Loading...
HomeMy WebLinkAbout2000.12.05_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE OWASSO PUBLIC WORKS AUTHORITY TYPE OF MEET G: Regular DATE: December 5, 2000 TIME: 6:30 p.m. PLACE: Council Charnbers, Owasso Community Center Notice and agenda filed in. the office o�['the City Clark and posted at City Hall at 4:00 p.m. on Friday, Friday, December 1, 2000. MZarc'iijalooAtuitwell, Authority Secretary AGENDA 1. Call to Order Chairman Williams 2. Flag Salute 3. Roll Call 4. Consideration and Appropriate Action Relating to a Request for Approval of the Consent Agenda. All matters listed under "Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee may, however, remove an item from consent by request. A motion to adopt the Consent Agenda is non-debatable. A. Approval of the Minutes of November 21, 2000 Regular Meeting. Attachment #4-A Owasso Public Works Authority December 5, 2000 Page 2 & Approval of Claims. Attachment 84-B 5. Consideration and Appropriate Action Relating to a Request for Approval of Change Order, Q, a Change Order to a Contract Between the City of Owasso and Crossland Heavy Contractors, Columbus, KS, for Wastewater Treatment plant phase IIA Improvements. Mr Carr Attachment #5 r The staff will recommend 49=approval of Change Order #2, adding $97,687 to the cost of the project for the purpose of main lift station modifications, more specifically, retrofitting the old existing wet well with two submersible pumps and all appurtenances thereto, and an increase in the contract time of 30 days. 6. Report from OPWA Manager. T Deport from OPWA Attorney. 8. New Business. Owasso Public Works Authority December 59 2000 Page 3 Adjournment, OWASSO PUBLIC WORKS AUTHORITY MINUTES OF RE, GULAR MEETING Tuesday, November 21, 2000 The Owasso Public Works Authority met in a regular session on Tuesday, November 21, 2000 in the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, November 1. 7, 2000. ITEM 1: CALL TO ORDER Chairman. Williams called the meeting to order at 7:00 p.m. ITEM 2: FLAG SALUTE The flag salute was held during the City Council meeting preceding this meeting. ITEM 3: ROLL CALL PRESENT H C "Till" Williams, Chairman Mary Lou Barnhouse, Vice Chairrra.ari Melinda Voss, Trustee Dandy Brogdon, Trustee Rebecca Armstrong, Trustee STAFF Larry Mitchell, City Manager Ronald D Cates, Authority .Attorney Marcia I3outwell, Authority Secretary A quorum was declared present. ITEM 4: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REOUEST - FOR APPROVAL OF THE CONSENT AGENDA. A. Approval of the Minutes of November 5, 2000 Regular Meeting. B. Approval of Claims. The consent agenda included minutes of the November 5, 2000 regular meeting, by reference made a part hereto. Item E on the consent agenda included the following claims: (1) Owasso Public Works Authority $55,086.13; (2) ®PWA Capital Improvements $169,963.649 (3) ®P TA Sever Line Extension $23,0009 (4) Payroll $35,061.33. Ms Voss moved, seconded by Ms Barnhouse, to approve the consent agenda. AYE: Voss, Barnhouse, Brogdon, Armstrong, Williams NAY: None Motion carried 5 -0, Owasso Public; Works Authority November 7, 2000 ITEM 5: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A