Loading...
HomeMy WebLinkAbout2011.02_Improvement/Repair Project & Traffic SignalC PROJECT COMPLETION REPORT PROJECT: Street Improvement/Repair Project (FY 2009) & Traffic Signal Enhancements DATE PROJECT WAS INITIATED: September 2008 DATE PROJECT WAS COMPLETED: February 2011 DEPARTMENT RESPONSIBILITY FOR PROJECT: Public Works Department STAFF COMMENTS: STREET REPAIR --As in previous years, the FY 2009 Street Improvement /Repair Project project was completed via a joint partnership between the City of Owasso and Tulsa County for the repair and /or resurfacing of residential and non - residential roadways throughout the city. On September 16, 2008, the City Council approved the following street priorities: E. 82nd Street North to E. 84th Street North from N. 125th East Avenue to N. 128th East Avenue (Elm Creek Estates); E. 4th Street; E. 6th Street; and, and Beaumont Street (Original Town). On June 16, 2009, the City Council awarded a construction contract to Pavement Conservation Specialists, Inc. in the amount of $259,125 for the necessary base repair work. In September 2009 City Council approved additional funds in the amount of $145,000 for the cost of asphalt, as well as labor and equipment provided by Tulsa County. In November 2009, City Council authorized a revised scope of work payable to PCSE, Incorporated under their existing contract, not to exceed $419,125 for repairs to the asphalt surface on a portion of E. 96th Street North between the HWY 169 overpass and the existing concrete surface west of the JC Penney's location. The Public Works Department performed street repairs on the remaining portion of the revised scope of work. On December 15, 2009, the City Council accepted the complete street repair project and approved final payment to PCSE, Incorporated bringing their total contract amount to $398,401 (an under run of $20,723). In February 2010, City Council authorized final payment to Tulsa County in the amount of $108,795 (an under run of $36,205.) Traffic Signal Enhancements - On October 7, 2008, the City Council awarded an engineering agreement in the amount of $37,000 to Traffic Engineer Consultants, Incorporated. On July 21, 2009, the City Council awarded the hardware installation contract to Midstate Traffic Control, Inc. in the amount of $132,711. On April 20 2010, the City Council accepted the work performed and approved final payment to Midstate Traffic Control, Inc. for a total contract amount of $132.711. As part of the original contract, Midstate Traffic Control tested and provided a report outlining the condition of the Citv's traffic loop detection devices. Several signalized intersections were determined to have loop detection deficiencies and corrections to the loop detection devices were not included in the original hardware installation contract. The estimated cost to correct the loop deficiencies exceeded 10% of the total contract amount and by law requires the City of Owasso to bid the additional work separately. On August 17, 2010, the City Council awarded the Miscellaneous Vehicle Loop Detection System Improvements contract to Traffic Signals Incorporated in the amount of $35,212.75. On February 15 2011 the City Council accepted the Miscellaneous Vehicle Loop Detection Improvements and approved final payment to Traffic Signals Inc. bringing their total contract amount to $35,170 (an under run of $42.75). Also included in this project are traffic signal improvements to the E. 96th Street and N. 121St East Avenue (Smith Farm) intersection as well as synchronizing between this intersection and the Hwy 169 access point. The cost of improvements to these traffic signals totaled $63,720. The total project cost for the 2009 Street Improvement /Repair Project and Traffic Signal Enhancements is $937,633. C)c Roger Steve s, Public Works Director July 25, 2011 DATE C Approv this 25th_day of July, 2011. Brend6 Snow, Chairm