HomeMy WebLinkAbout2009.12.07_Planning Commission AgendaPUBLIC NOTICE OF AN TO
THE MEETING OF THE
OWASSO PLANNING COMMISSION
The Owasso Planning Commission will meet in regular session on Monday, December 7,
2009 at 6:00 PM at Old Central, 109 N. Birch, Owasso, Oklahoma.
Notice of Addendum filed in the office of the City Clerk and posted on the city hall bulletin
board at 11:00 AM on Thursday, December 3, 2009.
Brian Dempster, Interim Community Development Director
The following is submitted as an addendum to the Planning Commission Agenda filed on
December 1, 2009. Items numbered 1 through 8 shall remain the same. Items numbered 9
through 13 are now numbered 10 through 14, and new item 9 is listed as follows:
9. DETACHMENT 09 -01 — Consideration and appropriate action of a request to
detach approximately 2.48 acres of right of way located along 193`d East Ave
between 76 "' Street North and 72nd Street North to allow for road improvements to be
performed by Rogers County.
TO: PLANNING COMMISSION
CITY OF OWASSO
FROM: BRIAN DEMPSTER
INTERIM COMMUNITY DEV. DIRECTOR
SUBJECT: DETACHMENT 09 -01
DATE: DECEMBER 2, 2009
BACKGROUND:
The city of Owasso has received a request to detach approximately 2.48 acres of right of
way located along 193`d East Ave between 76th Street North and 72nd Street North to
allow for road improvements to be performed by Rogers County.
ANALYSIS:
Rogers County will be performing road improvements along 193`d East Ave. to include
the section of 193`d between 76th Street North and 72 "d Street North the City Of Owasso
will need to detach this portion of road right of way until the improvements have been
made and then the City Of Owasso would then reattach this portion of the right of way
back into the city limits.
Staff recommends approval of the detachment of 193`d East Ave. between 76th Street
North and 72nd Street North.
ATTACHMENTS
1. Location Map
Legal Descrip lion Exhoobit
60 Foot Wide strip in NE /4
Section 36, T -21 -N, R -14 -E
Rogers County, Oklahoma
�■ - 1000' POINT OF BEGINNING
NE CORNER OF NE /4
y,, �+& AT SEC.36, T -21 —N, R -14 —E
ry
E / 6th St dW NORTH LINE NE /4 SEC.3(
I0n
MIV
cil(n
NIW
w z
z J
J N
I
a
w
SCHOOL-
36
m
n
ti
w
rn
w
z
V)
a
W
co
CREEK w
TANGLE`NOOD
i
Benchmark Surveying and Land Services, Inc.,
tO ®1 P.O, Zo 1078 PHONO 018) 276 1
M OWE OK. 7/ FM 0I6)27d 7
�' 1111111 � C.0.1V0. 'C115
PUBLIC NOTICE OF THE MEETING OF THE
OWASSO PLANNING COMMISSION
TYPE OF MEETING:
DATE:
TIME:
PLACE:
NOTICE FILED BY:
TITLE:
Regular
December 7, 2009
6:00 PM
Old Central
109 North Birch
Larissa Darnaby
City Planner
Filed in the office of the Owasso City Clerk and posted at the north entrance to City Hall
at 1:00 PM on December 1, 2009.
arissa Darnaby, City PlannerU
OWASSO PLANNING COMMISSION
Monday, December 7, 2009 at 6:00 PM
Old Central
109 North Birch
AGENDA
1. Call to Order
2. Roll Call
3. Approval of Minutes from the November 9, 2009 Regular Meeting.
4. Annexation- 09 -05- Consideration and appropriate action of a request to annex
approximately 10 acres of land, located about a quarter of a mile south of East
116x` Street North and North Garnett Road.
5. Annexation- 09 -06- Consideration and appropriate action of a request to annex
approximately 5.3 acres of land, located on the southeast corner of East 106"'
Street North and North 145"' East Avenue.
6. Annexation- 09 -07- Consideration and appropriate action of a request to annex
approximately 60.759 acres of land, located on the northwest corner of East
106"' Street North and North 145"' East Avenue.
7. Final Plat —CVS Commercial- A request and appropriate action to review a
final plat proposing one (1) commercial lot, in one (1) block on approximately
1.62 acres of land, located on the southeast corner of East 9e Street North and
North 129h East Avenue.
8. OPUD -09 -01 — Consideration and appropriate action of a request to review a
proposed Planned Unit Development No. 09 -01 on approximately 15.475 acres of
land, located on the northwest corner of 145h East Avenue and State Highway 20.
9. Report on Monthly Building Permit Activity.
10. Economic Development Report.
11. Report on Planning Items Previously Forwarded to City Council.
12. Adjournment.
ui TF ' '
Marilyn Hinkle
Charles Brown
Dr. Paul Loving
David Vines
OWASSO PLANNING COMMISSION
MINUTES OF REGULAR MEETING
Monday, November 9, 2009
Owasso Old Central
109 North Birch, Owasso, Oklahoma
MEMBERS ABSENT
Dr. Mark Callery
STAFF PRESENT
Steve Albert
Larissa Damaby
Brian Dempster
Marsha Hensley
Chelsea Harkins
The agenda for the regular meeting was posted at the north entrance to City Hall on November 4, 2009
at 4:00 PM.
1. CALL TO ORDER — Marilyn Hinkle called the meeting to order at 6:00 PM and declared a
quorum present.
Chairperson Hinkle asked for a moment of silence in remembrance of Eric Wiles.
2. ROLL CALL
CONSIDER APPROVAL OF THE MINUTES OF OCTOBER 12, 2009 REGULAR
MEETING — The Commission reviewed the minutes of October 12, 2009 regular meeting.
Charles Brown moved to approve the minutes and Dr. Loving seconded the motion. A vote
on the motion was recorded as follows:
Marilyn Hinkle - Yes
Charles Brown - Yes
Dr. Paul Loving - Yes
David Vines - Yes
The motion was approved 4 -0.
4. Annexation 09 -03 — Consideration and appropriate action related to a request to annex
approximately 30 acres of land, located on the northeast comer of North Garnett Road and
East 1060' Street North.
