Loading...
HomeMy WebLinkAbout2017.01.09_Planning Commission AgendaOWASSO PLANNING COMMISSION REGULAR MEETING January 9, 2017 6:00 PM PUBLIC NOTICE OF THE MEETING OF THE OWASSO PLANNING COMMISSION TYPE OF MEETING: Regular DATE: January 9, 2017 TIME: 6:00 PM PLACE: Old Central 109 North Birch NOTICE FILED BY: Marsha Hensley TITLE: Assistant City Planner Filed in the office of the Owasso City Clerk and posted at City Hall, 200 South Main (west entrance) at 3:00 PM on January 5, 2017. Marsha Hensley, Assistant City Planner OWASSO PLANNING COMMISSION Monday, January 9, 2017 at 6:00 PM Old Central 109 North Birch AGENDA 1. Call to Order 2. Flag Salute 3. Roll Call 4. Presentation of the Character Trait of the Month - Discipline 5. Approval of Minutes from the December 12, 2016 Regular Meeting. 6. OZ 16 -11. Rezoning Et Plat Waiver - 304 N Main - Consideration and appropriate action relating to the request for the review and acceptance of a rezoning from RS -3 (Residential Single- family) to CS (Commercial Shopping). The property is located at 304 N Main and is approximately 0.72 acres. A plat waiver will accompany this request. 7. Final Plat - Keys Landing II - Consideration and appropriate action relating to the request for the review and acceptance of a final plat proposing ninety - seven (97) lots, in four (4) blocks on approximately 38.6266 acres. The property is located at N 129"' E Ave and E 68th St N. The property is zoned RS- (Residential Single - family). 8. Community Development Report • Report on Monthly Building Permit Activity • Director's Update • Discussion of TIF • Zoning Code Update • PC Work Session for the Zoning Code Update 9. Report on Items from the December 28, 2016 TAC Meeting • Final Plat - Keys Landing II • Easement Closure - 10005 E 90" Ct N • Site Plan - El Fogon 10. Report from Planning Commissioners 11. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda) 12. Adjournment OWASSO PLANNING COMMISSION MINUTES OF REGULAR MEETING Monday, December 12, 2016 The Owasso Planning Commission met in regular session on Monday, December 12, 2016 at Old Central per the Notice of Public Meeting and Agenda posted at City Hall, 200 S. Main (west side) at 2:00 pm on December 8, 2016. ITEM 1. CALL TO ORDER Dr. Loving called the meeting to order at 6:00 p.m. ITEM 2. Flag Salute ITEM 3. Roll Call PRESENT David Vines Dr. Paul Loving Tim Miller A quorum was declared present. STAFF Bronce Stephenson Julie Lombardi Marsha Hensley Karl Fritschen Daniel Dearing Roger Stevens Morgan Pemberton ABSENT Jennifer Koscelny Renee Mowery ITEM 4. Presentation of the Character Trait of the Month - Generosity ITEM 5. Approval of Minutes from November 7, 2016 Regular Meeting. The Commission reviewed the minutes. Mr. Miller moved, seconded by Mr. Vines, to approve the minutes from the November 7, 2016 Regular Meeting. A vote on the motion was recorded as follows: YEA: Miller, Vines, Dr. Loving NAY: None Motion carried 3 -0. OWASSO PLANNING COMMISSION December 12, 2016 Page No. 2 ITEM 6. Approval of Minutes from the November 21, 2016 Special Meeting. The Commission reviewed the minutes. Mr. Vines moved, seconded by Mr. Miller, to approve the minutes from the November 21, 2016 Special Meeting. A vote on the motion was recorded as follows: YEA: Miller, Vines, Dr. Loving NAY: None Motion carried 3 -0. ITEM 7. Final Plat - Glover Owasso - Consideration and appropriate action relating to the request for the review and acceptance of a final plat proposing one (1) lot, one (1) block on approximately five (5) acres. The property is located at 10505 N Owasso Expressway. The property is zoned CS (Commercial Shopping). Morgan Pemberton presented the staff report. The property location was described. The applicable paybacks and fees were noted. The Owasso Technical Advisory Committee reviewed the final plat at their November 16, 2016 meeting. Staff recommends approval of the final plat for Glover Owasso. Dr. Loving moved, seconded by Mr. Miller, to approve the final plat for Glover