HomeMy WebLinkAbout2019.04.02_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE OWASSO PUBLIC WORKS AUTHORITY (OPWA) Council Chambers, Old Central Building 109 North Birch, Owasso, OK 74055 Regular Meeting Tuesday, April 2, 2019 - 6:30 pm 1. Call to Order Chair Chris Kelley 2. Roll Call RECEIVED MAR 2 9 2019S�? City Clerk's Office 3. Consideration and appropriate action relating to a request for approval of the Consent Agenda. (All matters listed under "Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee may, however, remove an Item from the Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.) A. Approve minutes • March 19, 2019, Regular Meeting B. Approve claims 4. Consideration and appropriate action relating to items removed from the Consent Agenda 5. Consideration and appropriate action relating to the award of a bid for the 2019 South Main Street Sanitary Sewer Improvement Project Daniel Dearing Staff recommends awarding the construction contract to Sapulpa Digging, Incorporated of Sapulpa, Oklahoma, in the amount of $546,650. 6. Report from OPWA Manager 7. Report from OPWA Attorney 8. Official Notices to Authority (documents for acknowledgment or information only, no discussion or action will be taken) • Payroll Payment Reports - Pay Period Ending Date 3/16/19 9. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda) 10. Adjournment Notice of Public Meeting filed in the office of the City Clerk on December 14, 2018, and the Agenda posted at City Hall, 200 South Main Street, at 00 pm on Friday, Mar h 29, 2019. ct `2 J� i nn M. Stevens—,C4Vy Clerk The City of Owasso encourages citizen participation. To request an accommodation due to a disability, contact the City Clerk at least 48 hours prior to the scheduled meeting by phone 918- 376 -1502 or by email to istevens@cityofowosso.com OWASSO PUBLIC WORKS AUTHORITY (OPWA) MINUTES OF REGULAR MEETING Tuesday, March 19, 2019 The Owasso Public Works Authority (OPWA) met in regular session on Tuesday, March 19, 2019, in the Council Chambers at Old Central, 109 North Birch, Owasso, Oklahoma per the Notice of Public Meeting filed December 14, 2018, and the Agenda filed in the office of the City Clerk and posted at City Hall, 200 South Main Street, at 6:00 pm on Friday. March 15, 2019. 1. Call to Order Chair Chris Kelley called the meeting to order at 7:16 pm. 2. Roll Call Present Absent Chair - Chris Kelley Trustee - Kelly Lewis Vice Chair- Bill Bush Trustee - Doug Bonebrake Trustee - Lyndell Dunn A quorum was declared present. Staff: Authority Manager- Warren Lehr Authority Attorney - Julie Lombardi 3. Consideration and appropriate action relating to a request for approval of the Consent Agenda. (All matters listed under "Consent" are considered by the Authority to be routine and will be enacted by one motion. Any Trustee may, however, remove an item from the Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.) A. Approve minutes • March 5, 2019, Regular Meeting • March 12, 2019, Regular Meeting B. Approve claims Mr. Dunn moved, seconded by Mr. Bush to approve the Consent Agenda with claims totaling $349,321.83. YEA: Bonebrake, Bush, Dunn, Kelley NAY: None Motion carried: 4 -0 4. Consideration and appropriate action relating to items removed from the Consent Agenda None 5. Consideration and appropriate action relating to Resolution 2019 -01, agreeing to file application with the Oklahoma Water Resources Board (the "OWRB ") for financial assistance through the state loan program, with the loan proceeds being for the purpose of financing certain water and wastewater system improvements; approving professional services agreements with The Public Finance Law Group PLLC, as the Authority's Bond Counsel and with Municipal Finance Services, Inc., as the Authority's Financial