HomeMy WebLinkAbout2018.07.03_City Council AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO CITY COUNCIL
Council Chambers, Old Central Building
109 N Birch, Owasso, OK 74055
Regular Meeting
Tuesday, July 3, 2018 - 6:30 pm
1. Call to Order
Mayor Chris Kelley
2. Invocation
Matt Thomason, Executive Minister of First Church
3. Flag Salute
4. Roll Call
S. Presentation of the Character Trait of Decisiveness
Mike Henry, Character Council Member
0 /111, 4?19
S
6. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. (All matters listed under "Consent" are considered by the City Council to be routine
and will be enacted by one motion. Any Councilor may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.)
A. Approve minutes
• June 19, 2018, Regular Meeting
B. Approve claims
7. Consideration and appropriate action relating to items removed from the Consent Agenda
S. Consideration and appropriate action relating to the award of a bid for earthwork and site
utilities and assignment of said bid to Nabholz Construction for the Police Headquarters
Renovation Project
Scott Chambless
Staff recommends awarding the bid to D -Kerns Construction in the amount of $49,900 for
changes to the planned improvements of the storm water drainage system; assignment of
the bid contract to Nabholz Construction Corporation for the purpose of construction
management and project oversite; and authorization to execute all necessary documents.
9. Consideration and appropriate action relating to the Master Service Agreement with First
Responder Support Services (FRSS) for behavioral health services for Emergency Responders
Michele Dempster
Staff recommends approval of a First Renewal Agreement with First Responder Support
Services in the amount of $31,690.80, and authorization for payment.
10. Consideration and appropriate action relating to a budget amendment in the Capital
Improvements Grant Fund
r Karl Fritschen
Staff recommends approval of a budget amendment in the Capital Improvement Grants
Fund, increasing the estimated revenues and the appropriation for expenditures by $9,550.04
for the FY 2018 CDBG Grant for sewer improvements in Hale Acres.
Owasso City Council
July 3, 2018
Page 2
11. Consideration and appropriate action relating to a right -of -way acquisition for the Garnett
Road Widening Project from E 106 St N to E 116 St N
Roger Stevens
Staff recommends approval of an agreement with Molini Properties, LLC for the acquisition of
right -of -way, easement, and compensation for damages in the amount of $55,000.00 and
authorization for payment.
12. Consideration and appropriate action relating to Change Order #1 to the agreement
between the City of Owasso and Builder's Unlimited for construction of the Redbud Festival
Park
Larry Langford
Staff recommends approval of Change Order #1 amending the contract to include the
installation of electricity and receptacles in the amount of $57,594 and deducting the cost of
Alternate #5.2 (6 ft. Security Fencing) in the amount of $17,000 changing to the total
contract amount to $2,301,335, and authorization to execute all necessary documents.
13. Consideration and appropriate action relating to City Council authorization to submit a
request to the Tulsa County Vision Authority for the allocation of Excess Vision 2025 funds and
requesting an amended Capital Improvement Agreement for Owasso Community Center
Project
Larry Langford
Staff recommends authorization for the City Manager to execute a letter requesting the Tulsa
County Vision Authority amend their Resolution, dated April 30, 2004, by including language
to allow the Community Center Outdoor Classroom and Gathering Area project to be an
approved Vision 2025 project, and further requesting the Tulsa Board of County
Commissioners issue an amended Capital Improvements Agreement.
14. Consideration and appropriate action relating to City Council authorization to submit a
request to the Tulsa County Vision Authority for the allocation of Excess Vision 2025 funds and
requesting an amended Capital Improvement Agreement for the Redbud Festival Park
Larry Langford
Staff recommends authorization for the City Manager to execute a letter requesting the Tulsa
County Vision Authority amend their Resolutions, dated December 6, 2016 (5k Trail and
Feature Splash Pad) and dated February 7, 2017 ( Redbud Festival Park), decreasing the 5k
Trail by $707,077.50, decreasing the Feature Splash Pad by $716,845, and increasing the
Redbud Festival Park by $1,423,922.50, for a total reimbursement of Vision 2025 Funds
allocated to the Redbud Festival Park project in the amount of $2,262,388.50; and requesting
the Tulsa Board of County Commissioners issue amended Capital Improvements Agreements
for each project.
15. Report from City Manager
• Monthly Public Works Project Status Report
16. Report from City Attorney
17. Report from City Councilors
Owasso City Council
July 3, 2018
Page 3
18. Official Notices to Council (documents for acknowledgment of receipt or information only,
no discussion or action will be taken)
Payroll Payment Report- Pay Period Ending Date 6/23/18
Health Care Self- Insurance Claims - dated as of 6/28/18
Oklahoma Department of Environmental Quality Permit No. SI-000072180402,
Magnolia Ridge 1, Facility No. S -21310
19. New Business (New Business is any item of business which could not have been foreseen at
the time of posting of the agenda)
20. Adjournment
Notice of Public Meeting filed in the office of the City Clerk and the Agenda posted at City Hall,
200 S Main St, at 6:00 pm on Friday, June 29, 2018.
1-1&�/ujN
Vliann M. Stevens, City Clerk
The City of Owasso encourages citizen participation. To request an accommodation due to a disability, contact the
City Clerk at /east 48 hours prior to the scheduled meeting by phone 918 - 376 -1502 or by email to
istevens@citvofowasso.com
OWASSO CITY COUNCIL
MINUTES OF REGULAR MEETING
Tuesday, June 19, 2018
The Owasso City Council met in regular session on Tuesday, June 19, 2018, in the Council
Chambers at Old Central, 109 N Birch, Owasso, Oklahoma per the Notice of Public Meeting and
Agenda filed in the office of the City Clerk and posted at City Hall, 200 S Main St, at 6:00 pm on
Friday, June 15, 2018.
1. Call to Order
Mayor Chris Kelley called the meeting to order at 6:30 pm.
2. Invocation
The invocation was offered by Pastor John -David Meissner of New Heights Church.
3, Flag Salute
Councilor Kelly Lewis led the flag salute.
4. Roll Call
Present
Mayor - Chris Kelley
Councilor- Doug Bonebrake
Councilor- Lyndell Dunn
Councilor- Kelly Lewis
A quorum was declared present.
Staff:
City Manager - Warren Lehr
City Attorney - Julie Lombardi
Absent
Vice - Mayor- Bill Bush
5. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. (All matters listed under "Consent" are considered by the City Council to be routine
and will be enacted by one motion. Any Councilor may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.)
A. Approve minutes
• June 5, 2018, Regular Meeting
• June 12, 2018, Regular Meeting
B. Approve claims
C. Approve a request from the spouse of Sonya Boggs to receive death benefits
from Oklahoma Municipal Retirement Fund (OkMRF)
D. Accept the public infrastructure improvements including 7,561 linear feet of four
inch PVC sanitary sewer force main and all appurtenances to serve the Patriot
Golf Course Club House
Mr. Bonebrake moved, seconded by Ms. Lewis to approve the Consent Agenda with claims
totaling 2,353,318.77.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
6. Consideration and appropriate action relating to items removed from the Consent Agenda
None
Owasso City Council
June 19, 2018
Page 2
Consideration and appropriate action relating to a contract with the Fraternal Order of Police
(FOP) Contract for Fiscal Year 2018 -19
Michele Dempster presented the item recommending approval of the FY 2018 -19 contract
with the Fraternal Order of Police (FOP) Lodge #149 and authorization for the Mayor to
execute the contract.
There were no comments from the audience. After discussion, Mr. Bonebrake moved,
seconded by Ms. Lewis to approve the contract with Fraternal Order of Police (FOP) Lodge
# 149, and authorize the Mayor to execute the contract, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
S. Consideration and appropriate action relating to the acquisition of right -of -way, easement,
and compensation for damages for the E 116 St N Roadway Improvement Project from
Garnett Road to N 129 E Ave
Dwayne Henderson presented the item recommending approval of an agreement with the
Priddy Family Trust for the acquisition of right -of -way, easement and compensation for
damages in the amount of $82,183.50 and authorization for payment.
There were no comments from the audience. After discussion, Mr. Dunn moved, seconded
by Ms. Lewis to approve the agreement and authorize payment, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
Consideration and appropriate action relating to Ordinance 1131, amending Part 12,
Planning, Zoning, and Development of the Code of Ordinances of the City of Owasso,
Oklahoma; repealing Chapter 2 Zoning Regulations in its entirety and enacting a new
Chapter 2, Zoning Code of the City Of Owasso, adopting by reference regulations for the use
of land, buildings, sites, and structures within the city limits
Karl Fritschen and Morgan Pemberton presented the item recommending approval of
Ordinance 1131.
There were no comments from the audience. After discussion, Mr. Dunn moved, seconded
by Mr. Bonebrake to approve Ordinance 1131, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
10. Consideration and appropriate action relating to a budget amendment in the General Fund
Linda Jones presented the item recommending approval of a budget amendment in the
General Fund increasing the estimated revenue and the appropriation for expenditures by
$444,651.
There were no comments from the audience. After discussion, Mr. Bonebrake moved,
seconded by Mr. Dunn to approve the budget amendment, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
Owasso City Council
June 19, 2018
Page 3
11. Consideration and appropriate action relating to a contract for audit services
Linda Jones presented the item recommending approval of a contract with RSM, LLP in the
amount of $51,500 for auditing services for the fiscal year ending June 30, 2018.
