HomeMy WebLinkAbout2013.09.10_Worksession AgendaPUBLIC NOTICE OF THE JOINT MEETING OF THE
OWASSO CITY COUNCIL, OPWA, AND OPGA
TYPE OF MEETING:
DATE:
TIME:
PLACE:
Regular
September 10, 2013
6:00 p.m.
Old Central Building
109 N. Birch
RECEIVED
SEf 0 h 2013
City Clerk's Office
Notice and agenda filed in the office of the City Clerk and posted on the City Hall bulletin board
at 6:00 PM on Friday, September 6, 2013. &~v
Sherry Bisho , City Clerk
AGENDA
Call to Order
Mayor Doug Bonebrake
2. Discussion relating to Economic Development and Contract with Retail Attractions
Chelsea Levo
3. Consideration and appropriate action relating to a request for an executive session for the
purpose of discussion a proposal to entice a business to locate in the City of Owasso; such
request pursuant to title 25 O.S. § 307-C10
Julie Lombardi
Attachment #3
4. Discussion Relating to Administrative Items
Ms. Bishop
Attachment #4
A. Firefighters Pension - Budget Amendment
B. FY 2013 Carryover Projects - Budget Amendment
C. Special Events Ordinance
5. Discussion Relating to Operational Items
Mr. Lehr
Attachment #5
A. McCarty Park - Annexation
B. Golf Rates and Fees Increase
C. Transportation Master Plan - Engineering Agreement
D. Application for Surface Transportation Program (STP) Funds for Garnett Road
E. Silver Creek Detention Pond Improvements
F. Sam's Infrastructure Improvements Project Update
Owasso City Council
September 10, 2013
Page 2
6. Discussion Relating to City Manager Items
Mr. Lehr
A. Financial Disclosure Policy
B. Citizens Wishing to Address Council
C. City Manager Report
• Sales Tax Report
7. Report from City Councilors
8. Adjournment
u
The City Witiout Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Julie Trout Lombardi
City Attorney and General Counsel
SUBJECT: Executive Session to Discuss an Economic Development Proposal
DATE: September 6, 2013
BACKGROUND:
The Open Meeting Act specifically provides in 25 O.S. §307(C) (10) that governing boards such
as the Owasso City Council may vote to go into executive session to discuss matters relating to
economic development. More specifically, that section narrows the types of economic
development topics that may be discussed in executive session by listing the following items and
stating that discussion of these issues in executive session is appropriate: the transfer of property,
financing, and the creation of a proposal to entice a business to locate within the a city's
jurisdiction. Section 307 (C) (10) clearly states that economic development matters may only be
discussed in executive session "if public disclosure of the matter discussed would interfere with
the development of products or services or if public disclosure would violate the confidentiality
of the business."
The referenced section of the Open Meeting Act clearly does not create a broad exception
allowing all items related to economic development to be discussed in executive session.
Rather, the parties must have defined and articulable facts or concerns establishing that
discussion of the item in open session would either interfere with development of the products
and services of the business or violate the business' confidentiality. If one of these two standards
cannot be established or shown to present a reasonable risk to the business, the Council should
not go into executive session to discuss economic development issues related to that business.
The underlying public policy of §307 (C) (10) is intended to protect the competitive economic
interests of businesses locating or doing business within Oklahoma's cities and towns.
Accordingly, executive session is only justified if discussion in an open meeting would jeopardize
development of products or services or violate the business' confidentiality. A vote to enter into
executive session must be treated as an affirmation by the Council that executive session is
necessary because public disclosure would interfere with product or service development or
violate confidentiality of the business.
Notably, §307 (C) (10) does not permit generalized discourse about economic development
trends or overall efforts to attract businesses to the City. Discussions in executive session must
focus on a specific business the City is attempting to entice to locate within Owasso. Executive
session, under §307 (C) (10), is also an inappropriate forum to discuss performance or
compensation of employees within the Economic Development Department or contracts and
compensation of vendors or independent contractors hired by the City to perform Economic
Development functions.
Willful violation of any provisions within the Open Meeting Act may result in conviction of a
misdemeanor offense. The penalties for this crime are imposition of a fine not exceeding five
hundred dollars ($500) and/or imprisonment in the county jail for a period of time not exceeding
one (1) year.
RECOMMENDATION:
Staff recommends that the City Council identify a permissible reason under §307 (C) (10) before
voting to enter into an executive session to discuss a matter relating to economic development.
Staff strongly recommends that all discussion during the executive session be confined to
strategies or proposals to entice a specified business to locate within the City of Owasso. Staff
further recommends that any and all discussion of contracts, compensation, economic
development trends, future economic development strategies for the City of Owasso and any
other matter not directly related to a proposal or enticement of the target business to locate
within Owasso be prohibited during executive session.
V
The City VWit out Limits.
TO: Honorable Mayor and City Council
FROM: Linda Jones
Finance Director
SUBJECT: Budget Supplement
DATE: September 6, 2013
BACKGROUND:
Based on state law, firefighters are required to participate in the Oklahoma Firefighters Pension
and Retirement System. Contributions and benefits are outlined by state statute and changed
or modified through the normal state statute process.
In late May, staff was notified by the Firefighters Pension and Retirement System that Governor
Mary Fallin signed into law House Bill 2078 effective November 1, 2013. House Bill 2078 affects the
amount of contributions that are paid into the Oklahoma Firefighters Pension and Retirement
System from both the firefighter and the municipalities.
Currently, firefighters are required to contribute 8% of gross wages into the Firefighters Pension
and Retirement System and the City is required to contribute 13%. Effective November 1, 2013,
the required contributions for firefighters will be 9% and the required contribution for the City will
be 14%.
Due to the timing of House Bill 2078 being signed into law, the Fiscal Year 2013-2014 budget did
not include funding for this increase. The additional 1% increase in contributions required by the
City will cost an additional $23,000.
PROPOSAL:
Staff intends to recommend a budget amendment in the general fund increasing the
appropriation for expenditures in the fire department by $23,000 at the September 17, 2013
Council Meeting.
The City Witt Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Linda Jones, Finance Director
SUBJECT: Supplemental Appropriation
Carryover Projects
DATE: September 6, 2013
BACKGROUND:
Every year at the June 30 fiscal year end, there are open purchase orders for projects, contracts,
and purchases where the goods or services have not yet been respectively, received or
performed. While the appropriation of these items was included in the FY 2013 budget, the
actual expenditure for all or part of these open items will occur during FY 2014.
Examples include the CDBG sidewalk project, Stormwater Management vehicles, and
ambulance vehicles.
Budgetary encumbrances from the previous fiscal year may, by statute, either be held open or
re-appropriated in the new fiscal year. The smoothest transition from one fiscal year to the next
is to close the encumbrances in the prior fiscal year (FY 2013) and re-authorize the
encumbrance items in the new fiscal year (FY 2014). Since Generally Accepted Accounting
Principles (GAAP) do not recognize encumbrances, closing out old encumbrances where goods
and services have not been received, will enable the City's budgetary financial statements to
more closely align with audited GAAP statements.
