HomeMy WebLinkAbout2014.04.01_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY
TYPE OF MEETING:
Regular
DATE:
April 1, 2014
TIME:
6:30 pm
PLACE:
Council Chambers, Old Central Building
109 N. Birch
A Notice of the meeting and agenda filed in the office of the City Clerk and posted at City Hal
at 6:00 pm on Friday, March 28, 2014.
Sherry Bishop, Co Clerk
AGENDA
Call to Order
Chairman Doug Bonebrake
2. Roll Call
3. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. All matters listed under "Consent" are considered by the Trustees to be routine
and will be enacted by one motion. Any Trustee may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable
A. Approval of the Minutes of the March 18, 2014 Regular Meeting
Attachment #3A
B. Approval of Claims
Attachment #3B
4. Consideration and appropriate action relating to items removed from the Consent Agenda
5. Consideration and appropriate action relating to Change Order # 2, Project Acceptance,
and Final Payment for the Santa Fe Lift Station Improvement Project
Earl Farris
Attachment # 5
Staff recommends approval of Change Order # 2 reducing the contract amount by
$188,916.46; acceptance of the completed project, and final payment to WN Couch
Construction in the amount of $277,487.95.
6. Report from OPWA Manager
7. Report from OPWA Attorney
8. New Business (New Business is any item of business which could not have been foreseen
at the time of posting of the agenda)
9. Adjournment
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, March 18, 2014
The Owasso Public Works Authority met in regular session on Tuesday, March 18, 2014 in the
Council Chambers at Old Central per the Notice of Public Meeting and Agenda filed in the
office of the City Clerk and posted on the City Hall bulletin board at 6:00 pm on Friday, March
14, 2014.
1. Call to Order
Chairman Doug Bonebrake called the meeting to order at 7:26 pm.
2. Roll Call
Present
Chairman - Doug Bonebrake
Vice - Chairman - Chris Kelley
Trustee - Charlie Brown
Trustee - Jeri Moberly
Trustee - Patrick Ross
A quorum was declared present.
Staff:
Authority Manager- Warren Lehr
Authority Attorney - Julie Lombardi
3. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. All matters listed under "Consent' are considered by the Trustees to be routine and
will be enacted by one motion. Any Trustee may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable
A. Approval of the Minutes of the March 4, 2014 Regular Meeting and Minutes of the March
1], 2014 Joint Regular Meeting
B. Approval of Claims
C. Acknowledge Receipt of Monthly Budget Status Report
Mr. Brown moved, seconded by Ms. Moberly to approve the Consent Agenda with claims
totaling $246,962.08. Also, included for review was the payroll report for 03/08/14,
YEA: Brown, Kelley, Moberly, Ross, Bonebrake
NAY: None
Motion carried: 5 -0
4. Consideration and appropriate action relating to items removed from the Consent Agenda
No action required
Owasso Public Works Authority
March 18, 2014
Page 2
5. Consideration and appropriate action relating to the purchase of a service truck for the
wastewater maintenance department
Travis Blundell presented the item recommending approval to purchase a 2015 Ford F550
Crew Cab 4x4 service truck in the amount of $105,265 from Vance Country Ford of Guthrie,
Oklahoma, per the Oklahoma State Bid.
After discussion, Mr. Brown moved, seconded by Mr. Ross to approve the purchase of a
service truck from Vance Country Ford of Guthrie in the amount of $105,265, as
recommended.
YEA: Brown, Kelley, Moberly, Ross, Bonebrake
NAY: None
Motion carried: 5 -0
b. Consideration and appropriate action relating to the Hale Acres Sanitary Sewer Line
Replacement Project
Dwayne Henderson presented the item recommending approval to award a contract to
Triangle Construction of Tulsa, Oklahoma for $359,879 for the base bid, and authorization for
the Chairman to execute the contract.
After discussion, Dr. Kelley moved, seconded by Ms. Moberly to award the contract with
Triangle Construction of Tulsa in the amount of $359,879 and authorize execution of contract,
as recommended.