There were no comments from the audience. After discussion, Mr. Dunn moved, seconded
by Ms. Lewis to approve the contract with RSM, LLP, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
12. Consideration and appropriate action relating to Resolution 2018 -07, providing for the
adoption of an annual budget for Fiscal Year 2018 -2019 for the General Fund and other
Funds as established by the Owasso City Council; establishing levels of expenditures by
department and establishing budget amendment authority as provided by state statute; and
establishing an effective date
Linda Jones presented the item recommending approval of Resolution 2018 -07.
There were no comments from the audience. After discussion, Mr. Bonebrake moved,
seconded by Mr. Dunn to approve Resolution 2018 -07, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
13. Consideration and appropriate action relating to Ordinance 1132, amending Part 1, General
Provisions of the Code of Ordinances of the City of Owasso, Oklahoma; amending in part
and repealing in part various sections
Julie Lombardi presented the item recommending approval of Ordinance 1132.
There were no comments from the audience. After discussion, Mr. Bonebrake moved,
seconded by Ms. Lewis to approve Ordinance 1132, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
14. Consideration and appropriate action relating to Ordinance 1133, amending Part 2
Administration and Government of the Code of Ordinances of the City of Owasso,
Oklahoma; amending in part and repealing in part various sections
Julie Lombardi presented the item recommending approval of Ordinance 1133.
There were no comments from the audience. After discussion, Mr. Dunn moved, seconded
by Mr. Bonebrake to approve Ordinance 1133, as recommended.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried: 4 -0
15. Report from City Manager
Mr. Lehr advised that KYFM radio will broadcast music during the city's Red, White & Boom
Independence Celebration on Wednesday, July 4; reminded that City Hall will be closed for
the holiday and refuse collection for Wednesday, Thursday, and Friday will occur one day
later than regularly scheduled.
16. Report from City Attorney
None
Owasso City Council
June 19, 2018
Page 4
17. Report from City Councilors
Councilor Bonebrake encouraged citizens to vote on June 261h and Councilors commented
on the collaborative efforts of staff for their work on the budget and new zoning code.
18. Official Notices to Council (documents for acknowledgment or information only, no
discussion or action will be taken)
The Mayor acknowledged receipt of the following:
• Payroll Payment Report - Pay Period Ending Date 6/9/18
• Health Care Self- Insurance Claims - dated as of 6/14/18
• Monthly Budget Status Report - May 2018
19. New Business (New Business is any item of business which could not have been foreseen at
the time of posting of the agenda)
None
20. Adjournment
Mr. Bonebrake moved, seconded by Ms. Lewis to adjourn the meeting.
YEA: Bonebrake, Dunn, Lewis, Kelley
NAY: None
Motion carried 4 -0 and the meeting adjourned at 7:26 pm.
Chris Kelley, Mayor
Lisa Wilson, Minute Clerk
Claims List - 7/3/2018
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL AEP IPSO
ELECTRIC USE
$225.36
JPMORGAN CHASE BANK
AMAZON - SUPPLIES
$224.29
JPMORGAN CHASE BANK
FLAGS UNL- SUPPLIES
$107.85
JPMORGAN CHASE BANK
HOME DEPOT- SUPPLIES
$54.88
JPMORGAN CHASE BANK
LEATHERMAN- SUPPLIES
$10.95
JPMORGAN CHASE BANK
LOWES - SUPPLIES
$38.02
JPMORGAN CHASE BANK
OREILLY- SUPPLIES
$56.95
JPMORGAN CHASE BANK
RAYALLEN - SUPPLIES
$77,59
JPMORGAN CHASE BANK
SERENITYPET- CREMATION
$210.00
JPMORGAN CHASE BANK
TJ MAXX -AC UNIFORMS
$77.95
JPMORGAN CHASE BANK
WATERSTONE -DRY CLEAN
$25.50
GEN ANIMAL CONTROL -Total
$1,1 D9.34
AEP /PSO
ELECTRIC USE
$21,61
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$13.12
JPMORGAN CHASE BANK
OREILLY -FUEL FILTER
$2.15
OWASSO TOP SOIL
DIRT
$65.00
SPOK, INC.
PAGER USE
$8.89
TREASURER PETTY CASH
CDL RENEW- DIETZFIELD
$56.50
GEN CEMETERY -Total
CORNERSTONE -KEYS
$167,27
JPMORGAN CHASE BANK
AMAZON - SUPPLIES
$101.66
JPMORGAN CHASE BANK
GATHERING MAIN -BOOTH
$100.00
JPMORGAN CHASE BANK
SAMS- REFUND
($3.57)
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$59.62
JPMORGAN CHASE BANK
WAL- MART - SUPPLIES
$62.67
GEN COMM CTR DONATIONS -Total
$320.38
AEP IPSO
ELECTRIC USE
$1,702.19
JPMORGAN CHASE BANK
AMAZON - REPAIR PARTS
$12.85
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$228.55
JPMORGAN CHASE BANK
ANCHOR PAINT - SUPPLIES
$3.13
JPMORGAN CHASE BANK
BAILEY RANCH - LUNCHEON
$290.00
JPMORGAN CHASE BANK
BIG LOTS - SUPPLIES
$24.00
JPMORGAN CHASE BANK
CORNERSTONE -KEYS
$18.93
JPMORGAN CHASE BANK
COX -WIFI
$69.00
JPMORGAN CHASE BANK
COX -WIFI
$69.00
JPMORGAN CHASE BANK
GLASS DOCTOR- REPAIR
$474.13
JPMORGAN CHASE BANK
LOWES -DOOR CLOSURE
$64.97
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$43,04
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$21.99
JPMORGAN CHASE BANK
QUIT BUGGIN' -PEST CON
$190.00
JPMORGAN CHASE BANK
SAMS - SUPPLIES
$67.96
JPMORGAN CHASE BANK
SENIORCNTR- SYSTEM
$375.00
1
Claims List - 7/3/2018
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL JPMORGAN CHASE BANK
WAL- MART - SUPPLIES
$67.22
GEN COMMUNITY CENTER -Total
$3,721.96
FELKINS ENTERPRISES, LLC
INSPECTION STICKERS
$155.00
JPMORGAN CHASE BANK
ADMIRAL EXP- SUPPLIES
$88.99
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$201.87
KENNETH LIVINGSTON
MOWING
$550.00
M. B. BICKERSTAFF
MOWING
$200.00
GEN COMMUNITY DEVELOPMENT -Total
$1,195.86
JPMORGAN CHASE BANK
BEST BUY - SUPPLIES
$32.66
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$148.53
JPMORGAN CHASE BANK
SURVEYMONKEY- SUBSCRIP
$384.00
GEN ECONOMIC DEV -Total
$565.19
AEP /PSO
ELECTRIC USE
$96.27
JPMORGAN CHASE BANK
ADMIRAL EXPSUPPLIES
$27.99
JPMORGAN CHASE BANK
INTERSTATE - BATTERIES
$1,936.00
GEN EMERG PREPAREDNESS -Total
$2,060.26
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$56.45
JPMORGAN CHASE BANK -
ADMIRAL EXPSUPPLIES
$123.97
JPMORGAN CHASE BANK
AMAZON- EQUIPMENT
$84.48
JPMORGAN CHASE BANK
DEQ- LICENSE RENEWALS
$184.00
GEN ENGINEERING -Total
$450.90
JPMORGAN CHASE BANK
AICPA - TRAINING
$129.00
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$306.96
JPMORGAN CHASE BANK
OFFICE EVERY -TONER
$199.98
JPMORGAN CHASE BANK
TRAINING EXPENSE
$8.00
GEN FINANCE -Total
$643.94
AEP /PSO
ELECTRIC USE
$4,459.21
BH MEDIA HOLDING GROUPS, INC
PUBLICATIONS
$445.92
DAVID L. WEATHERFORD
GENERAL MATTERS
$1,296.00
DRAKE SYSTEMS INC
COPIER SERVICES UPSTAIRS
$509.33
JPMORGAN CHASE BANK
ADMIRAL EXPSUPPLIES
$139.95
JPMORGAN CHASE BANK
AMERICAN WASTE- RENTAL
$84.94
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$328.99
MAILROOM FINANCE INC
POSTAGE
$1,000.00
RICOH USA, INC.
COPIER RENTAL
$138.82
TREASURER PETTY CASH
POSTAGE
$175.00
GEN GENERAL GOVERNMENT -Total
$8,578.16
AEP /PSO
ELECTRIC USE
$218.03
GEN HISTORICAL MUSEUM -Total
$218.03
JAY SAMPSON
EMPLOYEE DEVELOPMENT
$290.39
Claims List - 7/3/2018
Fund Vendor Name Payable Description Payment
Amount
01 GENERAL JPMORGAN CHASE BANK ADMIRAL EXP- SUPPLIES $201.30
JPMORGAN CHASE BANK ICIMS- APPLICANT TRACK $300.00
JPMORGAN CHASE BANK OFFICE DEPOT - SUPPLIES $47.78
JPMORGAN CHASE BANK TRAINING EXPENSE $8.00
GEN HUMAN RESOURCES -Total
$847.47
JPMORGAN CHASE BANK
COX - SUPPLIES
$1,250.00
GEN INFORMATION TECH -Total
JANITORIAL SERVICES
$1,250.00
JPMORGAN CHASE BANK
LEADERSHIP TRAINING
$8.00
JPMORGAN CHASE BANK
MEETING EXPENSE
$12.00
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$23.67
GEN MANAGERIAL -Total
LIGHT REPAIRS
$43.67
JPMORGAN CHASE BANK
LODGING EXPENSE
$197.75
JPMORGAN CHASE BANK
TRAVEL EXPENSE
$353.77
GEN MUNICIPAL COURT -Total
$551.52
AEP /PSO
ELECTRIC USE
$2,873.46
ANDREA SMITH
JANITORIAL SERVICES
$1,410.00
BENCHMARK ENTERPRISES, LLC
SOLENOIDS
$2,373.00
CITY OF OWASSO
WATER
$5,756.45
CLEAN UNIFORM COMPANY
PARKS STAFF UNIFORMS
$55.32
DAVID'S ELECTRIC, INC.