Advisor; and containing other related provisions Linda Jones presented the item, recommending approval of Resolution 2019 -01. There were no comments from the audience. After discussion, Mr. Bonebrake moved, seconded by Mr. Dunn to approve Resolution 2019 -01, as recommended. YEA: Bonebrake, Bush, Dunn, Kelley NAY: None Motion carried: 4 -0 Owasso Public Works Authority March 19, 2019 Page 2 6. Report from OPWA Manager None 7. Report from OPWA Attorney None 8. Official Notices to Council (documents for acknowledgment or information only, no discussion or action will be taken) The Chair acknowledged receipt of the following: • Payroll Payment Reports - Pay Period Ending Date 03/02/2019 • Monthly Budget Report - February 2019 9. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda) None 10. Adjournment Mr. Bush moved, seconded by Mr. Dunn to adjourn the meeting. YEA: Bonebrake, Bush, Dunn, Kelley NAY: None Motion carried: 4 -0 and the meeting adjourned at 7:22 pm. Chris Kelley, Chair Juliann M. Stevens, Authority Clerk Claims List - 412!2019 Fund Vendor Name Payable Description Payment Amount 61 OPWA AMERICAN MUNICIPAL SERVICES CORP. COLLECTION SERVICES $224.23 OPWA -Total $224.23 AEP /PSO ELECTRIC USE $1,635.09 CINTAS CORPORATION FIRST AID SUPPLIES $78.95 CITY OF OWASSO ADMIN OVERHEAD $25,000.00 CLEAN UNIFORM COMPANY UNIFORM SERVICE $54.82 HOLDER'S INC. REPLACE HARDWARE $358.79 JPMORGAN CHASE BANK ADMIRAL EXP- FILTERS $5.29 JPMORGAN CHASE BANK OFFICE DEPOT- SUPPLIES $38.85 JPMORGAN CHASE BANK OWASSO CHAMBER -FEE $40.00 JPMORGAN CHASE BANK SAMS - SUPPLIES $117.44 STANDLEY SYSTEMS, LLC COPIER MAINTENANCE $286.65 OPWA ADMINISTRATION -Total $27,615.88 BANCFIRST 800469017/098 $55,960.40 BANCFIRST 800470015/09C $23,361.34 BANCFIRST 800471013 /SANTA FE $14,375.74 BANCFIRST 800472011 /RANCH CRK $25,377.32 OPWA DEBT SERVICE -Total $119,074.80 JPMORGAN CHASE BANK GRAYBAR -DATA WIRE $293.20 JPMORGAN CHASE BANK HOME DEPOT - ROLLERS $38.91 JPMORGAN CHASE BANK LOWES- ADHESIVE $28.48 JPMORGAN CHASE BANK LOWES- MATERIALS $87.77 JPMORGAN CHASE BANK LOWES -PAINT $706.94 JPMORGAN CHASE BANK LOWES- PAINT/WOOD $194.92 JPMORGAN CHASE BANK LOWES- REFUND ($14.19) JPMORGAN CHASE BANK LOWES- SHELVING $27.92 JPMORGAN CHASE BANK LOWES- STAIN /BRUSHES $52.29 JPMORGAN CHASE BANK LOWES- SUPPLIES $1,115.62 JPMORGAN CHASE BANK LOWES -TAPE $37.96 JPMORGAN CHASE BANK LOWES- TROWEL $10.98 JPMORGAN CHASE BANK LOWES -VENT REDUCER $7.98 JPMORGAN CHASE BANK TINT SHOP- TINTING $300.00 PT ENTERPRISES LLC CARPET $550.00 PW OFFICE REMODEL -Total $3,438.78 AEP IPSO ELECTRIC USE $176.53 CLEAN UNIFORM COMPANY UNIFORM SERVICE $9.22 JPMORGAN CHASE BANK TULSA MOBILE -DOOR $256.51 RECYCLE CENTER -Total $444.26 CINTAS CORPORATION FIRST AID SUPPLIES $67.60 CLEAN UNIFORM COMPANY UNIFORM SERVICE $51.16 l Fund 61 OPWA Claims List - 4/2/2019 Vendor Name JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK JPMORGAN CHASE BANK SPOK, INC. Payable Description Payment Amount BUMP2BUMP -BOLT $3.99 BUMP2BUMP- CLEANER $10.58 BUMP2BUMP -PARTS $9.78 BUMP26UMP- REFUND ($39.91) BUMP2BUMP- SUPPLIES $36.47 BUMP2BUMP -ZIP TIESrFA $101.88 GRAINGER- PULLEY $37.96 P &K -AIR FILTER $11.98 SAMS- SUPPLIES $20.78 SEMI TRUCK -WASH $130.00 PAGER USE $71.28 REFUSE COLLECTIONS -Total $513.55 TULSA WORLD PROOF OF PUBLICATION $76.26 SO MAIN GRAV SEWER LINE -Total $76.26 TECHNICAL PROGRAMMING SERVICES INC BILLING SERVICES $1,477.62 TODD C. KIMBALL METER READER $333.00 TYRONE EUGENE DINKINS METER READER $1,365.30 UTILITY BILLING -Total $3,175.92 AEP IPSO ELECTRIC USE $5,72712 CLEAN UNIFORM COMPANY UNIFORM SERVICE $50.80 DUKE'S ROOT CONTROL, INC ROOT CONTROL $19,705.40 JAMES A. OZBUN REWIND & REPAIR $2,390.00 JPMORGAN CHASE BANK BROOKFIEL $60.60 JPMORGAN CHASE BANK BUMP2BUMP -BELT $15.90 SPOK, INC. PAGER