HomeMy WebLinkAbout2015.08.04_City Council AgendaPUBLIC NOTICE OF THE REGULAR MEETING OF THE
OWASSO CITY COUNCIL
Council Chambers, Old Central Building �XZI VE®
109 N Birch, Owasso, OK 74055 J(/( -) 7R15J
Regular Meeting zp
Tuesday, August 4, 2015 - 6:30 pm P'8 elk, Cg
1. Call to Order
Mayor Jeri Moberly
2. Invocation
Spencer Ray of Beacon Hill Baptist Church
3. Flag Salute
4. Roll Call
5. Presentation of the Character Trait of Flexibility
Kathy Curtis, Character Council Member
6. Presentation and discussion by the Tulsa City- County Library
Gary Shaffer, CEO
7. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. (All matters listed under "Consent' are considered to be routine and will be
enacted by one motion. Any Councilor /Trustee may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.)
A. Approve minutes - July 21, 2015
B. Approve claims
C. Approve Agreements for Urban Engineering Services (Engineer Agreement):
• Kellogg Engineering, Inc. for site grading, drainage, roadway, water
and sewer improvements to serve Abbott Farms Phase I
• Impact Engineering and Planning, PLC for site grading, drainage,
pavement, water and sewer improvements to serve Express Laundry
8. Consideration and appropriate action relating to items removed from the Consent Agenda
Consideration and appropriate action relating to an amendment to the Engineering Services
Agreement with Kellogg Engineering, Inc. for Brookfield Crossing Stormwater Conveyance
and Detention Improvements
Roger Stevens
Staff recommends approval of an amendment to the engineering services agreement with
Kellogg Engineering, Inc. in the amount of $22,500 for additional scope of work to the
Stormwater conveyance and detention improvements project in the Brookfield Crossing
Subdivision.
10. Report from City Manager
• Monthly Public Works Project Status Report
11. Report from City Attorney
12. Report from City Councilors
13. New Business (New Business is any item of business which could not have been foreseen at
the time of posting of the agenda)
Owasso City Council
August 4, 2015
Page 2
14. Adjournment
Notice of Public Meeting filed in the office of the City Clerk and Agenda posted at City Hall
bulletin board at 6:00 pm on Friday, July 31, 2015.
I-xil &to
(Juliann M. Stever.4 Deputy City Clerk
G`
OWASSO CITY COUNCIL
MINUTES OF REGULAR MEETING
Tuesday, July 21, 2015
The Owasso City Council met in regular session on Tuesday, July 21, 2015, in the Council
Chambers at Old Central, 109 N Birch, Owasso, Oklahoma per the Notice of Public Meeting and
Agenda filed in the office of the City Clerk and posted on the City Hall bulletin board at 6:00 pm
on Friday, July 17, 2015.
1. Call to Order
Mayor Jeri Moberly called the meeting to order at 6:30 pm.
2. Invocation
The invocation was offered by Pastor Ted Johnson of Bible Church of Owasso.
3. Flag Salute
Vice -Mayor Dunn led the flag salute.
4. Roll Cali
Present
Mayor - Jeri Moberly
Vice - Mayor- Lyndell Dunn
Councilor - Doug Bonebroke
Councilor -Chris Kelley
A quorum was declared present.
Staff:
City Manager - Warren Lehr
City Attorney - Julie Lombardi
Absent
Councilor- Bill Bush
5. Presentation of the Employee of the Quarter
Warren Lehr presented Employee of the Quarter, Debbie Grace, Managerial Department.
6. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. (All matters listed under "Consent" are considered by the City Council to be routine
and will be enacted by one motion. Any Councilor may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.)
A. Approve minutes
• July 7, 2015 Regular Meeting
• July 14, 2015 Regular Meeting
B. Approve claims
C. Receive monthly budget status report
D. Approve Agreement and authorize the
Mayor to execute the Urban Engineering
Services (Engineer Agreement): Tuttle & Associates, Inc., for site grading, drainage,
water and sewer improvements to serve The Cottaaes at Tallarass Paint
Mr. Dunn moved, seconded by Mr. Bonebrake to approve the Consent Agenda with claims
totaling $592,634.28. Also, included for review were the self- insurance claims report and the
payroll report for 711 1115.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
7. Consideration and appropriate action relating to items removed from the Consent Agenda
None
Owasso City Council
July 21, 2015
Page 2
8. Consideration and appropriate action relating to the final plat of Coffee Creek Play Park
located in the 10300 Block of the east frontage road of US -169
Karl Fritschen presented the item recommending approval of the Final Plat for Coffee Creek
Play Park.
After discussion, Dr. Kelley moved, seconded by Mr. Bonebrake to approve the Final Plat of
Coffee Creek Play Park.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
Consideration and appropriate action relating to the final plat of The Cottages at Tallgrass
Point located northwest of E 86th St N and N Mingo Rd
Karl Fritschen presented the item recommending approval of the Final Plat for The Cottages
at Tallgrass Point.
After discussion, Mr. Bonebrake moved, seconded by Mr. Dunn to approve the Final Plat of
The Cottages at Tallgrass Point.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
10. Consideration and appropriate action relating to the South Sports Park Regional Detention
Project - engineering services agreement and a budget amendment
Roger Stevens presented the item recommending approval of an engineering services
agreement with Meshek and Associates, PLC, in the amount of $57,330 for the South Sports
Park Regional Detention Project and approval of a budget amendment in the Stormwater
Management fund increasing the appropriation for expenditures by $57,330.
After discussion, Mr. Bonebrake moved, seconded by Mr. Dunn to approve the agreement in
the amount of $57,330 with Meshek and Associates, PLC, as recommended.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
11. Consideration and appropriate action relating to the Central Park Drainage Improvements
Project (between E 86th St N and Owasso Mid -High School) - engineering services agreement
and a budget amendment
Roger Stevens presented the item recommending approval of an engineering services
agreement with Meshek and Associates, PLC, in the amount of $66,760 for the Central Park
Drainage Project and approval of a budget amendment in the Stormwater Management
fund increasing the appropriation for expenditures by $66,760.
After discussion, Mr. Dunn moved, seconded by Dr. Kelley to approve the agreement in the
amount of $66,760 with Meshek and Associates, PLC, as recommended.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
Owasso City Council
July 21, 2015
Page 3
12. Consideration and appropriate action relating to the 2016 Street Rehabilitation Program
Roger Stevens presented the item recommending approval of the 2016 Street Rehabilitation
Program priorities list.
After discussion, Mr. Bonebrake moved, seconded by Dr. Kelley to approve the 2016 Street
Rehabilitation Program priorities list, as recommended.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
13. Consideration and appropriate action relating to Resolution 2015 -13, adopting the
Transportation Master Plan
Dwayne Henderson presented the item recommending approval of Resolution 2015 -13.
After discussion, Mr. Bonebrake moved, seconded by Mr. Dunn to approve Resolution 2015-
13, as recommended.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
14. Consideration and appropriate action relating to the Fraternal Order of Police (FOP) Fiscal
Year 2015 -2016 Contract
Michele Dempster presented the item recommending approval of the FY 2015 -16 contract
between the City of Owasso and the Fraternal Order of Police (FOP) Lodge #149 and
authorization for the Mayor to execute the contract.
After discussion, Mr. Bonebrake moved, seconded by Dr. Kelley to approve the Fraternal
Order of Police (FOP) Lodge # 149 Contract and authorize Mayor to execute the contract, as
recommended.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
15. Consideration and appropriate action relating to an interest award for Michael Denton
Michele Dempster presented the item recommending approval and authorization for
payment of interest in the amount of $35,772.75 payable to Michael Denton, as ordered by
the June 11, 2015 supplemental arbitrator's award.
After discussion, Mr. Bonebrake moved, seconded by Dr. Kelley to approve and authorize
payment, as recommended.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
Owasso City Council
July 21, 2015
Page 4
16. Consideration and appropriate action relating to a request for an executive session for the
purpose of discussing confidential communications between the City Council and the City
Attorney concerning pending potential litigation with the Tulsa County Sheriff's Department
and the Tulsa County Criminal Justice Authority, as provided for in Title 25, O.S. Section §
307(8)(4)
Julie Lombardi presented the item, Mr. Bonebrake moved, seconded by Dr. Kelley to enter
into executive session.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried: 4 -0
At 7:41 pm, the Council, along with Warren Lehr, Julie Lombardi, and David Weatherford of
Birmingham, Morley, Weatherford & Priore entered into executive session.
At 9:05 pm, the Council returned to open session.
17. Report from City Manager
None
18. Report from City Attorney
None
19. Report from City Councilors
None
20. New Business
None
21. Adjournment
Mr. Bonebrake moved, seconded by Dr. Kelley to adjourn the meeting.
YEA: Bonebrake, Dunn, Kelley, Moberly
NAY: None
Motion carried 4 -0 and the meeting adjourned at 9:07 pm.