LIGHT REPAIRS
$791.14
FREDRICK COSTIN JR
MAY PARKS MOWINGS
$1,041.00
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
$309.96
JPMORGAN CHASE BANK
C &C SUPPLY- SUPPLIES
$76.50
JPMORGAN CHASE BANK
CORNERSTONE -PARTS
$181.74
JPMORGAN CHASE BANK
CORNERSTONE - SUPPLIES
$126.94
JPMORGAN CHASE BANK
CORNERSTONE - TRIMMER
$91.98
JPMORGAN CHASE BANK
HOME DEPOT- SUPPLIES
$39.94
JPMORGAN CHASE BANK
LOCKE- REPAIR PARTS
$37.39
JPMORGAN CHASE BANK
LOWES -FIRST AID KITS
$119.82
JPMORGAN CHASE BANK
LOWES -HARD HATS
$29.96
JPMORGAN CHASE BANK
LOWES - SUPPLIES
$20.77
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$19.96
OWASSO TOP SOIL
POTHOLE REPAIRS
$225.00
PROTECTION ONE ALARM MONITORING
PARKS OFFICES ALARM SYSTE
$73.94
INC
ROGERS COUNTY RURAL WATER
PARKS WATER SERVICE
$298.45
DISTRICT
STACEY HILLIS
PORTABLE RESTROOMS
$442.68
VERDIGRIS VALLEY ELECTRIC COOP
PARKS WATER
$115.05
WASHINGTON CO RURAL WATER DISTRICT
WATER SERVICE MCCARTY
$228.44
PAR
GEN PARKS -Total $16,738.89
K.
Claims List - 7/3/2018
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL AEP IPSO
ELECTRIC USE
$21.69
DEPARTMENT OF PUBLIC SAFETY
OLETS
$350.00
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$322.51
JPMORGAN CHASE BANK
APCO -COMM TRAINING
$150.00
JPMORGAN CHASE BANK
APCO- TRAINING
$559.00
JPMORGAN CHASE BANK
SAMS- PRISONER BOARD
$66.46
JPMORGAN CHASE BANK
WAL- MARTSUPPLIES
$85.50
JPMORGAN CHASE BANK
WALMART - SUPPLIES
$6.72
JPMORGAN CHASE BANK
WATERSTONE -DRY CLEAN
$34.50
LANGUAGE LINE SERVICES
TRANSLATION SVCS
$43.63
RICH & CARTM ILL, INC
NOTARY BOND ENOS
$30.00
TREASURER PETTY CASH
MILEAGE -ALLEN
$153.83
TREASURER PETTY CASH
NOTARY BOND -ENOS
$10.00
GEN POLICE COMMUNICATIONS -Total
$1,833.84
SPECIAL OPS UNIFORMS, INC
VEST GRANT VESTS
$348.25
GEN POLICE DOJ VEST GIRT - Total
$348.25
PUBLIC SAFETY CORPORATION
CRYWOLF ALARM PROGRAM
$1,946.73
GEN POLICE SERVICES -Total
$1,946.73
NEILHANCE
FIREWORKS FY2019
$15,000.00
GEN RECREATION & CULTURE -Total
$15,000.00
CINTAS CORPORATION
REPLENISH FIRST AID KITS
$30.36
JPMORGAN CHASE BANK
ATWOODS -TRASH BAGS
$44,97
JPMORGAN CHASE BANK
CORE &MAIN -PIPE
$695.92
JPMORGAN CHASE BANK
LOWES - SEALANT
$12.75
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$92.39
JPMORGAN CHASE BANK
P &K EQUIP- REPAIR
$1,061.09
JPMORGAN CHASE BANK
PMSI -PPE
$29.85
JPMORGAN CHASE BANK
PMSI- SAFETY HATS
$49.75
SPOK, INC.
PAGER USE
$57.34
TWIN CITIES READY MIX, INC
CONCRETE
$240.00
WORLEYS GREENHOUSE & NURSERY, INC
RAYOLA PARK TREE
$887.00
MAINTENA
GEN STORMWATER -Total
$3,201.42
COPY WORLD BUSINESS SOLUTIONS, LLC
QTRLY BILLING FOR COPIER
$115.50
JPMORGAN CHASE BANK
COX - SUPPLIES
$69.95
JPMORGAN CHASE BANK
INTERSTATE- BATTERIES
$27.20
JPMORGAN CHASE BANK
LIBERTY FLAGS -FLAGS
$117.20
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$18.96
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$531.71
STEPHEN R GRINTER
ICE MACHINE REPAIRS
$349.00
GEN SUPPORT SERVICES -Total $1,229.52
4
Claims List - 7/3/2018
Fund
Vendor Name
Payable Description
Payment
Amount
01 GENERAL -Total
$62,022.60
20 AMBULANCE SERVICE
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
$1,070.00
JPMORGAN CHASE BANK
CAPITAL WASTE -WASTE
$80.00
JPMORGAN CHASE BANK
FIRE SERVICE- TRAINING
$65.00
JPMORGAN CHASE BANK
FULLERTON- OXYGEN
$25.50
JPMORGAN CHASE BANK
LIFE ASSIST - SUPPLIES
$185.05
JPMORGAN CHASE BANK
OREILLY- HEADLIGHT
$16.04
JPMORGAN CHASE BANK
ROUTE66 CHEV- REPAIR
$1,483.53
JPMORGAN CHASE BANK
STHRN ANESTHE- MEDICIN
$27.00
MEDICLAIMS INC
BILLING SERVICES
$11,980.30
AMBULANCE •Total
$14,932.42
AMERICAN MUNICIPAL SERVICES CORP.
COLLECTION FEES
$26.00
AMBULANCE SERVICE -Total
$26.00
AMBULANCE SERVICE -Total
$14,958.42
21 E -911
COX COMMUNICATIONS
T -1 CIRCUITS RADIO TWR MO
$233.95
JPMORGAN CHASE BANK
ATT -E911 MAPPING FEES
$355.35
E911 COMMUNICATIONS -Total
$589.30
E -911 -Total
$569.30 -
25 HOTEL TAX
AEP /PSO
ELECTRIC USE
$21.61
HOTEL TAX ECON DEV -Total
$21,61
JPMORGAN CHASE BANK
EXP LAUNDRY - CLEANING
$22.48
KEEP OKLAHOMA BEAUTIFUL INC
ANNUAL DUES
$200.00
STRONG NEIGHBORHOODS •Total
$222,48
HOTELTAX -Total
$244.09
27 STORMWATER MANAGEMENT
AEPIPSO
ELECTRIC USE
$494.21
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$39.49
JPMORGAN CHASE BANK
DEQ- LICENSE RENEWALS
$92.00
JPMORGAN CHASE BANK
GRAINGER- SUPPLIES
$459.60
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$44.98
NATIONAL CINEMEDIA
STORMWATER MARKETING
$1,207.72
OKLAHOMA FLOODPLAIN MANAGERS
TRAINING
$45.00
THE METROPOLITAN ENVIRONMENTAL
HAZARDOUS COLLECTIONS
$40.00
TRUS
THE METROPOLITAN ENVIRONMENTAL
WASTE DISPOSAL
$180.00
TRUS
STORMWATER - STORMWATER -Total
$2,603.00
STORMWATER MANAGEMENT
-Total
$2,603.00
34 VISION TAX
GARVER
ENGINEERING SERVICES -11
$7,565.00
VSN RECAP MINGO TO GARNET - Total
$7,565.00
-, ,. VISION TAX -Total
$7,565.00
Claims List - 7/3/2018
Fund
Vendor Name
Payable Description
Payment
Amount
36 CAPITAL IMPROV GRANTS
BUILDERS UNLIMITED
CONSTRUCTION SERVICES
$62,987.28
VSN 2025 FESTIVAL PARK -Total
$62,987,28
PHOENIX CONSTRUCTION DISASTER
CONSTRUCTION SERVICES
$41,658.60
VSN 2025 SPORTS PARK RDS - Total
$41,658.60
CAPITAL IMPROV GRANTS
-Total
$104,645.88
37 SALES TAX FIRE
AEP /PSO
ELECTRIC USE
$4,419.43
CITY OF OWASSO
WATER
$129.50
JPMORGAN CHASE BANK
A -1 APP - WASHER REPAIR
$204.48
JPMORGAN CHASE BANK
ATWOOD -OIL DRY
$23.96
JPMORGAN CHASE BANK
CONRAD FIRE- REPAIRS
$1,669.34
JPMORGAN CHASE BANK
EXCELLANCE -PARTS
$512.52
JPMORGAN CHASE BANK
FULLERTON- OXYGEN
$51.00
JPMORGAN CHASE BANK
HENRY SCHEIN- SUPPLIES
$336.32
JPMORGAN CHASE BANK
HODGES MARINE -PARTS
$603.95
JPMORGAN CHASE BANK
LIFE ASSIST - CREDIT
($35.12)
JPMORGAN CHASE BANK
LIFE ASSIST- SUPPLIES
$243.97
JPMORGAN CHASE BANK
LOWES- FAUCET
$69.00
JPMORGAN CHASE BANK
OREILLY -LIGHT
$3.59_
JPMORGAN CHASE BANK
SAMSSUPPLIES
$95.40
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORMS
$379.98
JPMORGAN CHASE BANK
SUMMIT - REPAIRS
$3,507.12
JPMORGAN CHASE BANK
VISION AIR - REPLACEMEN
$2,600.00
JPMORGAN CHASE BANK
WALMART- SUPPLIES
$30.28
