Loading...
HomeMy WebLinkAbout2020 18_Project Agreement E 76th St N Railroad ImprovementsCITY OF OWASSO, OKLAHOMA RESOLUTION NO. 2020-18 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF, OWASSO, OKLAHOMA THAT: The City of Owasso has agreed to participate in Federal -aid Project NHHP -272N (324) RR, J/P No. 34640(28) (see Attachment "A" Project Agreement) for construction with Federal participation described as follows: West 2ND Street / East 76th Street North in Owasso, Tulsa County improvements include the following: • Cantilever mounted flashing light signals with gate arms utilizing prediction circuitry • A 64' full depth concrete surface • 200' of 4' wide raised concrete median using 8" non - mountable curb • Two R4 -7 merge right signs • Two W 10 -1 railroad advanced warning signs • Four sets of railroad advanced warning pavement markings, lane striping and stop bars • Motor Vehicle traffic will be rerouted via Main Street, East 86TH Street North and Memorial Drive as necessary during construction. PASSED AND APPROVED this 15th day of September, 2020. CITY OF OWASSO, TULSA COUNTY, OKLAHOMA BY: Bill Bush, Mayor REV WED for form and legality: Jul Lombardi, City Attorney TO: The Honorable Mayor and City Council FROM: Roger Stevens Public Works Director APPROVED BY COUNCIL SEP 15 1020 SUBJECT: Resolution 2020 -18, Funding Agreement, East 76th Street North Railroad Crossing Improvements and Budget Amendment DATE: September 11, 2020 BACKGROUND: In November 2019, staff and members of the Oklahoma Department of Transportation (ODOT) Railroad Division met at the East 76th Street North Rail Crossing, just west of City Hall to discuss future improvements. An ODOT inspection team graded the crossing as in poor condition and were developing a plan for to improve the pavement surface, as well as, install railroad crossing gate arms with flashing lights. SCOPE OF WORK: On June 1, 2020, the Oklahoma Transportation Commission authorized state apportioned Federal -aid funds to match City participating funds for Railroad Crossing Improvements in the City of Owasso, . designated as Federal -aid Project NHHP -272N (324) RR, JP # 34640(28) consisting of improvements to railroad crossing as follows: • Improve the crossing by adding cantilever mounted flashing light signals with gate arms utilizing prediction circuitry • A 64' full depth concrete surface • 200' of 4' wide raised concrete median using 8" non - mountable curb • Two R4 -7 merge right signs • Two W10 -1 railroad advanced warning signs • Four sets of railroad advanced warning pavement markings, lane striping and stop bars • Motor Vehicle traffic will be rerouted via Main Street, East 86th Street North and Memorial Drive as necessary during construction. PROPOSED AGREEMENT /RESOLUTION: In July 2020, ODOT sent an agreement /resolution to the City of Owasso with a funding breakdown for the project. The breakdown is based on the engineer's construction estimate provided by ODOT. Federal Highway Administration (FHWA) railway funds will fund 90% of eligible project costs for the flashing light signal crossing improvements, with a 10% local match. Furthermore, FHWA will fund 90% and South Kansas and Oklahoma Railroad will fund the remaining 10% of the repair to the street approach on each side of the crossing. The following table is a breakdown of the proposed funding agreement: East 76th Street North Railroad Crossing Improvements Funding Agreement Page 2 of 2 Project Segment TOTAL ODOT Portion City of Owasso SKO Railroad Signal Improvements $327, 180.00 $294,462.00 $32,718.00 Surface Improvements $105,614.00 $95,052.60 $10,561.40 Total Project Cost $432,794.00 $389,514.60 $32,718.00 $10,561.40 When originally proposed, the project was slated for July 2021, so funding for the City portion of the project was not included in the FY 2020 -2021 budget. Given the importance of the project, and that the accelerated project schedule makes the outside funding available for immediate use, staff intends to propose moving forward using a budget amendment to cover the City's portion. FUNDING: The FY 2020 -2021 Streets Division Budget did not include funding for the proposed improvements. As a result, a carryover of funds from the FY 2019 -2020 Streets Division Fund is requested to fund the agreement. RECOMMENDATION: Staff recommends approval of a budget amendment in the FY 2020 -2021 General Fund increasing revenues and the appropriation for expenditures by $32,718.00 utilizing carryover FY 2019 -2020 Streets Division Funds. Staff further recommends approval of Resolution 2020 -18, authorizing the Funding Agreement between City of Owasso and Oklahoma Department of Transportation for the railroad crossing improvements located at East 76th Street North and Atlanta Road. ATTACHMENTS: Resolution 2020 -18 Invoice Site Map