RESOLUTION 2016 -25
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OWASSO, OKLAHOMA,
AUTHORIZING THE SUBMISSION OF AN APPLICATION FOR FUNDING BETWEEN THE
CITY OF OWASSO AND THE OKLAHOMA DEPARTMENT OF TRANSPORTATION FOR THE
EAST 106TH STREET NORTH AND NORTH 129TH EAST AVENUE INTERSECTION
IMPROVEMENTS
WHEREAS, Surface Transportation Program Urbanized Area funds have been made
available for transportation improvements within the Tulsa Transportation Management Area;
and
WHEREAS, The City of Owasso has selected a project described as follows: East 106th
Street North and North 129th East Avenue Intersection Improvement Project; and the selected
project is consistent with the local comprehensive plan, including applicable Major Street and
Highway Plan Element, and the Regional Transportation Plan; and
WHEREAS, the engineer's preliminary estimate of cost is $1,800,000 and Federal
participation under the terms of the Safe, Accountable, Flexible, Efficient Transportation Equity
Act: A Legacy for Users (SAFETEA -LU) relating to Surface Transportation Program Urbanized Area
funds are hereby requested for funding of 80% of the project cost, and the City of Owasso
proposes to match funds for the 207a balance of the project costs; and
WHEREAS, the City of Owasso will arrange a qualified ENGINEER licensed in the state of
Oklahoma to furnish professional services in the preparation of detailed plans, specifications and
estimates; and
WHEREAS, the City of Owasso agrees to provide for satisfactory maintenance after
completion, and to furnish the necessary right -of -way clear and unobstructed; and
WHEREAS, the City of Owasso has required matching funds available and further agrees
to deposit with the Oklahoma Department of Transportation said matching funds within thirty
(30) days after approval by the Federal Highway Administration.
NOW, THEREFORE, BE IT RESOLVED: That the Indian Nations Council of Governments is
hereby requested to program the East 106th Street North and North 129th East Avenue
Intersection Improvement Project into the Transportation Improvement Program for the Tulsa
Transportation Management Area; that upon inclusion in the Transportation Improvement
Program, the Oklahoma Transportation Commission is hereby requested to concur in the
programming and selection of this project and to submit the same to the Federal Highway
Administration for its approval; and that the Mayor is authorized and directed to execute the
above described agreement on behalf of the City of Owasso.
20th day of Deceffib¢r, 2016.
Attest:
AM i y II D nn, Mayor
L ti'i
Sherry Bish , City Clerk v' q G S;
AL
ovgd As To Form: �r orr%
uk<
ie Lombardi, City Attorney s_ 4
�
k(.AHUV`P.
SUBJECT PROPERTY CITY OF OWASSO
8/11/2016
106th/129th EAST AVE
li is %I %I' I5 FOR INI—ORMA -I -I C)N PLTRI 1- i)NI Y : \NI) 1\ N1.11- IN 11'N I>FS>T'I
-,I I:[s LiN'1': \N \CICURA1- Li: \NI> I-RUP'. S(. \LL. USI'01 :1111 ]1: \P Is \ \'lll R)L'-1.
'ARRANT -Y (IR RIIPRUS Iii NJ AI-I ON I I N I IN' OL O %N- . \55<) 0 11 S .\C (l LIR. NCY.
111 N. Main Street
P.O. Box 180
Owasso, OK 74055
918.376.1500
The City Wit out Limits.
TO: The Honorable Mayor and Council
City Of Owasso
From: H. Dwayne Henderson, P.E.
City Engineer
�p'OR
o�R
� eY
®FC ? ® ?4j6co�i IC14
Subject: Resolution 2016 -25 Application for STP Funds
106th Street North /North 129th East Avenue Intersection Improvements
Date: December 16, 2016
7_Ca11161 Z *111:1 D3
The Intersection at 106th Street North /129th East Avenue is owned and maintained by Tulsa
County. It is currently one of the most heavily traveled unimproved intersections in the Owasso
area. Traffic counts in this area are tabulated below along with the projected counts for 2020
from 2016 Traffic Counts.