TREASURER PETTY CASH
TRAINING EXPENSE
$39.90
SALES TAX FUND -FIRE -Total
$14,884.62
SALES TAX FIRE -Total
$14,864.62
38 SALES TAX POLICE
AEP /PSO
ELECTRIC USE
$4,599.37
CITY OF OWASSO
WATER
$3.50
DALE & LEES SERVICE, INC
AC REPAIR
$11,402.80
JPMORGAN CHASE BANK
ADMIRAL EXP- SUPPLIES
$167.94
JPMORGAN CHASE BANK
AMAZON SUPPLIES
$7.99
JPMORGAN CHASE BANK
AMAZON-SUPPLIES
$200.32
JPMORGAN CHASE BANK
AMERICAN WASTE- RENTAL
$102.72
JPMORGAN CHASE BANK
AT YOUR SRVCE- RENTAL
$80.00
JPMORGAN CHASE BANK
ATWOOD- REFUND
($99,99)
JPMORGAN CHASE BANK
BULLETPROOF- UNIFORM
$530.05
JPMORGAN CHASE BANK
COURT SEC- TRAINING
$798,00
JPMORGAN CHASE BANK
DASH MEDSUPPLIES
$567.20
JPMORGAN CHASE BANK
LOCKE- REPAIR PARTS
$73.25
JPMORGAN CHASE BANK
LODGING EXPENSE
$197.75
JPMORGAN CHASE BANK
LOWESSUPPLIES
$15.92
(
Claims List - 7/3/2018
Fund Vendor Name
Payable Description
Payment
Amount
38 SALES TAX POLICE JPMORGAN CHASE BANK
NLEOMF- UNIFORM ITEMS
$38.95
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$140.56
JPMORGAN CHASE BANK
PRAETORIAN - TRAINING
$4,200.00
JPMORGAN CHASE BANK
PUBLIC ENGINES - SUBSCR
$1,558.80
JPMORGAN CHASE BANK
PULSE TECH - REPAIR
$363.71
JPMORGAN CHASE BANK
REASOR'S- SUPPLIES
$46.99
JPMORGAN CHASE BANK
ROYAL CANIN -K9 FOOD
$407.92
JPMORGAN CHASE BANK
RUBBERSTAMPS- SUPPLIES
$24.90
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$329.94
JPMORGAN CHASE BANK
SCOTTS DOG -K9 PROF
$55.00
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORMS
$138.99
JPMORGAN CHASE BANK
TACTICALGEAR- UNIFORM
$177.48
JPMORGAN CHASE BANK
TARGET - SUPPLIES
$24.99
JPMORGAN CHASE BANK
THOMSON W -CLEAR ACCES
$374.00
JPMORGAN CHASE BANK
TRAVEL EXPENSE
$380.00
JPMORGAN CHASE BANK
ULINE- SUPPLIES
$164.96
JPMORGAN CHASE BANK
USPS- MAILING COSTS
$30.40
JPMORGAN CHASE BANK
WAL- MART - SUPPLIES
$17.76
- JPMORGAN CHASE BANK
WALMART- SUPPLIES
$126.79
JPMORGAN CHASE BANK
WATERSTONE -DRY CLEAN
$1,443.00
SPECIAL OPS UNIFORMS, INC
UNIFORM ITEMS
$348.25
SALES TAX FUND - POLICE -Total
$29,040.21
SALES TAX POLICE -Total
$29,040.21
39 SALES TAX STREETS AEP /PSO
ELECTRIC USE
$1,649.32
APAC- OKLAHOMA, INC.
ASPHALT
$54.08
CINTAS CORPORATION
REPLENISH FIRST AID KITS
$30.35
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$166.24
JPMORGAN CHASE BANK
ANCHOR PAINT - SUPPLIES
$64.06
JPMORGAN CHASE BANK
FIRST LIGHT -BULBS
$158.43
JPMORGAN CHASE BANK
GRAINGER- SUPPLIES
$798.00
JPMORGAN CHASE BANK
HOME DEPOT - BOARDS
$14.82
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
$7,72
JPMORGAN CHASE BANK
INTERSTATE- BATTERY
$2.80
JPMORGAN CHASE BANK
LOWES -PARTS
$88.76
JPMORGAN CHASE BANK
LOWES- SCREED BOARD
$11.56
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$1,224.20
JPMORGAN CHASE BANK
MAXWELL -DOWEL RODS
$96.80
JPMORGAN CHASE BANK
MAXWELL- DOWELS
$23.20
JPMORGAN CHASE BANK
MAXWELL -PARTS
$90.06
JPMORGAN CHASE BANK
PMSI - SAFETY HATS
$49.75
SIGNALTEK INC
REPAIR
$1,195.00
7
Claims List - 7/3/2018
Fund Vendor Name
Payable Description
Payment
FELKINS ENTERPRISES, LLC
SIGN
Amount
39 SALES TAX STREETS SIGNALTEK INC
REWIRE INTERSECTION
$3,028.50
SIGNALTEKINC
TRAFFIC SIGNAL REPAIR - C
$24,686.20
SPOK, INC.
PAGER USE
$116.07
TWIN CITIES READY MIX, INC
CENTRAL PARK STREET REPAI
$408.00
TWIN CITIES READY MIX, INC
CONCRETE
$1,666.00
SALES TAX FUND-STREETS - Total
CLIFFORD -AIR FILTER
$35,629.92
SALES TAX STREETS -Total
HESSELBEIN -TIRE
$35,629.92
40 CAPITAL IMPROVEMENTS DOERNER, SAUNDERS, DANIEL &
DETHEROW
$990.00
CI - E 76TH ST WIDENING -Total
JIM GLOVER -VISOR CLIP
$990.00
JPMORGAN CHASE BANK
DEQ -PLAN REVIEW FEE
$798.39
CIP FIRE STATION #4 -Total
KUBOTA -WHEEL
$798,39
DOERNER, SAUNDERS, DANIEL &
106 -116TH & N GARNETT RD
$1,620.00
CIP GARN RD WIDE 106416 -Total
CONSTRUCTION SERVICES - N
$1,620.00
FELKINS ENTERPRISES, LLC
SIGN
$20.00
GRADE LINE CONSTRUCTION
BLOCK 22 ORIGINAL TOWN AL
$27,146.25
CIP STREET REHAB FY18 -Total
WIRELESS SERVICE
$27,166.25
JPMORGAN CHASE BANK
CONRAD FIRE - EQUIPMENT
$12,284.39
JPMORGAN CHASE BANK
PAUL CONWAY- EQUIPMENT
$263.46
PUBLIC SAFETY VEH - FIRE -Total
GRADE LINE CONSTRUCTION
SRVC RD 106.116/135TH - Total
CONSTRUCTION SERVICES - N
$12,547.85
$92,525.25
$92,525.25
CAPITAL IMPROVEMENTS -Total
$135,647.74
70 CITY GARAGE AEP /PSO
ELECTRIC USE
$488.90
AT &T MOBILITY
WIRELESS SERVICE
$59.47
JPMORGAN CHASE BANK
B &M -SULK OIL
$506.00
JPMORGAN CHASE BANK
BEST CHOICE - WINDSHIEL
$195.00
JPMORGAN CHASE BANK
BUMP2BUMP -PARTS
$2,134.63
JPMORGAN CHASE BANK
CLIFFORD -AIR FILTER
$307.38
JPMORGAN CHASE BANK
HESSELBEIN -TIRE
$196.94
JPMORGAN CHASE BANK
INLAND TRUCK -PARTS
$88.17
JPMORGAN CHASE BANK
JIM GLOVER -VISOR CLIP
$18.02
JPMORGAN CHASE BANK
KUBOTA - SUPPLIES
$934.90
JPMORGAN CHASE BANK
KUBOTA -WHEEL
$405.85
JPMORGAN CHASE BANK
LENOX- TOWING
$100.00
JPMORGAN CHASE BANK
LOWES- FAUCET
$63.54
JPMORGAN CHASE BANK
OREILLY -PARTS
$355.08
JPMORGAN CHASE BANK
P &K- MOUNTING HARDWARE
$27.68
JPMORGAN CHASE BANK
TATE BOYS- ALIGNMENT
$79.95
JPMORGAN CHASE BANK
TRACTOR SPLY- HINGES
$7.47
JPMORGAN CHASE BANK
YELLOWHOUSE -LINE
$130.15
0
Fund
Claims List - 7/3/2018
Vendor Name
JPMORGAN CHASE BANK
Payable Description Payment
Amount
YELLOWHOUSE -PARTS $644.30
CITY GARAGE -Total $6,743.43
CITY GARAGE -Total $6,743.43
76 WORKERS' COMP SELF -INS CITY OF OWASSO IMPREST ACCOUNT WC CLAIMS $33,203.78
WORKERS' COMP SELF -INS -Total $33,203.78
WORKERS' COMP SELF -INS -Total $33,203.78
77 GENERAL LIABILITY - PROPERT HAGAR RESTAURANT SERVICE TORT CLAIM $1,899.27
RICH & CARTMILL, INC
PREMIUM FOR AERIAL FIRE A $1,555.00
GEN LIAB -PROP SELF INS -Total $3,454.27
GENERAL LIABILITY - PROPERT -Total $3,454.27
City Grand Total $451.232.26
REAL People •REAL Charsder •REAL Community
TO: The Honorable Mayor and City Council
FROM: Scott Chambless
Chief of Police
SUBJECT: Police Headquarters Renovation
Bid Award and Assignment for Changes to Storm Water Drainage System
DATE: June 29, 2018
PROPOSED ACTION:
Award bid for the storm water drainage improvements as part of the Owasso Police
Headquarters Renovation Project.
