Loading...
HomeMy WebLinkAbout2014.12.08_Planning Commission AgendaRecord Copy OWASSO PLANNING COMMISSION December 8, 2014 6:00 PM PUBLIC NOTICE OF THE MEETING OF THE OWASSO PLANNING COMMISSION TYPE OF MEETING: Regular DATE: December 8, 2014 TIME: 6:00 PM PLACE: Old Central 109 North Birch NOTICE FILED BY: Marsha Hensley TITLE: Assistant City Planner Filed in the office of the Owasso City Clerk and posted at the north entrance to City Hall at 4:00 PM on December 4, 2014. Marsha Hensley, Assistant City Planner OWASSO PLANNING COMMISSION Monday, December 8, 2014 at 6:00 PM Old Central 109 North Birch AGENDA 1. Call to Order 2. Flag Salute 3. Roll Call 4. Presentation of the Character Trait of the Month - Sensitivity 5. Approval of Minutes from the November 10, 2014 Regular Meeting. 6. Annexation #0A14 -03 1 Consideration and appropriate action related to the request for the review and acceptance of an annexation and rezoning of approximately 28 acres, from AG (Agriculture) District to RS -3 (Residential Single Family) District. The property is located at 9909 East 106th Street North. 7. OPUD 14 -03 - Tyann Plaza X - Consideration and appropriate action related to the request for the review and acceptance of a Planned Unit Development. The property is located at 9452 North Owasso Expressway (Lot 1, Block 1, Tyann Plaza X) and has an underlying zoning of CS (Commercial Shopping) District. A storage facility and office is proposed. 8. Community Development Report • Report on Monthly Building Permit Activity • Director's Update 9. Report on Items from the November 26, 2014 TAC Meeting. • OPUD 14 -03, Tyann Plaza X • Site Plan - AMC Urgent Care • Site Plan - 9inetyEight Apartments Phase II • Site Plan - Taco Bell (Morrow Place) 10. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda) 11. Adjournment OWASSO PLANNING COMMISSION MINUTES OF REGULAR MEETING Monday, November 10, 2014 The Owasso Planning Commission met in regular session on Monday, November 10, 2014 at Old Central per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4 :00 p.m. on November 6, 2014. ITEM 1. CALL TO ORDER Dr. Loving called the meeting to order at 6:00 p.m. ITEM 2. Flag Salute ITEM 3. Roll Call PRESENT Dr. Paul Loving Renee Mowery Tim Miller David Vines A quorum was declared present. STAFF Bronce Stephenson Marsha Hensley Karl Fritschen Daniel Dearing Dan Salts Julie Lombardi ABSENT Tammy Laakso ITEM 4. Presentation of the Character Trait of the Month - Hospitality ITEM 5. Approval of Minutes from October 13, 2014 Regular Meeting. The Commission reviewed the minutes. David Vines moved, seconded by Tim Miller, to approve the minutes from the October 13, 2014 meeting. A vote on the motion was recorded as follows: YEA: Loving, Mowery, Miller, Vines NAY: None Motion carried 4 -0. ITEM 6. Rezoning #02 14-05,11551 North 129th East Ave - Consideration and appropriate action related to the request for the review and acceptance for a rezoning of approximately 5.3274 acres, from AG (Agriculture) District to CS (Commercial Shopping) District, located at the southeast corner of East 116th Street North & North 129th East Avenue. OWASSO PLANNING COMMISSION November 10, 2014 Page No, 2 Bronce Stephenson presented an overview. The location was described. The request for CS zoning is appropriate for the subject property as it conforms to the land use master plan. A nearby property owner Larry Olds (11510 No. 131 E. Ave.) questioned what type of use was planned for this property. David Vines moved, seconded by Tim Miller, to approve the rezoning request. A vote on the motion was recorded as follows: YEA: Loving, Mowery, Miller, Vines NAY: None Motion carried 4 -0. ITEM 7. Final Plat - Garrett Creek Commercial - Consideration and appropriate action related to the request for the review and acceptance of a final plat proposing one (1) lot on one (1) block containing 5.3274 acres, more or less. The property is located on the southeast corner of East 116th Street North & North 129th East Avenue, Bronce Stephenson presented an overview. The property location was described. Payback fees will include a storm siren fee of $35.00 per acre. The Technical Advisory Committee reviewed the plat at the October 22, 2014 meeting. The applicant has addressed all TAC comments. Staff recommends approval of the final plat of Garrett Creek Commercial. Traffic signalization at that intersection was discussed. The applicant has agreed on installing a temporary signal along with turn lanes. Tim Miller moved, seconded by David Vines to approve the final plat, A vote on the motion was recorded as follows: YEA: Loving, Mowery, Miller, Vines NAY: None Motion carried 4 -0. ITEM 8. Annexation #OA 14 -02 & Rezoning #OZ 14- 06.9721 N Garnett - Consideration and appropriate action related to the request for the review and acceptance of an annexation and rezoning of approximately 2.437 acres, from AG (Agriculture) District to CS (Commercial Shopping) District. The property is located at 9721 North Garnett, Bronce Stephenson presented an overview. The properly location was described. There is a forty (40) foot utility easement across the front of the property. The land use master plan calls for commercial uses in this location so applying CS zoning to the property Is appropriate. Below are comments made by surrounding property owners: OWASSO PLANNING COMMISSION November 10, 2014 Page No, 3 Greg Barnes - 9711 North Garnett - Why would there commercial zoning in between two residential properties? Opposed to the rezoning of this property. Cindy Potter - 9711 North Garnett - Opposed to the rezoning. They have horses on their property and don't want commercial next to them. Staff recommends approval of annexation #OA 14 -02 and the rezoning of #OZ 14 -06. Staff explained that any development that occurs on the property must adhere to all subdivision, zoning and engineering requirements. Based on the land use master plan, David Vines moved, seconded by Tim Miller to approve annexation and rezoning for the above property, subject to additional right of way being dedicated on Garnett Road. A vote on the motion was recorded as follows: YEA: Loving, Mowery, Miller, Vines NAY: None Motion carried 4 -0. ITEM 9. Final Plat - Hickory Creek II - Consideration and appropriate action related to the request for the review and acceptance of a final plat proposing twenty -three (23) lots on three (3) blocks containing 7.607 acres, more or less. The property is located on the northwest corner of East 66th Street North and North 129th East Avenue. Bronce Stephenson presented an overview, The location was described. There will be a storm siren fee of $35.00 per acre and Elm Creek Sewer payback fee of $1,580.00 per acre, The Technical Advisory Committee reviewed the final plat at the October 22, 2014 meeting. The applicant has addressed all TAC comments. Staff recommends approval of the final plat for Hickory Creek II. David Vines moved, seconded by Renee Mowery to approve the final plat, A vote on the motion was recorded as follows: YEA: Loving, Mowery, Miller, Vines NAY: None ITEM 10. Final Plat - Caudle Center Phase III - Consideration and appropriate action related to the request for the review and acceptance of a final plat proposing one (1) lot on one (1) block and contains 1.05 acres, more or less. The property is located north of Christian Brothers Auto on the southwest corner of Garnett Road and East 96th Street North. The property is zoned CS (Commercial Shopping) District, OWASSO PLANNING COMMISSION November 10, 2014 Page No. 4 Karl Fritschen presented an overview. The property location was described. The applicant proposes to develop the property with retail uses. A MAE is being recorded by separate instrument on the Christian Brothers property essentially making the existing MAE six (b) feet wider to ensure both MAE's line up correctly. There is a storm siren fee of $35.00 per acre; Garnett Regional Detention fee of $30,737.00 per acre and Ranch Creek Sewer Interceptor fee of $800.00 acre. The Technical Advisory Committee reviewed the plat at the October 22, 2014 meeting. Staff recommends approval of the final plat for Caudle Center Phase III. Tim Miller moved, seconded by David Vines to approve the final plat, subject to TAC and Staff recommendations being addressed, A vote on the motion was recorded as follows: YEA: Loving, Mowery, Miller, Vines NAY: None Motion carried 4 -0. A five minute break was taken to adjust the microphones. ITEM 11. Community Development Report • Report on Monthly Building Permit Activity. • Director's Update ITEM 12. Report on Items from the October 22, 2014 TAC Meeting. • Final Plat - Garrett Creek Estates 2 • Site Plan - Walmart Neighborhood Market • Preliminary Plat /Final Plat- Hickory Creek II • Final Plat- Caudle Center III ITEM 13. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda) ITEM 14. Adjournment - David Vines moved, seconded by Tim Miller, to adjourn the meeting, A vote on the motion was recorded as follows: YEA: Loving, Miller, Mowery, Vines NAY: None Motion carried 4 -0 and the meeting was adjourned at 7 :25 PM, Chairperson Vice Chairperson Date TO: Owasso Planning Commission FROM: Bronce L. Stephenson Director of Community Development SUBJECT: Annexation (OA- 14 -03) & Rezoning (OZ- 14 -07) - 9909 East 106th Street North DATE: December 8, 2014 BACKGROUND: The Community Development Department received a request for annexation for property located at approximately 9909 East 1061h Street North. The property is comprised of three tracts of land (18.16 acres, 2.94 acres, and 6.86 acres) totaling 27.96 acres. There is one structure on the 2.94 acre tract. According to Tulsa County Assessor Data, The property measures 878.66 feet along the frontage and is 1599.10 feet deep. SUMMARY TABLE: Direction Zoning Use Land Use Plan Jurisdiction North Lots /Blocks Undeveloped Transitional Within PUD? (Agriculture) Within Overlay District? N/A Owasso City of Owasso PUD 06 -04 Storm siren fee of $35 /acre; Meadowcrest Sewer Payback fee of $867 /acre; Washington County #3 Water Payback @ $50/tap Streets (public or private) N/A South Amended Undeveloped Transitional City of RM, CS Owasso East (OM, RD, RS -3) Public Park Parks /Recreational City of Owasso West AG Undeveloped Transitional City of (Agriculture) Owasso SUBJECT PROPERTY /PROJECT DATA: Property Size 27.96 acres Current Zoning AG (Tulsa County) Proposed Use Residential Single Family Lots /Blocks N/A Number of Reserve Areas N/A Within PUD? N/A Within Overlay District? N/A Water Providers City of Owasso Applicable Paybacks Storm siren fee of $35 /acre; Meadowcrest Sewer Payback fee of $867 /acre; Washington County #3 Water Payback @ $50/tap Streets (public or private) N/A ANALYSIS: The applicant is requesting RS -3 (Residential Single Family) zoning be applied to the property as part of the annexation, which can be done if the proposed zoning conforms to the land use master plan. In this case, the Land Use Master Plan calls for commercial and transitional uses in this location so applying RS -3 zoning to the property is appropriate, as this is a lesser use then it would be allowed by the Land Use Master Plan. It appears that the City can serve the property with police, fire, EMS and utilities. ANNEXATION COMMITTEE: The Annexation Committee reviewed the request on November 29, 2014 and recommend approval to annex the subject property into the corporate limits of the City of Owasso. COMPREHENSIVE PLAN CONSISTENCY: The GrOwasso 2030 Land