USE $49.05 TREASURER PETTY CASH TRAVEL EXPENSE -BOGGS $236.16 TREASURER PETTY CASH TRAVEL EXPENSE - CORLEY $46.75 WASHINGTON CO RURAL WATER DISTRICT MORROW LS WATER $61.71 WASTEWATER COLLECTIONS -Total $28,282.89 AEP /PSO ELECTRIC USE $31,259.22 CLEAN UNIFORM COMPANY UNIFORM SERVICE $110.22 JPMORGAN CHASE BANK AMAZON- FILTERS $349.93 JPMORGAN CHASE BANK AMAZON -PIPET TIPS $36.24 JPMORGAN CHASE BANK BUMP2BUMP -OIL $60.60 JPMORGAN CHASE BANK DEQ -TEST FEE $62.00 JPMORGAN CHASE BANK EVOQUA- MATERIAL $579.50 JPMORGAN CHASE BANK FORT BEND - POLYMER $2,970.00 JPMORGAN CHASE BANK HACH -PARTS $54.49 JPMORGAN CHASE BANK LOWES- SUPPLIES $50.92 JPMORGAN CHASE BANK WALMART -WATER $16.92 SPOK, INC. PAGER USE $17.82 2 Claims List - 4/2/2019 Fund Vendor Name Payable Description Payment Amount 61 OPWA WASTEWATER TREATMENT -Total $35,567.86 ... AEP IPSO ELECTRIC USE $470.97 CITY OF TULSA DEPT OF FINANCE LAB SERVICES FOR FEB 2019 $500.00 CLEAN UNIFORM COMPANY UNIFORM SERVICE $74.36 JET TRUCKING, LLC YARD DIRT $55.00 JPMORGAN CHASE BANK BROWN FARMS -SOD $95.00 JPMORGAN CHASE BANK CORE &MAIN -CAPS $1,050.00 JPMORGAN CHASE BANK CORE&MAIN- SADDLES $647.33 JPMORGAN CHASE BANK LOWES- SUPPLIES $29.24 JPMORGAN CHASE BANK LOWES -WATER HOSE $29.35 JPMORGAN CHASE BANK UTILITY SPLY -HYD METE $654.00 SPOK, INC. PAGER USE $98.59 WATER -Total $3,703.84 OPWA -Total $222,118.27 67 OPWA SALES TAX BANCFIRST 80065001212016 NOTE $132,503.08 BANCFIRST 800730038/2018 NOTE $93,700.00 OPWASTF DEBT SERVICE -Total $226,203.08 OPWA SALES TAX -Total $226,203.08 69 OPWA SALES TAX SUB MORROW PLACE INVESTMENT GROUP LLC DEVELOPMENT AGREEMENT $3,935.99 ACCOUN OPWA ST SUB - DEBT SERV -Total $3,935.99 OPWA SALES TAX SUB ACCOUN - Total $3,935.99 OPWA Grand Total $452,257.34 3 HEAL People • REAL cnantlar •REAL Commonly TO: The Honorable Chair and Trustees Owasso Public Works Authority FROM: Daniel Dearing, P.E., CFM Sr. Civil Engineer SUBJECT: Recommendation for Contract Award 2019 South Main Street Sanitary Sewer Improvements DATE: March 29, 2019 BACKGROUND: As being one of the longest standing areas of our community, Original Town's supporting infrastructure has aged. In the past few years, pavement repairs in Original Town have been a focus of City staff. Also, aging in parts of Original Town are subsurface areas hidden beneath in the sanitary sewer and storm drainage systems. Storm drainage system problems can sometimes be easy to determine with the evidence of poor street drainage but sanitary sewer system dilapidation can be harder to determine since they occur in an enclosed pipe and manhole system. After experiencing some sanitary sewer system surcharges in Original Town, City staff performed flow test studies and used video camera inspection to help identify problem areas causing the surcharging. Identified problem areas were from Atlanta Street to Main Street and from Main Street to 5th Avenue. Many of these problems were repaired under 76th Street and Main Street as a part of the intersection improvement project prior to the installation of the concrete surface. Additional problems in the alley from Atlanta Street to Main Street in Block 22 of Original Town were resolved when the replacement of the sanitary sewer line occurred as a part of Block 22 OT Alley Improvements project completed in September 2018. In August 2018, the City Engineering staff began in -house survey and design of the final phase of replacing the remaining problematic sanitary sewer south of 76th Street and Main Street Intersection. The project will replace, and upsize for future growth potential, the sanitary sewer line under South Main Street from the end of the previous improvements to the City's Relief Pump Station. Utilizing an open City lot south of 5th Avenue for a cost savings to the