BACKGROUND:
In July 2016, Police Facility Development Group was contracted for basic design services to
update the proposed renovation plans for the Owasso Police Headquarters. The resulting design
plans included a renovation of the interior of the current building at 111 N Main, as well as the
addition of an enclosed sally port' on the east side and d fenced parking lot on the north side of
the facility. As part of the design process, Police Facility Design Group contracted with a local
civil engineering firm for infrastructure design requirements, including areas related to the sally
port and new parking lot.
The civil engineers presented a design, which included improvements to the storm water
drainage system; specifically the addition of surface drains along the east edge of the new
parking lot and an underground drainage pipe from the south edge of the parking lot to the
storm water intake at the northeast corner of the soon to be constructed Redbud Park. The civil
engineers' design specifications were incorporated into the overall project design by the
architects and included in the bid specification documents prepared by the construction
manager.
On December 27, 2017, the bid advertisement and notification process was initiated. At that
time, construction drawings were also submitted to Owasso Public Works for the permitting
process. On January 19, 2018, sealed bids were opened in public in accordance with the State
Competitive Bidding Act of 1974. Eighty -five bids were received in the twenty -four different bid
categories. After review and recommendations by staff, the bids were awarded by City Council
on February 20.2018. Included in the bid award was D -Kems Construction for the category of
"Earthwork and Site Utilities" in the amount of $110,000. This bid included the improvements to
the storm water drainage system as designed by the civil engineers.
CHANGE IN PROJECT SCOPE:
In late January 2018, comments were sent by Public Works to the private civil engineers
contracted by the architect. The contracted civil engineers proceeded with the process of
incorporating the changes outlined in the comments into the design with the understanding the
changes were required for the permit to be issued.
The changes included.
• A change in materials from Polyvinyl Chloride (PVC) pipe to reinforced concrete pipe
under all vehicle drives and in areas that were within the city right of way.
• An extension of the underground piping and addition of a concrete inlet on the north
side of the new parking lot in place of the previously designed surface drains.
• Increased diameter from 18" round PVC to 18 "x29" oval concrete reinforced piping
from the SE edge of the new parking lot to the connection point at Redbud Park.
• A change in the depth and degree of grade were also needed to accommodate
the changes outlined above.
• Concrete approaches along North Birch were recommended for longevity over
asphalt, but were not required per code.
The updated design was presented to the contractor (D -Kerns Construction) as part of a
proposed change request. D -Kerns Construction provided an estimated cost of $43,734 to
implement all of the changes, including the concrete approach recommendation. As a cost
savings measure and because it was not a code requirement, the decision was made by staff to
delete the concrete substitution in the approaches. Without the concrete approaches, D -Kems
Construction estimated the cost to implement the required changes to the storm water
drainage system at $28,638, which would result in a 26% .increase over their original bid of
$110,000.
Under Oklahoma Statute 61 -121 of the Competitive Bidding Act;
Change orders or addenda to public construction contracts of one million dollars
($1,000,000.00) or less shall not exceed a fifteen percent (15 %) cumulative increase in
the original contract amount. Change orders or cumulative change orders which
exceed that amount shall require a re- advertising for bids on the incomplete portions
of the contract.
With an estimated 26% increase to implement the required changes to the storm water
drainage system, this item would legally require a re -bid for that portion of the project.
The work to complete the original design of the storm water system was calculated at $12,435 as
part of the original $110,000 bid to D -Kerns Construction. Due to that work being removed from
the original bid because of the changes in design, a reduction of $12,435 will therefore be
credited to the project by D -Kerns Construction to partially offset the cost of the changes being
bid.
Unfortunately, because the work was not completed at the same time as the majority of the
earthwork and site utilities, increased costs were likely in any new bids due to the need for
remobilization of equipment and increased costs associated with delays in work due to the
bidding process. It was also predicted that underground utility locations for existing gas lines,
data cables, telephone cables and emergency power supply lines near the new reinforced
concrete pipe location may likely result in a required partial hand dig as opposed to the less
expensive use of digging equipment. The cost of hand digging was not included in the original
estimate for the design changes.
COMPETITIVE BIDDING:
The bid specifications were prepared and publically advertised on both May 29, 2018 and June
5, 2018. A public sealed bid opening was conducted on June 19, 2018 at City Hall.
Bids were received from the following companies:
Bidder Amount Bid
Timberwolf Construction $115,000
D -Kerns Construction $ 49,900
A detailed review of the bids was conducted by City staff and Nabholz Construction
Management. In addition to being the lowest in price at $49,900, the bid submitted by D -Kerns
Construction was determined to meet the needs and specifications of the project. The balance
from the original contract ($12,435) will be credited to the project, which will yield a final cost
increase for implementing the changes of $37,464.
FUNDING:
The award of bids and the contract amendment with Nabholz Construction Management were
approved by Council actions on February 20, 2018. The total project cost estimate included a
contingency in the amount of $257,033.09 for unforeseen issues that might arise during the
project. The increased costs associated with the changes to the storm water drainage system
will fall within that allotted contingency.
RECOMMENDATION
Staff recommends awarding the bid to D -Kerns Construction in the amount of $49,900 for
changes to the planned improvements of the storm water drainage system; assignment of the
bid contract to Nabholz Construction Corporation for the purpose of construction management
and project oversite; and authorization to execute all necessary documents.
ATTACHMENT:
Drainage System Design Change Drawings
€i7r�$TI?€ET
NEW
PIPE
Imp
i
i
f. SAME SIZE
R DIFFERENT
MATERIAL
LARGER PIPE,
DIFFERENT ;
MATERIAL
SIMaF -
:1 T
s
R
The Honorable Mayor and City Council
FROM: Michele Dempster
Human Resources Director
SUBJECT: First Responders Support Services (FRSS) Renewal Agreement
DATE: June 29, 2018
BACKGROUND:
Last July, the City Council approved a budget amendment and a one year Master Service
Agreement with First Responder Support Services (FRSS) for behavioral health services for Emergency
Responders. Between July of 2017 and April of 2018, thirty -one Firefighter Medics and Police Officers
utilized the services of FRSS, totaling 130 hours. In addition FRSS has provided forty -one combined
hours of training to both departments. Police and Fire departments will continue efforts to promote
the services of FRSS throughout the upcoming year and staff fully expects these numbers to grow as
awareness and comfort with the services and FRSS staff increases.
FUNDING:
The cost to continue services for FY 2018 -19 is $31,690.80, and is included in the Police and Fire
Departments, Half -Penny Sales Tax Funds for FY 2018 -19. This is a $7,724.55 increase over the FY 2017 -18
agreement for services.
The increase is a result of two modifications FRSS agreed to make in the initial agreement for fiscal year
2017 -18:
• Reducing the initial contract to eleven months, and
• delaying implementation of counseling services until October 2017, knowing it would take
time for personnel to become aware of the services.
FIRST RESPONDER SUPPORT SERVICES:
Approval of the First Renewal Agreement with FRSS will continue the following services:
• Unlimited number of hours of self- referred counseling services for Firefighter Medics, Police
Officers, Dispatchers, Animal Control Officers, and their immediate family members;
• Up to 55 hours of education and /or training services per department annually; and
• Consultative services, including but not limited to, Critical Incident and Peer Support Teams.
RECOMMENDATION:
Staff recommends approval of a First Renewal Agreement with First Responder Support Services in the
amount of $31,690.80, and authorization for payment.
ATTACHMENT:
First Renewal Agreement
FIRST RENEWAL AGREEMENT
THIS FIRST RENEWAL AGREEMENT is made and entered into as of
Su i V 3 .2018, by and between the CITY OF OWASSO,
OKLA IOMA, a municipal corporation, 200 S. Main, Owasso, Oklahoma, 74055
( "City ") and, FIRST RESPONDER SUPPORT SERVICES, a Professional Limited
Liability Company, 1612 Harvard, Tulsa, Oklahoma 74112 ( "FRSS ").
