HomeMy WebLinkAbout2023.02.07_City Council AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO CITY COUNCIL
Council Chambers Old Central Building 109 North Birch, Owasso, OK
Tuesday, February 7, 2023 - 6:30 PM
NOTE: APPROPRIATE ACTION may include, but is not limited to: acknowledging, affirming, amending, approving, authorizing,
awarding, denying, postponing, ortabling.
AGENDA
1. Call to Order - Mayor Kelly Lewis RECEIVED
2. Invocation - Pastor Jonathan Cook of Destiny Life Church
FEB 03 2023
3. Flag Salute
4. Roll Call
City Clerk's Office
5. Presentation of the Character Trait of Tolerance - Larry Langford, Recreation and Culture Director
6. Consideration and appropriate action relating to the Consent Agenda. (All matters listed under
"Consent" are considered by the City Council to be routine and will be enacted by one motion. Any
Councilor may, however, remove an item from the Consent Agenda by request. A motion to adopt the
Consent Agenda is non - debatable.)
A. Approve minutes - January 17, 2023, Regular Meeting
B. Approve claims
C. Accept public infrastructure of a driveway approach and sidewalk, sanitary sewer
infrastructure, concrete bridge and headwalls located approximately 2,300 linear feet south
of East 116th Street North, off of North 135th East Avenue (Garrett Creek Mutual Access
Easements)
D. Accept public infrastructure of a sidewalk and curb ramps located at 11396 North 1351h East
Avenue (Wendy's at Garrett Creek)
7. Consideration and appropriate action relating to items removed from the Consent Agenda
8. Presentation of the Owasso Strong Neighborhood Initiative Annual Report - Jerry Fowler
9. Consideration and appropriate action relating to bids received for construction of the Police Multi -
Purpose Building and the Alternate Shoot House
Mike Barnes
Staff recommends awarding the base bid and alternate #1 to Bravo Builders LLC, of Coweta,
Oklahoma, in the amount of $1,403,000.00 and authorization to execute the necessary documents.
10. Consideration and appropriate action relating to an agreement for the lease of approximately 0.18
acres of excess right -of -way located immediately east of 9202 North Garnett Road
Brian Dempster
Staff recommends approval of the Memorandum of Lease Agreement and the Lease Agreement
between the City of Owasso, and the Redbud Group, LLC, and authorization to execute the necessary
documents.
11. Report from City Manager
• Monthly Public Works Project Status Report
12. Report from City Attorney
13. Report from City Councilors
Owasso City Council
February 7, 2023
Page 2
14. Official Notices (documents for acknowledgment of receipt or information only, no discussion or action
will be taken)
• Payroll Payment Reports - Pay Period Ending Dates January 14, 2023 and January 28, 2023
• Health Care Self- Insurance Claims - dated as of January 31, 2023
• Oklahoma Department of Environmental Quality Permit No. SL000072220888 Sanitary Sewer
Line, 51h Avenue Business Park
• Oklahoma Department of Environmental Quality Permit No. WL000072220887 Potable Water
Line Extension, 51h Avenue Business Park
• Change Orders executed by the City Manager or designee for the Wastewater Treatment
Plant and Main Plant Lift station Expansion Project
15. New Business (New Business is any item of business which could not have been foreseen at the time of
posting of the agenda)
16. Adjournment
Notice of Public Meeting filed in the office of the City Clerk on Friday, December 9, 2022, and the Agenda
posted at City Hall, 200 South Main Street, at 1:00 pm on Friday, February 3, 2023.
M. Stevens,
The City of Owasso encourages citizen participation. To request ath accommodation due to a disability, contact the City Clerk at
least 48 hours prior to the scheduled meeting by phone 918 -37 6-1502 or by email to istevens§citvofowasso.com
OWASSO CITY COUNCIL
MINUTES OF REGULAR MEETING
TUESDAY, JANUARY 17, 2023
The Owasso City Council met in regular session on Tuesday, January 17, 2023, in the Council Chambers at
Old Central, 109 North Birch, Owasso, Oklahoma per the Notice of Public Meeting filed Friday, December 9,
2022; and the Agenda filed in the office of the City Clerk and posted at City Hall, 200 South Main Street, at
5:00 pm on Thursday, January 12, 2023.
1. Call to Order
Mayor Kelly Lewis called the meeting to order at 6:30pm.
2. Invocation
The Invocation was offered by Senior Pastor Dr. Chris Wall of First Baptist Church of Owasso.
3. Flag Salute
Councilor Doug Bonebrake led the flag salute.
4. Roll Call - A quorum was declared present.
Present Absent
Mayor - Kelly Lewis None
Vice Mayor -Alvin Fruga
Councilor - Doug Bonebrake
Councilor -Bill Bush
Councilor - Lyndell Dunn
A quorum was declared present.
