4. Consideration and Appropriate Action Relating to a Request for Approval of the Consent
Agenda. All matters listed under "Consent" are considered by the Trustees to be routine
and will be enacted by one motion. Any Trustee may, however, remove an item from
consent by request. A motion to adopt the Consent Agenda is non-debatable.
A. Approval of the Minutes of November 21, 2000 Regular Meeting.
Attachment #4-A
Owasso Public Works Authority
December 5, 2000
Page 2
& Approval of Claims.
Attachment 84-B
5. Consideration and Appropriate Action Relating to a Request for Approval of Change Order,
Q, a Change Order to a Contract Between the City of Owasso and Crossland Heavy
Contractors, Columbus, KS, for Wastewater Treatment plant phase IIA Improvements.
Mr Carr
Attachment #5
r
The staff will recommend 49=approval of Change Order #2, adding $97,687 to the
cost of the project for the purpose of main lift station modifications, more specifically,
retrofitting the old existing wet well with two submersible pumps and all appurtenances
thereto, and an increase in the contract time of 30 days.
6. Report from OPWA Manager.
T Deport from OPWA Attorney.
8. New Business.
Owasso Public Works Authority
December 59 2000
Page 3
Adjournment,
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF RE, GULAR MEETING
Tuesday, November 21, 2000
The Owasso Public Works Authority met in a regular session on Tuesday, November 21, 2000 in
the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and
Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, November 1. 7, 2000.
ITEM 1: CALL TO ORDER
Chairman. Williams called the meeting to order at 7:00 p.m.
ITEM 2: FLAG SALUTE
The flag salute was held during the City Council meeting preceding this meeting.
ITEM 3: ROLL CALL
PRESENT
H C "Till" Williams, Chairman
Mary Lou Barnhouse, Vice Chairrra.ari
Melinda Voss, Trustee
Dandy Brogdon, Trustee
Rebecca Armstrong, Trustee
STAFF
Larry Mitchell, City Manager
Ronald D Cates, Authority .Attorney
Marcia I3outwell, Authority Secretary
A quorum was declared present.
ITEM 4: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REOUEST
-
FOR APPROVAL OF THE CONSENT AGENDA.
A. Approval of the Minutes of November 5, 2000 Regular Meeting.
B. Approval of Claims.
The consent agenda included minutes of the November 5, 2000 regular meeting, by reference
made a part hereto. Item E on the consent agenda included the following claims: (1) Owasso
Public Works Authority $55,086.13; (2) ®PWA Capital Improvements $169,963.649 (3) ®P TA
Sever Line Extension $23,0009 (4) Payroll $35,061.33. Ms Voss moved, seconded by
Ms Barnhouse, to approve the consent agenda.
AYE: Voss, Barnhouse, Brogdon, Armstrong, Williams
NAY: None
Motion carried 5 -0,
Owasso Public; Works Authority November 7, 2000
ITEM 5: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
CONTRACT FOR THE PURCHASE OF A FLATBED TAG TRAILER.
Mr Roberts said that the Water Distribution Division budget contains funds for the purchase of a
flatbed trailer, which is needed to reduce the transport time for off-road equipment to and from
work sites, In September, bids were advertised and were also mailed to three prospective
bidders, Subsequent to the bid opening, staff identified a discrepancy in the specifications, The
equipment was advertised as a PAG,trailer, when the description should have been TAG (tag-a-
long) trailer. No vendor inquiries were made regarding this error, so staff contacted the three
bidders that documents were mailed to in order to ensure consistency in the bidding process,
Each vendor indicated that the misspelling does not misrepresent the equipment specified and
should not create an improper interpretation by any prospective bidder. Ms doss moved,
seconded by Ms Barnbouse, to award a contract to Overbilt Trailer Co, Drumright, CIS, for the
purchase of a 20,000 lb GV I flatbed TAG trailer consistent with bid specifications at a cost of
$8190
AYE: doss, Barnhouse, Bro don, Armstrong, Williams
NAY: None
Motion. carried 5 -0.
ITEM 6: REPORT FROM OPWA MANAGED.