Jeri Moberly, Mayor
Lisa Wilson, Minute Clerk
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
PaymentAmount
GENERAL
TREASURER PETTY CASH
CC REFUND /ELLIS
45.00
TREASURER PETTY CASH
CC REFUND /GOAD
50.00
TREASURER PETTY CASH
CC REFUND /MORGANS
100.00
TREASURER PETTY CASH
OC REFUND /HERNANDEZ
100.00
TREASURER PETTY CASH
CC REFUND /RAINWATER
35.00
TREASURER PETTY CASH
CC REFUND /LILES
50.00
TREASURER PETTY CASH
OC REFUND /RAMIREZ
100.00
TREASURER PETTY CASH
OC USER FEE REFUND /RAMIRE
100.00
TREASURER PETTY CASH
CC REFUND /NAVARRO
50.00
TOTAL GENERAL 630.00
MANAGERIAL
TREASURER PETTY CASH
PASTOR MEETING EXPENSE
11.20
JPMORGAN CHASE BANK
EMPLOYEE APPRECIATION
25.00
JPMORGAN CHASE BANK
EMPLOYEE APPRECIATION
39.15
JPMORGAN CHASE BANK
MEETING EXPENSE
16.17
JPMORGAN CHASE BANK
EMPLOYEE RELATIONS
29.90
JPMORGAN CHASE BANK
SAV ON- PRINTING SERVICES
259.00
JPMORGAN CHASE BANK
MEETING EXPENSE
27.96
TOTAL MANAGERIAL 408.38
FINANCE
JPMORGAN CHASE BANK
OWASSO AUTO -CAR DETAIL
32.00
JPMORGAN CHASE BANK
OFFICE EVERYTHING -TONER
84.81
JPMORGAN CHASE BANK
ADVANCED - STEERING COVER
15.25
JPMORGAN CHASE BANK
OFFICE DEPOT - RETURN
-3.19
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
3.19
JPMORGAN CHASE BANK
USPS- SHIPPING COST
19.99
TOTAL FINANCE 152.05
HUMAN RESOURCES
JPMORGAN CHASE BANK
OK NEWSPAPER- ADVERTISING
1,547.96
JPMORGAN CHASE BANK
NEIGHBOR NEWS- ADVERTISING
88.40
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
10.49
JPMORGAN CHASE BANK
OFFICE DEPOT- SUPPLIES
6.04
JPMORGAN CHASE BANK
OFFICE DEPOT - RETURN
-29.94
JPMORGAN CHASE BANK
BAUDVILLE -ID MAKER INK
125.85
JPMORGAN CHASE BANK
BLR /HCPRO- SAFETY SUBSCRIP
1,195.00
JPMORGAN CHASE BANK
CHARACTER - BULLETINS
675.00
COMMUNITYCARE EAP
EMPLOYEE ASSISTANCE PROGR
227.00
GREENWOOD PERFORMANCE SYSTEMS INC
EMPLOYEE DEVELOPMENT
825.00
NAVEX GLOBAL, INC
SILENTWHISTLE
1,500.00
TOTAL HUMAN RESOURCES 6,170.80
HR - CHARACTER INITIATIVE
JPMORGAN CHASE BANK
ADMIRAL EXP- CHARACTER
48.41
JPMORGAN CHASE BANK
SAV ON- CHARACTER BANNERS
112.00
Page 1
Claims List
8/4/2015
Budget Unit Title I
Vendor Name
Payable Description IPayment
Amount
TOTAL HR- CHARACTER INITIATIVE 160.41
GENERAL GOVERNMENT
RICOH USA, INC.
COPYING SERVICES - RICOH
626,47
GRAND GATEWAY ECO. DEV. ASSC.
PELIVAN TRANSIT SERVICES
5,100.00
AEP IPSO
ELECTRIC USAGE
6,045.60
CINTAS CORPORATION
CARPET CLEANING SERVICES
67.04
CINTAS CORPORATION
CARPET CLEANING SERVICES
67.04
INCOG
LEGISLATIVE CONSORTIUM
1,292.00
TULSA COFFEE SERVICE INC
CITY HALL COFFEE SERVICE
69.84
BH MEDIA HOLDING GROUPS, INC
LEGAL PUBLICATIONS
121.80
MAILROOM FINANCE INC
POSTAGE
1,000.00
OMECORP, LLC
INK CARTRIDGE
165.00
AT &T
CONSOLIDATED PHONE BILL
530.28
MCAFEE & TAFT
LEGAL - ARBITRATION
144.00
MCAFEE & TAFT
LEGAL - ARBITRATION
4,750.98
RUSSELL M. GUTTSHALL III
ARBITRATION
3,023.08
TOTAL GENERAL GOVERNMENT 23,003.13
COMMUNITY DEVELOPMENT
JPMORGAN CHASE BANK
LOWES -SALES TAX CREDIT
-17
JPMORGAN CHASE BANK
SAMS CLUB - SUPPLIES
10.73
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
15.78
JPMORGAN CHASE BANK
OFFICE DEPOT - CALENDAR
12.99
JPMORGAN CHASE BANK
OFFICE DEPOT- SUPPLIES
22.38
JPMORGAN CHASE BANK
LOWES- SUPPLIES
14.21
TULSA COUNTY INFORMATION TECH DEPT
TULSA COUNTY LAND RECORDS
30.00
JOE W. THOMPSON
CODE ENFORCEMENT MOWING
200.00
KENNETH LIVINGSTON
CODE ENFORCEMENT MOWING
250.00
TRAVIS SHANE WELLS
CODE ENFORCEMENT MOWING
250.00
FRED STEPHEN CORLEY
CODE ENFORCEMENT MOWING
200.00
KENNETH LIVINGSTON
CODE ENFORCEMENT MOWING
150.00
KENNETH LIVINGSTON
CODE ENFORCEMENT MOWING
150.00
FRED STEPHEN CORLEY
CODE ENFORCEMENT MOWING
400.00
JOE W. THOMPSON
CODE ENFORCEMENT MOWING
200.00
INCOG
1ST QTR MEMBERSHIP DUES
5,784.00
TOTAL COMMUNITY DEVELOPMENT 7,688.93
ENGINEERING
GRAPHIC RESOURCES & REPRODUCTION
SCANNER
11,540.00
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
19.56
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
19.56
JPMORGAN CHASE BANK
WALMART - SUPPLIES
9.54
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
19.56
TOTAL ENGINEERING 11,608.22
Page 2
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
PaymentAmount
INFORMATION TECHNOLOGY
JPMORGAN CHASE BANK
OFFICE DEPOT- BATTERY BKUP
84.99
JPMORGAN CHASE BANK
COX -CITY INTERNET SERVICE
1,309.00
JPMORGAN CHASE BANK
SURVEYMONKEY - RENEWAL
299.00
JPMORGAN CHASE BANK
DELL -PC FOR IT /MCCALLIE
1,159.30
JPMORGAN CHASE BANK
AMAZON - SERVER HARD DRIVES
519.96
JPMORGAN CHASE BANK
AMAZON- WIRELESS AP'S
804.40
TOTAL INFORMATION TECHNOLOGY 4,176.65
SUPPORT SERVICES
OKLAHOMA DEPARTMENT OF LABOR
INSPECTION FEES - BOILER
25.00
OKLAHOMA DEPARTMENT OF LABOR
INSPECTION FEES - BOILER
25.00
JPMORGAN CHASE BANK
LOWES - SUPPLIES
14.75
JPMORGAN CHASE BANK
LOWES- SUPPLIES
5.62
JPMORGAN CHASE BANK
FORREST- BOILER DIAGNOSTIC
313.00
JPMORGAN CHASE BANK
FEDEX- SHIPPING
27.50
JPMORGAN CHASE BANK
FEDEX- SHIPPING
27.50
JPMORGAN CHASE BANK
LOWES -CAT 5 CABLE
151.00
SPOK, INC.
PAGER USE
8.88
AT &T
CONSOLIDATED PHONE BILL
19.93
JPMORGAN CHASE BANK
LOWES -LIGHT BULBS
47.48
SPRINT SOLUTIONS, INC.
SPRINT CARDS
79.98
JPMORGAN CHASE BANK
SAMS CLUB - SUPPLIES
11.48
JPMORGAN CHASE BANK
SAMS CLUB- SUPPLIES
255.66
JPMORGAN CHASE BANK
LOCKE -BULBS
11.71
JPMORGAN CHASE BANK
LOWES -WASP SPRAY
5.20
JPMORGAN CHASE BANK
LOCKE SUPPLY - BALLASTS
219.31
JPMORGAN CHASE BANK
LOCKE SUPPLY -PARTS
5.35
JPMORGAN CHASE BANK
LOWES -WATER ALARM
11.99
JPMORGAN CHASE BANK
DALE AND LEES -CH AC REPR
117.00
JPMORGAN CHASE BANK
COMM'L POWER -OIL SENDER
208.22
TOTAL SUPPORT SERVICES 1,591.56
CEMETERY
SPOK, INC.
