Loading...
HomeMy WebLinkAbout2017.05.08_Planning Commission AgendaRecord Copy OWASSO PLANNING COMMISSION REGULAR MEETING May 8, 2017 6:00 PM PUBLIC NOTICE OF THE MEETING OF THE OWASSO PLANNING COMMISSION TYPE OF MEETING: Regular DATE: May 8, TIME: 6:00 PM PLACE: Old Central 109 North Birch NOTICE FILED BY: Marsha Hensley TITLE: Assistant City Planner Filed in the office of the Owasso City Clerk and posted at City Hall, 200 South Main (west side) at 1:00 PM on May 4, 2017. 1. Call to Order 12. Flag Salute 3. Roll Call Marsha Hensley, Assistant City Pla er OWASSO PLANNING COMMISSION Monday, May 8, 2017 at 6:00 PM Old Central 109 North Birch AGENDA 4. Presentation of the Character Trait of the Month - Boldness 5. Approval of Minutes from the April 10, 2017 Regular Meeting. 6. Preliminary Plat - Charleston Place - Consideration and appropriate action relating to the request for the review and acceptance of a preliminary plat proposing sixteen (16) lots on two (2) blocks containing 5.03 acres. The property is located west of N 145th E Ave and south of E 93`d Pl N and is zoned RS -3 (Residential Single- family) District. 7. Community Development Report • Report on Monthly Building Permit Activity • Director's Update • Public Works Project Status Update 8. Report on Items from the April 19, 2017 TAC Meeting • Site Plan - Owasso Fire Station No. 4 • Site Plan - Oklahoma Central Credit Union • Site Plan - Mallard Crossing • Preliminary Plat - Charleston Place 9. Report from Planning Commissioners 10. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda) 11. Adjournment OWASSO PLANNING COMMISSION MINUTES OF REGULAR MEETING Monday, April 10, 2017 The Owasso Planning Commission met in regular session on Monday, April 10, 2017 at Old Central per the Notice of Public Meeting and Agenda posted at City Hall, 200 S. Main (west side) at 3:00 pm on April 6, 2017. ITEM 1. CALL TO ORDER Dr. Loving called the meeting to order at 6:00 p.m. ITEM 2. Flag Salute ITEM 3. Roll Call PRESENT ABSENT David Vines Dr. Paul Loving Tim Miller Renee Mowery David Horton A quorum was declared present. Bronce Stephenson Marsha Hensleyr Karl Fritschen Morgan Pemberton Dwayne Henderson ITEM 4. Presentation of the Character Trait of the Month - Flexibility ITEM 5. Approval of Minutes from March 13, 2017 Regular Meeting. The Commission reviewed the minutes. Mr. Miller moved, seconded by Mr. Vines, to approve the minutes from the March 13; 2017 Regular Meeting. A vote on the motion was recorded as follows: YEA: Miller, Vines, Dr, Loving, Mowery, Horton NAY: None Motion carried 5 -0. j ITEM 6. Approval of Minutes from March 30, 2017 Special Meeting. The Commission reviewed the minutes. Mr. Miller moved, seconded by Mr. Vines, to approve the minutes from the March 30, OWASSO PLANNING COMMISSION April 10, 2017 Page No. 2 2017 Special Meeting. A vote on the motion was recorded as follows: YEA: Miller, Vines, Dr. Loving, Mowery, Horton NAY: None Motion carried 5 -0. ITEM 7. OZ 17 -02 - Rezoning, Frank and Kathleen Morrow - Consideration and appropriate action relating to the request for the review and acceptance of a rezoning from AG (Agriculture) zoning district to CS (Commercial Shopping) zoning district. The subject property is located at the southwest corner of E 126th St N and N 1351h E Ave and is approximately 4 acres. Morgan Pemberton presented the staff report. The property location was described. This property is part of the Morrow Place PUD. The applicant is requesting that the zoning be changed from AG (Agriculture) to CS (Commercial Shopping). Staff recommends approval of the rezoning request. Mr. Miller