No report.
ITEM/ 7: REPORT FROM OP TA ATTORNEY.
No report.
ITEM 8e NEW BUSINESS.
LWIN
Ms Voss moved, seconded by Ms Barnhouse to adjourn.
AYE: Voss, Rarnhouse, Brogdon, Armstrong, Williams
NAY: None
Motion carried 5 ®0, and the meeting was adjourned at 7;04 porno
Marcia Boutwell, Secretary
-2..-
H C Williams, Chairperson
City of Owasso
Claims 1215/00
Fund
Department
Total
General
Deposit Refunds
50.00
105 Municipal Court
62.99
110 Managerial
1,70017
120 Finance
3.47
150 General Government
14,539,35
160 Community Development
203.93
170 Engineering
20235
175 Information Systems
1334
161 Support Services
425,61
190 Cemetery
103.43
201 Police Services
1 8359,01
215 Police Communications
654.42
221 Animal Control
161.50
250 Fire Services
3,935.47
230 Emergency Preparedness
119.24
300 Streets
9,263.29
515 Park Maintenance
241 A6
550 Community Center
70&57
710 Economic Development
47.00
TOTAL
33,300.51
Ambulance
Refunds
575.14
255 Ambulance
1,116.77
TOTAL
1,691.91
Ambulance Capital
255 Ambulance
67113
TOTAL
671.73
Bond Projects
Streets /intersections
33,344.52
City mall /Police Station
90,030.95
Project Management
3,279.00
TOTAL
131,154.47
OPGA
Merchandise
1,193.36
Food and Beverage
1,672,36
600 Golf Shop
60.63
605 Cart Operations
30.37
610 Golf Course Maintenance
1,314.31
670 Food and Beverage Operations
546.10
690 Golf Administration
795.17
691 Clubhouse
1,365.97
600 [debt Service
33,253.35
TOTAL
40,233.67
11-l",
0PWA Capital Improvements
PWA Sales Tax
City Garage
Workers'Comp Siff Insurance
Debt Service
TOTAL
186 City Garage
TOTAL
150 Workers' Comp
TOTAL
918A5
3,090
164,811,05
649.17
5,269,2
4,949006
3,016.13
182,72166
32,54&27
32,54327
92 ,621023
120,621.23
12,336.69
12,336M
9,189 6
Claims Total 566,966,86
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 11/16/00
DEPARTMENT
OVERTIME TOTAL
EXPENSES EXPENSES
0��mfnistnition
Utility Billing 115.3 79116.61
Wastewater 209A2 5,776.61
twrcallti ! C}o
eftase 60.17 5,015.74
Red
'YO l 6 Center 3.94,!
N TL. „457.5 ,76
APPROVED: December 5, 7000
Trustee
TO. HONORABLE CHAIR AND TRUSTEES
Y
OWASSO PUBLIC WORKS AUTHORITY
Jy a 5l
FROM- F. ROBERT CA RR, , J , P.E.
PUBLIC WORDS DIRECTOR 0
SUBJECT- CHAN E ORDER NUMBER 2 - PRAM; III
WASTEWATER TREATMENT PLANT IMPROVEMENTS
DATE: November 28, 2000
BACKGROUND-
A construction contract with Crossland Heavy Contractors, Inc. for the Wastewater Treatment
Plant Phase III, Improvements in the amount of 1,965,950.00 was approved by the Trustees at
the March `i, 2000 meeting. Work to be performed in this phase of construction consists of
constructing a now sludge digester and belt filter press and modifications to the plant headworks,
ultraviolet disinfection and Maim Lift Station.
Change Larder No, 1 was approved on September 19, 2000 in the amount of $29,296.45. At the
present time, funds have been obligated on the project in the amount of $1,935,246045 (the
total contract ward of $1,965,950 less the remaining $30,703.55 project allowance).