Staff: City Manager - Warren Lehr / City Attorney - Julie Lombardi
5. Presentation of the Employee of the Quarter
Warren Lehr presented the item recognizing Aimee Claiborne, HR Benefits and Wellness Coordinator.
6. Consideration and appropriate action relating to the Consent Agenda. (All matters listed under "Consent'
are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee may,
however, remove an item from the Consent Agenda by request. A motion to adopt the Consent Agenda
is non - debatable.)
A. Approve minutes - January 3, 2023, and January 10, 2023, Regular Meeting
B. Approve claims
C. Re- approve the Real Property Lease between 815 W Kenosha LLC, and the City of Owasso,
dated November 15, 2022, and authorize execution of all necessary documents
Mr. Bonebrake moved, seconded by Mr. Bush to approve the Consent Agenda as presented, with claims
totaling $1,093,783.95.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
7. Consideration and appropriate action relating to items removed from the Consent Agenda - None
8. Consideration and appropriate action relating to the nomination of Brian Cook to serve on the Owasso
Planning Commission to begin May 2, 2023, until such term expires on June 30, 2025
Mayor Kelly Lewis presented the item, recommending appointment of Brian Cook to serve on the Owasso
Planning Commission. There were no comments from the audience. Mr. Bush moved, seconded by Mr.
Dunn to appoint Brian Cook, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
Owasso City Council
January 17, 2023
Page 2
9. Consideration and appropriate action relating to Ordinance 1203, approving rezoning from Residential
Single - Family (RS -3) to Public Facility (PF) of approximately 63.667 acres, located south of East 116th Street
North and east of North 971h East Avenue, as referenced in application OZ 22 -10
Alexa Beemer presented the item, recommending adoption of Ordinance 1203. Two citizens addressed
the City Council. After discussion, Mr. Bush moved, seconded by Mr. Bonebrake to adopt Ordinance
1203, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
10. Consideration and appropriate action relating to a Specific Use Permit (SUP) for approximately 0.8136
acres located south of East 96th Street North and east of North 129th East Avenue for an automotive repair
and maintenance facility (Take 5 Oil Change) in a Commercial Shopping (CS) district, as referenced in
application SUP 22 -03
Alexa Beemer presented the item, recommending approval of Specific Use Permit 22 -03. One citizen
addressed the City Council. After discussion, Mr. Dunn moved, seconded by Mr. Fruga to approve the
Specific Use Permit, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
11. Consideration and appropriate action relating to Resolution 2023 -01, accepting the notice of retirement
from Warren Lehr, City Manager, to be effective on or about March 2, 2024, and resolving to extend an
offer on or before December 5, 2023, to Chris Garrett, Assistant City Manager, to fill the position of City
Manager
Julie Lombardi presented the item. There were no comments from the audience. After discussion, Mr.
Bush moved, seconded by Mr. Bonebrake to approve Resolution 2023 -01, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
12. Report from City Manager
Warren Lehr read a letter received from the Golf Course Superintendents Association of America
recognizing Chris Cook, Bailey Ranch Superintendent, for receiving the Certified Golf Course
Superintendent designation.
13. Report from City Attorney - None
14. Report from City Councilors
City Councilors recognized Chris Cook's accomplishment.
15. Official Notices - The Mayor acknowledged receipt of the following:
• Payroll Payment Report- Pay Period Ending Date December 31, 2022
• Health Care Self- Insurance Claims - dated as of January 12, 2023
• Monthly Budget Status Report - December 2022
• Letter dated January 10, 2023 from the Owasso Audit Committee; the FY 2021 -2022 Annual
Comprehensive Financial Report; and, the City's annual financial audit for fiscal year ending
June 30, 2022
16. New Business - None
17. Adjournment
Mr. Bonebrake moved, seconded by Mr. Dunn to adjourn the meeting.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0 and the meeting adjourned at 7:32 pm.
Kelly Lewis, Mayor
Juliann M. Stevens, City Clerk
Claims List - 02/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL TYLER TECHNOLOGIES, INC.