Use Master Plan identifies the subject property and its surroundings as having a future land use of commercial and transitional. Since the proposed use of the property is for residential single family homes, a less intense use than prescribed under the Land Use Master Plan, the proposed use and associated zoning is appropriate. RECOMMENDATION: Staff recommends approval of the request to annex the subject property into the corporate limits of the City of Owasso with an assigned zoning of Residential Single Family (RS -3). ATTACHMENTS: 1. Area Map 2. Aerial Map 3. Land Use Plan 4. Legal Exhibit ANNEXATION REQUEST 9909 East 106 Street North 1" = 752 ft #OA 14 -03 11!1312014 map represents a visual display of related geographic information. Data provided hereon is not a guarantee of actual field conditions.. To be sure of complete accuracy, se contact 01,vasso staff for the most up -to -date information. ANNEXATION REQUEST 9909 East 106 Street Forth ft #OA 14 -03 11/1312014 map represents a visual display of related geographic information_ Data provided hereon Is not a guarantee of actual field conditions. To be sure of complete accuracy, se contact Owasso staff forthe most up-to -date information. 2030 LAND USE PLAN MAP OA 14-3/OZ 14-07 Legal Description: A tract of land that is part of the Government lots Three (3) and Four (4) in Section Seven (7), Township Twenty -One (21) North, Range Fourteen (14) East, of the Indian Base and Meridian, Tulsa County, State of Oklahoma, Said tract being Described as Follows: Commencing at the Southwest Corner of said Section Seven; Thence N 88°35'58" E for 483.05 feet to the Point of Beginning of said Tract of land; Thence N 01°36'23" W for 440.01 feet; Thence N 14°15'55" E for 1,220.11 feet; Thence N 88°38'07" E for 552.56 feet to a Point on the Easterly line of said Government Lot Three; Thence S 01°29'34" E along the Easterly line of Government Lots Three and Four for 951.66 feet to the Northeast Comer of the Southeast Quarter of Government Lot Four; Thence S 88°38'07" W along the Northerly line of said Southeast Quarter of Government Lot Four for 683.70 feet to the Northwest Corner thereof; Thence S 01°32'58" E along the Westerly line of said Southeast Quarter of Government Lot Four for 663.23 feet to a Point on the Southerly line of said Section Seven; Thence S 88°35'58" W along said Southerly line for 200.00 feet to the Point of Beginning of said Tract of land. AND The Southeast Quarter (SE /4) of the Southwest Quarter (SW /4) of the Southwest Quarter (SW /4), also described as the Southeast Quarter (SE /4) of Government Lot 4, less and except the West 198 feet thereof, all in Section Seven (7) /Township Twenty -one (21) North, Range Fourteen (14) East of the Indian Base and Meridian, County of Tulsa, State of Oklahoma, according to the U. S. Government Survey thereof. IUN7 A tract or parcel of land being the West 198.0 feet of the East 660.00 -feet of the- SEA of the SW /4 of the SW /4 of Section Seven (7), Township Twenty -one (21) North, Range Fourteen (14) East, Tulsa County, State of Oklahoma, more particularly described as beginning at a point on the Section line a distance of 706. 34 feet East of the Southwest corner of mentioned Section 7; thence North and parallel to the west line of Section 7 a distance of 663.13 feet to a point; thence East a distance of 198.0 feet to a point; thence South a distance of 663.13 feet to a point on the section line; thence West a distance of 198.0 feet to the point of beginning.. There is an existing 25.0 feet road easement along the South boundary of this tract. TO: The Owasso Planning Commission FROM: Karl A. Fritschen, Chief Urban and Long Range Planner SUBJECT: Planned Unit Development, OPUD -14 -03 DATE: December 5, 2014 BACKGROUND: The City of Owasso received a Planned Unit Development (PUD) application for review and approval of a development called Tyann Storage, Planned Unit Development # 1403. The subject property Is located just behind the Southern Agriculture building on the east US -169 service road and is identified as Lot 1, Block 1 Tyann Plaza X. The subject property is zoned Commercial General (CG) according to the Tulsa County Assessors records and Ordinance #498. The PUD would act as an overlay to the underlying zoning on the property and the proposed development would be required to adhere to the conditions outlined in the PUD. The applicant proposes to develop the property with a mini - storage facility. SURROUNDING ZONING: Direction Zonin Use North CG Fitness Gym South OM Detention Pond MLandUseftn lCounty East RS -3 School West CG Retail Store SUBJECT PROPERTY /PROJECT DATA: CONCEPT AND USE OF A PUD: The concept of a Planned Unit Development is to provide a creative alternative to conventional development where a particular tract is under common ownership or control and where a detailed development plan, outlining the development of the tract as a unit, is proposed and submitted for public review. The use of a PUD technique is a way to amend the zoning designation in accordance with a complete and coordinated plan of development for a larger parcel, rather than piecemeal individual changes using the variance process. A PUD, which is essentially negotiated zoning, may be submitted for any parcel of land located within any general zoning district or combination of general zoning districts within the Owasso City Limits. In all cases, the PUD will be reviewed as to the proposed location and character of the uses and the unified treatment of the development of the tract. The regulations of the general zoning district or districts remain applicable except as specifically modified pursuant to the provisions of this chapter. ANALYSIS: The applicant has submitted a PUD