Loading...
HomeMy WebLinkAbout2012 07_Interlocal Agreement -2012.07.17CITY OF OWASSO, OKLAHOMA RESOLUTION NO. 2012-07 A RESOLUTION REQUESTING FEDERAL-AID SURFACE TRANSPORTATION PROGRAM URBANIZED AREA FOR CONSTRUCTION OF EAST 106TH STREET NORTH/NORTH GARNETT ROAD IMPROVEMENTS. WHEREAS, Surface Transportation Program funds for urbanized areas have been made available for transportation improvements within approved Urban Areas; and, WHEREAS, The City of Owasso is submitting a project candidate described as follows: East 106TH Street North and North Garnett Road Intersection Improvements WHEREAS, the submitted project is consistent with the local comprehensive plan, including applicable Major Street and Highway Plan Element, and the Regional Transportation Plan; and, WHEREAS, the engineer's estimate for construction is $2.1 million, and Federal participation under the terms of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A legacy for Users (SAFETEA-LU) relating to Surface Transportation Program Urbanized Area funds are hereby requested for funding of 80 percent of the project cost; and, WHEREAS, the City of Owasso proposes to use sales tax revenues as the source(s) of funds for the balance of the project costs; and, WHEREAS, the City of Owasso agrees, as a condition to receiving any Federal financial assistance from the Department of Transportation, that it will comply with Title VI of the Civil Rights Act of 1964,78 Stat. 252,42. U.S.C. 2000d et seq., and all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, "Nondiscrimination of Federally-Assisted Programs of the Department of Transportation-Effectuation of Title VI of the Civil Rights Act of 1964"; and, WHEREAS, the City of Owasso agrees to become jointly responsible, with the Oklahoma Department of Transportation and the contractor as co- applicants, for meeting all Environmental Protection Agency (EPA) requirements for storm water runoff from this project. Further, if required, the City of Owasso agrees to file jointly, with the Department and the contractor, the general National Pollutant Discharge Elimination System (NPDES) permit with the EPA which authorizes the storm water discharges associated with activity from the construction site identified in this resolution; and, WHEREAS, the City of Owasso further agrees to deposit with the Oklahoma Department of Transportation the matching funds required ninety (90) days prior to the contract letting date; and, WHEREAS, the City of Owasso further understands that acceptance of this resolution by the Department is not a commitment to federal funding, but only registers the City's interest and intent in participating in the program application process. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OWASSO, OKLAHOMA, that the Oklahoma Transportation Commission is hereby requested to consider the selection of this project as a candidate for federal funding. DATED this 17th day of July 2012 Op O N OpnCIAL O SEAL y6r/ I/ ~AHQMA ATT ES City Cler APPROVED AS TO FORM: Za / A0Lf'1,4 City Attorney Owasso Public `Yorks Department Engineering Div. P.O. 180 Owasso, OK 74055 918.272.4959 www. cityofowasso.com E 106th ST 111 & GARN ETT RD INTERSECTION WIDENING PROJECT SITE MAP N W E S 11/02/11 0 The City W V Wit out Limits. TO: The Honorable Mayor and Council City Of Owasso From: H. Dwayne Henderson, P.E. City Engineer Subject: Application for STP Funds East 106th Street North/North Garnett Road Date: July 13, 2012 APPROVED BY COUNCIL JUL 17 ZO1Z BACKGROUND: In 2005, the City contracted with four (4) engineering firms to perform conceptual engineering studies for the intersections at East 106th Street North/North Garnett Road, East 106th Street North/North 145th East Avenue, East 961h Street North/North 145th East Avenue and East 96th Street North/North Mingo Road. Each intersection was planned for a 20 year growth. Once the studies were performed, staff recommended that the East 106th Street North/North Garnett Road be selected for funding by the Oklahoma Department of Transportation Small Cities Set-Aside funds. The small cities funds are used for cities that are not contiguous with a metropolitan area, which Owasso was not at that time. The project was designed and submitted to ODOT for review. The needed right-of-way for the project was obtained using the Federal Highway Administration Guidelines for land acquisition. Once the