PAGER USE
8.88
IAEPIPSO
ELECTRIC USAGE
42.81
TOTAL CEMETERY 51.69
POLICE SERVICES
JPMORGAN CHASE BANK
AT YOUR SERVICE - RENTAL
80.00
JPMORGAN CHASE BANK
DELL -PC SQUAD REPLACEMENT
1,184.91
MICHAEL T. HUFF
M HUFF INVESTIGATIVE SVCS
2,177.40
JPMORGAN CHASE BANK
WATERSTONE -DRY CLEANING
1,228.75
JPMORGAN CHASE BANK
GALLS - UNIFORM ITEM
74.65
JPMORGAN CHASE BANK
HILLS PET -K9 FOOD
84.82
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORMS
89.98
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORMS
844.83
Page 3
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description IPaymentAmount
TOTAL POLICE SERVICES 5,765.34
POLICE COMMUNICATIONS
JPMORGAN CHASE BANK
SOUTHERN RUBBER - NOTARY
47.40
JPMORGAN CHASE BANK
QUEENSBORO- UNIFORMS
81.85
JPMORGAN CHASE BANK
WATERSTONE -DRY CLEANING
40.50
AEP /PSO
ELECTRIC USAGE
236.78
JPMORGAN CHASE BANK
WALMART- PRISONER BOARD
33.90
DEPARTMENT OF PUBLIC SAFETY
OLETS USER FEE
450.00
JPMORGAN CHASE BANK
SAMSCLUB- PRISONER BOARD
100.93
TOTAL POLICE COMMUNICATIONS 991.36
ANIMAL CONTROL
JPMORGAN CHASE BANK
ZOETIS- SUPPLIES
278.75
JPMORGAN CHASE BANK
SHOEBUYCOM-UNI FORM ITEM
119.99
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
59.92
JPMORGAN CHASE BANK
AMAZON-SUPPLIES
14.38
JPMORGAN CHASE BANK
AMAZON - SUPPLIES
31.96
JPMORGAN CHASE BANK
BEST BUY- SUPPLIES
322.95
JPMORGAN CHASE BANK
VCA -VET SERVICES
223.67
JPMORGAN CHASE BANK
AMAZON - SUPPLIES
57.98
JPMORGAN CHASE BANK
TJ MAXX -AC UNIFORMS
50.97
JPMORGAN CHASE BANK
LOWES- SUPPLIES
70.70
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
102.37
JPMORGAN CHASE BANK
DELL SALES - SUPPLIES
89.99
JPMORGAN CHASE BANK
WT FARLEY- SUPPLIES
46.50
JPMORGAN CHASE BANK
LOCKE - SUPPLIES
19.08
JPMORGAN CHASE BANK
LOWES -WATER HEATER
236.55
AEP /PSO
ELECTRIC USAGE
277.71
JPMORGAN CHASE BANK
MEDVET - SUPPLIES
160.76
JPMORGAN CHASE BANK
MEDVET - SUPPLIES
273.98
AT &T
CONSOLIDATED PHONE BILL
24.33
JPMORGAN CHASE BANK
WATERSTONE -DRY CLEANING
93.60
JPMORGAN CHASE BANK
AMAZON - SUPPLIES
16.95
JPMORGAN CHASE BANK
LOWES- SUPPLIES
263.18
JPMORGAN CHASE BANK
MEDVET- SUPPLIES
270.85
JPMORGAN CHASE BANK
SERENITY - CREMATION SVCS
360.00
JPMORGAN CHASE BANK
IHOME DEPOT - SUPPLIES
41.97
TOTAL ANIMAL CONTROL
3,509.09
FIRE SERVICES
JPMORGAN CHASE BANK
FERRARA- VEHICLE PARTS
48.75
JPMORGAN CHASE BANK
DRY CLEANING ST- CLEANING
42.67
TOTAL FIRE SERVICES 91.42
EMERGENCY PREPAREDNES TOTAL RADIO INC
SIREN REPAIR
70.00
Page 4
Claims List
8/4/2015
Budget Unit Title
ndor Name
Payable Description
Payment Amount
EMERGENCY PREPAREDNE
ELECTRIC USAGE
109.55
LEPIPSOA
CONSOLI DATED PHONE BILL
13.78
E BANK
SAMS CLUB - SUPPLIES
2E
BANK
OK EMER MGMT - ANNUAL DUES
70.00
TOTAL EMERGENCY PREPAREDNESS 285.19
STREETS
SIGNALTEK ING
TRAFFIC SIGNAL MAINT /JUNE
2,585.60
ITULSA
COUNTY BOCC
MISC SIGN
416.80
TOTAL STREETS 3,002.40
STORMWATER
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
33.31
JPMORGAN CHASE BANK
STD SPLY- TRIMMER LINE
77.66
JPMORGAN CHASE BANK
EQUIPMENT ONE - SWITCH /KEY
58.25
JPMORGAN CHASE BANK
ATWOOD -LED TAIL LIGHTS
69.97
TREASURER PETTY CASH
PARKING FEE
10.00
SPOK, INC.
PAGER USE
35.52
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
33.31
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
33.31
JPMORGAN CHASE BANK
I OREILLYS -DEF FLUID
59.96
TOTAL STORMWATER 411.29
PARKS
JPMORGAN CHASE BANK
TUCKER JANT'L- SUPPLIES
137.00
JPMORGAN CHASE BANK
LOWES- REPAIR SUPPLIES
15.17
JPMORGAN CHASE BANK
LOWES -WEED CONTROL
160.55
AT &T
CONSOLIDATED PHONE BILL
21.10
JPMORGAN CHASE BANK
P & K EQUIP -PARTS
62.98
AEP /PSO
ELECTRIC USAGE
1,377.11
JPMORGAN CHASE BANK
P & K EQUIP -MOWER PARTS
436.10
JPMORGAN CHASE BANK
ACE HARDWARE -BOLTS
13.32
JPMORGAN CHASE BANK
ACE HARDWARE- SUPPLIES
21.29
UNIFIRST HOLDINGS LP
PARKS UNIFORMS
15.25
UNIFIRST HOLDINGS LP
PARKS UNIFORMS
15.25
UNIFIRST HOLDINGS LP
PARKS UNIFORMS
15.25
WASHINGTON CO RURAL WATER DISTRICT
WATER SERVICE MCCARTY PAR
39.40
TOTAL PARKS 2,329.77
COMMUNITY CENTER
INCOG
ANNUAL AREAAGENCY FEE
1,000.00
JPMORGAN CHASE BANK
LOWES- SPONGE HOLDER
6.64
AEP /PSO
ELECTRIC USAGE
1,959.86
JPMORGAN CHASE BANK
CHARACTER - BULLETINS
2915
AT &T
CONSOLIDATED PHONE BILL
38.10
JPMORGAN CHASE BANK
OFFICE DEPOT- SUPPLIES
57.62
JPMORGAN CHASE BANK
LOCKE -WATER HEATER /LINE
387.71
Page 5
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
Payment Amount
COMMUNITY CENTER...
JPMORGAN CHASE BANK
TUCKER JANT'L- SUPPLIES
181.05
JPMORGAN CHASE BANK
LOWES- SUPPLIES
17.95
JPMORGAN CHASE BANK
LOWES- SUPPLIES
11.48
TOTAL COMMUNITY CENTER
3,689.66
HISTORICAL MUSEUM
AEP /PSO
ELECTRIC USAGE
199.56
AT &T
CONSOLIDATED PHONE BILL
13.78
EMTEC PEST CONTROL, INC
ANNUAL PEST CONTROL
200.00
OWASSO REPORTER
RENEW OWASSO REPORTER
36.75
TOTAL HISTORICAL MUSEUM 450.09
ECONOMIC DEV
JPMORGAN CHASE BANK
WEBSCRIBBLE- HOSTING
19.99
JPMORGAN CHASE BANK
WALL ST JRNL- SUBSCRIPTION
12.00
TOTAL ECONOMIC DEV 31.99
FUND GRAND TOTAL 76,199.4
AMBULANCE SERVICE
TREASURER PETTY CASH
AMB REFUND /GING
56.50
TREASURER PETTY CASH
AMB COLL REFUND /GING
14.13
TOTAL AMBULANCE SERVICE 70.63
AMBULANCE
JPMORGAN CHASE BANK
BOUND TREE-SUPPLIES
124.35
JPMORGAN CHASE BANK
BOUND TREE-SUPPLIES
36.00
JPMORGAN CHASE BANK
BOUND TREE-SUPPLIES
176.56
JPMORGAN CHASE BANK
BOUND TREE-SUPPLIES
1,296.46
JPMORGAN CHASE BANK
HOME DEPOT -FIRE EXTING
99.94
JPMORGAN CHASE BANK
FRONTIER -MEDIC REPAIR
380.16
JPMORGAN CHASE BANK
ARROW INT'L- SUPPLIES
1,108.21
JPMORGAN CHASE BANK
HENRY SCHEIN- SUPPLIES
789.39
JPMORGAN CHASE BANK
TRAVEL EXPENSE
5.52
MEDICLAIMS INC
BILLING SERVICES
12,911.21
JPMORGAN CHASE BANK
HENRY SCHEIN- SUPPLIES
605.49
JPMORGAN CHASE BANK
QUADMED - SUPPLIES
238.00
JPMORGAN CHASE BANK
SAFE KIDS- CREDIT
-55.00
JPMORGAN CHASE BANK
QUADMED- SUPPLIES
543.60
JPMORGAN CHASE BANK
BOUND TREE-SUPPLIES
1,225.96
JPMORGAN CHASE BANK
PHYSIO- SERVICE CONTRACT
1 10,670.88
TOTAL AMBULANCE 30,156.73
FUND GRAND TOTAL 30,227.3
E911 COMMUNICATIONS AT &T 1CONSOLIDATED PHONE BILL 563.93
Page 6
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
PaymentAmount
E911 COMMUNICATIONS...
AT &T
E911 MAPPING FEES
355.35
TOTAL RADIO INC
RADIO REPAIRS
440.46
INCOG -E911
ANNUAL MAPPING & MSAG MAI
5,622.80
TOTAL E911 COMMUNICATIONS 6,982.54
FUND GRAND TOTAL 6,982.5
HOTEL TAX - ECON DEV
JPMORGAN CHASE BANK
TRAVEL EXPENSE -TAXI FARE
51.65
JPMORGAN CHASE BANK
TRAVEL EXPENSE
17.10
JPMORGAN CHASE BANK
TRAVEL EXPENSE -TAXI FARE
12.15
JPMORGAN CHASE BANK
UNITED - AIRFARE
545.20
AEP IPSO
ELECTRIC USAGE
86.07
JPMORGAN CHASE BANK
TULSA AIRPORT- PARKING
30.00
JPMORGAN CHASE BANK
UNITED - BAGGAGE FEE
25.00
JPMORGAN CHASE BANK
TRAVEL EXPENSE
52.24
JPMORGAN CHASE BANK
UNITED - BAGGAGE FEE
25.00
JPMORGAN CHASE BANK
TRAVEL EXPENSE
10.10
JPMORGAN CHASE BANK
TRAVEL EXPENSE
6.06
JPMORGAN CHASE BANK
LODGING EXPENSE
446.98
JPMORGAN CHASE BANK
I TRAVEL EXPENSE -TAXI FARE
10.95
TOTAL HOTEL TAX - ECON DEV 1,318.50
STRONG NEIGHBORHOODS JJPMORGAN CHASE BANK OFFICE DEPOT - BATTERY BKUP 84.99
TOTAL STRONG NEIGHBORHOODS 84.99
FUND GRAND TOTAL 1,403.4
STORMWATER - STORMWATE
PRECISION LAWN CARE OF TULSA, LLC
US 169 MOWING
1,385.00
PRECISION LAWN CARE OF TULSA, LLC
US 169 MOWING
547.10
INCOG
ANNUAL MEMBERSHIP FEE
4,000.00
AEP /PSO
ELECTRIC USAGE
376.65
ANCHOR STONE COMPANY
ROCK FOR DRAINAGE PROJECT
961.56
TWIN CITIES READY MIX, INC
CONCRETE
1,640.00
JPMORGAN CHASE BANK
LOWES- BROOMS
15.64
TOTAL STORMWATER- STORMWATER 8,925.95
LAKERIDGE /CNTRL DRAIN IM GEODECA, LLC SURVEY - LAKERIDGE /CENTRA 10,600.00
TOTAL LAKERIDGE /CNTRL DRAIN IMP 10,600.00
FUND GRAND TOTAL 19,525.9
SALES TAX FUND -FIRE JJPMORGAN CHASE BANK ITRAVEL EXPENSE 2430
Page 7
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
Payment Amount
SALES TAX FUND - FIRE...
