HomeMy WebLinkAbout2018.09.04_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY
Council Chambers, Old Central Building
109 N Birch, Owasso, OK 74055 +FC,
Regular Meeting 4&,g �&
Tuesday, September 4, 2018 - 6:30 pm ®i�� �,
1. Call to Order
Chair Chris Kelleyf�
2. Roll Call
3. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. (All matt ers listed under "Consent' are considered by the Trustees to be routine and
will be enacted by one motion. Any Trustee may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.)
A. Approve minutes of the August 21, 2018, Regular Meeting
B. Approve claims
4. Consideration and appropriate action relating to items removed from the Consent Agenda
5. Consideration and appropriate action relating to the purchase of a service vehicle for use in
the Water Division and declaration of a surplus vehicle
Travis Blundell
Staff recommends approval to purchase a 2018 Dodge Ram 4500 Crew Cab 44 service
truck in the amount of $51,821.00 from Bob Howard Chrysler Jeep Dodge of Oklahoma City,
Oklahoma, per the State of Oklahoma Vehicle Bid Contract #SW60035; and to declare the
2002 Chevy One Ton service truck (VIN #IGBJK341X2E265277) as surplus to the needs of the
OPWA and made available for disposal via on -line auction.
6. Consideration and appropriate action relating to engineering and design of the Coffee
Creek Lift Station and Force Main Improvement Project
Roger Stevens
Staff recommends approval of an Agreement for Engineering Services with Kellogg
Engineering, of Talala, Oklahoma for the purpose of designing the Coffee Creek Lift Station
and Force Main Improvements in the amount of $260,625.00 and authorization for the Chair
to execute the agreement.
7. Report from OPWA Manager
8. Report from OPWA Attorney
9. Official Notices to Authority (documents for acknowledgment or information only, no
discussion or action will be taken)
Payroll Payment Reports - Pay Period Ending Date 8/18/18
10. New Business (New Business is any item of business which could not have been foreseen at
the time of posting of the agenda)
OPWA
September 4, 2018
Page 2
11. Adjoumment
Notice of Public Meeting filed in the office of the City Clerk and the Agenda posted at City Hall,
200 S Main St, at 6:00 pm on Friday, August 31, 2018.
')'In M. Stevens, Citl lerk
The City of Owasso encourages citizen participation. To request an accommodation due to a disability, contact the
City Clerk at least 48 hours prior to the scheduled meeting by phone 918 - 376-1502 or by email to
istevens@citvofowasso.com
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, August 21, 2018
The Owasso Public Works Authority met in regular session on Tuesday, August 21, 2018, in the
Council Chambers at Old Central, 109 N Birch, Owasso, Oklahoma, per the Notice of Public
Meeting and Agenda filed in the office of the City Clerk posted at City Hall, 200 S Main St, at 6:00
pm on Friday, August 17, 2018.
1. Call to Order
Chair Chris Kelley called the meeting to order at 7:25pm.
2. Roll Call
Present Absent
Chair- Dr. Chris Kelley None
Vice -Chair - Bill Bush
Trustee - Doug Bonebrake
Trustee - Lyndell Dunn
Trustee - Kelly Lewis
A quorum was declared present.
Staff:
Authority Manager - Warren Lehr
Authority Attorney - Julie Lombardi
3. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. (All matters listed under "Consent" are considered by the Trustees to be routine and
will be enacted by one motion. Any Trustee may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.)
A. Approve minutes
• August 7, 2018, Regular Meeting
• August 14, 2018, Regular Meeting
B. Approve claims
Mr. Dunn moved, seconded by Mr. Bush to approve the Consent Agenda with claims
totaling $532,230.57.
YEA: Bonebrake, Bush, Dunn, Lewis, Kelley
NAY: None
Motion carried: 5 -0
4. Consideration and appropriate action relating to items removed from the Consent Agenda
None
5. Consideration and appropriate action relating to ratification of an expenditure exceeding
the OPWA Manager's spending authority to repair equipment located at the Wastewater
Treatment Plant and authorization for payment
Roger Stevens presented the item recommending ratification of an expenditure in the
amount of $28,585 to repair an aeration ditch blower for the Wastewater Treatment Plant
and authorization for payment to Gardner Denver Nash, LLC, of St. Louis, Missouri.
There were no comments from the audience. After discussion, Mr. Bonebrake moved,
seconded by Ms. Lewis to ratify the expenditure and authorize payment, as recommended.
YEA: Bonebrake, Bush, Dunn, Lewis, Kelley
NAY: None
Motion carried: 5 -0
OPWA
August 21, 2018
Page 2
6. Report from OPWA Manager
None
7. Report from OPWA Attorney
None
8. Official Notices to Authority (documents for acknowledgment or information only, no
discussion or action will be taken)
The Chair acknowledged receipt of the following:
• Payroll Payment Reports — Pay Period Ending Date 8/4/18
• Monthly Budget Status Report - July 2018
9. New Business (New Business is any item of business which could not have been foreseen at
the time of posting of the agenda)
None
10. Adjournment
Mr. Bonebrake moved, seconded by Mr. Dunn to adjourn the meeting.
YEA: Bonebrake, Bush, Dunn, Lewis, Kelley
NAY: None
Motion carried: 5 -0 and the meeting adjourned at 7:30 pm.
