary
C. OML Conference
D. Other Items
Mr Mitchell
Adjournment,
'r o.. THE HONORABLE MAYOR & CITY COUNCIL
CITY OF OWASSO
FROM: MARCIA BOUTWELL
CITY CLERK
SUBJECT: COUNCIL WORK SESSION SCHEDULE FOR 8/28/01
DATE- August 28, 2001
Information and discussion relating to the following issues is planned for the City Council work
session on 'Tuesday, August 28"' beginning at 6:00 p.me in the Lower Level Conference Room
at Owasso City Hall,
L Discussion RelatinR to Water Svstern Im-Provements Fingnciiqg-QptioRs - Keith McDonald,
Mr Mitchell, & Ms Bishop will discuss financing options for the proposed water system
improvements. See attachment 9-2.
2. Discussion Relating to for Phase I and Phase 11 of Water System
Improvements - Mr Carr will discuss proposed engineering design services for water
system improvements, including proposed costs and scope of services. See attachment #2.
3. Deport from Citv Manager - Mr Mitchell will report on several items, including a
replacement vehicle for the City Manager & transfer of the City Manager's current vehiclee
to the police department, an employee wage & benefits summary, the OML Conference,
and other items.
207 South Cedar
PO Box
Owasso, `'rial 74055
uty of Owasso
MEMORANDUM
AUGUST 24, 2001
To. Mayor Barnhouse and City Council
Frog: Larry Mitchell® City Manager
Sherry Bishop® Finance Director
Subject. Financing of Water System Improvements
(918) 272 ®2251
FAX ( 18) 272A.999
w
C3
IJJ
1
EM
Water & Sewer Rate Increases, With Connection Growth*
Year
1
2
3
4
5
Water Rate Increase
$
546,253.17
$
657,962.06
$
773,580.76
$
893,246.11
$
924,509.72
Sewer Rate Increase
- 139,307.99
287,0'12.83
443,531.65
609,300.48
630,626.00
Total
$
685,561.16
$
944,974.89
$
1,217,112.40
$
1,502,546.59
$
- 1,555,135.72
Additional Debt Payments
685,628.30
852,759.52
1,194,318.01
1,194,318.01
1,194,318.01
Excess
$
(67.14)
$
92,215.37
$
22,794.40
$
308,228.58
$
360,817.71
Current Water Base Rate
$
7.50
Current Water Consumption Rate
$
3.20
Water Base Rate
$
9.00
$
9.00
$
9.00
$
9.00
$
9.00
Water Consumption Rate
$
3.52
$
3.52
$
3.52
$
3.52
$
3.52
Current Sewer Base Rate
$
3.33
Current Sewer Consumption Rate
$
1.72
Sewer Base Rate
$
3.33
$
3.33
$
3.33
$
3.33
$
3.33
Sewer Consumption Rate
$
1.72
$
1.90
$
2.08
$
2.26
$
2.26
"Sewer rate increases reflect those previously approved by the Authority.
OPVVA
Refunding Revenue Bonds, Series 1997
Revenue Bonds, Series 1998
Promissory Notes to OWRB:
Series 1993A
Series 19938
Series 1999A
Series 19998
Series 2001A
Series 2001 B
Series 2001
Promissory Note to FBO
Revenue Anticipation Note
OPGA
Revenue Bonds (OPWA), Series 1996
Revenue Anticipation Note, 1993
Capital Lease
TOTAL
PROPOSED DEBT
OWASSO PWA
Long-Term Debt
Approximate
3,630,000.00
Annual
Original
Payment
Amount
$ 52.0,000.00
$ 4,345,000.00 $
1.128.000.00
8.500.000.00
Principal Accounting
Outstanding Fund
3,420,000.00 OPWA (6.1) & SALES TAX (67)
6,795,000.00 OPWA (61) & SALES TAX (67)
290,000.00
3,630,000.00
2,835,000.00
OPWA CAP IMP (62)
60,000.00
970,000.00
895,200.00
OPWA CAP IMP (62)
50,000.00
931,609.92
812,173.00
OPWA CAP IMP (62)
40,000.00
570,000.00
541,100.00
OPWA CAP IMP (62)
56,000.00
1,029,535.03
1,029,535.03
OPWA CAP IMP (62)
140,000.00
1,805,000.00
1,805,000.00
OPWA CAP IMP (62)
80,000.00
1,005,000.00
1,005,000.00
OPWA CAP IMP (62)
276,000.00
1,200,000.00
648,358.00
OPWA SEWER EX -r (65)
163,000.00
1,800,000.00
712,970.00
OPWA SEWER EXT (65)
$ 480,000.00
$ 5,340,000.00 $
4,885,000.00
OPGA (55)
64,350.00
400,000.00
170,000.00
OPGA (55)
49,656.00
166,690.00
75,190.00
OPGA (55)
$ 3,347,350.00
$
25,554,336.03
2001:
OWRB IIB SRF Interim Construction Note $
Water System Improvements Phase 1 - 3
2002:
OWRB IIB Refinance (SRF)
OWRB IIB Refinance (FAP)
2003:
Water System Improvements Phase 4 - 6
106,362.14
$ 2,985,604.00
OPWA CAP IMP (62)
579,266.16
7,270,594.00
OPWA CAP IMP (62)
59,712.08
1,194,241.60
OPWA CAP IMP (62)
164,125.28
2,060,000.00
OPWA CAP IMP (62)
341,558.49
4,287,033.00
OPWA CAP IMP (62)
ANNUAL TOTAL 2001 $ 4,032,978.30 $ 685,628.30
ANNUAL TOTAL 2002 $ 4,200,109.52 $ 852,759.52
ANNUAL TOTAL 2003 $ 4,541,668.01 $ 1,194,318.01
IM
Proposeci ionasing of improvements:
Project
Project
Quantity
Construction
Number
Description
Diameter
(feet)
Cost ($)
30 -inch Transmission main
30
16,000
$
2,496,000
2
16-inch Transmission line replacing existing 10 -Inch
16
13,300
$
1,296,750
3
24 -inch Dine Upgrade at 96th & Garnett
24
1,200
$
156,000
4
16 -inch line replacing 8 -inch line on '116th Street
16
2,600
$
253,500
5
New 12-inch Transmission line
12
3,000
$
156,000
6
12 -Inch line on Mingo
12
5,280
$
274,560
i�
20 -inch line across 96th Street
20
8,300
$
663,200
New 12 -inch line on 96th Street
12
5,300
$
275,600
New 16-inch line on 96th Street
16
1,000
$
97,500
10
12-inch line
12
2,500
$
130,000
11
12 -inch line on 145th E. Avenue
12
5,280
$
274,560
('
24-inch line replacing 12 & 10 -inch lines
24
8,600
$
1,118,000
13
10-inch Dine for National Steak & Poultry f=ire Flow
10
900
$
40,950
14'
2.0 MG Elevated Storage Tank
n/a
2.0 M
$
2,060,000
5
200 HP Pump Station
n/a
200 hp
$
910,000
16
Additional Space in PS for Future Pumps
n/a
n/a
$
130,000
L.: E17
2 0-inch PRV for Lower Pressure done
n/a
n/a
$
26,000
Total
10,578,620
LF F�i�ing
Cost
Phase 1A (shaded)
48,400
$
9,173,450
Phase 1R
24,860
$
2,523,170
`total
73,260
10,578,620
Proposed Construction Contracts,
Project
Project
Quantity
Construction
Number
Description
Diameter
(feet)
Cost {$)
Ccnstructi ®r� Contract #t
15
200 HP Pump Station
n/a
200 hp
$
910,000
16
Additional Space in PS for Future Pumps
n/a
n/a
$
130,000
17
20-inch PRV for lower Pressure Zone
n/a
rt/a
$
26,000
Total Contract Amount
$
1.066,000
Construction Contract #2
1
30 -inch Transmission main
30
16000
$
2,496,000
3
24 -inch tine Upgrade at 96th & Garnett
24
1200
$
156,000
Total Contract Amount
$
2,652,000
Construction Contract #3
14
2,0 MG Elevated Storage Tank
n/a
2.0 MC
$
2,080,000
Total Contract Amount
$
2,080,000
Construction Contract #4
7
20 -inch line across 96th Street
20
8300
$
863,200
9
New 16-inch line on 96th Street
16
1000
$
97,500
Total Contract Amount
$
960,700
Construction Contract #5
2
16 -inch Transmission line replacing existing 10 -inch
16
13300
$
1,296,750
Total Contract Amount
$
1,296,750
Construction Contract #S
12
24-inch line replacing 12 & 10 -inch lines
24
8600
$
1,118,000
`total Contract Amount
$
1,118,000
Total ferail6 Ccrr�irtacticn C ®rptract�
$
9,173,450
k
a� J,
Construction Contract #1 - Pump Station
Investigate and Finalize Siang