CONTRACT FOR THE PURCHASE OF A FLATBED TAG TRAILER. Mr Roberts said that the Water Distribution Division budget contains funds for the purchase of a flatbed trailer, which is needed to reduce the transport time for off-road equipment to and from work sites, In September, bids were advertised and were also mailed to three prospective bidders, Subsequent to the bid opening, staff identified a discrepancy in the specifications, The equipment was advertised as a PAG,trailer, when the description should have been TAG (tag-a- long) trailer. No vendor inquiries were made regarding this error, so staff contacted the three bidders that documents were mailed to in order to ensure consistency in the bidding process, Each vendor indicated that the misspelling does not misrepresent the equipment specified and should not create an improper interpretation by any prospective bidder. Ms doss moved, seconded by Ms Barnbouse, to award a contract to Overbilt Trailer Co, Drumright, CIS, for the purchase of a 20,000 lb GV I flatbed TAG trailer consistent with bid specifications at a cost of $8190 AYE: doss, Barnhouse, Bro don, Armstrong, Williams NAY: None Motion. carried 5 -0. ITEM 6: REPORT FROM OPWA MANAGED. No report. ITEM/ 7: REPORT FROM OP TA ATTORNEY. No report. ITEM 8e NEW BUSINESS. LWIN Ms Voss moved, seconded by Ms Barnhouse to adjourn. AYE: Voss, Rarnhouse, Brogdon, Armstrong, Williams NAY: None Motion carried 5 ®0, and the meeting was adjourned at 7;04 porno Marcia Boutwell, Secretary -2..- H C Williams, Chairperson City of Owasso Claims 1215/00 Fund Department Total General Deposit Refunds 50.00 105 Municipal Court 62.99 110 Managerial 1,70017 120 Finance 3.47 150 General Government 14,539,35 160 Community Development 203.93 170 Engineering 20235 175 Information Systems 1334 161 Support Services 425,61 190 Cemetery 103.43 201 Police Services 1 8359,01 215 Police Communications 654.42 221 Animal Control 161.50 250 Fire Services 3,935.47 230 Emergency Preparedness 119.24 300 Streets 9,263.29 515 Park Maintenance 241 A6 550 Community Center 70&57 710 Economic Development 47.00 TOTAL 33,300.51 Ambulance Refunds 575.14 255 Ambulance 1,116.77 TOTAL 1,691.91 Ambulance Capital 255 Ambulance 67113 TOTAL 671.73 Bond Projects Streets /intersections 33,344.52 City mall /Police Station 90,030.95 Project Management 3,279.00 TOTAL 131,154.47 OPGA Merchandise 1,193.36 Food and Beverage 1,672,36 600 Golf Shop 60.63 605 Cart Operations 30.37 610 Golf Course Maintenance 1,314.31 670 Food and Beverage Operations 546.10 690 Golf Administration 795.17 691 Clubhouse 1,365.97 600 [debt Service 33,253.35 TOTAL 40,233.67 11-l", 0PWA Capital Improvements PWA Sales Tax City Garage Workers'Comp Siff Insurance Debt Service TOTAL 186 City Garage TOTAL 150 Workers' Comp TOTAL 918A5 3,090 164,811,05 649.17 5,269,2 4,949006 3,016.13 182,72166 32,54&27 32,54327 92 ,621023 120,621.23 12,336.69 12,336M 9,189 6 Claims Total 566,966,86 OWASSO PUBLIC WORKS AUTHORITY PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 11/16/00 DEPARTMENT OVERTIME TOTAL EXPENSES EXPENSES 0��mfnistnition Utility Billing 115.3 79116.61 Wastewater 209A2 5,776.61 twrcallti ! C}o eftase 60.17 5,015.74 Red 'YO