JPMORGAN CHASE BANK
SAMSCLUB- SUPPLIES
168.74
JPMORGAN CHASE BANK
YORK ELECTRONICS - SERVICE
222.00
JPMORGAN CHASE BANK
SAMSCLUB- SUPPLIES
82.46
JPMORGAN CHASE BANK
HOME DEPOT- SUPPLIES
30.48
JPMORGAN CHASE BANK
ATWOODS- SUPPLIES
33.96
JPMORGAN CHASE BANK
AMERIFLEX -PARTS
39.30
TREASURER PETTY CASH
TAHOE TAG
37.50
JPMORGAN CHASE BANK
LOWESSUPPLIES
28.91
JPMORGAN CHASE BANK
AMAZON -TOOLS
16.79
JPMORGAN CHASE BANK
LOWES- INSULATION
2626
JPMORGAN CHASE BANK
SAMSCLUB- SUPPLIES
46.32
JPMORGAN CHASE BANK
P & K EQUIP-SUPPLIES
208.70
JPMORGAN CHASE BANK
LOWES- REPAIR PARTS
13.06
JPMORGAN CHASE BANK
SPECIAL OPS -PROT CLOTHING
43.98
JPMORGAN CHASE BANK
AIRGAS -MAINT SUPPLIES
24.34
AT &T
CONSOLIDATED PHONE BILL
165.84
AEP /PSO
ELECTRIC USAGE
4,116.64
JPMORGAN CHASE BANK
SAMSCLUB - SUPPLIES
22.88
JPMORGAN CHASE BANK
TRAVEL EXPENSE
10.99
JPMORGAN CHASE BANK
SHOE CARNIVAL -SHOES
74.98
JPMORGAN CHASE BANK
APPLIANCE PARTS -DRYER PRT
14.67
JPMORGAN CHASE BANK
LOWES- SUPPLIES
14.44
JPMORGAN CHASE BANK
LOWES -WEED CONTROL
63.95
JPMORGAN CHASE BANK
TRAVEL EXPENSE
4.78
JPMORGAN CHASE BANK
TRAVEL EXPENSE
22.00
JPMORGAN CHASE BANK
TRAVEL EXPENSE
10.00
JPMORGAN CHASE BANK
LOCKE -PARTS
5.68
JPMORGAN CHASE BANK
FINISH LINE -SHOES
119.99
JPMORGAN CHASE BANK
LOWES- SUPPLIES
3.32
JPMORGAN CHASE BANK
OK FIRE CHIEFS ASSOC -DUES
288.00
JPMORGAN CHASE BANK
KNOX CO -MAINT SUPPLIES
44.00
JPMORGAN CHASE BANK
ACADEMY -SHOES
69.99
JPMORGAN CHASE BANK
F.I.LE.R.O- SYMPOSIUM
395.00
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
31.19
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
24.99
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
59.98
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
21.97
JPMORGAN CHASE BANK
STD SPLY LAWN-SUPPLIES
23.19
JPMORGAN CHASE BANK
IMAGENET- COPIER CONTRACT
440.17
JPMORGAN CHASE BANK
TOOLMARTSUPPLIES
97.78
JPMORGAN CHASE BANK
SAMSCLUB- SUPPLIES
15.96
JPMORGAN CHASE BANK
SAMSCLUB - SUPPLIES
27.76
JPMORGAN CHASE BANK
BEST BUY -DRYER
349.99
JPMORGAN CHASE BANK
UNITED - AIRFARE
494.20
Page 8
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
PaymentAmount
SALES TAX FUND - FIRE...
JPMORGAN CHASE BANK
LOWES- SUPPLIES
24.98
JPMORGAN CHASE BANK
REASORS- OFFICE SUPPLIES
10.05
JPMORGAN CHASE BANK
LOWES- SUPPLIES
18.42
JPMORGAN CHASE BANK
OREILLYS- VEHICLE PARTS
50.06
JPMORGAN CHASE BANK
WALMART- SUPPLIES
6.74
JPMORGAN CHASE BANK
WALMART - SUPPLIES
12.38
JPMORGAN CHASE BANK
AMAZON -PFD EQUIPMENT
224.81
JPMORGAN CHASE BANK
MEETING EXPENSE
46.99
JPMORGAN CHASE BANK
ATWOOD -PARTS
182.66
JPMORGAN CHASE BANK
PRUITTS- PAINTING TAHOE
613.60
JPMORGAN CHASE BANK
IGRAYBAR ELECTRIC - BREAKER
28.91
TOTAL SALES TAX FUND -FIRE 9,301.43
FUND GRAND TOTAL 9,301.4
SALES TAX FUND - POLICE
JPMORGAN CHASE BANK
TRAVEL EXPENSE
17.07
JPMORGAN CHASE BANK
SAMS CLUB- SUPPLIES
79.60
JPMORGAN CHASE BANK
OK ARMY SURPLUS - CARTRIDGE
24.00
JPMORGAN CHASE BANK
USPS- MAILING COSTS
10.79
JPMORGAN CHASE BANK
EBAY -EBAY FEES /IMPOUNDS
113.00
JPMORGAN CHASE BANK
PUBLIC ENGINES- SUBSCRIPTI
1,299.00
JPMORGAN CHASE BANK
DASH MEDICAL - GLOVES
197.70
JPMORGAN CHASE BANK
SPECIALS OPS- UNIFORMS
2,596.95
JPMORGAN CHASE BANK
TRAVEL EXPENSE
17.77
JPMORGAN CHASE BANK
WALMART- SUPPLIES
29.76
JPMORGAN CHASE BANK
SPECIAL OPS- VEST /GRAY
348.25
SPOK, INC.
PAGER USE
35.52
JPMORGAN CHASE BANK
HENDON MEDIA - TRAINING
279.00
AT &T
CONSOLIDATED PHONE BILL
522.89
JPMORGAN CHASE BANK
AMAZON - UNIFORM ITEMS
117.90
JPMORGAN CHASE BANK
AMAZON- UNIFORM ITEMS
63.40
JPMORGAN CHASE BANK
USPS- MAILING COSTS
50.80
JPMORGAN CHASE BANK
SOUTHERN AG- SUPPLIES
66.99
JPMORGAN CHASE BANK
TESTING SUPPLIES
86.77
JPMORGAN CHASE BANK
OFFICE DEPOT - PRINTING
127.40
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
57.90
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
121.17
JPMORGAN CHASE BANK
41MPRINT- UNIFORM ITEMS
176.21
AEP /PSO
ELECTRIC USAGE
3,174.64
JPMORGAN CHASE BANK
LODGING EXPENSE
166.00
JPMORGAN CHASE BANK
WALMART- SUPPLIES
93.76
JPMORGAN CHASE BANK
REASORS - SUPPLIES
9.44
JPMORGAN CHASE BANK
MARLOW WHITE- UNIFORM
209.25
JPMORGAN CHASE BANK
ILODGING EXPENSE
166.00
Page 9
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
Payment Amount
SALES TAX FUND - POLICE...
JPMORGAN CHASE BANK
LODGING EXPENSE
297.00
JPMORGAN CHASE BANK
KUM & GO- SUPPLIES
9.18
JPMORGAN CHASE BANK
BROWNELLS- SUPPLIES
526.82
JPMORGAN CHASE BANK
SAMSCLUB - SUPPLIES
94.33
REGIONAL ORGANIZED CRIME
ROCICANNUALDUES
300.00
COLOSSUS, INC.
ANNUAL INTERACT MAINT
938.07
TOTAL SALES TAX FUND - POLICE 12,424.33
POLICE -DOJ VEST GRANT JJPMOMAN CHASE BANK SPECIAL OPS- VEST /GRAY 348.25
TOTAL POLICE -DOJ VEST GRANT 348.25
FUND GRAND TOTAL 12,772.5
SALES TAX FUND - STREETS
SPOK, INC.