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract 92 - 30' Transmission Main
Investigate and Finalize Alignment
Survey
Geolechnicall
Detailed Design
Bidding
Construction
Construction Contract 03 - Elevated Tank
Investigate and Finalize Siting
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #4 - 20* Transmission Main
Investigate and Finalize Alignment
Survey
Geolechnical
Detailed Design
Bidding
Construction
Construction Contract #5 -16° Transmission Main
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #6 - 24' Transmission Main
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
ccaa p 9 2 9 9 9 9 9 q 9 9 1;1 0 9 9 q q 1;1 q q 1;1 9 9 0 -C >ca U ? C? v R > 0 CL
0 0
0
0Z a �LLM 't <Crl Z <9)
< 0 2
N
I
f
ur
Broken Arrow
Base Bate
Consumption Rate
$11.59
$19.34
Tulsa
flnrludes 100Q-g I
r 1000 coal
pir 50 0 Ilons
Per 10 DDQ allQns
Sand Springs
$5.75
$2.82
Sorted by base Rate
$31.13
Collinsville
$8.37
$2.27
Broken Arrow
$5.39
$1.55
$11.59
$19.34
Sand Springs
$5.75
$2.82
$17.03
$31.13
Tulsa
$5.83
$1.98
$13.75
$23.65
Owasso
$7.50
$3.20
$20.30
$36.30
Sapulpa
$7.77
$3.40
$21.37
$38.37
Bixby
$8.00
$2.90
$19.60
$34.10
Collinsville
$8.37
$2.27
$17.45
$28.80
Jenks
$9.10
$3.14
$21.66
$37.36
Rogers RWD #3
$12,00
$2.50
$22.00
$34.50
Washington RWD #3
$12.50
$3.00
$24.50
$39.50
Sorted by Cons m i n a
$28.80
Sand Springs
$5.75
$2.82
Broken Arrow
$5.39
$1.55
$11.59
$19.34
Tulsa
$5.83
$1.98
$13.75
$23.65
Collinsville
$8.37
$2.27
$17.45
$28.80
Rogers RWD #3
$12.00
$2.50
$22.00
$34.50
Sand Springs
$5.75
$2.82
$17.03
$31.13
Bixby
$8.00
$2.90
$19.60
$34.10
Washington RWD #3
$12.50
$3.00
$24.50
$39.50
Jenks
$9.10
$3.14
$21.66
$3736
Owasso
$7.50
$3.20
$20.30
$36.30
Sapulpa
$7.77
$3.40
$21.37
$38.37
Broken Arrow
$5.39
$1.55
$11.59
$19.34
Tulsa
$5.83
$1.98
$13.75
$23.65
Sand Springs
$5.75
$2.82
$17.03
$31.13
Collinsville
$8.37
$2.27
$17.45
$28.80
Bixby
$8.00
$2.90
$19.60
$34.10
Owasso
$7.50
$3.20
$20.30
$36.30
Sapulpa
$7.77
$3.40
$21.37
$38.37
Jenks
$9.10
$3.14
$21.66
$37.36
Rogers RWD #3
$12.00
$2.50
$22.00
$34.50
Washington RWD #3
$12.50
$3.00
$24.50
$39.50
Sorted by 10,000 usage
Broken Arrow
$5.39
$1.55
$11.59
$19.34
Tulsa
$5.83
$1.98
$13.75
$23.65
Collinsville
$8.37
$2.27
$17.45
$28.80
Sand Springs
$5.75
$2.82
$17.03
$31.13
Bixby
$8.00
$2.90
$19.60
$34.10
Rogers RWD #3
$12.00
$2.50
$22.00
$34.50
Owasso
$7.50
$3.20
$20.30
$36.30
Jenks
$9.10
$3.14
$21.66
$37.36
Sapulpa
$7.77
$3.40
$21.37
$38.37
Washington RVVD #3
$12.50
$3.00
$24.50
$39.50
a It
Base Rate
Consumption Rate
Includes 100 I
_per 1000 Mal
F' it M al-I
Per kK0 gal on
S r eb� t
Jenks
$2.82
$1.46
$8.66
$15.96
Broken Arrow
$3.75
$0.95
$7.55
$12.30
Bixby
$5.00
$0.92
$8.68
$13.28
Owasso
$5.05
$1.72
$11.93
$20.53
Sand Springs
$ &40
$2.80
$16.60
$30.60
Tulsa
$6.17
$2M
$14.69
$25.34
Collinsville
$7.71
$1.15
$12.31
$18.06
Sapulpa
$1138
$1.65
$19.98
$28.23
Bixby
$5.00
$0.92
$8.68
$13.28
Broken Arrow
$3.75
$0.95
$7.55
$12.30
Collinsville
$7.71
$1.15
$12.31
$18.06
Jenks
$2.82
$1.46
$8.66
$15.96
Sapulpa
$13.38
$1.65
$19.98
$28.23
Owasso
$5.05
$1.72
$11.93
$20.53
Tulsa
$6.17
$2.13
$14.69
$25.34
Sand Springs
$5.40
$2.80
$16.60
$30.60
Sorted b5000 usage
Broken Arrow
$3.75
$0.95
$7,.55
$12.30
Jenks
$2.82
$1.46
$8.66
$15.96
Bixby
$5.00
$0.92
$8.68
$13.28
Owasso
$5.05
$1.72
$11.93
$20.53
Collinsville
$7.71
$1.15
$12.31
$18.06
Tulsa
$6.17
$2.13
$14.69
$25.34
Sand Springs
$5.40
$2.80
$16.60
$30.60
Sapulpa
$13.38
$1.65
$19.98
$28.23
Sorted by 10, 000 rasa
Broken Arrow
$3.75
$0.95
$7.55
$12.30
Bixby
$5.00
$0.92
$8.68
$13.28
Jenks
$2.82
$1.46
$8.66
$15.96
Collinsville
$7.71
$1.15
$12.31
$18.06
Owasso
$5.05
$1.72
$11.93
$20.53
Tulsa
$6.17
$2.13
$14.69
$25.34
Sapulpa
$13.38
$1.65
$19.98
$28.23
Sand Springs
$5.40
$2.80
$16.60
$30.60
TO: HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: F. ROBERT CARR, JR., P.E. t
PUBLIC WORKS DIRECTOR
SUBJEc'n WATER SYSTEM IMPROVEMEN,rS DESIGN SERVICES
DATE. August 249 2001
Attached is a draft Agreement for Engineering Services with MWH Americas, Inc. (formerly
Montgomery-Watson) for Phase I and 11 Water System Improvements as detailed in the Water
Master Plan, A map of proposed improvements is included for reference.
Costs of the engineering services are shown in the Fee/Manhour Calculation (see Attachment E
of the Agreement) for each designated project and details of the percentage of construction cost
are provided. The schedule for design and construction is also included (see Attachment F of the
Agreement).
I — Diagram of Phase I and II Water System Improvements
2 —Draft Engineering Services Agreement
0
cr)
0
w
cf)
5;
w
X
co
CKI
0
- -----------
CONTRACT #7.
12" AND 16," S._.._)
Id,
10 611KII-Y ls�, 'V - �NTC-Dl .1
4
go"mi I 'T T-f
e6lill-I 01.1. INft2k-
EXISTM
2M MW
"ll
rvi
K'ZCONTRAC% #8
12" LINE
CONTR T #2 REPLACE
DIAIVMMM LESS THAN 4"
30" TI MMUSSION LME,
j
PUAV TA77ON TO 96TH ST. K
CONTRACT #1
2
9 THS
T
-4- q
200 HP PUMP STATIO
PUWS
ADDITIONALSPACE 0 PUWS) CONTRACT #6
20® PRV 0 Jim
0 24" LINE ACING
-'-10" AND I 11LUINES
Proposed Phasing of Improvements:
Proposed Construction Contracts:
�£ y
tdtar:ibei
1
� ?d93trri�%U� }� ` n. .,. „.., i,:.
_�tari� eel'
U etnt♦
}
'iii�R •<
Ar9�eG�
Prola�t
; v
00antttY
Consfr�fahan
15
200 HP Pump Station
n/a
200 hp
$ 910,000
1
30 -inch Transmission main
30
16,000
$ 2,496,000
2
16 -inch Transmission line replacing existing 10 -inch
16
13,300
$ 1,296,750
3
24 -inch Line Upgrade at 96th & Garnett
24
1,200
$ 156,000
4
16 -inch line replacing 8 -inch line on 116th Street
16
2,600
$ 253,500
5
New 12 -inch Transmission line
12
3,000
$ 156,000
6
12 -Inch line on Mingo
12
5,280
$ 274,560
7
20 -inch line across 96th Street
20
8,300
$ 863,200
8
New 12 -inch line on 96th Street
12
5,300
$ 275,600
9
New 16 -inch line on 96th Street
16
1,000
$ 97,500
10
12 -inch line
12
2,500
$ 130,000
11
12 -inch line on 145th E. Avenue
'12
5,280
$ 274,560
12
24 -inch line replacing 12 & 10 -inch lines
24
8,600
$ 1,118,000
13
10 -inch Lino for National Steak & Poultry Fire Flow
10
900
$ 40,950
'14
2.0 MG Elevated Storage Tank
n/a
2.0 MG
$ 2,080,000
15
200 HP Pur'np Station
n/a
200 hp
$ 910,000
16
Additional Space in PS for Future Pumps
n/a
n/a
$ 130,000
17
20 -inch PRV for louder pressure zone
n/a
n/a
$ 26,000
18
16 -inch transmission main
16
1,400
$ 109,200
19
6 -inch line small pipe replacement
6
25,000
$ 830,500
20
New 24 -inch Motor at Tulsa Take Point
24
n/a
$ 29,900
Total
$ 11,548,220
Proposed Construction Contracts:
�£ y
tdtar:ibei
1
� ?d93trri�%U� }� ` n. .,. „.., i,:.