City, staff completed the design in November 2018, with an engineering estimate of $561,885.25 for the project, and received Oklahoma Department of Environmental Quality (ODEQ) permit to construct in December 2018. Staff delayed scheduled soil -boring exploration, needed for bidding purposes, from December to January in order to lump together with other projects and provide an additional cost savings to the City. Upon receiving the soil -boring exploration data February 1, 2019, City staff completed the preparation of bidding documents and proceeded with project advertisement. SOLICITATION OF BIDS: In February 2019, City Engineering staff completed final bid documents and published advertisements in accordance with state statutes. A mandatory pre -bid meeting was held on March 7, and bids were opened on March 21, with a total of seven contractors submitting bids. City Engineering staff completed a Bid Tabulation and Sapulpa Digging, Inc. was determined to be lowest qualified bidder. The bid amount provided by Sapulpa Digging, Inc. is $546,650. IUZIQIlk e3i Funds are available in the FY 2019 Wastewater Collections Division budget. PUBLIC MEETING: Due to the project's location along South Main Street, upon entering into a contractual agreement, City staff will hold a public meeting at City Hall in the Community Room on April 11, 2019, at 6:30 pm to discuss the nature and sequence of the project to the residents and business owners in the area. RECOMMENDATION: Staff recommends award of a construction contract to Sapulpa Digging, Incorporated of Sapulpa, Oklahoma, for the 2019 South Main Street Sanitary Sewer Improvements in the amount of $546,650. ATTACHMENTS: Site Map Bid Tabulation Contract Documents all ciTr HALL _/ SKATE PARK F ECT TIONI t 2019 SOEWERMAIN ROREET SANITARY I CITY OF OWASSO I 43 LF 12" SEWER MAIN 21240 LF 1511 SEWER MAIN 3/5/2019 1 14 IRPOSE ONLY.ANU IS NOT INTENDED TO UF. SCAI'..F. USA OF 7R IS MAP IS W'IT140i.:'1' BY CITY OF <')WASSO OF ITS AC 200 S. Main Street P.O. Box 180 Owasso, OK 74055 918.376.1500 BID DOCUMENTATION Number of Bids: Bids Opened By: Witnesses: Daniel Dearing Jacob Ketner Ron Easterling Brandon Hancock CITY OF OWASSO, OKLAHOMA 2019 South Main Street Sanitary Sewer Improvements Bid Opening: March 21, 2019 Travis Blundell Steve Nelms Earl Farris BIDDER Lump Sum Base Bid Sapulpa Digging, Inc. $546,650.00 R.L. Hensley Construction, Inc. $574,103.50 Tri-Star Construction, LLC $591,572.17 Grade Line Construction, LLC $604,831.75 Triangle Construction & Utility $672,169.00 McGuire Brothers Construction, Inc. $796,000.00 Timber Wolf Excavating, LLC. $812,888.50 Certification: I, Daniel Dearing, Contract Administrator, do hereby certify that, to the best of my knowledge, this Bid Documentation is true and correct. Signa Date: ture:�G�/ March 21,1, 2019 4elo SECTION 00300 AGREEMENT THIS AGREEMENT is dated as of the 2nd day of April, 2019, by and between The Owasso Public Works Authority, Owasso, Oklahoma (hereinafter called OWNER) and Sapulpa Digging, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: 2019 SOUTH MAIN SANITARY SEWER IMPROVEMENTS OWASSO, OKLAHOMA The project, for which the Work under the contract documents may be the whole or only a part, is described as follows: Sanitary sewer replacement for approximately 2280 LF of existing line. Proposed line is parallel to the existing line under roadway for approximately half the project length and then in a new alignment across an open field for the other portion of the project. ARTICLE 2. ENGINEER The project has been assigned to the Project Manager or his /her duly authorized representative, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIME 3.1 The Work will be substantially completed within Seventy -five (75) calendar days from the date