Owasso, subject to TAC and Staff recommendations. A vote on the motion was recorded as follows: YEA: Vines, Miller, Dr. Loving NAY: None Motion carried 3-0. ITEM 8. Final Plat - Lifepoint Church - Consideration and appropriate action relating to the request for the review and acceptance of a final plat proposing one (1) lot, one (1) block on approximately 4.99 acres. The property is located at 10857 E 11 6th St N. The property is zoned AG (Agriculture). Morgan Pemberton presented the staff report and described the property location. The applicable paybacks and fees were noted. The Owasso Technical Advisory Committee reviewed the final plat at their November 16, 2016 meeting. Staff recommends approval of the final plat for Lifepoint Baptist Church. Mr. Miller moved to approve the final plat for Lifepoint Church, subject to TAC and Staff recommendations. Dr. Loving seconded the motion. OWASSO PLANNING COMMISSION December 12, 2016 Page No. 3 YEA: Dr. Loving, Vines, Miller NAY: None Motion was approved 3 -0. ITEM 9. Community Development Report • Report on Monthly Building Permit Activity. • Director's Update • Public Works Update ITEM 10. Report on Items from the November 16, 2016 TAC Meeting • Final Plat- Grover Owasso • Final Plat- Lifepoint Church • Site Plan - 9inetyEight Apartments -Senior Living ITEM 11. Report from Planning Commissioners ITEM 12. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda). ITEM 13. Adjournment - Mr. Miller moved, seconded by Mr. Vines, to adjourn the meeting. A vote on the motion was recorded as follows: YEA: Dr. Loving, Vines, Miller NAY: None Motion carried 3 -0 and the meeting was adjourned at 6:50 PM. Chairperson Vice Chairperson Date TO: Owasso Planning Commission FROM: Karl Fritschen, Chief Urban and Long Range Planner SUBJECT: Rezoning (OZ- 16 -11) and Plat Waiver DATE: January 6, 2017 BACKGROUND: The City of Owasso received for review and consideration a rezoning application for property located at 304 N Main St. The property, which has never been platted, is 0.72 gross acres in size, with 0.25 acres of undedicated City right -of -way. If the right -of -way area is subtracted out of the total acreage, then 0.47 acres remains. The property falls within the recently approved TIF District and is within the amended Downtown Development District on the Land Use Plan. However, the property does not fall within the Downtown Overlay District defined in the Zoning Code. The applicant requests that the zoning be changed from RS -3 (Single - Family Residential High Density) to CS (Commercial Shopping). SURROUNDING ZONING: Direction Zoning Use Land Use Plan Jurisdiction RS -3 (Single - Family Single Family Downtown North Residential High Home Development City of Owasso Density) District South CS (Commercial Commercial Downtown Development City of Owasso Shopping) Parking Lot District RS -3 (Single - Family Residential High Single Family East Density) CS Home Residential City of Owasso (Commercial Shopping) RS -3 (Single - Family Single Family West Residential High Home Residential City of Owasso Density) SUBJECT PROPERTY /PROJECT DATA: Property Size 0.72 gross acres Current Zoning AG A riculture Proposed Use Commercial Lots /Blocks N/A Land Use Plan Downtown Development District Number of Reserve Areas N/A Within PUD? No Within Overlay District? No Water Provider City of Owasso Applicable Paybacks- Storm siren fee of $35 Streets (public or private) N/A ANALYSIS: The applicant is requesting CS (Commercial Shopping) zoning be applied to the property. The property falls within the Downtown Development District on the recently amended Land Use Master Plan, which allows CS zoning and encourages development to be pedestrian in scale and low intensity commercial development. Additionally, mixed use structures, with office or retail on the ground floor and loft apartments above are also encouraged in this area. A description of the Downtown Development District from the Land Use Master Plan is shown below. ** *Downtown Development