CAD SOFTWARE
$13,752.65
CAD SOFTWARE -Total
LOCKE- SUPPLIES
$13,752.65
AEP /PSO
ELECTRIC USE
$577.38
BRANDON HEMSOTH
REIMBURSEMENT
$649.99
JPMORGAN CHASE BANK
ADVANCE- EQUIPMENT
$45.91
JPMORGAN CHASE BANK
AMAZON - EQUIPMENT
$4,493.87
JPMORGAN CHASE BANK
AMAZON- REFUND
($371.88)
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$327.67
JPMORGAN CHASE BANK
AMAZON- UNIFORM
$149.80
JPMORGAN CHASE BANK
AUTOZONE- EQUIPMENT
$4.98
JPMORGAN CHASE BANK
CORNERSTONE - SUPPLIES
$10.84
JPMORGAN CHASE BANK
CUSTOMMOLD- EQUIPMENT
$348.00
JPMORGAN CHASE BANK
EBAY- SUPPLIES
$43.57
JPMORGAN CHASE BANK
FENIEX- EQUIPMENT
$926.77
JPMORGAN CHASE BANK
KUM &GO -FUEL
$83.38
JPMORGAN CHASE BANK
MAGNUM - EQUIPMENT
$134.95
JPMORGAN CHASE BANK
MEEKS- EQUIPMENT
$1,480.00
JPMORGAN CHASE BANK
MIDWEST VET - SUPPLIES
$1,103.73
JPMORGAN CHASE BANK
OREILLY- EQUIPMENT
$33.86
JPMORGAN CHASE BANK
ROBERTSON - EQUIPMENT
$817.99
JPMORGAN CHASE BANK
RUGGED DEP- EQUIPMENT
$360.09
JPMORGAN CHASE BANK
SAVON- SUPPLIES
$80.00
JPMORGAN CHASE BANK
TINT SHOP - EQUIPMENT
$500.00
JPMORGAN CHASE BANK
TOMMYS- SERVICE
$24.99
JPMORGAN CHASE BANK
TRAVEL EXP 2/28 -3/1
$59.57
JPMORGAN CHASE BANK
TRIELECTRO- SUPPLIES
$86.60
JPMORGAN CHASE BANK
ULTRA BRIGHT -EQUIP
$1,044.98
GEN ANIMAL CONTROL -Total
$13,017.06
• AEP IPSO
ELECTRIC USE
$39.87
JPMORGAN CHASE BANK
UPSTATE - REPAIR
$115.00
SPOK INC.
PAGER USE
$9.41
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$29.22
GEN CEMETERY -Total
$193.50
JPMORGAN CHASE BANK
MEETING EXP 01/16
$112.14
SUSAN R CHERMACK
PAINT CLASS
$600.00
GEN COMM CTR DONATIONS -Total
$712.14
AEP /PSO
ELECTRIC USE
$761.13
JPMORGAN CHASE BANK
LOCKE- SUPPLIES
$57.95
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$459.63
JPMORGAN CHASE BANK
ONE BILLIARDS - MAINT
$71.00
JPMORGAN CHASE BANK
ROTOROOTER- REPAIR
$1,414.39
1
Fund
01
Claims List - 02/07/2023
Vendor Name
Payable Description
Payment
Amount
GENERAL GEN COMMUNITY CENTER -Total
AMAZON- REFUND
$2,764.10
FELKINS ENTERPRISES LLC
NEW BUSINESS CARDS
$40.00
INCOG
MEMBERSHIP DUES
$7,074.50
JPMORGAN CHASE BANK
HOME BUILDER - TRAINING
$150.00
JPMORGAN CHASE BANK
INTL CODE -FEES
$145.00
JPMORGAN CHASE BANK
JMAC- REFUND
($25.99)
JPMORGAN CHASE BANK
JMAC- SUPPLIES
$184.20
JPMORGAN CHASE BANK
ODP- SUPPLIES
$71.37
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$659.23
JPMORGAN CHASE BANK
SAVON- SUPPLIES
$550.00
TREASURER PETTY CASH
SUPPLIES REF- TOWNSEND
$70.89
GEN COMMUNITY DEVELOPMENT - Total
$8,919.20
J & K EQUIPMENT, INC.
MANLIFT RENTAL
$600.00
JPMORGAN CHASE BANK
OFFICE DEPOT - REFUND
($16.98)
GEN CULTURE & RECREATION -Total
$583.02
AEP IPSO
ELECTRIC USE
$21.02
REGINALD KIM HENRY
BANNER SERVICE
$3,350.00
GEN ECONOMIC DEV -Total
$3,371.02
AEP /PSO
ELECTRIC USE -
$76.84
AT&T
PHONE USE
$26.52
CONNECTIONS IT INC
ELECTRIC LOCK AT EOC
$1,829.38
GEN EMERG PREPAREDNESS -Total
$1,932.74
AUTO DEFINITIONS OF CLAREMOREJNC
LEASED VEH EQUIPMENT
$6,816.59
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$66.59
JPMORGAN CHASE BANK
ASFPM- CERTIFICATION
$85.00
JPMORGAN CHASE BANK
ODP- SUPPLIES
$39.98
JPMORGAN CHASE BANK
OK FLOODPLAIN -EXAM
$160.00
JPMORGAN CHASE BANK
SPEEDTECH- EQUIPMENT
$2,199.94
JPMORGAN CHASE BANK
SUNDANCE- SUPPLIES
$247.96
JPMORGAN CHASE BANK
USPS- POSTAGE
$15.00
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$52.53
UNITED STATES CELLULAR CORPORATION
PW CELL PHONES
$63.00
GEN ENGINEERING -Total
$9,746.59
JPMORGAN CHASE BANK
AMAZON- REFUND
($54.99)