PAGER USE
78.03
JPMORGAN CHASE BANK
NORTHERN TOOL - SUPPLIES
139.97
AEP /PSO
ELECTRIC USAGE
1,541.47
JPMORGAN CHASE BANK
FASTENAL -PARTS
57.19
JPMORGAN CHASE BANK
TRUCKPRO -LIGHT PLUG
14.55
TWIN CITIES READY MIX, INC
CONCRETE
144.00
SIGNALTEK INC
TRAFFIC LOOP INSTALLATION
566.60
JPMORGAN CHASE BANK
APWA- MEMBERSHIP DUES
179.00
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
39.35
UNIFIRST HOLDINGS LP
UNIFORM CLEANING
41.30
JPMORGAN CHASE BANK
HOME DEPOT - FITTINGS
1196
TECHNICAL PROGRAMMING SERVICES INC
INSERTS
760.00
JPMORGAN CHASE BANK
LOWES - SUPPLIES
80.98
UNIFIRST HOLDINGS LP
JUNIFORM CLEANING
39.35
TOTAL SALES TAX FUND- STREETS 3,695.75
FUND GRAND TOTAL 3,695.7
CI - GARN WID 96TH -106TH PSA- DEWBERRY INC JENGINEERING SERVICES 1,492.75
TOTAL Cl - GARN WID 96TH -106TH 1,492.75
TRANSPORTATION MSTR PLP C. H. GUERNSEY & COMPANY JENGINEERING SERVICES 1,646.72
TOTAL TRANSPORTATION MSTR PLAN 1,646.72
FUND GRAND TOTAL 3,139.4
CITY GARAGE
JPMORGAN CHASE BANK
OREILLYS- SUPPLIES
62.08
JPMORGAN CHASE BANK
OREILLYS -PARTS RESALE
626.84
JPMORGAN CHASE BANK
LENOX WRECKER- TOWING
125.00
Page 10
Claims List
8/4/2015
Budget Unit Title
Vendor Name
Payable Description
PaymentAmount
CITY GARAGE...
AT &T
CONSOLIDATED PHONE BILL
24.33
JPMORGAN CHASE BANK
OPFMA -CONF REGISTRATION
35.00
JPMORGAN CHASE BANK
LENOX WRECKER - TOWING
85.00
JPMORGAN CHASE BANK
LOWES -SHOP VAC & HOSE
67.21
JPMORGAN CHASE BANK
HESSELBEIN -TIRES
381.92
JPMORGAN CHASE BANK
UNITED FORD -PARTS RESALE
272.53
JPMORGAN CHASE BANK
UNITED FORD -PARTS RESALE
697.38
JPMORGAN CHASE BANK
UNITED FORD -PART RESALE
402.58
JPMORGAN CHASE BANK
BUMP2BUMP -PARTS
43.86
AT &T MOBILITY
WIRELESS SERVICE
57.33
AEP IPSO
ELECTRIC USAGE
447.46
JPMORGAN CHASE BANK
GOODYEAR -TIRES
2,719.52
JPMORGAN CHASE BANK
BUMP2BUMP -PARTS
54.06
JPMORGAN CHASE BANK
BUMP213UMP -PARTS
284.92
JPMORGAN CHASE BANK
BUMP2BUMP -PARTS
282.06
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
13.70
JPMORGAN CHASE BANK
HENDON MEDIA - TRAINGING
279.00
JPMORGAN CHASE BANK
BUMP2BUMP -CORE RETURN
-30.00
JPMORGAN CHASE BANK
BUMPER TO BUMPER -PARTS
363.20
JPMORGAN CHASE BANK
BUMP2BUMP -CORE RETURN
-75.00
TOTAL CITY GARAGE 7,219.98
FUND GRAND TOTAL 7,219.9
WORKERS' COMP SELF -INS
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP /FELL
323.00
CITYOFOWASSOIMPRESTACCOUNT
WORKERS COMP /FELL
323.00
TOTAL WORKERS' COMP SELF -INS 646.00
WORKERS' COMP SELF -INS
CITY OF OWASSO IMPRESTACCOUNT
WORKERS COMP CLAIMS
256.92
CITY OF OWASSO IMPRESTACCOUNT
WORKERS COMP CLAIMS
2,268.29
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIMS
640.00
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIMS
366.98
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIMS
366.98
CITY OF OWASSO IMPREST ACCOUNT
CITY OF OWASSO IMPREST AC
1,158.77
TOTAL WORKERS' COMP SELF -INS 5,057.94
FUND GRAND TOTAL 5,703.9
GEN LIAR -PROP SELF INS
DON CARLTON HONDA PARTS
TORT CLAIM
1,100.83
JASON KITCH
I
TORT CLAIM
200.00
TOTAL GEN LIAR -PROP SELF INS 1,300.83
Page 11
Claims List
8/4/2015
Budget Unit Title I Vendor Name Payable Description IPaymentAmount
FUND GRAND TOTAL 1,300.8
CITY GRAND TOTAL $177,472.74
Page 12
CITY OF OWASSO
HEALTHCARE SELF INSURANCE FUND
CLAIMS PAID PER AUTHORIZATION OF ORDINANCE #789 AS OF 814115
VENDOR
AETNA HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
ADMIN FEES
STOP LOSS FEES
HEALTHCARE DEPT TOTAL
DELTA DENTAL DENTAL MEDICAL SERVICE
DENTAL MEDICAL SERVICE
DENTAL DEPT TOTAL
AMOUNT
39,698.67
61,367.00
22,151.51
35,556.74
12,358.66
44,695.89
215,828.47
1,699.66
2,178.30
3,877.96
HEALTHCARE SELF INSURANCE FUND TOTAL 219,706.43
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 07/25115
Department Payroll Expenses Total Expenses
Municipal Court
5,186.79
6,012.30
Managerial
20,840.75
24,843.25
Finance
15,750.48
18,698.83
Human Resources
8,134.91
9,686.52
Community Development
13,022.39
15,492.81
Engineering
14,534.74
17,233.00
Information Systems
13,110.35
15,649.81
Support Services
7,954.29
9,402.38
Cemetery
1,146.59
1,368.82
Central Dispatch
19,566.57
23,164.11
Animal Control
3,168.10
3,715.83
Emergency Preparedness
1,653.00
1,973.19
Stormwater /ROW Maint.
4,870.96
5,804.63
Park Maintenance
5,567.92
6,565.19
Culture /Recreation
4,804.45
5,745.60
Community - Senior Center
2,454.77
2,827.21
Historical Museum
654.40
734.75
Economic Development
3,205.00
3,825.80
General Fund Total
145,626.46
172,744.03
Garage Fund Total 4,687.61 5,588.72
Ambulance Fund Total 365.00 409.82
Fire Fund 37 Total 155,843.14 183,226.29
Police Fund 38 Total 138,928.74 162,304.13
Streets Fund 39 Total 7,632.91 9,081.24
Stormwater Fund 27 Total
Worker's Compensation Total 3,898.90 4,663.26
Strong Neighborhoods Total 3,642.86 4,296.95
O—T City Wif out Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Daniel Dearing
Sr. Civil Engineer
SUBJECT: Acceptance of Urban Engineering Agreement
DATE: July 31, 2015
BACKGROUND:
On May 17, 2005, the Engineering Design Criteria, Construction Standards and Standard Details
for any and all developments, projects, and infrastructure improvements within the City of
Owasso were adopted by the City Council. Documents required as a result of that adoption
include two different agreements, one which must be submitted by the developer and one
which must be submitted by the developer's engineer. The agreements are as follows:
ENGINEER AGREEMENT:
The agreement required to be submitted by the developer's engineer is titled "Agreement for
Urban Engineering Services" (Section 0114.1(B). This agreement requires the engineer to list all
improvements associated with the proposed development, attest that all designs will be in
compliance with City standards (outlined in the design criteria), pay all fees associated with the
plan review, attest that he /she is a Registered Professional Engineer in the State of Oklahoma,
and attest that he /she maintains Professional Liability Insurance in limits directly correlated to the
cost of the project specified in the attached agreement. The liability insurance to project cost
ratio schedule is as follows:
Project Cost
Less than $500,000
$500,000 - $1,000,000
Greater than $1,000,000
DEVELOPER AGREEMENT:
Professional Liability Insurance
$ 250,000
$ 500,000
$1,000,000
The agreement required to be submitted by the developer is titled "Agreement Guaranteeing
Installation of Improvements" (Section 0114.1 (C). This agreement requires the developer to
submit engineering drawings for the proposed improvements, provide oversight of his /her
construction contractor to assure compliance with the approved plans, and submit "as- built"
drawings upon completion of the construction of improvements.
The Mayor's signature is required on the "Agreement for Urban Engineering Services" (Engineer
Agreement), and therefore Council approval is needed.
RECOMMENDATION:
Staff recommends approval and authorization for the Mayor to execute the following
"Agreements for Urban Engineering Services" (Engineers Agreement):
• Kellogg Engineering, Inc., for site grading, drainage, roadway, water and sewer
improvements to serve Abbott Farms Phase I;
• Impact Engineering and Planning, PLC, for site grading, drainage, pavement, water and
sewer improvements to serve Express Laundry.
ATTACHMENTS:
"Agreement for Urban Engineering Services" - Kellogg Engineering, Inc., for site grading,
drainage, roadway, water and sewer improvements to serve Abbott Farms Phase I
"Agreement for Urban Engineering Services" - Impact Engineering and Planning, PLC, for site
grading, drainage, pavement, water and sewer improvements to serve Express Laundry
AGREEMENT FOR URBAN ENGINEERING SERVICES
THIS AGREEMENT, entered into by and between the CITY OF OWASSO,
OKLAHOMA, a municipal corporation, hereinafter called "City" and
Kellogg Engineering, Inc. hereinafter called "Design Engineer ".
W ITN ESS ETH:
WHEREAS, the Design Engineer has been employed by the Owner /Developer/Subdivider
of [he herein described real property to prepare all project plans and specifications and to
provide certain engineering services during the construction of the hereinafter sometimes
referred to as the "Project ", upon easements and rights -of -ways to be owned or controlled by
the City; and
WHEREAS, the Design Engineer is desirous of obtaining the review (and approval) of the
plans and specifications for said project by the City of Owasso Public Works Department; and
WHEREAS, the City is willing to review the plans and specifications prepared by the
Design Engineer under the hereinafter described terms and conditions.