Marilyn Hinkle presented the item and Larissa reviewed the staff report. The location and the
surrounding land use were described. The development process was described. The purpose of
the applicant's annexation request is to bring the property into the city limits of Owasso in
order to receive city services. The applicant has agreed to dedicate necessary right -of -way for
future road expansion. The property is zoned Agricultural (AG) in Tulsa County and would
remain this classification upon annexation. Residential sewer and water service will be
provided by the City of Owasso. Staff published legal notice of the annexation in the Owasso
Reporter and mailed notice to surrounding property owners. The Owasso Annexation
Committee met at their regularly scheduled meeting on October 28, 2009. The applicant was
OWASSO PLANNING COMMISSION
November 9, 2009
Page No. 2
present to address any concerns. The staff recommends approval of the annexation request.
David Vines moved to approve the annexation. Charles Brown seconded. A vote on the
motion was recorded as follows:
Marilyn Hinkle - Yes
Charles Brown - Yes
Dr. Paul Loving - Yes
David Vines - Yes
The motion carried 4 -0.
5. Annexation 09 -04 — Consideration and appropriate action related to a request to annex
approximately 19 acres, located on the northwest comer of Highway 20 and North 145'' East
Avenue.
Marilyn Hinkle presented the item and Larissa reviewed the staff report. The location and the
surrounding land use were described. The property is zoned Agricultural (AG) in Tulsa
County and would remain this classification upon annexation. The applicant has agreed to
dedicate necessary right -of -way, as deemed by Public Works, for future road expansion.
Residential sewer and water service will be provided by the City of Owasso. Staff published
legal notice of the annexation in the Owasso Reporter and mailed notice to surrounding
property owners. The Owasso Annexation Committee met at their regularly scheduled meeting
on October 28, 2009. The applicant was present to address any concerns. Staff recommends
approval. Mr. Wilbur Casement, property owner to the north, had questions regarding sewer
and water services. Larissa explained that Rural Water District #3 will provide water service
and the City of Owasso will provide sewer service. Marilyn Hinkle assured Mr. Casement that
during the PUD /rezoning step he would receive notification.
David Vines moved to approve the annexation request. Dr. Loving seconded. A vote on the
motion was recorded as follows:
Marilyn .Hinkle - Yes
Charles Brown - Yes
Dr. Paul Loving - Yes
David Vines - Yes
The motion carried 4 -0.
6. Rezoning Request — OZ 09 -02 — Consideration and appropriate action related to a request to
review and rezoning from a Residential Duplex (RD) Zoning District to a Commercial
Shopping (CS) Zoning District, on property located at the southeast corner of 2°" and Atlanta,
more commonly recognized as 113 North Atlanta.
Marilyn Hinkle presented the item. David Vines, the applicant for this item, recused himself.
Larissa reviewed the staff report. The property is zoned (Residential Duplex) and is .24 acres
OWASSO PLANNING COMMLSSION
November 9, 2009
Page No. 3
in size. The proposed development for this property is unknown. The applicant has requested
a Commercial Shopping (CS) zoning designation to allow for the construction of facilities that
would support light commercial uses such as retail or office space. Letters were mailed to
surrounding property owners and the legal notification was published in the Owasso Reporter.
Staff recommends approval. Mr. Dewayne Welborn (105 West 10"' Street), a nearby property
owner, had questions regardinS setbacks on commercial property. Mr. Welborn would also
prefer the facility to face 2 Street. Larissa stated that commercial property abutting
residential property requires a 25' setback. She also mentioned that the city could contact him
when the site plan is reviewed by the Technical Advisory Committee.
Dr. Loving moved to approve the rezoning request. Charles Brown seconded. A vote on the
motion was recorded as follows:
Marilyn Hinkle - Yes
Charles Brown - Yes
Dr. Paul Loving - Yes
David Vines - Recuse
The motion carried 3 -0.
7. Partial Easement Closure Request — Consideration and appropriate action related to a
request to close a portion of a 25' Utility Easement, located in the rear yard of property
recognized as 13800 East 94 Street North.
Marilyn Hinkle presented the item and Larissa reviewed the staff report. The location was
described. The applicant desires to close a portion of the 25' utility easement in order to clean
up title work regarding the existing swimming pool and pool house that was built over a
portion of the utility easement. The request was reviewed by the Owasso Technical Advisory
Committee at their regular meeting on October 28, 2009. There were no comments made in
regards to this item. Staff recommends approval. Copies of the pool permit and site plan were
handed out to the Commissioners. Commissioner Brown asked if the staff has ever seen a
partial closure this extreme. Encroachment of nine feet seems to be very severe and after
reviewing the pool permit, the homeowners should have been aware of the easement location.
Mr. Dennis Blind was present to represent the applicant. Mr. Blind stated that the seller was
unaware the pool house was over into the easement.
After discussion, Dr. Loving moved to approve the partial easement closure request. David
Vines seconded. A vote on the motion was recorded as follows:
Marilyn Hinkle - Yes
Charles Brown - No
Dr. Paul Loving - Yes
David Vines - Yes
The motion carried 3 -1.
OWASSO PLANNING COMMISSION
November 9, 2009
Page No. 4
8. Report on Monthly Building Permit Activity
9. Economic Development Report. — Chelsea discussed the `Buy Owasso" campaign.
10. Report on Planning Items Previously Forwarded to City Council.
11. Adjournment — Charles Brown moved; David Vines seconded to adjourn the meeting.
A vote on the motion was recorded as follows:
Marilyn Hinkle - Yes
Charles Brown - Yes
Dr. Paul Loving - Yes
David Vines - Yes
The motion carried 4 -0 and the meeting was adjourned at 6:45 PM.
Chairperson
Vice Chairperson
Date
orI 3
TO: PLANNING COMMISSION
CITY OF OWASSO
FROM: LARISSA DARNABY
CITY PLANNER
SUBJECT: ANNEXATION 09 -05
DATE: NOVEMBER 30, 2009
BACKGROUND:
The City of Owasso has received a request for the annexation of approximately 10 acres of
land, located at the about a quarter of a mile south of East 116a' Street North and North
Garnett Road.
EXISTING LAND USE:
Single - Family Residence
SURROUNDING LAND USE:
North: Cabinet Making Shop (Commercial General Zoning Designation)
South: Commercial Strip Center (Commercial Shopping Zoning Designation) and German
Acres Trailer Park (Residential Mobile Home Zoning Designation).
East: Undeveloped (Agricultural)
West: The Vines Commercial and Mini- Storage Units (Commercial General Zoning
Designation)
AG (Agricultural District) — Tulsa County
MASTER PLAN DESIGNATION:
The planned land use for the westerly portion of the property is Commercial, while the
easterly portion of the property is planned for residential use.