District Part of the adopted 2004 Downtown Plan, this area is identified as a key redevelopment area. Industrial uses and intensive commercial zoning should be avoided. Rather, low intensity pedestrian scale commercial, office, and residential uses above retail should be encouraged, as well as attractive architecture. Signage should also be carefully controlled with an emphasis on pedestrian scale. Consideration should be given to one or more of the following: implementation of mixed use zoning or form based codes, preparation of small area plan, preparation of an overlay district, and formation of an architectural review board. The CS zoning requested is the most common commercial zoning found in Owasso and allows for a variety of retail oriented uses. Commercial zoning and uses are located to the south of the property and residential uses to the north, west and east. The size of the property typically dictates the intensity of the use. The subject property is 0.72 gross acres in size, however approximately 0.25 acres includes the right of way on Main Street. This property was never platted and therefore no dedications ever occurred, yet easement has allowed City streets and services within the undedicated portion. Because the net size of the tract is only 0.47 acres, it will self - govern the intensity of use that can occur on the property. Further, if any redevelopment occurs on the tract, it would have to accommodate for parking and landscaping, which will dictate the size of any structure placed on it. Since zoning cannot be approved with conditions, this case involves two actions. One is for the rezoning and the other is for a plat waiver subject to conditions. According to the City of Owasso Subdivision Regulations, Section 1.5, Subdivision Plat Requirement and Waiver, the Planning Commission and City Council have the authority approve plat waivers in situations where platting would not yield additional benefits to the City. It is within the City's authority to approve a plat waiver, subject to conditions similar to some lot split approvals. Because this property was never platted, the right -of -way was never dedicated along Main Street in this location. The right -of -way can be obtained with a general warranty deed, therefore staff does not believe that platting is necessary. There are no utility easements on the property, but there is a 5' utility easement on the property immediately to the west that also contains a sewer main. Considering this, it is recommended that an 11' utility easement be provided along the west boundary of the subject property to ensure an adequate easement for any future utility expansions. The remainder of the property appears to be adequately served with utilities and has room for only one point of *access. If the aforementioned items are made conditions of the plat waiver, staff believes that platting the property would not yield any additional benefits to the City and therefore is not necessary. However, any development that occurs on the subject property, including upfits or expansions, must adhere to all subdivision, building code, zoning, and engineering requirements including, but not limited to, landscaping and parking requirements. The City of Owasso will provide Police, Fire, EMS, and sanitary sewer and water services to the property. RECOMMENDATION: Zonina Action Staff recommends approval of Rezoning Request OZ- 16 -11, rezoning the subject property from RS -3 (Single - Family Residential High Density) to CS (Commercial Shopping). Plat Waiver Staff recommends a plat waiver be approved subject to the following: • The area of the property within City right -of -way being deeded to the City of Owasso • An 1 1' utility easement be recorded along the west boundary of the property ATTACHMENTS: • Area Map • Aerial Map • Zoning Map • Land Use Plan 304 N Main St I" = 94 ft Rezoning 12/20f2016 This map represents a visual display of related geographic information. Data provided hereon Is not a guarantee of actual Held conditions. To be sure of complete accuracy, I please contact Owasso Public staff for the most Up-to-date Information. 