application for a commercial mini - storage project. Although the property is zoned CG, which allows mini - storage facilities with a special exception, the US- 169 Overlay prohibits mini - storage uses. The subject property is located behind several existing commercial businesses and is somewhat hidden from view. This characteristic makes commercial uses less viable for this property, as commercial uses typically require higher visibility than this site provides. Considering this the proposed use seems appropriate and the applicant has submitted a PUD for the project. A private road bisects the property. On the east side of the road will be a building containing unconditioned storage units and on the west side of the road will be a building containing the conditioned units, which includes a small office space. The PUD indicates that the maximum height for all structures shall not exceed 30 feet and all proposed setbacks meet or exceed CG standards. The PUD proposes enhanced landscaping and attractive masonry architecture for the front facades of the buildings along the private road. A perimeter opaque wood fence will be constructed along the north, east, and south boundaries of the area containing the unconditioned storage units (eastern project area). This will serve as an additional buffer and screening from the properties to the east and south. The applicant has provided exhibits of the proposed architecture and landscaping. Staff has reviewed these exhibits in concert with the text in the PUD and believes they meet the Intent of the US -169 Overlay. If the PUD is approved, the applicant will provide final development plans for administrative review and approval by City staff and proceed with the platting process. PUD applications presented to the Planning Commission and City Council are for approval of the zoning, the uses, the overall plan as it relates to the immediate area, and the concept for the development. Future planning issues must still be considered if the PUD is approved. If approved, the applicant will be required to adhere to all City of Owasso subdivision regulations and engineering requirements. City staff published legal notice of the PUD request in the Owasso Reporter and mailed notices to property owners within a 300' radius of the subject property. COMPREHENSIVE PLAN CONSISTENCY: The Owasso 2030 Land Use Master Plan identifies the subject property and its surroundings as having a future land use of commercial, so this proposal conforms to the 2030 Land Use Master Plan. HARMONY WITH THE EXISTING AND EXPECTED DEVELOPMENT: This proposal appears to be consistent with the current and expected development of the area. The US -169 Overlay district was created to promote higher quality architecture, enhanced landscaping, and to discourage uses that may detract from the positive image that the corridor is intended to promote. Given this, mini - storage and similar facilities were prohibited in the overlay district. However, in this case, given the location of this property and the fact it is not highly visible, staff can support the proposal with additional protections offered in the PUD. In actuality, the use will actually serve as an effective transition from higher intensity commercial uses and the school and residential areas further to the east. A detention facility is also located to the southeast of the property, which adds additional buffer area. Since this is a commercial PUD, there are no amenity requirements. PUBLIC HEARING: In accordance with the Owasso Zoning Code, the Planning Commission and City Council shall hold a public hearing on any PUD application and make the following determinations: 1. Whether the PUD is consistent with the Comprehensive Plan, 2. Whether the PUD is in harmony with the existing and expected development of surrounding areas. 3. Whether the PUD is a unified treatment of the development possibilities of the project site. 4. Whether the PUD is consistent with the stated purpose and standards of the PUD ordinance. a. To permit innovative land development while maintaining appropriate limitation on the character and intensity of use assuring compatibility with adjoining and proximate properties; b. To permit flexibility within the development to best utilize the unique physical features of the particular site; c. To provide and preserve meaningful open space; and d. To achieve a continuity of function and design within the development. Overall, this project has been adequately designed to meet the challenges associated with the property. During the early stages, staff provided the applicant with feedback as to what would make this project viable and how to minimize the Impacts of developing this particular piece of property. The applicants have responded with a quality plan that responds to what staff had requested. TECHNICAL ADVISORY COMMITTEE REVIEW: This item was taken to the TAC for review on November 26, 2014 and the comments from this meeting are attached. RECOMMENDATION: Staff recommends Planning Commission approval of PUD -14 -03 for Tyann Storage, Planned Unit Development # 1403 with underlying zoning of CG subject to addressing all TAC comments as well as any additional conditions from the Planning Commission, ATTACHMENTS: A. Area Map B. Zoning Map C. Development Plan D. TAC Comments Tyann Plaza X OPUD 14-03 112712014 This map represents a visual display of related geographic information. Data provided hereon is not a guarantee of actual field conditions- To be sure of complete accuracV, please contact Owasso staff for the most up-to-date information. Tyann "Plaza X 1" = 752 ft #OPUD 14 -03 11/07/2014 map represents a visual display of related geographic information. Data provided hereon is not a guarantee of actual