l 6 Center 3.94,! N TL. „457.5 ,76 APPROVED: December 5, 7000 Trustee TO. HONORABLE CHAIR AND TRUSTEES Y OWASSO PUBLIC WORKS AUTHORITY Jy a 5l FROM- F. ROBERT CA RR, , J , P.E. PUBLIC WORDS DIRECTOR 0 SUBJECT- CHAN E ORDER NUMBER 2 - PRAM; III WASTEWATER TREATMENT PLANT IMPROVEMENTS DATE: November 28, 2000 BACKGROUND- A construction contract with Crossland Heavy Contractors, Inc. for the Wastewater Treatment Plant Phase III, Improvements in the amount of 1,965,950.00 was approved by the Trustees at the March `i, 2000 meeting. Work to be performed in this phase of construction consists of constructing a now sludge digester and belt filter press and modifications to the plant headworks, ultraviolet disinfection and Maim Lift Station. Change Larder No, 1 was approved on September 19, 2000 in the amount of $29,296.45. At the present time, funds have been obligated on the project in the amount of $1,935,246045 (the total contract ward of $1,965,950 less the remaining $30,703.55 project allowance). Funding for the project has , Board (OWRB). The loan (totaling $2,581, 100) includes, in part, $1,965,950 for constructi and $98,275 for contingencies. I Conditions in the vicinity of the Fain Lift Station have compounded the inability of the collection system to adequately carry the flows High wet well levels have been maintained at the lift station as a result of full storm holding lagoons. These conditions have caused upstream Page 2 Change Order dumber 2 Wastewater Treatment Plant Improvements Phase IIA gravity lines to surcharge (reach over - capacity) during extreme rain events and at some times during normal flog conditions. The hydraulic profile of the flow equalization basins, control structure and wet well (copy attached) severely limits the ability to return water from the basins once the basins are full. The eater surface elevation of the basins dictate the wet well operating elevation and,, most importantly, the elevation of water in the collection system. In addition, the gravity sewer ties directly to the wet well at a flow lime elevation of 56905 -feet. The basins are full at approximately elevation 585 feet, 'Therefore, ender the present mode of operation and system design, the collection system will surcharge until a lower profile elevation is achieved. The following alternatives were considered to alleviate this problem° l o Construct a new duplex submersible pump station on the gravity lime and pump the wastewater to the existing pump station. 20 Retrofit the old existing wet well (adjacent to the wet well `yin use ") with two submersible pumps and pump to the existing influent structure. ('The old wet well is 5± feet deeper than the existing wet well which will permit the water level to be lowered,) The lime between the old and 66in use" wet wells will be plugged, 3. Provide temporary pumping and postpone the work until Phase IIB, Detailed plans for Alternate No. 1 were prepared by our consulting engineer. The present Phase IIA contractor (Crossland Heavy Contractors) provided a cost proposal of this alternate in the amount of $175,000,00° Alternate No. 2 was also detailed by our consultant, Crossland Heavy Contractors cost proposal for