304 N Main St V = 94 ft Rezoning 12/20/2016 map represents a visual display o, related geographic Information. Data provided hereon Is not a guarantee of actual field condltlons. To be sure of complete accuracy, contact Public staff for the most up -to -date Information. OZ 16 -11 Land Use Plan LEGEND Land Use Categories Commercial IndusmaVRegional Employment Neighborhood Mixed Use (Light Office, Commercial Shopping, Attached Housing, SF Housing, Apartments above retail) Parks/Recreation PubiitllnslitutionaVOuasi Public Residential w. Transitional (Attached housing, duplexes, offices) US469 Ovedxy District FM 'GlenrWurAddNon Special District Downtown Development District Subject Property Floodplain PlaNned TraiVOn- Street Bikeroute! Complete Street Fire Station Existing Public School Future Public School Civilian Airstrip Part of the adopted 2004 Downtown Plan, this area is identified as a key redevelopment area. Industrial uses and intensive commercial zoning should be avoided. Rather, low intensity pedestrian scale commercial, office, and residential uses above retail should be encouraged, as well as attractive architecture. Signdge should also be carefully controlled with an emphasis on pedestrian scale. Consideration should be given to one ar more of the following: implementation of mixed use zoning or form based codes, preparation of small area plan, preparation of on overlay district, and formation of an architectural review board. TO: The Owasso Planning Commission FROM: Karl Fritschen, MRCP, RLA, AICP Chief Urban and Long Range Planner SUBJECT: Final Plat —Keys Landing II DATE: January 6, 2017 BACKGROUND: The City of Owasso received an application for review and approval of a final plat for Keys Landing Il. The property is located south of Keys Landing I, located on the west side of N 129th E Ave approximately %: mile south of E 76th St N. This will be the first phase of the Keys Landing II residential development. SURROUNDING ZONING: Direction Zoning Use Land Use Plan Jurisdiction Single-Family Residential RS -3 (Single- 65 lots in 5 blocks Number of Reserve Areas ';> 5 North Family Single Family Residential City of Rogers County Rural #3 Residential ) Housing Streets ublicor private) Owasso South AG (Agriculture) Undeveloped Flood lain Residential Tulsa County East AG A riculture Large Lot Residential Residential Tulsa County West RE (Residential Large Lot Residential Tulsa County Estates ) Residential SUBJECT PROPERTY /PROJECT DATA: Property Size 38.63 acres Current Zoning RS -3 Proposed Use Single-Family Residential Lots /Blocks 65 lots in 5 blocks Number of Reserve Areas 5 Within PUD None Within Overlay District None Water Provider Rogers County Rural #3 Applicable Paybacks /Fees Storm siren fee of $35 /acre; $1580.00 /acre Elm Creek Sanitary Sewer Payback Streets ublicor private) Public Streets ANALYSIS: The Final Plat for Keys Landing II proposes 97 lots in 4 blocks on 38.63 acres, yielding a gross density of 2.51 lots /acre. The property was annexed under Ordinance 868 in July, 2006 and rezoned under Ordinance 875 in August, 2006. The zoning for the property is RS -3, which requires minimum lot widths of 65 feet, front setbacks of 25 feet, rear setbacks of 20 feet, side yards of 5 feet and minimum lot sizes of 7,000 square feet. All of the proposed lots meet the lot size and dimensional requirements of the RS -3 Zoning District. The Preliminary Plat for Keys Landing II was reviewed and approved by the Planning Commission in July, 2007. Keys Landing II will complete the entire Keys Landing development, which will have a total of 204 lots at build out. The Final Plat shows a large draining easement (Reserve Area E) that will serve to detain water for the entire Keys Landing development. Reserve area E was constructed at the time Keys Landing I was developed and was sized to account for the runoff generated from the