_�tari� eel'
U etnt♦
}
'iii�R •<
orts, iru/�t gn
J pp y f
Construction Contract #1
15
200 HP Pump Station
n/a
200 hp
$ 910,000
16
Additional Space in PS for Future Pumps
n/a
n/a
$ 130,000
17
20 -inch PRV for lower pressure zone
n/a
n/a
$ 26,000
Total Contract Amount
$ 1,066,000
Construction Contract #2
1
30 -inch Transmission main
30
16,000
$ 2,496,000
3
24 -inch Line Upgrade at 96th & Garnett
24
1,200
$ 156,000
$ 2,652,000
Total Contract Amount
Construction Contract #3
14
2.0 MG Elevated Storage Tank
n/a
2.0 MG
$ 2,080,000
$ 2,080,000
Total Contract Amount
Construction Contract #4
7
20 -inch line across 96th Street
20
8,300
$ 863,200
9
New 16 -inch line on 96th Street
16
1,000
$ 97,500
$ 960,700
Total Contract Amount
Construction Contract #5
2
16 -inch Transmission line replacing existing 10 -inch
16
13,300
$ 1,296,750
$ 1,296,750
Total Contract Amount
Construction Contract #6
12
24 -inch line replacing 12 & 10 -inch lines
24
8,600
$ 1,118,000
$ 1,118,000
Total Contract Amount
Construction Contract #7
4
16 -inch line replacing 8 -inch line on 116th Street
16
2,600
$ 253,500
5
New 12 -inch Transmission line
12
3,000
$ 156,000
6
12 -Inch line on Mingo
12
5,280
$ 274,560
8
New 12 -inch line on 96th Street
12
5,300
$ 275,600
$ 959,660
Total Contract Amount
Construction Contract #6
10
12 -inch line
12
2,500
$ 130,000
11
24 -inch line replacing 12 & 10 -inch lines
24
5,280
$ 274,560
13
10 -inch Line for National Steak & Poultry Fire Flow
10
900
$ 40,950
18
16 -inch transmission main
16
1,400
$ 109,200
19
6 -inch line small pipe replacement
6
25,000
$ 830,500
20
New 24 -inch Meter at Tulsa Take Point
24
n/a
$ 29,900
$ 1,415,110
Total Contract Amount
Total for all 8 Construction Contracts
$ 11,548,220
Construction Contract 41 - Pump Station
Investigate and Foallze Siting
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #2 - 30" Transmission Main
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #3 - Elevated Tank
Investigate and Finalize Siting
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract 44 - 20" Transmission Main
Investigate and Finafze Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #5 - 16" Transmission Main
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #6 - 24" Transmission Main
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
Construction Contract #7 - 12" Transmission Lines
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Construction
construction Contract #8 - Additional Line Improvements
Investigate and Finalize Alignment
Survey
Geotechnical
Detailed Design
Bidding
Constructon
O O O O O O O O O
-' G 0 0 Z O ti Q - -' 4 Z 0 C
O O 8 2 O O O 8 O O O O O O O O O O O O O O
4 N Z ti S _' Q N Z ti S Q
MR
gm
no
�
o
�
0
Im
O
J F m A m J J A S D
Calendar Years 2000 and 2001
CITY OFOVVASS0 TOTAL WATER USE
125
375
5.00 Calendar Year 2000
-Calendar Year 2001
10.00
AGREOR EM61T
F
THIS AGREEMENT, made and entered into this — day of 9
2001 between the Owasso Public Works Authority, Owasso, Oklahoma, hereinafter
referred to as CITY, and MWH AMERICAS, INC., hereinafter referred to as ENGINEER;
WITNESSETH:
1 SCOPE OF PROJECT-. The scope of this PROJECT is described in Attachment
A, SCOPE OF PROJECT, which is attached hereto and incorporated by
reference as part of this AGREEMENT.
nql*
111,11111,11111 10 11111101 MINUM 116,11-1-l"'NUM-00-101
tiftlywomm
3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters
described in Attachment C, RESPONSIBILITIES OF THE CITY OF OWASSO,
which is attached hereto and incorporated by reference as part of this
AGREEMENT.
Iml o► AN
�V I WARA i R iol a mo, I's tal
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment
B, SCOPE OF SERVICES, in accordance with the schedule set forth in
Attachment F, SCHEDULING, which is attached hereto and incorporated by
reference as part of this AGREEMENT.
6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERTICES
undertaken in a manner consistent with the prevailing accepted standard for
similar services with respect to projects of comparable function and complexity
7. LIMITATION OF RESPONSIBILITY.
7.1 ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs
in connection with the PROJECT.
11 a INSURANCE
11.1. luring the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
11.1,1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in
the aggregate, and with property damage limits of not less than
$100,000 for each occurrence and not less than $100,000 in the
aggregate.
11 1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for
each accident and with property a
000 for each accident.
Compensation a e in accordance
requirements and Employers' Liability Insurance with limits of not
less than $100,000 for each occurrence.
11.1.4.Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and
Omissions a; g e to be for a m $500,000, deductibles
subject
11.2 ENGINEER shall furnish CITY certificates insurance
include a provision tha insurance shs be w! without at
least 30 days written notice to the CITY.
12. OWNERSHIP AND REUSE OF DOCUMENTS. v ' > k r
!
12.1. All documents, including original drawings, estimates, specifications, field
notes and data shall become and remain the property of the CITY. `° 4V F
12.2. CITY'S reuse of such documents without written verification or adaptation
by ENGINEER for the specific purpose intended shall be at CITY'S risk.
11 TERMINATION OF AGREEMENT.
13.1 . `the obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the
terms hereof through no fault of the terminating party,
7o CITY: OWASSO PUBLIC WORKS AUTHORITY
P.O. Sox 180
Owasso, Oklahoma 74055
Attention: F. Robert Carr, Jr., P.F.
Nothing contained in this Article shall be construed to restrict the
transmission of routine communications e n representatives
UNCONTROLLABLE ENGINEER and CITY.
- Neither _ R shall be
including, considered to be in default of this AGREEMENT if delays in or failure of
performance shall be due to forces which are beyond the control of the parties;
but not limited flood, a a storms, g i ,
4
16. SEVERABILITY, If any portion of this AGREEMENT shall be construed by a
court of competent jurisdiction as unenforceable, such portion shall be severed
herefrom, and the balance of this AGREEMENT shall remain in full force and
effect
19. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant
to this AGREEMENT, provided that nothing contained in this paragraph shall
prevent ENGINEER from employing such independent consultants, associates,
and subcontractors as ENGINEER may deem appropriate to assist ENGINEER
in the performance of the SERVICES hereunder.
21. KEY PERSONNEL. ENGINEER has designated Darryl Corbin, P.E., as Principal-
In-Charge and Brian Williams as Project Manager in the performance of the
SERVICES hereunder. ENGINEER agrees that no change will be made in the
assignment of these positions without prior approval of CITY.
a,
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple
copies on the respective dates herein below reflected to be effective on the date
executed by the Chairman of the Owasso Public Works Authority.
APPROVED AS TO FORM:
Authority Attorney
.Ashok V rma, Mice President
Date,
OWASSO PUBLIC WORDS AUTHORITY
Chairman
EM
M,
Agreement
for
Scope of Project
Attachment A
SCOPE OF PROJECT. The PROJECT shall include eight capital improvements
contracts required to construct improve the City of Owasso water distribution system,
The background for design of each capital improvements contract is presented in the
Water Master Plan for the City of Owasso, While this document provides a starting point
for the recommended improvements, the details will be developed during design and
may change as agreed by the CITY and the ENGINEER.
The eight capital improvements contracts are defined as follows:
Capital Improvements Contract 1: Booster Pump Station
This contract includes installation of a new 200 hp pump station utilizing constant
speed pumps. Inlet piping, discharge piping, process piping, and related isolation
and control valves will be provided. The pump station will be housed in an
approximately 5,000 square foot building, Plumbing will be provided for the roof
gutter, and floor drains..
Electrical and instrumentation work will include the electrical feed service to the
pump station, conduit and wiring for the equipment, building exterior and interior
lighting, and electric overhead door, and a communications link,
Also included in this contract is the installation of a 20-inch pressure-reducing
valve for the proposed low pressure zone.
Capital Improvements Contract 2: Garnett Road 30-inch Transmission Main
This contract includes installation of a 30-inch transmission main from the new
pump station on 76th Street east along 76th and then north along Garnett Road to
96th Street.