moved, seconded by Mr. Horton, to approve the rezoning request OZ 17 -02. A vote o;i the i notion was recorded as follows: - YEA: Miller, Dr. Loving, Mowery, Horton, Vines NAY: None Motion carried 5 -0. ITEM 8. OA 17 -03/OZ 17- 03- Annexation &, Rezoning, Kyle Smalygo - Consideration and appropriate action relating to the request for the review and acceptance of an annexation and rezoning from AG . (Agriculture) zoning district to CS (Commercial Shopping) zoning district. The subject property is located at 12708 E 116th St N and is approximately 2.74 acres. Karl Fritschen presented the staff report. The property location was described. The applicant is requesting that the property be assign CS (Commercial Shopping) zoning upon annexation. Staff recommends approval of the annexation and rezoning request. Ms. Tracy Conley, a nearby property owner, asked to address the Commissioners. She expressed issues regarding drainage in the area and issues with the traffic. Mr. Vines moved, seconded by Mr. Miller, to approve the annexation and rezoning request OA 17 -03 /OZ 17 -03. A vote on the motion was recorded as follows: YEA: Miller, Dr. Loving, Mowery, Horton, Vines NAY: None OWASSO PLANNING COMMISSION April 10, 2017 Page No. 3 Motion carried 5-0. ITEM 9. Community Development Report • Report on Monthly Building Permit Activity. • Director's Update ITEM 10. Report on Items from the March 15, 2017 TAC Meeting • Site Plan —Glover Auto ITEM 11. Report from Planning Commissioners ITEM 12. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda). ITEM 13. Adjournment —Mr. Miller moved, seconded by Mr. Horton, to adjourn the meeting. A vote. on the motion was recorded as follows: YEA: Dr. Loving, Vines, Mowery, Horton, Miller NAY: None Motion carried 5 -0 and the meeting was adjourned at 6:29 PM, Chairperson Vice Chairperson Date TO: Owasso Planning Commission FROM: Karl A. Fritschen Planning Manager SUBJECT: Preliminary Plat Charleston Place DATE: May 81h, 2017 BACKGROUND: The City of Owasso received an application for review and approval of a preliminary plat for Charleston Place. The subject property is located west of N 145th E Avenue and south of E 93rd PI N. The property is zoned RS -3 (Residential Single - Family High Density), which was approved with case OZ -16 -07 and Ordinance 1084. The property is approximately 5.03 acres in size and the proposed use is for single- family homes. SURROUNDING ZONING: Direction Zoning Use Land Use Plan Jurisdiction Single-Family Residential Lots /Blocks 16 Lots /2 Blocks Number of Reserve Areas City of North AG (Agriculture) Residential Residential Owasso South RS- 3'(Residential Single- Residential Residential City of Family High Density) Owasso East AG (Agriculture) Residential Residential City of Owasso West RS -2 (Residential Single- Residential Residential City of Family Medium Density) Owasso SUBJECT PROPERTY /PROJECT DATA: Property Size 5.03 acres Current Zoning RS -3 Proposed Use Single-Family Residential Lots /Blocks 16 Lots /2 Blocks Number of Reserve Areas 3 Within PUD? No Within Overlay District? No Water Provider City of Owasso Applicable Pa backs /Fees Elm Creek Sewer Payback - $1580.00 per acre Streets (public or private) Public ANALYSIS: The preliminary plat for Charleston Place proposes sixteen (16) lots on two (2) blocks, yielding a gross density of 3.18 dwelling units per acre. The project consists of sixteen (16) lots fronting one street oriented in a north /south direction. The subject property is immediately north of the Camelot Estates subdivision and connects to E 91st St N. There is a 50' mutual access easement (Book 