this alternate is $97,687000, Alternate Igloo 3 is not practical, Phase III3 may be one (1) to three (3) years from the start of construction, CHANGE NUMBER 2 A Change Order has been submitted for Trustees approval for Alternate No. 2 to retrofit the old existing wet well with two submersible pumps. Mork includes purchase and installation of two Page 3 Change Order Number 2 Wastewater `treatment Plant Improvements Phase III (2) new pumps, two (2) aluminum hatches, one (1) valve vault, one (1) manhole; miscellaneous piping; and demolition. Total cost of the work is $97,687, In addition, Crossland has requested an. additional. 30-days be added to their contract. Graver Engineers ineers have reviewed the change order proposal and believe the costs are acceptable for this work. FUNDING SOURCE. Staff recommends the Trustees authorization of Change Order No. 2 to the Wastewater `treatment Plant Phase III Improvements with Crossland Heavy Contractors, Ingo for Main Lift station modifications in an amount of $97,687000 and an increase in the contract time of 30 days. J , Change Order Number 2 20 OWRB State Revolving Fund Project Budget (Outlay Report) 30 Hydraulic profile (Fain Lift Station area to plant headworks 4e November 28, 2000 letter from OVVRB 5. November 29, 2000 response letter from City of Owasso to OYM PROJECT: Wastewater Treatment Plant Expansion Phase I A TO CONTRACTOR- Crossland Heavy Contractors, Inc. 833 South East Avenue RC , Box 2350 Columbus, KS 66725 CHANGE, ORDER NO: DATE- CONTRACT C'T DAT:I+_ - T'he Contract is changed to incorporate modifications to the Fain Pump Station at the Owasso Wastewater Treatment Plant per the attached drawing and proposal. NOT VA1AD UNTIL, SIGNED BY THE OWNER AND CONTRACTOR The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order is The Contract Time is extended by 30 calendar clays. The contract completion date is therefore extended from March 27, 2001 to April 26, 2001. CONTRACTOR _ Crossland Heavy Contractors ADDRESS P.O. Box 350 Columbus, IBS 66725 2 11/27/00 :1/7/00 $ 1,965,950,00 0.00 $ 1,965,950.00 $ 97,687.00 $ 2,063,637.00 Owasso Public Works Authority ADDRESS P.O. Box 180 Owasso, OIL 74055 BY BY DATE DATE Pa vae No. 1 of 1 Crossland Heavy Contractors, Inc. P.O. Box 350 833 SE Avenue olumbus, Kansas 66725 (316)429 -1410 FAX (316)429-2977 PROPOSAL SUBbilrTED 1O ... PHONF .. tr!Owasso Public orks Authon��� �.n� 10 NOV 00 S°112M: ,..y,,,.,�..K....,.�. �..��� ,.� JOBNAME "Er—Ty, S'rA17. AND 71P CODE JOB LOCATION: Owasso, OK 14053 Owasso OK. AitCHi1'Ei,`f CJW F Of i LAMS: JUII PHONE WE HEREBY sUBWT SPECIFICATION AND ESf[P.9ATES FOR: We would like to thank you for the opportunity to quote the pump station change order. The proposal is as follows. Install: _ Two (2) 4 ", 15 BY, 1.750 rpm, 1000gpnnna pumps with controls. Two (2) aluminum hatches, One (1) valve vault per drawings. One (1) 4" diameter manhole. Discs piping per drawinns° Demolition per drawings. CHC requests an additional 30 days for the completion of this work. All complete installation for the price of $97,687 °00 Should you have any questions re�ardin� this proposal% please feel fn °ee to cal ➢, _�_ Wt hereby to lumish material