Attached is a listing of carryover FY' 13 projects proposed for Council re-appropriation in FY 2014.
PROPOSAL:
Staff intends to recommend budget amendments to both the City Council and the OPWA
Trustees at the September 17, 2013 meetings.
ATTACHMENT:
Fiscal Year 2012-13 Budget Carryover to Fiscal Year 2013-14
Fiscal Year 2012-13 Budget Carryover to Fiscal Year 2013-14
Fund
Department
Adopted FY'14
Expenditure
Budget
FY'13 Carryover
Expenditure
Request
Revised FY'14
Expenditure
Budget
FYI 3 Carryover
Revenue
Request
General Fund
Finance
$ 620,625
$ 4,696
$ 625,321
General Fund
Information Technology
785,287
9,927
795,214
General Fund
Support Services
398,087
14,864
412,951
General Fund
Cemetery
11,255
2,900
14,155
General Fund
Police Services
4,888,834
31,785
4,920,619
$ 29,909
General Fund
Fire Services
4,510,530
131,704
4,642,234
61,704
General Fund
Streets
871,980
207,363
1,079,343
General Fund
Stormwater
442,360
38,215
480,575
33,985
Ambulance Capital Fund
Ambulance Operations
289,700
258,449
548,149
Stormwater Management Fund
Stormwater
456,105
246,085
702,190
OPWA
$ 37,549,276
$ 1,112,652
$ 38,661,928
$ 467,096
Apoft
Th. City Wit7aut Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Julie Trout Lombardi
City Attorney
SUBJECT: Proposed Special Events Permit Ordinance
DATE: September 6, 2013
BACKGROUND:
The number of special events within the City of Owasso has been increasing for several years.
"Special Events" in this context includes parades, fundraising social events, run events, bicycle
events, parades and other events including the recent and successful Gathering on Main.
Given that these types of events are increasing in number and often require the commitment of
significant City resources from Police, Fire, Public Works and other departments, staff believes the
City of Owasso needs to enact an ordinance regulating events of this type which requires the
event organizers to obtain a permit before holding the event.
A review of special events permit ordinances from other cities convinced staff that it is
preferable for the Council to adopt an ordinance that is brief and basic which defines a
"special event" and requires the sponsors of such an event to obtain a permit from the City
before holding an event of this type. Staff is in the process of completing this ordinance and it
will be provided to the Council at the work session. In addition to the ordinance, a more
comprehensive list of guidelines will be brought to the Council when completed. The guidelines
will detail the specific requirements event organizers must meet, the procedures to be followed
and the fees for various types of events depending on the size of the event and the resources
the City is required to provide.
PROPOSED ACTION:
Review and consideration of the proposed Special Events Permit Ordinance. Future
consideration of the Special Event Guidelines and Fees.
RECOMMENDATION:
Staff recommends the City Council review the proposed Special Events Permit Ordinance when
it is provided to the Council at the work session next week and discuss any questions or concerns
the Council might have about the form and content of the ordinance. Staff further
recommends the Council review the Special Event Guidelines and Fee Schedule which
supplement the ordinance when those documents are completed by staff and provided to the
Council.
At"
The City Wit,out Limits.
TO:
The Honorable Mayor and City Council
FROM:
Bronce L. Stephenson
Director of Community Development
SUBJECT:
OA-13-03- Annexation of McCarty Park
DATE:
September 6, 2013
BACKGROUND:
The City of Owasso is requesting to annex McCarty Park, located south of E 861h St N
approximately'/2 mile west of N Mingo Road.
ANALYSIS:
The McCarty Park land was donated to the City of Owasso for use as a park and has developed
accordingly. McCarty Park contains a rodeo arena, baseball fields and football fields. At the
time of the development of the park, an agreement was reached with Tulsa County for the
maintenance of the park. The City of Owasso owned the park, but it was maintained by the
County. About 10 years ago, the City of Owasso took over maintenance of the park from Tulsa
County and has worked with the various user groups to invest into the further development and
continued maintenance of the park. Because the park is not currently within City limits, Police
and other emergency services cannot be provided. This annexation request would simply bring
a City-owned and maintained property into the corporate limits of Owasso.
PROPOSED ACTION:
Staff intends to recommend approval of the annexation of McCarty Park at the September 17,
2013 meeting with the ordinance approval on the October 1 agenda.
ATTACHMENTS:
A. Area Map
McCarty Park
1" = 752 ft OA -13 -03 09/06/2013
This map represents a visual display of related geographic information- Data provided hereon is not a guarantee of actual field conditions- To be sure of complete accuracy.
please contact Owasso staff for the most up-to -date information-
The City Wit iout Limits.
TO: The Honorable Chairman and Trustees
Owasso Public Golf Authority
FROM: Corey Burd
Bailey Ranch Golf Club - Director of Golf
SUBJECT: Recommendation for OPGA Rate Increase
DATE: September 6, 2013
BACKGROUND:
Over the past three years, the Bailey Ranch Golf Club has seen an increase in golf memberships
as well as rounds played. Many factors play a part in this trend but a few of the main
contributors are the sustainable improvement to the course conditions, positive golfer
experience with regular referrals and restructuring of the membership options.
The course has maintained the current rate structure for many years and has not increased rates
in the past decade. To increase profitability and maintain financial responsibility, staff is
proposing an increase in membership rates and golf course fees. The proposed increase is not
substantial but will assist in addressing escalating costs.
Although the cost of doing business such as gas, materials and supplies has continued to rise, our
rates have not increased. Furthermore, employee costs have risen with minimum wage
increasing from $5.15 to $7.25. Relying heavily on part-time staff, this is a significant cost that we
must address in budget preparation. Staff believes we must begin to recoup these rising cost to
sustain the improving standards the course now realizes. Prior year course conditions have not
merited an increase but our product and current state justify this rise in fees. This rate adjustment
will also allow us to maximize the limited available rounds of golf the course can accommodate.
Many members and golfers are supportive of this increase if it continues to allow staff to
maintain the conditions and golf experience they currently enjoy. Although staff is aware of
possible turnover due to the increase, previous changes to the membership options allow for a
variety of choices to fit a diverse array of patrons.
MARKET SURVEY:
In preparation of the FY 2013-2014 OPGA budget, staff conducted a market survey to identify
industry standards and compare surrounding golf facilities' fee structures. Rates at Bailey Ranch
Golf Course are about average among all courses but rank lowest o f all the comparable
facilities. Staff believes we must begin to align the rates with other high end courses as
highlighted in the following market survey.