WITNESSETH:
WHEREAS, the parties entered into a Master Services Agreement (the
"Agreement ") dated July 18, 2017 relating to Behavioral Health Services for the City
Police and Fire Departments. Said Agreement covers the period of time commencing
July 1, 2017 to and including June 30,2018; and
WHEREAS, the parties desire to renew the Agreement for an additional one (1)
year period as set forth in SECTION IV —TERMS OF AGREEMENT; and
NOW THEREFORE, the parties agree to renew and extend the term of the above
described Agreement for the period July 1, 2018 to and including June 30, 2019, all
according to the terms, covenants, and conditions set forth in the original Agreement
between the. parties, except as amended by the following provision:
SECTION II - METHOD OF PAYMENT:
In consideration for the services provided to the Departments, the
City shall pay to FRSS for the fiscal year July 1, 2018 to June 30,
2019, the annual sum of $ $31,690.80 in two payments of S 15,845.40
due on July 15, 2018 and January 15, 2019.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date set forth above for the term stipulated herein.
"City" "FRSS"
City of Owasso,
a Municipal Corporation
M
Title: Warren Lehr, City Manager
First Responder Support Services, PLLC
By:
Dana L. Mugavero
Managing Member
REAL Paopie • REAL Ciarxmt • REAL Communlly
TO: The Honorable Mayor and City Council
FROM: Karl A. Fritschen. RIA. AICP
SUBJECT: Budget Amendment - Capital Improvement Grants Fund
DATE: June 29, 2018
BACKGROUND:
On May 31, 2018, the City was notified by the Indian Nation Council of Governments (INCOG) of
an increase in the allocation amount of Community Development Block Grant (CDBG) funds.
The original amount of $128,827 was identified in the CDBG Application and Resolution
approved by the Council at the April 3, 2018 regular meeting.
The allocation that Owasso will now receive is $138,377.04, or $9,550.04 higher than the original
amount budgeted. This new allocation will continue to be used for the sanitary sewer
improvement work in the Hale Acres subdivision, as identified in the approved CDBG
application.
In order to receive and expend the increase in CDBG Grant funds, a budget amendment is
being requested.
RECOMMENDATION:
Staff recommends approval of a budget amendment in the Capital Improvement Grants Fund,
increasing the estimated revenues and the appropriation for expenditures by $9,550.04 for the
FY 2018 CDBG Grant for sewer improvements in Hale Acres.
C?, NLPeaplc Am C mohr -RE,LL COmmunfty
TO:
The Honorable Mayor and City Council
FROM:
Roger Stevens
Public Works Director
SUBJECT:
Right -of -Way Acquisition
Garnett Road Widening from E 106 St N to E 1 16 St N
DATE:
June 29, 2018
BACKGROUND:
City staff is involved in the acquisition of right -of -way and easements for the Garnett Roadway
Improvements from E 106 St N to E 116 St N. The purchase of 2,400 square feet of right -of -way
from Molini Properties, LLC has been negotiated through K. Ellis Ritchie - RRM Law Firm, and staff
is seeking City Council authorization to purchase the land. The general location of the property
is E 115 St N and Garnett Road.
DESCRIPTION /PURCHASE PRICE:
The offer for right -of -way was $5.00 per square foot, for a purchase price of $12,000.00. In
addition to the cost for right -of -way, compensation for easement and damages in the amount
of $23,300.00 was offered, for a total amount of $35,300.00. Damages include the loss of parking
and asphalt in the front of the parcel, as well as asphalt and installation for a new parking lot in
the rear of the property.
The Molinis rejected the offer and provided a counteroffer through RRM Law Firm in the amount
of $90,400.00.
City staff rejected the counteroffer and provided a second offer in the amount of $52,000.00.
The property owner rejected this offer and submitted an amount of $77,900.00.
A final offer was made by the City in the total amount of $55,000.00, which calculates to $16,800
for the needed right -of -way, $8,200 for the easement, and $30,000 for damages.
FUNDING:
Funding for this purchase is included in the Capital Improvement Fund.
RECOMMENDATION:
Staff recommends approval of an agreement with Molini Properties, LLC for the acquisition of
right -of -way, easement, and compensation for damages in the amount of $55,000.00 and
authorization for payment.
ATTACHMENTS:
Site Map
Agreement Letter
,r
Garnett Widening - E 106 St N to E 116 St N
>.•.-
� Z tae
F
Ultimate Auto
do
a r
a .x;a
- ^r � . � -• ' ..tea
E116StN'
t � ,
rrst D�r.lc o C';r
w
: � Q0.' �� ^• _ ". .� ;
t
} ^
L i*;; l� -
7 r -,. b -, yew. •1S`
.
MMLM
?ern of Uoe
-E 116 St N
Hope Chapel Owasso
1" =188 ft I Molini Properties, LLC 1 06/26/2018
This map may represents a visual display of related geographic information. oata provided here on is not guarantee of acuival field conditions. To be sure of complete accuracy, please contact the
responsible staff for most up- to-date information.
April 30, 2018
K. Ellis Ritchie
The RRM Law Firm
PO Box 246
Pryor, OK 74362
RE: City of Owasso Road Widening Project
106" to 116" North Gamett Road — Molini Properties, LLC Parcel 28
Dear Mr. Ritchie:
I received your counter offer letter dated April 23, 2018 and passed it on to Roger
Stevens, Owasso Public Works Director. After reviewing your information the City has
decided to one additional offer in order to complete this transaction in order to avoid
condemnation.
The City of Owasso will increase the amount to 255,000,0 0 for the needed right of way
and easements for this project. This reflects $25,000 for the right of way and easements
and $30,000 for damages.
If this offer meets with your approval, I would request that you acknowledge with your
signature below. I will need to obtain this signed letter and the enclosed W -9 so the
check can be processed. It will take about three weeks in order to obtain the check.
If you have any questions please feel free to contact me at the number listed above to
discuss this project.
Sincerely,
Mike R. Craddock
Terra Acquisition Services
Cc Roger Ste
City of O'
Agreed to:
Molini Properties, LLC
,
a18
evi Moli
2� - &,,, -
O�LP-W,--MLM�- -
s�
TO:
The Honorable Mayor and City Council
FROM:
Larry Langford
Deduct Alternate #5.2
Director Recreation and Culture
SUBJECT:
Redbud Festival Park
Change Order # I
DATE:
June 29, 2018
BACKGROUND:
On November 5, 2014, the Tulsa County Vision Authority adopted a resolution that states Owasso
is eligible to receive excess Vision 2025 funds totaling $6,882,761. On April 21, 2015, Owasso City
Council approved Resolution 2015 -08 recommending identified projects for these funds. Portions
of these funds were designated to construction of a festival park.
On April 13, 2018, City Council awarded a contract to Builder's Unlimited for the base bid and
Alternates 1 - 7 in the amount of $2,260,741 for construction of Redbud Festival Park.
( Upon starting work on the project, staff discovered electricity for the food truck alley was
omitted from the design plans and construction documents. These items are necessary to power
food trucks and complete the scope of the food truck alley.
Installing the electrical receptacles prior to sidewalk construction will eliminate the inevitability of
adding these items at a later date, which would consist of tearing out and re- constructing the
new sidewalk.
PROPOSED CHANGE ORDER:
Staff received a proposal from Builder's Unlimited in the amount of $57,594 to add electricity and
the necessary components.
In addition, the proposed change order includes the deduction of Alternate #5.2 in the amount
of $17,000 for the 6 ft. Security Fence. Alternate #5 included two different options for fencing
along with evergreen screening. At the time of awarding the construction contract, staff
intended for the 5 ft. ornamental option to be constructed and did not realize both options were
still listed in the total construction contract amount.
The following is a breakdown of changes:
Original Contract Cost
$2,260,741
CO #1 -adding electricity and receptacles
$57,594
Deduct Alternate #5.2
17,000
New contract amount
$2,301,335
The proposed change order with the deduction will result in contract change of an additional
$40,594.
FUNDING:
Funding for project is included in the Capital Improvements Fund.
RECOMMENDATION:
Staff recommends approval of Change Order #1 amending the contract pay items to include
the installation of electricity and receptacles in the amount of $57,594 and deducting the cost
of Alternate #5.2 (6 ft. Security Fencing) in the amount of $17,000 changing to the total contract
amount to $2,301,335; and authorization to execute all necessary documents.
ATTACHMENT:
Requested Change Order
SECTION 00600
CHANGE ORDER
PROJECT: Redbud Festival Park
CONTRACT DATE:
TO CONTRACTOR: Builder's Unlimited
The Contract is changed as follows:
CHANGE ORDER NUMBER: 1
DATE: June 29, 2018
CONTRACT FOR:
1) Provide all labor, material equipment and supervision as required to add electrical
receptacles, breakers, NEMA boxes conduit wire ditching, backfill and concrete boxes at a cost
of $57,594.
2) Deduct the cost of Alternate #5.2 in the amount of $17,000 for the 6ft. Security Fence
Not valid until signed by the Owner and Contractor
The original Contract Sum was ............................ .....................$2,260,741
The Contract Sum prior to this Change Order was ..........................
$2,260,741
The Contract Sum will be increased by
this Change Order in the amount of .... ...............................
$40,594
The new Contract Sum including this Change Order will be ...............
$2,301,335
The Contract Time will be unchanged
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by
Construction Change Directive.
CONTRACTOR
IO -Md
City of Owasso
OWNER
BY Larry an rd
DATE DATE June 29.2018
TO: The Honorable Mayor and City Council
FROM: Larry Langford
Director of Recreation & Culture
SUBJECT: Capital Improvements Agreement with Tulsa County
for Owasso Community Center Vision 2025 Project
DATE: June 29, 2018
BACKGROUND:
Vision 2025 funds for the Owasso Community Center Project were originally allocated to the City
with a Capital Improvements Agreement (CIA) dated April 30, 2004 in the amount of $1,000,000.