Location
Daily Traffic
Daily Traffic
Projected Daily
Volume
Volume
Traffic Volume
(Vehicles per
(Vehicles per
(Vehicles per day
da 2016 ADT *
do 2014 ADT **
20)0 ADT
129th East
Avenue, south
6,702
6,700
7,254
of 106th Street
North
129th East
Avenue, north
6,342
4,400
6,864
of 106th Street
North
106th Street
North, east of
7,465
6,300
8,080
129th East
Avenue
106th Street
North, west of
6,151
5,900
6,658
129th East
Avenue
* - Post Rejoice Christian School Opening
** - Prior to Rejoice Christian School Opening
The intersection has increased in activity as the growth of Owasso has continued north.
However, the traffic most assuredly will increase significantly more with the construction of the
Rejoice Christian School Campus and the new Wal -Mart Neighborhood Market to the north and
200 new apartment units to the south.
In 2016, Tulsa County and the City of Owasso agreed that the project was needed to expand
the intersection. We agreed to share costs for the engineering design for the project, right -of-
way and eventually the utility relocation, as we did for the East 1 16rh Street North /North 1291h East
Ave Project.
Staff has prepared a conceptual plan and preliminary design report that will be submitted to
INCOG for FY 2016 -17 Surface Transportation Program (STP) funds. These funds are made
available on an annual basis by the Federal Highway Administration (FHWA), through the
Oklahoma Department of Transportation (ODOT), for the implementation of eligible
transportation improvements in the Tulsa Urbanized Area.
INCOG administers the grant funding and has established a selection process for the distribution
of STP funds. Priority funding is given to projects that meet federal regulations and help advance
the Regional Transportation Plan through safety improvements and to projects that reduce
traffic congestion. Proposed projects are evaluated for eligibility and priority based on a 100 -
point rating system. On December 2, 2016, INCOG solicited for STP funding applications with a
submittal deadline of January 31, 2017.
PROPOSED RESOLUTION FOR CONSTRUCTION PHASE:
Similar to the process utilized in obtaining federal funding assistance for the East 116 +h Street
North and North 129th East Ave Intersection Improvements, a resolution is necessary in order to
complete the application process. The 2016 -17 application will request federal funding
assistance for the construction of the roadway improvements. If this project is selected in the
Spring of 2016, the funding for construction will be targeted in FY 2021 or sooner, depending on
funding availability.
CONCEPTUAL DESIGN SUMMARY:
Both East 106th Street North and North 129th East Avenue are considered secondary arterials in
Owasso. The intersection is a heavily used roadway that conveys residential, commercial and
school traffic in the area, as well as commuter traffic to and from Owasso. Based on the
projected needs for the intersection as the school became fully developed, the engineer for the
school mentioned a future need for signals at this intersection.
The proposed lane configuration is a 5 -lane roadway section including 2 -lanes in each direction
with left turn lanes to expedite left turning movements. The projected right turning movements
warrant right -turn lanes for west bound traffic turning north and east bound traffic turning south
toward the commercial area and hospital. Also included are sidewalks on each side of the
intersection. Based on the conceptual design, the anticipated cost for construction of the
proposed roadway improvements is $1,800,000. Construction administration (testing, inspection
and administration of pay applications) is equal to 8% of the construction fee.
Tulsa County has agreed that paying for 50% of Phase I (engineering design, right -of -way and
utility relocations) locally and requesting ODOT funding to contribute to Phase II (construction)
would allow us the best chance of obtaining funding. ODOT funding for this project would be
through the Surface Transportation Program, which would fund 80% of eligible construction costs,
while the local government funds 20 %.
Based upon this information, the following is an estimate of the cost distribution:
Project Segment
Estimate
($ x1000)
ODOT Portion
($ x1000)
City of Owasso/Tulsa
County Shared
Portion
$ x1000
Construction
$1.800
$1.440
$0.360
Administration
$0.200
$0.160
$0.040
Utility Relocation
$0.600
$0.000
$0.600
Right -of -way
$0.850
$0.000
$0.850
Engineering
$0.200
$0.000
$0.200
Total Project Cost
$3.650
$1.600
$2.050
RECOMMENDATION:
Staff recommends approval and authorization of the Mayor to execute a resolution requesting
ODOT to consider the construction phase of the East 106th Street North and North 129th East Ave
as a candidate for federal funding assistance through the Surface Transportation Program.
ATTACHMENTS:
Resolution 2016 -25
Location Map