REGIONAL GOLF COURSE FEES MARKET SURVEY
GOLF COURSE
Forest Ridge
Battle Creek
Whitehawk
Clary Fields
BAILEY RANCH
Page Belcher
Mohawk
LaFortune
Heritage Hills
Sand Springs
PROPOSAL:
2001
2013
WEEKDAY
WEEKEND
WEEKDAY
WEEKEND
SENIOR
TWILIGHT
SUPER
TWILIGHT
$65.00
$75.00
$60.00
$70.00
$50.00
$48.00
$38.00
$43.00
$53.00
$45.00
$45.00
$30.00
$30.00
$30.00
$38.00
$45.00
$33.00
$43.00
$23.00
$35.00
$27.00
$37.00
$42.00
$34.00
$39.00
$27.00
$27.00
$27.00
$35.61
$39.93
$40.00
$40.00
$21.00
$25.00
$20.00
$27.08
$30.33
$37.00
$40.00
$26.00
$31.00
$31.00
$27.08
$30.33
$32.00
$36.00
$24.00
$27.00
$27.00
$29.14
$29.14
$39.00
$42.00
$27.75
$28.25
$28.25
$28.00
$28.00
$36.00
$36.00
$27.00
$27.00
$27.00
$24.00
$27.50
$25.00
$35.00
$23.00
$29.00
$23.00
Attached for your review is the proposed fee structure for the Bailey Ranch Golf Course. Additional
discussion is needed by the Public Golf Authority. An item has been included on the September
worksession for such discussion.
ATTACHMENT:
A. Proposed Fee Structure
B. Proposed Resolution
Bailey Ranch Golf Club Proposed Fee Structure
GREEN FEES
EXISTING RATE
INCREASE
NEW RATE
Regular 18 Holes
$28
$2
$30
Twilight after 3pm
$15
$2
$17
Super Twilight after 5pm
$10
$2
$12
Senior
$11
$2
$13
MEMBERSHIP
EXISTING RATE
INCREASE
NEW RATE
Individual
$140
$15
$155
Week Da Mon.-Thur.
$110
$0
$110
Seasonal 5 months
$200
$0
$200
Family
$185
$15
$200
Corporate
$200
$0
$200
EMPLOYEE
EXISTING RATE
INCREASE
NEW RATE
Regular 18 Holes
various
N/A
$15
Twilight after 3pm
various
N/A
$10
Super Twilight after 5pm
various
N/A
$5
Cart Fee
various
N/A
$10
SPECIALS
EXISTING RATE
INCREASE
NEW RATE
Juniors
Free w/ Adult
Cart Fee
Cart Fee
Multi-Play Card
All Year
Special Dates
5X / Year
Complementary Rounds
Director Approval
N/A
Director Approval
CARTS
EXISTING RATE
INCREASE
NEW RATE
Regular 18 Holes
$12
$2
$14
Twilight (after 3pm
$10
$2
$12
Super Twilight after 5pm
$10
$2
$12
Senior
$10
$2
$12
OWASSO PUBLIC GOLF AITHORITY
RESOLUTION NO. 2013-
A RESOLUTION OF THE OWASSO PUBLIC GOLF AUTHORITY ADOPTING RATES AND FEES
TO BE CHARGED AT BAILEY RANCH GOLF CLUB, AND ESTABLISHING AN EFFECTIVE
DATE.
BE IT RESOLVED BY THE TRUSTEES OF THE OWASSO PUBLIC GOLF AUTHORITY THAT:
SECTION ONE: From and after the effective date as hereinafter set forth, the rates and fees
charged by the Owasso Public Golf Authority at Bailey Ranch Golf Club be, and the same hereby
are, established as follows, to-wit:
DAILY RATES- Fees include green fee, cart fee and tax
Regular
$45.00
Senior
$25.00
Twilight
$29.00
Super Twilight
$24.00
CART FEE- Includes tax
Regular Cart Fee, one rider $14.00
EMPLOYEE- Fees include green fee, cart fee and tax
Regular $25.00
Twilight $20.00
Super Twilight $15.00
SPECIALS
Juniors
Multi-Play Card
Complementary Rounds
Cart fee with paid adult
Director approval
Director approval
SECTION TWO: The rates hereby adopted shall become effective on the 1 st day of October, 2013
APPROVED AND ADOPTED this 17th day of September, 2013 by the Trustees of the Owasso Public
Golf Authority
Dated this 17TH day of September, 2013.
ATTEST:
Doug Bonebrake, Mayor
Sherry Bishop, City Clerk
Approved as to Form:
Julie Lombardi, City Attorney
The City Witiout Limits.
TO: The Honorable Mayor and Council
City Of Owasso
FROM: H. Dwayne Henderson, P.E.
City Engineer
SUBJECT: Agreement for Engineering Services
2013 Transportation Master Plan
DATE: September 6, 2013
BACKGROUND:
The City of Owasso has seen tremendous growth in the last 25 years. The growth has required the
City of Owasso to construct a new wastewater treatment facility and expand it three times since
the mid-1980s. Sewer lines that were constructed in the 1960s are being upsized and replaced
along with miles of water lines. The original water tank has been removed and a new water
tower stands on the north end of town. All of these improvements were a result of master plans
implemented by the City of Owasso.
Owasso has not had a detailed Transportation Master Plan. INCOG updates a regional master
plan that includes Owasso and Tulsa County, but the detail is for planning purposes to apply for
federal highway funding and does not address traffic issues. However, Owasso needs a plan to
address the traffic issues that continue to grow.
With the addition of health related businesses, commercial centers, education facilities,
residential housing and new apartments, Owasso needs a plan to address the traffic needs for
the next 5, 10 and 20 years.
The approved FY 2013-14 budget includes funds from capital improvements for a transportation
master plan.
TRANSPORTATION MASTER PLAN:
The proposed Transportation Master Plan (TMP) for the City of Owasso is to study and document
existing traffic conditions in Owasso, and prepare a 5, 10 and 20 year plan for improving the
transportation system in Owasso to keep up with the projected growth. The boundaries of the
study are from Memorial Drive to N 161 St E Ave (west to east) and from E 68th Street North to E
126th Street North (south to north). Also, a corridor running east along E 76th Street North to N 193rd
E Ave, which will include the impacts of Stone Canyon.
The roads that will be studied are primary arterials (i.e. North Garnett from E 86th St N to E 1 16th St
N), secondary arterials (i.e. E 76th St N, US Hwy 169 to N 161 St E Ave) and collectors (i.e. N 129th E
Ave from E 96th St N to E 1 16th St N). Also, the study will look at the impact that US Hwy 169 and SH
20 pass-through traffic has on Owasso.
Initial work on the study will include data collection. A comprehensive traffic count program will
be implemented to generate the data needed for the traffic model. The Owasso traffic model
will use components from INCOG's regional model as a base-line.
Also to be included is input from citizens, business owners, the schools and City staff so the plan
will have feedback from the people that are directly impacted by the Owasso traffic.
The engineer will develop Owasso's Travel Demand Model and then calibrate/validate the
model with new traffic data. Engineers will also identify anticipated traffic volumes and travel
patterns, evaluate effectiveness of alternative improvements, project populations and traffic
flows for the years 2015, 2025 and 2035.
Once this information has been analyzed, the engineer shall establish a Functional Classification
System for the City streets. The system will confirm whether City typical sections, cross-section
and right-of-way needs are adequate and will evaluate future transportation systems to identify
optimal improvement alternatives and provide preliminary costs for improvements.