This contract includes installation of 20-inch and 16-inch transmission mains on
•• 1h Street.
Capital Improvements Contract 5: Garnett load 16-inch Transmission Main
This contract includes replacement of a 10-inch transmission line on Garnett
Street with a new 16-inch line, The new main starts at 961h and runs north to 121s'
Street,
Capital Improvements Contract : 761h Street 24 -inch Transmission Main
This contract includes replacing 12- and 10 —inch lines on 7611i Street with a new
24 -inch line.
Capital Improvements Contract 7: North -West Legion Transmission Dines
This contract includes replacernent of an 6 -inch line with a 16-inch line on 116$"
Street (west of Garnett), installation of a new 12-inch transmission line on 1161h
(east of Mingo), installation of a 12 -inch line on Mingo Road between 1061h and
116th, and a new 12 -inch line on 961h Street east of 129111 Street,
Capital Improvements Contract : South Legion Water Mains
This contract includes installation of a 12-inch line on 145 E. Avenue, 12 -inch
and 16-inch transmission mains, replacement of miscellaneous small pipes with
6 -inch pipes, a 10-inch line for the National Steak and Poultry fire flow, and a
new 24-inch meter at the Tulsa take point,
Agreement
for
Scope ®f Services
Attachment B
BASIC SERVICES
The Basic Services of ENGINEER include the following tasks for each of the eight
capital improvements contracts.
PROJECT MANAGEMENT
Engineer shall provide project management of ENGINEER'S activities,
ENGINEER shall conduct a kick-off meeting with for the purposes of introducing
staff of parties, establishing communication protocols, establishing PROJECT
goals, and receiving comments from CITY on preliminary PROJECT schedule
and PROJECT management plan.
ERGIREER shall establish a database of historical and current information regarding
features of the CITY'S service area for proposed site and alignment alternatives:
PRELIMINARY DESIGN
e1qw
T Lt7FM 55,77, uO-ff 77TFr, 1=1 T IA 19 11 0 11 -M7 '(7870
improvements project and finalize the design through performance of the following
services:
In
BID PHASE SERVICES
ENGINEER shall evaluate the kids received through performance of the following
services:
ri
5, ENGINEER shall review bid proposals, review qualifications of bidders, prepare
bid tabulation and a letter of recommendation for award of a construction contract
for the capital improvements project to the apparent lowest responsive and
responsible bidder,
6, `three copies of full -size (24" x 36 ") drawings, three copies of reduced -size
(11 "x17 ") drawings, and six copies of specifications and addenda will be
delivered to the successful bidder.
Deliverables for the Bid Phase Services `tusk will include:
CONSTRUCTION PHASE SERVICES
ENGINEER shall provide CITY with assistance during construction of the PROJECT,
through performance of the following services:
12
Reviewed sh ®p drawings
RFI responses
13
® Final punch list
® Record drawings
SPECIAL SERVICES
The following services and all services not identified above as Basic Services are
Special Services. Special Services shall not proceed without written authorization by the
CIS. Payment for Special Services shall be as described in Attachment D.
MWH Americas, Inc. (MW H) will contract the services of a qualified Land Surveyor(s),
registered in the State of Oklahoma, to perform topographical surveys for pipeline
alignments, one elevated tank site, and one booster pump station site approved for
preliminary design by the City of Owasso.
Survey for Pipelines
Topographic surveys will be performed along the full length of each proposed pipeline
alignment. Topographic surveys shall include a profile of the ground elevation along
centerlines of each alignment and identify locations of all surface features within 25 feet
either side of centerlines. Features will include, but not be limited 'to, the locations of:
architectural landscaping,
trees (caliper diameters 5- inches or larger),
IMMMEM
above ground structures, buildings and fences,
ii 1011 10111111114.111! . 1�
�.
VMS
drainage ways, swales, creeks and river beds.
existing underground
,y the City of R ,; d: G
pull-boxes dves, utility
property A_ right-of-way
acent to or impacting said
14
Topographic surveys will be performed for one elevated tank and one booster pump
station site. Site locations will be selected and approved by the City of Owasso for
preliminary design. Surveys will provide ground surface topography extending beyond
site property boundaries for 50 feet in all directions, where practical. All surface features
and utilities, as indicated above, shall be located and shown for each site.
Survey services will not include construction staking or property staking for platting
purposes, production of metes and bounds descriptions, or any written documentation
utilized for acquisition of property and /or easements. Acquiring approvals for right-of-
entry and /or access to any public and /or private properties in order to perform surveys
will be the responsibility of the City of Owasso.
OT CHNICAL INVESTIGATION AND REPORT
MWH will contract the services of a Oeotechnical Engineer(s), qualified and
professionally registered in the state of Oklahoma, to perform borings sampling and
soils analyses for design construction contracts approved by the City of Owasso,
15
PROJECT MANAGEMENT SPECIAL SERVICES
Assistance to the CITY as an expert witness in any litigation with third parties,
arising from the development or construction of the PROJECT including the
preparation of engineering data and reports.
16
5. Preparation of applications and supporting documents for governmental grants,
loans or advances in connection with the PROJECT.
6. Review and evaluation of the effect on design requirements of the PROJECT of
any assessments, statements, or documents prepared by others.
7. Revising previously accepted studies, reports, design documents or Contract
Documents when such revisions are required by changes in laws, rules,
regulations, ordinances, codes or orders enacted subsequent to the preparation
of such studies, reports, and documents, or are due to causes beyond the
ENGINEER'S control,
8. Preparation of and submittal of Flood Plain revisions to FEMA,
FINAL DESIGN SPECIAL SERVICES
Preparation and/or definition of bid alternatives in the Bid Documents.
2. Use of design criteria not conforming with OD EQ standards.
3. Preparation of permit applications for any CITY, State, or Federal permits
required for the PROJECT,
4. Providing Value Engineering during the course of design.
5. Additional copies of, reports, drawings and specifications over the number
specified in the base contract.
BID PHASE SPECIAL SERVICES
WAM
I Services in evaluating and determining the acceptability of an unreasonable and
excessive number of substitutions proposed by Contractor.
2. Resident project representative services.
3. A formal construction partnering program including partnering workshops.
17
7r,
4. Services in making revisions to Drawings and Specifications occasioned by the
acceptance of substitutions by the CITY proposed by the capital improvements JV
contractor.
5. Preparation of reports summarizing construction progress.
. Detailed quantity surveys of materials, equipment, and labor during or after
18
Agreement T
for
Engineering Services
Ar
Responsibilities of the City of Owasso
Attachment C
RESPONSIBILITIES OF THE CITY. The CITY agrees:
1.0 Emo_rts
etc. tc. To furnish, as required by the work, and not at expense
�
to the ENGINEER:
1,1 Records, reports, studies, plans, drawings, and other data available in the
files of the CITY which may be useful in the work involved under this
AGREEMENT.
2.0 Access. To provide access to public and private property when required in
performance of ENGINEER'S SERVICES,
3.0 Specifications. To provide front-end specifications, including notice to bidders,
instruction to bidders, bid forms, agreement, general conditions, etc,
5.0 Review. Examine all studies, reports, sketches, estimates, drawings, and other
documents presented by ENGINEER and render in writing decisions pertaining
thereto with a reasonable time so as not to delay the services of ENGINEER. All
review comments shall be combined on one copy of the study, report, sketch,
estimate, drawing, or other document.
6.0 Costs. Pay for costs related to the following items.
5.2 Permits required for construction.
7.0 EgjnUpj�M Provide po services either in house or subcontracted, to
locate existing utilities as required by the ENGINEER.
V,. 0 Resident Representative Services. To provide full- or part-time Resident
Engineering and Construction Inspection for the duration of construction. The
Resident Representatives shall be responsible for the following items, at a
llimei-It.
19
i
Agreement
for
Compensation
Attachment D
f
Capital Improvements Contract 1: Booster Pump Station
Siting Investigation
$6,239
Preliminary Design and Final Design
$143,352
Bidding and Construction Management
$51,317
Capital Improvements Contract 2: Garnett Road 30-inch Transmission
Main
Alignment Investigation
$6,882
Preliminary Design and Final Design
$86,794
Bidding and Construction Management
$27,877
Capital Improvements Contract 3: 2.0 MG Elevated Storage Tank
Siting Investigation
$6,239
Preliminary Design and Final Design
$98,649
Bidding and Construction Management
$38,568
Capital Improvements Contract 4: 96th Street Transmission Mains
Alignment Investigation
$6,882
Preliminary Design and Final Design
$61,142
Bidding and Construction Management
$27,820
Capital Improvements Contract 5: Garnett Road 16-inch Transmission
Main
Alignment Investigation
$6,882
Preliminary Design and Final Design
$68,537
Bidding and Construction Management
$27,820
Capital Improvements Contract 6: 76th Street 24-inch Transmission Main
Alignment Investigation
$6,882
Preliminary Design and Final Design
$58,984
Bidding and Construction Management
$27,820
Capital Improvements Contract 7: North-West Region Transmission Lines
Alignment Investigation
$6,882
Preliminary Design and Final Design
$65,336
Bidding and Construction Management
$31,239
Capital Improvements Contract 8: South Region Water Mains
Alignment Investigation
$8,753
Preliminary Design and Final Design
$96,098
Bidding and Construction Management
$33,617
21
Principal Engineer $150 per hour
Supervising Engineer $126 per hour
Senior Engineer $97 per hour
Engineer $85 per hour
Associate Engineer $72 per hour
Senior Designer $75 per hour
Designer $65 per hour
Administrator $65 per hour
Clerical $47 per hour
Special services shall be authorized by CITY prior to performance of said services by
ENGINEER,
22
Agr /»«2
fr
;< *L> 22 «��2 2 :
Fey anhour Breakdown
Attachment E
, � 9
F,
� w,
$� f�
See the table for each of the eight capital improvements contracts on following pages.