5219, Page 2627) that runs east /west and connects to the northern end of the proposed E 91It St N, which can be utilized for emergency access if necessary_ There are three (3) reserve areas identified on the plat. The two smaller reserve areas will provide access to utility easements located at the rear of the residential lots and the larger reserve area at the southeast corner of the plat will be used for stormwafer detention. All of the lot dimensions conform to the RS -3 (Residential Single - Family High Density) standards outlined in the Owasso Zoning Code (minimum lot width of 65 feet and lot area of 7000 square feet). A 17.5' utility easement surrounds the perimeter of the property and internal easements are shown on the plat, which will allow the property to be served with utilities. The property was rezoned to RS -3 under OZ 16 -07 in August 2016 and the 2030 Land Use Plan calls for residential uses in this location, supporting the proposed use for the property. TECHNICAL ADVISORY COMMITTEE (TAC): The Technical Advisory Committee reviewed the preliminary plat for Charleston Place at their regu'arly schedAed; meeting on April 19.1h, 2016. The notes from the meeting are included in. the agenda packet. RECOMMENDATION: Staff recommends Planning Commission approval of the preliminary plat for Charleston Place. ATTACHMENTS: Aerial Map Preliminary Plat for Charleston Place TAC Meeting Notes Charleston Place 1 - 376 ft Preliminary Plat 04/06/2017 This map represents a visual display of related geographic information. Data provided hereon is not a guarantee of actual feld conditions. To be sure of complete accuracy, please contact Owasso Public staff, for the most up -to -date information. PRELIMIMARY PLAT OWNER/DEVELOPER: CHARLESTON PLACE TYANN BE CO., INC. RESIDENTIAL SINGLE FAMILY NEW CONSTRUCTION MONTH END REPORT APRIL 2017 Month 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 1 January 25 15 17 18 19 15 22 12 15 9 2 February 19 23 29 17 15 26 21 19 26 15 3 March 35 30 46 14 27 27 31 23 18 55 4 April 31 36 31 19 26 26 36 27 23 20 5 May 23 27 30 20 23 19 17 15 9 6 June 21 34 23 19 24 19 12 11 31 7 July 24 28 17 20 15 27 23 20 16 8 August 18 28 19 12 15 18 19 33 15 9 September 40 20 11 12 12 28 15 13 15 10 October 15 36 13 10 21 19 23 12 11 November 10 13 1 8 11 7 21 25 6 TOTAL NEW CONSTRUCTION DOLLARS FOR EACH YEAR 12 December 6 13 9 10 16 11 34 7 3 15,000,000 Totals 267 303 246 179 224 238 270 228 189 99 YTD 110 104 123 68 87 94 110 81 82 99 APRIL YEAR-TO-DATE COUNT 140 120 CITY OF OWASSO RESIDENTIAL LOT INVENTORY STATUS April 30th, 2017 SUBDIVISION Abbott Farms 1 (12/16) Camelot Estates (4107) Carrington Pointe 1 (1/11) Carrington Pointe I Extended (10/15) Carrington Pointe II (11/16) Crescent Ridge (02/08) Falls at Garrett Creek (12/05) Keys Landing 1 (3/08) Lake Valley V (9/30) Lake Valley V Phase 2 Lake Valley V Phase 3 Nottingham Estates V (3/01) Nottingham Hill (6/09) Sawgrass Park II (04/05) The Summit at Southern Links (6/97) The Champions East (05/08) The Champions West (5/08) TOTALS # OF LOTS # DEVELOPED # AVAILABLE 65 13 52 139 130 9 171 167 4 15 14 1 93 24 69 101 100 1 85 84 1 131 124 7 78 75 3 82 77 5 71 71 0 44 43 1 58 16 42 96 96 0 31 29 2 66 56 10 45 40 5 1371 1159 212 The Champions West (5101 The Champions East (050 The Summit at Southern Links (6/97 Sawgrass Park II (04/05 Nottingham Hill (6/09 Nottingham Estates V (3/01, Lake Valley V Phase 1 Lake Valley V Phase 2 Lake Valley V (9/30) Keys Landing 1(3/08) Fulls of Garrett Creek (12/05) Crescent Ridge (02/08) Carrington Pointe II (11116) Carrington Pointe I Extended (10/15) Carrington Pointe 