YEA: Brown, Kelley, Moberly, Ross, Bonebrake
NAY: None
Motion carried: 5 -0
7. Report from OPWA Manager
No report
8. Report from OPWA Attorney
No report
9. New Business
None
Owasso Public Works Authority
March 18, 2014
Page 3
10. Adjournment
Mr. Ross moved, seconded by Ms. Moberly to adjourn the meeting.
YEA: Brown, Kelley, Moberly, Ross, Bonebrake
NAY: None
Motion carried 5 -0 and the meeting adjourned at 7:39 pm.
Doug Bonebrake, Mayor
Lisa Wilson, Minute Clerk
Claims List
:►iOONE!
Budget Unit Title
Vendor Name
Payable Description
Payment Amount
OPWA JAMERICAN
MUNICIPAL SERVICES CORP. 1COLLECTION
SERVICES 1
558.01
TOTAL OPWA
558.01
OPWA ADMINISTRATION
STANDLEY SYSTEMS, LLC
COPIER MAINTENANCE AGREEM
226.15
CITY OF OWASSO
ADMIN OVERHEAD
15,416.00
JPMORGAN CHASE BANK
LOWES- THERMOSTAT
149.00
JPMORGAN CHASE BANK
LOCKE -LIGHT BULBS
6,50
TREASURER PETTY CASH
NOTARY BOND FILING
10.00
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
204,44
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
57.98
JPMORGAN CHASE BANK
PIKEPASS- PIKEPASS FEE
7.80
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
142.03
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
44.26
UNITED STATES CELLULAR CORPORATION
CELL BILL
62,77
TREASURER PETTY CASH
TAG -DUMP TRUCK
60.00
AEP IPSO
ELECTRIC USE
1,198.60
TOTAL OPWA ADMINISTRATION 17,585.53
UTILITY BILLING TRACY HARLIN METER READER 354.15
TODD C. KIMBALL METER READER 676.50
KATHLEEN A BALSIGER METER READER 477.00
TECHNICAL PROGRAMMING SERVICES INC BILLING SERVICES 1,530,86
TYRONE EUGENE DINKINS METER READER 233.55
TRACY HARLIN METER READER 214.20
KATHLEEN A BALSIGER METER READER 146.25
TOTAL UTILITY BILLING
3,632.51
WATER
JPMORGAN CHASE BANK
FULLERTON- CYLINDER LEASE
40.00
JPMORGAN CHASE BANK
HOLMAN SEED -SEED
32.00
TREASURER PETTY CASH
COL LICENSE
51.50
JPMORGAN CHASE BANK
LOWES -DUMP CABLE
1107
CITY OF TULSA DEPT OF FINANCE
LAB SERVICES FOR FEB 2014
500.00
USA MOBILITY WIRELESS, INC
PAGER USE
89.20
JPMORGAN CHASE BANK
HD SUPPLY -METER CAN
1,601.80
JPMORGAN CHASE BANK
HD SUPPLY -2 INCH METERS
1,380.00
JPMORGAN CHASE BANK
HOLMAN SEED -SEED
32.00
TWIN CITIES READY MIX, INC
CONCRETE
182.00
JPMORGAN CHASE BANK
HD SUPPLY - SUPPLIES
2,553.05
JPMORGAN CHASE BANK
HD SUPPLY - HYDRANT LOCK
383.00
JPMORGAN CHASE BANK
BROWN FARMS-SOD
80.00
AEPIPSO
ELECTRIC USE
527.85
JPMORGAN CHASE BANK
ATWOODS- SUPPLIES
24.68
TWIN CITIES READY MIX, INC
CONCRETE
118.75
Page 1
Claims List
4/1/2014
Budget Unit Title
Vendor Name
Payable Description 1payment
Amount
WATER... JUNIFIRST
HOLDINGS LP
UNIFORM RENTAL
55.02
TOTAL WATER
7,663.92
WASTEWATER TREATMENT
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
106.77
AEP /PSO
ELECTRIC USE
21,966.46
JPMORGAN CHASE BANK
ADMIRAL EXP -PHONE CORDS
6.20
JPMORGAN CHASE BANK
GRAINGER -TOOLS
242.45
JPMORGAN CHASE BANK
DALE & LEES -LAB AC REPAIR
354.00
JPMORGAN CHASE BANK
BUMPER TO BUMPER -PARTS
511.32
JPMORGAN CHASE BANK
LOWES- SHELVING /ROPE
164.74
JPMORGAN CHASE BANK
NCL -LAB SUPPLIES
55.08
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
9.68
LOT MAINTENANCE OF OKLAHOMA, INC.