field conditions. To be sure of complete accuracy. >e contact Owasso staff for the most up-to -date information. Tyann Plaza X = Surrounding 1 752 ft Zoning - 12/04/2014 map represents a visual display of related geographic information. Data provided hereon is not a guarantee of actual field conditions. To be sure of complete accuracy, se contact Owasso staff for the most up-to -date information. Tyann Storage Planned Unit Development #1403 Tyann Development Co., Inc. P.O. Box 397 Owasso, Ok 74055 General Description Plan Unit Development -1403 is an existing lot 1.S Ac. in size and platted as a part of the Tyann Plaza South development. It is identified as Lot 1, Block 1, Tyann Plaza X. It is located in Section 20, Township 21 North, Range 14 East and is within the City of Owasso. It is proposed to be developed as a landscaped and screened mini- storage facility. The cover picture shows the location of the subject lot and its relationship with the newer Overlay District. The subject lot is abutted on the West side by the Smith Elementary School and on the South side by the grassed detention facility used for storm water management of the Tyann Plaza South development area. On the Southwest it is abutted by two vacant commercial lots zoned CG, on the Northwest by the back sides of the exiting Southern Agriculture and Aldi stores, and on the North by the 10Gym parking lot and building. Because the lot is at the bottom of the drainage water shed and Tyann Plaza continues to grow this lot will be completed screened by commercial or the abutting school. The closest residential properties are located on the other side of the detention facility 315 feet South of the subject lot. Zoning Description Exhibit -A shows a portion of the approved Final Plat for Tyann Plaza X. It is identified on the plat that the subject lot is zoned a combination of Commercial General (CG) and Commercial Shopping (CS). The Mini - Storage use was allowed by exception on a tract zoned CS and by right on a tract zoned CG. However, more recently an Overlay District was placed on all of Tyann Plaza including the subject lot. The addition of this Overlay District prohibits the development of a Mini - Storage facility on the subject lot. This is the primary reason for the filing of this PUD zoning request. If approved it would allow the mini - storage use to once again be allowed as originally zoned and plated. Exhibit -B shows the proposed Tyann Shopping Center and how the subject lot fits into the overall development plan. It also shows how the mini - storage will be screened from view by both the future buildings and the topography of the surrounding area. EXilibit- B SECTON 20, TOYINSHIP 21 NORTH. RANGE 14 EAST AN AOOITON TO THE CITY OF Ol':ASSO. TULSA COUNTY. OKLAHOM A / A SITE MAP N.T.S. OWNER / DEVELOPER: TYANN DEVELOPMENT CO., INC PO BOX 397 OWASSO, OK 74055 (913) 274 -0517 The topography of the Subject Lot is that it slopes gently from front to back. There in a small swell running across the back portion of the lot which carries storm water from the 10Gym parking lot North of the subject lot and Smith School East of the lot to the detention facility on the South side of the lot. Because it is located at one of the lowest parts of Tyann Plaza its visibility from the Hwy 169 East Service Road will be significantly restricted. In addition, as the physical environment surrounding the subject lot develops, these new buildings will restrict the visibility even more (See Exhibits A and B). It is anticipated that this project will not be seen from the service road or the highway. All utilities including storm water management were put in place at the time that Tyann Plaza X was plated. As required the plat is filed at the Tulsa County Clerk's Office and the Community Development Department has a copy of the filed plat and the "as built" drawings showing the location of all utilities. The soils that cover this lot are similar to the soils within all of Tyann Plaza. 97% of the lot is covered by Dennis Radley Complex while the northwest corner 2% is covered by Dennis Silt Loam. Development Statement This PUD is being proposed as a small mini - storage project to provide additional storage for the tenants that currently are located in the Tyann Plaza Shopping Center and the community at large. The landscaping and building design improvements will be concentrated in the "Visibility Corridor" as shown on Exhibit -C below. The lot is 1.5 acres in size and located behind the Southern Agriculture business. It will be developed by Tyann Development Co., Inc. who has developed several projects in the Owasso area. This project . complies with the PUD ordinance because it encourages developmentthat otherwise could not occur on the site and it promotes compatibility with the surrounding lots and uses. The project will be developed by Tyann Development Co., Inc. The civil engineer for this project will be Kellogg Engineering, Inc. from Talala, OK and the general contractor will be Ira Green Constructing from Claremore, OK. The buildings well be engineered and built by Frank Reeder Company LLC from Catoosa, OK. These firms have been apart several projects in the Owasso area. RESERVE AREA 'B' TYANN PLAZA VIII BLOCK 1 TYANN PLAZA IX BLOCK 1 I LOT 2 Development Standards This lot will be development in accordance with the City of Owasso Zoning Ordinance, except as described herein and shown on the previous page as Exhibit —C. Gross Land Area: Permitted Use: Number of Lots: Maximum Building Height: Minimum Off - Street Parking Spaces: Minimum Lot Frontage on Private Drive: Minimum Building Setback: 65,174 SF / 1.5 AC Commercial Mini - Storage One Story Not to Exceed 30 FT 13 200 FT Front Yard 25 FT Back Yard 15 FT From