1 (1/11) Camelot Estates (4/07) Abbott Farms 1 (12/16) CITY OF OWASSO Residential Lotlnventor Status 20 40 60 80 100 120 140 160 180 Lots Developed Motal Lots RESIDENTIAL MULTI - FAMILY NEW CONSTRUCTION MONTH END REPORT APRIL 2017 Initial recording be Mav 2016 Month 2016 201 2018 2019 20 0 20 20 2023 2024 2025 1 January 12 8 4 4 2 February 6 2017 3 March 2019 0 2021 2022 2023 4 April 2025 0 APRIL 0 5 May 0 0 0 0 6 June 0 0 7 July 0 8 August 0 YEAR -TO -DATE DOLLARS 1,500,000 1,000,000 500,000 9 September 0 0 2076 10 October 2019 2020 11 November 0 1,007,673 COMMERCIAL NEW CONSTRUCTION MONTH END REPORT APRIL 2017 Month 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 January 4 1 1 3 1 1 1 1 2 2 2 February 2 0 1 3 1 1 0 2 1 0 3 March 0 1 3 0 0 0 1 2 0 2 4 April 4 1 1 1 0 4 0 2 0 0 5 May 1 2 1 2 1 0 0 0 0 1,000,000 6 June 1 2 0 0 2 1 2 3 2 8,470,000 7 July 1 0 0 0 0 1 0 0 2 30,000,000 8 August 1 0 0 2 2 0 0 0 2 2017 9 September 3 0 0 0 0 0 3 2 3 10 October 1 0 0 1 0 4 0 1 2 11 November 1 2 2 1 0 1 3 1 1 12 December 1 0 1 0 0 1 2 0 0 Totals 20 9 10 13 7 14 12 14 16 OCCUPANCY PERMITS NAME ADDRESS DATE COMPLETE APRIL 2017 Sonkissed Photography 12500 E 86 St N #103 4/1/2017 Yes Our Daily Donut 12650 E 85 PI N 4/13/201 Yes MARCH 2017 Fyzical Therapy & Balance Center 9540 North Garnett Rd #101 3/812017 Yes Bath & Body Works 12321 E 96 St N #11 3/31/2017 Yes FEBRUARY 2017 State Farm 9455 N Owasso Exp #K 2/27/2017 Yes JANUARY 2017 Summit Physical Therapy 9455 N Owasso Exp #H 1/10/2017 Yes Cricket Wireless 124158 E 96 St N 1/31/2017 Yes DECEMBER 2016 TLC Nails 12307 E 96 St N 12/312015 Yes NOVEMBER 2016 Braum's 11503 E 76 St N 11/10/2016 Yes Titan Title 9455 N Owasso Exp #1 11/30/2016 Yes Another Chapter 9455 N Owasso Exp #J 11/2312016 Yes OCTOBER 2016 The Stacy Grr.up 8091 N Owasso Exp 101;/2016, Yes Gaie'a Learr,ipg Academy 11570E 83 Si: N 1 OF:12016 Yes Panera Fread 12417 E 96 St N ',10/27/2016 Yes SEPTEMBER 2016 - Zaxby's 12807 E 86 St N 9/7/2016 Yes The Church @ Owasso 12200 E 86 St N 9/16/2016 Yes Village Market Offices 8551 N 125 E Ave #300 & #325 9/23/2016 Yes AUGUST 2016 Luxe Fitness 12500 E 86 St N #102 8/5/2016 Yes Rejoice High School 13407 E 106 St N 8/23/2016 Yes Clinch Martial Arts 11693 N Garnett Rd 8/2412016 Yes Marsh Medi Clinic 12500 E 86 St N #105 8/10/2016 Yes B & B Fitness 9220 N Garnett Rd #1040 815/2016 Yes JULY 2016 First Church 10100 N Garnett Rd 7/1512016 Yes Dusty's Grill & Cantina 7708 N Owasso Exp 715/2016 Yes Sun Spark Foot Massage 12500 E 86 St N #105A 7/5/2016 Yes PJ Bar & Grill 9500 N 129 E Ave #130 7/1/2016 Yes JUNE 2016 Starbucks 13506 E 116 St N 6/612016 Yes Braum's 11415 E 96 St N 6/9/2016 Yes The Emerald Academy 11111 N 116 St N 6/13/2016 Yes Owasso Auto Source 300 W 2 Ave 6/16/2016 Yes Folds of Honor 8551 N 125 E Ave, Suite 100 6/17/2016 Yes Bailey Medical Center — Bariatrics 10512 N 110E Ave 6.28/2016 Yes Serenity Nails 9500 N 129 E Ave 5/23/2016 Yes i t: PERMITS APPLIED FOR IN APRIL 2017 ADDRESS BUILDER ADD /ZONE VALUE A.S.F. PERMIT# 8113 N 77 E Ave Landmark Homes CARPII /RS3 $ 164,725 2,995 17- 0401 -X 7402 E 81 PI N Landmark Homes CARPII /RS3 $ 148,665 2,703 17- 0402 -X 8102 N 76 E Ave Landmark Homes CARPII /RS3 $ 145,530 2,646 17- 0403 -X 8204 N 74 E Ave Landmark Homes CARPII /RS3 $ 145,530 2,646 17- 0404 -X 7601E 82 St N Landmark Homes CARPII /RS3 $ 145,530 2,646 17- 0405 -X 8212 N 74 E Ave Landmark Homes CARPII /RS3 $ 152,240 2,768 17- 0406 -X 7701 E 82 St N Landmark Homes CARPII /RS3 $ 152,735 2,777 17- 0407 -X 14511 E 114 St N Simmons Homes LVV3 /RS3 $ 111,760 2,032 17- 0408 -X 11307 N 147 E Ave Capital Homes LVV3 /RS3 $ 125,510 