The recital of the Capital Improvements Agreement calls for these funds to be used for "Capital
Improvements for Community Enrichment within Tulsa County, Oklahoma." Between 2004 and
2006, four projects were completed using $948;668.77 of the allocated funds, leaving $51,331.23
to spend on an additional project.
City staff identified The Community Center Outdoor Classroom and Gathering Area as a
potential project to utilize these remaining funds. This project is expected to have a total cost of
$56,971, with the remaining expenses of $5,639.77 to be paid out of the General Fund. This
project includes the development of the northeast comer between the Community Center and
parking lot into an outdoor space to host classes, events, and meetings. The area would
incorporate elements of nature through plants and trees allowing the space to feel open yet
secure with railing and fencing.
AMENDING THE CURRENT AGREEMENT:
To expend all funds allocated under Vision 2025, the Tulsa County Vision Authority (TCVA) is
requesting City Council authorization for the City Manager to submit an application seeking to
amend the CIA and allocate $51,331.23 to the Community Center Outdoor Classroom and
Gathering Area project.
In addition, an executed amended CIA between the City of Owasso and Tulsa County will be
required in order to receive the $51,331.23 as reimbursement for costs associated with the
project. The amended CIA will be submitted to the City Council for consideration and action
upon Tulsa County Vision Authority approval of the amended resolution.
RECOMMENDATION:
Staff recommends authorization for the City Manager to execute a letter requesting the Tulsa
County Vision Authority amend their Resolution, dated April 30, 2004, by including language to
allow the Community Center Outdoor Classroom and Gathering Area project to be an
approved Vision 2025 project, and requesting the Tulsa Board of County Commissioners issue an
amended Capital Improvements Agreement for the Community Center Outdoor Classroom and
Gathering Area at the Owasso Community Center.
ATTACHMENT:
Proposed Letter to the TCVA
s�
nRLP..P1. • R REAL Cammu "ity
...removing
obstacles
standing
in 'the ray
of people
celebrating
their lives.
July 3, 2018
Tulsa County Vision Authority
500 South Denver
Tulsa, OK 74103
Dear Authority Members,
The City of Owasso is requesting an updated Capital Improvements Agreement (CIA) for Vision
2025 funding available under Sub -Fund #29. The Recital of the CIA calls for these funds to be
used for "Capital Improvements for Community Enrichment within Tulsa County, Oklahoma."
The funds for Project A, Owasso Community Center Project, were originally allocated to the City
with a Capital Improvements Agreement dated April 30, 2004 in the amount of $1,000,000, with
a 5% retainage of $50,000. There were four individual projects to be paid for by these funds,
including replacement of the heating and air conditioning units in the Community Center.
All of the projects were completed between 2004 and 2006 for a combined cost of $948,668:77,
leaving $51,331.23 for the City of Owasso to spend on an additional project.
Owasso has now completed plans for a new project, The Community Center Outdoor
Classroom and Gathering Area, to be completed at the Owasso Community Center which will
enhance the experience of citizens utilizing the center. We believe this project meets the
requirements of "Capital Improvements for Community Enrichment within Tulsa County,
Oklahoma." The Community Center Outdoor Classroom and Gathering Area Project is
estimated to be a total of $56,971, of which the City will subsidize $5,639.77 with funds from the
city's General Fund.
The City of Owasso requests that the Tulsa County Vision Authority authorize an updated CIA in
the amount of $51,331.23, for the Community Center Outdoor Classroom and Gathering Area
Project, in Owasso, OK.
Respectfully,
Warren Lehr
City Manager
200 S Main St 1 (918) 376 -1500
PO Box 180 City of Owasso FAX (918) 376 -1599
Owasso, OK 74055 A City Of Character wwwzityofowasso.com
sd
REILProple•RF°, CM1axmr.RC^, Comm�nMy
TO: The Honorable Mayor and City Council
FROM: Larry Langford
Director of Recreation and Culture
SUBJECT: Capital Improvements Agreement with Tulsa County
for the Redbud Festival Park
DATE: June 29, 2018
BACKGROUND:
Capital Improvements agreements (CIA's) with Tulsa County are required for each project
funded by the Vision 2025 excess funding package, and approved by the Tulsa County Vision
Authority (TCVA). There are three propositions under which the monies may be spent and they
are subject to previously approved ballot language and project approvals.
Vision 2025 Proposition 4 provides funding for capital improvements for the purpose of
community enrichment, including parks, trails, downtown areas, and neighborhoods. The
Owasso 5K Trail and the Feature Splash Pad were approved as Proposition 4 projects in the
amount of $722,500 and $760,000, respectively, with CIA's dated December 6, 2016. However,
both projects are impacted due to concerns expressed by the Army Corps of Engineers
regarding the wetlands at the south end of the Sports Park.
To date, the City has expensed $15,422.50 on the 5K Trail and $43,155 on the Feature Splash Pad.
Staff intends to complete both projects using an alternate funding source in the future. Staff is
proposing the remaining Vision Funds allocated to the 5K Trail and the Feature Splash Pad be re-
allocated to the Redbud Festival Park.
AMENDING THE CURRENT AGREEMENT:
The Owasso Festival Park Project (now known as the Redbud Festival Park), was approved as a
Proposition 4 project in the amount of $838,466 with a CIA dated February 7, 2017. In order to
expend all of the funds allocated under Proposition 4 in a timely manner, TCVA is requesting
Council authorization to submit an application to amend the CIA's for all three projects; to
reduce the 5k Trail by $707,077.50, reduce the Feature Splash Pad by $716,845 and to increase
the Redbud Festival Park Project by $1,423,922.50, for a total budget of $2,262,388.50 for the
Redbud Festival Park.
In addition, three new executed CIA's between the City of Owasso and Tulsa County will be
required in order to receive the $2,262,388.50 as reimbursement for costs associated with the
Redbud Festival Park Project, and to show the maximum received for the 5k Trail as $15,422.50
and the maximum received for the Feature Splash Pad as $43,155. The CIA's will be submitted to
the City Council for consideration and action upon TCVA approval of the amended resolutions.
L
RECOMMENDATION:
Staff recommends Council authorization for the City Manager to execute a letter requesting the
Tulsa County Vision Authority amend their Resolutions, dated December 6, 2016 for the Sk Trail
and Feature Splash Pad, and dated February 7, 2017 for the Redbud Festival Park, by
decreasing the 5k Trail by $707,077.50, decreasing the Feature Splash Pad by $716,845, and
increasing the Redbud Festival Park by $1,423,922.50, for a total reimbursement of Vision 2025
Funds on the Redbud Festival Park project in the amount of $2,262,388.50; and requesting the
Tulsa Board of County Commissioners issue amended Capital Improvements Agreements for
each project.
ATTACHMENT:
Proposed Letter to the TCVA
� sd
REAL PxoPle • REAL Chamoter •REAL Community
...removing
obstacles
standing
in the way
of people
celebrating
=ir lives.
.1
4y��
200 S Main St
PO Box 180
Owasso, OK 74055
July 3, 2018
Tulsa County Vision Authority
500 South Denver
Tulsa, OK 74103
Dear Authority Members,
The City of Owasso is requesting to increase the amount assigned to a project under Proposition
4 of our available Vision 2025 excess funds at the next scheduled Tulsa County Vision Authority
meeting.
Owasso originally proposed the Owasso Festival Park (now known as the Redbud Festival Park),
project in April 2015 with approval of an allocation of Proposition 4 funds in the amount of
$838,466. At the same time, monies were allocated from Proposition 4 funds to the Owasso 5K
Trail in the amount of $722,500 and to the Feature Splash Pad in the amount of $760,000. The City
received Capital Improvement Agreements dated December 6, 2016 for the 5k Trail and Feature
Splash Pad, and dated February 7, 2017 for the Redbud Festival Park.
However, the Owasso 5K Trail and Feature Splash Pad are on hold due to detention mitigation at
the Owasso Sports Park and are not expected to begin construction for a few years. The City of
Owasso intends to complete the construction of both projects at a later time using an alternate
funding source. Therefore, Owasso is requesting the remaining funds available in the allocation
for the 5K Trail ($707,077.50), and the allocation for the Feature Splash Pad ($716,845) be re-
allocated to the Redbud Festival Park, for a total allocation of $2,262,388.50.
The intended purpose of this project is consistent with the intent of Proposition 4 to "fund Capital
Improvements for the purpose of Community Enrichment within Tulsa County, Oklahoma." The
Redbud Festival Park will be a focal point as part of the revitalization of Owasso's downtown. A
gathering place allowing for a farmers market, pavilion, water feature, outdoor stage, food truck
alley, detention improvements, and landscaping. Owasso is experiencing revitalization of an
undeveloped/ under - developed area with an influx of private sector investment. This investment
accompanied with public investment will result in new amenities and revenues associated with
unique retailers, services, living units, and the potential addition of primary and secondary jobs.
The Redbud Festival Park project cost estimate is $2,454,223.70. The City will utilize the Capital
Improvement Fund for the remaining $191,845.20.
The City of Owasso requests the Tulsa County Vision Authority authorize the additional allocation
of funds In the amount of $1,423,922.50 to the " Redbud Festival Park ", Project 1 -3, in Owasso, OK,
for a total of $2,262,388.50.
