Loading...
HomeMy WebLinkAbout2010.12.13_Planning Commission AgendaOWASSO PLANNING COMMISSION DECEMBER 13, 2010 TYPE OF MEETING: DATE: TIME: PLACE: NOTICE FILED BY: TITLE: PUBLIC NOTICE OF THE MEETING OF THE OWASSO PLANNING COMMISSION Regular December 13, 2010 6:00 PM Old Central 109 North Birch Marsha Hensley Assistant City Planner Filed in the office of the Owasso City Clerk and posted at the north entrance to City Hall at 1:00 PM on December 9, 2010. Marsha Hensley, Assistant City Planne OWASSO PLANNING COMMISSION Monday, December 13, 2010 at 6:00 PM Old Central 109 North Birch AGENDA 1. Call to Order 2. Roll Call 3. Approval of Minutes from the November 8, 2010 Regular Meeting. 4. Lot Tie - Lot 9 £t 10, Block 19, Original Town- Consideration and appropriate action related to the request for the review and acceptance of a lot tie of Lot 9 and Lot 10, Block 19, Original Town from two tracts of land into one tract of land. The subject property is located on West 1st Avenue. 5. Final Plat - Temple Business Park - Consideration and appropriate action related to the request for the review and acceptance of a final plat consisting of 1 commercial lot, on approximately 1.28 acres of property zoned CG (Commercial General). The subject property is located on North Main just to the west of the Brookwood Apartments, east of the Owasso Public School's 7th Grade Center, and North of the Kum ft Go site. 6. Report on Monthly Building Permit Activity. 7. Report on Items Previously Forward to City Council. 8. Economic Development Report. 9. Community Development Report. 1. Discuss Special Use Permit process. 10. Adjournment. OWASSO PLANNING COMMISSION MINUTES OF REGULAR MEETING Monday, November 8, 2010 Owasso Old Central 109 North Birch, Owasso, Oklahoma MEMBERS PRESENT Marilyn Hinkle Charles Brown Dr. Paul Loving David Vines MEMBERS ABSENT Dr. Mark Callery STAFF PRESENT Karl Fritschen Larissa Darnaby Dan Salts Marsha Hensley Daniel Dearing The agenda for the regular meeting was posted at the north entrance to City Hall on November 3, 2010 at 1:00 PM. 1. CALL TO ORDER — Charles Brown called the meeting to order at 6:00 PM and declared a quorum present. 2. ROLL CALL 3. CONSIDER APPROVAL OF THE MINUTES OF OCTOBER 11, 2010 REGULAR MEETING — The Commission reviewed the minutes of October 11, 2010 regular meeting. Dr. Loving moved to approve the minutes, seconded by Marilyn Hinkle. A vote on the motion was recorded as follows: Marilyn Hinkle — Yes Dr. Paul Loving — Yes David Vines — Yes Charles Brown - Yes The motion was approved 4 -0. 4. Final Plat of Maple Glen II— Consideration and appropriate action related to the request for the review and acceptance of the Maple Glen II Final Plat of ninety-three (93) residential lots, in five (5) blocks on approximately 18.50 acres, located on the east side of North Garnett Road and approximately a half of a mile north of East 106'" Street North. Charles Brown presented the item and Larissa reviewed the staff report. The location and the surrounding land use were described. The property is undeveloped at this time. The owner of the property plans to develop the area with ninety -three (93) residential lots in five (5) blocks, on 18.50 acres of land. The single family homes on the Maple Glen II final plat is consistent with the Owasso Land Use Master Plan. The tract is subject to the emergency storm siren fee ($35.00 per acre). The property will be served sewer by the City of Owasso. The Rural Water District #3 of Washington County will provide water service. The Owasso Technical Advisory Committee reviewed the Maple Glen Final Plat at its regular meeting on October 27, 2010. The following comments were made: OWASSO PLANNING COMMISSION November 8, 2010 Page No. 2 Public Works- Show adjacent easements from Maple Glen I • Call out radius on right -of -way curves • Show boundaries for city and Rural Water #3 • Include language regarding the Home Owners Assoc. responsible for pond maintenance. • Show the