DEVELOPMENT PROCESS:
The first step in the development of a piece of property in Owasso is annexation.
Annexation is the method whereby land located outside the city limits is made a part of the
city. Property owners and land developers sometimes choose to have their property
annexed into Owasso in order to receive Owasso municipal services, such as police
protection, refuse collection, and sanitary sewer.
The second step in the development of a piece of property in Owasso is rezoning. When a
property is annexed into Owasso, by law it must come in classified for AG Agricultural
use. In order to develop the property, the land must be zoned for particular kinds of uses,
such as residential, office, commercial, or industrial. Rezoning decisions are made in
accordance with the growth policy displayed in the Owasso Master Plan.
The third step in the development of a piece of property in Owasso is platting. Once the
property development proposal shows a division of lots that is acceptable to both the
developer and the City of Owasso, a final plat application is submitted. A final plat
illustrates the layout and dimension of lots included on the final plat, right -of -way widths,
easements, and other physical characteristics that must be provided for review by the City.
ANALYSIS:
The City of Owasso has received a request from for the annexation of approximately 10
acres, more or less. The subject property is located at the about a quarter of a mile south of
East 11e Street North and North Garnett Road. The property is currently occupied by one
single family- residence.
If the property is annexed into the city the applicant will be required to follow normal
development procedures which would include rezoning, preliminary and final plat and site
plan review. If annexed, any development proposed for the property would be required to
meet the Owasso Zoning Code and the Owasso Subdivision Regulations and any
appropriate site engineering standards as prescribed by Public Works including but not
limited to paved streets and sidewalks.
Upon the development of the property, it would be subject to the emergency storm siren fee
($35.00 per acre). The property will be served sewer by the City of Owasso and water by
the Rural Water District #3 of Washington County.
The Owasso Land Use Master Plan calls for commercial and residential use developments
to occur on this particular tract.
Staff published legal notice of the annexation petition in the Owasso Reporter and letters of
notification were mailed to property owners within a 300' radius.
ANNEXATION COMMITTEE MEETING:
The Owasso Annexation Committee met at their regularly scheduled meeting on November
18, 2009. At that meeting members are allowed the opportunity to comment on the ability
of the City being able to service the proposed annexation site. The following Comments
were provided: Police, Fire and Public works stated the site could be serviced by the City.
The request was unanimously approved by the Annexation Committee.
RECOMNIDNDATTON:
Staff recommends approval of the request to annex the property into the corporate limits of
the City of Owasso.
ATTACHMENTS:
General Area Map
EEM
m
HE
E112STN
LOIJ
Cam:
Subject Tract
a -�-
/ .�
113 ST N
C
WE
E113PLN
Rtl9 H
E 112 PL N
M
m
P
LU
a
W
N
Z
E112S
TO: PLANNING COMMISSION
CITY OF OWASSO
FROM: LARISSA DARNABY
CITY PLANNER
SUBJECT: ANNEXATION 09 -06
DATE: NOVEMBER 30, 2009
BACKGROUND:
The City of Owasso has received a request for the annexation of approximately 5.3 acres of
land, located at the southeast corner of North 145h East Avenue and East 106`s Street
North.
EXISTING LAND USE:
Undeveloped
SURROUNDING LAND USE:
North: Single - Family Residential, with the hard corner of the northeast corner of 145a' East
Avenue and East 106th Street North being zoned for commercial uses
South: Rogers County Residential — Pinebrook Crossing
East: Rogers County Agricultural
West: Currently undeveloped, but zoned for Multi - Family Residential and Commercial
Uses —Coffee Creek
AG (Agricultural District) – Rogers County
MASTER PLAN DESIGNATION:
The planned land use for the property is commercial.
DEVELOPMENT PROCESS:
The first step in the development of a piece of property in Owasso is annexation.
Annexation is the method whereby land located outside the city limits is made a part of the
city. Property owners and land developers sometimes choose to have their property
annexed into Owasso in order to receive Owasso municipal services, such as police
protection, refuse collection, and sanitary sewer.
The second step in the development of a piece of property in Owasso is rezoning. When a
property is annexed into Owasso, by law it must come in classified for AG Agricultural
use. In order to develop the property, the land must be zoned for particular kinds of uses,
such as residential, office, commercial, or industrial. Rezoning decisions are made in
accordance with the growth policy displayed in the Owasso Master Plan.
The third step in the development of a piece of property in Owasso is platting. Once the
property development proposal shows a division of lots that is acceptable to both the
developer and the City of Owasso, a final plat application is submitted. A final plat
illustrates the layout and dimension of lots included on the final plat, right -of -way widths,
easements, and other physical characteristics that must be provided for review by the City.
ANALYSIS:
The City of Owasso has received a request for the annexation of approximately 5.3 acres,
more or less. The subject property is located at the southeast comer of East 10e Street
North and North 145s East Avenue. The property is currently undeveloped. Rural
residential development exists to the south and west. The property is currently zoned AG
(Agricultural District) in Rogers County, it is surrounded by AG (Agricultural District) A
general area map is attached for your review.
At this time it is our understanding the applicant is requesting this annexation petition in
order to begin a process that will result in the development of residential facilities to the
site which would include attached - single family dwelling units and multi - family dwelling
units. If the property is annexed into the city the applicant will be required to follow normal
development procedures which would include rezoning, preliminary and final plat and site
plan review. If annexed, any development proposed for the property would be required to
meet the Owasso Zoning Code and the Owasso Subdivision Regulations and any
appropriate site engineering standards as prescribed by Public Works including but not
limited to paved streets and sidewalks.
Upon the development of the property, it would be required to participate in the Elm Creek
Interceptor sanitary sewer payback ($1580.00 per acre), the TTC Interceptor sanitary sewer
payback ($1000.00 per acre), and the emergency storm siren fee ($35.00 per acre). The
property will be served sewer by the City of Owasso and water by the Rural Water District
#3 of Washington County,
The Owasso Land Use Master Plan calls for commercial use developments to occur on this
particular tract.
Staff published legal notice of the annexation petition in the Owasso Reporter and letters of
notification were mailed to property owners within a 300' radius.
ANNEXATION COMMITTEE MEETING:
The Owasso Annexation Committee met at their regularly scheduled meeting on November
18, 2009. At that meeting members are allowed the opportunity to comment on the ability
of the City being able to service the proposed annexation site. The following Comments
were provided at that meeting: Police, Fire and Public works stated the site could be
serviced by the City. The request was unanimously approved by the Annexation
Committee.