Funding for the project has ,
Board (OWRB). The loan (totaling $2,581, 100) includes, in part, $1,965,950 for constructi
and $98,275 for contingencies. I
Conditions in the vicinity of the Fain Lift Station have compounded the inability of the
collection system to adequately carry the flows High wet well levels have been maintained at the
lift station as a result of full storm holding lagoons. These conditions have caused upstream
Page 2
Change Order dumber 2
Wastewater Treatment Plant Improvements Phase IIA
gravity lines to surcharge (reach over - capacity) during extreme rain events and at some times
during normal flog conditions.
The hydraulic profile of the flow equalization basins, control structure and wet well (copy
attached) severely limits the ability to return water from the basins once the basins are full. The
eater surface elevation of the basins dictate the wet well operating elevation and,, most
importantly, the elevation of water in the collection system. In addition, the gravity sewer ties
directly to the wet well at a flow lime elevation of 56905 -feet. The basins are full at
approximately elevation 585 feet, 'Therefore, ender the present mode of operation and system
design, the collection system will surcharge until a lower profile elevation is achieved.
The following alternatives were considered to alleviate this problem°
l o Construct a new duplex submersible pump station on the gravity lime and pump
the wastewater to the existing pump station.
20 Retrofit the old existing wet well (adjacent to the wet well `yin use ") with two
submersible pumps and pump to the existing influent structure. ('The old wet well
is 5± feet deeper than the existing wet well which will permit the water level to be
lowered,) The lime between the old and 66in use" wet wells will be plugged,
3. Provide temporary pumping and postpone the work until Phase IIB,
Detailed plans for Alternate No. 1 were prepared by our consulting engineer. The present Phase
IIA contractor (Crossland Heavy Contractors) provided a cost proposal of this alternate in the
amount of $175,000,00°
Alternate No. 2 was also detailed by our consultant, Crossland Heavy Contractors cost proposal
for this alternate is $97,687000,
Alternate Igloo 3 is not practical, Phase III3 may be one (1) to three (3) years from the start of
construction,
CHANGE NUMBER 2
A Change Order has been submitted for Trustees approval for Alternate No. 2 to retrofit the old
existing wet well with two submersible pumps. Mork includes purchase and installation of two
Page 3
Change Order Number 2
Wastewater `treatment Plant Improvements Phase III
(2) new pumps, two (2) aluminum hatches, one (1) valve vault, one (1) manhole; miscellaneous
piping; and demolition. Total cost of the work is $97,687, In addition, Crossland has requested
an. additional. 30-days be added to their contract.
Graver Engineers ineers have reviewed the change order proposal and believe the costs are acceptable
for this work.
FUNDING SOURCE.
Staff recommends the Trustees authorization of Change Order No. 2 to the Wastewater
`treatment Plant Phase III Improvements with Crossland Heavy Contractors, Ingo for Main Lift
station modifications in an amount of $97,687000 and an increase in the contract time of 30 days.
J , Change Order Number 2
20 OWRB State Revolving Fund Project Budget (Outlay Report)
30 Hydraulic profile (Fain Lift Station area to plant headworks
4e November 28, 2000 letter from OVVRB
5. November 29, 2000 response letter from City of Owasso to OYM
PROJECT:
Wastewater Treatment Plant
Expansion Phase I A
TO CONTRACTOR-
Crossland Heavy Contractors, Inc.
833 South East Avenue
RC , Box 2350
Columbus, KS 66725
CHANGE, ORDER NO:
DATE-
CONTRACT C'T DAT:I+_ -
T'he Contract is changed to incorporate modifications to the Fain Pump Station at the
Owasso Wastewater Treatment Plant per the attached drawing and proposal.
NOT VA1AD UNTIL, SIGNED BY THE OWNER AND CONTRACTOR
The original Contract Sum was
Net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this
Change Order in the amount of
The new Contract Sum including this Change Order is
The Contract Time is extended by 30 calendar clays.
The contract completion date is therefore extended from March 27, 2001 to April 26, 2001.
CONTRACTOR _
Crossland Heavy Contractors
ADDRESS P.O. Box 350
Columbus, IBS 66725
2
11/27/00
:1/7/00
$ 1,965,950,00
0.00
$ 1,965,950.00
$ 97,687.00
$ 2,063,637.00
Owasso Public Works Authority
ADDRESS P.O. Box 180
Owasso, OIL 74055
BY BY
DATE DATE
Pa vae No. 1 of 1
Crossland Heavy Contractors, Inc.