easement in the reserve area • Correct plat language - Item #3, line #3 lots 8 - 13 should be 8 -12 David Vines- 0 Show the sidewalks & curb through the reserve area. PSO - • Additional side yard easements need on the following: Blk 1 between lots 4 & 5, 5' 15' Blk 2 between lots 21 & 22, 5' 15' Blk 3 between lots 10 & 11, 5' 15' Blk 3 between lots 25 & 26, 5' 15' Blk 4 between lots 10 & 11, 5' 15' The applicant has made the above changes to the final plat. Staff recommends approval of the Final Plat for Maple Glen II. Discussion was held regarding the merger of the Maple Glen I homeowners association with the Maple Glen II homeowners association. Mr. Jerrod Sanders was present to represent the applicant. Also discussed was the suggestion of a walking trail around Reserve " A" and the pond. Mr. Sanders stated that he feels that could be a possibility and would speak to the applicant for future consideration. David Vines moved to approve the Final Plat for Maple Glen II, seconded by Marilyn Hinkle. A vote on the motion was recorded as follows: Marilyn Hinkle - Yes Dr. Paul Loving - Yes David Vines - Yes Charles Brown - Yes The motion carried 4 -0. 6. Report on Monthly Building Permit Activity. 7. Report on Items Previously Forwarded to City Council. 8. Economic Development Director Report. 9. Adjournment - Marilyn Hinkle moved, David Vines seconded, to adjourn the meeting. OWASSO PLANNING COMMISSION November 8, 2010 Page No. 3 A vote on the motion was recorded as follows: Marilyn Hinkle - Yes Dr. Paul Loving — Yes David Vines — Yes Charles Brown - Yes The motion carried 4 -0 and the meeting was adjourned at 6:20 PM. Chairperson Vice Chairperson Date Oivasso Planning Commission Date: December 10, 2010 Case #: OLS -10 -04 Description: Lot Tie Location: Lots 9 and 10 Block 19, Original Town Plat (108 West First) Parcel ID., 61000143001080, 61000143001090 Area: +/- 0.42 acres (total both lots) Prepared by: Karl Fritschen, Community Development Director Existing Land Use: Undeveloped Present Zoning: Commercial High Intensity (CH) Surrounding Land Use /Zoning Designations: North: Devco Inc. Zoned CH South: Owasso Beauty College, Zoned CH West: Undeveloped, Zoned CH East: Owasso Historic Society, Zoned CH Background: The City of Owasso received a request for the review and approval of a lot tie that will result in a 0.42 acres parcel. The proposal is to create one parcel from two parcels, Lot 9 comprises 0.21 acres and Lot 10 0.20 acres in size. The owners intend to develop the property for an automotive repair facility, and needs the lot tie in order to develop the property with the intended footprint of the structure and associate parking. Development Process: Step One, Annexation Annexation is the method whereby land located outside the city limits is made a part of the city. Property owners and land developers sometimes choose to have their property annexed into Owasso in order to receive Owasso municipal services, such as police protection, refuse collection, and sanitary sewer. Step Two Rezoning The second step in the development of a piece of property in Owasso is rezoning. When a property is annexed into Owasso, by law it must come in classified for AG Agricultural use. In order to develop the property, the land must be zoned for particular kinds of uses, such as residential, office, commercial, or industrial. Rezoning decisions are made in accordance with the growth policy displayed in the Owasso Master Plan. One type of rezoning that a developer may choose to seek is a Planned Unit Development, or PUD. When a development proposes to exhibit a mixture of uses with specific regulations and standards unique to a particular tract of land, a PUD is often the preferred land use control mechanism. Step 3, Platting A preliminary plat is required for any development that proposes to divide land into two or more lots. Preliminary plats illustrate the development concept for the property, and are often modified significantly after being