RECONEMENDATION:
Staff recommends approval of the request to annex the property into the corporate limits of
the City of Owasso.
ATTACHMENTS:
General Area Map
MEMORANDUM
TO: PLANNING COMMISSION
CITY OF OWASSO
FROM: LARISSA DARNABY
CITY PLANNER
SUBJECT: ANNEXATION 09 -07
DATE: NOVEMBER 30, 2009
BACKGROUND:
The City of Owasso has received a request for the annexation of approximately 60.759
acres of land, located at the northwest corner of North 145a' East Avenue and East 106`s
Street North.
EXISTING LAND USE
Undeveloped
SURROUNDING LAND USE:
North: Undeveloped — Proposed TTC/TCC Site
South: Undeveloped —zoned for Multi - Family Residential and Commercial Uses —Coffee
Creek
East: Single - Family Residential —Lake Valley
West: Owasso Expressway
PRESENT ZONING:
AG (Agricultural District) – Rogers County
MASTER PLAN DESIGNATION:
The planned land use for the property is commercial.
DEVELOPMENT PROCESS:
The first step in the development of a piece of property in Owasso is annexation.
Annexation is the method whereby land located outside the city limits is made a part of the
city. Property owners and land developers sometimes choose to have their property
annexed into Owasso in order to receive Owasso municipal services, such as police
protection, refuse collection, and sanitary sewer.
The second step in the development of a piece of property in Owasso is rezoning. When a
property is annexed into Owasso, by law it must come in classified for AG Agricultural
use. In order to develop the property, the land must be zoned for particular kinds of uses,
such as residential, office, commercial, or industrial. Rezoning decisions are made in
accordance with the growth policy displayed in the Owasso Master Plan.
The third step in the development of a piece of property in Owasso is platting. Once the
property development proposal shows a division of lots that is acceptable to both the
developer and the City of Owasso, a final plat application is submitted. A final plat
illustrates the layout and dimension of lots included on the final plat, right -of -way widths,
easements, and other physical characteristics that must be provided for review by the City.
ANALYSIS:
The City of Owasso has received a request for the annexation of approximately 60.759
acres, more or less. The subject property is located at the northwest corner of East 106a'
Street North and North 145' East Avenue. The property is currently undeveloped. To the
north of the tract is the proposed TTC/TCC site. To the east lies single - family residential
(Lake Valley). To the south lies property zoned for multi - family residential. To the west
lies the Owasso Expressway. The property is currently zoned AG (Agricultural District) in
Tulsa County, A general area map is attached for your review.
If the property is annexed into the city the applicant will be required to follow normal
development procedures which would include rezoning, preliminary and final plat and site
plan review. If annexed, any development proposed for the property would be required to
meet the Owasso Zoning Code and the Owasso Subdivision Regulations and any
appropriate site engineering standards as prescribed by Public Works including but not
limited to paved streets and sidewalks.
Upon the development of the property, it would be required to participate in the Elm Creek
Interceptor sanitary sewer payback ($1580.00 per acre), the TTC Interceptor sanitary sewer
payback ($1000.00 per acre), and the emergency storm siren fee ($35.00 per acre). The
property will be served sewer by the City of Owasso and water by the Rural Water District
#3 of Washington County.
The Owasso Land Use Master Plan calls for commercial use developments to occur on this
particular tract.
Staff published legal notice of the annexation petition in the Owasso Reporter and letters of
notification were mailed to property owners within a 300' radius.
ANNEXATION COMMITTEE MEETING:
The Owasso Annexation Committee met at their regularly scheduled meeting on November
18, 2009. At that meeting members are allowed the opportunity to comment on the ability
of the City being able to service the proposed annexation site. The following Comments
were provided at that meeting: Police, Fire and Public works stated the site could be
serviced by the City. The request was unanimously approved by the Annexation
Committee.
RECOMD'IENDATION:
Staff recommends approval of the request to annex the property into the corporate limits of
the City of Owasso.
ATTACHMENTS:
1. General Area Map
MEMORANDUM
TO:
FROM:
SUBJECT:
DATE:
BACKGROUND:
PLANNING COMMISSION
CITY OF OWASSO
LARISSA DARNABY
CITY PLANNER
REQUEST FOR ACCEPTANCE OF THE CVS OWASSO FINAL PLAT
NOVEMBER 30, 2009
The City of Owasso has received a request from Armstrong Development applicant/owner, for
the review and acceptance of the CVS Owasso Final Plat. The Final Plat proposes one (1) lot in
one (1) block on 1.624 acres of property. The applicant wishes to plat the property so that they
may develop a CVS Pharmacy.
LOCATION:
The subject property is located on the southeast corner of North 129`s East Avenue and East 96" Street
North.
EXISTING LAND USE:
Undeveloped
SURROUNDING ZONING:
North: Agricultural (Single- Family Dwelling)
East: Agricultural (Undeveloped
West: Commercial Shopping (Walgreens)
South: Agricultural (Single- Family Dwelling and a Church)
PRESENT ZONING:
The subject tract is zoned Commercial Shopping
DEVELOPMENT PROCESS:
The first step in the development of a piece of property in Owasso is annexation. Annexation is
the method whereby land located outside the city limits is made a part of the city. Property owners
and land developers sometimes choose to have their property annexed into Owasso in order to
receive Owasso municipal services, such as police protection, refuse collection, and sanitary sewer.
The second step in the development of a piece of property in Owasso is rezoning. When a property
is annexed into Owasso, by law it must come in classified for AG Agricultural use. In order to
develop the property, the land must be zoned for particular kinds of uses, such as residential,
office, commercial, or industrial. Rezoning decisions are made in accordance with the growth
policy displayed in the Owasso Master Plan.
One type of rezoning that a developer may choose to seek is a Planned Unit Development, or PUD.
When a development proposes to exhibit a mixture of uses with specific regulations and standards
unique to a particular tract of land, a PUD is often the preferred land use control mechanism.
The third step in the development of a piece of property in Owasso is platting. A preliminary plat
is required for any development that proposes to divide land into two or more lots. Preliminary
plats illustrate the development concept for the property, and are often modified significantly after
being reviewed by the Technical Advisory Committee (TAC), and the Owasso Planning
Commission. Sometimes, difficult development issues such as existing utility lines, wells, or
easements are brought to light at the preliminary plat stage and must be remedied prior to
development.