LINE CLEANING - WWTP
2,475.00
JPMORGAN CHASE BANK
FULLERTON- CYLINDER GAS
88.50
JPMORGAN CHASE BANK
OREILLYS -SPARK PLUGS
15.26
JPMORGAN CHASE BANK
LOWES -SHOP BROOM
37.64
JPMORGAN CHASE BANK
HACH CO -LAB SUPPLIES
389.12
JPMORGAN CHASE BANK
EQUIPMENT ONE- OILJFILTERS
29.58
JPMORGAN CHASE BANK
LOWES - SUPPLIES
3.16
JPMORGAN CHASE BANK
LOWES -PVC MATERIAL
9.59
JPMORGAN CHASE BANK
LOWES- CLARIFIER MATERIAL
22.64
JPMORGAN CHASE BANK
LOWES- REPAIR MATERIAL
65.12
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
20.23
USA MOBILITY WIRELESS, INC
PAGER USE
18.24
JPMORGAN CHASE BANK
PIKEPASS- PIKEPASS FEE
7.80
JPMORGAN CHASE BANK
LOWES- SUPPLIES
1.98
JPMORGAN CHASE BANK
FULLERTON- CYLINDER LEASE
80.00
TOTAL WASTEWATER TREATMENT
26,680.56
WASTEWATER COLLECTION:
AEP /PSO
ELECTRIC USE
3,711.54
USA MOBILITY WIRELESS, INC
PAGER USE
53.22
SCHUERMANN ENTERPRISES, INC
MAINTENANCE AND REPAIRS
2,689.39
JPMORGAN CHASE BANK
MET INDUSTL -PUMP SEALS
2,77717
JPMORGAN CHASE BANK
HD SUPPLY - SUPPLIES
163.00
JPMORGAN CHASE BANK
HD SUPPLY-SUPPLIES
115.00
JPMORGAN CHASE BANK
BROWN FARMS -SOD
240.00
JPMORGAN CHASE BANK
ATWOODS- GREASE GUN
9.98
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
40.20
TWIN CITIES READY MIX, INC
1CONCRETE
95.00
TOTAL WASTEWATER COLLECTIONS 9,895.10',
REFUSE COLLECTIONS UNITED STATES CELLULAR CORPORATION CELL BILL 62.77
UNIFIRST HOLDINGS LP UNIFORM RENTAL 45.31
Page 2
Claims List
4/1/2014
Budget Unit Title Vendor Name Payable Description Payment Amount
REFUSE COLLECTIONS... JPMORGAN CHASE BANK AMERIFLEX- TAILGATE HOSE 26.50
USA MOBILITY WIRELESS, INC PAGER USE 62.59
TOTAL REFUSE COLLECTIONS 197.17
RECYCLE CENTER IAEP /PSO IELECTRIC USE 1 68.84
Page 3
JPMORGAN CHASE BANK
PMSI - SAFETY CONES
162.50
JPMORGAN CHASE BANK
WASTE MGMT- TIPPING FEES
1,281.45
JPMORGAN CHASE BANK
LOWES- SUPPLIES
17.96
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
10.98
TOTAL RECYCLE CENTER
1,541.73
OPWA DEBT SERVICE
BANCFIRST
06 NOTE
36,269.17
BANCFIRST
FAP-01 -0003-L/01C
6,412.82
BANCFIRST
FAP04- 0006 -L/04
21,181.35
BANCFIRST
FAP10- 0002 -U1 O
7,200.00
BANCFIRST
ORF -01- 0002 -U01 B
11,826.86
BANCFIRST
ORF09- 0007- CW109C
23,361.34
BANCFIRST
FAP 12- 0011- L /12 -02B
10,500.00
BANCFIRST
ORF09- 0003- CW /09B
55,960.40
BANCFIRST
13 -06DW
21,059.33
BANCFIRST
ORF- 990008 -U99B
3,581.90
TOTAL OPWA DEBT SERVICE
197,353.17
FUND GRAND TOTAL
265,107.7
OPWA STF DEBT SERVICE
RCB TRUST SERVICES
SERIES 2008 NOTE
100,316,67
BANCFIRST
07 NOTE
138,604.33
TOTAL OPWA STF DEBT SERVICE
238,921.00
FUND GRAND TOTAL
238,921.0
OPWA ST SUB - DEBT SERV
SF SHOPS INVESTORS, L.P.