reviewed by the Technical Advisory Committee (TAC), and the Owasso Planning Commission. Sometimes, difficult development issues such as existing utility lines, wells, or easements are brought to light at the preliminary plat stage and must be remedied prior to development. After the preliminary plat has been reviewed by the City and various utility companies, construction plans for the development's infrastructure are submitted. These plans include specifications and drawings for stormwater drainage, streets and grading and erosion control, waterlines, stormwater detention, and wastewater lines. Often, approval is required of other agencies, such as the Department of Environmental Quality for wastewater collection and the US Army Corps of Engineers for properties that may be development sensitive. Once the property development proposal shows a division of lots that is acceptable to both the developer and the City of Owasso, a final plat application is submitted. A final plat illustrates the layout and dimension of lots included on the final plat, right -of -way widths, easements, and other physical characteristics that must be provided for review by the City. After obtaining approval from the TAC and Planning Commission, the final plat is considered by the City Council. If approved, the final plat is filed with the office of the County Clerk and governs all future development on that property. Another form of property division that can be considered in some cases is a lot split or lot tie. Lot splits or ties are minor subdivisions of property into three or fewer tracts, and do not provide for any new public streets. Typically, this is an appropriate option for a land owner who wishes to take large undeveloped parcels of land and divide it into two or three smaller tracts. Step 4, Site Plan Preparation Site plans are reviewed by the TAC. Issues such as building setbacks, parking, access, landscaping, and building footprint are presented in the site plan. Once a site plan is approved, the development is clear to apply for a building permit and to submit construction plans for the building's foundation, plumbing, electrical system, and HVAC. Lot Split /Tie Development Process: The Lot Tie review process is initiated when a property owner submits an application to the City of Owasso requesting the review and approval of a lot tie. The application shall be accompanied by the correct fee, legal description of the undivided tracts and tracts to be created, and survey, site plan or drawing that shows the existing and proposed conditions. Upon receipt of a complete application City staff will begin reviewing the proposal for compliance with the Owasso Zoning Code, Subdivision Regulations and Engineering criteria. The proposed Lot Tie is then presented to the Owasso Technical Advisory Committee (TAC) for review and recommendation. At that meeting utility providers and City staff are afforded the opportunity to comment on the technical aspects of the development proposal. The TAC then forwards a recommendation to the Planning Commission. Finally, the Owasso Planning Commission holds a public hearing to determine if the application is compliant with the Owasso Zoning Code, Subdivision Regulations, and Engineering criteria. The Planning Commission has the final determination on the application, as lot ties are not forwarded to City Council. Analysis: As stated above, the requested lot tie is in necessary for the applicant to develop the property with the auto repair facility. The property is zoned CH, which is appropriate for the use. The area is surrounded with a mix of commercial establishments of a similar intensity. The two lots (Lots 9 and 10 Block 19, Original Town Plat) proposed to be tied are currently undeveloped. The lot tie will create one lot that will become 0.42 acres in size with 130.13' of frontage along West lsf Avenue. The proposal meets all bulk and area and lot frontage requirements for the High Intensity Commercial