and labor -complete in accordance with above specifications, for the sum of: ZNh et ®Seven Thousand Six Hundred Ei ht -Seven Dollars 00/1.00 dollars $97,687M ayment to ma a as o o o All material is guaranteed to be as specified_ All work to be completed in a workmanlike Authorized Signature: Darrell Moorman manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are filly covered by Workman's Compensation Insurance. Na o The above prices, specifications Signature and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment as outlined above. Signature Date of Acceptance: Owasso Public Works Authority Crossland Heavy Contractors Wastewater Treatment Plant Improvements Phase IIA P.O. Bow 350 OR F Project No. 98-013 Date: November 8, 2000 Columbus, KS 66725 Breakdown of Pump Station change order Descdp tea m Construct existing manhole into pump station and reroute sanitary sewer line into existing line. This will able the ci d relief to the surcharge on the existing sewer line. Labgg Hrs. Rate/Hr. Qt L. Unit Price. Superintendent 80.0 $23.00 $1,840.00 Foreman 235.0 $19.00 $4,465.00 Operator 40.0 $16.00 $640.001 Carpenter 115.0 $18.25 $22,098.751 Laborer 307.0 $11.00 $3,377.00 SuhtgtaL $12,420.75 Matehals, .. ..... ... Hatches 1.0 ls. $5,400.00 $5,400.00 Pumps 1.0 1s. $13,150.00 $13,150.00 Base rock 16.0 tn. $8.85 $141.60 Class "A" concrete 15.0 c f. $63.00 $945.00 Form rental 1.0 Is. MOM $400.00 Pipe small tools 1.0 Is. $250.00 $250.00 Concrete small tools 1.0 Is $500.00 $500.00 Demolition small tools 1.0 Is $500,00 g $500.00 14' precast manhole 1.0 F Is. $1,400,00 $1,400.00 6' precast manhole to 1.0 Is. $550.00 $550.00 Rebar 1.0 Is. $250.00 $250.00 8" flang e cou apter gpling a d 2,0 ea. $170.70 $341.40 8" check valve 1.0 ea. $653.00 $653.00 8" 45 bend 2.0 ea. $110.00 $220.00 8"wye 1.0 ea. $235.25 $235.25 8" ductile iron spool 1,0 ea. $295,00 $295.00 8"x6" reducer 1.0 ea. $210.00 @ $210.00 6"x6" tee Lo ea. a X83.50 $83.501 6"x4' wall pipe 1.0 e--. - $359.775 $358.75 6'x4" tagging saddle 1.0 ea. re $253.90 fi $253.90 14" quick coupling 1.0 ea. $50.00 l $507001 16" 90 bend 4.0 ca. $55.70 $221801 16" gate valve w/ handwheel 2.0 ea. $244.15 $489.30 6" check valve w/ ext ➢ever 2.0 g ea. $610.010 $1,220.00 16"x6' wall pipe g 2.0 ea. $423.00 a $946.00 Wxll'spool 4.0 ea. $445.27 $1,781.08 2' check valve 1.0 ea. $60.00 — $60.001 Safety say pplies I $2s ,2GO.00 $2,200.00 Taxes., $2,438.98 $35,444.46 Subcontractors: Electrical 1.0 Is. $31,353.00 k $31,353.00 Coring 1.0 is. $1,400.00 $1,400.00 Trucking 4.0 hr. $45.00 $180.00 Subtotal: $32,933.00 coat® .Cat. IT-28 loader 32.0 $19.88 $636.16 Cat. 320 trackhoe 27.0 $30.42 a $821.34 lAir compresser 175 cfm 40.0 $9.35 I $374.00 6" Pumps 240.0 $9,65 $2,316.00 Subtota l : $4,147.50 $84,945.71 11/15/2C00 15:16 918-376-2335 CROSSLAND HEAVY CONT PAGE 02 $w FLUID 918 786 6Ge4 P.09 0 VNIP IN as - 120 IOU 31 80 20 80 m swIke vui�m ft�m&A A�bwaltiv go &mwagwo wift SPA # stwa"lll Mal leag for mmnoj 09 lu 4AL& to tAl rAlawAffiffil at Q6 03M MY." CUBIC METERS PER HOUR 6 EOfAANS 1999 NORTH RUBY STREET MELROSE PARK, ILLINOIS 60160 y 1 BASIN AND ACCESS DOOR DISCHARGE PIPING/VALVE BOX LAYOUT USING STANDARD COMMERCIAL FITTINGS ---BASIN DIA V F -7, - J_ To TEE TRE\FffSf _IN _ ACCESS DOOR PUMP aEAR OPENING MIN. EASY M MODFL mlhl� SIZE BASIN uFT DISCHARGE A & B DIAMETER RBOW SIZE 4072.5 23X43 54 Af192.5 25X45 54 41035 �O3 L 29X48 1-6 jo W 4103SV 4X4 4 13-1 a -9 8 1 185 A, 41135 8 4 a 8 4123SV 3OX50 60 A133SV 4123 3OX51 60 4 Kl�= 4153 36X54 66 v' 407245 Z7-3 23X49 60 122 2 237 a r 4092.5 25X51 60 72 _2' 41035 i alp I 41031 — 29X54 66 4X6 6 16-1° 11 a 6J­ 22-1 alf A103SV 8 a 8 4 4113SY A123SV 30 X56 66 1 1 3 8 22 a 4 .4133SV tb 4123 30X57 66 1 1 3. 8 2 2 '4' F2 ®1 4153 36X60 72 1 o l 2 1 Z ALL 01 INNS IONS ARE IN INCHES. FOR NiULTIPLE PUMP INSTALLATION. PLEASE REFER TO FACTORY. ISSUE 6 /96 PAGE 9175 mm PUMPING EG2UIPMENT 51—HEOULE - P.}NP SIZE CAPACITY TDH MIN EPP ® W VOLTAGE FHA SPEED 9 AK1. (am7 (FTJ RATED FLOW MIW RFM IODO 30 55% 15 460 3 1150 2 4' IOOO 50 55% t5 460 3 I15O t 1 —; EKIST. PLOW ST CgMTROL , ! 1 G02 Exi5TIN5 W at.L f I / 6 GROJT NEW b' PIPE 1 L -- d IN t�.AGEJ EKIST. 10" PIPE —i B i— EXt$T. 18' PIPE b• Di PIPE — 5' -0 -0- r EL. 510b4 6za �, ....... 4 °WALL PIPE REavi TEE i � I I t311e' t3! /H" -P. 9 u'f I - _- 4• GATE VALE i 1 NEW 5k5•x45 DEEP ¢ EL. 5'15.11 J} I I ( E VALVE VAIAi WITH { eY l 1 36,36- A HATCH -_ . • R° GHECX v vE I f f TOP EL 516b4 AHD I TYP. F OOR EL 514. i I , L— __J I� I L =� 1 �+ REP'lJ`r CXfSi. —.� GROJ* I YiT,, T}� t I I ! 3 EXESVI t2' —' EKIS:lNG 18' RGP c '• ^ N =� '- EX15T1NG ELEG. O I ELM GREEK MAIN F - -' X EXISTING H' — „4. I' PJG � i i _________ �1�RGP� k _ . EX5TIN5 FLOW CONTROL 5TR1)C.TURE TOP EL. 51l.IO I M ( yy ! SOT:a�TL^..E iSi \\ SIDENSV_K ' � e i ` GENERATOR � y i � I I /�i v EUILDINCi � ( � Imo, ;r�TRq�i .'1�n bAL \"E _____________j �® �Ex15TlNG I f� EXiSTiNS LIFT 1 FtiALE. 1' =10' r RAFX a 15TI,— '- I ( //i STATIOM 6 Fci v,ELL; I( TOP EL, 5145 / TO EL. 56000 I INSTALL FiMPS tN L_ —_ —x— j _ ----------------- --------- ---- - -- --- - = ei — -- ------- --- -- -PLfiS EXiSi. 10' L Ex 5TIN5 !O' VLP 1 ' E ----- _ - - - - -_ I 1.- InTO LIF, TO REMA[M FN / -- - , I_ STATION W GONG. J / SERVICE TTOPO? E:SiST1i NV- P'PC —I EXl5TIMG HETNELL TO BE MODIFIED POR F. Pt _______ 1MP5 - _- - - - - -- / // �STiPY VALVES `- 5TAT'N6t 'oP Ems. srsa i TOP n. 5912 z� AP PROxt, rE TOP L 9 O f OF RGLK EL. -5150 I N 5, AG4AO,_,.,, —�__ -- 4" DIXo-W:GE 1 1 b`LL I— WET [ 1 PlP1NG TYP. REM(T/E EX15T. SRATEW AND INSTALL MEW 29 -x16" i i5,.q nAAMO E TO 7 k / / AlUn. HATCH i REMAIN IN SERVICE F� �\ r-T -- {E - - y — EL.= L I F / "fEx5T 10'LNE TO 55a < -- -_�__ E VVVVVV LIFT STATi� (M - i (� NE]N IOOD GP.^1 � 1 =--{ 1 Si>�R5113LE FUMPS � - - -1- L -1 — EL 55261 2 ELEVATION ® EX15TING a NET WELL ____5'-0 ID- WET - - -- ✓eldt§ LA LRETeF L— �XISTIPLri 1 %LL _J 3 PLAN 0 EXISTING A NET WELL GALE, Ili- =t' -0' s PLAN �1 NAEN Pi;MP STATION &LTEPSJATE oG G AaLSE ORDER :v. 2 HALF '.xZE P AN GARVERIENGINEEPS ' �asrEwATEPTreEaaacENTZLaNrIasPN�vEUENTS �.ola�`•��^¢ a__�s1rE.��,N . } PHASC- IIII OWASSO. O—HOMA oo�a 2oa6 ; Gnocu:.NLJ @ .kAiN PU%P STAitCN kODIFICATSONS y,t. No AI b. Facilltv Plan n Phase Services L. Contit m Bond intive to Date for Elgltalo C five to Data n. Amount o. Porcontaoa of Phvsical Comnletion im1" wif ORF -271 ° 0 D d �4� !,'` 9t}"Y'Y Fd +lt?,iJSVr itr '' rr t 7'•. 