entire development. Reserve are C denoted on the plan will serve to convey the water from Keys Landing into Reserve Area E. Perimeter and interior utility easements, shown on the final plat, will provide utility companies adequate access to provide and maintain service to the proposed development. Any development that occurs on the subject property shall adhere to all subdivision, zoning, and engineering requirements including but not limited to paved streets, landscaping, and sidewalks. Technical Advisory Committee (TAC): The Technical Advisory Committee reviewed the Final Plat for Keys Landing II on December 28, 2016. The TAC comments are attached with this memo. RECOMMENDATION: Staff recommends Planning Commission approval of the final plat for Keys Landing II. ATTACHMENTS: Area Map Aerial Map Final Plat for Keys Landing II Keys Landing II V = 752 ft Final Plat 12/20/2016 map represents a visual display of related geographic information. Data provided hereon is not a guarantee of actual field conditions, To be sure of complete accuracy, se contact Owasso Pubilc staff for the most up-to-date Information. Keys Landing II 1 ' = 752 ft Final Plat 1212012016 map represents a visual display of related geographic Information, Data provided hereon is not a guarantee of actual field conditions, 7o be sure of com ie contact Owasso Public staff for the plete accuracy, must up.to -date Information. ENGINEER /SURVEYOR TO: WARREN LEHR CITY MANAGER FROM: CHELSEA LEVO FEARY DIRECTOR OF ECONOMIC DEVELOPMENT SUBJECT: MONTHLY DEVELOPMENT REPORT DATE: December 29, 2016 • The Garage Restaurant - 13303 E 96th St N • Hal Smith Restaurant Group restaurant • Last available lot in Willis Farms (Sam's) • Construction to begin soon • Amber Crossing - 11413 E 96th St N o One vacant 1,500 sf space available for lease • Fairway Market II - 9538 N Garnett Rd o One vacant 1,900 sf space available for lease • LaQuinta Inn - 8949 N Garnett Rd o Under construction • Braum's - 11503 E 761h St N o Construction completed; occupancy permit issued; open for business • Smith Farm Market -- 9018 N 121st E Ave #500 o Vacant 10,820 sf space • Wheels & Thrills - NE Corner of E 106th St N and N Garnett Rd • New skating rink • Site under construction • Eastern OK Oral Surgery Center- 12802 E 101st PI N o Site under construction • Owasso Industrial Park • Two new concept buildings to be constructed by OLT • One about 10,500 sf • One about 4,500 sf • Site under construction • Jim Glover Coffee Creek Dealership - 10500 block of HWY 169 E Service Rd • Proposed new car dealer offering Chrysler, Jeep, Dodge, Ram and Fiat • Five acre lot • Specific Use Permit (SUP) approved by Council • Final plat has been approved • Home2Suites -8700 N Garnett Rd o Site under construction • IQ Car Wash - 8700 N Garnett Rd • Permits have been issued • Site under construction • Another Chapter Book Store- 9455 N Owasso Exp. #J o Opened on November 25 in Tyann Plaza • Summit Physical Therapy- 9455 N Owasso Exp. #H o Under construction in Tyann Plaza • Titan Title - 9455 N Owasso Exp. #1 , o Open for business in Tyann Plaza REDBUD DISTRICT DEVELOPMENT Mowery Development -SW Corner of N Main St & W 1st Ave • Construction beginning soon of new buildings, to include restaurant, retail, office space on ground level with loft apartments on second floor level • Site Plan went before TAC in August Coulter Development - SE Corner of Main St & E 76th St N o Property has been purchased and is now in the design phase The Redbud District Project Plan was approved by the Owasso City Council on Deember 20, 2016 creating a TIF District for the Owasso Redbud District. RESIDENTIAL DEVELOPMENT • Cottages at Tallgross Point - 266 -unit apartment complex to be located at the northwest corner of E 86th St N & N Mingo Rd. • Buildings are under construction • DEQ permits have been received and all infrastructure work is now under way • Somerset of Owasso - Residential Development for the general area of N 140th E Ave and E 96th St N and is