DEVELOPMENT AGREEMENT
38,596.23
TYANN DEVELOPMENT COMPANY, INC
DEVELOPMENT AGREEMENT
48,265.73
TOTAL OPWA ST SUB - DEBT SERV
86,861.96
FUND GRAND TOTAL
86,861.9
OPWA GRAND TOTAL
$590,890.66
Page 3
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 03/22/14
Department
Payroll Expenses
Total Expenses
OPWA Administration
8,039.33
11,514.30
Utility Billing
4,663.20
7,922.54
Water
12,017.62
20,073.11
Wastewater
10,024.79
16,966.21
Wastewater Collection
7,527.19
12,449.22
Santa Fe Lift Station
-
Ranch Creek Interceptor
1,662.50
1,850.03
Refuse
10,26171
16,286.08
Recycle Center
958.40
1,856.45
FUND TOTAL 55,154.74 88,917.94
The City Wit ouf Limits.
TO: The Honorable Chairman and Trustees
Owasso Public Works Authority
FROM: Earl Farris
Project Administrator
SUBJECT: Santa Fe Lift Station and Force Main Improvement Project
DATE: March 28, 2014
BACKGROUND:
In accordance with the 2005 Wastewater Master Plan and in order to comply with an Oklahoma
Department of Environmental Quality (ODEQ) Consent Order (No. 10 -036) issued in January
2010, this project upgraded the Santa Fe Lift Station and Force Main to provide adequate
pumping capacity and conveyance for current and future wastewater flows from the Ranch
Creek Interceptor.
In February 2010, OPWA Trustees approved the Santa Fe Lift Station and Force Main
Improvements as a project. The scope of work included replacing the existing lift station with a
new submersible style pump station, standby power facilities, upgrades to the existing electrical
and instrumentation equipment, and the installation of a new 20" diameter force main to run
parallel with the existing 12" force main. The improvements increased the pumping capacity
from 2.7 MGD to 9 MGD, which will meet pumping capacity needs for the next 10 -15 years. The
engineering estimate prepared by Greely and Hansen was $2,900,000 for the total base bid.
On September 20, 2010, OPWA Trustees approved Resolution No. 2010 -06, which authorized staff
to file an application with the Oklahoma Water Resources Board (OWRB) for financial assistance
through the OWRB Clean Water State Revolving Fund Program for the purpose of financing the
Santa Fe Pump Station and Force Main Improvement Project.
On May 4, 2011, the ODEQ approved the engineering design and issued the required permit for
the construction of the project.
In September 2011, bids were advertised. Eight bids were received and on November 15, 2011
Trustees awarded the construction contract to WN Couch in the amount of $2,636,700. During
construction one administrative change order was approved by Trustees in August 2012.
Change Order #I in the amount of $14,000 was for the addition of thirty -six feet of 36 inch
ductile iron pipe for the future Ranch Creek Interceptor improvements and adjusted the
contract amount to $2,650,700.
CHANGE ORDER #2 AND PROJECT COMPLETION:
Change Order #2, which is part of the final payment, is a reconciliatory change order reducing
the contract amount by $188,916.46. These reductions result from the removal of two- hundred
linear feet of ductile iron pipe, a change in the Concrete Masonry Unit block used,
compensation to the City for items not used, such as earth excavation, additional select fill, class
D concrete, epoxy coated reinforcing steel, and liquidated damages as the contractor did not
complete the project within the construction timeframe.