Smith School Boundary 15 FT From 10Gym Boundary 15 FT From Aldi's Boundary 20 FT From Southern Agriculture Boundaryll FT From Southerly Boundary 25 FT From Detention Facility 11 FT Between Buildings 24 FT Signs: One Pole Sign 30 FT Wall Sign 6 FT Development Concept It is proposed that the subject lot be designed and developed with the up most caution and care. There would be metal buildings covered with decorative EFIS similar to the existing Southern Agriculture, ALDI, and 10Gym buildings The northwestern portion of the lot behind Aldi's and Southern Agriculture would contain one metal building 25' by 90'. The front and South side will have decorative EFTS covering the metal skin of the building. The North side is hidden by Aldi's and the West side is hidden by Southern Agriculture. This building will contain an office 20' by 25' in size and 40 climate controlled 5' by 10' storage units. All outside HVAC units will be screen from view. There will also be provided a small parking lot that contains 13 parking spaces. The green space around the parking lot and building will.be landscaped to meet all City regulation. There will be two metal storage building and paved access on the easterly portion of the lot. The first building, which also fronts the private drive, will have a decorative EFTS surface. The entire" Visibility Corridor" will be landscaped meeting the requirements of the adopted landscape standards. The remaining boundaries of the back portion of the lot will have a six feet high wood screening fence erected. The face of this fence shall be directed outwardlyto properly buffer surrounding properties. Exhibit —D above and Exhibit —E on the next page provide a conceptual view of the proposed Site Plan, Landscaping, and the possible Building Frontages within the "Visibility Corridor ". These sketches are somewhat simplicity in nature but provide an adequate conceptual view of the proposed development. A decorative wooden fence will be used to screen 106YM's trash dumpster and parking lot and the area in the back of the project that is under the electric lines. A wooden screening will also be used between the subject lot and the area wide detention facility. Working Sketches Screening and Landscaping Details Landscaping and screening is extremely important in this case because the proposed use can be very unsightly if not properly softened and enhanced. Landscaping and screening can improve the appearance of not only the subject lot but also the areas around the lot. Exhibit -F below show how the developer would propose to landscape and screen the mini - storage project. Exhibit -F 6' Wood Screening Fence Landscape Plamand Screening) Crape 4orway Maple Crape 6' Wood Screening Fence The overall landscape concept is to beautify both sides of the private drive that splits the lot and at the same time to enhance the fronts of the two buildings that face that same driveway. The first part of the concept would be to use a 6' stained wood screening with metal support poles to fences around the back sides of the lot thereby screening and softening the views of the new project buildings from the abutting uses. As previously noted the fronts of both buildings shall be covered with a decorative EFTS depicting a design of rock, brick, stucco, graphic or a combination of these styles. The back side of the project abutting Smith School is a very small and restricted area. It is under several power lines that reduces the height of plants and the storm water swell limits most plant locations. It is proposed that the 6' wood screening fence along 10GYM property line be extended. The landscaping would consist of a series of serpentine Boxwood hedges located on both sides of the main driveway. This creates a series of planting pockets. It also provides locations for seven Scarlet Maple trees to be placed along both sides of the driveway for future shade and screening. Each planting pocket will contain an arrangement of flowering shrubs and perennials. A row of "Hetzii" Junipers, and the decorative EFTS on the building will serve as a unique backdrop for each the planting pockets. On the northwestern side of the driveway there will be a climate control storage and office space building which will have a decorative EF1S front fagade similar to the design of the first building. Also located on the westerly portion of the site is a small 13 car parking lot. The use of the landscape theme of serpentine Japanese Barberry hedges will be continued. These hedges will be accented by planting of flowering shrubs, perennials and annuals. Finally, there will be a five feet high identification sign located on the face of the easterly building and a 30' high business sign will be erected at the southwestern of the lot corner. Plant List Common Name Scarlet Maple Eastern Redbud Hetzi Juniper Boxwood Winged Burning Bush A. W. Spirea Crape Myrtle Roses Perennials Annuals Scientific Name Units Acer rubrum 7 Cercis Canadensis 1 Juniperus chinensis "Hetzii" 25 Buxus sempervirens 150 Eonymus alatus 9 Spirea bumalda "Anthony Waters" 6 Lagerstoemia (I. x faurlei) 13 Various types and colors 9 Various types and colors 105 Various types and colors NA NOTES FROM NOVEMBER 26 " TAC MEETING 3. OPUD 14 -03 - Tyann Plaza X ONG- • Absent David Vines- • No comments. AEP /PSO - • No comments Public Works- 0 Submit civil plans for review. Community Development- • Show a reduced sign height. • Consider sidewalks. Rural Water District #3 • Not in service area. AT &T • Absent Fire Dept, • Discuss the fire access at rear of building with fire department. PRESENT David Vines Karl Fritschen Daniel Dearing Marsha Hensley AEP /PSO Fire Dept. Brian Dempster Bronce Stephenson. OWASSO TECHNICAL ADVISORY COMMITTEE Wednesday, November 26, 2014 City Hall, Lower Level Conference Room ABSENT Rural Water District #3 ONG Police Dept. Chelsea Levo AT &T NOTES FROM NOVEMBER 26th TAC MEETING 3. OPUD 14 -03 — Tyann Plaza X ONG- • Absent David Vines- • No comments. AEP /PSO - • No comments Public Works- * Submit civil plans for review. Community Development- • Show a reduced sign height. • Consider sidewalks. Rural Water District #3 • Not in service area. AT &T • Absent Fire Dept.