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$247.94
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
$11.27
JPMORGAN CHASE BANK
ODP- SUPPLIES
$20.33
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$44.99
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$14.32
SUMNERONE INC
COPIER SERVICES
$49.00
2
Claims List - 02/07/2023
Fund Vendor Name Payable Description Payment
Amount
01 GENERAL TREASURER PETTY CASH KIPLINGER- NOVOZINSKY $74.00
GEN FINANCE -Total
$406.86
AEP /PSO
ELECTRIC USE
$3,512.11
AT &T
PHONE USE
$106.07
MAILROOM FINANCE INC
POSTAGE
$1,500.00
MCAFEE & TAFT
LEGAL SERVICES
$504.00
TREASURER PETTY CASH
POSTAGE DUE -USPS
$0.70
GEN GENERAL GOVERNMENT -Total $5,622.88
AEP /PSO ELECTRIC USE $112.08
JPMORGAN CHASE BANK LOCKE- SUPPLIES $24.40
GEN HISTORICAL MUSEUM -Total
$136.48
JPMORGAN CHASE BANK
SUNDANCE- SUPPLIES
$179.40
GEN HR - CHAR INITIATIVE - Total
$179.40
COMMUNITYCARE EAP
EAP FEE
$468.00
JPMORGAN CHASE BANK
41MPRINT -EMPY RECOG
$487.91
JPMORGAN CHASE BANK
GIANT TV -EMPY RECOG
$599.00
JPMORGAN CHASE BANK
MAIL THIS - SUPPLIES
$4.27
JPMORGAN CHASE BANK
ODP- SUPPLIES
$58.87
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$25.76
JPMORGAN CHASE BANK
SOCIETYFORHR -FEES
$458.00
JPMORGAN CHASE BANK
STRATEGIC GOVT -CONF
$1,287.00
GEN HUMAN RESOURCES -Total
$3,388.81
AT &T
PHONE USE
$26.52
AT &T MOBILITY
PUBLIC SAFE WIRELESS
$83.35
JPMORGAN CHASE BANK
AMAZON- EQUIPMENT
$420.48
JPMORGAN CHASE BANK
COX - SERVICE
$100.05
JPMORGAN CHASE BANK
EBAY- EQUIPMENT
$2,493.57
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
$40.01
JPMORGAN CHASE BANK
JMAC.EQUIPMENT
$92.09
MCC INNOVATIONS, LLC
LASERFICHE RENEWAL
$10,635.45
TREASURER PETTY CASH
CISCO SWITCHES -IT
$2,000.00
TREASURER PETTY CASH
MILEAGE REIMB- TIBBLES
$130.09
TREASURER PETTY CASH
SERVICE OKLAHOMA -TAGS
$414.00
GEN INFORMATION TECH -Total
$16,435.61
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$27.99
JPMORGAN CHASE BANK
CHAMBER -FEES
$350.00
JPMORGAN CHASE BANK
IIMC -FEES
$625.00
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$25.96
JPMORGAN CHASE BANK
MEETING EXP 01/12
$247.00
JPMORGAN CHASE BANK
NFPA -FEES
$175.00
K7
Claims List - 02/07/2023
Fund Vendor Name Payable Description Payment
Amount
01 GENERAL JPMORGAN CHASE BANK SAMS - SUPPLIES $4.91
JPMORGAN CHASE BANK SMOKE -EMPY RECOG $25.00
GEN MANAGERIAL -Total $1,480.86
HOUGHTON, TIMOTHY L BAILIFF $400.00
OKLAHOMA MUNICIPAL COURT CLERKS MEMBERSHIP FEES $110.00
OKLAHOMA MUNICIPAL COURT CLERKS TRAINING $70.00
GEN MUNICIPAL COURT -Total
$580.00
AEP /PSO
ELECTRIC USE
$2,823.41
ALL STAR RESOURCES CORP
RESTRIPE LINES
$895.00
DEERE & COMPANY
REPLACEMENT MOWER
$10,243.74
ROGERS COUNTY RURAL WATER
CENTENNIAL PARK
$312.23
DISTRICT
ASTRO SYSTEM PLUS PKG YR
$9,579.68
UNIFIRST HOLDINGS LP
PARKS STAFF UNIFORMS
$57.06
WASHINGTON CO RURAL WATER DISTRICT
MCCARTY PARK
$36.40
GEN PARKS -Total
$14,367.84
AEP /PSO
ELECTRIC USE
$362.72
JPMORGAN CHASE BANK
AMAZON- PRISON BOARD
$67.99
JPMORGAN CHASE BANK
SAMS- PRISON BOARD
$14.98
MOTOROLA SOLUTIONS INC
ASTRO SYST PLUS PKG
$2,394.92
MOTOROLA SOLUTIONS INC
ASTRO SYSTEM PLUS PKG YR
$9,579.68
GEN POLICE COMMUNICATIONS -Total
$12,420.29
JPMORGAN CHASE BANK
CAVENDERS - UNIFORM
$170.00
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$76.23
JPMORGAN CHASE BANK
LOWES -TOOLS
$59.98
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$89.99
JPMORGAN CHASE BANK
SPEEDTECH - EQUIPMENT
$2,199.94
SPOK INC.