Substantial completion of this project occurred in March, 2013, and WIN Couch Contractors
completed the project in its entirety in February 2014. City staff and the design engineering firm
have found the project to be acceptable and in accordance with the design engineer's intent.
FUNDING:
Funding for the construction of this project was obtained from the OWRB via a loan from the
Clean Water State Revolving Fund (CWSRF).
RECOMMENDATION:
Staff recommends approval of Change Order #2 reducing the amount of the contract by
$188,916.46, amending the contract to $2,461,783.54. Staff further recommends acceptance of
this project and authorization of final payment to WN Couch in the amount of $277,487.95 for a
total and completed contract price of $2,461,783.54.
ATTACHMENTS
A. Site Map
B. Change Order #2
C. Final Payment Application
D. Certificate of Project Completion
_ r4 �g
C
p -
1
+1
A _
SANTA FE LIFTSTATION / FORCEMAIN UPGRADE
Legend
P IS FOR IN
; l IN'I "FNOFD 10
NIAP 1S W I- THOU "1'
: ITS ACCURACI'.
=z
m
CITY OF OWASSO
I11 N. Main Street
P.O. Box 180
Owasso, OK 74055
918.376.1500
CITY OF OWASSO, OI{
SANTA FE LIFT STATION AND FORCE
MAIN REPLACEMENT
Change Order No. 2
DATL August 27, 2013
CONTRACT: Santa Fe Litt Station and Force Main Replacement
CONTRACTOR: W.N. Couch Contractors
401 S. Memorial Drive
Tulsa, Oklahoma 74112
DESCRIPTION OF CHANGE ORDER:
1. Compensate the City for the removal of the 20 -in0h extension near the Flow Control
Structure to the Storm Water Holding Lagoon, approximately 200 linear feet of ductile iron
pipe.
2. Compensate the City for the change in the type of CMU block used for the Electrical Room
of the Santa Fe Lift Station,
3. Compensate the City for Contract Item No. 2, additional earth excavation, that was not used
dating construction.
4. Compensate the City for Contract Item No. 3, additional select fill material, which was not
used during construction.
5. Compensate die City for Contract Itern No. 4, additional Class D concrete, that was not used
during construction.
6. Compensate the Cityfor Contract Item No. 5, additional epoxy coated reinforcing steel, that
was not used during construction,
7. Compensate the City for liquidated damages accrued by the Contractor for failing to reach
Substantial Completion in the required number of days per the Contract Documents.
METHOD TO BE USED IN MAKING PAYMENT:
The payment for this Change Order will be made in accordance with Articles 10, 11 and 12
of the General Conditions and. Section 01250 of the Contract.
City of Owasso, Oklahoma
Santa Fe Lift Station and Force Main Replacement
Change Order No. 2
ADJUSTMENTS TO THE CONTRACT AMOUNT:
The adjustment to the contract amount resulting from this Change Order is a subtraction in
the amount of $188,926.46 determined as follows:
I. Compensate the City for the removal of the 20 -inch extension near the Plow
Control Structure to the Storm Water Holding Lagoon, approxinrately2001inear
feet of ductile iron pipe.
($11,550,00)
2. Compensate the City for the change in the type of CMU block used for the
Electrical Room of the Santa Fe Lift Station.
($12,626.46)
3. Compensate the City for Contract Item No. 2, additional earth excavation, that
was not used.
($6,700.00)
4. Compensate the City for Contract Item No. 3, additional select fill material,
which was not during construction used.
($3,600.00)
5. Compensate the City for Contract Item No. 4, additional Class D concrete, that
was not used during construction.
($11,040.00)
6. Compensate the City for Contract Item No. 5, additional epoxy coated
reinforcing steel, that was not used during construction.
($4,400.00)
7. Compensate the City for liquidated damages accrued by the Contractor for
failing to reach Substantial Completion in the required number of days per the
Contract Documents.
0139.000 001
TOTAL ($188,916.46)
The considerations provided herein are accepted by the Contractor as Rill compensation for
all costs associated with this Change Order including all direct and indirect costs, whether field or
office incurred, and any costs associated with additional time, if any, which may be required as a
result of this Change Order.