- • Discuss the fire access at rear of building with fire department. 4,_ Site Plan —AMC Urgent Care ONG- • Absent David Vines- • Keep in mind this is in the overlay district for landscaping & signage. • Submit building elevations. • File mutual access easement by separate instrument & state book and page on site plan. • Show the easement between IHOP & AMC property. • Submit lighting plan. AEP(PSO- • No comments. Public Works- • Verify the amount of impervious area. • Submit civil plans for review. Community Development- • Label the width of the right of way on Garnett Rd. • Label the width of the entrance. • Label zoning on subject property as CS. • Label zoning to the south as CG. • Label the address as 9003 North Garnett. Fire- 9 No comments. Rural Water District #3 • Not in service area. AT &T • Absent. 5. Site Plan - 9inetvEight Apartments Phase II ONG- • Absent. David Vines- • Submit landscape plan and show fencing. • Submit photometric plan. • Permit for signage is required. AEP(PSO- • No comments. Public Works- 0 Submit civil plans for review. Community Development- • Correct the density in the project data. • Karl will address the units. Rural Water- • Need notification of when water service will begin. • Service from RWD #3 from Phase 1. AT &T • Absent Fire- • Submit a water flow study. • Possibly add another hydrant on the Owasso waterside, 6. Site Plan — Taco Bell (Morrow Place) ONG- • Absent David Vines- • Submit building elevations. • Keep in mind this is in the overlay district when submitting landscape plan, sign permit and photometric plan. AEP/PSO - • No comments Public Works- • Submit civil plans for review. • Submit drainage report • Submit sanitary sewer plans. • Sleeve over the sewer pipe on the north side. Community Development- • Label C111 as detention area. • Show dimensions on cars at the drive thru lane. • Label the zoning to the west as CS, OPUD 05 -02. • Show book & page on mutual access. • Pay in lieu of for the sidewalk along frontage, $18.00 per linear feet. Rural Water District #3 Fire Dept. • Case entry— possibly lower — problem with the bend @ north end. • Is a sign proposed in the U /E? (Note C 113). Proximity to waterline, recommend relocating. • Meters locations? Space for meters, no sizes shown, what purposes? Domestic, irrigation, fire protection. • Water service membership for each service and cost. • Need to follow the RWD #3 development process. • Absent • Has to be 20', not 18' at the edge of drive thm (south end). • Show hydrant inside of turn. RESIDENTIAL SINGLE FAMILY NEW CONSTRUCTION MONTH END REPORT NOVEMBER 2014 Month 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 1 January 31 22 13 25 15 17 18 19 15 22 2 February 52 41 14 19 23 29 17 15 26 21 3 March 65 50 25 35 30 46 14 27 27 31 4 April 63 52 30 31 36 31 19 26 26 36 5 May 43 36 60 23 27 30 20 23 19 17 6 June 42 29 27 21 34 23 19 24 19 12 7 July 27 12 23 24 28 17 20 15 27 23 8 August 45 28 27 18 2B 19 12 15 18 19 9 September 35 12 17 40 20 11 12 12 28 15 10 October 30 25 31 15 36 13 10 21 15 19 11 November 32 13 26 10 13 1 8 11 7 21 12 December 53 16 8 6 13 9 10 16 11 Totals 518 330 301 267 303 246 179 224 238 236 YTD 465 320 293 261 290 237 169 200 227 236 2011 2012 2013 357, 810 -I _- 25,989004 -� 30,6225 589 08 - .L_.._ 30,183 357, TOTAL NEW CONSTRUCTION DOLLARS FOR EACH YEAR 45,000,000 30.000,000 15,000,000 CITY OF OWASSO RESIDENTIAL LOT INVENTORY STATUS November 30, 2014 SUBDIVISION # OF LOTS # DEVELOPED # AVAILABLE Burberry Place (6/09) 89 87 2 Camelot Estates (4/07) 139 103 36 Carrington Pointe 1(1/11) 171 155 16 Champions East (05/08) 66 8 58 Champions West (5/08) 45 21 24 Country Estates III (3/99) 61 58 3 Country Estates VI (11/03) 37 36 1 Crescent Ridge (02/08) 101 93 8 Fairways V (8/99) 71 66 5 Fairways VI (12/00) 42 41 1 Falls at Garrett Creek (12/05) 85 84 1 Falls at Garrett Creek Amended (12105) 24 23 1 Hickory Creek 50 8 42 Honey Creek (4102) 202 198 4 Keys Landing (3/08) 131 113 18 Lake Valley IV (5/10) 114 112 2 Lake Valley V (9/30) 78 61 17 Lake Valley V (Phase 2) 82 8 74 Lakes at Bailey Ranch (10107) 235 232 3 Maple Glen (12/08) 98 95 3 Maple Glen 11(1/11) 93 89 4 Maple Glen III (5/13) 43 39 4 Maple Glen IV (6/2/14) 92 27 65 Nottingham Estates IV (8/01) 20 17 3 Nottingham Estates V (3101) 44 43 1 Nottingham Hill (6/09) 58 13 45 Park Place at Preston Lakes 93 45 48 Preston Lakes (12/00) 272 243 29 Preston Lakes 111(10/04) 147 144 3 Remington Park 11 (11/04) 84 82 2 Sawgrass Park 11(04/05) 96 94 2 The Summit at Southern Links (6/97) 31 26 5 Watercolours (12/02) 40 31 9 TOTALS 3034 2495 539 Walercolours(12/C The Summit at Southern Links (6/9 Sawgrass Park 1 (0410 Remington Park II (11/0 Preston Lakes 111(10/0 Preston Lakes (1210 Park Place at Preston Laki Nottingham Hill (6/0'. Nottingham Estates V (310 Nottingham Estates IV (810' Maple Glen IV (61211 Maple Glen III (51+ Maple Glen 11 (1111 Maple Glen (1210E Lakes at Bailey Ranch (10107 Lake Valley V (Phase 2 Lake Valley V (9130 Lake Valley IV (5/10 Keys Landing (3/08 Honey Creek (4/02 Hickory Creel Faits at Garrett Creek Amended (12105; Fails at Garrett Creek (12105; Fairways VI (12100) Fairways V (8/99) Crescent Ridge (02/08) Country Estates VI (11/03) Country Estates ill (3199) Champions West (5108) Champions East (05/08) Carrington Pointe I (1111) Camelot Estates (4/07) Burberry Place (6109) CITY OF OWASSO 0 50 100 150 200 250 300 ■Lots Developed UTotal Lots COMMERCIAL NEW CONSTRUCTION MONTH END REPORT NOVEMBER 2014 NOVEM13ERYEXR-TO-DATE DOLLARS 50,000,000 Month 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 1 January 1 2 9 4 4 1 1 3 1 1 1 2 February 5 5 0 3 2 0 1 1 1 1 0 3 March 2 1 14 2 0 1 3 0 0 0 1 4 April 3 4 1 0 4 1 1 1 0 1 0 5 May 1 3 2 1 1 2 1 2 1 0 0 6 June 4 3 4 1 1 2 0 0 2 1 2 7 July 0 0 0 0 1 0 0 0 0 1 0 8 August 3 1 7 3 1 0 0 2 2 0 3 9 September 1 2 1 28 3 0 0 0 0 0 0 10 October 0 1 3 4 1 0 0 1 0 4 0 11 November 3 0 1 1 1 2 2 1 0 1 3 12 December 0 1 1 1 1 0 1 0 0 1 o d s 23 23 43 48 20 9 10 11 7 11 10 YTD 23 22 42 47 19 9 9 11 7 10 10 NEW CONSTRUCTION DOLLARS FOR EACH YEAR _2011 6,018,116 - -- _..._ -- ---- -..... _.. 