P.O. Box 350 833 SE Avenue
olumbus, Kansas 66725
(316)429 -1410
FAX (316)429-2977
PROPOSAL SUBbilrTED 1O ... PHONF .. tr!Owasso Public orks Authon��� �.n� 10 NOV 00
S°112M: ,..y,,,.,�..K....,.�. �..��� ,.� JOBNAME
"Er—Ty, S'rA17. AND 71P CODE JOB LOCATION:
Owasso, OK 14053 Owasso OK.
AitCHi1'Ei,`f CJW F Of i LAMS: JUII PHONE
WE HEREBY sUBWT SPECIFICATION AND ESf[P.9ATES FOR:
We would like to thank you for the opportunity to quote the pump station change order. The proposal
is as follows.
Install: _ Two (2) 4 ", 15 BY, 1.750 rpm, 1000gpnnna pumps with controls.
Two (2) aluminum hatches,
One (1) valve vault per drawings. One (1) 4" diameter manhole.
Discs piping per drawinns°
Demolition per drawings.
CHC requests an additional 30 days for the completion of this work. All complete installation for the price of $97,687 °00
Should you have any questions re�ardin� this proposal% please feel fn °ee to cal ➢, _�_
Wt hereby to lumish material and labor -complete in accordance with above specifications, for the sum of:
ZNh et ®Seven Thousand Six Hundred Ei ht -Seven Dollars 00/1.00 dollars $97,687M
ayment to ma a as o o o
All material is guaranteed to be as specified_ All work to be completed in a workmanlike Authorized Signature: Darrell Moorman
manner according to standard practices. Any alteration or deviation from above specifications
involving extra costs will be executed only upon written orders, and will become an extra
charge over and above the estimate. All agreements contingent upon strikes, accidents
or delays beyond our control. Owner to carry fire, tornado and other necessary insurance.
Our workers are filly covered by Workman's Compensation Insurance.
Na o The above prices, specifications Signature
and conditions are satisfactory and are hereby accepted. You are
authorized to do the work as specified. Payment as outlined above. Signature
Date of Acceptance:
Owasso Public Works Authority
Crossland Heavy Contractors
Wastewater Treatment Plant Improvements Phase IIA
P.O. Bow 350
OR F Project No. 98-013 Date: November 8, 2000
Columbus, KS 66725
Breakdown of Pump Station change order
Descdp tea m Construct existing manhole into pump station and reroute sanitary
sewer line into existing line. This will
able the ci d relief to the surcharge on the existing sewer line.
Labgg Hrs. Rate/Hr.
Qt L.
Unit
Price.
Superintendent 80.0 $23.00
$1,840.00
Foreman 235.0 $19.00
$4,465.00
Operator 40.0 $16.00
$640.001
Carpenter 115.0 $18.25
$22,098.751
Laborer 307.0 $11.00
$3,377.00
SuhtgtaL
$12,420.75
Matehals,
.. ..... ...
Hatches
1.0
ls.
$5,400.00
$5,400.00
Pumps
1.0
1s.
$13,150.00
$13,150.00
Base rock
16.0
tn.
$8.85
$141.60
Class "A" concrete
15.0
c f.
$63.00
$945.00
Form rental
1.0
Is.
MOM
$400.00
Pipe small tools
1.0
Is.
$250.00
$250.00
Concrete small tools
1.0
Is
$500.00
$500.00
Demolition small tools
1.0
Is
$500,00 g
$500.00
14' precast manhole
1.0
F Is.
$1,400,00
$1,400.00
6' precast manhole to
1.0
Is.
$550.00
$550.00
Rebar
1.0
Is.
$250.00
$250.00
8" flang e cou apter
gpling a d
2,0
ea.
$170.70
$341.40
8" check valve
1.0
ea.
$653.00
$653.00
8" 45 bend
2.0
ea.
$110.00
$220.00
8"wye
1.0
ea.