PAGER USE
$79.28
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$224.40
GEN STORMWATER -Total
$2,899.82
AT &T
PHONE USE
$26.52
JPMORGAN CHASE BANK
AMAZON -PARTS
$89.38
JPMORGAN CHASE BANK
COX - SERVICE
$69.95
JPMORGAN CHASE BANK
LOCKE- REPAIR
$161.98
JPMORGAN CHASE BANK
LOCKE- SUPPLIES
$6.56
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$115.78
JPMORGAN CHASE BANK
LOWES -TOOLS
$26.38
JPMORGAN CHASE BANK
MAGIC REFRIG- REPAIR
$140.00
JPMORGAN CHASE BANK
OK PRECAST - SUPPLIES
$196.00
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$47.59
JPMORGAN CHASE BANK
SCHINDLER -TEST
$398.68
JPMORGAN CHASE BANK
SUMNER- SERVICE
$75.00
4
Claims List - 02/07/2023
Fund Vendor Name
Payable Description
Payment
AMERICAN MUNICIPAL SERVICES LTD
COLLECTION SERVICES
Amount
01 GENERAL SCHINDLER ELEVATOR INC
ANNUAL MAINT CONTRACT
$3,016.26
UNIFIRST HOLDINGS LP
UNIFORMS
$22.50
GEN SUPPORT SERVICES -Total
AMB PAYMENT REF -CAITO
$4,392.58
TREASURER PETTY CASH
CC DEP REF -BELK
$50.00
TREASURER PETTY CASH
CC DEP REF - BUCKLAND
$100.00
TREASURER PETTY CASH
CC DEP REF - CONNELL
$20.00
TREASURER PETTY CASH
CC DEP REF -DEERE
$100.00
TREASURER PETTY CASH
CC DEP REF -DUGAN
$50.00
TREASURER PETTY CASH
CC DEP REF - FOSTER
$50.00
TREASURER PETTY CASH
CC DEP REF - JOHNSON
$100.00
TREASURER PETTY CASH
CC DEP REF - KESSLER
$20.00
TREASURER PETTY CASH
CC DEP REF -KITCH
$50.00
TREASURER PETTY CASH
CC DEP REF - OKERSON
$50.00
TREASURER PETTY CASH
CC DEP REF - PIERCE
$50.00
TREASURER PETTY CASH
CC DEP REF -TOWNS
$100.00
TREASURER PETTY CASH
REDBUD DEP REF -DANCE
$200.00
GENERAL -Total
$940.00
GENERAL -Total
$118,243.45
20 AMBULANCE SERVICE JPMORGAN CHASE BANK
AMAZON -PARTS
$10.21
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
$1,234.27
JPMORGAN CHASE BANK
HENRY SCHEIN- SUPPLIES
$669.07
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
$8.28
JPMORGAN CHASE BANK
INTERSTATE- RECYCLE
$43.75
JPMORGAN CHASE BANK
LIFE ASSIST - SUPPLIES
$3,604.50
JPMORGAN CHASE BANK
NATION REG -CERT
$25.00
JPMORGAN CHASE BANK
SEED TECH - SUPPLIES
$126.75
JPMORGAN CHASE BANK
ZOLL- SUPPLIES
$1,680.96
MEDICLAIMS INC
BILLING SERVICES
$14,732.66
AMBULANCE -Total
$22,337.45
AMERICAN MUNICIPAL SERVICES LTD
COLLECTION SERVICES
$41.74
TREASURER PETTY CASH
AMB DISCOUNT- JACKSON
$20.40
TREASURER PETTY CASH
AMB DISCOUNT - PORTMAN
$20.40
TREASURER PETTY CASH
AMB PAYMENT REF -CAITO
$280.00
AMBULANCE SERVICE -Total
$362.54
AMBULANCE SERVICE -Total
$22,699,99
21 E -911 AT &T
PHONE USE
$429.33
DEPARTMENT OF PUBLIC SAFETY
OLETS
$635.00
INCOG
E911 CHARGES
$8,720.05
JPMORGAN CHASE BANK
AMAZON - EQUIPMENT
$808.00
JPMORGAN CHASE BANK
APCO - TRAINING
$30.00
5
Claims List - 02107/2023
Fund
Vendor Name
Payable Description
Payment
Amount
21 E -911
JPMORGAN CHASE BANK
TYLER USER - TRAINING
$1,099.00
LANGUAGE LINE SERVICES
TRANSLATION SVCS
$419.52
RICH & CARTMILL
NOTARY BOND
$10.00
E911 COMMUNICATIONS -Total
$12,150.90
E -911 - Total
$12,150.90
25 HOTEL TAX
JPMORGAN CHASE BANK
MEETING EXP 01113
$301.20
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$13.98
JPMORGAN CHASE BANK
WALMART- CONFERENCE
$93.04
TREASURER PETTY CASH
STRONG NEIGHBORHOODS
$50.00
STRONG NEIGHBORHOODS -Total
$458.22
HOTELTAX -Total
$458.22
27 STORMWATER MANAGEMENT
AEP IPSO
ELECTRIC USE
$315.59
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
$44.99
JPMORGAN CHASE BANK
BEST BUY - SUPPLIES
$32.98
JPMORGAN CHASE BANK
BROWN FARMS -SOD
$94.00
JPMORGAN CHASE BANK
CORE &MAIN- REPAIR
$98.95
JPMORGAN CHASE BANK
HARD HAT - UNIFORM
$117.00
JPMORGAN CHASE BANK
LOWES- REPAIR
$258.79
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$18.32
JPMORGAN CHASE BANK
LOWES -TOOLS
$208.91
LOT MAINTENANCE OF OKLAHOMA, INC.