zoning district. A lot split /tie is a minor subdivision of previously subdivided land. The Planning Commission may approve a lot split /tie that creates no more than three (3) lots fronting on an existing, dedicated street, which does not involve any new public street or road, or the extension of municipal facilities, the creation of any public improvements, and is not in conflict with any provision or portion of the Comprehensive Plan, Major Street and Highway Plan, Zoning Ordinance (unless approved by the Board of Adjustment) or these regulations. Technical Advisory Committee: The lot tie was reviewed by the Owasso Technical Advisory Committee at a special meeting held November 24, 2010. At that meeting, utility providers and city staff were afforded the opportunity to comment on the application and request any changes or modifications. There were no comments provided by the TAC regarding the lot tie. Recommendation: Staff recommends approval of OLS -10 -04 Attachments: 1. Location Map 2. Site Map PINNACLE PERFORMANCE AND REPAIR TO: The Owasso Planning Commission FROM: Karl Fritschen, Community Development Director SUBJECT: Final Plat — Temple Business Park DATE: December 10, 2010 BACKGROUND: The City of Owasso has received a final plat for the review and approval of the Temple Business Park. The final plat proposes one (1) lot on 1.28 acres of property. The applicant wishes to plat the property so that they may develop a heating and air conditioning unit commercial sales facility. The subject property is located on North Main just to the west of the Brookwood Apartments, east of the Owasso Public School's 7th Grade Center, and North of the Kum & Go site. SURROUNDING ZONING: North: Recreation Center, RS -3 Zoning South: Kum and Go, CG Zoning East: Brookwood Apartment, RM -1 Zoning West: The Owasso Public Schools 71h Grade Center, RS -3 Zoning PROPERTY CHARACTERISTICS: The subject property is 1.28 acres in size. The property is served by the City of Owasso water, sanitary sewer, police, fire, and EMS service. DEVELOPMENT PROCESS: Step One, Annexation Annexation is the method whereby land located outside the city limits is made a part of the city. Property owners and land developers sometimes choose to have their property annexed into Owasso in order to receive Owasso municipal services, such as police protection, refuse collection, and sanitary sewer. Step Two, Rezoning The second step in the development of a piece of property in Owasso is rezoning. When a property is annexed into Owasso, by law it must come in classified for AG Agricultural use. In order to develop the property, the land must be zoned for particular kinds of uses, such as residential, office, commercial, or industrial. Rezoning decisions are made in accordance with the growth policy displayed in the Owasso Master Plan. One type of rezoning that a developer may choose to seek is a Planned Unit Development, or PUD. When a development proposes to exhibit a mixture of uses with specific regulations and standards unique to a particular tract of land, a PUD is often the preferred land use control mechanism. Step 3, Platting A preliminary plat is required for any development that proposes to divide land into two or more lots. Preliminary plats illustrate the development concept for the property, and are often modified significantly after being reviewed by the Technical Advisory Committee (TAC), and the Owasso Planning Commission. Sometimes, difficult development issues such as existing utility lines, wells, or easements are brought to light at the preliminary plat stage and must be remedied prior to development. After the preliminary plat has been reviewed by the City and various utility companies, construction plans for the development's infrastructure are submitted. These plans include specifications and drawings for stormwater drainage, streets and grading and erosion control, waterlines, stormwater detention, and wastewater lines. Often, approval is required