$235.25
$235.25
8" ductile iron spool
1,0
ea.
$295,00
$295.00
8"x6" reducer
1.0
ea.
$210.00 @
$210.00
6"x6" tee
Lo
ea.
a X83.50
$83.501
6"x4' wall pipe
1.0
e--.
-
$359.775
$358.75
6'x4" tagging saddle
1.0
ea.
re $253.90 fi
$253.90
14" quick coupling
1.0
ea.
$50.00 l
$507001
16" 90 bend
4.0
ca.
$55.70
$221801
16" gate valve w/ handwheel
2.0
ea.
$244.15
$489.30
6" check valve w/ ext ➢ever
2.0 g
ea.
$610.010
$1,220.00
16"x6' wall pipe
g
2.0
ea.
$423.00 a
$946.00
Wxll'spool
4.0
ea.
$445.27
$1,781.08
2' check valve
1.0
ea.
$60.00 —
$60.001
Safety say pplies
I
$2s ,2GO.00
$2,200.00
Taxes.,
$2,438.98
$35,444.46
Subcontractors:
Electrical
1.0
Is.
$31,353.00 k
$31,353.00
Coring
1.0
is.
$1,400.00
$1,400.00
Trucking
4.0
hr.
$45.00
$180.00
Subtotal:
$32,933.00
coat®
.Cat. IT-28 loader
32.0
$19.88
$636.16
Cat. 320 trackhoe
27.0
$30.42
a
$821.34
lAir compresser 175 cfm
40.0
$9.35
I
$374.00
6" Pumps
240.0
$9,65
$2,316.00
Subtota l :
$4,147.50
$84,945.71
11/15/2C00 15:16 918-376-2335 CROSSLAND HEAVY CONT PAGE 02
$w FLUID 918 786 6Ge4 P.09
0
VNIP
IN
as - 120
IOU
31
80
20
80
m
swIke vui�m ft�m&A A�bwaltiv
go &mwagwo wift SPA # stwa"lll Mal leag for
mmnoj 09 lu 4AL& to tAl rAlawAffiffil at Q6 03M MY."
CUBIC METERS PER HOUR
6 EOfAANS
1999 NORTH RUBY STREET
MELROSE PARK, ILLINOIS 60160
y 1
BASIN AND
ACCESS DOOR
DISCHARGE PIPING/VALVE BOX
LAYOUT USING STANDARD
COMMERCIAL FITTINGS
---BASIN DIA
V F
-7, -
J_
To
TEE TRE\FffSf _IN _
ACCESS DOOR
PUMP
aEAR OPENING
MIN.
EASY
M
MODFL
mlhl� SIZE
BASIN
uFT
DISCHARGE
A & B
DIAMETER
RBOW
SIZE
4072.5
23X43
54
Af192.5
25X45
54
41035
�O3 L
29X48
1-6 jo
W
4103SV
4X4
4
13-1
a -9
8 1
185
A,
41135
8
4
a
8
4123SV
3OX50
60
A133SV
4123
3OX51
60
4
Kl�=
4153
36X54
66
v'
407245
Z7-3
23X49
60
122
2
237
a
r
4092.5
25X51
60
72 _2'
41035
i
alp
I
41031
—
29X54
66
4X6
6
16-1°
11 a
6J
22-1
alf
A103SV
8
a
8
4
4113SY
A123SV
30 X56
66
1 1 3
8
22 a
4
.4133SV
tb
4123
30X57
66
1 1 3.
8
2 2 '4'
F2
®1
4153
36X60
72
1 o l
2
1 Z
ALL 01 INNS IONS ARE
IN INCHES.
FOR NiULTIPLE PUMP
INSTALLATION.
PLEASE REFER TO FACTORY.