of Notice to Proceed, and completed and ready for final payment in accordance with the General Conditions within Ninety (90) calendar days from the date of Notice to Proceed. The date of final completion will, therefore, be on or before 0219 00300 - Pale I of 15 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER, if the Work is any such proof. OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER One Thousand Dollars ($1000.00) for each consecutive calendar day that expires after the time specified in paragraph 3.1 for substantial completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER One Thousand Dollars ($1000.00) for each consecutive calendar day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. ARTICLE 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds the amount agreed upon in CONTRACTOR'S bid. 4.2 CONTRACTOR understands that the estimated quantities are not guaranteed and that the determination of actual quantities and their classification is to be made by the OWNER at the time of application for payment. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with the General Conditions on the Pay Estimate Forms included as Exhibit "A" to this Agreement. Applications for Payment will be processed by OWNER as provided in the General Conditions. 5.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTORs Applications for Payment in accordance with the Owasso Public Works Authority Payment Schedule included as Exhibit 'B" to this Agreement during construction as provided below. All progress payments will be on the basis of the progress of the Work. 5.1.1 Progress payments shall not exceed an amount equal to 90% of the WORK completed until such time as CONTRACTOR shall complete in excess of fifty percent (50 %) of the contract amount. 5.1.2 Upon completion in excess of fifty percent (50 %) of the total contract amount, Owner shall pay an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as OWNER shall determine in accordance with the General Conditions, provided that OWNER has determined that satisfactory progress is being made and upon approval by the Surety. 0219 00300 - Page 2 of 15 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with the General Conditions, OWNER shall pay the Contract Price. ARTICLE 6. CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself /herself with the nature and extent of Contract Documents, Work, locality, and with all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress or performance of the Work. 6.2 CONTRACTOR has studied carefully all reports or explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplementary Conditions as provided in the General Conditions. Contractor accepts the determination set forth in the General Conditions of the extent of the "technical data" contained in such reports and drawings upon which Contractor is entitled to rely. Contractor acknowledges that such reports and drawings are not Contract Documents and may not be complete for Contractor's purposes. Contractor acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to underground facilities at or continuous to the site. Contractor has obtained and carefully studied (or assume responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 6.3 CONTRACTOR has made or caused to be made examinations, investigations, tests and studies of such reports and related data in addition to those referred to in paragraph 6.2 as (s)he deems necessary for the performance of the Work at the Contract price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, tests, reports or similar data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price within the 0219 00300 - Page 3 of 15 Contract Time and in accordance with the other terms and conditions of the Contract Documents, including the General Conditions. 