of other agencies, such as the Department of Environmental Quality for wastewater collection and the US Army Corps of Engineers for properties that may be development sensitive. Once the property development proposal shows a division of lots that is acceptable to both the developer and the City of Owasso, a final plat application is submitted. A final plat illustrates the layout and dimension of lots included on the final plat, right -of -way widths, easements, and other physical characteristics that must be provided for review by the City. After obtaining approval from the TAC and Planning Commission, the final plat is considered by the City Council. If approved, the final plat is filed with the office of the County Clerk and governs all future development on that property. Step 4, Site Plan Preparation Site plans are reviewed by the TAC. Issues such as building setbacks, parking, access, landscaping, and building footprint are presented in the site plan. Once a site plan is approved, the development is clear to apply for a building permit and to submit construction plans for the building's foundation, plumbing, electrical system, and HVAC. F_A:►_\I OR5 The applicant is requesting the review and approval of the Temple Business Park final plat so they may plat and eventually develop the property with a full commercial sales facility of heating and air equipment and supplies. The property is zoned CG (Commercial General). The designation outlines the development standards for the property in a commercial manner. The proposed layout for the heating and air conditioning unit commercial sales use associated with the plat is allowed by right according to the zoning designation. According to the final plat, the developer would like to create one (1) 1.28 acre lot, which would be the proposed site of the commercial sales entity. A final plat application was heard and approved by the City Council in March 2008. However, the final plat was never filed and the 6 month time frame to get the plat filed lapsed. Therefore the final plat is being heard again. The main access into the Temple Business Park will be from North Main Street. The applicant has shown a total of 100' to be designated on the site plan for ingress and egress. The 100' that is designated for ingress and egress would consist of two 50' points of access. Any development that occurs on the subject property must adhere to all subdivision, zoning, and engineering requirements including but not limited to paved streets, landscaping, and sidewalks. Commercial sewer and water service will be provided by the City of Owasso. The property will be subject to all payback fees, including Storm Siren fees of $35 per acre. The proposed plat illustrates a 17.5' utility easement on the west and north boundaries of the site, a 15' utility easement on the east boundary of the site, and an 11' utility easement on the south boundary of the site. Technical Advisory Committee: The Temple Business Park Final Plat was reviewed by the Owasso Technical Advisory Committee at a special meeting held November 24, 2010. At that meeting, utility providers and city staff were afforded the opportunity to comment on the application and request any changes or modifications. The following comments were made. Public Works - Provide language for the drainage easement AT &T - In the 2nd paragraph Section A it should read "to the public" rather than easement. AT &T - In the 2nd paragraph, Section E should read "owner of lot shall be responsible for repairing and replacement..." as opposed to "any party" RECOMMENDATION: Staff recommends the Planning Commission approve the Temple Business Park final plat subject to addressing the TAC comments. ATTACHMENTS: A. Final Plat of Temple Business Park B. Case Map 1 .... 1 `• .A - Owasso Public Works Department Engineering Div. P.O. 180 Owasso, OK 74055 918.272.4959 www.cityofowasso.com TEMPLE BUSINESS PARK LOCATION MAP Z 12/7/10 A RESIDENTIAL NEW CONSTRUCTION MONTH END REPORT NOVEMBER 2010 Month 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 1 January 20 23 64 54 30 31 22 13 25 15 17 2Febf0.pry; 26 4!