2013_ 9,375,440 NOVEM13ERYEXR-TO-DATE DOLLARS 50,000,000 41111/11 30,000,000 20,000,000 10,000,000 1 d'5 1 1 2012 1 2013 1 � 45,370,347 • 018,11 17,296,000 i 1 X11 NEW CONSTRUCTION DOLLARS FOR EACH YEAR _2011 6,018,116 - -- _..._ -- ---- -..... _.. 2013_ 9,375,440 NAME ADDRESS APPLICATION OPENING COMPLETE DATE DATE NOVEMBER 2014 Mathnasium 12336 E 86 St N 10/30/2014 11/11/2014 Yes Lash Love 9100 N Garnett Rd 11/3/2014 11119/2014 Yes OCTOBER 2014 12455 N 100 E Ave 1/27/2014 5/14/2014 Yes Whataburger 12903 -B E 96 St N 6/17/2014 10/6/2014 Yes Blondy's Pizza 7708 N Owasso Exp 10/6/2014 10/27/2014 Yes Hideaway Pizza 12903 -A E 96 St N 3/5/2014 11/6/2014 Yes Jimmy John's Sandwhiches 9551 N Owasso Exp #102 8/13/2014 11/6/2014 Yes SEPTEMBER 2014 7703 N Owasso Exp #11 6/18/2014 9/1/2014 Yes Rock Nutrition AUGUST 2014 11604 E 76 St N 2/26/2013 8/15/2014 Yes Super 8 Hotel JULY 2014 13101 E 96 St N 11/12/2013 7/7/2014 Yes Heartland Dental 11909 E 96 St N 5/29/2014 7/7/2014 Yes Bricktown Brewery JUNE 2014 12810 E 101 PI N #102 4/13/2013 6/3/2014 Yes Bite Perfect 9500 N 129 E Ave #100 3/19/2014 6/24/2014 Yes Ichiban Steak House 12700 E 100 St N #1 -24 2/26/2013 6/19/2014 Yes 9inetyEight Apartments 12455 E 100 St N #120 3/5/2014 6/11/2014 Yes Tulsa Bone & Joint 403 W 2 Ave #102 4/22/2014 6/13/2014 Yes Body by BJ 12760 E 74 St N 6/20/2013 6/30/2014 Yes Ok Baptist Children's Home MAY 2014 11560 N 135 E Ave #110 4/15/2014 5/6/2014 Yes Garrett Creek Wine & Spirits 12200 E 96 St N 10/22/2013 5/14/2014 Yes RCB Bank 12455 N 100 E Ave 1/27/2014 5/14/2014 Yes St. John Medical Office 13301 E 96 St N 7/8/2013 1/8/2014 Yes APRIL 2014 13321 E 116 St N 10/14/2013 4/30/2014 Yes Discount Tire 425 E 22 St N 1/15/2014 4/4/2014 Yes Ledford Properties 9800 N 119 E Ave 2/21/2014 4/14/2014 Yes Owasso Auto Spa /Dog Wash MARCH 2014 _ 301 W 12 St 2/25/2014 3/5/2014 Yes Undo Veracruz FEBRUARY 2014 11211 N Garnett Rd 2/24/2014 2/26/2014 Yes Gramma's Attic JANUARY 2014 9455 N Owasso Exp #G 10/22/2013 1/2/2014 Yes Envi Spa 13301 E 96 St N 7/8/2013 1/8/2014 Yes Raising Canes 11713 S Main St 1/9/2014 1/13/2014 Yes Simply Nutrition 12455 N 100 E Ave 9/30/2013 1/2212014 Yes St. Johns MOB 3rd Floor 14100 E 86 St N 9/11/2013 1/24/2014 Yes Friendship Baptist Church 11519 N Garnett Rd 9/1612013 1/28/2014 Yes AAA Insurance DECEMBER 2013 ADDRESS BUILDER ADD /ZONE VALUE A.S.F. PERMIT# DATE 14110 E 88 St N Money Homes CE /RS3 $ 143,000 2,600 14- 1101 -X 11/3/2014 7513 E 82 PI N Money Homes CARPI /RS3 $ 143,000 2,600 14- 1102 -X 11/3/2014 14623 E 112 PI N Simmons Homes LVVII /RS3 $ 96,305 1,751 14- 1103 -X 11/3/2014 11111 N 148 E Ave Simmons Homes LVVII /RS3 $ 92,015 1,673 14- 1104 -X 11/3/2014 11004 N 120 E Ave Capital Homes MGIV /RS3 $ 107,580 1,956 14- 1105 -X 11/3/2014 7906 N 142 E Ave Executive Homes CW /RS3 $ 178,200 3,240 14- 1106 -X 11/3/2014 7902 N 142 E Ave Executive Homes CW /RS3 $ 178,200 3,240 14- 1107 -X 11/3/2014 7802 N 142 E Ave Executive Homes CW /RS3 $ 165,990 3,018 14- 1108 -X 11/3/2014 9601 N 133 E Ave Oil Capital Neon WF /CS $ 36,450 405 14- 1109 -S 11/5/2014 15508 E 87 PI N Simmons Homes PPPL /RS3 $ 153,285 2,787 14- 1110 -X 11/6/2014 10701 N 129 E Ave Fleming Construction RC /CS /AG $7,000,000 87,233 14- 1111 -C 11/6/2014 11413 E 96 St N Hoey Construction 96C /CG $1,190,000 11,900 14- 1112 -C 11/11/2014 11104 N 146 E Ave Capital Homes LVVI /RS3 $ 157,300 2,860 14- 1114 -X 11/11/2014 7822 N 142 E Ave Executive Homes CW /RS3 $ 175,780 3,196 14- 1115 -X 11/11/2014 10915 N 121 E Ave Simmons Homes MGIV /RS3 $ 100,815 1,833 14- 1116 -X 11/12/2014 14623 E 111 Ct N Simmons Homes LVVII /RS3 $ 111,430 2,026 14- 1117 -X 11/12/2014 11119 N 148 E Ave Simmons Homes LVVII /RS3 $ 111,430 2,026 14- 1118 -X 11/12/2014 7501 E 83 PI N Executive Homes CARPI /RS3 $ 143,440 2,608 14- 1119 -X 11/12/2014 10318 N 138 E Ave Fleming Construction CC /OM $ 3,000 30 14- 1120 -S 11/12/2014 11640 E 86 St N Acura Neon 3L /CS $ 3,500 47 14- 1121 -S 11/12/2014 14610 E 111 Ct N Simmons Homes LVVII /RS3 $ 111,430 2,026 14- 1122 -X 11/13/2014 11013 N 121 E Ave Simmons Homes MGIV /RS3 $ 100,815 1,833 14- 1123 -X 11/13/2014 12005 E 110 St N Simmons Homes I MGIV /RS3 $ 105,710 1,922 14- 1124 -X 11/17/2014 11203 N 148 E Ave ISimmons Homes I LVVII /RS3 $ 111,430 2,026 14- 1125 -X 11/17/2014 14615 E 111 Ct N ISImmons Homes LVVII /RS3 $ 111,430 2,026 14- 1126 -X 11/17/2014 14604 E 111 Ct N Simmons Homes LVVII /RS3 $ 111,430 2,026 14- 1127 -X 11/19/2014 7744 N Owasso Exp Oakwood Graphics FC /CG $ 578 32 14- 1128 -S 11/19/2014 8959 N Garnett Rd GBT Realty 7's /CG $3,000,000 64,250 14- 1129 -C 11/19/2014 9455 -F N Owasso Exp Claude Neon TP /CS $ 4,000 58 14- 1130 -S 11/24/2014 12500 E 86 St N Claude Neon ECC /CG $ 4,000 40 1 14- 1131 -5 11/26/2014 21 Single Family $ 2,710,015 1 49,273 SgFt 3 New Commercial $ 11,190,000 163,383 SgFt 6 Signs $ 51,528 612 SgFt 30 Total Building Permit $ 13,951,543 213,268 SgFt Cult' Of Oways0-111 N. Mai -S* Owa, lW, OK 74055