Dr. Chris Kelley, Chair
Juliann M. Stevens, Authority Clerk
Claims List - 9/4/2018
Fund Vendor Name Payable Description Payment
Amount
61 OPWA AMERICAN MUNICIPAL SERVICES CORP. COLLECTION SERVICES $160.96
OPWA -Total
$160.96
AT &T LONG DISTANCE
CONSOLIDATED PHONE
$146.28
CITY OF OWASSO
ADMIN OVERHEAD
$25,000.00
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$80.82
JPMORGAN CHASE BANK
GREENHILL- GRAVEL
$3,990.60
JPMORGAN CHASE BANK
LOWES - SUPPLIES
$58.97
JPMORGAN CHASE BANK
VORNADO AIR - SUPPLIES
$57.98
STANDLEY SYSTEMS, LLC
COPIER MAINTENANCE
$464.01
TWIN CITIES READY MIX, INC
CONCRETE
$212.00
TWIN CITIES READY MIX, INC
CONCRETE - PW PARKING LO
$120.00
TWIN CITIES READY MIX, INC
CONCRETE FOR PW PARKING
$1,314.00
REFUSE COLLECTIONS -Total
L
$401.35
OPWA ADMINISTRATION -Total
$31,444.66
BANCFIRST
800329021/10
$7,188.37
BANCFIRST
800469017/09B
$55,960.40
BANCFIRST
800470015/090
$23,361.35
BANCFIRST
800471013/SANTA FE
$14,375.72
BANCFIRST
800472011 /RANCH CRK
$25,377.32
OPWA DEBT SERVICE -Total
$126,263.16
AT &T LONG DISTANCE
CONSOLIDATED PHONE
$12.00
CINTAS CORPORATION
FIRST AID SUPPLIES
$55.61
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$4.61
RECYCLE CENTER -Total
$72.22
AT &T LONG DISTANCE
CONSOLIDATED PHONE
$12.00
CINTAS CORPORATION
FIRST AID SUPPLIES
$133.97
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$64.99
CRANE CARRIER COMPANY
VALVE
$105.16
JPMORGAN CHASE BANK
BUMP2BUMP -FUSE
$3.97
SPOK, INC.
PAGER USE
$81.26
REFUSE COLLECTIONS -Total
$401.35
TECHNICAL PROGRAMMING SERVICES INC
BILLING SERVICES
$1,570.51
TODD C. KIMBALL
METER READER
$333.75
TYRONE EUGENE DINKINS
METER READER
$1,336.80
UTILITY BILLING -Total
$3,241.06
JAMES A. OZBUN
MOTOR
$3,211.00
JPMORGAN CHASE BANK
GRAINGER- EQUIPMENT
$249.00
JPMORGAN CHASE BANK
LOWES - FITTING
$6.13
OMEGA RAIL MANAGEMENT, INC.
PIPELINE AGREEMENT
$316.90
OWASSO FENCE CO
REPLACEMENT FENCE
$3,376.00
SPOK, INC.
PAGER USE
$48.95
1
Claims List - 9/4/2018
Fund Vendor Name Payable Description Payment
Amount
61 OPWA WARREN POWER & MACHINERY, L.P DOZER RENTAL $2,028.50
WASHINGTON CO RURAL WATER DISTRICT WATER $19.80
WASTEWATER COLLECTIONS -Total
$9,256.28
AT &T LONG DISTANCE
CONSOLIDATED PHONE
$71.97
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$118.22
JAMES A. OZBUN
MOTOR
$3,100.00
JPMORGAN CHASE BANK
ADVANCE AUTO -TOOL
$8.79
JPMORGAN CHASE BANK
AMER LANDMASTER -TAILG
$61.80
JPMORGAN CHASE BANK
BA ELECTRIC - BREAKER
$1,117.42
JPMORGAN CHASE BANK
CORNERSTONE - CLEANER
$9.99
JPMORGAN CHASE BANK
FORT BEND - SUPPLIES
$2,788.00
JPMORGAN CHASE BANK
GELLCO -BOOTS
$143.99
JPMORGAN CHASE BANK
GRAINGER- ORGANIZER
$61.20
JPMORGAN CHASE BANK
HACH- BATTERY
$281.27
JPMORGAN CHASE BANK
HACH- REAGENT
$23.54
JPMORGAN CHASE BANK
LOCKE -PARTS
$80.13
JPMORGAN CHASE BANK
LOWES- SOCKET SET
$214.18
JPMORGAN CHASE BANK
LOWES - SUPPLIES
$70.20
JPMORGAN CHASE BANK
NCL OF WISC -EQUIP
$58.82
SCHUERMANN ENTERPRISES, INC
TROUBLESHOOT PUMP
$1,643.76
SCHUERMANN ENTERPRISES, INC
TROUBLESHOOT UV SYS
$442.61
SPOK, INC.
PAGER USE
$17.78
WASTEWATER TREATMENT -Total
$10,313.67
CITY OF TULSA DEPT OF FINANCE
LAB SERVICES
$500.00
CLEAN UNIFORM COMPANY
UNIFORM SERVICE
$77.02
JET TRUCKING, LLC
DIRT
$135.00
JPMORGAN CHASE BANK
ACCURATE ENV - TESTING
$280.00
JPMORGAN CHASE BANK
ATWOODS- EXTINGISHERS
$33.97
JPMORGAN CHASE BANK
BROWN FARMS -SOD
$275.00
JPMORGAN CHASE BANK
GRAINGER- EQUIPMENT
$249.00
JPMORGAN CHASE BANK
LOWES- KNEEPADS
$92.88
JPMORGAN CHASE BANK
LOWES -RAKES
$54.36
JPMORGAN CHASE BANK
LOWES -TOOLS
$179.00
JPMORGAN CHASE BANK
OREILLY- SUPPLIES
$23.58
JPMORGAN CHASE BANK
SAV ON -DOOR HANGERS
$570.00
JPMORGAN CHASE BANK
UTILITY SUPPLYSUPPLI
$3,060.38
JPMORGAN CHASE BANK
WASSCO - SUPPLIES
$577.00
SPOK, INC.