MI
CALCULATIONS FEE
FEE FOR BASIC SERVICES
S'ER VICES - 93RO F N DOWN
BY CONSTR
Corflsru t
UCTION CONTRA CT
Feefor CPercent
Construction
Construction
Improvement
Fee for
Percent of
Contract
Improvernent
Cost Estimate
Engineering Services
Services
Construction
#1 -#8
All Phase I & 2 Improvements
$ 11,548,220
Siting Investigation
$ 55,641
0.5%
$ 143,352
113.4%
Prelim. Design and Final Design
$ 678,892
5,91%
$ 51,317
4.8%
Bidding and Construction management
$ 266,079
2.3%
Subtotal
I All Phase I & 2 Improvements
$ 11,548,220
Subtotal of Basic Services
$ 1,000,612
8.'7%
F"F'F FOR BASIC"
Construction
S'ER VICES - 93RO F N DOWN
BY CONSTR
Corflsru t
UCTION CONTRA CT
Feefor CPercent
Contract
Improvement
Cost Estimate
Engineering Services
Services
Constr &c tio
Construction
#1
Pump Station
$ 1,066,000
G
Siting Investigation
$ 6,2.39
0.6%
Special Services - Survey
Prelim. Design and Final Design
$ 143,352
113.4%
Easement and Site Acquisition
Bidding and Construction management
$ 51,317
4.8%
Assistance with environmental issues
Subtotal of Basic Services
$ 2-00,9087
18.8%
#2
30 -inch Transmission main
$ 2,652,000
Alignment Investigation
$ 6,882
0.3%
Prelim. Design and Final Design
$ 86,794
303%
Bidding and Construction management
$ 27,877
1.1%
Subtotal of Basic Services
$ 121,553
4.6%
#3
2.0 MG Elevated Storage Tank
$ 2,080,000
Siting Investigation
$ 6,239
0.3%
Prelim. Design and Final Design
$ 98,649
4.7%
Bidding and Construction management
$ 38,568
1.9%
Subtotal of Basic Services
$ 143,456
-690/.
#4
20-inch Transmission main
$ 960,700
Alignment Investigation
$ 6,882
0.7%
Prelim. Design and Final Design
$ 61,142
6.4%
Bidding and Construction management
$ 27,820
2.9%
Subtotal of Basic Services
$ 95,845
10.0%
#5
16 -inch Transmission main
$ 1,296,750
Alignment Investigation
$ 6,882
0.5%
Prelim. Design and Final Design
$ 68,537
503%
Bidding and Construction management
$ 27,820
2.1%
Subtotal of Basic Services
$ 103,239
8.0%
#6
24 -inch Transmission maul
$ 1,118,000
Alignment Investigation
$ 6,882
0.6%
Prelim. Design and Final Design
$ 58,984
5.3%
Bidding and Construction management
$ 27,820
2.5%
Subtotal of Basic Services
$ 93,686
8.4%
#7
12-inch Transmission Lines
$ 959,660
Alignment Investigation
$ 6,882
0.7%
Prelim. Design and Final Design
$ 65,336
6.8%
Bidding and Construction management
$ 31,239
3.3%
Subtotal of Basic Services
$ 103,457
10.8%
#8
Additional Line Improvements
$ 1,415,110
Alignment Investigation
$ 8,753
0.6%
Prelim. Design and Final Design
$ 96,098
6,8%
Bidding and Construction management
$ 33,617
2.4%
Subtotal of Basic Services
$ 138,468
9.8%
Subtotal
All Phase I Improvements
$ 11,548,220
All Basic Services
$ 1,000,612
8.7%
services on reimbursable contract
Notes:
1. Resident representative services (including routine inspection) performed by City.
2. Still discussing survey and geotechnical costs with local firms. Fee may change from numbers shown.
lee for
Special Services
Services
Special Services - Geotechnical
$ 52,000
Special Services - Survey
$ 112,000
Easement and Site Acquisition
Assistance with environmental issues
Assistance with permitting & flnancinR
services on reimbursable contract
Notes:
1. Resident representative services (including routine inspection) performed by City.
2. Still discussing survey and geotechnical costs with local firms. Fee may change from numbers shown.
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT fit - PUNIP STATION
FEE CALCULATIONS
Principal
Supervising
Senior
Associate
CADD
Subtotal
Total
Expenses
Total
No.
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
flours
Hours
(S)
Cost (S)
1
Data Collection & Siting Investigation
1.1
Property & Utility Research
1
2
8
11
1.2
Evaluate Alternative Sites
1
2
12
I5
1.3
Create Displays/Maps for Alternatives
4
16
20
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
,Subtotal.
--
57
$ 1,341
S 6,239
2
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
2
8
4
14
2.2
Confirm Design Calculations
1
2
8
11
2.3
Preliminary Design Report
4
8
20
16
48
2.4
Develop Preliminary Sht. Layout (40% Complete)
2
8
16
24
50
2.5
City Review & Comment
1
2
4
8
15
2.6
Preliminary Cost Estimate
1
2
6
9
2.7
Status Meetings
8
12
8
30
Subtotal
_
177
$ 2,933
—1 9 _ 9
S ,14
3
Final Design Phase
3.1
Drawings
Plo.
Genera l& Civil
I
Cover Sheet
1
2
3
2
Abbreviations & Symbols
2
2
4
3
General Notes & Piping Schedule
1
4
4
9
4
Location Map & Site Layout
1
2
10
13
5
Site Plan - Paving, Grading & Profile
1
2
16
16
35
6
Piping Plan & Details
1
2
16
16
35
7
Piping Plan & Details
1
2
16
16
35
8
Standard Civil Details • 1
1
2
8
11
9
Standard Civil Details -11
1
2
8
11
Architectural
10
Floor Plan & Roof Plan
1
2
16
16
35
11
Building Sections & Elevations
1
2
16
16
35
12
Architectural Details - I
1
8
8
17
13
Architectural Details -II
1
8
8
17
Structural (for Pre - Fabricated Building)
14
Foundation Plan & Details
1
2
16
18
37
15
Standard Structural Details - 1
1
6
8
15
16
Standard Structural Details - 11
1
6
8
15
Mechanical (Includes Pressure Reducing Valve)
17
Pump Station Layout Plan
1
2
20
24
47
78
Mechanical Sections - I
1
2
16
is
37
19
Mechanical Sections - II
1
2
16
18
37
20
Miscellaneous Details
1
2
12
18
33
21
Mechanical Standard Details -1
1
2
8
11
22
Mechanical Standard Details - II
1
2
8
11
HVAC
23
Plan - HVAC, Plumbing & Fire Suppression
1
2
20
20
43
24
HVAC Details
2
12
8
22
Electrical
25
Electrical Symbols & Legend
1
4
16
21
26
Electrical Site Plan
1
2
12
16
31
27
Electrical One Line Diagram
1
2
12
16
31
28
Floor Plan - Power & Lighting
1
2
12
16
31
29
Floor Plan - Instrumentation
1
2
12
16
31
30
Electrical Room Details
1
1
12
16
30
31
Electrical Sections & Details - MCC
1
1
12
16
30
32
Electrical Schematic
1
1
12
16
30
33
RTU Interface Diagram
1
1
12
16
30
34
Standard Electrical Details
1
4
12
17
Instrumentation
35
Instrumentation Symbols & Legend
1
4
16
21
36
P &ID and RTU Riser Diagram
1
2
12
16
31
37
Loop Drawings
1
2
16
20
39
38
Instrumentation Details
1
2
12
16
31
3.2
Contract Specifications
8
16
18
18
16
24
100
3.3
Cost Estimate
1
2
2
6
6
17
3.4
City Review & Comments
4
8
8
16
36
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
16
12
12
48
Subtotal
1205
$ 19,002
S 124,203
4
Advertise & Bidding
4.1
Distribute Contract Documents
1
8
4
6
16
35
4.2
Conduct Pre -Bid Conference
8
4
12
4.3
Produce Bid Addenda
1
2
12
4
8
27
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
4
6 -
Subtotal
87
$ 1,659
S 8,377
5
Construction Administration (13 months)
5.1
Conduct Pre- Construction Meeting
1
8
4
13
5.2
Review Requests for Information, Change Orders
6
15
25
12
58
5.3
Site Visits & Status Meetings
16
40
16
8
16
96
5.4
Review Shop Drawing Submittals
2
4
35
40
5
20
106
5.5
Final Walk - Through
1
8
8
4
21
5.6
Prepare Punch List
1
2
4
4
11
5.7
Close -Out /Record Drawings
2
6
40
48
5.8
Project Management
8
12
8
8
36
Subtotal
389
$ 6,984
S 42,940
_� _ �raT=142,�4�
310
4 28
0
622
�41
111
1915
$31,919
S 200,908
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT #2 - 30 -INCH TRANSMISSION MAIN
FEE CALCULATIONS
Principal
Supervising
Senior
Associate
CADD
Subtotal
Total
Expenses
Total
No.