LITTER CONTROL
$2,564.00
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$17.04
UNITED STATES CELLULAR CORPORATION
PW CELL PHONES
$91.48
STORMWATER- STORMWATER -Total
$3,862.05
STORMWATER MANAGEMENT
-Total
$3,862.05
31 AMBULANCE CAPITAL
TREASURER PETTY CASH
AMB DISCOUNT - JACKSON
$3.60
TREASURER PETTY CASH
AMB DISCOUNT - PORTMANT
$3.60
AMBULANCE CAPITAL -Total
$7.20
JPMORGAN CHASE BANK
DELL - EQUIPMENT
$3,723.76
AMBULANCE CAPITAL FD -Total
$3,723.76
AMBULANCE CAPITAL -Total
$3,730.96
34 VISION TAX
GARVER
116 -MINGO TO GARNETT
$28,497.50
OMEGA RAIL MANAGEMENT, INC.
DOCUMENT FEE - FIBER LINE
$1,150.00
OMEGA RAIL MANAGEMENT, INC.
RR AGREE -FIBER LINE
$2,000.00
OMEGA RAIL MANAGEMENT, INC.
RR AGREE -STROM PIPE
$1,500.00
OMEGA RAIL MANAGEMENT, INC.
RR AGREEMENT WATER
$750.00
OMEGA RAIL MANAGEMENT, INC.
RR DOCUMENT FEE
$2,300.00
116TH -MINGO TO GARNETT RD - Total
$36,197.50
VISION TAX -Total
$36,197.50
11
Claims List - 02/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
36 CAPITAL IMPROV GRANTS R &L CONSTRUCTION LLC
SPORTS PARK IMPROVE
$486,466.20
VSN 2025 SPORTS PARK RIDS • Total
$486,466.20
CAPITAL IMPROV GRANTS -Total
$486,466.20
37 SALES TAX FIRE AEP /PSO
ELECTRIC USE
$5,407.12
AT &T
PHONE USE
$26.52
GARRETT WENDLANDT
TUITION REIMBURSEMENT
$717.30
JPMORGAN CHASE BANK
5.11- UNIFORM
$230.00
JPMORGAN CHASE BANK
A &B IDENTITY- SUPPLIES
$81.00
JPMORGAN CHASE BANK
A &B IDENTITY- UNIFORM
$319.80
JPMORGAN CHASE BANK
AMAZON -NEW HIRE
$135.86
JPMORGAN CHASE BANK
AMAZON- REFUND
($188.00)
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$421.96
JPMORGAN CHASE BANK
AMER WASTE - DISPOSAL
$101.35
JPMORGAN CHASE BANK
AMERIFLEX- REPAIR
$49.10
JPMORGAN CHASE BANK
ATWOOD -PARTS
$29.99
JPMORGAN CHASE BANK
BEST BUY - EQUIPMENT
$549.99
JPMORGAN CHASE BANK
CORNERSTONE -TOOLS
$17.08
JPMORGAN CHASE BANK
EPOCH -TOOLS
$499.99
JPMORGAN CHASE BANK
FIERO- CONFERENCE
$150.00
JPMORGAN CHASE BANK
FIRE PROTECT -NEW HIRE
$81.12
JPMORGAN CHASE BANK
HARRISON ENER- REPAIR
$665.13
JPMORGAN CHASE BANK
HARRISON- REPAIR
$1,772.00
JPMORGAN CHASE BANK
HOME DEPOT -PARTS
$139.16
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
$44.13
JPMORGAN CHASE BANK
LOCKE- REPAIR
$56.54
JPMORGAN CHASE BANK
LODGING EXP 01119 -23
$408.09
JPMORGAN CHASE BANK
LODGING EXP 01/23 -24
$65.05
JPMORGAN CHASE BANK
LOWES- EQUIPMENT
$1,118.16
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$319.99
JPMORGAN CHASE BANK
LOWES - TRAINING
$116.98
JPMORGAN CHASE BANK
MOTOROLA- EQUIPMENT
$424.16
JPMORGAN CHASE BANK
NAFECO -NEW HIRE
$384.66
JPMORGAN CHASE BANK
NAFECO- UNIFORM
$134.00
JPMORGAN CHASE BANK
ODP- SUPPLIES
$141.04
JPMORGAN CHASE BANK
OK POLICE SUP - UNIFORM
$218.97
JPMORGAN CHASE BANK
OK POLICE - UNIFORM
$27.50
JPMORGAN CHASE BANK
OREILLY -PARTS
$11.22
JPMORGAN CHASE BANK
OREILLY- SUPPLIES
$45.63