NOW, THEREFORE, in consideration of the foregoing and in consideration of the
hereinafter set forth promises and covenants, the parties hereto mutually agree as follows, to-
wit;
1. The Improvements to be designed by the Design Engineer (pursuant to this Contract)
shall generally consist of the following types of improvements
Residential Housing, Site Grading, Roadway, Waterline,
Sewer lines, Erosion Control, & Drainage Improvements.
which shall be located on the following described tract of land:
Abbott Farms Phase I, Part of Section 7, T -21 -N, R -14 -E, IB &M,
City of Owasso Oklahoma at the Northeast' Corner of
E. 106th St. N. and N. Mingo rd
2. 'file Design Engineer shall, in conformity with the provisions of the City's Standard
Specifications for Urban Engineering Services, including the City's current Design
Criteria, which are hereby incorporated and made a part of this Contract by reference,
prepare project plans, specifications, and other engineering documents as may be
necessary for the proper construction of the project improvement, and shall perform
all construction layout surveys, and staking and periodic general construction
supervision on the project improvements as they are constructed by the Owner and his
Contractor.
3. The City shall review (and approve) the project plans, specifications, and other
engineering documents for the construction of the project improvements prepared and
submitted to the City by the Design Engineer.
4. The Design Engineer shall compensate the City for reviewing (and approving) plans
and specifications for the project at the rate of One Hundred Dollars ($ 100.00) for each
plan sheet submitted (other than plan sheet Standard Drawings of the City of Owasso
or of the Oklahoma Department of Transportation), except that the minimum charge
for each project shall be One Hundred -fifty Dollars ($150.00). Payment shall be due
and payable upon presentation of the plans and specifications for the project for review
by the City. PFPI plan review and permit fees are waived for governmental entities.
No fees shall be collected by the City of Owasso on any public work or improvement
performed by or for any city, county, state, or federal governmental entity; provided
however, that this exemption shall not constitute waiver of any ordinance requiring the
issuance of such permits, and it shall apply only to such permits issued directly to the
governmental entity involved.
5. The Design Engineer hereby covenants that he /she is a Registered Professional
Engineer in the State of Oklahoma at the time of execution of this Contract, and should
the Design Engineer cease to be a Registered Professional Engineer prior to
completing performance of the terms and conditions of this Contract, the Design
Engineer shall immediately notify the City and shall engage a Registered Professional
Engineer acceptable to the City to complete performance of the promises and
covenants contained herein.
6. The Design Engineer further covenants and agrees that he /she maintains and is covered
by Professional Liability Insurance in limits of not less than those indicated in the
following schedule:
Project Cost Professional Liability Insurance
Less than $500,000 $250,000
$500,000- $1,000,000 $500,000
Greater than $1,000,000 $1,000,000
(Project Costs to be as defined in Section I of the attached Specifications for Urban
Engineering Services) and that he /she will maintain same in continuous force and effect
for a period of not less than three years from and after final acceptance of the project
herein.
7. The Design Engineer further covenants and agrees to comply with Section 1, Section 11
and Section 111 of the attached Standard Specifications for Urban Engineering Services
and that these specifications become a part this contract.
IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be
executed by their duly authorized officers or representatives on the dates set for the below.
Executed by the City of Owasso, Oklahoma, on the _day of 20
Executed by the Design Engineer on the 16thday of July 20-1S.
CITY OF OWASSO, OKLAHOMA
a municipal corporation
BY
Mayor
ATTEST:
City Clerk
APPROVED AS TO FORM:
City Attorney
APPROVED)
r'
Pul c Works D rector
DE ENGINE R
Design Engineer
BY President
Title
ATTEST:
'. H1110
THIS AGREEMENT, entered into by and between the CITY OF OWASSO,
OKLAHOMA, a municipal corporation, hereinafter called "City" and
I MpacT at,-+b QLaP, i r,36 hereinafter called "Design Engineer ".
WITNESSETH:
WHEREAS, the Design Engineer has been employed by the Owner /Developer /Subdivider
of the herein described real property to prepare all project plans and specifications and to
provide certain engineering services during the construction of the hereinafter sometimes
referred to as the "Project', upon easements and rights-of-ways to be owned or controlled by
the City; and
WHEREAS, the Design Engineer is desirous of obtaining the review (and approval) of the
plans and specifications for said project by the City of Owasso Public Works Department; and
WHEREAS, the City is willing to review the plans and specifications prepared by the
Design Engineer under the hereinafter described terms and conditions.
NOW, THEREFORE, in consideration of the foregoing and in consideration of the
hereinafter set forth promises and covenants, the parties hereto mutually agree as follows, to-
wit;
1. The Improvements to be designed by the Design Engineer (pursuant to this Contract)
shall generally consist of the following types of improvements
�iT� � nPrro�Erv\c-u�is 1 �cC.uD� �C,vi= n�,,.si a ✓�"r6R- rzwo—rr,�,
SAt�tTb[t\I °2F &a 12 9V2J1CJi ( 6t- JtjrC_il,r)P4 E�N9 (mil Y1 CEa
Co N P taG —n0ejS
which shall be located on the following described tract of land:
2. The Design Engineer shall, in conformity with the provisions of the City's Standard
Specifications for Urban Engineering Services, including the City's current Design
Criteria, which are hereby incorporated and made a part of this Contract by reference,
prepare project plans, specifications, and other engineering documents as may be
necessary for the proper construction of the project improvement, and shall perform
all construction layout surveys, and staking and periodic general construction
supervision on the project improvements as they are constructed by the Owner and his
Contractor.
3. The City shall review (and approve) the project plans, specifications, and other
engineering documents for the construction of the project improvements prepared and
submitted to the City by the Design Engineer.
4. The Design Engineer shall compensate the City for reviewing (and approving) plans
and specifications for the project at the rate of One Hundred Dollars ($100.00) for each
plan sheet submitted (other than plan sheet Standard Drawings of the City of Owasso
or of the Oklahoma Department of Transportation), except that the minimum charge
for each project shall be One Hundred -fitly Dollars ($150.00). Payment shall be due
and payable upon presentation of the plans and specifications for the project for review
by the City. PFPl plan review and permit fees are waived for governmental entities.
No fees shall be collected by the City of Owasso on any public work or improvement
performed by or for any city, county, state, or federal governmental entity; provided
however, that this exemption shall not constitute waiver of any ordinance requiring the
issuance of such permits, and it shall apply only to such permits issued directly to the
governmental entity involved.
5. The Design Engineer hereby covenants that he /she is a Registered Professional
Engineer in the State of Oklahoma at the time of execution of this Contract, and should
the Design Engineer cease to be a Registered Professional Engineer prior to
completing performance of the terms and conditions of this Contract, the Design
Engineer shall immediately notify the City and shall engage a Registered Professional
Engineer acceptable to the City to complete performance of the promises and
covenants contained herein.
6. The Design Engineer further covenants and agrees that he /she maintains and is covered
by Professional Liability Insurance in limits of not less than those indicated in the
following schedule:
Proiect Cost Professional Liability Insurance
Less than $500,000 $250,000
$500,000 - $1,000,000 $500,000
Greater than $1,000,000 $1,000,000
(Project Costs to be as defined in Section I of the attached Specifications for Urban
Engineering Services) and that he /she will maintain same in continuous force and effect
for a period of not less than three years from and after final acceptance of the project
herein.
7. The Design Engineer further covenants and agrees to comply with Section I, Section II
and Section III of the attached Standard Specifications for Urban Engineering Services
and that these specifications become a part this contract.
IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be
executed by their duly authorized officers or representatives on the dates set for the below.
Executed by the City of Owasso, Oklahoma, on the _day of 20
Executed by the Design Engineer on the 2-77 day of 20_1T
CITY OF OWASSO, OKLAHOMA
a municipal corporation
BY
Mayor
ATTEST:
City Clerk
APPROVED AS TO FORM:
City Attorney
APPROVED:
Public Works Director
DESI E GINEER
Design Engineer
BY�fy� r`u.� ?rau.
Title
ATTEST:
Secretary
n—Too Wit out Limits.
TO: The Honorable Mayor and City Council
FROM: Roger Stevens
Public Works Director
SUBJECT: Brookfield Crossing - Stormwater Conveyance and Detention
Amendment to Agreement for Engineering Services
DATE: July 31, 2015
BACKGROUND:
On October 14, 2014, City Council approved an engineering services agreement with Kellogg
Engineering, Inc. in the amount of $57,500 for the purpose of designing stormwater conveyance
and detention improvements in the Brookfield Crossing Subdivision.
Staff is seeking City Council approval to amend the engineering services agreement. Preliminary
work performed by the Engineer identified another option that would reduce the amount of
excavation within the Brookfield Crossing neighborhood and reduce the project construction
cost.
PROPOSAL:
In April 2015, Kellogg Engineering, Inc. requested a meeting with City staff to discuss the project
status and a possible new option for the conveyance of stormwater currently flowing from south
to north located on the eastside of Brookfield subdivision. Preliminary work revealed that the
stormwater could be re- routed to the east between two existing homes and then discharged
into a Swale or pipe across three properties. The benefits to re -route the stormwater to the east
would eliminate disturbance to several yards and driveways along the eastside of Brookfield
subdivision. In addition, construction cost could decrease by approximately $180,000.
In May and June 2015, Kellogg Engineering, Inc. and city staff met with the property owners to
the east to determine if they would be in agreement to allow a drainage easement to be
established for the stormwater improvements. After several meetings, the property owners have
agreed to allow a drainage easement to cross their, property along with construction of the
drainage improvements.
In May 2015, Kellogg Engineering, Inc. met with the Unites State Army Corp of Engineers (USACE)
concerning the 404 permit process and requirements. After providing plans of the project to the
USACE, additional studies will likely be required in order to receive the necessary permit.