After the preliminary plat has been reviewed by the City and various utility companies,
construction plans for the development's infrastructure are typically submitted. These plans
include specifications and drawings for stormwater drainage, streets and grading and erosion
control, waterlines, stormwater detention, and wastewater lines. Often, approval is required of
other agencies, such as the Department of Environmental Quality for wastewater collection and the
US Army Corps of Engineers for properties that may be development sensitive.
Once the property development proposal shows a division of lots that is acceptable to both the
developer and the City of Owasso, a final plat application is submitted. A final plat illustrates the
layout and dimension of lots included on the final plat, right -of -way widths, easements, and other
physical characteristics that must be provided for review by the City. After obtaining approval
from the TAC and Planning Commission, the final plat is considered by the City Council. If
approved, the final plat is filed with the office of the County Clerk and governs all future
development on that property.
The fourth step in the development of a piece of property in Owasso is the site plan. Site plans are
reviewed by the TAC and approved by city staff. Issues such as building setbacks, parking, access,
landscaping, and building footprint are presented in the site plan. Once a site plan is approved, the
development is clear to apply for a building permit and to submit construction plans for the
building's foundation, plumbing, electrical system, and HVAC.
ANALYSIS:
The applicant is requesting the review and approval of the CVS Owasso final plat so they may plat
and eventually develop the property with a CVS Owasso pharmacy facility. The property is zoned
CS (Commercial Shopping). The designation outlines the development standards for the property
in a commercial manner. The proposed layout for the pharmacy is associated with the plat and is
allowed by right according to the zoning designation.
According to the final plat, the developer would like to create one 1.624 acre lot, recognized as Lot
1, Block 1, CVS Owasso, which would be the proposed site of the CVS Pharmacy.
The main access points into the CVS Owasso Addition will be from North 129* East Avenue and
East 96a' Street North. The applicant has shown a total of 80' to be designated on the final plat for
ingress and egress. The 80' that is designated for ingress and egress would consist of two points of
access, which includes the 40' entrance /exit, as proposed, on the west side of the property and an
entrance/exit on the north side of the property being 40' in width, as well.
Any development that occurs on the subject property must adhere to all subdivision, zoning and
engineering requirements including but not limited to paved streets and sidewalks. Commercial
sewer and water service will be provided by the City of Owasso. The property will be subject to a
payback fee of $35 per acre for Storm Siren Fees.
RECOMWNDATION:
Staff recommends approval of the CVS Owasso final plat
ATTACHMENTS:
1. CVS Owasso Final Plat
b CR
m. 0
a
CO
c
R H AL
..F+ 191 F 21
® a q'OgN ~0S
� �w OmE
f0 �Eo
•C t
a` H�
2
;w o
o
Q Z �
rpwa
o
w
w
N
a
1
J 8 n
J� ICi
A
>z a
3HN3AV1Stl3 RY904 H1 ON
111
br5
O
Z
bo
nw '+yw4
'NNFU'
jF�$F�j$!!
yCSyCS����{{fifi
o
b CR
m. 0
a
CO
c
R H AL
..F+ 191 F 21
® a q'OgN ~0S
� �w OmE
f0 �Eo
•C t
a` H�
2
;w o
o
Q Z �
rpwa
o
w
w
N
a
1
J 8 n
J� ICi
A
4
CCbpppppp
YOW�6$
WWG
b�
>z a
�QwQ
4
CCbpppppp
YOW�6$
WWG
b�
rt+
a
e CO)
LL
R
03
v
a
e
!I I�
N
Y
6
s
s
4
E 4 F
e �
l
� tla�
1I'fill
11 ' I11 0
[�1A
I35 u 1 ►11 lU
TO: PLANNING COMMISSION
CITY OF OWASSO
FROM: LARISSA DARNABY
CITY PLANNER
SUBJECT: OPUD 09 -01
DATE: NOVEMBER 30, 2009
The City of Owasso has received a request from Encore Enterprises applicant/owner, to review
and approve a proposed 16.549 acre Planned Unit Development 09 -01 with underlying zoning
designations of Multi Family (RM) District and Commercial General (CG) District, located near
the northwest corner of East 116th Street North and North 145x` East Avenue. The site is
currently undeveloped and zoned Agriculture.
LOCATION:
The subject property is located near the northwest corner of East 116'h Street North and North
145th East Avenue.
EXISTING LAND USE:
Undeveloped
CONCEPT OF A PUD:
The concept of a Planned Unit Development is to provide a creative alternative to conventional
development where a particular tract is under common ownership or control and where a detailed
development plan, outlining the development of the tract as a unit is proposed and submitted for
public review. The use of a PUD technique is a way to amend a zoning ordinance in accordance
with a complete and coordinated plan of development for a larger parcel, rather than piecemeal
individual changes using the variance process. The supplemental zoning district PUD must be
approved by the City Council as a prerequisite to the Planned Unit Development.
ANALYSIS:
OPUD 09 -01 (Encore at Elm Creek) is a proposed planned unit development (PUD) comprised
of approximately 16.549 acres. The development concept behind Encore at Elm Creek is for
mixed Multi Family and Commercial General uses. The 16.549 acre site is located near the
northwest corner of East 116'h Street North and North 145'h East Avenue.
Encore at Elm Creek is a proposed multi - family use development, submitted as a Planned Unit
Development (PUD 09 -01) pursuant to the provisions of the Owasso Zoning Code. The proposed
use consists of two development areas. Development area "A" encompasses approximately
14.614 net acres of land. Development area `B" consists of commercial and retail development
that is currently unknown. Development Area `B" encompasses 1.935 net acres of land.
The project is located at the northwest corner of North 145th East Avenue and East 116th Street
North (State Highway 20). The east side of the subject tract abuts North 145th East Avenue. A
portion of the south side of the subject tract extends to East 116th Street North (State Highway
20). The property abuts a single - family residence to the north, zoned Agriculture; on the west the
property abuts a vacant tract, zoned Agriculture.
The site is currently vacant land covered with vegetation. Development Area "A" has
approximately 1230 feet of street frontage along North 145th East Avenue and approximately 50
feet of street frontage along East 116th Street North (State Highway 20).