approximately 9.53 acres. o Final plat approved • Abbott Farms - New residential subdivision located to the west of the South Sports Park along E 1061h St N. 166 single - family residential lots are planned for this neighborhood. o Construction underway • 98 Apartments - New buildings under construction • Carrington Pointe Phase II • Construction is underway • Sewer, storm and roads are complete • Hickory Creek Phase II • Under construction • Infrastructure complete BUSINESS RETENTION & EXPANSION (BR &E) • Ponera Bread - 12417 E 96th St N o New drive -thru window completed • Ator Elementary School, 1500 N Ash • Existing gym has been demolished • Construction underway for new gym facility • Owasso High School, 12901 E 86th St N • Mary Glass Performing Arts Center under construction for remodel • Plans for new athletic building have been approved and construction to begin soon • 10 Gym - 509E 2nd Ave • Relocating from Tyann Plaza • Construction permit issued PRESENT David Vines Bronce Stephenson ONG Daniel Dearing Earl Farris Brian Dempster Marsha Hensley AEP /PSO Fire Dept. AT &T Chelsea Levo OWASSO TECHNICAL ADVISORY COMMITTEE Wednesday, December 28, 2016 City Hall Community Room ABSENT Rural Water District #3 — Comments attached Cox Police Dept. Julie Lombardi NOTES FROM DECEMBER 28" TAC MEETING 3. Easement Closure —10005 E 90 Ct N The only item expressed was with A T & T. Michael Christenberry will get with Rob Myers to discuss. No other comments were made. 4 Final Plat — Keys Landing II Cox- AT&T- * No comments. 0 No comments. David Vines- AEP /PSO- • Add the language regarding the maintenance of the common areas. See Section 3.14 in the Owasso Subdivision Regulations. • State that there will be a master HOA for Phase I and Phase II. • Get with Karl Fritschen to discuss a landscape plan for the entrances. • No comments. Public Works- • There needs to be language in the covenants, conditions and restrictions that discusses the reserve areas. Include maintenance responsibilities. • There needs to be language about detention pond maintenance and restrictions and the identification of the responsible party. Both phases of development utilize the detention pond therefore both phases should share in maintenance responsibilities and the cost thereof. Reword the HOA paragraph to include into the existing HOA (creating only one HOA)? • The Point of Beginning on sheet 1 is in error. • The start of the legal description on sheet 2 is unclear. • Provide minimum pad elevations on the plat for all lots adjacent to the 100 -yr floodplain and any lots next to drainage ways that carry significant 100 -yr events. • Does the existing flood plain boundary incorporate the boundary from the • LOMR of phase I? It should be referenced or shown if not. • Clarify Fences for Lots 1 -5 in Block 2 in section 2.4. • Are easement widths adequate for the adjustment to locations of the Sanitary Sewer as commented in first review comments of 11/7/16. Conceptual Utility Plan • Sanitary Sewer locations do not show that the comments were addressed from the plan review comments of 11 /7/16. • City water service line extends across this phase to serve the old home place from the west (according to City Staff). This will need to be taken into account during construction. • Why is there a sewer line proposed for lots 4 -8 of block 1? Community Development- • Add the language in Section 2.3 in the covenants stating the mechanical equipment will be in the rear yard. No A/C units shall be placed in the side yards. • Please add language in the DOD /Covenants about who takes care of the landscaping and maintenance in the reserve areas (i.e. Developer then HOA). I could not find who will take care of these areas. Fire- Chelsea- In paragraph 5.4 regarding the language about the turnover date, Owasso subdivision regulations state in 3.14 that the turnover date shall occur when 85% of the lots are developed, The language indicated in the covenants seems to indicate other things to occur that will trigger turnover. Please correct this language to comply with the City subdivision regulations. 