PROPOSED AMENDMENT TO THE ENGINEERING AGREEMENT:
Staff requested a proposal from Kellogg Engineering, Inc. for the additional work needed for the
design of the new stormwater conveyance option.
In July 2015, Kellogg Engineering, Inc. submitted a proposal in the amount of $22,500 for the
following additional scope of work:
Item 1: Survey, design, prepare easements, and develop construction plans for a
drainage system immediately east of Brookfield Crossing as part of the overall Brookfield
Crossing Drainage Project.
Item 2: Prepare and provide a mitigation plan to USACE, provide cultural resources study
and report, wetland and stream delineation, and threatened and endangered species
assessment report, for the drainage improvements immediately north of Brookfield
Crossing as part of the overall Brookfield Crossing Drainage Project.
FUNDING:
Funding in the amount of $80,000 is included for the design of this project in the Stormwater Fund
Budget.
RECOMMENDATION:
Staff recommends approval of an amendment to the Agreement for Engineering Services for
the Brookfield Crossing Stormwater Conveyance and Detention Improvements with Kellogg
Engineering, Inc. for the purpose of expanding the scope of services to include a mitigation plan
and environmental study and to include survey and design for a drainage system immediately
east of Brookfield Crossing Subdivision for additional fees in the amount of $22,500.
ATTACHMENTS:
Location Map
Amendment to the Engineering Services Agreement
Staff memorandum dated October 10, 2014 - Original Agreement for Engineering Services
AS
• • O , 1
CROSSING
1r r l
0�
s
116th
BROOKFIELD CROSSING CITY OF OWASSO
LOCATION MAP
S
O 111 P.O. N. Main Street
s .O Box 180
Owasso, OK 74055
9/30/14 NOPtIl
THIS MAP IS FOR INFORMATION PURPOSE ONLY AND IS NOT INTENDED TO
i REPRESENT AN ACCURATE AND TRUE SCALE. USE OF THIS MAP IS WITHOUT 918.376.1500
f5 WARRANTY OR REPRESENTATION BY CITY OF OWASSO OF ITS ACCURACY.
AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO
BROOKFIELD CROSSING DRAINAGE PROJECT
AGREEMENT BETWEEN KELLOGG ENGINEERING, INC. AND
CITY OF OWASSO, DATED OCTOBER 21, 2014
THIS AGREEMENT, made and entered into this _ day of between the CITY OF
OWASSO, OKLAHOMA, a Municipal Corporation, of Oklahoma, hereinafter referred to as
CITY, and KELLOGG ENGINEEREING, INC., hereinafter referred to as ENGINEER;
WITNESSETH:
WHEREAS, CITY intends to upgrade the BROOKFIELD CROSSING DRAINAGE,
hereinafter referred to as the PROJECT; and,
WHEREAS, CITY requires certain professional services in connection with the PROJECT,
hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES;
WHEREAS, funding is available for the PROJECT through the CITY OF OWASSO
operating budget;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROTECT. The scope of the PROJECT is described in Attachment A,
SCOPE OF PROTECT which is attached hereto and incorporated by reference as part
of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES. which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBILITIES OF THE CITY. which is attached hereto and
incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D,
COMPENSATION and further described in Attachment E, FEE /HOUR
BREAKDOWN, which are attached hereto and incorporated by reference as part of
this AGREEMENT.
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B,
SCOPE OF SERVICES. in accordance with the schedule set forth in Attachment F,
SCHEDULE attached hereto and incorporated by reference as part of this
AGREEMENT.
6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with
the applicable laws and regulations published and in effect at the time of
performance of the SERVICES. The PROJECT shall be designed and engineered in a
good and workmanlike manner and in strict accordance with this AGREEMENT.
All engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by CITY. Other
than the obligation of the ENGINEER to perform in accordance with the foregoing
standards, no warranty, either express or implied, shall apply to the SERVICES to be
performed by the ENGINEER pursuant to this AGREEMENT or the suitability of
ENGINEER'S work product.
7. LIMITATION OF RESPONSIBILITY.
7.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
7.2. The presence of ENGINEER's personnel at a construction site is for the
purpose of providing to the CITY a greater degree of confidence that the
completed construction work will conform generally to the construction
documents and that the integrity of the design concept as reflected in the
construction documents has been implemented and preserved by the
construction contractor(s).
7.3. In soils, foundation, groundwater, and other subsurface investigations, the
actual characteristics may vary significantly between successive test points
and sample intervals and at locations other than where observations,
exploration, and investigations have been made. Because of the inherent
uncertainties in subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total PROJECT cost
and /or execution. These conditions and cost /execution effects are not the
responsibility of ENGINEER.
7.4. Record drawings will be prepared, in part, on the basis of information
compiled and furnished by others, and may not always represent the exact
location, type of various components, or exact manner in which the
PROJECT was finally constructed. ENGINEER is not responsible for any
errors or omissions in the information from others that are incorporated into
the record drawings.
7.5. ENGINEER's deliverables, including record drawings, are limited to the
sealed and signed hard copies. Computer - generated drawing files furnished
by ENGINEER are for CITY or others' convenience. Any conclusions or
information derived or obtained from these files will be at user's sole risk.
8. OPINIONS OF COST AND SCHEDULE.
8.1. Since ENGINEER has no control over the cost of labor, materials, equipment,
or services furnished by others, or over contractors', subcontractors', or
vendors' methods of determining prices, or over competitive bidding or
market conditions, ENGINEER'S cost estimates shall be made on the basis of
qualifications and experience as a Professional Engineer.
2
8.2. Since ENGINEER has no control over the resources provided by others to
meet construction contract schedules, ENGINEER'S forecast schedules shall
be made on the basis of qualifications and experience as a Professional
Engineer,
9. LIABILITY AND INDEMNIFICATION.
9.1. ENGINEER shall defend and indemnify the CITY from and against legal
liability for damages arising out of the performance of the SERVICES for the
CITY, including but not limited to any claims, costs, attorney fees, or other
expenses of whatever nature where such liability is caused by the negligent
act, error, or omission of ENGINEER, or any person or organization for
whom ENGINEER is legally liable. Nothing in this paragraph shall make the
ENGINEER liable for any damages caused by the CITY or any other
contractor or consultant of the CITY.
9.2. ENGINEER shall not be liable to the CITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
10. CONTRACTOR INDEMNIFICATION AND CLAIMS.
10.1. CITY agrees to include in all construction contracts the provisions of Articles
7.1, and 7.2, and provisions providing contractor indemnification of the CITY
and ENGINEER for contractor's negligence.
10.2. CITY shall require construction contractor(s) to name the CITY and
ENGINEER as additional insureds on the contractor's general liability
insurance policy.
11. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any construction unless such responsibilities
are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
12. INSURANCE.
12.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
12.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the
aggregate, and with property damage limits of not less than $100,000
for each occurrence and not less than $100,000 in the aggregate.
12.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each
accident and with property damage limits of not less than $100,000
for each accident.
7
12.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not
less than $100,000 for each occurrence.
12.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions
coverage to be for a minimum of $1,000,000, deductibles subject to
approval by the CITY.
12.2. ENGINEER shall furnish the CITY certificates of insurance which shall
include a provision that such insurance shall not be canceled without at least
30 days written notice to the CITY.
13. OWNERSHIP AND REUSE OF DOCUMENTS.
13.1. All documents, including original drawings, estimates, specifications, field
notes and data shall become and remain the property of the CITY.
13.2. CITY'S reuse of such documents without written verification or adaptation
by ENGINEER for the specific purpose intended shall be at the CITY'S risk.
14. TERMINATION OF AGREEMENT.
14.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
14.2. CITY shall have the right to terminate this AGREEMENT, or suspend
performance thereof, for the CITY'S convenience upon written notice to
ENGINEER; and ENGINEER shall terminate or suspend performance of
SERVICES on a schedule acceptable to the CITY. In the event of termination
or suspension for the CITY'S convenience, the CITY shall pay ENGINEER for
all SERVICES performed to the date of termination in accordance with
provisions of Attachment D, COMPENSATION. Upon restart of a
suspended project, ENGINEER's contract price and schedule shall be
equitably adjusted.
15. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: KELLOGG ENGINEERING, INC.
6755 S. 4060 Rd.
Talala, OK 74080
Attention: Brian Kellogg, President
To CITY: CITY OF OWASSO
City Municipal Building
111 N. Main
Owasso, OK 74055
Ph: 918-376-1500
Attn: Warren Lehr, City Manager
15.1. Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and CITY.
16. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considered
to be in default of this AGREEMENT if delays in or failure of performance shall be
due to forces which are beyond the control of the parties; including, but not limited
to: fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance,
sabotage; inability to procure permits, licenses, or authorizations from any state,
local, or federal agency or person for any of the supplies, materials, accesses, or
services required to be provided by either CITY or ENGINEER under this
AGREEMENT; strikes, work slowdowns or other labor disturbances, and judicial
restraint.
17. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
18. INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments
A, B, C, D, E, and F and represents the entire and 'integrated AGREEMENT between
the parties; and supersedes all prior negotiations, representations, or agreements
pertaining to the SCOPE OF SERVICES herein, either written or oral. CITY may
make or approve changes within the general Scope of Services in this AGREEMENT.
If such changes affect ENGINEER's cost of or time required for performance of the
services, an equitable adjustment will be made through an amendment to this
AGREEMENT. This AGREEMENT may be amended only by written instrument
signed by each of the Parties.
19. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the CITY over the interpretation or application of the terms of this
AGREEMENT, the matter shall be referred to the CITY's Manager for resolution.
Regardless of these procedures, neither party shall be precluded from exercising any
rights, privileges or opportunities permitted by law to resolve any dispute.