The City of Owasso is a rapidly expanding suburban area. The Planned Unit Development is
located in an area of Owasso that is experiencing continuing growth. As the market has evolved,
the property owners feel it is appropriate and feasible to develop the area for multi- family
residential and commercial general uses. The staff concurs that a development of this nature is
consistent with other developments in the Owasso area, as well as immediate needs for
apartment housing and commercial space. The intention of the PUD is to unify the two tracts into
one development and provide a higher standard of development.
According to the Owasso Zoning Code, the Planning Commission shall hold a public hearing on
any PUD application and determine the following:
1. Whether the PUD is consistent with the Comprehensive Plan.
2. Whether the PUD is in harmony with the existing and expected development of surrounding
areas.
3. Whether the PUD is a unified treatment of the development possibilities of the project site.
4. Whether the PUD is consistent with the stated purpose and standards of the PUD ordinance.
a. To permit innovative land development while maintaining appropriate limitation on
the character and intensity of use assuring compatibility with adjoining and
proximate properties;
b. To permit flexibility within the development to best utilize the unique physical
features of the particular site;
c. To provide and preserve meaningful open space; and
d. To achieve a continuity of function and design within the development.
FUTURE PLANNING ISSUES:
Future planning issues must still be considered if the PUD is approved. If approved, the
applicant must submit a preliminary plat, infrastructure plans, and a final plat that must be
approved by the City of Owasso.
Sidewalks will be required along all public rights -of -way associated with the subject property.
Perimeter sidewalks must be installed at the time of overall development, while the internal
walks may be constricted as individual lots are developed.
The applicant has identified the terrain of the area as relatively flat terrain. The existing soils on
the site would appear to create no unusual development problems that are not typically
encountered in development in and around the City of Owasso. On -site detention is required and
will be further defined at the platting stage. The City will require, through engineering review
and inspections, that the rate of storm water runoff after construction will be no greater than the
greater of storm water runoff before construction.
Any future development on the property will be served sewer by the City of Owasso, and water
by Rural Water District No. 3 Washington County. The subject tract is required to pay the Storm
Siren fee of $35.00 per acre.
The staff published legal notice of the PUD request in the Owasso Reporter and mailed notices to
property owners within a 300' radius of the subject property.
RECOMMENDATION:
The staff recommends approval of OPUD 09 -01.
ATTACHMENTS:
1. General Area Map
2. OPUD 09 -01 Development Outline Plan
Location Map
scud. Y =4000'
_ _ _ _ _ _ _ 1r0[F TQ9NG (6K6024, c6.
- _ - _ - 7D'T17E- fBK�l4�'PL -19B
SOUTH LINE SECTIO
200 1D0 GRAPHIC SCALE 200 East 116th Street North
1 "= 200'
PUD LEGAL DESCRIPTION:
P.O.B.
POINT OF BEGINNING
SOUTHEAST CORNER OF
SECTION 4, T-21-N, R -14 -E
A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF (SE /4 SE /4) OF SECTION FOUR (4)
TOWNSHIP TWENTY -ONE (21) NORTH, RANGE FOURTEEN (14) EAST OF THE INDIAN BASE & MERIDIAN, TULSA COUNTY, STATE OF
OKLAHOMA, ACCORDING TO THE U.S. GOVERNMENT SURVEY THEREOF, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS TO WIT:
BEGINNING AT THE SOUTHEAST CORNER OF SAID SECTION 4; THENCE 588'44'45 "W ALONG THE SOUTHERLY LINE THEREOF A DISTANCE OF
405.28 FEET; THENCE N 01'19'46" W A DISTANCE OF 430.68' FEET; THENCE S 88'40'14" W A DISTANCE OF 378.51 FEET; THENCE N
01'19'46" W A DISTANCE OF 889.91 FEET; THENCE N 88'45'54" E A DISTANCE OF 733.62 FEET TO A POINT ON THE EASTERLY LINE OF
SAID SECTION 4; THENCE S 01'19'46" E ALONG SAID LINE A DISTANCE OF 1319.846 FEET TO THE POINT OF BEGINNING. SAID TRACT
CONTAINING 805,660.91 S.F. OR 18.495 ACRES MORE OR LESS.
ON 4R0
°t';., JflO Khoury Engineering, Inc. ENCORE ENTERPRISES Exhibit No. TULSA COUNTY- OKLAHOMA
ChedeE by: WE 1435 East Cut S6eel- Tulsa. OK 74105
Law Tel 910 .712.6760 - Fax 916.712.1069
"' ":30220 CA #3751, Renewal 06/30/2011 PUD LEGAL DESCRIPTION
11sue Oblu 1I&M
1
Encore at Elm Creek
Planned Unit Development
PUD No. 09 -01
Submitted to:
City of Owasso
Tulsa County, Oklahoma
November 10, 2009
Prepared By
Khoury Engineering, Inc.
1435 East 41" Street, Tulsa, OK 74105
Tel (918) 712 -8768 • Fax (918) 712 -1069
Khoury Engineering, Inc.
Encore at Elm Creek
TABLE OF CONTENTS
DEVELOPMENT CONCEPT & CHARACTER ........................................................
..............................3
DEVELOPMENTSTANDARDS ...............................................................................
..............................3
DevelopmentArea A ................................................................................................
..............................3
DevelopmentArea B ................................................................................................
..............................4
GRADING & UTILITY PLANS ................................................................................
............................... 5
ACCESS AND CIRCULATION .................................................................................
..............................5
SCHEDULED DEVELOPMENT ...............................................................................
............................... 5
PUD LEGAL DESCRIPTION .....................................................................................
..............................6
PROJECT DESIGN TEAM ........................................................................................
............................... 6
EXHIBITA ................................................................................................................
............................... A
CONCEPTUAL SITE IMPROVEMENT PLAN ...............................................
..............................A
EXHIBITB ................................................................................................................
............................... B
CONCEPTUAL DRAINAGE PLAN ................................................................