4X1 +fi ;� I.i , 47'x. � 1 pAR'fl�L DI3 ®UFis�M�PIT i. �� v `�i, Ir it''�rJ I T REQUEST NO 2 (Two) OF 9 ° PAGE 9 � H (�" r ,f nEVOLVINq y IDENTIFYING NUMBEB(s) ASSIGNED 13Y STATE AGENCIES. Loon No. ORf 098=013 =CW, jtl39g2853 ' S. PERIOD COVERED BY THIS REPORT YO D5 %2JDD: SAME AS D, 700.00 gram $27,810.00 v z $27,610.00 � � $0.00 $27,610.00 $12,905.00 u R 92 905 00 i ry $0.00 y y $12,905.00 $33,560.00 - s $33,560.00 a 1 Y_u $0.00 $33,560x00 581,100.00 5287,625.Ofl GzD0,334.45 ____A375,959.45 w. _ $375,959.45 b. Representative certifying to Ilr D.M. $0.00 �® $375,959.45 - a $267,625.00 $06,334.45 _ 2/ SIGNATURE OF AUTNOIAZED DATE REPORT CERTIFYING OFFICIAL SUBMITTED TYPED OR PRINTED NAME AND TITLE TELEPHONE No. Lar Mitoholl, Clt -- er 191811272-2251 SIGNATURE OF AUTHORIZED DATE SIGNED b. Representative certifying to Ilr D.M. CERTIFYING OFFICIAL In �® TO%5,qO 20 55-7b5 600 W5 55115 V6 5bb .45 8 TOH 55635 TON 5;ow H5 555.05 5qO . ........ .... . TOD 5bO.5 TON 5-71.8 - 20. TOCC 5-76b PARALLEL �IECq BAR 51CREEW5 y sg Z 556.45 MAX .513.8.. 515.b -5 - -------- 5b5.03 5,816 A b �;3.qt TOO 51i2,455 510 F7i:Ei I I- F, 5128 12' FMI 24' CE 510b MAX. — - ------------- 5. 560J6 fi ' I VALVE 'VAULT PARALLEL AERATED — — — MIN. F &RIT CRAMBERS P� to, L 3b 5583 j 555 --B-- HOLDW7 PRE-AERATM CONTROL &ATE 5A51N 5A5IN 5TRJoTLRE PET PELL I vi i Will fjj MAIN PUMP 5TATtON DRY VELL 11/28/00 15 m 59 405 530 8900 OK WATER RES BD Q001/001 ECMIVE DIRECTOR November 28, 2(')00 Mr. Fa Robert Carr, PE, Director Owasso Public Works Authority 207 '�outh Cedar ')wss, Oklahoma 740f) Dear Mr. Carr- STATE F OKLAHOMA WATFR -RESOURCES BOARD r post -Ito Fax Grote 767 1 . M FRANK K—FATING GOVERNOR 0- U Owasso Phase 11A Wastewater Treatment Pleat lmprOv m rrt $ OWRB CWSRF Loan Number F -98-01 ThO 8PPcifiG 80lution proposed in this charge order will be eligible If the following pl anning aspects are addressed. 1 A The need must be justified with a descripNon of the problems accurring. 2. The work must die, shown to be are, cost Oflective alternative among Other appropriate solutions. If you have any questions, please call Mara Hullingey or me at ( ) 530-8800. Sincerely, ly, aL� h rty, in r° Supervisor Financial Assistance Division 3804) N, CLASSEN BOULIWARD o OKLAHOMA CU Y, OKLAHOMA 731'18 % TELL'"O (4051 530-8300 b PAX (06) 5 LonAe L. Fannwa, Chair ,qn ® Ricksaed Q ^uci ooak$, Vices Chaljwn o CsadVGmndgtaff, Smatarb, E "4r) C� Jchcll Rk"Mi McDonaald a RA gets o I)ICk Sayb ®If 0 41 mdeA Th�tia21mon o Many C u,nis gr-v p City of Owassi 207 South Cedar PO Box 180 Owasso, OK 74055 November 29, 2000 Reese Daugherty E!,ngineering Supervisor Oklahoma Water Resources Board 3800 Na Classen Blvd. Oklahoma City, OK 73118 Re: Owasso Phase IIA Wastewater Treatment Plant Improvements OWIZI3 CWSRFLoan No. ORF -98-013 Dear Mr. Daugherty: 018) 272-2251 FAX (918) 272-4999 FAXed to (4-05)530-8836 (Original mailed) This letter is in response to your letter of November 28, 2000 concerning the proposed Change Order No. 2 for additional work at the Main Pump Station located at the wastewater plant, The f-bllowing information is provided in response to your request. Rmigcteed The Main Pump