PAGER USE
$89.40
TWIN CITIES READY MIX, INC
CONCRETE
$336.00
TWIN CITIES READY MIX, INC
REPAIR AFTER WTR REP
$432.00
WARREN POWER & MACHINERY, L.P
DOZER RENTAL
$2,028.50
Pi
Claims List - 9/4/2018
Fund
Vendor Name
Payable Description
Payment
Amount
61
OPWA
WATER -Total
$8,993.09
OPWA -Total
$190,146.45
67
OPWA SALES TAX
BANCFIRST
80049201912008 NOTE
$99,039.90
BANCFIRST
800650012/2016 NOTE
$131,368.75
BANCFIRST
800730038/2018 NOTE
$23,722.59
OPWA STF DEBT SERVICE -Total
$254,131.24
OPWA SALES TAX -Total
$254,131.24
69
OPWA SALES TAX SUB
OWASSO INVESTMENT PARTNERS LLC
DEVELOPMENT AGREEMENT
$15,618.37
ACCOUN
OPWA SALES TAX SUB ACCOUN -Total
$15,618.37
MORROW PLACE INVESTMENT GROUP LLC
DEVELOPMENT AGREEMENT
$4,045.50
OPWA ST SUB - DEBT SERV -Total
$4,045.50
OPWA SALES TAX SUB ACCOUN -Total
$19,663.87
OPWA Grand Total
$463,941.56
s�
REPL Paopla • REAL Character • REpL Commonly
TO: The Honorable Chair and Trustees
Owasso Public Works Authority
FROM: Travis Blundell
Utility Superintendent
SUBJECT: Purchase of a Service Truck
Water Division
DATE: August 31, 2018
BACKGROUND:
Public Works Department staff annually assesses the motor fleet in order to determine the safety
and reliability of the vehicles assigned to each division. These evaluations are used as the basis
for vehicle replacement and Public Works budgeting.
Based upon the assessment of the motor fleet, staff is proposing the replacement of the 2002
Chevy one ton service truck in the Water Division with the purchase of a new service truck. In
addition, staff is proposing that the 2002 Chevy one ton service truck be declared surplus and
placed on eBay for auction.
VEHICLE DESCRIPTION:
Staff proposes the purchase of a 2018 Dodge Ram 4500 Crew Cab 44 pickup truck through the
Oklahoma state bid. This vehicle will be equipped with a service body for organized and secure
storage of tools, repair materials and equipment.
FUNDING:
The FY 2018 -2019 Water Divisions budget includes $60,000 for the purchase of a new vehicle.
RECOMMENDATION:
_ Staff recommends approval to purchase a 2018 Dodge Ram 4500 Crew Cab 44 service truck in
the amount of $51,821.00 from Bob Howard Chrysler Jeep Dodge of Oklahoma City, Oklahoma,
per state bid award Contract # SW60035; and to declare the 2002 Chevy One Ton service truck
(VIN #1GBJK341X2E265277) as surplus to the needs of the OPWA and disposed of via on -line
auction.
ATTACHMENT:
A. Bob Howard Chrysler Jeep Dodge Bid Quote
July 27, 2018 @0
Vaughan BOB HOWARD
Ron Vau
g CHRYSLER JEEP DODGE
City of Owasso
Public Works
301 West 2nd Avenue
Owasso, OK 74055
RE: 2018 RAM 4500 CREW CAB CAB /CHASSIS 4X4 173.5" WB / 60" CA
Dear Mr. Vaughan;
Please find attached the specifications for the requested truck along with the specifications for the
requested dump bed. Pricing as follows is per the State of Oklahoma Vehicle Contract SW60035:
Item # 1000009409
2018 RAM 4500 CREW CAB CAB /CHASSIS
16,000# Crew Cab Truck Cab & Chassis
BASE
$32,998,00
OPTIONS ADD:
6.71 Cummins Turbo Diesel Engine -
7,995.00
DP9194
Four Wheel Drive with Skid Plates
3,560.00
BAJ
220 Amp Alternator
185.00
GKJ
Two Additional Base Keys
125,00
TBB
Full Size Spare Tire & Wheel
included
XEF
Transfer Case Skid Plates
Included
XHC
Electric Brake Control
280.00
TotaiforTruck
$45,143.00
CST110CCD 52.5 UTILITY BODY
$ 6,678.00
Total for Truck & Body $51,821.00
Color: PW7 Bright White
Interior: TXX8 Black /Diesel Gray 40/20/40 Vinyl Split Bench Seat with Vinyl
Rear Fold Up Bench
Tom Ayers ftA�.
Governmental /Fleet Sale M ager
13260 North Broadway Extension, Oklahoma City, OK 73114
phone: 405.936.8900 • P.O, Box 14508 • Oklahoma City, OK 73113 • ww.v bobhowardauto.cum
sd
FLA Prc -yr RU[ C .. atla RUl Commvn;.