20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
21. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the CITY OF OWASSO
of Owasso, and any plans or specifications not meeting the terms set forth in this
AGREEMENT will be replaced or corrected at the sole expense of the ENGINEER.
The ENGINEER will meet with the CITY staff initially and as needed thereafter and
will be available for public meetings and CITY OF OWASSO presentations.
22. KEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has
designated Brian Kellogg as Project Manager for the PROJECT. ENGINEER agrees
that no change will be made in the assignment of this position without prior
approval of CITY.
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Mayor of the CITY OF OWASSO.
APPROVED:
CITY Clerk
APPROVED AS TO FORM:
CITY Attorney
s
ENGINEER
By: Brian K. Kellogg, President
Kellogg Engineering, Inc.
CITY OF OWASSO,
OWASSO, OKLAHOMA
Mayor
Date
AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO
BROOKFIELD CROSSING DRAINAGE PROJECT
AGREEMENT BETWEEN KELLOGG ENGINEERING, INC. AND
CITY OF OWASSO, DATED OCTOBER 21, 2014
ADDITIONAL SCOPE OF WORK
ATTACHMENT G
ADDITIONAL SCOPE OF PROJECT: The PROJECT shall consist of civil
engineering SERVICES described as follows:
Additional Scope Item 1
Project scope area has hereby been revised to include an area immediately east of
Brookfield Crossing for the purpose of engineering and survey of an alternative
drainage route.
The Engineer proposes to survey, design, prepare easements, and develope
construction plans for a drainage system immediately east of Brookfield Crossing as
part of the overall Brookfield Crossing Drainage Project.
Additional Scope Item 2:
Project scope area has hereby been revised to include environmental services and
a mitigation plan as part of the 404 permit process through the USACE for an area
immediately north of Brookfield Crossing.
The Engineer proposes; prepare a and provide a mitigation plan to USACE, provide
cultural resources study & report, wetland & stream delineation, and threatened &
endangered species assessment report, for the drainage improvements immediately
north of Brookfield Crossing as part of the overall Brookfield Crossing Drainage
Project.
AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO
BROOKFIELD CROSSING DRAINAGE PROJECT
AGREEMENT BETWEEN KELLOGG ENGINEERING, INC. AND
CITY OF OWASSO, DATED OCTOBER 21, 2014
ADDITIONAL COMPENSATION
ATTACHMENT H
ADDITIONAL COMPENSATION. The CITY agrees to pay, as compensation for services
set forth in Attachment B, the following fees, payable monthly as the work progresses; and
within 30 calendar days of receipt of invoice. ENGINEER shall submit monthly invoices
based upon actual hours or work, invoiced according the Rate Schedule provided in
ATTACHMENT E, completed at the time of billing. Invoices shall be accompanied by such
documentation as the CITY may require in substantiation of the amount billed.
D.1 Additional Compensation
For the work under this project the total maximum billing including direct costs and
subconsultant services shall be Twenty Two Thousand Five Hundred Dollars and
No /100 ($22,500 which amount shall not be exceeded without further written
authorization by CITY.
Additional Scope Item 1:
Engineering & Surveying: $9,500.00
Additional Scope Item 2:
Mitigation Plan: $4,000.00
Enviromental: $9,000.00
Total Additional Compenstion: $22,500.00
D.2 Subconsultants and Other Professional Associates: All Subcultant and Other
Professional Associate costs are included in the Total Compsentation. Services of
subcontractors and other professional consultants shall be compensated at actual
cost. Subconsultants to be used must be authorized in advance by the CITY.
D.3 Other Direct Costs: All Direct Costs are included in the Total Compensation
D.3.1 Travel and subsistence shall be compensated for at actual cost. Local travel
by personal or firm automobile shall be compensated for at the rate currently
allowed by the IRS.
D.3.2 Printing expenses shall be compensated for as shown in ATTACHMENT E.
D.3.3 Any other direct costs shall be compensated for at actual when authorized in
advance by CITY.
DA Additional Services: Unless otherwise provided for in any accepted and authorized
proposal for additional services, such services shall be compensated for on the same
basis as provided for in Attachment D. This includes, but is not limited to, staking of
property lines and /or easements for easement acquisition.
D.5 Terminated Services: If this AGREEMENT is terminated, ENGINEER shall be paid
For services performed to the effective date of termination.
D.6 Conditions of Payment
D.6.1 Progress payments shall be made in proportion to services rendered and
expenses incurred as indicated within this AGREEMENT and shall be due
and owing within thirty days of ENGINEER'S submittal of his progress
payment invoices,
D.6.2 If CITY fails to make payments due ENGINEER within sixty days of the
submittal of any progress payment invoice, ENGINEER may, after giving
fifteen days written notice to CITY, suspend services under this
AGREEMENT.
D.6.3 If the PROJECT is delayed, or if ENGINEER'S services for the PROJECT are
delayed or suspended for more than ninety days for reasons beyond
ENGINEER'S control, ENGINEER may, after giving fifteen days written
notice to CITY, request renegotiation of compensation.
0
F
AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO
BROOKFIELD CROSSING DRAINAGE PROJECT
AGREEMENT BETWEEN KELLOGG ENGINEERING, INC. AND
CITY OF OWASSO, DATED OCTOBER 21, 2014
REVISED SCHEDULE
ATTACHMENT
REVISED SCHEDULE. The schedule for general engineering services for the
PROJECT is provided as follows:
F.1
Notice to Proceed:
11/01/2014
F.2
Boundary and Topographical Surveys
11/01/2014 - 12/01/2014
F.3
Preliminary Plans/ Engineering Report
12/01/2014 - 01/01/2015
F.4
Additional Topographical Surveys
07/01/2015 - 08/01/2015
F.5
Complete Preliminary Construction Plans
08/01/2015 - 11/01/2015
F.6
Complete Final Construction Plans and Specs
11/01/2015 - 12/01/2015
F.7
Submit plans to City of Owasso
12/01/2015 - 01/01/2016
F.8
Complete Final Contract Documents
01/01/2016 - 02/01/2016
F.9
Advertise and Bid Project
04/01/2016 - 05/01/2016
F.10
Project Construction
06/01/2016 - 10/01/2016
F.11
As -built Surveys & Record Drawings
11/01/2016 - 12/01/2016
Substantial Completion: 01Z01/2016
10
The City Wit out Limits.
TO:
The Honorable Mayor and
City Council
FROM:
Roger Stevens
Public Works Director
SUBJECT:
Brookfield Crossing - Stormwater Conveyance and Detention
Engineering Service Agreement
DATE:
October 10, 2014
BACKGROUND
The Brookfield Crossing subdivision is located N/W of E 116 St N and Garnett Road Intersection.
This residential subdivision was developed in 2001 -2002 with City infrastructure being accepted
by City Council in January 2003.
Prior to acceptance, Public Works identified several issues with the stormwater conveyance
system and detention pond. However, miscommunication between the former Infrastructure
Inspector and City Engineer led to the stormwater infrastructure being accepted prematurely. In
January 2004, Public Works met with the developer concerning the stormwater issues within
Brookfield. At that time, all parties were able to view the certified as -built plans and come to
agreement that the stormwater system has faults in the design and the system was not installed
as shown in the designed plans.
Shortly thereafter, the developer hired a new engineering consultant (Kellogg Engineering) to
analyze, identify, and provide solutions relating to the stormwater deficiencies. The results
indicate the stormwater detention facility outfoll structure was installed at the incorrect elevation
consequently detention capacity isn't adequate for a 100 -year storm event. In addition,
stormwater piping is inadequate in size and doesn't have proper slope is some areas of the
conveyance system causing street and yard flooding on the north and east end of the
subdivision during a 2 -3 inch rain event.
Since Kellogg Engineering provided a conceptual design in February 2004, the developer has
not made any attempt to address these drainage issues within Brookfield Crossing. In addition,
the developer has recently informed the City staff that he does not have the funding available
to assist with costs related to the identified stormwater deficiencies. As a result, Public Works is
proposing to proceed with the planning phase of the project this fiscal year with construction in
FY 2015 -2016, if funding is available.
ENGINEERING SERVICES AGREEMENT:
In August 2014, Staff requested a proposal from Kellogg Engineering, Incorporated of Talala,
Oklahoma. Based upon past knowledge of this project and fee negotiations, Kellogg
Engineering, Inc. is being recommended as the design engineer for the project.
The proposed work includes the following:
Task 1 - Prepare 404 application to USACE for a Nation Wide Permit
Task 2 - Topographic survey of existing storm drains, detention ponds and utilities
Task 3 - Prepare legal descriptions and exhibits for all LIE to be acquired.
Task 4 - Prepare and provide construction plans to the City for review
Task 5 - Prepare and provide H &H report the City for review.
Task 6 - Prepare and provide SWPPP to the City for review.
Task 7 - One (1) Final set of reproducible Construction Plans and bid documents.
Task 8 - ODEQ Stormwater Discharge Permit
Task 9 - Bid documents in accordance with Owasso standards.
Task 10 - Attend plan -in hand meeting with the City.
Task 1 1 - Attend Preconstruction conference.
Task 12 - Material specifications review.
Task 13 - Provide Construction Assistance and As -built Drawings
FUNDING:
Funding in the amount of $80,000 is included in the FY 2015 Stormwater Fund Budget for the
engineering services for the Brook Field Crossing Stormwater Improvement Project.
PROPOSED ACTION:
An item has been included on the October 14, 2014 Council Work Session in order to discuss this
Project. Staff is proposing an engineering services agreement with Kellogg Engineering, Inc. in
the amount of $57,500 for the Brookfield Crossing Stormwater Improvement Project.
ATTACHMENTS:
A. Location Map
B. Agreement for Engineering Services