� '7p, 3 March 24 48 51 38 75 65 50 25 35 30 46 4 9pr�1 _ 41 ' , '''� ¢0 b'1 „• 35 - 47'6 52 .:.: 30 .31,. 5 May 42 26 38 29 3,i 1 43 36 60 23 27 30 6 June0.... 3A ,31r 33 .:;: 53 .92 29, •. 27 21 7 July 33 37 44 32 34 27 12 23 24 28 17 8 AuD�i3f; '�.'' 38 ,. �1 `;33.;: , �l ". ? 36 ., 'd5_ '28 � -� 27 1� . 2& �.:.. 9 September 29 29 30 52 64 35 12 17 40 20 11 10 O9,Pberx X36 • ` -; 31 •31: 48 '_: aA2 30 11 November 18 24 26 35 31 32 13 26 10 13 1 12 De6erpbei 2Q• , 29 ,05;. 5,1 : 35, ,53 Totals 377 406 524 479 528 518 336 301 267 303 237 YTD 357 377 489 428 493 465 320 293 261 290 237 600 500 400 300 200 100 0 NOVEMBER YEAR-TO-DATE COUNT 3000 3001 3002d 4 083 I 3004 300 3006 _i. 22007 2008 _ 2 09 I 2370 TOTAL NEW CONSTRUCTION DOLLARS FOR EACH YEAR CITY OF OWASSO RESIDENTIAL LOT INVENTORY STATUS November 30, 2010 SUBDIVISION Burberry Place (6/09) Camelot Estates (4/07) Champions East (05/08) Country Estates 111 (3/99) Country Estates VI (11/03) Crescent Ridge (02/08) Fairways V (8/99) Fairways VI (12/00) Falls at Garrett Creek (12/05) Falls at Garrett Creek Amended (12/05) Honey Creek (4/02) Keys Landing (3/08) Lake Valley 111 (09/08 Lake Valley IV (5/2010) Lakes at Bailey Ranch (10/07) Maple Glen (12/08) Nottingham Estates IV (8/01) Nottingham Estates V (3/01) Nottingham Hill (6/09) Preston Lakes (12/00) Preston Lakes 111 (10/04) Remington Park 11 (11/04) Sawgrass Park 11 (04/05) The Summit at Southern Links (6/97) Watercolours (12/02) TOTALS # OF LOTS 89 139 66 61 37 101 71 42 85 24 202 131 131 114 235 98 20 44 58 272 147 84 96 31 40 2418 # DEVELOPED 19 43 4 58 36 83 57 40 84 21 198 85 124 20 132 91 17 43 6 243 141 82 94 26 31 1778 # AVAILABLE 70 96 62 3 1 18 14 2 1 3 4 46 7 94 103 7 3 1 52 29 6 2 2 5 9 640 Watercolours (17102 The Summit at Southern Link (6197) Sawgrass Park II (04/0; Remington Park II (11/04 Preston Lakes 111(10/04 Preston Lakes (12100 Nottingham Hill (6/09; Nottingham Estates V (3101; Nottingham Estates IV (8101; Maple Glen (17108) Lakes at Bailey Ranch (10107) Lake Valley IV (5/2010; Lake Valley III (09 10t Keys Landing (3/08) Haney Creek (4102) Falls at Garrett Creek Amended (12/05) Falls at Garrett Creek (12/05) Fairways VI (12100) Fairways V (8/99) Crescent Ridge (02706) Country Estates VI (11/03) Country Estates III (3/99) Champions East (05 /08) Camelot Estates (4/07) Burberry Place (6/09) CITY OF OWASSO 0 50 100 150 200 250 300 13 Total Lots 10 Lots Developed COMMERCIAL NEW CONSTRUCTION MONTH END REPORT NOVEMBER 2010 Month 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 I January 3 0 0 0 1 2 9 4 4 1 1 2 ... ......... .. ..... E- �p 3 March 0 3 1 2 1 14 2 0 1" 3 4 M' Dtl I I IT; �15' ";1! jljij�]]q V: ]�i 4 �' � 1'z� if;� ;��h rnl Ai .. ILWM pp, r kr�%e' , , �: �:' 1. 5 May 2 2 4 1 1 3 2 'v 1 1 2 ';E� 1 6 .0 K ."I" " � I" 2 k g0j tIt -:j. jl ri A A O �'J' 7 July 7 0 1 0 0 0 0 0 1 0 0 8 F 9 Septem&' 2 2 2 1 28 3 0 0 10 f(), . ........ . , nQ! P 0,10.6� �[j 1; f�� i'lp! L5: n! $0, � , � %� I, 'A � ff ,, ­'r . 1'r� NY !�M APPT' � :j i i j 11 Noven�b 6 1 1 3 0 1 1 1 2 2 12q R E Totals 52 27 23 12 23 23 43 48 20 7 9 YTD 52 27 23 u 23 22 42 47 19 9 9 2006 2007 2008 2009 2010 40,861,909 44,633,444 19,271,125 12,830,700 45,370,347 NEW CONSTRUCTION DOLLARS TOTALS FOR EACH YEAR 50,000,000 45,000,000 ...... 40,000,000 35,000,000 .... ............ .......... 30,000,000 25,000,000 20,000,000 15,000,000 .. .. .. ... .. ............................... .. ... . 10,000,000 ...... .. .. .......... 