TO: The Honorable Chair and Trustees
Owasso Public Works Authority
FROM: Roger Stevens
Public Works Director
SUBJECT: Coffee Creek Lift Station and Force Main Improvements
Engineering Agreement
DATE: August 31, 2018
BACKGROUND:
The Coffee Creek lift station and force main were constructed in 2002. Per the October 2016
Wastewater Master Plan, the lift station pumps, wet well and generator, as well as the 8" force
main are in need of replacement and upgrade by 2020.
The lift station is currently operating at approximately 90% of its rated capacity and provides
service to Lake Valley Chelsea Park and Coffee Creek subdivision, as well as several commercial
developments along the east side of Highway 169. Additional development in this area is
anticipated to occur over the next 5 to 15 years, at which time, the projected sanitary sewer
flow will exceed the capacity of the lift station and force main.
In November 2017, Public Works staff began discussions with Kellogg Engineering concerning
needed improvements to the Coffee Creek lift station and force main in order to accommodate
the current and future sanitary sewer flows within the basin.
As a result of those discussions, an assessment area totaling 338 acres was established and then
approved by OPWA Trustees in January 2018. In addition, staff and Kellogg Engineering agreed
it would be cost effective to construct the new lift station on property located on the east side of
North 1451h East Avenue due to inadequate space and wet lands adjacent to the existing site
located on the west side of North 145th East Avenue. The purchase of 4.66 acres was approved
by OPWA Trustees in May 2018.
ENGINEERNG AGREEMENT /SCOPE OF WORK:
City staff met with Kellogg Engineering to develop a proposed scope of work and the level of
plans that would be needed for the design of this project. The following components are
proposed in the agreement:
— Preparation of preliminary and final design for the Coffee Creek Lift Station and Force
Main Project (including design survey, mapping and geotechnical investigation).
— Preparation of contract documents including drawings, specifications and permit
applications for the project.
— Bid related assistance.
— Prepare final as -built record drawings to City standards and submit in AutoCAD and
mylar form.
Following the discussion concerning the scope
hour projects and submitted a fee proposal
estimated construction cost of $3.5 million.
FUNDING:
of work, Kellogg Engineering developed staff -
in the amount of $260,625.00 or 7.5% of the
Funding for this service is included in the FY 2018 -2019 Wastewater Collection budget.
RECOMMENDATION:
Staff recommends approval of an Agreement for Engineering Services with Kellogg Engineering,
(Talala, Oklahoma) for the purpose of designing the Coffee Creek Lift Station and Force Main
Improvements in the amount of $260,625.00 and authorization of the Chair to execute the
agreement.
ATTACHMENTS:
Site Map
Agreement for Engineering Services
Assessment Area
Coffee Creek Lift Station - Proposed Site
1" =188 ft
Land Acquisition T
03/01/2018
This map may represents a visual display of related geographic information. Data provided here on is not guarantee of acutual field conditions. To he sure of complete accuracy, please contact the
responsible staff for most up- to-date information.
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLIC WORKS AUTHORITY OF OWASSO, OK
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
THIS AGREEMENT, made and entered into this 41h day of September, 2018 between the
OWASSO PUBLIC WORKS AUTHORITY OF OWASSO, Oklahoma, a Municipal
Corporation, of Oklahoma, hereinafter referred to as AUTHORITY, and KELLOGG
ENGINEERING, INC. hereinafter referred to as ENGINEER;
WITNESSETH:
WHEREAS, AUTHORITY intends to replace and upgrade the Coffee Creek Lift station and
Force main which will replace the existing lift station due to age and condition, as well as
provide for additional sanitary sewer capacity within the basin, hereinafter referred to as
the PROJECT; and,
WHEREAS, AUTHORITY requires certain professional services in connection with the
PROJECT, hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES,
WHEREAS, funding is available for the PROJECT through the Owasso Public Works
Authority operating budget;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROTECT. The scope of the PROJECT is described in Attachment A,
SCOPE OF PROTECT, which is attached hereto and incorporated by reference as part
of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. AUTHORITY'S RESPONSIBILITIES. AUTHORITY shall be responsible for all
matters described in Attachment C, RESPONSIBILITIES OF THE AUTHORITY
which is attached hereto and incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. AUTHORITY shall pay ENGINEER in accordance with
Attachment D, COMPENSATION, and further described in Attachment E,
FEE/ HOUR BREAKDOWN, which are attached hereto and incorporated by
reference as part of this AGREEMENT.
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B,
SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F,
SCHEDULE, attached hereto and incorporated by reference as part of this
AGREEMENT.
6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with the
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -3148 G.t
applicable laws and regulations published and in effect at the time of performance of
the SERVICES. The PROJECT shall be designed and engineered in a good and
workmanlike manner and in strict accordance with this AGREEMENT. All
engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by AUTHORITY.
Other than the obligation of the ENGINEER to perform in accordance with the
foregoing standards, no warranty, either express or implied, shall apply to the
SERVICES to be performed by the ENGINEER pursuant to this AGREEMENT or the
suitability of ENGINEER'S work product.
LIMITATION OF RESPONSIBILITY.
7.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
7.2. The presence of ENGINEER's personnel at a construction site is for the
purpose of providing to the AUTHORITY a greater degree of confidence that
the completed construction work will conform generally to the construction
documents and that the integrity of the design concept as reflected in the
construction documents has been implemented and preserved by the
construction contractor(s).