REQUEST FOR QUALIFICATIONS:
Requests for Qualifications were solicited from transportation engineering firms in the state
interested in working with the City of Owasso who had transportation planning expertise or the
ability to provide a team with that experience. Eleven (11) firms were invited to participate and
three (3) firms submitted Statements of Qualifications (SOQ).
QUALIFICATIONS BASED SELECTION PROCESS:
On August 2, 2013, staff received Statements of Qualifications from three (3) engineering firms.
The three responding firms are Guernsey, Oklahoma City; NewTrans Solutions, Owasso and EST,
Inc, Oklahoma City. Each Statement of Qualifications provided a proposed Scope of Services
based on our RFQ and provided extensive documentation outlining their experiences with
previous transportation master planning, strategy for successfully completing the master plan,
lists of previous similar planning projects, and staff qualifications.
Members of the Public Works and Community Development staff have reviewed and graded
the SOQs based on the information included in the Request for Proposals. Based on the SOQs,
staff interviewed the "Most-Highly Qualified and Responsive Firm." After the interview process,
staff began meeting with this firm and are currently negotiating a professional fee.
FUNDING:
Funding for this project is included in the FY 2013-2014 Capital Improvement Budget.
PROPOSED ACTION:
Staff intends to recommend approval at the October 1, 2013, Council meeting of the 2013
Transportation Master Plan Project - Agreement for Engineering Services.
ATTACHMENTS:
A. Request for Qualifications
100 GENERAL INFORMATION
A. The purpose of this Request for Qualifications (RFQ) is to obtain professional
engineering services for the preparation of the 2013 Transportation Master Plan.
B. All qualification statements will be considered without regard to age, race, creed,
color sex, handicap or national origin.
C. Instructions and Statement of Submission
1. Closing Submission Date: Statement of Qualifications (SOQ) must be
submitted no later than 5:00 p.m. Central Daylight Savings Time (CDST) on
August 2, 2013. The SOQ will be referred to a review committee who will
evaluate each statement in accordance with the evaluation criteria stated later
in this RFQ. A short-list of firms will be selected from the SOQs and
interviews conducted in August 2013. The goal of this process is to determine
the best qualified firm, prepare a scope of services, negotiate a fee proposal
and have a contract to the City Council for review at the September 10, 2013
Council Work Session for discussion and approve the agreement at the
September 17, 2013 City Council Meeting.
2. Conditions of the Statement: All costs associated with the preparation of a
proposal in response to this RFQ will be the responsibility of the offerer and
will not be reimbursed by the City of Owasso.
3. Instructions to Prospective Contractors:
a. Qualifications should be addressed as follows:
H. Dwayne Henderson, P.E.
City Engineer
City of Owasso
P.O. Box 180 or 301 W. 2nd Avenue (E. 76th Street North))
Owasso, OK 74055
b. Qualifications may be mailed or hand delivered. It is important that the
offerer's SOQ be submitted in a sealed envelope clearly marked on the
lower left hand corner with the following information:
PROFESSIONAL ENGINEERING SERVICES -
2013 TRANSPORTATION MASTER PLAN
It is the responsibility of the offerer to ensure that the SOQ is received by
the date and time specified above. Late submittals will not be considered.
4. Right to Reject: The City reserves the right to reject any and all Qualifications
received in response to the RFQ. Rating of each statement will be based only
on the factors and procedures described in the RFQ.
CITY OF OWASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
July 2013 Page 1 of 8
200 REQUIREMENTS OF THE SELECTED PROJECT ENGINEERING TEAM
(ENGINEER)DURING THE MASTER PLAN PROJECT
A. Complete the project with the team outlined in the SOQ.
B. Provide General liability insurance with a minimum combined coverage of
$1,000,000.
C. Provide Errors and Omissions Insurance to remain in effect during the project and
the term of any legal liability. Errors and Omissions coverage to be for a
minimum of $500,000, deductibles subject to approval.
D. Provide Workman Compensation insurance in accordance with the applicable
state statute.
E. During the course of the work the Engineer will be required to submit proof of the
required insurance coverage.
F. It is a requirement that the firm be accessible to the City of Owasso for staff,
Council and public meetings. The lead team representative (or their designated
alternate) must be able to respond to issues and/or be present at City of Owasso
offices within twenty-four (24) hours of notification.
300 ANTICIPATED SCOPE OF SERVICES
A. GENERAL
1. ENGINEER agrees to perform professional services in connection with the
Project as hereinafter stated.
2. ENGINEER will serve as professional engineering representative to the City
on the project, and will give consultations and advice to the City during the
performance of their services.
3. ENGINEER will prepare all documents necessary so that the City may secure
approval of such governmental authorities, including ODEQ, as have
jurisdiction over approval applicable to this project.
4. ENGINEER will become thoroughly knowledgeable about the contents,
conclusions, and recommendations of all available studies pertaining to these
projects. As needed by the ENGINEER, conduct other onsite investigations or
inspections of the project areas to aid in the planning activities.
5. It is anticipated that the OWNER may provide staff to perform a portion of the
work. The duration and availability of OWNER'S staff is not defined at this
time.
CITY OF OWASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
my 2013 Page 2of8
B. REQUIRED SERVICES
1. Setting:
a. The purpose of the work is to prepare a Transportation Master Plan for the
City of Owasso. The document must include an evaluation of the City's
existing transportation system;
b. The City of Owasso currently serves over 30,000 residents.
c. The City of Owasso currently has one (1) U.S. Highway running through
the corporate limits and another U.S. Hwy running north/south just west of
Owasso that impacts travel in Owasso; one (1) state highway running
east/west, 67 lane miles of existing arterials and 16 lane miles of collector
streets.
d. Traffic generators that will need to be considered are the following:
i. Owasso has a single middle high school/senior high school campus
with arterial separating the two buildings;
ii. Tulsa Technology Center (TTC) and Tulsa Community College
recently completed a 160,000 SF facility, which will be open for
classes in August 2013.
in. The Wal-Mart Corporation is constructing a new Sam's Club in
Owasso on 96`h Street North, east of U.S. Hwy 169, and which will
generate a large volume of traffic
iv. Five out-parcels in front of the new Sam's Club will add to the traffic
volume along the 96th Street North and US-169 corridor
v. The Owasso Medical Campus located north of the Super Wal-Mart
facility, when fully developed, along with a new 105 bed senior
housing center and new 280 unit apartment project could potentially
create a critical situation For the City in the 96`' St. N. and US-169
corridor.
e. Recommendations for intersection and signalization improvements shall
be included in. the plan. Existing LOS shall be determined at each
intersection and recommendations for improvements made to improve
traffic flow and efficiency.
f. A Transportation Master Plan Committee (TMPC) shall be formed and be
comprised of:
i. City Management Representative
ii. Public Works Representative
iii. Engineering Department Representative
iv. Streets Department Representative
v. Community Development Representative
vi. Long Range Planning Representative
vii. Economic Development Representative
CITY OF OwASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
my 2013 Page 3 of 8
viii. Police Department Representative
ix. Fire Department Representative
2. Progress Reports, Workshops and Meetings
i. ENGINEER shall have a kick-off meeting with the TMPC to discuss
limits of the study (in-case they change from that designated in this
RFQ); address goals and objectives of the study; focus on special need
areas and potential traffic generators.