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
Hours
Hours
($)
Cost (S)
1
Data Collection & Alignment Investigation
1.1
Property, Utility & General Alignment Research
1
2
12
15
1.2
Evaluate Potential Alignments
1
2
12
15
1.3
Create Displays /Maps for Alternatives
2
4
16
22
1.4
Presentation and Selection of Chosen Alterative
1
2
2
6
11
Subtotal
63
$ 1,392
$ 6,882
2
Prelirrrinary Design Phase
2.1
Coord. & Begin Field Services, Survey / Gemech
2
8
4
14
2.2
Review Flow Calculations & Confirm Line Size
1
2
8
11
2.3
Develop Preliminary Slit. Layout (40% Complete)
2
6
20
40
68
2.4
City Review & Comment
1
2
4
8
15
2.5
Preliminary Cost Estimate
1
2
6
9
2.6
Status Meetings
4
8
12
8
32
Subtotal
149
$ 3,029
S 16,773
3
Final Design Phase
3.1
Drawings
No.
30 -Inch Transmission Line
I
Cover Sheet
1
2
3
2
General Notes
2
2
4
3
Abbreviations
1
2
4
7
4
Location Map & Site Layout
2
2
10
14
5
Plan & Profile ( 1 " =40')
2
6
16
24
6
Plan & Profile ( 1 " =40')
2
6
16
24
7
Plan & Profile ( 1 " =40')
2
6
16
24
3
Plan & Profile ( 1 " =40')
2
6
16
24
9
Plan & Profile ( 1 " =40')
2
6
16
24
10
Plan & Profile ( 1 " =40')
2
6
16
24
11
Plan & Profile ( 1 " =40')
2
6
16
24
12
Plan & Profile ( 1 " =40')
2
6
16
24
13
Plan & Profile ( 1 " =40')
2
6
16
24
14
Plan & Profile ( 1 " =40')
2
6
16
24
15
Plan & Profile ( 1 " =40')
2
6
16
24
16
Plan & Profile ( 1 " =40')
2
6
16
24
17
Plan & Profile ( 1 " =40')
2
6
16
24
18
Plan & Profile ( 1 " =40')
2
6
16
24
19
Plan & Profile ( 1 " =40')
2
6
16
24
24 -Inch Line Upgrade
20
Plan & Profile( 1 " =40')
2
6
16
24
21
Plan & Profile( 1 " =40')
2
6
16
24
22
Detail Sheet
2
4
10
16
23
Detail Sheet
2
4
10
16
24
Detail Sheet
2
4
10
16
3.2
Contract Specifications
2
6
20
16
20
64
3.3
Cost Estimate
1
2
8
4
15
3.4
City Review & Comments
2
4
12
30
48
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
Subtotal
677
$ 13,150
S 70,021
4
Advertise & Bidding
a
4.1
Distribute Contract Documents
1
5
4
6
16
32
4.2
Conduct Pre -Bid Conference
4
4
8
4.3
Produce Bid Addenda
1
2
8
4
8
23
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
3
5
Subtotal
75
$ 1,557
S 7,091
5
Construction Administration (12 months)
5.1
Conduct Pre - Construction Meeting
1
8
4
13
5.2
Review Requests for Information, Change Orders
6
16
8
30
5.3
Site Visits & Status Meetings
8
20
8
16
52
5.4
Review Shop Drawing Submittals
2
4
10
3
5
24
5.5
Final Walk - Through
1
8
4
13
5.6
Prepare Punch List
I
2
2
2
7
5.7
Close -Out / Record Drawings
2
4
16
22
5.8
Project Management
4
8
5
5
22
Subtotafl
i
183
$ 3,741
$ 20,787
Total
54
180
0
317
0
438
38
120
1147
$22,868
$ 121,553
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT #3 - 2 MG ELEVATED STORAGE TANK
FEE CALCULATIONS
Principal
Supervising
Senior
Associate
CADD
Subtotal
Total
Expenses
Total
No.
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
Hours
Hours
($)
Cost (S)
I
Data Collection & Siting Investigation
1.1
Property & Utility Research
1
2
8
11
1.2
Evaluate Alternative Sites
1
2
12
15
1.3
Create Displays /Maps for Alternatives
4
16
20
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
_�-�Subtotal
w
N
57
_
$ 1,341
$ 6,239
2
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
2
8
4
14
2.2
Confirm Design Calculations
1
2
8
11
2.3
Preliminary Design Report
4
8
20
16
48
2.4
Develop Preliminary Slit. Layout (40% Complete)
2
8
16
24
50
2.5
City Review & Comment
1
2
4
8
15
2.6
Preliminary Cost Estimate
1
2
6
9
2.7
Status Meetings
4
8
12
8
32
_m rem Subtotal
W
179
_.._
$ 2,950
S 19,466
3
Final Design Phase
3.1
Drawings
No.
General & Civil
I
Cover Sheet
1
2
3
2
Abbreviations & Symbols
2
4
6
3
General Notes & Piping Schedule
1
4
6
11
4
Location Map & Site Layout
1
2
10
13
5
Site Plan - Paving, Grading & Profile
1
2
16
20
39
6
Piping Plan & Details
1
2
16
20
39
7
Standard Civil Details - 1
1
2
12
15
8
Standard Civil Details - Il
1
2
12
15
Structural
12
Foundation Plan & Details
1
2
16
20
39
13
Valve Vault -Plan and Sections
1
2
16
20
39
14
Standard Structural Details- 1
1
6
12
19
15
Standard Structural Details -11
1
6
12
19
Mechanical
16
Elevated Tank -Plan & Details
1
2
16
20
39
17
Mechanical Standard Details
1
16
12
29
Electrical
18
Electrical Symbols & Legend
1
4
20
25
19
Electrical Site Plan
1
2
12
20
35
20
Electrical One Line Diagram
1
2
12
20
35
21
Standard Electrical Details
1
6
12
19
Instrumentation
22
Instrumentation Symbols & Legend
1
4
20
25
23
P &ID and RTU Riser Diagram
1
2
12
20
35
24
Instrumentation Details
2
12
20
34
3.2
Contract Specifications
8
20
40
16
24
108
13
Cost Estimate
2
2
8
6
18
3.4
City Review & Comments
4
16
16
36
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
Subtotal
761
$ 12,212
$ 79,183
4
Advertise & Bidding��
4.1
Distribute Contract Documents
1
8
4
6
16
35
4.2
Conduct Pre -Bid Conference
8
4
12
4.3
Produce Bid Addenda
1
2
12
4
8
27
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
4
6
Subtotal
87
$ 1,659
S 8,377
5
Construction Administration (11 months)
5.1
Conduct Pre - Construction Meeting
1
8
4
13
5.2
Review Requests for hmformation, Change Orders
6
12
20
8
46
5.3
Site Visits & Status Meetings
8
20
16
16
60
5.4
Review Shop Drawing Submittals
2
4
25
25
4
12
72
5.5
Final Walk - Through
1
8
8
4
21
5.6
Prepare Punch List
1
2
2
2
4
11
5.7
Close -Out / Record Drawings
2
6
20
28
5.8
Project Management
4
8
5
5
22
Subtotal 1
273
$ 5,141
$ 30,191
1_
_ Total
71
191
245
254
0
406
39
151
1357
$ 23,303
$ 143,456
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT #4 - 20 -INCH TRANSMISSION MAIN
FEE CALCULATIONS
No.
Task
Sub -Task
Principal
Engineer
Supervising
Engineer
Senior
Engineer
Engineer
Associate
Engineer
CADD
Drafter
Admin.
Clerical
Subtotal
Hours
Total
Hours
Expenses
($)
Total
Cost (S)
1
Data Collection & Alignment Investigation
1.1
Property, Utility & General Alignment Research
1
2
12
15
1.2
Evaluate Potential Alignments
1
2
12
15
1.3
Create Displays /Maps for Alternatives
2
4
16
22
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
Subtotal
63
$ 1,392
_
S 6,882
2
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
2
2
4
2.2
Review Flow Calculations & Confirm Line Size
1
2
6
9
2.3
Develop Preliminary Slit. Layout (40% Complete)
1
2
12
24
39
2.4
City Review & Comment
1
2
4
6
13
2.5
Preliminary Cost Estimate
1
2
6
9
2.6
Staters Meetings
4
6
8
8
26
Subtotal
100
1959 ,
$ 11,031
3
Fhtal Design Phase
3.1
Drawings
No.