It is mutually agreed that the lump sum price or prices listed above are accepted by the
Contractor as payment in full for all work under this Change Order, or as full credit against the
contract amount in omission of work included.
All Work included in this Change Order is subjec
the Contract.
Original Contract Amount ... ...............................
Adjusted Contract Amount (previous) .............
Adjustment this Change Order ........................
Adjusted Contract Amount .. ...............................
2
I to all applicable terms and conditions of
$ 2,636,700.00
$ 2,650,700.00
$ - 188,916.46
$ 2,461,783.54
City of Owmo, Oldahoma
Santa Fe Lift Station and Force Main Replacement
Change Order No, 2
ADJUSTMENT TO CONTRACT TIME:
This Change Order No. 2 does not affect the Contract Times Guider Article 4 of Section 00520
of the Contract.
Recommended:
GREELEY AND HANSEN, LLC
r .
BY /✓ Date: 3/20/2014
n M. C riiistopher, PE
Project Manager
Aceet ted:
W.N. COUCH CONTRACTORS, INC.
By: l�jltkf J Date:7� °�(e�t�
t'�1✓a�nr 1nitLt*lx�,j
Approved: t
CITY OF OWASSO, OIC
By: Date:
Chair
Owasso Public Works Authority
Omer Ch of Owasso
Project Name /Address: Santa Fe Lift Station and FM Replacement
Application Period: Juiv t - August 31 2013
Application No.: 80056.18 - FINAL
Change Order Summary
Approved Change Orders
Number Additions Deductions
1 $14,000.00 $0.00
2 $0.00 - $188,916.46
TOTALS $14,000.00 - $188,916,46
NET CHANGE BY CHANGE ORDERS ($174,916.46)
Certification
The undersigned Contractor certifies that: (1) all previous progress
payments received from Owner on account of Work done under the Contrec
have been applied on account to discharge Contrdctoes legitimate
obligations incurred in connection vdth Work covered by prior Applications
for Payment; (2) title of all Work materials and equipment incorporated in
said Work or otherwise listed in or covered by this Application for Payment
w01 pass to Owner at time of payment free and clear of all Liens, security
interests and encumbrances (except such as are covered by a Bond
acceptable to Owner indemnifying Owner against any such Liens, security
interest or encumbrances); and (3) all Work covered by this Application for
Payment is in accordance with the Contract Documents and is not defective
By: [
Brian Wcibom, Moe President,
Yale of Oklahoma "County of.,
8estedthis 6th ay /8,ptember,
Date: 0 O Zo 1
Rogers
2013
I lrta Whitfield, Asst SeC.
Contractor's Name: W.N. Couch Contractors a div of Sherwood
Remittance Address: 401 S Memorial
Tulsa OK 74112
Contractor's Project No.: 60056 Contractor Phone Number 918 -836 -8816
Owner's Contract No.: ORF -10- Contracto?s Invoice Number $005618
0014 -CW Invoice Date: 8/31/2013
1. ORIGINAL CONTRACT PRICE .................... . ............
2. Net change by Change Orders ..............................
3. CURRENT CONTRACT PRICE (Line 1 t 2) ......................
4. TOTAL COMPLETED AND STORED TO DATE
(Column F on Progress Estimate) ............................
5. RETAINAGE:
a. 0 %x Work Completed (Column D on Progress Estimate) ...
b. 0 %x Stored Material (Column E on Progress Estimate) ......
c. Total Retainage (Line Sa+ Line 5b) ............................
6. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c) ................ .
7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application) .....
S. LESS LIQUIDATED DAMAGES
9. AMOUNT DUE THIS APPLICATION ......... " ..................
10. BALANCE TO FINISH, PLUS RETAINAGE ....................... .
(Column G on Progress Estimate + Line 5 above) .............