6.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONTRACTOR has given OWNER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents, and the written resolution thereof by OWNER is acceptable to CONTRACTOR. 6.7 CONTRACTOR has obligated himself /herself to the OWNER to be responsible for the workmanship, labor and materials used in the project for one (1) year after the project has been accepted by the OWNER. 6.8 CONTRACTOR understands that (s)he will be exempt from all sales tax on materials and other items necessary for the completion of the project. The OWNER has issued him a Certification of Tax Exempt Project enclosed as Exhibit "C" of this Agreement. ARTICLE 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR are attached to this Agreement, made a part hereof, and consist of the following: 7.1 This Agreement (pages 1 to 6 inclusive). 7.2 Exhibits "A ", "B ", "C" and "D" to this Agreement. 7.3 Advertisement for Bids (Section 00100). 7.4 Requirements for Bidders (Section 00110). 7.5 Instructions to Bidders (Section 00120). 7.6 Bid (Section 00200). 7.7 Bid Bond (Section 00210). 7.8 Bid Affidavits (Section 00220). 7.9 Statement of Bidders Qualifications (Section 00230). 7.10 Certificate of Non - Discrimination (Section 00240). 7.11 Performance Bond (Section 00410). 7.12 Maintenance Bond (Section 00420). 0219 00300 - Page 4 of 15 7.13 Statutory payment Bond (Section 00430). 7.14 Notice of Award (Section 00510). 7.15 Notice to Proceed (Section 00520). 7.16 Change Order (Section 00600). 7.17 General Conditions (Section 00700). 7.18 Project Specifications (Section 00800). 7.19 Special Provisions (Section 00900). 7.20 Project Drawings, consisting of Sheets 1 to 13, inclusive, and Standard Drawings. 7.21 Addendum Numbers to , inclusive. 7.22 Documentation submitted by CONTRACTOR prior to Notice of Award (pages to _ inclusive). 7.23 Any Modification, including Change Orders, duly delivered after execution of Agreement. There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be altered, amended or repealed by a Modification (as defined in the General Conditions). ARTICLE 8. MISCELLANEOUS 8.1 Terms used in this Agreement which are defined in the General Conditions shall have the meanings indicated in the General Conditions. 8.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law) and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3 OWNER and CONTRACTOR each binds himself /herself, his /her partners, successors, assigns, and legal representatives to the other party hereto, his /her partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 0219 00300 - Page 5 of 15 8.3 The Agreement (or remaining portions thereof) should continue in effect, be valid and binding upon both parties even if a provision or part of the Contract Documents should be held void or unenforceable by law. IN WITNESS WHEREOF, the parties hereby have signed this Agreement in duplicate. One counterpart has been delivered to CONTRACTOR, and one belongs to OWNER. All portions of the Contract Documents have been signed by OWNER and CONTRACTOR. This Agreement will be effective on April 2 "d. 2019. OWNER: Chris Kelley, Chair CONTRACTOR: ie (SEAL) (SEAL) ATTEST: Juliann M. Stevens, Authority er Title Title Address for giving notices: Owasso Public Works Authority PO Box 180 Owasso, OK 74055 0219 00300 - Page 6 of 15 OWASSO PUBLIC WORKS AUTHORITY PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 03/16/19 Department Payroll Expenses Total Expenses 400 OPWA Administration 14,574.31 21,907.95 405 Utility Billing 6,263.21 11,695.09 420 Water 14,568.24 24,806.44 450 Wastewater 13,527.21 23,675.60 455 Wastewater Collection 11,162.65 19,186.25 480 Refuse 12,682.66 22,350.80 485 Recycle Center 2,514.40 4,524.76 FUND TOTAL 75,292.68 128,146.89