5'000'000 0 2006 2007 2008 2009 2010 f F --�T5 jT ---i2l f88,��9 44,833,444 1 20 771,125 12,830,700 45,370,347 OCCUPANCY PERMITS NAME ADDRESS STATUS APPLICATION DATE OPENING DATE COMPLETE JANUARY 2010 Ow Track/Soccer Bldg 12901 E 86 St N New 1/1/2710 1/112710 Yes Church's 11618 E 86 St N New 1/6/2010 1/6/2010 Yes Larry C. Sang, Jr 12899 E 76 St N New 1128/2010 2/112010 No FEBRUARY 2010 Oklahoma Heart Institute 10512 N 110 E Ave #140 New 214/2010 2/4 /2010 Yes Hope Hospice LLC 8291 N Owasso Exp New 2/17/2010 2/17/2010 No Ruby Tuesday 11909 E 96 St N New 211/2010 2128/2010 Yes MARCH 2010 Crash Course 204 E 5 Ave New 3/1/2010 3/112010 Yes Marriott Townplace 9355 Owasso Exp New 3/12/2010 3115/2010 Yes Statewide Title & Escrow 12899 E 76 St N #116 New 3/25/2010 4/1/2010 No APRIL 2010 Terri A. Richison 11230 N Garnett Road New 4/15/2010 5/1/2010 No Aaron's Rental 8705 N 117 E Ave New 4/23/2010 4/26/2010 Yes A J Medical 202 E 2 Ave New 4/28/2010 6/1/2010 No Owasso Tumbling & Cheer 507 E 2 Ave New 4/29/2010 511/2010 No MAY 2010 Bloomingdeals LLC 11612 E 86 St N New 5119/2010 6/112010 No Asian Express 11560 N 135th E ave New 5/27/2010 5/27/2010 Yes JUNE 2010 Qwik Fix LLC 8703 N Owasso Exp #N Location Change 6/2/2010 6/14/2010 No Fieldhouse'of Tulsa LLC 104 E 2nd Ave New 6114/2010 6/28/2010 No Miller EMS LLC 10314 N 136 E Ave #101 New 6/18/2010 7/19/2010 No JULY2010 L. A. Images 8361 N Owasso Exp New 7/2/2010 No GNC 9046 N 121 E Ave #350 New 7/1212010 7/12/2010 Yes Family Video Movie Club 14499 E 86 St N New 7115/2010 7/1512010 Yes China Wok 8521 N 129 E Ave New 7/23/2010 7/23/2010 Yes AUGUST 2010 Mocha- Uclous 12550 E 86 St N New 8/16/2010 6/30/2010 No Cherry Berry 9046 N 121 E Ave #300 New 8/19/2010 8/19/2010 Yes SEPTEMBER 2010 Jing Tao 12300 E 86 St N New 9123/2010 9/23/2010 No Orange Leaf 12910 E 86 st N New 9/23/2010 9/23/2010 Yes Halloween Express 9018 N 121 E Ave #300 New 9/5/2010 9/2/2010 Yes OCTOBER 2010 Sprouts Playcafe 8787 N Owasso Exp #K New 10/5/2010 10/4/2010 No CVS Pharmacy 12902 E 96 St N New 10/21/2010 10/21/2010 Yes Owasso Land Trust #106 9540 N Garnett New 10/1112010 10/11/2010 Yes NOVEMBER 2010 QuikTrip #022 12902 E 86 St N New 11/11/2010 11/11/2010 Yes Don Wilson (Sims BBQ) 12416 E 86 St N New 11/17/2010 11/30/2010 No OK Mattress Ventures 9045 N 121 E Ave #1500 New 11/23/2010 11/23/2010 Yes PERMITS APPLIED FOR IN NOVEMBER 2010 ADDRESS BUILDER ADD /ZONE VALUE A.S.F. PERMIT # DATE 9218 N 98 E Ct San Juan Pools FW/RS -3 18,000 300 10- 1101 -P 11/2/2010 9403 E 92 St N Shaw Homes LBR/RS -3 160,250 2404 10- 1102 -X 11/2/2010 7806 N 117 E Ave Gloria Carrillo EC/RS -3 1,000 120 10- 1103 -X 11/3/2010 9505 N 95 E Ct Blue Haven Pools LBR/RS -3 30,000 309 10- 1104 -P 11/8/2010 13808 E 93 Cr N Advanced Pools NH/RS -2 40,000 578 10- 1105 -P 11/10/2010 13720 E 86 St N Global Sign Renaissance Ctr 5,500 70 10- 1106 -S 11/15/2010 9500 N 129 E Ave #235 96 & 129 LLC City Center /CS 1 50,000 888 10- 1107 -C 11/15/2010 10800 N 140 E Ave Crossland Construction TTC/ 43,000,000 233915 10- 1108 -C 11/22/2010 322 E 5 Ave OLT Development 1VCC/RM OwIndustrial Plc 250,000 12600 10- 1109 -C 11/22/2010 14100 E 106 StN JP Construction 60,000 1058 10- 1110 -P 11/29/2010 1 Single Family $160,250 2,404 SgFt 1 Accessory 1,000 120 SgFt 2 New Commercial 43,250,000 246,515 SgFt 1 Commercial Remodel 50,000 888 SgFt 1 Sign 5,500 70 SgFt 4 Pools 148,000 2,245 SgFt 10 Building Permits 43,614,750 252,242 S Ft Draft Process for Obtaining a Special Use Permit Amend Chapter 13, Amendments, by adding a new Section 1330.5, Specific Use Permits with the following language. 1330.4 SPECIFIC USE PERMITS A. Purpose This section provides a discretionary approval process foi are required for uses that have unique or widely varying unusual site development features. The uses classified as intensely dominate the area in which they are located the the district. Care should be taken to integrate specific .lar area and to prevent adverse impacts on the com,-'mur encourages public review and evaluation of a use "sioen development features. This review process is inte,I t community that such uses will be compatible with their )off uses and will further the purposes of this Ordinance B. Relationship to Site Plan Requirements A conceptual site plan shall be submitted with formal site plan that is submitted later shall be conceptual site plan approved