Payment of:
is recommended by:
Is approved by:
Is approved by:
Is approved by
$ J 1-1 1 Li C7 7. q S
(Lin 8 or er; attach exelanation of other amount)
��j} �23-
��GO2
{ ject Team Leader /Superintendent)
(Manager, if applicable)
(Vice President, it applicable)
$2,461,
$2,461
$2,
31)})14
(Daze)
1 214 /
(Date)
(Dzte)
(Date)
Pay Application No. 80056.18 REMITTO: W.N. COUCH CONTRACTORS
City vi Owsaso -Santa Fe LI11 Station and Force Main Replaccmont 401 SOUTH MEMORIAL OftWE
Oat. of Ciaim 813112013 -FINAL TVLS0.0K74142 OK 74112
._.._ ""
Hwn
4 Deacriptlon
Bid Unit Bia
Unl1 Price Wlua
Prw 121y Tple Total thy POST. at. t. Dale
fLaat Claim) Eat TD Date Ta Date Ta Caro
c1a1Siwad
MaterLY Casa
Taal Completed
aM Stored
Par[enl Compbted
and S[wed
fiat »w
I. Finish
t IASWGLYeGOn
t
I LS
IS 216,$W.00
1 5 210,SYJW
11001 OCG
"c9t
S 216500.00
S
S 216.5]01.01
1..15%
5
_
t Siro WoM- Cloa-�and Grvbd "rq
i
LS
S 2.8011.00
E ?2.800.00
1110 000
RUI)m
1001 100.110 %S
22.000.011
$
5 21.8116.00'
IW,00%
5 -
1 8 Dsa PUmp Salop
LS
5 99.155.m
S W?SSm
t.m 000
1.001. 100.00%
S 99,155.00
S
S til CO
100.00%
5
1 IBVpaas PVmp MaNbin
1
LS
'S &500.00
S i"Wom
11001 Cwj
1.001 i0000ii
5 O.ym.CO
S
$ 9,500.081
100.00%
5
1 IDumD Em'aCrlq u(t 5btbn
1
I L5
S 25.000DO
S 25,000 CO
Iml o.wl
1.001 TCOAO%
5 25,00000
S
$ 25.004C0.
10008%0
5
_ _
t Subam:cwa Peak Eaeaea4on
1
LS
S 60.3W.W
5 00.300.00
1001 0.01
1.00 iCOAG %:5
64300.00
5
S 50,300001
100.00%
S
1 Viet Y[el!Ro0r8 kYalb
1
1 L5
.5 166252.m
E 188,252.00
1.00 om
1.001 200.00°1.
5 166252.00
S
S 188.252,001
100.00%
5
1 IFDO! .Slab,fi0ama. Ca:umna &Peep
T
tS
IS 105.526.00
S 10483000
1.110 OW
11011 100.00:
S '96.626.00
S
5 106.626.00
im9C%
5
1 1Maponry
1 1
1 LS
IS 9.3931.0
S 9,39300
098 O.W
G]8� 7800%
S 44,766.54
5
5 64TW.5a1
7&00%
S It ;b2 q
t tik519YOn ROC!
1
LS
tS 27.393,W
S 2:,393.00
1110 OW:
2110, f00.m?S
5 2T.393.W
_
3
S 27.393.001
t00D0%
9
t Lift Stafon Panpa..Pia.
t
LS
1$ 294.278.00
$ 294278.00
1.001 OW
100" SO600%
5 293270.00
$
S 294228.001
loo'Do%
1 MDIM VaWId Meer
i
LS
5 14820.00
5 10,57O.W
1.00 OW
tW IDO.CO =a
S 14070.00
1 $
S 10.870.00
. 100.00%
5
1 iFx. Mofalz
t
LS
I S 21302.09
S 29, no
10 O W
1:01 100.00%
5 29.202.110
16
S 22202001
100.00%
5
1 '➢Den BHardwaz.
1
L5
1$ 10,308.00
S 10I1)Il,m
1.W O.W
1.00 100.00%
S 10.308.00
5
$ 10. &3SCCI
100,00%
5
t iOvam.od Gsnod Troilw
1
L5
S 9,888.0
5 9.6118.110
1.00 oml
1,00i 200.00%
5 9.088.00
S
S 9,880001
1GO.00%
S
1 Elac.i48faanaratw�__
i
LS
1 5 423.183.00
S 4%1,703.00
i'Mil 0001
1.00 f Imm %IS
421783.00
3
3 423,V)340.