2,282 17- 0409 -X 11306 N 148 E Ave Capital Homes LVV3 /RS3 $ 111,265 2,023 17- 0410 -X 8503 N 129 E Ave A -Max Signs ROCO /CS $ 4,000 63 17- 0411 -S 9031 N 121 E Ave Global Sign Solutions SF /CS $ 6,000 111 17- 0412 -S 14613 E 114 St N Simmons Homes LVV3 /RS3 $ 123,695 2,249 17- 0413 -X 9538 N Garnett Rd Retail Cont. Group CC /CS $ 115,000 1,803 17- 0414 -C 9538 N Garnett Rd Oil Capitol Neon CC /Cs $ 7,000 116 17- 0415 -S 14612 E 113 St N Capital Homes LVV2 /RS3 $ 122,485 2,227 17- 0416 -X 11116 N 145 E PI Capital Homes LVV1 /RS3 $ 131,065 2,383 17- 0417 -X 8108 N 77 E Ave Signature Series Homes CARPII /RS3 $ 143,000 2,600 17- 0418 -X 7801 N,144 E Ave Strategic Builders . TCE /RS3 $ 203,500 3,700 17- 0419 -X 7729 N 144 E Ave Strategic Builders TCE /RS3 $' 198,000 3,600 17- 0420 -X i72_+ N 144 E Ave Strategic Builders _ : TC{ /1153, $ 198,000 3,600 17- 0421 -X 8020" N 144 -EAv_ Strategic Buil&? rs TCE /RS3T� $ 198,000 3,600 17- 0422 -X 8014 N 144 E Ave IStrategic Builders TCE /RS3 $ 198,000 3,600 17- 0423 -X 8111 N 144 E Ave IStrategic Builders I TCE /RS3 $ 153,560 2,792 1770424 -X 20 Single Family $ 3,072,795 55,869 SgFt 1 Commercial Remodel $ 115,000 1,803 SgFt 3 Signs $ 17,000 290 SgFt 24 Total Building Permits $ 3,204,795 57,962 SgFt Gift' of Owa5,w200 S. Mai,v„S-F Owamo-, OK 74055 NEW HOME PERMITS APPLIED FOR WITHIN OWASSO FENCELINE - APRIL 2017 ADDRESS COUNTY BUILDER TYPE VALUE 17747 N 97 E Ave Tulsa Terry Manley New Home $300,000.00 6601 E 91 St N Tulsa Smalygo Properties New Home $275,000.00 9038 N 66 E Ave Tulsa Smalygo Properties New Home $250,000.00 9014 N 66 E Ave Tulsa Smalygo Properties New Home $250,000.00 1959 E 173 St Tulsa PMC Corporation New Home $393,431.00 9029 N 67 E Ave Tulsa Executive Homes New Home $240,000.00 9009 N 66 E Ave Tulsa Executive Homes New Home $240,000.00 1970 E 174 St Tulsa Shaw Homes New Home $250,000.00 6634 E 89 St N Tulsa Smalygo Properties New Home $280,000.00 6517 E 89 St N Tulsa Executive Homes New Home $250,000.00 8927 N 67 E Ave Tulsa Executive Homes New Home $270,000.00 6610 E 89 St N Tulsa Executive Homes New Home $270,000.00 801 E 166 St N Tulsa Robert Hamil New Home $400,000.00 5982 Eagle Summit Rd Rogers Epic Custom Homes New Home $1,478,390.00 11417 N 168E Ave Rogers Simmons Homes New Home $174,600.00 18648 E Redfox Trail Rogers Higgins Homes New Home $500,000.00 16 Single Family $5,821,421.00 0 Multi Family 16 Total $5,821,421.00 TO: WARREN LEHR CITY MANAGER FROM: CHELSEA LEVO FEARY DIRECTOR OF ECONOMIC DEVELOPMENT SUBJECT: MONTHLY DEVELOPMENT REPORT DATE: April 26, 2017 NEW BUSINESS DEVELOPMENT • The Garage Restaurant- 13303 E 961h St N • Hal Smith Restaurant Group restaurant • Last available lot in Willis Farms Sam's) • Site under construction • Fairway Market II - 9538 N Garnett Rd o Redwing Shoes will occupy last vacant 1,900 sf space • LaQuinta Inn - 8949 N Garnett Rd o Under construction Smith Farm Market - 9018 N 121st E Ave #500 o Vacant 10,820 sf space Wheels & Thrills - NE Corner of E 106th Sf N and N Gcrneti Rd • New skating rink • Site under construction • Eastern OK Oral Surgery Center- 12802 E 101st PI N o Sit e under construct ion • Owasso Industrial Park • New 10,500 sf concept building to be constructed by OLT • Construction to begin soon • Jim Glover Coffee Creek Dealership- 10500 block of HWY 169 E Service Rd • Proposed new car dealer offering Chrysler, Jeep, Dodge, Ram and Fiat • Five acre lot • Site under construction • Home2Suites - 8700 N Garnett Rd o Site under construction • IQ Car Wash - 8700 N Garnett Rd o Site under construction • Summit Physical Therapy - 9455 N Owasso Exp. #H o Under