0 Show hydrant locations. * No comments. Washington Rural Water No. 3 • This item is not in Washington Co. RWD #3 service area. ONG • No comments. 5 Site Plan — El Fogon Cox- AT &T 0 No comments. • No comments. David Vines- • Check to see if the city has obtained right of way along Garnett Road. • Submit a lighting plan if changing or adding lights. • Submit a sign permit, if changing out sign. • Coordinate with staff regarding the sidewalks, maybe escrow. • How is the building going to be serviced? Public Works- Civil site plan set has been submitted and reviewed by engineering staff. There are no comments and at this time with the current proposed improvements there is no need for Public Works plan review, approval and inspections. Community Development- Get with Karl regarding the landscaping. Specify tree and shrub species to be planted in landscape areas. Suggestion Chinese Pistache or Lacebark Elm for trees and a mix of Carissa Holly, Anthony Waterier Spirea, Maiden Grass and Mexican Feather Grass for Shrubs Fire- * No comments. Chelsea Levo- • No comments. Washington Rural Water No 3 • Not in service area. ISM10 • The owner is responsible for relocating the meters. RESIDENTIAL SINGLE FAMILY NEW CONSTRUCTION MONTH END REPORT DECEMBER 2016 Month 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 1 January 13 25 15 17 18 19 15 22 2 1 2 February 14 19 23 29 17 15 26 21 19 26 3 March 25 35 30 46 14 27 27 31 23 18 4 April 30 31 36 31 19 26 26 36 27 23 5 May 60 23 27 30 20 23 19 17 15 9 6 June 27 21 34 23 19 24 19 12 11 31 7 July 23 24 28 17 20 15 27 23 20 16 8 August 27 18 28 19 12 15 18 19 33 15 9 September 17 40 20 11 12 12 28 15 13 15 10 October 31 15 36 13 to 21 15 19 23 12 11 November 26 10 13 1 8 11 7 21 25 6 12 December 8 6 13 9 10 16 11 34 7 3 Totals 301 267 303 246 179 224 238 270 228 189 YTD 301 267 303 246 179 224 238 270 228 189 CITY OF OWASSO RESIDENTIAL LOT INVENTORY STATUS December 31, 2016 SUBDIVISION Burberry Place (6109) Camelot Estates (4/07) Carrington Pointe I (1/11) Carrington Pointe I Extended (10115) Country Estates III (3/99) Country Estates VI (11/03) Crescent Ridge (02/08) Fairways V (8/99) Fairways VI (12100) Falls at Garrett Creek (12/05) Falls at Garrett Creek Amended (12/05) Honey Creek (4/02) Keys Landing 1 (3/08) Lake Valley IV (5/10) Lake Valley V (9/30) Lake Valley V Phase 2 Lake Valley V Phase 3 Lakes at Bailey Ranch (10/07) Nottingham Estates IV (8/01) Nottingham Estates V (3/01) Nottingham Hill (6/09) Park Place at Preston Lakes Preston Lakes (12/00) Preston Lakes 111 (10/04) Remington Park II (11/04) Sawgrass Park II (04/05) The Summit at Southern Links (6/97) The Champions East (05/08) The Champions West (5/08) Watercolours (12/02) TOTALS # OF LOTS # DEVELOPED # AVAILABLE 89 87 2 139 115 24 171 171 0 15 13 2 61 58 3 37 36 1 101 93 8 71 67 4 42 41 1 85 84 1 24 23 1 202 198 4 131 121 10 114 112 2 78 73 5 82 71 11 71 56 15 235 232 3 20 18 2 44 43 1 58 16 42 93 93 0 272 243 29 147 144 3 84 82 2 96 94 2 31 27 4 66 42 24 45 36 9 40 31 9 2744 2520 224 Watercolours (12/02. The Champions West (5/08; The Champions East (05/08, The Summit at Southern Links (6197, Sawgrass Park II (04105; Remington Park II (11/04; Preston Lakes III (10104; Preston Lakes (12100; Park Place at Preston Lakes Nottingham Hill (6/09) Nottingham Estates V (3/01) Nottingham Estates IV (8/01) Lakes at Bailey Ranch (10/07) Lake Valley V Phase 3 Lake Valley V Phase 2 Lake Valley V (9/30) Lake Valley IV (5/10) Keys Landing 1 (3/08) Honey Creek (4102) Falls at Garrett Creek Amended (12105) Falls at Garrett Creek (12/05) Fairways VI (12100) Fairways V (8/99) Crescent Ridge (02108) Country Estates VI (11/03) Country Estates III (3/99) Carrington PointeI Extended (10115) Carrington Pointe I (1/11) Camelot Estates (4107) Burberry Place (6/09) CITY OF OWASSO 0 50 100 150 200 250 300 OLots Developed Motal Lots RESIDENTIAL MULTI - FAMILY NEW CONSTRUCTION MONTH END REPORT