by the City'Counc C. Procedure The following review procec development review procec Step 1 A Pre - Application C Department orior;to Step 2 Deg Step 3 The APF Step 4 Not Step 5 Staf Step 6 Pub Step 7 Dec ition Comp Published Specific Use Permits, which operating characteristics or specific uses tend to more permitted uses in other uses in the The procedure cteristics and site assurance to the surroundina land use pgrm`rt application. The antial compliance with the hall be followed for Specific Use Permits. The standard shall apply, with modifications as noted below. uence shall be held with the Community Development nittiri'g pn application n SU4rp'ittal ment Department Staff shall make a Determination of -The following additional procedures shall apply: D. Planning Commission's Review and Recommendation The Planning Commission shall hold a public hearing on the proposed application and, within thirty (30) days from the date of receipt of the completed application take one of the following actions: 1. Recommend approval 2. Approve with modifications and /or conditions 3. Deny the request The Planning Commission may place conditions on the use as part of the approval to assure adequate mitigation measures are associated with the use. The conditions shall become a part of the special use permit approval and shall be included as part of the site plan. The Commission may continue the hearing on the decision for a maximum of sixty (60) days. The recommendation shall be referred to the City Council for final action. E. City Council Review and Action Upon receipt of the Planning Commission's recommendation, the City Council shall approve, approve with modifications and /or conditions, or deny the application, or request that the application be further reviewed by the Planning Commission. F. Indication on Zoning Map Required s; A zoning change is not required for Specific Use Permits; however, the location of each approved Specific Use Permit shall be indicated on the zoning map as follows: "SP—(the number of the request for a specific use permit) ". Step 8. Approval Criteria Applicable, as follows: A Specific Use Permit may be approved only if the City Council finds that all of the following criterid`'have been met: a. The proposed use is consistent with the comprehensive plan and all applicable provisions of this Ordinance and applicable state and federal regulations; b. The proposed use is consistent with the purpose and intent of the zoning district in which it is located; c. The proposed use is consistent with any applicable Specific Use Permit standards. d. The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics (hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts); e. Any significant adverse impacts anticipated to result from the use will be mitigated or offset to the maximum extent practicable; f. Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development; g. Adequate assurances of continuing maintenance have been provided; and Step 9 Conditions of Approval a. Any of the conditions imposed by the permit shall be considered as conditions precedent to the granting of a building permit for the specific use allowed. b. Following approval, a site plan meeting the conditions specified in the Specific Use Permit shall be required of the applicant and shall be submitted and processed. Step 10 Amendments No approved Specific Use Permit may be operation extended, or otherwise altered, procedures applicable to initial approval e Zoning Ordinance. Step 11 Lapse a. In the event of Permit or,any cc Permit s Specific original b. Should the SIDE (1) yeai then the aoolie'ation, mplionce by the applicant with the Specific Use is of approv�at,> or it rthe specific use is not in it after the date b6s approval, the Specific Use Ipplicant may file an application to renew the i renewal shall occur in the same manner as for de in this section. cease operation for a period longer than one all be considered void and shall require a new