7.3. In soils, foundation, groundwater, and other subsurface investigations, the
actual characteristics may vary significantly between successive test points
and sample intervals and at locations other than where observations,
exploration, and investigations have been made. Because of the inherent
uncertainties in subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total PROJECT cost
and /or execution. These conditions and cost/ execution effects are not the
responsibility of ENGINEER.
7.4. Record drawings will be prepared, in part, on the basis of information
compiled and furnished by others, and may not always represent the exact
location, type of various components, or exact manner in which the PROJECT
was finally constructed. ENGINEER is not responsible for any errors or
omissions in the information from others that are incorporated into the
record drawings.
7.5. ENGINEER's deliverables, including record drawings, are limited to the
sealed and signed hard copies. Computer - generated drawing files furnished
by ENGINEER are for AUTHORITY or others' convenience. Any conclusions
or information derived or obtained from these files will be at user's sole risk.
8. OPINIONS OF COST AND SCHEDULE.
8.1. Since ENGINEER has no control over the cost of labor, materials, equipment,
or services furnished by others, or over contractors', subcontractors', or
vendors' methods of determining prices, or over competitive bidding or
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 G.2
market conditions, ENGINEER'S cost estimates shall be made on the basis of
qualifications and experience as a Professional Engineer.
8.2. Since ENGINEER has no control over the resources provided by others to
meet construction contract schedules, ENGINEER'S forecast schedules shall
be made on the basis of qualifications and experience as a Professional
Engineer.
9. LIABILITY AND INDEMNIFICATION.
9.1. ENGINEER shall defend and indemnify AUTHORITY from and against legal
liability for damages arising out of the performance of the SERVICES for
AUTHORITY, including but not limited to any claims, costs, attorney fees, or
other expenses of whatever nature where such liability is caused by the
negligent act, error, or omission of ENGINEER, or any person or organization
for whom ENGINEER is legally liable. Nothing in this paragraph shall make
the ENGINEER liable for any damages caused by the AUTHORITY or any
other contractor or consultant of the AUTHORITY.
9.2. ENGINEER shall not be liable to AUTHORITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
10. CONTRACTOR INDEMNIFICATION AND CLAIMS.
10.1. AUTHORITY agrees to include in all construction contracts the provisions of
Articles 7.1, and 7.2, and provisions providing contractor indemnification of
AUTHORITY and ENGINEER for contractor's negligence.
102 AUTHORITY shall require construction contractor(s) to name AUTHORITY
and ENGINEER as additional insureds on the contractor's general liability
insurance policy.
11. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any construction unless such responsibilities
are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
12. INSURANCE.
12.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
12.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the
aggregate, and with property damage limits of not less than $100,000
for each occurrence and not less than $100,000 in the aggregate.
12.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -3
accident and with property damage limits of not less than $100,000 for
each accident.
12.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not
less than $100,000 for each occurrence.
12.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions
coverage to be for a minimum of $1,000,000, deductibles subject to
approval by AUTHORITY.
12.2. ENGINEER shall furnish AUTHORITY certificates of insurance which shall
include a provision that such insurance shall not be canceled without at least
30 days written notice to the AUTHORITY.
13. OWNERSHIP AND REUSE OF DOCUMENTS.
13.1. All documents, including original drawings, estimates, specifications, field
notes and data shall become and remain the property of the AUTHORITY.
13.2. AUTHORITY'S reuse of such documents without written verification or
adaptation by ENGINEER for the specific purpose intended shall be at
AUTHORITY'S risk.
14. TERMINATION OF AGREEMENT.
14.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
14.2. AUTHORITY shall have the right to terminate this AGREEMENT, or
suspend performance thereof, for AUTHORITY'S convenience upon written
notice to ENGINEER; and ENGINEER shall terminate or suspend
performance of SERVICES on a schedule acceptable to AUTHORITY. In the
event of termination or suspension for AUTHORITY'S convenience,
AUTHORITY shall pay ENGINEER for all SERVICES performed to the date
of termination in accordance with provisions of Attachment D,
COMPENSATION. Upon restart of a suspended project, ENGINEER's
contract price and schedule shall be equitably adjusted.
15. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: Mr. Brian Kellogg
KELLOGG ENGINEERING, INC.
6755 S. 4060 Rd.
Talala, OK 74080
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 CA
To CITY: Mr. Roger Stevens, Public Works Director
City of Owasso
301 W 2nd Avenue
Owasso, Oklahoma 74055
Nothing contained in this Article shall be construed to restrict the transmission of
routine communications between representatives of ENGINEER and AUTHORITY.
16. UNCONTROLLABLE FORCES. Neither AUTHORITY nor ENGINEER shall be
considered to be in default of this AGREEMENT if delays in or failure of
performance shall be due to forces which are beyond the control of the parties;
including, but not limited to: fire, flood, earthquakes, storms, lightning, epidemic,
war, riot, civil disturbance, sabotage; inability to procure permits, licenses, or
authorizations from any state, local, or federal agency or person for any of the
supplies, materials, accesses, or services required to be provided by either
AUTHORITY or ENGINEER under this AGREEMENT; strikes, work slowdowns or
other labor disturbances, and judicial restraint.
17. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
18. INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments
A, B, C, D, E, and F and represents the entire and integrated AGREEMENT between
the parties; and supersedes all prior negotiations, representations, or agreements
pertaining to the SCOPE OF SERVICES herein, either written or oral. AUTHORITY
may make or approve changes within the general Scope of Services in this
AGREEMENT. If such changes affect ENGINEER's cost of or time required for
performance of the services, an equitable adjustment will be made through an
amendment to this AGREEMENT. This AGREEMENT may be amended only by
written instrument signed by each of the Parties.
19. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the AUTHORITY over the interpretation or application of the terms
of this AGREEMENT, the matter shall be referred to the AUTHORITY's Director of
Public Works for resolution. If the Director of Public Works is unable to resolve the
dispute, the matter may, in the Director's discretion, be referred to the AUTHORITY
Manager for resolution. Regardless of these procedures, neither party shall be
precluded from exercising any rights, privileges or opportunities permitted by law
to resolve any dispute.
20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
21. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the Public Works
Department of the AUTHORITY of Owasso, and any plans or specifications not
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -5
meeting the terms set forth in this AGREEMENT will be replaced or corrected at the
sole expense of the ENGINEER. The ENGINEER will meet with the AUTHORITY
staff initially and as needed thereafter to manage the project and will be available for
one public meeting or AUTHORITY of Owasso presentation.
22. KEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has
designated Brian Kellogg as Project Manager for the PROJECT. ENGINEER agrees
that no change will be made in the assignment of this position without prior
approval of AUTHORITY.
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Chairman of the Owasso Public Works Authority.
APPROVED:
Juliann M. Stevens, Authority Clerk
APPROVED AS TO FORM:
Julie Lombardi, Authority Attorney
ENGINEER
13
Date /_/
OWASSO PUBLIC WORKS AUTHORITY
Dr. Chris Kelley, Chair
Date _//
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -6
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLIC WORKS AUTHORITY
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
Scope of Project
Attachment A
SCOPE OF PROTECT. The PROJECT shall consist of civil engineering SERVICES
described as follows:
Design of the Coffee Creek Lift Station and Force Main will replace existing equipment due
to age and condition, as well as increase sanitary sewer capacity within the basin.
The lift station and appurtenances will be decommissioned as part of the project and the
area disturbed will be restored.
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 G.7
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLIC WORKS AUTHORITY
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
Scope of Services
Attachment B
The services to be performed by the ENGINEER under this AGREEMENT will consist of
designing the Coffee Creek Lift Station and Force Main Project., execution of the work will
be broken up into seven major work tasks, as stated below. Further, it is understood and
agreed that the date of beginning, rate of progress, and the time of completion of the work
to be done hereunder are essential provisions of this AGREEMENT; and it is further
understood and agreed that the work embraced in this AGREEMENT shall commence upon
execution of the AGREEMENT and receipt of Notice to Proceed. The Basic Services of
ENGINEER consist of the following tasks:
Scope of Services
Kellogg Engineering, Inc. proposes to furnish the AUTHORITY the following professional
engineering services for the design of the Coffee Creek Lift Station and Force Main Project:
1. Engineering Report
1.1 Working in concert with the Owasso Public Works Department, establish
ultimate extents of the lift station service area;
1.2 Using the Land Use Master Plan, project flows for each site property in the
established service area;
1.3 Utilize same flow criteria (gpm per household and commercial area) used in
determining the flows for Coffee Creek Lift Station and Force Main;
1.4 Utilize flow data acquired by the City of Owasso design criteria. 100 gpcpd to
be used unless otherwise determined to be higher or lower. Use 2.5 peaking
factor unless determined to be higher or lower;
1.5 Determine the capacity of the pumps based on the City of Owasso design
criteria. Utilize three (3) pump arrangement, if necessary. Limit lift station
run time to 12 -15 hours a day during peak conditions, if allowable;
1.6 Evaluate odor control for the lift station;
1.7 Recommend reserve power options for the site;
1.8 Document necessary tower height to serve lift station with existing SCADA
1.9 Determine ROW/ easements needed to obtain and access the site;
1.10 Determine capacity of the existing 8" force main and propose line size to
parallel and work in conjunction with the existing 8" line or with a new line
to replace the 12 ". Max velocity of 8 fps to be used on any force main,
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 G8
1.11 Determine depth and diameter of the wet -well needed to serve ultimate
service area;
1.12 Recommend hoist for the new lift station.
2. Survey/ROW Documents
2.1 Ground Survey - Arrange for, as needed, a survey of the sites, as need to
determine best location for the lift station and force main. The survey shall
consist of:
• Establish a temporary benchmark near the lift station site from an
established existing monument,
• Verify elevations of structures as needed;
• Perform property survey of final selected sites;
2.2 ROW documents - Provide legal descriptions and exhibits for all easements
to be acquired by the City.
3. Detailed Design
3.1 Regular Meetings - Attend a progress meeting each month with the
wastewater/ engineering staff to review technical aspects of the project;
3.2 Plan Review Meetings - Attend 30% (Report review), 60% (Preliminary
plans), and 90% (Final plans) review meetings;
3.3 Project Management - Project management activities include reviewing
invoices as provided by the AUTHORITY and providing project status
reports for the AUTHORITY'S review;
3.4 Drawings - Prepare construction drawings for the lift station and force main
project.
4. Detailed Specifications
4.1 Detailed Specifications - Prepare construction specifications with the
construction drawings, for taking competitive bids and entering into a
construction contract with an experienced and competent contractor for the
project. Specifications will include bid information and contract terms as
required by the AUTHORITY. AUTHORITY standards for lift station
construction and control/ operations shall be included.