DECEMBER 2016 (initial recording began May 2016 Month 2016 201 2018 2019 2020 2021 20 2 2023 2024 2025 1 January 2 February 3 March 4 April 5 May 0 6 June 0 7 July 0 8 August 0 9 September 0 10 October 0 11 November 0 12 December 0 Totals 0 0 0 0 0 0 0 0 0 0 YTD 0 0 0 0 0 0 0 0 0 0 NOVEMBER YEAR -TO -DATE COUNT 4 0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 NOVEMBER 0 0 0 0 0 0 0 0 0 0 NOVEMBER YEAR -TO -DATE DOLLARS 500,000 0 2016 2017 2018 1 2019 2020 NOVEMBER 0 0 0 1 0 0 COMMERCIAL NEW CONSTRUCTION MONTH END REPORT DECEMBER 2016 Month 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 1 January 4 4 1 1 3 1 1 1 1 2 2 February 3 2 0 1 3 1 1 0 2 1 3 March 2 0 1 3 0 0 0 1 2 0 4 April 0 4 1 1 1 0 4 0 2 0 5 May 1 1 2 1 2 1 0 0 0 0 6 June 1 1 2 0 0 2 1 2 3 2 7 July 0 1 0 0 0 0 1 0 0 2 8 August 3 1 0 0 2 2 0 0 0 2 9 September 28 3 0 0 0 0 0 3 2 3 10 October 4 1 0 0 1 0 4 0 1 2 11 November 1 1 2 2 1 0 1 3 1 1 12 December 1 1 0 1 0 0 1 2 0 0 Totals 48 20 9 10 13 7 14 12 14 15 YTD 48 20 9 10 13 7 14 12 14 15 DECEMBER YEAR -TO -DATE COUNT 011 1 2012 2013 2014 2015 2016 13 7 14 12 14 15 ri 0= 011 1 2012 2013 2014 2015 2016 13 7 14 12 14 15 OCCUPANCY PERMITS NAME ADDRESS DATE COMPLETE DECEMBER 2016 11570 E 83 St N 10/7/2016 Yes TLC Nails 12307 E 96 St N 12/3/2015 Yes NOVEMBER 2016 12500 E 86 St N #105 8/10/2016 Yes Braum's 11503 E 76 St N 11110/2016 Yes Titan Title 9455 N Owasso Exp #1 11/30/2016 Yes Another Chapter 9455 N Owasso Exp #J 11/23/2016 Yes :�I�YL�7- 3�iZ�SG The Stacy Group 8091 N Owasso Exp 10/1/2016 Yes Dale's Learning Academy 11570 E 83 St N 10/7/2016 Yes Panera Bread 12417 E 96 St N 10/27/2016 Yes SEPTEMBER 2016 12500 E 86 St N #105 8/10/2016 Yes Zaxby's 12807 E 86 St N 9/712016 Yes The Church @ Owasso 12200 E 86 St N 9/16/2016 Yes Village Market Offices 8551 N 125 E Ave #300 & 4325 9/23/2016 Yes AUGUST 2016 Luxe Fitness 12500 E 86 St N #102 8/512016 Yes Rejoice High School 13407 E 106 St N 8/2312016 Yes Clinch Martial Arts 11693 N Garnett Rd 8124/2016 Yes Marsh Medi Clinic 12500 E 86 St N #105 8/10/2016 Yes B & B Fitness 9220 N Garnett Rd #1040 8/512016 Yes JULY 2016 10512 N 110 E Ave 6/28/2016 Yes First Church 10100 N Garnett Rd 7/1512016 Yes Dusty's Grill & Cantina 7708 N Owasso Exp 7/512016 Yes Sun Spark Foot Massage 12500 E 86 St N #105A 7/5/2016 Yes PJ Bar & Grill 9500 N 129 E Ave #130 7/1/2016 Yes JUNE 2016 Starbucks 13506 E 116 St N 6/6/2016 Yes Braum's 11415 E 96 St N 6/9/2016 Yes The Emerald Academy 11111 N 116 St N 6113/2016 Yes Owasso Auto Source 300 W 2 Ave 6116/2016 Yes Folds of Honor 8551 N 125 E Ave, Suite 100 6/1712016 Yes Bailey Medical Center — Bariatrics 10512 N 110 E Ave 6/28/2016 Yes Serenity Nails 9500 N 129 E Ave 5/23/2016 Yes APRIL 2016 Starbucks 9035 N 121 E Ave 4/1/2016 Yes Red Robin 9017 N 121 E Ave 4/4/2016 Yes Capelli Salon 12300 E 86 St N 4/812016 Yes MARCH 2016 Owasso Laundromat Facility 12802 E 86 PI N 3/11/2016 Yes Owasso Express Laundry Center 9700 North Garnett Road 3/22/2016 Yes FEBRUARY 2016 Butcher Bros. Meats 13720 E 86 St N #160 2/8/2016 Yes JANUARY 2016 Liquids 11413 E 96 St N #300 1/25/2016 Yes PERMITS APPLIED FOR IN DECEMBER 2016 ADDRESS BUILDER ADD /ZONE VALUE A.S.F. PERMIT# 14609 E 114 St N Simmons Homes LVV3 /RS3 $ 133,265 2,423 16- 1201 -X 14601 E 113 St N Capital Homes LVV2 /RS3 $ 145,035 2,637 16- 1201 -X 12203 E 96 St N #3 Wagoner Const. Serv. OM /CS $ 177,600 4,804 16- 1203 -C 8501 N Owasso Exp Thompson Const. 3L /CG $ 208,000 2,080 16- 1204 -C 12500 E 86 St N Acura Neon ECCC /CG $ 13,000 27 16- 1205 -S 12307 E 96 St N Rainbow Signs OM /CS $ 2,000 30 16- 1206 -5 124158 E 96 St N Winfax Const. OM /CS $ 12,000 1,092 16- 1207 -C 14515 E 114 St N Simmons Homes LVV3 /RS3 $ 111,760 2,032 16- 1208 -X 9717 N 100 E Ave Homeowner CG /RS3 $ 8,700 336 16- 1209 -X 3 Single Family $ 390,060 7,092 SgFt 1 Residential Remodel $ 8,700 336 SgFt 3 Commercial Remodel $ 397,600 7,976 SgFt 2 Signs $ 15,000 57 SgFt 9 Total Building Permits $ 811,360 1 15,461 SgFt Cify of 0wa44o•111 N. Mai.wSf Owa, OK. 74055