H. ENGINEER shall prepare progress reports at each meeting following
the kick-off meeting. Included in the report shall be the minutes of
previous meetings for distribution to the committee for review and
approval. Reports shall include an updated schedule indicating due
dates for milestones and deliverables.
iii. ENGINEER shall coordinate TMPC meetings at regular intervals to
assure schedule compliance and gather input from the Committee on
findings are new issues found during preparation of the plan.
iv. ENGINEER shall coordinate and moderate Public Meetings at the
beginning of the process and one at the end of the process before the
draft plan is presented to the TMPC.
v. ENGINEER shall schedule an initial meeting with the sub-state
planning district, the Indian Nations Council of Governments
(INCOG) to determine how much of their existing model can be used
and to gather as much information as possible before embarking on the
study. A final presentation of the Master Plan shall be made to
INCOG's Regional Transportation Committee once approved by the
City.
vi. ENGINEER shall conduct workshop with Committee to review the
draft report and receive comments.
vii. Incorporate review comments and submit final report.
viii. Formally discuss the Master Plan at a regularly scheduled council
meeting and get final approval.
ix. Be available to discuss the Transportation Master Plan at a City
Council Work Session, which is a meeting that is designed to discuss
details of the project before formal action on the plan is taken.
3. Data Collection
a. ENGINEER shall collect traffic count information from City of Owasso
records, Tulsa/Rogers Counties records, Oklahoma Department of
Transportation and INCOG. The City of Owasso has records for various
roadway segments and can assist with traffic counting during the study, as
needed.
b. ENGINEER shall collect traffic signal information from the City of
Owasso and Tulsa County. As-built plans will be provided by the
CITY OF OwASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
July 2013 Page 4 of 8
responsible party. Field review and verification for each signal may be
necessary;
c. ENGINEER shall obtain regional functional classification maps and
transportation modeling information from INCOG;
d. ENGINEER shall obtain aerial photography from INCOG or City of
Owasso for use in the master plan;
e. ENGINEER shall obtain traffic accident data from the City of Owasso
Police Department;
f. ENGINEER shall obtain roadway right-of-way information from the Tulsa
County Assessor's website
g. ENGINEER shall review the existing roadway conditions and determine
the Level of Service of each roadway segment for the existing
transportation system.
h. ENGINEER shall review the community Land Use Plan (currently being
updated) and incorporate the information into the Transportation Master
Plan. Population projections, employment data, shall also be considered
and can be collected from the Community Development Department.
Additionally, existing land use information maintained by the Community
Development Department shall be referenced as needed to assist with the
study.
4. Travel Demand Model
a. ENGINEER shall meet with INCOG to gather information from their
Regional Travel Demand Model;
b. Update INCOG's Travel Demand Model
i. Calibrate/validate model with new traffic data
ii. Identify anticipated traffic volumes and travel patterns
iii. Evaluate effectiveness of alternative improvements
c. Model shall be used to project populations and traffic flows for the years
2015, 2025 and 2035.
5. Evaluate Future Transportation System
6. Identify Optimal Improvement Alternatives
7. Utilize alternative street sections and evaluate City's typical sections and
recommendation improvements.
CITY OF OwASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
July 2013 Page 5 of 8
a. Functional Classification System - Determine a classification system for
the City of Owasso streets and confirm whether City typical sections,
cross-section and right-of-way needs are adequate and where changes
should be made.
b. Development preliminary costs
c. Assess engineering/environmental impacts and challenges
d. Identify fatal flaws and adjust/reevaluate improvement alternatives as
required
e. Utilize low-level aerial data and other resources to minimize site
reconnaissance & concerns from public.
f. Prepare recommended improvements report
g. Optimizes City's transportation vision including recommendations for
"complete street" locations and recommended cross sections..
h. Most effectively accommodates anticipated future land use and modal
travel demand with minimal engineering and environmental impacts
i. Develop Improvement Prioritization Plan (identify immediate, near term
and long term improvement projects)
j. Prepare planning level project cost estimates
k. Identify alternative/creative funding strategies
1. Review existing transportation planning and design policies, ordinances
and guidelines
in. Finalize report
300 SOQ CONTENT
All sections A through G must be included to receive points in Section 500. Consulting
engineering firms desiring consideration should submit their qualifications in the following
format:
A. Cover letter
B. Project Understanding and Approach: This section shall demonstrate
understanding of the scope of the Project and summarize the approach to
providing each of the services included in Section 300 of the RFQ. This section
should not merely restate the contents of the Request for Qualifications but
provide a discussion of planned approach and specific work elements to be
performed in accomplishing all phases of this work. Bullitt items shall be used.
Keep in mind that this information will be used to develop a detailed Scope of
Work during the agreement section.
C. Project Organization and Staffing: This section shall discuss project staffing
including key personnel and their qualifications. The Project Manager shall be
identified. Resumes of key personnel and project manager shall be included as an
CITY OF OWASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
my 2013 Page 6 of 8
appendix. If the lead firm partners with other firms, a description of their
qualifications and relationship to the project work shall be included.
D. Qualifications of the ENGINEER:
1. This section shall discuss prior experiences of the firm. Particular mention
should be made regarding previous experience on similar projects.
Governmental master planning for disciplines other than transportation may
be included in this section. References MUST be included.
2. The section shall also include a discussion of projects performed within the
past five (5) years involving transportation master. The discussion of each
project shall include a description of any similar project, schedules (both
design and construction) and special circumstances encountered in the project.
3. All current or pending litigation, against the firm shall be provided.
4. This portion of the SOQ shall also include a listing of all projects currently in
progress by the proposed project team and their anticipated completion dates.
E. Schedule: Please include a proposed schedule for the completion of the Master
Plan based on your experiences on similar project. Use days per phase in lieu of
actual dates.
F. Description of Additional or Supporting Services: The consulting engineering
firm shall submit a description of other capabilities to provide the City with
additional information which may be used as a reference should they desire the
firm to perform additional or supporting services.
G. Number of Copies of SOQ: Engineer shall submit one (1) original and four
(4) copies of the SOQ to the City in response to the RFQ.
H. CAUTION: All information requested shall be included in the SOQ at the time of
submittal. Incomplete Qualifications will be considered informal and may be
subject to rejection on that basis.
400 REVIEW CRITERIA FOR THE SOQs S RECEIVED
A. All Qualifications that have been received by the deadline and in the manner
required in this RFQ will be opened and evaluated by a Review Committee. The
evaluation will be based upon the criteria presented in section F. Qualifications
will be ranked according to the total number of evaluation points assigned by the
Review Committee. Based upon this initial evaluation, the Review Committee
will identify one firm as most "Qualified and Highly Responsive".
B. If warranted, the Review Committee may, at its discretion, select one or more of
the firms for an interview in order to exchange additional information or clarify
portions of the SOQ contents.