5. Geotechnical Report
5.1 Geotechnical Report - Prepare a geotechnical report, which shall include soil
borings to a minimum depth of 5 feet below the required depth of the wet
well. The report shall address type/ depth of rock layers, depth to subsurface
water, ability to excavate the rock without using explosives, etc. for the
selected lift station site using information from the subsurface evaluation
portion of the work.
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 O.9
6. Cost Opinion Development
6.1 Cost Opinion - Prepare final Engineer's Opinion of Construction Cost,
including 15% contingencies.
7. Bid Assistance
7.1 Contract Documents - The lift station and force main project will be bid as a
single project. Assist AUTHORITY in advertising for bid. Mail notices to
prospective bidders and distribute documents to prospective bidders;
7.2 Pre -Bid Conference - Attend pre -bid meeting for the project. AUTHORITY to
furnish bid sets (drawings and detailed specifications - matter copy to be
provided by engineer);
7.3 Bidders Inquiries and Addenda - Respond to bidders inquires during the
bidding period. Prepare addenda to the contract documents as necessary;
7.4 Pre -Award - Tabulate bids and prepare recommendation letter.
8. Construction Assistance
8.1 Attend pre -work conference;
8.2 Review and approve all submittals;
8.3 Review and approve all pay applications;
8.4 Answer questions throughout the project regarding design intent;
8.5 Prepare Record Drawings of the project.
9. Assumptions and limitations of the engineering services
9.1 Proposed Coffee Creek Lift Station shall be designed similar to the Morrow
Lift Station; foot print, layout, wet -well, control building, piping, and overall
concept.
9.2 The proposed Coffee Creek Lift Station will be located southeast of the
existing lift station, on the east side of 145Th south of the creek;
9.3 The proposed force main along 145Th will be wholly contained within
existing right -of -way easements. Additional right -of -way easements along
145Th shall be limited to six (6) additional parcels;
9.4 Topographic survey for the proposed force main shall be limited to the
proposed alignment, which is assumed to be the west side of 145Th parallel
and adjacent to the existing force main line and shall be limited to a strip 70
feet west of the centerline of 145Th, unless existing structures impedes the
survey alignment;
9.5 Engineer shall provide survey control along the proposed force main
alignment and shall stake the property boundary of the proposed lift station
site and shall provide coordinates of staked control points, all of which shall
be limited to one staking/ set of stakes;
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -10
9.6 No formal mitigation procedures are required for environmental issues;
9.7 Engineer is not responsible for construction staking; however control stakes
and benchmarks with coordinates shall be provide and shall be limited to one
staking /set of stake ;
9.8 Engineer shall prepare and provide "As- Built" drawing upon completion of
the Project, but is not responsible for "As- Built" survey;
9.9 Engineer is exempt from paying City of Owasso review fees;
9.10 Engineer shall prepare USACE 404 under the "USACE Nationwide
Permitting Process" as needed;
9.11 Engineer is not responsible for USACE 404 permit under the "USACE
Individual Permitting Process" nor any related mitigation;
9.12 Advertising fees not responsibility of the Engineer;
9.13 Engineer is not responsible for ODEQ, OWRB, or USACE fees;
9.14 Engineer is not responsible for mitigation credits or any related fees;
9.15 Engineer is not responsible for right -of -way acquisition or any related fees;
9.16 Engineer is not responsible for construction inspection; however the Engineer
shall make routine site visits upon request of the Authority;
9.17 Engineer is not responsible for project management or construction
management;
9.18 Engineer is not responsible for any Environmental Review, study, or report,
9.19 Engineer is not responsible for preparation of a CLOMR /LOMR for the
proposed Project;
9.20 Reproduction shall be limited as follows:
9.20.1 50% Complete Review -1 full size set, 5 half size sets, and half size PDFs;
9.20.2 95 % Complete Review -1 full size set, 5 half size sets, and half size PDFs;
9.20.3 100% Complete -1 full size set, 5 half size sets, half size PDFs, and full
size PDFs;
9.20.4 "As- Builts" - 1 full size set of PDFs, 1 full size set of Mylars, and 1 set of
construction plans in CAD format including "ctb" files;
9.21 Project shall be funded by the City of Owasso and that standard Owasso
contract documents and specifications shall apply;
9.22 Engineer is not for any type of funding applications, engineering reports,
and/or engineering documentation as required by outside funding by state
agencies;
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -16 C -11
9.23 Engineer is not responsible for a "FACT" based Engineering Report as
required by OWRB. Engineer shall prepare an ODEQ approvable
engineering report assuming no outside funding by state agencies
9.24 Engineering report shall be limited to the Proposed Lift Station and Proposed
Force Main and shall not include any analysis or study of the Elm Creek
Interceptor;
9.25 Engineering report shall be limited to and /or shall stop at the connection of
the proposed Force Main to the Elm Creek Interceptor;
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -12
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLICS WORKS AUTHORITY
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
Responsibilities of the AUTHORITY
Attachment C
RESPONSIBILITIES OF THE AUTHORITY. The AUTHORITY agrees:
C.1 Reports, Records, etc: To furnish, as required by the work, and not at the expense of
the ENGINEER:
C.1.1 Records, reports, studies, plans, drawings, and other data available in the
files of the AUTHORITY that may be useful in the work involved under this
AGREEMENT
C.1.2 Standard construction drawings and standard specifications
C.1.3 ENGINEER will reasonably rely upon the accuracy, timeliness, and
completeness of the information provided by AUTHORITY.