construction in Tyann Plaza • Owasso Holiday Inn Express - Tyann Plaza VII, Block 1, Lot 1 0 48,803 sf building o Site plan reviewed by TAC • Montessori Academy of Owasso - 708 N Atlanta o Specific Use Permit approved • Torrid - 9002 N 121st E Ave Suite 300 • New women's clothing store locating in space where Maurices is located • See BR &E notes regarding Maurices move • Owasso Fire Station No. 4 - 11933 E 116th Street N o Site Plan reviewed by TAC • Oklahoma Central Credit Union -12901 E 116th Street N • Site Plan Reviewed by TAC • Site under construction REDBUD DISTRICT DEVELOPMENT • Mowery Development - SW Corner of N Main St & W 1 st Ave • Mixed use development to include restaurant, retail, office space on ground level with loft apartments on second floor level • Construction has begun • Coulter Development - SE Corner of Main St & E 76th St N o Property has been purchased and is now in the design phase • The Redbud District Project Plan was approved by the Owasso City Council on December 20, 2016 creating a TIF District for the Owasso Redbud District. • Construction for E 76th Street & Main Street improvements to begin early May. BUSINESS RETENTION & EXPANSION (BR &E) • Ator Elementary School, 1500 N Ash • Existing gym has been demolished • Construction underway for new gym facility 9 Owasso High School, 12901 E 861h St N o Mary Glass Performing Arts Center under construction for remodel o Under Construction Y 10 Gym - 509 E 2nd Ave o Relocating from Tyann Plaza - o Construction pe «nit issued Mourices -12105 E. 96th Street N. o Moving from Smith Farm Market location to Owasso Market location • Wal -Mart Neighborhood Market (North) - 115521 N 1291h E Ave o Adding a "phone in and pick -up your groceries" feature in there parking lot. No new structures, just some restriping work. RESIDENTIAL DEVELOPMENT • Cottages at Tallgross Point - 266 -unit apartment complex to be located at the northwest corner of E 86th St N & N Mingo Rd. • Buildings are under construction • DEQ permits have been received and all infrastructure work is now underway • Public infrastructure completed • Somerset of Owasso - Residential Development for the general area of N 1401h E Ave and E 96th St N and is approximately 9.53 acres. • Final plat approved • Construction to begin soon • Abbott Farms - New residential subdivision located to the west of the South Sports Park along E 1061h St N. 166 single - family residential lots are planned for this neighborhood. • Construction underway • Partial acceptance by the city, 20 lots have been released • Mallard Crossing - Multi- family residential development which totals 25,052 sq ft of buildings on a 6.2 acre lot located north of E 106th St N on the west side of N 145th E Ave o Site plan reviewed by TAC • Charleston Place - residential development general location is N 142nd E Ave and E 93rd St N o Preliminary Plat reviewed by TAC PRESENT David Vines AT &T Bronce Stephenson ONG Julie Lombardi Chelsea Levo Feary Marsha Hensley Fire Dept. Police Dept. Public Works Karl Fritschen Morgan Pemberton OWASSO TECHNICAL ADVISORY COMMITTEE Wednesday, April 19, 2017 Community Room @ City Hall ABSENT Rural Water District #3 PSO Cox NOTES FROM APRIL 19`" TAC MEETING 3. Site Plan — Owasso Fire Station No. 4 ONG- • No comments. Chelsea Levo Feary- • No comments. AT' &T- • No comments. David Vines- Didn't see trash enclosure details. Chief stated that they may use poly carts, will decide later. Public Works- • Public Works will work with everyone regarding sewer location and connection. • Fire suppression will be City of Owasso water and domestic will be Rural Water District No. 3 Community Development- * Will work with Fire Department regarding landscaping. Fire- Police * No comments. • No comments. 