1. The ENGINEER selected as most "Qualified and Highly Responsive" will be
requested to submit a detailed Scope of Services and fee proposal for final
evaluation by the Review committee. The detailed Scope of Services will
CITY OF OWASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
July 2013 Page 7 of 8
consist of all modifications and refinements made to the original RFQ Scope
of Services. Said modifications will be based upon review of the original
ENGINEER'S proposal, any and all RFQ Addenda, oral or written
communications between the ENGINEER and CITY, and all other pertinent
factors relating to the scope or conditions of the project.
Based upon the evaluation process outline above, the Review Committee will
contact an Engineer and negotiate the terms of the contract for services. If the
contract negotiations are successful, then the Review Committee will make a
recommendation to the City for approval of the Engineering Services
Contract.
3. A point system will be used to rank the Qualifications from which the review
committee will then recommend an award to the Engineer that will provide
the best service to the City of Owasso.
4. Qualifications will be reviewed in terms of content and completeness. Any or
all references may be contacted. Each required item, as defined in Section
500, will be reviewed and rated according to the criteria described below. The
following factors will be assessed throughout the review process:
5. Experience and technical competence of the Engineer, and project staff in the
required areas of expertise.
6. Capacity to perform all required services.
7. Evaluation of Engineer record on similar projects which shall include quality
of work and cost control.
All written material, oral interviews and other information relative to the RFQ
obtained during the review process will be treated confidentially, except as
required pursuant to local and state laws.
500 CITY CONTACT INFORMATION
A. Any questions should be directed to H. Dwayne Henderson, PE., City Engineer,
(telephone: (918) 272-4959, FAX: (918) 272-4996 or e-mail
(dhenderson@cityofowasso.com.)
CITY OF OWASSO REQUEST FOR QUALIFICATIONS 2013 TRANSPORTATION MASTER PLAN
July 2013 Page 8 of 8
7h~ City VYifiaut Limifs.
TO: The Honorable Mayor and Council
City Of Owasso
From: H. Dwayne Henderson, P.E.
City Engineer
Subject: Application for STP Funds
North Garnett Road from E 96th St N to E 1061h St N
Date: September 6, 2013
BACKGROUND:
Garnett Road from E 96th St N to E 106th St N is currently the heaviest traveled two-lane roadway
segment in Owasso. Traffic counts in this area were tabulated at 14,800 and 15,411 vehicles/day
in 2012 and 2013, respectively. The road, once on the highway system, accommodates heavy
residential traffic, commercial uses, and hospital traffic. For these reasons, the Owasso Capital
Improvements Committee listed the widening of Garnett from E 96th St N to E 106th St N as one of
the highest priorities among potential capital improvements projects.
In October 2012, the City of Owasso contracted with Dewberry Engineers, Inc., to perform the
engineering for the Garnett Widening project. They have prepared a conceptual plan and
preliminary design report that will be submitted to INCOG for FY 2017 Surface Transportation
Program (STP) funds. These funds are made available on an annual basis by the Federal
Highway Administration (FHWA), through the Oklahoma Department of Transportation (ODOT),
for the implementation of eligible transportation improvements in the Tulsa Urbanized Area.
INCOG administers the grant funding and has established a selection process for the distribution
of STP funds. Priority funding is given to projects that meet federal regulations and help advance
the Regional Transportation Plan through safety improvements and to projects that reduce
traffic congestion. Proposed projects are evaluated for eligibility and priority based on a 100-
point rating system. In August 2013, INCOG began accepting STP funding applications with a
submittal deadline of September 13, 2013.
PROPOSED RESOLUTION FOR CONSTRUCTION PHASE:
Similar to the process utilized in obtaining federal funding assistance for the E 106th St N and N
Garnett Intersection Improvements funded last year, a resolution is necessary in order to
complete the application process. The 2013 application will request federal funding assistance
for the construction of the roadway improvements. If this project is selected in November 2013,
the funding for construction will be targeted in FY 2017 or sooner, depending on funding
availability.
CONCEPTUAL DESIGN SUMMARY:
North Garnett Road Improvements from E 961h St N to E 1061h St N is a primary arterial in Owasso. It
is a heavily used roadway that conveys residential and commercial traffic in the area, as well as
commuter traffic to and from Owasso. This roadway accommodates a large percentage of
local traffic and is significant in the distribution of traffic to and from the Bailey Elementary School
and the primary shopping district in Owasso.
It is expected that residential growth north and east of this project will increase traffic volumes
and continue to overload the existing two-lane road section. The following table shows existing
and future flow patterns:
Location
Daily Traffic Volume
Daily Traffic Volume
(Vehicles per day 2013
(Vehicles per day
ADT/Peak)
projected for 2023)
Garnett Road, south of
106'" Street North
10,696 / 11,519
17,422 / 18,763
Garnett Road, north of
96th Street North
14,603 / 15,411
23,786 / 25,102
Garnett Road, north of
106th Street North
10,963 / 11,714
17,857 / 19,080
The proposed lane configuration is a 5-lane roadway section including 2-lanes in each direction
with a center turn lane to expedite turning movements into the various subdivisions along the
roadway. Also, included are sidewalks on each side of the roadway and dedicated bike lanes
Based on the conceptual design, the anticipated cost for the planning and construction of the
proposed roadway improvements is $7.991 million.
ODOT funding for this project would be through the Surface Transportation Program, which
would fund 80% of eligible construction costs, while the local government funds 20%. Based
upon this information, the following is an estimate of the cost distribution:
Project Segment
Estimate
($x1000)
ODOT Portion
($x1000)
City of Owasso
Portion
$x1000
Construction
$5.349
$4.279
$1.070
Right-of-Way
$0.750
$0.000
$0.750
Utility Relocation
$1.547
$0.000
$1.547
Engineering
$0.345
$0.000
$0.345
Total Project Cost
$7.991
$4.279
$3.712
PROPOSED ACTION:
Staff intends to present this item for discussion at the September 10, 2013 Council Work Session
with intent to have an item on the September 17, 2013 City Council agenda approval of a
resolution requesting ODOT to consider the construction phase of the North Garnett Road
Improvements from E 96th St N to E 106th St N as a candidate for federal funding assistance
through the Surface Transportation Program.