............................... B
EXHIBITE ................................................ ................................................................................................ E
PUD LEGAL DESCRIPTION ............................................. ............................... ..............................E
ENDOF REPORT ....................................................................................................... ..............................F
Page 2 1111011009
Khoury Engineering, Inc. Encore at Elm Creek
DEVELOPMENT CONCEPT & CHARACTER
Encore at Elm Creek is a proposed multifamily use development, submitted as a Planned Unit
Development (PUD 09 -01) pursuant to the provisions of the Owasso Zoning Code. The proposed
development consist two development areas. Development Area A consist of residential dwellings in the
form of low -rise apartments contained in 12 buildings. Development Area A encompasses
approximately 14.614 net acres of land. Development Area B consists of commercial and retail
development that will be constructed by others at a future date. Development Area B encompasses
approximately 1.935 net acres of land. This project is located at the Northwest comer of North 145th
East Avenue and East 116 h Street (State Highway 20). The limits of this PUD extend to the centerline
of the street and therefore include a total 18.495 acres. The subject property is currently zoned AG. The
East side of the subject tract abuts North 145th East Avenue. A portion of the south side of the subject
tract extends to East 116" Street North (State Highway 20). The property abuts a single family residence
on the North side zoned AG; on the West the property abuts a vacant land zoned AG. The site is
currently a vacant land covered with vegetation. Development Area A has approximately 1,230.90 feet
of street frontage along 145th East Avenue and approximately 50.00 feet of street frontage along East
116'h Street North (State Highway 20).
Section 820 of the Owasso Zoning Code states the purposes of the Planned Unit Development (PUD)
are to permit innovative land development while maintaining appropriate limitations on the character
and intensity of use. Additionally, a purpose of the PUD is to permit flexibility within the development
to best utilize the unique physical features of the particular site and provide and preserve meaningful
open space. The proposed PUD meets and exceeds this requirement and the stated purposes of the
Owasso Zoning Code.
A subdivision plat will be submitted to the City of Owasso after approval of the PUD by the City
Council. The platted area will establish private covenants which set forth criteria which will establish
and maintain a very high quality of development, and will establish aesthetic features such as nicely
landscaped entries, neighborhood recreation areas and proper screening between commercial and
residential uses.
DEVELOPMENT STANDARDS
This PUD shall be governed by the use and development regulations of Owasso Zoning Code except as
follows:
Development Area A
Permitted Use:
As permitted in RM, Multi - Family
District, under the Owasso Zoning Code
Net Development Area .................. ...............................
14.614 Acres (636,605.11 s.f.)
Maximum Floor Area Ratio Per Lot .. ...............................
0.50
Minimum Building Setback:
From East Property line ................ ...............................
35 feet
From North Property line ................ ...............................
20 feet
From South Property line .............. ...............................
10 feet
From West Property line ................... ...............................
10 feet
Page 3 1111012009
Khoury Engineering, Inc. Encore at Elm Creek
Maximum Building Height ............. ............................... 50 feet (Not to exceed three stories)
Minimum Landscape Buffer .......... ...............................
Minimum dwelling size ................ ...............................
30 feet along N. 145"E. Ave.
20 feet along North Property Line
5 feet along West Property Line
5 feet along South Property Line
600.00 Square feet
Percent of masonry ...................... ............................... 25% (entire project)
Parking Ratio ............................. ............................... As required in Chapter 9 of the Owasso
Zoning Code.
Development Area B
Permitted Use: As permitted in CG, Commercial
District, under the Owasso Zoning Code
Net Development Area .................. ............................... 1.935 Acres (84,299.93 s.f.)
Maximum Floor Area Ratio Per Lot .. ............................... 0.50
Minimum Building Setback:
From East Property line ................ ............................... 35 feet
From North Property line ................ ............................... 20 feet
From South Property line .............. ............................... 10 feet
From West Property line ................... ............................... 10 feet
Maximum Building Height ............. ............................... 50 feet (Not to exceed three stories)
Minimum Landscape Buffer ........... ............................... 30 feet along N. 145th E. Ave.
10 feet along North Property Line
5 feet along West Property Line
10 feet along South Property Line
Percent of masonry ...................... ............................... 25% (entire project)
Parking Ratio ............................. ............................... As required in Chapter 9 of the Owasso
LANDSCAPING AND SCREENING: Zoning Code.
Encore at Eln: Creek landscaping plan will be designed to enhance the N. 145`h East Avenue frontage,
and to create an attractive view form East 110h Street North (S.H. 20). The planting theme will
highlight the site entries and buildings, and will utilize plant selections indigenous to North East
Oklahoma that are durable and require low maintenance. All landscaping shall be provided in
accordance with the City of Owasso Zoning Ordinance except as noted herein.
A minimum of ten percent (10 %) of the land area shall be improved as internal landscape open space.
All landscaping shall comply with Chapter 20 "Landscape Requirements" of the Owasso Zoning Code.
Page 4 1111012009
Khoury Engineering, Inc. Encore at Elm Creek
The frontage along N. 145'h E. Ave. will have a thirty (30) foot wide landscaped edge along the street
right -of -way. This landscape area will be planted with trees and shrubs that meet or exceed the
requirements of the Owasso Zoning Code. In addition, at least one tree per 50 lineal feet of landscaped
edge shall be installed in this area, and at least one half of the trees shall be evergreen.
In order to screen the facility from the north, we are proposing an 8 -foot tall privacy fence along the
northern boundary. Detail of the fence will be presented to City Staff for approval during the site plan
review process.
LIGHTING:
All Outdoor lighting shall comply with Chapter 19 "Outdoor Lighting" of the Owasso Zoning Code.
TRASH CONTAINERS:
Outside trash containers will be located in designated areas within the development, and will be
screened from the view from the residential area and roadways.
SIGNS:
All Signage shall comply with Chapter 18 "Signs" of the Owasso Zoning Code.
GRADING & UTILITY PLANS
A Site Grading & Utility Plan will be submitted to the City of Owasso for review and approval. The
Conceptual Drainage Plan is shown on Exhibit B. The Conceptual Site Utility Plan is shown on Exhibit
C. All utilities are available to serve this development except Sanitary Sewer. Plans are currently in
development to bring sanitary sewer to the site. Drainage and Utility plans will be prepared in
accordance with the City of Owasso engineering requirements.
Existing topography of the site ranges from elevation 713.00 at the Southeast comer of Development
Area B to elevation 693.00 at the North Property line of Development Area A. The site is not located
within the FEMA floodplain.
There is a 4 -inch water lines located on the West side of 145th East Avenue. There is also an 6 -inch
water line that currently located along the south right -of -way line of State Highway 20. These lines will
be upgraded to 12 -inch water lines along the boundaries of the development. There are plans to
construct an 8 -inch sanitary sewer line to be stubbed out at the Northwest corner of Development Area
A. All other utilities and communication services are available and accessible to Encore at Elm Creek.
ACCESS AND CIRCULATION
Ingress and egress to Encore at Elm Creek will be from both North 145th East Avenue and East 116th
Street North (State Highway 20).