20 -Inch Line
I
Cover Sheet
1
2
3
2
General Notes
2
2
4
3
Abbreviations
1
2
4
7
4
Location Map & Site Layout
2
2
10
14
20 -Inch Line
5
Plan & Profile ( 1 " =40')
2
6
16
24
6
Plan & Profile ( 1 " =40')
2
6
16
24
7
Plan & Profile ( 1 " =40')
2
6
16
24
8
Plan & Profile ( 1 " =40')
2
6
16
24
9
Plan & Profile ( 1 " =40')
2
6
16
24
10
Plan & Profile ( 1 " =40')
2
6
16
24
11
Plan & Profile ( I " =40')
2
6
16
24
12
Plan & Profile ( 1 " =40')
2
6
16
24
16 -Inch Line
13
Plan & Profile ( 1 " =40')
2
6
16
24
14
Detail Sheet
2
4
10
16
15
Detail Sheet
2
4
10
16
16
Detail Sheet
2
4
10
16
3.2
Contract Specifications
2
6
20
16
20
64
3.3
Cost Estimate
1
2
8
4
15
3.4
City Review & Comments
2
4
12
30
48
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
a Subtotal_
e.
485
$ 8,936
$ 50,111
4
Advertise & Bidding
4.1
Distribute Contract Documents
1
5
4
6
16
32
4.2
Conduct Pre -Bid Conference
4
4
8
4.3
Produce Bid Addenda
1
2
8
4
8
23
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
3
5
Subtotal
75
$ 1,557
S 7,091
5
Construction Administration (12 months)
1
5.1
Conduct Pre - Construction Meeting
1
8
4
13
5.2
Review Requests for Information, Change Orders
6
16
8
30
5.3
Site Visits & Status Meetings
8
20
8
16
52
5.4
Review Shop Drawing Submittals
2
4
10
3
5
24
5.5
Final Walk- Through
1
8
4
13
5.6
Prepare Punch List
1
2
2
2
7
5.7
Close -Out / Record Drawings
2
4
16
22
5.8
Project Management
4
8
5
5
22
Subtotal
$ 20,729
Total
51
152
0
253
0
292
38
120
f18
217,52d8
$ 95,845
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT #5 -16 INCH TRANSMISSION MAIN
FEE CALCULATIONS
Principal
Supervising
Senior
Associate
CADD
Subtotal
Total
Expenses
Total
No.
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
Hours
Hours
($)
Cost ($)
1
Data Collection & Alignment Investigation
1.1
Property, Utility & General Alignment Research
1
2
12
15
1.2
Evaluate Potential Alignments
1
2
12
15
1.3
Create Displays /Maps for Alternatives
2
4
16
22
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
Subtotal
_ _w_
_w __
_.m
63
$ 1,392
$ 6,882
2
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
2
2
4
2.2
Review Flow Calculations & Confirm Line Size
1
2
6
9
2.3
Develop Preliminary Slit. Layout (40% Complete)
1
2
12
24
39
2.4
City Review & Comment
1
2
4
6
13
2.5
Preliminary Cost Estimate
1
2
6
9
2.6
Status Meetings
4
6
8
8
26
Subtotal
100
S 1,959
$ 11,031
3
Final Design Phase
3.1
Drawings
No.
16 -Inch Transmission Line
I
Cover Sheet
1
2
3
2
General Notes
2
2
4
3
Abbreviations
1
2
4
7
4
Location Map & Site Layout
2
2
10
14
S
Plan & Profile ( 1 " =40')
2
6
16
24
6
Plan & Profile ( V40')
2
6
16
24
Plan & Profile ( V =40')
2
6
16
24
8
Plan & Profile ( 1 " =40')
2
6
16
24
9
Plan & Profile ( I " =40')
2
6
16
24
10
Plan & Profile ( 1 " =40')
2
6
16
24
11
Plan & Profile ( 1 " =40')
2
6
16
24
12
Plan & Profile ( 1 " =40')
2
6
16
24
13
Plan & Profile ( 1 " =40')
2
6
16
24
14
Plan & Profile ( V =40')
2
6
16
24
15
Plan & Profile ( 1 " =40')
2
6
16
24
16
Plan & Profile ( 1 " =40')
2
6
16
24
17
Detail Sheet
2
4
10
16
18
Detail Sheet
2
4
10
16
19
Detail Slreet
2
4
10
16
12
Contract Specifications
2
6
20
16
20
64
3.3
Cost Estimate
1
2
8
4
15
3.4
City Review & Comments
2
4
12
30
48
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
Subtotal
�
557
$ 10,444
$ 57,505
d
Advertise &Bidding
�
-
4.1
Distribute Contract Documents
1
5
4
6
16
32
4.2
Conduct Pre -Bid Conference
4
4
8
4.3
Produce Bid Addenda
1
2
8
4
8
23
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
3
5
Subtotal
75
$ 1,557
$ 7,091
5
Construction Administration (12 months)
5.1
Conduct Pre - Construction Meeting
1
8
4
13
5.2
Review Requests for Information, Change Orders
6
16
8
30
5.3
Site Visits & Status Meetings
8
20
8
16
52
5.4
Review Shop Drawing Submittals
2
4
10
3
5
24
5.5
Final Walk - Through
1
8
4
13
5.6
Prepare Punch List
1
2
2
2
7
5.7
Close -Out / Record Drawings
2
4
16
22
5.8
Project Management
4
8
5
5
22
LL
Subtotal
183
$ 3,683
$ 20,729
Total
51
158
0
271
0
340
38
120
978
$ 19,036
$103,239
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT #6 - 24 INCH TRANSMISSION MAIN
FEE CALCULATIONS
Principal
Supervising
Senior
Associate
CARD
Subtotal
Total
Expenses
Total
No.
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
Hours
Hours
($)
Cost (S)
I
Data Collection & Alignment Investigation
1.1
Property, Utility & General Alignment Research
1
2
12
15
1.2
Evaluate Potential Alignments
1
2
12
15
1.3
Create Displays /Maps for Alternatives
2
4
16
22
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
Subtotal
63
$ 1,392
$ 6,882
2
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
2
2
4
2.2
Review Flow Calculations & Confirm Line Size
1
2
6
9
23
Develop Preliminary Sht. Layout (40% Complete)
1
2
12
24
39
2.4
City Review & Comment
1
2
4
6
13
2.5
Preliminary Cost Estimate
1
2
6
9
2.6
Status Meetings
4
6
8
8
26
�3
<... -,>
w wm Subtotal
wW
-
100
$ 1,959
$ 11,031
FYBtal'De51gn Phase
3.1
Drawings
No.
30 -1rneh Transmission Line
1
Cover Sheet
1
2
3
2
General Notes
2
2
4
3
Abbreviations
1
2
4
7
4
Location Map & Site Layout
2
2
10
14
5
Plan & Profile ( 1 " =40')
2
6
16
24
6
Plan & Profile ( 1" =40')
2
6
16
24
7
Plan & Profile ( 1 " =40')
2
6
16
24
8
Plan & Profile( 1 " =40')
2
6
16
24
9
Plan & Profile ( 1 " =40')
2
6
16
24
10
Plan & Profile ( 1 " =40')
2
6
16
24
11
Plan & Profile ( 1 " =40')
2
6
16
24
12
Plan & Profile ( 1 " =40')
2
6
16
24
13
Detail Sheet
2
4
10
16
14
Detail Sheet
2
4
10
16
15
Detail Sheet
2
4
10
16
3.2
Contract Specifications
2
6
20
16
20
64
3.3
Cost Estimate
1
2
8
4
15
3.4
City Review & Comments
2
4
12
30
48
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
Subtotal
w
461
_
$ 8,740
$ 47,953
4
Advertise & Bidding
4.1
Distribute Contract Documents
1
5
4
6
16
32
4.2
Conduct Pre -Bid Conference
4
4
8
43
Produce Bid Addenda
1
2
8
4
8
23
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
3
5
Subtotal
75
$ 1,557
$ 7,091
5
Construction Administration (12 months)
5.1
Conduct Pre - Construction Meeting
I
8
4
13
5.2
Review Requests for Information, Change Orders
6
16
8
30
5.3
Site Visits & Status Meetings
8
20
8
16
52
5.4
Review Shop Drawing Submittals
2
4
10
3
5
24
5.5
Final Walk - Through
1
8
4
13
5.6
Prepare Punch List
1
2
2
2
7
5.7
Close -Out / Record Drawings
2
4
16
22
5.8
Project Management
4
8
5
5
22
Subtotall
1
1
$ 3,683
S 20,729
LLL--
Total 1
51
I50
0
247
0
276
38
120
882
$17,331
$ 93,686
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT #7 - 12 -INCH TRANSMISSION LINES
FEE CALCULATIONS
Principal
Supervising
S enior
Associate
CADD
Subtotal
Total
Expenses
Total
No.