ATTACHMENT:
A. Resolution - Draft
B. Location Map
CITY OF OWASSO, OKLAHOMA
RESOLUTION NO. 2013-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OWASSO,
OKLAHOMA, AUTHORIZING THE MAYOR TO EXECUTE A
RESOLUTION SUBMITTING AN APPLICATION FOR FUNDING
BETWEEN THE CITY OF OWASSO AND THE OKLAHOMA
DEPARTMENT OF TRANSPORTATION FOR THE NORTH GARNETT
AVENUE WIDENING PROJECT FROM E 96TH STREET NORTH TO
EAST 106TH STREET NORTH
WHEREAS, Surface Transportation Program Urbanized Area funds have been
made available for transportation improvements within the Tulsa Transportation
Management Area; and
WHEREAS, the City of Owasso has selected a project described as follows: The
widening of North Garnett Avenue from East 96th Street North to East 106th Street North,
Owasso, Oklahoma; and
WHEREAS, the selected project is consistent with the local comprehensive plan,
including applicable Major Street and Highway Plan Element, and the Regional
Transportation Plan; and
WHEREAS, the engineer's preliminary estimate of cost is $5,349,000, and Federal
participation under the terms of the Safe, Accountable, Flexible, Efficient Transportation
Equity Act: A Legacy for Users (SAFETEA-LU) relating to Surface Transportation Program
Urbanized Area funds are hereby requested for funding of 80 percent of the project cost;
and
WHEREAS, the City of Owasso proposes to use Owasso Capital Improvement
Funds (CIP) funds for the balance of the project costs; and
WHEREAS, the City of Owasso has arranged for Dewberry Engineers, a qualified
engineer licensed in the state of Oklahoma to furnish professional services in the
preparation of detailed plans, specifications and estimates; and
WHEREAS, the City of Owasso agrees to provide for satisfactory maintenance
after completion and to furnish the necessary right-of-way clear and unobstructed; and
WHEREAS, the City of Owasso has required matching funds available and further
agrees to deposit with the Oklahoma Department of Transportation said matching funds
within thirty (30) days after approval by the Federal Highway Administration.
NOW, THEREFORE, BE IT RESOLVED: That the Indian Nations Council of
Governments is hereby requested to program this project into the Transportation
Improvement Program for the Tulsa Transportation Management Area; and
BE IT FURTHER RESOLVED: That upon inclusion in the Transportation Improvement
Program, the Oklahoma Transportation Commission is hereby requested to concur in the
programming and selection of this project and to submit the same to the Federal
Highway Administration for its approval.
NOW, THEREFORE, it is hereby resolved that the Mayor is authorized and directed to
execute the above described agreement on behalf of the City of Owasso.
ADOPTED this 17thth day of September, 2013.
Doug Bonebrake, Mayor
Attest:
Sherry Bishop, City Clerk
Approved As To Form:
Julie Lombardi, City Attorney
- PR
. R,q,SSO
I ,
'FIRST CHRISTIAN
CHURCH OF OWASSO
a
COMBS 0
- EL RIO
VISTA IV -
a
l
L~L~ ~,Tj If
I
1 EL 4id - E&PIO
ISTA,
ELO VaSTAtI
-VISTAII7
i
i
a
i i
CAUDLE,
1 re-rA TCO~ vVQ-
s
a
0
T,
H
nrC
BAILED` RRNCH ESTATES 11
ESTATES ,
I
I, J
r ( LOCATION MAP I CITY OF OWASSO
9/7/2012
Legend
North
TTTTS MAP TS PC1R TN-F'OTR.MATTC)N PURPOSE (>NLY ATTZ.) IS NOT TN TF_NDED TC)
hEPHLSE 'vT AN AC CE K1\ E.E, AJ' FR 3 SCAT E. Li'S1 rir 1111 S N3 AP IS WII I-10 l.1.I-.
IVARRAN'J"Y' ()R, .2U( RJ`Sl.,N"TATI(TN T31' Cf Y ()2 ()WASSK) ()F IFS ACCURACY.
111 N. Main Street
P.O. Box 180
Owasso, OK 74055
918.376.1500
V
The City Wit out Limits,
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Roger Stevens
Public Works Director
SUBJECT: Silver Creek Dry Detention Facility
Homeowners Association Request for Assistance
DATE: September 6, 2013
BACKGROUND:
In January 2011, the Silver Creek Homeowners Association (HOA) requested assistance with the
maintenance of their dry detention facility. Over a period of time, sedimentation has been
dispersed into the northern section of the facility. As a result, frequent ponding of water is
causing difficulty with vegetation control and human health concerns relating to stagnant water
(see Attachment B).
In March 2011, following a series of meetings with Silver Creek HOA representatives to discuss
their concerns, potential solutions, and cost estimates, the City staff agreed that the City would
fund 50% of the requested improvements and the HOA would cover the remaining 50%. At that
time, the improvements were estimated at $24,000 and include grading, placement of a
concrete trickle channel, and re-establishing the area with sod. The Silver Creek HOA agreed to
pay back the City in monthly installments totaling $12,000. Funding for this project was included
in the FY 201 1-2012 budget proposal and subsequently approved by City Council in June 2011.
Shortly after the approval of the FY 2012 budget, the City Council began discussions relating to
the development and adoption of a "Private Stormwater System Improvement Policy." In
September 2011, City Council adopted such policy.
In October 2011, the City employed Meshek and Associates to evaluate the Silver Creek
detention pond to see if this project met the requirements for public funding as defined in the
new Private Stormwater System Improvement Policy.
The results indicate that an excessive amount of sedimentation in the northern area of the pond
is prohibiting the pond from performing at its full capacity. The downstream flow rates reflect an
increase from the pond outfall. The 100-year flows downstream of the pond show an increase of
approximately 20 cubic feet per second (approximately a 40% increase). However, it is
important to note that the stormwater appurtenances located at East 86~h Street North have
more than enough capacity to effectively manage the increase in flow.
As you may recall, an element within the Private Stormwaer System Policy requires that Owasso
Public Works Engineering Division must determine if the capacity has been reduced, resulting in
a risk of flooding to the adjacent, upstream, or downstream properties. As mentioned above,
the capacity has been reduced; however, the drainage structure downstream of the facility
can accommodate the additional flows. Additionally, the model does not reflect an adverse
impact to downstream properties as a result of the increase in flow (20 cfs).
In April 2012, City staff presented this item at a regular scheduled Council work session meeting.
At that time, Council was not in favor of utilizing public funds to correct the issues relating to the
Silver Creek Dry Detention Facility. The primary reason was the deficiencies described didn't
follow within the private stormwater policy criteria.
Since then, the HOA representatives have met with City staff on several occasions to discuss
their concerns and why the City should assist with this project. In August 2013, after further
research, staff informed the HOA that the City could not legally loan money to another entity. As
a result, the HOA provided a new proposal and is willing to pay $6,000 towards the project with
the remaining balance being funded by the City. Although the HOA members are aware this
project does not qualify for public funds under the adopted Private Stormwater Policy, they are
requesting the City to adhere to the verbal agreement made prior to the adoption of the policy.
PROJECT DESCRIPTION/QUOTE ANAYLSIS:
As mentioned above, the improvements consist of grading, placement of a concrete channel
trickle channel and re-establishing the area with sod.
In August 2013, City staff requested construction quotes from several local contractors. In early
September 2013, three quotes were received with Tri-Star Construction providing the lowest
quote at $30,000. With the HOA contributing $6,000, the cost to the City would be $24,000.
FUNDING:
The Stormwater Fund balance has funds available in the event this project is approved.
SUMMARY:
It is important to note, City staff agreed to fund a portion of this project as a result of construction
standards not enforced by ODEQ and the City. Had the City required an as-built survey prior to
acceptance, this issue would not be before us.