1 100.00%
5
1 ilnmryttgn!aELn
t
LS
is uu=wl
$ f40.223.m
1.01 O,COI
100 10000%IS
14022300
S
$ 140223.00
1 100. (*%
9
t l4ochanlDal
1
LS
1 3 31,523.00
1 5 31,523.110
LOCI O.ml
1.00i loo.60kl
31,52300
5
5 31.523.001
100.00%
$
1 6oeoATvmd
t
LS
$ 126.WO.m
$ 126,60000
LOCI Oml
1.00i im.W%
t 126.000.00
5
$ 126,Mw
100.08%
9
1 Peini:p
1
LS
5 41.305015
41,306.00
LWI O.WI
1001 1W.m35
$ 41.306.00
'a
S 41.300.00
100.00%
5
Y Fen61g
1
LS
Is 28.26200 1
S 2026200
11001 O.Xl
1.00, lw.w%l
S 26262.00
5
5 28262.00
10000%
5
I m-olpF -mam
5.050
LF
IS 10500 1
$ 530250.m
4146001 (I'm
494000 97.82%
S 518.20000
$
5 518,70000
9T,02Ys
S DYSSaa.,
1 1T FOrte mom
11m
LF
3 80.00
S 88.00p.CO
1100.001 Oml
1100.00 &00.511%
S 0&COO.m
5
S a5miw
186039E
5
1 Pa•emonl Repairs
LS
3 38.586.03
S aISISm
0.501 OS^v
iG0 IDO�i5
36.68800
5
8 34608.00
1011.00•!.
5
Y lt.aMxoalp &Seed
i
1.5
5 t6.5m.W
S 16,500 CC
1.00 O.CC
Y,ml 1W.m%
5 t0S0000
5
5 16Sm.m
1060095
9
I TOTAL -BID Th11
S 2010,000.00
1
2 Addldonal FaaX ExCADaPon
tm
CY
5 67.90
t e1G0.m
O.OGI C.W
O.W O.W%
5
S
5
0.00%
S la,2maol
'a AEditla dSdecl Sp
100
Cy
5 38.00
S 3.m0.m
OG01 0.00
OW OCO%
S
S
3
0.00%
5 (Y.pD1Wl
4 Aa4idanai ClasaOCtnaao
ion
CY
$ 120.00]$
12.OWW
0.m1 0.00
6m1 e.m %t
980.00
S
S 9Wm
8,001A
5pt,9La01
5 Abaii,M Epax Reinfn !
2,Om
LB
S 2.20
S 4.SW.m
O,m1 O,m
0col O.W%
Y
5
S
0.00%
S f4sppDpj
CheryDOMer Ci- inaml1 Sir Ca:+uelo PiPtl ^
1
LS
5 14,1100.00
$ fd.CmtO
1 O.m
1,00i
$ 14.000,00
5
S 16.0?'10
100.0054
5
TOTAL 5 21650100.00 5 2,600183.54
5
5 2.60018354 9&12%
I, Joseph M, GorcLtin, PE , a registered professional Engineer in the State of
Oklahoma, working for Greeley and Hansen LLCas the project engineer forthe
Owasso Public Works Authority of Owasso, Oklahoma, for certain improvements
consisting of Santa Fe Lift Station Replacement and New Force Main, do hereby certify
that t have inspected the above referred to improvements and find the same,
accomplished, to the best of our knowledge, according to approved plans and
specifications and (or duly authorized change orders.
I further certify that, to the best of my knowledge, the test results for materials and
performance were satisfactory according to approved plans and specifications,
on
A final Inspection of the project was completed.
I DO HEREBY APPROVE THE ABOVE REFERRED TO IMPROVEMENTS, AND
RECOMMEND APPROVAL TO THE OWASSO PUBLIC WORKS AUTHORITY.
Dated this the 55" day of September, 2013.
ACCEPTED:
This the 5111 day of September, 2013.
B�TCd�
[s {gnaturej
Public Works Director
Title
Respectfully submitted,
O ^PUBLIC WORKWROJECTSWANITARY SEWERSISANTA FE PUMP AND FORCE NWIN IMPROWMENTOIOPWA MEMOSIENGINEER
CERWICNTION.000