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
Hours
Hours
($)
Cost ($)
1
Data Collection & Alignment Investigation
1.1
Property, Utility & General Alignment Research
1
2
12
15
1.2
Evaluate Potential Alignments
1
2
12
15
1.3
Create Displays /Maps for Alternatives
2
4
16
22
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
Subtotal
63
$ 1,392
$ 6,882
2
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
2
2
4
2.2
Review Flow Calculations & Confinn Line Size
1
2
6
9
2.3
Develop Preliminary Slit. Layout (40% Complete)
1
2
16
24
43
2.4
City Review & Comment
1
2
4
6
13
2.5
Preliminary Cost Estimate
1
2
6
9
2.6
Status Meetings
4
6
8
8
1 26
Subtotal
_
__J764
$ 1,993
$ 11,405
3
Final Design Phase
3.1
Drawings
No.
1
Cover Sheet
1
2
3
2
General Notes
2
2
4
3
Abbreviations
1
2
4
7
4
Location Map & Site Layout
2
2
10
14
16 -Inch Line
5
Plan & Profile ( 1 " =40')
2
6
16
24
6
Plan & Profile ( 1" =40')
2
6
16
24
7
Plan & Profile ( 1 " =40')
2
6
16
24
12 -Inch Line
8
Plan ( 1"=40')
2
8
18
28
9
Plan ( 1 " =40')
2
8
18
28
12 -Inch Line on Mingo
10
Plan (1 " =40')
2
8
18
28
11
Plan (1 " =40')
2
8
18
28
12 -Inch Line on 96th
12
Plan ( 1 " =40')
2
8
18
28
13
Plan ( 1 " =40')
2
8
18
28
14
Plan ( 1 " =40')
2
8
18
28
15
Detail Sheet
2
4
10
16
16
Detail Sheet
2
4
10
16
17
Detail Sheet
2
4
10
16
12
Contract Specifications
2
6
20
16
20
64
3.3
Cost Estimate
1
2
8
4
15
3.4
City Review & Comments
2
4
12
30
48
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
Subtotal
537
$ 8,553
$ 53,930
4
Advertise &Bidding
4.1
Distribute Contract Documents
1
5
4
6
16
32
4.2
Conduct Pre -Bid Conference
4
4
8
4.3
Produce Bid Addenda
1
2
8
4
8
23
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
3
5
Subtotal
75
$ 1,557
$ 7,091
5
Construction Administration (14 months)
5.1
Conduct Pre - Construction Meeting
1
12
4
17
5.2
Review Requests for Information, Change Orders
8
20
8
36
5.3
Site Visits & Status Meetings
8
24
12
16
60
5.4
Review Shop Drawing Submittals
2
4
16
3
5
30
5.5
Final Walk- Through
1
8
4
13
5.6
Prepare Punch List
1
2
4
2
9
5.7
Close -Out / Record Drawings
2
6
20
28
5.8
Project Management
4
8
5
5
22
Subtotal 1
215
$
Total
51
164
0
295
0
326
38
120
994
508
$ 103,457
OWASSO PUBLIC WORKS DEPARTMENT
CONTRACT 48 - ADDITIONAL LINE IMPROVEMENTS
FEE CALCULATIONS
Principal
Supervising
Senior
Associate
CADD
Subtotal
Total
Expenses
Total
Task
Sub -Task
Engineer
Engineer
Engineer
Engineer
Engineer
Drafter
Admin.
Clerical
Hours
Hours
($)
Cost ($)
Data Collection & Alignment Investigation
1.1
Property, Utility & General Alignment Research
1
2
24
27
1.2
Evaluate Potential Alignments
1
2
20
23
1.3
Create Displays /Maps for Alternatives
2
4
16
22
1.4
Presentation and Selection of Chosen Alternative
1
2
2
6
11
Subtotal
A
_
_
83
$ 1,563
$ 8,753
Preliminary Design Phase
2.1
Coord. & Begin Field Services, Survey / Geotech
4
2
6
2.2
Review Flow Calculations & Confirm Line Size
1
2
8
11
2.3
Develop Preliminary Sht. Layout (40% Complete)
1
4
16
32
53
2.4
City Review & Comment
1
2
4
10
17
2.5
Preliminary Cost Estunate
1
2
6
9
2.6
Status Meetings
4
6
8
8
26
Subtotal
_ �
�v
122
$ 2,3 i3
$ 13,299
Final Design Phase
3.1
Drawings
No.
I
Cover Sheet
1
2
3
2
General Notes
2
2
4
3
Abbreviations
1
2
4
7
4
Location Map & Site Layout
2
2
10
14
12 -Inch Line
5
Plan 1"=40')
2
8
18
28
6
Plan ( V" 40')
2
8
18
28
24 -Inch Line
7
Plan & Profile ( V =40')
2
6
16
24
8
Plan & Profile ( 1 " =40')
2
6
16
24
9
Plan & Profile( 1 " =40')
2
6
16
24
10
Plan & Profile ( 1 " =40')
2
6
16
24
11
Plan & Profile ( 1 " =40')
2
6
16
24
10 -Inch Line for National Steak and Poultry Fire Flow
12
Plan ( 1 " =40')
2
8
18
28
16 -Inch Transmission Main
13
Plan & Profile ( 1 " =40')
2
6
16
24
14
Plan & Profile ( 1 " =40')
2
6
16
24
6 -Inch Line Small Pipe Replacement
15
Plan ( V =40')
2
8
18
28
16
Plan ( V =40')
2
8
18
28
17
Plan ( V=40')
2
8
18
28
18
Plan ( V =40')
2
8
18
28
19
Plan 1"=40')
2
8
18
28
20
Plan( 1 " =40')
2
8
18
28
21
Plan( 1 " =40')
2
8
18
28
22
Plan ( 1 " =40')
2
8
18
28
23
Plan( 1 " =40')
2
8
18
28
24
Plan ( V =40')
2
8
18
28
25
Plan 1"=40')
2
8
18
28
26
Plan ( 1 " =40')
2
8
18
28
27
Detail Sheet
2
4
10
16
28
Detail Sheet
2
4
10
16
29
Detail Sheet
2
4
10
16
3.2
Contract Specifications
2
6
20
16
20
64
3.3
Cost Estimate
1
2
8
4
15
3.4
City Review & Comments
2
4
12
30
48
3.5
Status Meetings
8
12
12
32
3.6
Project Management
8
10
8
8
34
Subtotal
857
$ 11,318
S 82,799
Advertise & Bidding
4.1
Distribute Contract Documents
1
5
4
6
16
32
4.2
Conduct Pre -Bid Conference
-
4
4
8
4.3
Produce Bid Addenda
1
2
8
4
8
23
4.5
Bid Tab Compilation
1
4
2
7
4.6
Award Bid
1
1
3
5
Subtotal
75
$ 1,557
S 7,091
Construction Administration (14months)
5.1
Conduct Pre - Construction Meeting
1
8
4
13
5.2
Review Requests for Information, Change Orders
12
24
8
44
5.3
Site Visits & Status Meetings
8
30
12
16
66
5.4
Review Shop Drawing Submittals
2
6
16
3
5
32
5.5
Final Walk- Through
1
8
4
13
5.6
Prepare Punch List
1
2
4
2
9
5.7
Close -Out / Record Drawings
2
6
24
32
5.8
Project Management
4
12
5
5
26
Subtotal
235
$ 4,238
$ 26,526
Total
51
204
0
409
0
550
38
120
1372
$ 20,989
$ 138,468
Agreement
for
41y
See the schedule on allowing page. If notice -to- proceed is issued by the CITY at a date
inter than later than September 1, 20 01, the schedule shall be adjusted to show the
actual notice-to-proceed date. All activities shall move forward by the number of days
difference between the actual notice-to-proceed date and September 1, 200
24
Construction Contract #1 - Pump Station
Survey
Detailed Design
Construction
Investigate and Finalize Alignment
Geotechnical
Bidding
Construction Contract #3 - Elevated Tank
Survey
Detailed Design
Construction
Investigate and Finalize Alignment
Geotechnical
Bidding
Construction Contract #5 - 16" Transmission Main
Survey
Detailed Design
Construction
Investigate and Finalize Alignment
Geotechnical
Bidding
Construction Contract #7 - 12" Transmission Lines
Survey
Detailed Design
Construction
Investigate and Finalize Alignment
Geotechnical
Bidding
> f3 C -6 L ' :;, �L —' = >, c: -3 M CL 0 C -0 r- M CL > 0 C: -0 O 63 0 Q) CL 6) _6
0 0 M CL M 0
= -� = a)
.
..........
....
..
was
0 so Water System Improvements 17
4
L
EE
1 771
1-4 1 +-t-f-1 I
1+---
I
777-
IN
U
nmi-
"all
y
m-
T--
L
--4 —4
> f3 C -6 L ' :;, �L —' = >, c: -3 M CL 0 C -0 r- M CL > 0 C: -0 O 63 0 Q) CL 6) _6
0 0 M CL M 0
= -� = a)