4. Site Plan — Oklahoma Central Credit Union ONG- • Will need the gas load numbers. Chelsea Levo Feary- • No comments. AT&T- 0 The engineer for this district has been in touch with Dwayne Henderson. David Vines • The photometrics on the east side show fairly strong readings. Maybe review. • Discussed the possibility of escrowing the sidewalks on N 129 E Ave & E 116 St N. • Submit a separate sign permit when ready for signage. Public Works- 0 No comments. Community Development- • Label a right - in/right -out for the driveway entrance along E 116'' st N and show a "pork chop" median. • Please clearly label the ultimate right -of -way line on N 129' E Ave and E 116t' St N. • Correct B/U typo on west building line (should be B/L). • Add a note regarding how stormwater will be conveyed to the detention facility to the east. • Please place a note on the drawing that the owner shall be responsible for the long term care and maintenance of the !:andscaping once contractor is finished. • Add shrubs in front of the south parking stalls. • Please submit architectural elevations for review as per the.US -169 Overlay requirements. • Sidewalks may be escrowed for this project at $18/1,17 for the entire frontage covering both N 129'' E Ave and E 116" St N. • Please push the street trees to within 5 feet of the curb of south parking areas and west drive to keep them as far away from future buried utility lines as possible. • Show a 10 foot street yard as required in the zoning code for plant material in front of the same curb lines as described in note 9. Coordinate with Karl regarding the possible delay of tree planting along E 116`h St N. Fire- Police • No comments. • Encouraged ample amount of cameras on the exterior of the building. 5. Site Plan — Mallard Crossin¢ ONG- • No comments. The project is all electric. Chelsea Levo Feary- • No comments. . ck Police • We will not patrol traffic concerns since they are private roads. 6. Preliminary Plat — Charleston Place ONG- • No comments. Service is close by. Chelsea Levo Feary- • No comments. AT &T- No comments. David Vines- Typos - • Paragraph 1.4— "Shale" should be "shall" (in A. and B.) • Paragraph 5.4 — fix "Sheridan Crossing" to read "Charleston Place ". • Paragraph 2.9 references E 1061' St N Public Works- * Show the property owners on surrounding properties. • Be sure the plat is sealed by surveyor and architect. • Show whatever is in or on the ground, such as abandoned slabs or sheptic tanks. • Show external easements on Camelot and Nottingham Estates. • Show 10' u/e on the south side. • Correct paragraph 1.6 B. • Submit storm sewer plan. • Nottingham Estates V drainage problems were discussed. Work together to eliminate firture problems. Community Development- • Show adjoining easements and zoning. • Please address the typos on the DOD page (I gave them the covenants sheet back to them with my corrections). • Add language to the DOD page, paragraph 5.4, that states that at the point that 85% of the total lots are permitted (14 lots), control of the HOA shall be turned over to the homeowners. • Note the surrounding zoning and property owners. • Show perimeter easements for adjoining properties. • The City will provide addresses for the project. Fire- Police * Show hydrant locations. • No comments. TO: Community Development FROM: Public Works SUBJECT: Engineering TAC Review Comments (April 19, 2017) DATE: April 26, 2017 Here is the summary of Engineering's comments from the TAC meeting. All comments