C2 Access: Provide access to public and private property when required in
performance of ENGINEER's services.
C.3 Staff Assistance: Designate the Public Works Director or another individual
designated in writing to act as its representative in respect to the work to be
performed under this AGREEMENT, and such person shall have complete authority
to transmit instructions, receive information, interpret and define AUTHORITY'S
policies and decisions with respect to materials, equipment, elements and systems
pertinent to the services covered by this AGREEMENT.
C.3.1 Furnish staff assistance in locating, both horizontally and vertically, existing
AUTHORITY owned utilities and in expediting their relocation as described
in Attachment B. Further, AUTHORITY will furnish assistance as required in
obtaining locations of other utilities, including excavations to determine
depth.
C.3.2 Furnish legal assistance as required in the preparation of bidding, property
acquisition, construction and other supporting documents.
CA Review: Examine all studies, reports, sketches, estimates, specifications, drawings,
proposals and other documents presented by ENGINEER and render in writing
decisions pertaining thereto within a reasonable time so as not to delay the services
of ENGINEER.
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -13
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLIC WORKS AUTHORITY
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
Compensation
Attachment D
COMPENSATION. The AUTHORITY agrees to pay, as compensation for services set
forth in Attachment B, the following fees, payable monthly as the work progresses; and
within 30 calendar days of receipt of invoice. ENGINEER shall submit monthly invoices
based upon actual hours or work, invoiced according the Rate Schedule provided in
ATTACHMENT E, completed at the time of billing. Invoices shall be accompanied by such
documentation as the AUTHORITY may require in substantiation of the amount billed.
D.1 Total Compensation
For the work under this project the total maximum billing including direct costs and
subconsultant services shall be $260,625.00 which amount shall not be exceeded
without further written authorization by AUTHORITY.
D.2 Subconsultants and Other Professional Associates: All Subconsultant and Other
Professional Associate costs are included in the Total Compensation. Services of
subcontractors and other professional consultants shall be compensated for at actual
cost. Sub - consultants to be used must be authorized in advance by AUTHORITY.
D.3 Other Direct Costs: All Direct Costs are included in the Total Compensation.
D.3.1 Travel and subsistence shall be compensated for at actual cost. Local travel
by personal or firm automobile shall be compensated for at the rate currently
allowed by the IRS.
D.3.2 Printing expenses are included in the maximum fee.
D.3.3 Any other direct costs shall be compensated for at actual cost when
authorized in advance by AUTHORITY.
DA Additional Services: Unless otherwise provided for in any accepted and authorized
proposal for additional services, such services shall be compensated for on the same
basis as provided for in Attachment D.
D.5 Terminated Services: If this AGREEMENT is terminated, ENGINEER shall be paid
for services performed to the effective date of termination.
D.6 Conditions of Payment
D.6.1 Progress payments shall be made in proportion to services rendered and
expenses incurred as indicated within this AGREEMENT and shall be due
and owing within thirty days of ENGINEER'S submittal of his progress
payment invoices.
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07 -31 -18 C -14
D.6.2 If AUTHORITY fails to make payments due ENGINEER within sixty days of
the submittal of any progress payment invoice, ENGINEER may, after giving
fifteen days written notice to AUTHORITY, suspend services under this
AGREEMENT.
D.6.3 If the PROJECT is delayed, or if ENGINEER'S services for the PROJECT are
delayed or suspended for more than ninety days for reasons beyond
ENGINEER'S control, ENGINEER may, after giving fifteen days written
notice to AUTHORITY, request renegotiation of compensation.
AGREEMENT WITH KELLOGG ENGINEERING REVISED DT31 -18 C-15
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLIC WORKS AUTHORITY
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
Billing Rate Sheet
Attachment E
KELLOGG ENGINEERING, INC.
Current Hourly Fee Schedule
Effective January 1, 2018
Principal Engineer ....... ............................... $110 /hour
Structural Engineer ....... ............................... $100 /hour
Project Manager ........ ............................... $100 /hour
Engineering /Drafting GIS Technician ....................... $85 /hour
Clerical ............... ............................... $35 /hour
Direct Expenses ........ ............................... Cost+ 15%
Travel................ ............................... $0.55 /mile
Geotechnical Engineer .... ............................... $95 /hour
Survey Crew ......... ............................... $150 /hour
Registered Surveyor ..... ............................... $100 /hour
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07-31 -18 C16
AGREEMENT FOR ENGINEERING SERVICES
FOR THE OWASSO PUBLIC WORKS AUTHORITY
COFFEE CREEK LIFT STATION AND FORCE MAIN DESIGN
Schedule
Attachment F
F. SCHEDULE. The schedule for general engineering services for the PROJECT is
provided as follows:
F.I. Notice to Proceed: September, 2018
F.2. Final Design Completion: September, 2019
AGREEMENT WITH KELLOGG ENGINEERING REVISED 07.31AS x.17
Coffee Creek Lift Station Improvements
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 08118/18
Department Payroll Expenses Total Expenses
400
OPWA Administration
11,125.43
16,600.73
405
Utility Billing
6,052.00
11,390.73
420
Water
14,252.22
24,640.98
450
Wastewater
14,103.27
24,379.18
455
Wastewater Collection
10,990.13
18,542.85
480
Refuse
13,644.42
22,385.77
485
Recycle Center
1,200.00
1,843.59
FUND TOTAL
71,367.47
119,783.83