right-of-way was obtained, utility companies mobilized and relocated their utilities. Funding for the project through ODOT is limited to $750,000 in the Small Cities Set-Aside funds for construction. The City of Owasso paid for utility relocation, engineering fees, and right-of-way. However, with the recent adoption of Owasso into the urbanized area, Owasso is now eligible for Urbanized Surface Transportation Funds. Surface Transportation Program (STP) funds are made available on an annual basis by the Federal Highway Administration (FHWA), through the Oklahoma Department of Transportation (ODOT), for the implementation of eligible transportation improvements in the Tulsa Urbanized Area. INCOG administers the grant funding and has established a selection process for the distribution of STP funds. Priority funding is given to projects that meet federal regulations and help advance the Regional Transportation Plan through safety improvements and to projects that reduce traffic congestion. Proposed projects are evaluated for eligibility and priority based on a 100-point rating system. Since Owasso has followed the federal guidelines for right-of-way acquisition, this project qualifies for the STP funds. The potential 80% ODOT/20% local match could save the City of Owasso approximately $900,000 on this project. In addition, Owasso can apply for these funds without jeopardizing the Small Cities funds. If the STP funds are obtained, the $750,000 will revert back to the Small Cities Program. PROPOSED RESOLUTION FOR CONSTRUCTION PHASE: In June 2012, INCOG issued applications for STP funds with a submittal deadline of July 27, 2012. Similar to the process utilized in obtaining federal funding assistance for the East 76th Street North roadway improvement project, a Council resolution is necessary in order to complete the application process. The 2012 application will request federal funding assistance for the construction of the roadway improvements. If this project is selected in September 2012, the funding for construction will be requested to move up to FY2012 from FY2016 so construction can begin. CONCEPTUAL DESIGN SUMMARY: The East 106th Street North/North Garnett Road intersection is in a heavily trafficked area that conveys residential and commercial traffic, as well as commuter traffic to and from Owasso. This roadway accommodates a large percentage of local traffic and is significant in the distribution of traffic to and from the Collinsville and German Corner areas to commercial areas in Owasso. It is expected that residential growth will increase traffic volumes and continue to overload the existing two-lane road intersection. The following table shows existing and future flow patterns: Location Daily Traffic Volume Daily Traffic Volume (Vehicles per day 2006) (Vehicles per day 2012) 106TH Street North (West of Garnett 1,600 5,159 1061H Street North (East of Garnett 3,300 4,463 North Garnett (South of 106th Street North 7,300 13,597 North Garnett (North of 106th Street North 7,900 13,354 The proposed lane configuration is a 5-lane roadway section with additional dedicated right- turn lanes. The intersection will be signalized. Based on recent estimates from the final plans, the anticipated cost for the construction is $2.1 million. ODOT funding for this project will be through the Surface Transportation Program, which will fund 80% of eligible project costs, while the local government funds 20%. Based upon this information, the following is an estimate of the cost distribution: Project Segment Estimate millions) ODOT Portion millions) City of Owasso Portion Construction $2.1 $1.68 $420,000 Right-of-Way Completed $0.00 Completed Utility Relocation Completed $0.00 Completed Engineering (8%) Completed $0.00 Completed Total Project Cost $2.1 $1.68 $420,000 PROPOSED RESOLUTION: The proposed Resolution declares the City's intent to request federal funding assistance through the Surface Transportation Program Urbanized Area for the construction of the roadway improvements to East 106th Street North/North Garnett Road intersection. RECOMMENDATION: Staff recommends approval of Resolution No. 2012-07, requesting ODOT to consider the construction phase of the East 106th Street North/North Garnett Road intersection as a candidate for federal funding assistance through the Surface Transportation Program.. ATTACHMENT: A. Resolution No. 2012-07 B. Site Map