as a result of questions raised in the meeting are amended and supplied below in red. 3. Site Plan - Owasso Fire Station No.4 - Consideration and appropriate action related to a request for the review and acceptance of a site plan for the Owasso Fire Station Training Facility on a ten (10) acre lot. The property is located at 11933 E 116th St N and is zoned OM (Office Medium) District. - Is the shown layout the final buildout intent? Public Works is looking to extend a gravity sewer line near the site, but w,s dt) not want to interfere with ;he layout. 4. Site Plan - Oklahoma Central Credit Union - Consideration and appropriate action related to a request for the review and acceptance of a site plan proposing a 4,486 sq. ft. building on a 1.50 acre lot. The property i s located at 12901 E 1 16lh St N and is zoned PUD 05 -02 with the underlying zoning of CS (Commercial Shopping) District. Civil site plans have been submitted to Public Works and have been approved, Should any changes occur from this review process, please submit any necessary revised plans to Public Works for issuing to construction. 5. Site Plan - Mallard Crossing - Consideration and appropriate action related to a request for the review and acceptance of a site plan proposing a multi - family residential development which totals 25,052 sq. ft. of buildings on a 6.2 acre lot. The property location is north of E 106th St N on the west side of N 1451h E Ave and is zoned PUD 16 -06 with the underlying zoning of RNX (Residential Neighborhood Mixed) District. - Public Works will withhold any site plan comments until the full Civil plan set is submitted to review all aspects in conjunction together. - The engineer should draft a letter detailing the fire flow demands for the development, send It to the Fire Marshal for signature, and forward that signed letter to Washington County Rural Water District #3. - If the engineer decides to build a berm in lieu of a privacy fence to screen the west side of the property, the engineer must design a drainage system to prevent the berm from damming up any flows that the site historically received. - If the developer does not want to put curb on the proposed driveways, a request for a variance should be submitted to the City Engineer. 6. Preliminary Plat - Charleston Place - Consideration and appropriate action related to a request for the review and acceptance of a preliminary plat proposing sixteen (16) lots on two (2) blocks containing 5.03 acres. The general location is N 142nd E Ave and E 93rd St N and is zoned RS -3 (Residential Single - family) District. Show property owners in the subdivisions adjacent to the proposed development. There used to be a house and barn on the property. Show existing slabs, septic system, cisterns, etc. as necessary. Show adjacent utility easements in the yards of the properties that abut the proposed development. Please provide a certification that there are no uncapped oil or gas wells on the site. The utility easement on the southern edge of the proposed development should be at least eleven feet wide, and potentially wider based on what easement currently exists in the development to the south. Section 1.6.13 should include the City of Owasso. The preliminary plat should be sealed by a registered professional engineer or surveyor. The city of Owasso may propose a cost sharing project on the storm sewer within the proposed development to alleviate an existing drainage problem in an adjacent development. The waterline for the proposed development will need to be looped as the project is too long to accommodate a dead end waterline.