Station, which is an integral component of the overall treatment plant site, receives raw sludge from a series of force mains and one gravity line. The wet well level required for the proper control of the plant backs raw sewage up in the gravity line causing customers complaints and occasional overflows. In the past few years, more frequent and repeated instances of collection system bypasses in the vicinity of the Main Lift Station (located adjacent to the old lagoons) have had to be reported to the Oklahoma Department of Environmental Quality (ODEQ). In addition, population growth and excessive inflow/infiltration conditions in the collection system have directly affected abilities of the existing collection system to carry wastewater flow. Conditions in the vicinity of the Main Lift Station have compounded the inability of the collection system to adequately carry the flow. High wet well levels have been maintained at the lift station as a result of fill storm holding lagoons. These conditions have caused upstream Page I of 3 I gravity lines to surcharge (reach over - capacity) during extreme rain events and at some tires during normal flow conditions, Expansion of the Main hilt Station is included in Consent Order 98-288 with ODEQ, In conformance with the schedule of improvements, constriction at this location is to be initiated by October 2001. Preliminary engineering has already been completed; however, staff asked the design engineer (Garver Engineers) to re- evaluate methods to eliminate surcharging the gravity system leading to the station. Alternatives and Cost - effective Anal sus 'rho following alternatives were considered to alleviate this problem. 1. Construct new duplex submersible pump station on the gravity line and pump the wastewater to the existing pump station. 2. Retrofit the old existing Bret well (adjacent to the wet well "in use ") with two submersible pumps and pump to the existing influent structure. (The old wet well is 5 _feet- deeper than the existing vet well which will permit the water level to be lowered.) The litre between the old and "in use" wet wells will be plugged. 3. Provide temporary primping and postpone the works until Phase II . contractor Detailed plans for Allernate No. I were prepared by our consulting engineer. The preseni Phase HA (Crossland alternate in the amount of 1.. Alternate No. 2 was also detailed by our consultant. Crossland Heavy Contractors cost alternate proposal for this * 0. Alternate No, 3 is not practical, Phase IlB may be one (1) to three (3) years from the start of construction, We therefore request your approval of Change Order No. 2 which is based on Alternate No. 20 This alternate is the cost effective and best solution to the problem. Page 2 of 3 The Owasso Public; Works Authority will consider Change Order Noe 2 at their meeting of December 59 2000° Your concurrence in the use of SRF loan funds from the project contingencies prior to this would be appreciated, If you have any questions or comments concerning the contents of this latter, please contact this office at (918)272 -4959. Sincerely, PUBLIC WORKS DEPARTMENT Pa Hobert Car, Jr., P.E. Public Works Director Pate 3 of 3