ISSUE 6 /96
PAGE
9175 mm
PUMPING EG2UIPMENT 51—HEOULE -
P.}NP SIZE CAPACITY TDH MIN EPP ® W VOLTAGE FHA SPEED 9
AK1. (am7 (FTJ RATED FLOW MIW RFM
IODO 30 55% 15 460 3 1150
2 4' IOOO 50 55% t5 460 3 I15O
t 1
—;
EKIST. PLOW ST
CgMTROL ,
! 1 G02 Exi5TIN5 W at.L
f I / 6 GROJT NEW b' PIPE
1 L -- d IN t�.AGEJ
EKIST. 10" PIPE —i B i— EXt$T. 18' PIPE
b• Di PIPE —
5' -0 -0-
r EL. 510b4 6za �, ....... 4 °WALL PIPE
REavi
TEE
i
� I I t311e' t3! /H"
-P.
9 u'f I - _- 4• GATE VALE
i 1 NEW 5k5•x45 DEEP
¢ EL. 5'15.11 J}
I I ( E VALVE VAIAi WITH
{ eY l 1 36,36- A HATCH -_ . • R° GHECX v vE
I f f TOP EL 516b4 AHD I TYP.
F OOR EL 514.
i I
, L—
__J
I�
I L =�
1 �+
REP'lJ`r CXfSi. —.�
GROJ* I YiT,, T}�
t
I
I
! 3 EXESVI t2' —' EKIS:lNG 18' RGP
c '• ^ N =� '- EX15T1NG ELEG. O I ELM GREEK
MAIN F - -'
X
EXISTING H' — „4. I'
PJG � i i _________ �1�RGP�
k _ .
EX5TIN5 FLOW
CONTROL 5TR1)C.TURE
TOP EL. 51l.IO
I
M
( yy
! SOT:a�TL^..E iSi \\ SIDENSV_K
' � e
i ` GENERATOR � y i � I I /�i
v
EUILDINCi � ( � Imo, ;r�TRq�i .'1�n bAL \"E _____________j �®
�Ex15TlNG
I
f� EXiSTiNS LIFT 1 FtiALE. 1' =10'
r RAFX a 15TI,— '- I ( //i STATIOM 6 Fci v,ELL;
I( TOP EL, 5145
/ TO EL. 56000 I INSTALL FiMPS tN
L_ —_ —x—
j _ ----------------- --------- ---- - -- ---
- = ei
— -- ------- ---
-- -PLfiS EXiSi. 10'
L Ex 5TIN5 !O' VLP 1 ' E ----- _ - - - - -_ I 1.- InTO LIF,
TO REMA[M FN / -- - , I_ STATION W GONG. J
/ SERVICE TTOPO? E:SiST1i NV- P'PC —I
EXl5TIMG HETNELL TO BE
MODIFIED POR F. Pt _______
1MP5
- _- - - - - --
/ // �STiPY VALVES `- 5TAT'N6t
'oP Ems. srsa i TOP n. 5912
z� AP PROxt, rE TOP L
9 O f OF RGLK EL. -5150 I N 5, AG4AO,_,.,,
—�__ --
4" DIXo-W:GE
1 1 b`LL I— WET [ 1 PlP1NG TYP.
REM(T/E EX15T. SRATEW
AND INSTALL MEW 29 -x16"
i i5,.q nAAMO E TO 7 k / / AlUn. HATCH
i REMAIN IN SERVICE F�
�\
r-T -- {E - - y — EL.= L I F / "fEx5T 10'LNE TO 55a < -- -_�__ E
VVVVVV LIFT STATi� (M -
i (� NE]N IOOD GP.^1
� 1 =--{ 1 Si>�R5113LE FUMPS �
- - -1- L -1 — EL 55261
2 ELEVATION ® EX15TING
a NET WELL
____5'-0 ID-
WET - - --
✓eldt§ LA LRETeF
L— �XISTIPLri
1 %LL
_J
3 PLAN 0 EXISTING
A NET WELL
GALE, Ili- =t' -0'
s PLAN �1 NAEN Pi;MP STATION
<EPSJATE oG G AaLSE ORDER :v. 2
HALF '.xZE P AN
GARVERIENGINEEPS ' �asrEwATEPTreEaaacENTZLaNrIasPN�vEUENTS �.ola�`•��^¢ a__�s1rE.��,N .