Respectfully,
Warren Lehr
City Manager
City of Owasso
A City Of Character
(918) 376 -1500
FAX (918) 376 -1599
www.cityofowasso.com
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 06/23118
Department Payroll Expenses Total Expenses
105
Municipal Court
6,037.03
6,984.39
110
Managerial
19,894.58
23,803.00
120
Finance
17,543.09
20,949.22
130
Human Resources
8,499.97
10,175.53
160
Community Development
20,293.59
24,128.11
170
Engineering
21,004.15
24,889.84
175
Information Systems
14,408.21
17,232.20
181
Support Services
7,493.89
8,869.77
190
Cemetery
1,387.92
1,655.14
201
Police Grant Overtime
3,487.40
3,534.53
215
Central Dispatch
21,448.35
25,561.76
221
Animal Control
3,714.72
4,363.46
280
Emergency Preparedness
2,115.38
2,529.99
370
Stormwater /ROW Maint.
9,738.68
11,338.60
515
Park Maintenance
7,910.80
9,370.38
520
Culture /Recreation
8,886.26
10,591.23
550
Community- Senior Center
5,483.30
6,272.07
580
Historical Museum
1,114.40
1,234.91
710
Economic Development
3,646.85
4,346.99
General Fund Total
184,108.57
217,831.12
185 Garage Fund Total 7,359.71 8,782.92
255 Ambulance Fund Total 553.85 621.86
250 Fire Fund 37 Total 168,596.21 200,019.81
201 Police Fund 38 Total 146,190.67 171,923.14
300 Streets Fund 39 Total 16,369.04 19,552.11
370 Stormwater Fund 27 Total 2,105.01 2,517.58
150 Worker's Compensation Total 2,491.98 2,939.64
720 Strong Neighborhoods Total 3,891.76 4,600.16
CITY OF OWASSO
HEALTHCARE SELF INSURANCE FUND
CLAIMS PAID PER AUTHORIZATION OF ORDINANCE #789 AS OF 6128/18
VENDOR
DESCRIPTION
AMOUNT
AETNA
HEALTHCARE MEDICAL SERVICE
37,398.78
HEALTHCARE MEDICAL SERVICE
51,567.64
HEALTHCARE MEDICAL SERVICE
72,192.77
HEALTHCARE MEDICAL SERVICE
30,765.96
HCC LIFE INSURANCE
STOP LOSS FEES
47,080.92
HEALTHCARE DEPT TOTAL
239,006.07
DELTA DENTAL
DENTAL MEDICAL SERVICE
2,953.70
DENTAL MEDICAL SERVICE
4,154.40
DENTAL DEPT TOTAL
7,108.10
HEALTHCARE SELF INSURANCE FUND TOTAL
246,114.17
I�,+ S �,.
rte+
0 x L A H 0 M A
oevnaneetlr of EUARON)JEHYAt OVAIny MARY FALLIN
SCOTT A. THOTMENT OF ENVIRONMENTAL QUALITY
Executive OKLAHOMA DEPARTMENT Direor Governor
June 04, 2018
Mr. Roger Stevens, Public Works Director
City of Owasso
301 West 2nd Ave
Owasso, Oklahoma 74055
Re: Permit No. SL000072180402
Magnolia Ridge I
Facility No. S -21310
Dear Mr. Stevens:
Enclosed is Permit No. SL000072180402 for the construction of 6,557 linear feet of eight (8) inch PVC,
836 linear feet of six (6) inch PVC force main, one (1) 200 -gpm lift station, one (1) backup power
generator with an automatic transfer switch and all appurtenances to serve the Magnolia Ridge I, Tulsa
County, Oklahoma.
The project authorized by this permit should be constructed in accordance with the plans approved by this
Department on June 04, 2018. Any deviations from the approved plans and specifications affecting
capacity, flow or operation of units must be approved, in writing, by the Department before changes are
made.
Receipt of this permit should be noted in the minutes of the next regular meeting of the City of Owasso,
after which it should be made a matter of permanent record.
We are returning one (1) set of the approved plans to you, one (1) set to your engineer and retaining one
(1) set for our files.
RReC spectfully,
yFK!Kabariti
Construction Permit Section
Water Quality Division
QRK7RC /ag
Enclosure
c: Debbie Nichols, Regional Manager, DEQ
TULSA DEQ OFFICE EeC WE D
Brian K Kellogg, P.E., Kellogg Engineering, Inc.
BY.
707 NORTH ROBINSON, P.O. BOX 1677, OKLAHOMA CITY, OKLAHOMA 73101 -1677
printed on recycled paper with soy Ink
Fne
PaV
WT P2'1 ,r
0 x L A 11 0 IA A
OEPAUMEN10P EOVIRONLIE111AE OUAIIIY
SCOTT A. THOMPSON MAR
OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY Governor
Executive Diredor G Governor
PERMIT No.SL000072180402
SEWEALINES
FACILITY No. S -21310
PERMIT TO CONSTRUCT
June 04, 2018
Pursuant to O.S. 27A 2 -6 -304, the City of Owasso Is hereby granted this Tier I Permit to construct 6,557
linear feet of eight (8) inch PVC, 836 linear feet of six (6) inch PVC force main, one (1) 200 -gpm lift
station, one (1) backup power generator with an automatic transfer switch and all appurtenances to serve
the Magnolia Ridge I, located in Section 23, T -21 -N, R -13 -E, Tulsa County, Oklahoma, in accordance
with the plans-approved June 04, 2018.
By acceptance of this permit, the permittee agrees to operate and maintain the facilities in accordance
with the "Oklahoma Pollutant Discharge Elimination System Standards - OPDES' (OAC 252:606) rules
and to comply with the state certification laws, Title 59, Section 1101 -1116 O.S. and the rules and
regulations adopted thereunder regarding the requirements for certified operators.
This permit Is Issued subject to the following provisions and conditions.
1) That the recipient of the permit is responsible that the project receives supervision and inspection
by competent and qualified personnel.
2) That construction of all phases of the project will be started within one year of the date of
approval or the phases not under construction will be resubmitted for approval as a new project.
3) That no significant information necessary for a proper evaluation of the project has been omitted
or no Invalid information has been presented in applying for the permit.
4) That wherever water and sewer lines are constructed with spacing of 10 feet or less, sanitary
protection will be provided in accordance with OAC 252:656- 5- 4(c)(3) of the standards for Water
Pollution Control Facility Construction.
5) That tests will be conducted as necessary to insure that the construction of the sewer lines will
prevent excessive infiltration and that the leakage will not exceed 10 gallons per inch of pipe
diameter per mile per day.
6) That the Oklahoma Department of Environmental Quality shall be kept informed of occurrences
which may affect the eventual performance of the works or that will unduly delay the progress of
the project.
7) That-the permittee will take steps to assure that the connection of house services to the sewers is
done in such a manner that the functioning of the sewers will not be impaired and that earth and
ground water will be excluded from the sewers when the connection is completed.
707 NORTH ROBINSON, P.O. BOX 1677, OKLAHOMIAOTY, OKLAHOMA 73101 -1677
printed on recycled paper YAM soy Ink
G�i9
sff Al t
f' I4
0 K i A H 0 M A
S[OTT A.THOMPSON DRAMIEY.IOFEINNO MEMALOIJAWY MARY FAUIN
Executive Direclar OKLAHOMA DEPARTMENT OF ENVIRONMENTAL OLIALR Governor
PERIMIT No. SL000072180402
SEWER LINES
FACILITY No. S -21310
I7N�TUITIWYirden WM 00H
8) That any deviations from approved plans or specifications affecting capacity, flow or operation of
units must be approved by the Department before any such deviations are made in the
construction of this project.
9) That the recipient of the permit is responsible for the continued operation and maintenance of
these facilities in accordance with rules and regulations adopted by the Environmental Quality
Board, and that this Department will be notified in writing of any sale or transfer of ownership of
these facilities.
10) The issuance of this permit does not relieve the responsible parties of any obligations or liabilities
which the permittee may be under pursuant to prior enforcement action taken by the Department.
11) That the permittee is required to inform the developer /builder that a DEQ Storm Water
Construction Permit is required for a construction site that will disturb one (1) acre or more in
accordance with OPDES, 27A O.S. 2 -6 -201 et. seq. For information or a copy of the GENERAL
PERMIT (OKR10) FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES,
Notice of Intent (NOI) form, Notice of Termination (NOT) form, or guidance on preparation of a
Pollution Prevention Plan, contact the Storm Water Unit of the Water Quality Division at P.O. Box
1677, Oklahoma City, OK 73101 -1677 or by phone at (405) 702 -8100.
12) That all manholes shall be constructed in accordance with the standards for Water Pollution
Control Facility Construction (OAC 252:656 -5 -3), as adopted by the Oklahoma Department of
Environmental Quality.
13) That when it is impossible to obtain proper horizontal and vertical separation as stipulated in
Water Pollution Control Facility Construction OAC 252:656- 5- 4(c)(1) and OAC 252:656- 5- 4(c)(2),
respectively, the sewer shall be designed and constructed equal to water pipe, and shall be
pressure tested using the ASTM air test procedure with no detectable leakage prior to backfilling,
in accordance with the standards for Water Pollution Control Facility Construction OAC 252:656 -
5- 4(c)(3).
Failure to appeal the conditions of this permit in writing within 30 days from the date of issue will
constitute acceptance of the permit and all conditions and provisions.
107 NORTH ROBINSON, P.O. BOX 1677, OKLAHOMA CITY, OKLAHOMA 73101 -1677
pr[M.d on reayaf.d paper will, say Ink
0T
�Y