SCHEDULED DEVELOPMENT
Construction of Encore at Elm Creek project will commence upon receiving all required governmental
permits. It anticipated that all permits are secured by the spring of 2010.
Page 5 1111012009
Khoury Engineering, Inc.
PUD LEGAL DESCRIPTION
Encore at Elm Creek
A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF THE SOUTHEAST
QUARTER OF (SE /4 SE /4) OF SECTION FOUR (4) TOWNSHIP TWENTY -ONE (21) NORTH,
RANGE FOURTEEN (14) EAST OF THE INDIAN BASE & MERIDIAN, TULSA COUNTY,
STATE OF OKLAHOMA, ACCORDING TO THE U.S. GOVERNMENT SURVEY THEREOF,
BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS TO WIT:
BEGINNING AT THE SOUTHEAST CORNER OF SAID SECTION 4; THENCE S88 044'45 "W
ALONG THE SOUTHERLY LINE THEREOF A DISTANCE OF 405.28 FEET; THENCE N
01019'46" W A DISTANCE OF 430.68' FEET; THENCE S 88 040114" W A DISTANCE OF 378.51
FEET; THENCE N 01 119'46" W A DISTANCE OF 889.91 FEET; THENCE N 88 045'54" E A
DISTANCE OF 733.62 FEET TO A POINT ON THE EASTERLY LINE OF SAID SECTION 4;
THENCE S 01 019'46" E ALONG SAID LINE A DISTANCE OF 1319.846 FEET TO THE POINT OF
BEGINNING. SAID TRACT CONTAINING 805,660.91 S.F. OR 18.495 ACRES MORE OR LESS.
PROJECT DESIGN TEAM
The project design team consists of the following professionals:
Owner/Developer:
Civil Engineer:
Encore Enterprises, L.L.C.
Khoury Engineering, Inc.
5005 LBJ Freeway, Suite 1200
1435 East 41st Street
Dallas, TX 75244
Tulsa, OK 74105
Tel(214)259 -7042
Tel(918)712 -8768
Fax(918)259 -7001
Fax(918)712 -1069
Architect
JHP Architecture
8340 Meadow Road, # 150
Dallas, TX 75231 -3766
Tel(214)363 -5687
Page 6
1111012009
EXHIBIT A
CONCEPTUAL SITE IMPROVEMENT PLAN
0
i
0
a
Ll N
p0^
D
n o
oN �3
oD
r
m
0
0
— _____ --- --
nier -Brew
_ ___ _
• -
East 116th Street North (State Highway
x ! CONCEPTUAL SITE PLAN I ENCORE at ELM CREEK
145TH & HIGHWAY 20
Puo nos -ot CITY OF OWASSO OKLAHOMA
y.
i lt_
3 NB445�sCE 6&.79' I FOR Nei E 5 EI SE /4
i006016J16) )` - y4 �..5 J/ �J r
\ ,�) I �� • �- � $� �w 1 / � III U� I ;1 \l I
,q p 7 i •µ
•'ll i � 24 UNITS %/ ;' I •• v2 ayv` ii °�
'
90 \ \•\ i it N ,f / ! _.� ` II L7 y i
] •£, , --�_' E3:�" ill i� I i I
•'•15 Z \ I •'a ', % C§�� 99 CCU( , III .:
OF
r � I
'i r i s •'\ I
H� 1�4 li I y
iii I I
E 1,
I E �� 2/ /, VI• I II � I
,
I rp I ) -� L � I ❑ •Nfie'a5'zo'[ "- I I i
bM 44
r
___�_______. ___________ ..____.
:,.
l�
it , ab
_,_______ ,�____t- ,_w__.______ _ _
to
m
-_
` --- East- tt6fYi Street,North- State Highway zu}
!
-__
u�w
$
(
m
•\ i � i
A
20 UNIi,
I 11 m
i
CONCEPTUAL DRAINAGE PLAN
ENCORE at ELM CREEK
(
Khnu=v EOnlnee„
fi Ine
_
I
me
145TH & HIGHWAY 20
PUD M09 -01
rl
\
\
I II
g N
l
[r
nest
________ _._z__ I NBBs'fi 9 oo ' ,6
sa—e 4o 9—w - zsse J
�•'•\
�•
I ill
\1 \
\S.
A G
o
E/• a I I I
Oo
•1
I
D
!
li•
4 X
bM 44
(
___�_______. ___________ ..____.
:,.
l�
it , ab
_,_______ ,�____t- ,_w__.______ _ _
__ 0'VE
-
-- ,._ OUIH UxE sCC1fONJ.,
-_
` --- East- tt6fYi Street,North- State Highway zu}
!
-__
u�w
$
A
m
x-
CONCEPTUAL DRAINAGE PLAN
ENCORE at ELM CREEK
(
Khnu=v EOnlnee„
fi Ine
me
145TH & HIGHWAY 20
PUD M09 -01
CITY OF OWASSO, OKLAHOMA
�4
U � °BSS m
s� r
— — — paAA
— • m.nomN 51
m�
_______ ___
East 115th Street
n
r
7
In r
n m
a a
Y �
1�
O' 3
II �
O V
N
J
s
o
o
m
N
O
O
N
O
O
N
O
7
N
N
V 2
S> I
m
c+
°od
% a
u 3
O
3 x
O
o A
6
f E
a a
�
N
� O
O
ET
Inc C
o .n
� a
a 3
In r
n m
a a
Y �
1�
O' 3
II �
O V
N
J
s
o
o
m
N
O
O
N
O
O
N
O
7
N
N
V 2
S> I
m
c+
°od
% a
u 3
coo
3 S� ac 3 a 3
V_I N
v w'
A i
A
>i9' -O"
0
' o
o 0
2
0
3
o N
x�
N �
o m
A
3�
3 x
o A
Inc C
coo
3 S� ac 3 a 3
V_I N
v w'
A i
A
>i9' -O"
0
' o
o 0
2
0
3
o N
x�
N �
o m
A
3�
00
m N
N N
o ut
• O
O 3
d G
O =
3 a
m 3
i
v�
9 n
U �
D N
.m
O
� O
N
6
3
O
e O
o �
N
O
O
N
O
O
n�
M
9_
N
Z
n
m
z �
id
N �
0
d
c
5 � m
3 ° x
E a
v �n
1
w
0
n
N
n
3
w
3
°o
N
w'
n