} PHASC- IIII OWASSO. O—HOMA oo�a 2oa6 ; Gnocu:.NLJ @ .kAiN PU%P STAitCN kODIFICATSONS y,t. No AI
b. Facilltv Plan
n Phase Services
L. Contit
m Bond
intive to Date
for Elgltalo C
five to Data
n. Amount
o. Porcontaoa of Phvsical Comnletion
im1" wif
ORF -271
° 0 D
d �4� !,'` 9t}"Y'Y Fd +lt?,iJSVr itr '' rr t 7'•. 4X1 +fi ;� I.i ,
47'x. � 1 pAR'fl�L DI3 ®UFis�M�PIT i.
�� v `�i, Ir it''�rJ I T REQUEST NO 2 (Two) OF 9
° PAGE 9 �
H (�" r ,f
nEVOLVINq
y
IDENTIFYING NUMBEB(s) ASSIGNED 13Y STATE
AGENCIES. Loon No. ORf 098=013 =CW,
jtl39g2853 ' S. PERIOD COVERED BY THIS REPORT
YO D5 %2JDD:
SAME AS D,
700.00
gram
$27,810.00
v z $27,610.00
� � $0.00 $27,610.00
$12,905.00
u R 92 905 00
i ry $0.00 y y $12,905.00
$33,560.00
- s $33,560.00
a 1 Y_u $0.00 $33,560x00
581,100.00
5287,625.Ofl
GzD0,334.45 ____A375,959.45
w. _ $375,959.45
b. Representative certifying
to Ilr D.M.
$0.00
�®
$375,959.45
-
a $267,625.00
$06,334.45
_
2/
SIGNATURE OF AUTNOIAZED
DATE REPORT
CERTIFYING OFFICIAL
SUBMITTED
TYPED OR PRINTED NAME AND TITLE
TELEPHONE No.
Lar Mitoholl, Clt -- er
191811272-2251
SIGNATURE OF AUTHORIZED
DATE SIGNED
b. Representative certifying
to Ilr D.M.
CERTIFYING OFFICIAL
In
�®
TO%5,qO 20
55-7b5
600
W5 55115 V6 5bb .45
8
TOH 55635
TON 5;ow H5 555.05
5qO
. ........ .... .
TOD 5bO.5 TON 5-71.8 - 20.
TOCC 5-76b PARALLEL �IECq
BAR 51CREEW5 y sg Z 556.45
MAX
.513.8.. 515.b -5 - -------- 5b5.03
5,816 A b �;3.qt
TOO 51i2,455
510
F7i:Ei I I-
F,
5128
12' FMI
24' CE 510b MAX.
— - ------------- 5. 560J6 fi
' I VALVE 'VAULT PARALLEL AERATED
— — — MIN. F &RIT CRAMBERS P�
to,
L 3b
5583 j 555
--B--
HOLDW7 PRE-AERATM CONTROL &ATE
5A51N 5A5IN 5TRJoTLRE PET PELL
I vi i Will
fjj
MAIN PUMP
5TATtON
DRY VELL
11/28/00 15 m 59 405 530 8900 OK WATER RES BD Q001/001
ECMIVE DIRECTOR
November 28, 2(')00
Mr. Fa Robert Carr, PE, Director
Owasso Public Works Authority
207 '�outh Cedar
')wss, Oklahoma 740f)
Dear Mr. Carr-
STATE F OKLAHOMA
WATFR -RESOURCES BOARD
r
post -Ito Fax Grote 767 1 .
M
FRANK K—FATING
GOVERNOR
0-
U Owasso Phase 11A Wastewater Treatment Pleat lmprOv m rrt $ OWRB CWSRF Loan
Number F -98-01
ThO 8PPcifiG 80lution proposed in this charge order will be eligible If the following pl anning aspects
are addressed.
1 A The need must be justified with a descripNon of the problems accurring.
2. The work must die, shown to be are, cost Oflective alternative among Other appropriate
solutions.
If you have any questions, please call Mara Hullingey or me at ( ) 530-8800.