PROPOSED ACTION:
Staff intends to present this item at the September 17'h Council meeting for consideration and
appropriate action.
ATTACHMENT:
A. Location Map
B. Images
C. Quote
D. Private Stormwater System Improvement Policy
~f
s:1
i,
x- ,
c
. fli,
SILVER CREEK DETENTION POND CITY OF OWASSO
Legend 111 N. Main Street
P.O. Box 180
® SUBJECT PROPERTY 4/2'1' Owasso, OK 74055
North
THIS Me-.P IS FOR INFORMATION PURPOSE ONLY AND IS NOT INTENDED TO
REPRESENT AN ACCURATE AND TRUE SCALE. USE OF TIIIS MAP IS WITHOUT 918.376.1500
WARRANTY OR REPRESENTATION BY CITY OF OWASSO OF ITS ACCURACY.
Fr t 1 I !I ~ R ~
t
{L ~ y
1 1J ,
I' I I I~~ i s . 3t
t
C~
~V
T -
I, 3. ? ~ rte ~x
~ !F F r
~¢v~. t•:
_t
-
$m
;,+'I;' ~~l~~ilFlt+'~I~~il a a•~
1 tH t 1I ( v ~fS' T,
h w, S .t
51 r sf z
6 R
3 ' :.i
3 ~
II
11 1
vL a~~A
fir,; Yi•. ! ,
F ~sxr (t•
11 f l'•, ,4 `
tf l
\ J r.
fie- .L ~y
w kr tt ~
\y s
Q v ,
!1 .ai~t ~ t Y t ` N ar
• tF. • ~ .trR• ( J ~;y
d x ~ ~t _ ~r
- - l ~ t 1 1 A~ 4 1
J 1 - ~E
S Ir L kT' t .
L.,v
1
1
( 5 T~I x~ k .N \'a. 57
rr ~ ,2E ~ "t :c
A_k
PROPOSAL
Project: Silver Creels Pond Trickle Channel
Submitted to: City of Owasso
Date: 9/5/2013
Attn: Earl Farris
Item Unit Adj. Unit Total
4' Wide Trickle Channel in Bottom of Pond-450 L.F. 1 Is 30,000.00 $ 30,000
Scope of Work:
Excavate for 4' Wide Trickle Channel
Install 4" Aggregate Base under Trickle Channel
Pour 4' Wide Trickle Channel- 450 L.F. -Class'C' Concrete
Includes, W1.5 x W1.6 x 10 x 10 WWF
Shoulder up Trickle Channel & Re-grade bottom of Pond- 2330 S.Y.
Sod 3' Strip along both sides of Trickle Channel- 300 S.Y.
Re-Vegetate Bottom of Pond w/ Hydro-Seed- 2000 S.Y.
Staking/Layout
Quality Control Testing... Soil Densities, Concrete Cylinders, Etc.
Rock Excavation
Utility Conflicts, Relocations, Etc.
AL BALANCE TO AWARD:
Payment Terms: Monthly pay applications for completed work and material on hand
invoices are due and payable 30 days from receipt.
All material is guaranteed to be as specified. All work to be completed in safe workmanlike manner
Any alteration or deviation from the original plans and specifications will only be executed upon
receipt of written change order, which will become part of the original agreement and will
effect the original price agreed upon.
Thank You for the opportunity to bid this project.
Signed: Mark Huff
Managing Member, Tri-Star Construction, LLC
Signed:
City of Owasso Representative
Owasso City Council
Policy Statement Relating to Private Stormwater System Improvements
In its desire to pursue the highest quality of life for citizens of the Owasso community, the
City Council recognizes the importance of stormwater management. The City of
Owasso continues to face difficult issues concerning the reliance of storm water
facilities constructed by land developers and maintained by subsequent landowners or
Home Owner Associations. The City of Owasso stormwater system contains
approximately 45 public or private detention stormwater detention facilities.
Stormwater detention facilities and related infrastructure require routine maintenance
to function properly and in the long-term can require significant investments for repair
and replacement of structures in order to prevent flooding of adjacent properties as
well as minimize the negative impacts of excessive flows on public roads, private
property, public facilities, and to aquatic habit downstream areas.
More and more often, the burden of assuring the integrity of the public stormwater
facilities subsequent to the failure of a private storm water management facility falls on
the local government. The purpose of the Private Sterm Water System improvement
Policy is to create guidelines and procedures to aid in the consideration of requests
from private stormwater facility owners for public assistance. Therefore, the City Council
adopts the following guidelines and directs the municipal staff to endeavor to
implement the policy as a priority in the administration of the staff's duties:
GUIDELINES:
The following requirements must be met in order for a private stormwater facility to be
eligible for funding consideration and appropriate action by the Owasso City Council:
1. The Private Stormwater Facility must be part of the City's stormwater system; and,
2. A determination made by the Owasso Public Works Engineering Division that the
basin's intended stormwater capacity has been reduced resulting in a risk of
flooding to the adjacent, upstream, or downstream properties; and,
3. A determination made by the Owasso Public Works Engineering Division that the
weakened or eroded areas of the dam or barrier poses a likely threat of a dam
or barrier failure; and,
4. A determination made by the Owasso Public Works Engineering Division that the
request for assistance is not to achieve purely aesthetic enhancement of the
basin or surrounding area (i.e., vegetation control, landscaping etc.).
PROJECT PRIORTIZATION:
Public Works will rate and prioritize each project request utilizing the following set of
criteria:
• Cost Participation by Property Owners - 10 points (max): Points awarded = of
property owner funding x 10)
• Capacity degradation - 10 points max : Extent to which the capacity of the
basin has been reduced as determined by Public Works Engineering Division.
Points awarded = (Estimated % surface area x 10)
• Erosion - 10 points (max): Extent of erosion along the dam or barrier, as
determined by the Public Works Engineering Division. Points awarded =
(Estimated % surface erosion x 10)
• Safety - 10 points (max): Degree of safety hazard (Scored by Public Works
Engineering Division):
a. None = 0 points awarded
b. Low = 1 to 3 points awarded
c. Medium = 4 to 6 points awarded
d. High = 7 to 10 points awarded
PROJECT SCOPE:
Public Works will have the sole discretion in defining the scope and characteristics of
the work necessary in order to bring the private stormwater facility into compliance with
the City of Owasso Engineering Design Criteria (Ordinance No. 812).
PRIVATE STORMWATER FACILITY MAINTENANCE:
In an effort to reduce future maintenance costs and potential flooding risk, the City of
Owasso will perform, or cause to be performed, an inspection of the private stormwater
detention facility on a bi-annual basis to ensure the property owner or Home Owner's
Association is providing adequate maintenance of the detention facility. The City staff
will provide notice to the property owner,
scheduled date and time of the inspection.
show signs of inadequate maintenance,
enforcement action.
via certified or registered mail, of the
Should the stormwater detention facility
the City will take appropriate code
ADOPTED by the Owasso City Council on the 201h day of September, 2011
C9du Bonebrake, Mayor