Sincerely,
ly,
aL� h rty, in r° Supervisor
Financial Assistance Division
3804) N, CLASSEN BOULIWARD o OKLAHOMA CU Y, OKLAHOMA 731'18 % TELL'"O (4051 530-8300 b PAX (06) 5
LonAe L. Fannwa, Chair ,qn ® Ricksaed Q ^uci ooak$, Vices Chaljwn o CsadVGmndgtaff, Smatarb,
E "4r) C� Jchcll Rk"Mi McDonaald a RA gets o I)ICk Sayb ®If 0 41 mdeA Th�tia21mon o Many C u,nis
gr-v
p
City of Owassi
207 South Cedar
PO Box 180
Owasso, OK 74055
November 29, 2000
Reese Daugherty
E!,ngineering Supervisor
Oklahoma Water Resources Board
3800 Na Classen Blvd.
Oklahoma City, OK 73118
Re: Owasso Phase IIA
Wastewater Treatment Plant Improvements
OWIZI3 CWSRFLoan No. ORF -98-013
Dear Mr. Daugherty:
018) 272-2251
FAX (918) 272-4999
FAXed to (4-05)530-8836
(Original mailed)
This letter is in response to your letter of November 28, 2000 concerning the proposed Change
Order No. 2 for additional work at the Main Pump Station located at the wastewater plant,
The f-bllowing information is provided in response to your request.
Rmigcteed
The Main Pump Station, which is an integral component of the overall treatment plant site,
receives raw sludge from a series of force mains and one gravity line. The wet well level
required for the proper control of the plant backs raw sewage up in the gravity line causing
customers complaints and occasional overflows.
In the past few years, more frequent and repeated instances of collection system bypasses in the
vicinity of the Main Lift Station (located adjacent to the old lagoons) have had to be reported to
the Oklahoma Department of Environmental Quality (ODEQ). In addition, population growth
and excessive inflow/infiltration conditions in the collection system have directly affected
abilities of the existing collection system to carry wastewater flow.
Conditions in the vicinity of the Main Lift Station have compounded the inability of the
collection system to adequately carry the flow. High wet well levels have been maintained at the
lift station as a result of fill storm holding lagoons. These conditions have caused upstream
Page I of 3
I
gravity lines to surcharge (reach over - capacity) during extreme rain events and at some tires
during normal flow conditions,
Expansion of the Main hilt Station is included in Consent Order 98-288 with ODEQ, In
conformance with the schedule of improvements, constriction at this location is to be initiated
by October 2001. Preliminary engineering has already been completed; however, staff asked the
design engineer (Garver Engineers) to re- evaluate methods to eliminate surcharging the gravity
system leading to the station.
Alternatives and Cost - effective Anal sus
'rho following alternatives were considered to alleviate this problem.
1. Construct new duplex submersible pump station on the gravity line and pump the
wastewater to the existing pump station.
2. Retrofit the old existing Bret well (adjacent to the wet well "in use ") with two
submersible pumps and pump to the existing influent structure. (The old wet well
is 5 _feet- deeper than the existing vet well which will permit the water level to be
lowered.) The litre between the old and "in use" wet wells will be plugged.
3. Provide temporary primping and postpone the works until Phase II .
contractor Detailed plans for Allernate No. I were prepared by our consulting engineer. The preseni
Phase HA (Crossland
alternate in the amount of 1..
Alternate No. 2 was also detailed by our consultant. Crossland Heavy Contractors cost
alternate proposal for this * 0.
Alternate No, 3 is not practical, Phase IlB may be one (1) to three (3) years from the start
of construction,
We therefore request your approval of Change Order No. 2 which is based on Alternate No. 20
This alternate is the cost effective and best solution to the problem.
Page 2 of 3
The Owasso Public; Works Authority will consider Change Order Noe 2 at their meeting of
December 59 2000° Your concurrence in the use of SRF loan funds from the project
contingencies prior to this would be appreciated,
If you have any questions or comments concerning the contents of this latter, please contact this
office at (918)272 -4959.
Sincerely,
PUBLIC WORKS DEPARTMENT
Pa Hobert Car, Jr., P.E.
Public Works Director
Pate 3 of 3