JPMORGAN CHASE BANK
OSFA -FEES
$4,620.00
JPMORGAN CHASE BANK
QUIKSERVICE- SUPPLIES
$176.62
JPMORGAN CHASE BANK
QUIZS SVCS -MAINT
$660.00
7
Claims List - 02/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
37 SALES TAX FIRE JPMORGAN CHASE BANK
REACH CLOTH - UNIFORM
$507.00
JPMORGAN CHASE BANK
SAMS- EQUIPMENT
$957.97
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$179.94
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORM
$182.98
JPMORGAN CHASE BANK
SW FLUIDS - REPAIR
$955.46
JPMORGAN CHASE BANK
TRACE ANALY- SUPPLIES
$1,092.20
JPMORGAN CHASE BANK
WALMART- SUPPLIES
$52.10
WILLIAM A HARRISON INC
HVAC REPAIR
$3,242.62
SALES TAX FUND -FIRE - Total
$27,349.48
SALES TAX FIRE -Total
$27,349.48
38 SALES TAX POLICE AEP /PSO
ELECTRIC USE
$5,832.52
ALEMI ALCALA
TUITION REIMBURSEMENT
$699.30
AT &T
PHONE USE
$26.52
AT &T MOBILITY
PUBLIC SAFE WIRELESS
$140.88
BAILEY EVENT CENTER, INC.
EVENT SERVICE
$1,690.00
BOARD OF TESTS FOR ALCOHOL & DRUG
RENEWALS
$192.00
FIREFIGHTER SELECTION, INC
TESTING MATERIAL
$500.00
GT DISTRIBUTORS INC
FIREARMS
$11,826.75
JPMORGAN CHASE BANK
ACADEMY -TOOLS
$244.98
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$143.00
JPMORGAN CHASE BANK
AMAZON- UNIFORM
$80.00
JPMORGAN CHASE BANK
AMER WASTE- RENTAL
$135.10
JPMORGAN CHASE BANK
AR500 -TOOLS
$730.70
JPMORGAN CHASE BANK
AT YOUR SERV- RENTAL
$276.00
JPMORGAN CHASE BANK
BROWNELLS -TOOLS
$267.30
JPMORGAN CHASE BANK
CORNERSTONE -PARTS
$20.00
JPMORGAN CHASE BANK
DOLLAR GENERAL -PARTS
$34.74
JPMORGAN CHASE BANK
ES GUARDIANS -FEES
$12.24
JPMORGAN CHASE BANK
FAM- MEDICAL
$639.20
JPMORGAN CHASE BANK
IACP -FEES
$190.00
JPMORGAN CHASE BANK
IDSECURITY- SUPPLIES
$775.00
JPMORGAN CHASE BANK
KUM &GO- SUPPLIES
$5.78
JPMORGAN CHASE BANK
L &M- FURNITURE
$1,211.00
JPMORGAN CHASE BANK
LEGION TARGETS -TOOLS
$1,237.46
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$39.92
JPMORGAN CHASE BANK
MCALISTERS- SUPPLIES
$45.94
JPMORGAN CHASE BANK
MIDWAYUSA -TOOLS
$2,194.90
JPMORGAN CHASE BANK
MTM RECOG- UNIFORM
$1,510.00
JPMORGAN CHASE BANK
NATIONALASS - TRAINING
$1,400.00
JPMORGAN CHASE BANK
NJ CRIMINAL - TRAINING
$1,397.00
JPMORGAN CHASE BANK
OOP- SUPPLIES
$292.06
13
Claims List - 02107/2023
Fund Vendor Name
Payable Description
Payment
Amount
38 SALES TAX POLICE JPMORGAN CHASE BANK
OK GANG - TRAINING
$100.00
JPMORGAN CHASE BANK
OPTICSPLANET -TOOLS
$146.08
JPMORGAN CHASE BANK
OREILLY -PARTS
$50.60
JPMORGAN CHASE BANK
OSBI- TRAINING
$175.00
JPMORGAN CHASE BANK
PAYPAL -DUES
$130.00
JPMORGAN CHASE BANK
PLTPAYCSR -FEES
$1.40
JPMORGAN CHASE BANK
RSU- ADVERTISE
$50.00
JPMORGAN CHASE BANK
RUBBERDUMMI- EQUIPMENT
$454.06
JPMORGAN CHASE BANK
SAFARILAND- UNIFORM
$1,087.50
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$39.96
JPMORGAN CHASE BANK
SAVON- SUPPLIES
$120.00
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORM
$5,194.66
JPMORGAN CHASE BANK
STALKERRADAR -TOOLS
$2,695.00
JPMORGAN CHASE BANK
SUMNER- RENTAL
$786.38
JPMORGAN CHASE BANK
TORCHLIGHTK- TRAINING
$750.00
JPMORGAN CHASE BANK
TRACTOR SUP - SUPPLIES
$109.98
JPMORGAN CHASE BANK
ULINE- SUPPLIES
$361.12
JPMORGAN CHASE BANK
LISPS- POSTAGE
$9.45
JPMORGAN CHASE BANK
WALMART- SUPPLIES
$49.92
KENT RIICHI INOUYE
DOOR REPAIR
$1,500.00
KIRKCORYN
AWARDS & RECOGNITION
$2,136.00
LENOX WRECKER SERVICE INC
TOWING SERVICE
$110.00
MCINTOSH CORPORATION
CONDENSER REPAIR
$1,385.88
RICH & CARTMILL INC
NOTARY RENEWALS
$30.00
SCHINDLER ELEVATOR INC
ANNUAL MAINT CONTRACT
$3,016.26
SOME'S UNIFORMS INC
AWARDS & RECOGNITION
$1,669.00
SALES TAX FUND- POLICE -Total
$55,950.54
SALES TAX POLICE - Total
$55,950.54
39 SALES TAX STREETS AEP /PSO
ELECTRIC USE
$2,638.69
JPMORGAN CHASE BANK
APAC- ASPHALT
$894.00
JPMORGAN CHASE BANK
BOOT BARN - UNIFORM
$154.99
JPMORGAN CHASE BANK
BROWN FARMS -SOD
$128.00
JPMORGAN CHASE BANK
CORNERSTONE- SUPPLIES
$39.27
JPMORGAN CHASE BANK
ELLIOTT- EQUIPMENT
$2,978.06
JPMORGAN CHASE BANK
GRAINGER- SUPPLIES
$45.30
JPMORGAN CHASE BANK
LOWES - LUMBER
$45.61
JPMORGAN CHASE BANK
LOWES -PARTS
$189.44
JPMORGAN CHASE BANK
LOWES- REFUND
($3.73)
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$190.66
JPMORGAN CHASE BANK
RED WING- UNIFORM
$170.00
JPMORGAN CHASE BANK
ROADSAFE- SUPPLIES
$320.00
0
Claims List - 02/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
39 SALES TAX STREETS JPMORGAN CHASE BANK
TEXNITE- EQUIPMENT
$564.00
JPMORGAN CHASE BANK
TEXNITE- REFUND
($564.00)
JPMORGAN CHASE BANK
VOSS LIGHTING - REPAIR
$1,245.00
JPMORGAN CHASE BANK
WELSCO- RENTAL
$49.64
JPMORGAN CHASE BANK
XCESSORIES -PARTS
$2,350.00
SIGNALTEKINC
PEDESTAL SERVICE
$441.82
SIGNALTEK INC
TRAFFIC CAB REPAIR
$10,169.58
SPOK INC.
PAGER USE
$156.06
THE COTTAGES AT MINGO CROSSING
STREET LIGHT REIMS
$2,187.76
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$407.94
WASHINGTON CO RURAL WATER DISTRICT
116 LANDSCAPE IRRIG
$46.20
40
70
10
SALES TAX FUND-STREETS -Total
$24,844.29
SALES TAX STREETS
- Total
$24,844.29
CAPITAL IMPROVEMENTS
GARVER
ENGINEERING SERVICES - Cl
$21,507.85
96TH FROM 134TH TO 145TH - Total
$21,507.85
JPMORGAN CHASE BANK
INTERSTATE - VEHICLE
$178.10
JPMORGAN CHASE BANK
MATTHEWS FORD - VEHICLE
$28162
CIP FIRE DEPT VEHICLES -Total
$461.72
DOERNER, SAUNDERS, DANIEL &
LEGAL SERVICES
$187.62
CIP GARN RD WIDE 106 -116 -Total
$187.62
JPMORGAN CHASE BANK
TINT SHOP - EQUIPMENT
$240.00
TURN -KEY MOBILE, INC
NEW VEHICLE EQUIPMENT
$3,807.00
CIP POLICE VEHICLES -Total
$4,047.00
STRONGHAND LLC
STREET REHAB FY21 -22
$56,154.78
STREET REHAB FY21.22 - Total
$56,154.78
KLEINFELDER, INC
GEO TECH SERVICES
$12,200.00
STREET REHAB FY22 -23 -Total
$12,200.00
CAPITAL IMPROVEMENTS
-Total
$94,558.97
CITY GARAGE
AEP /PSO
ELECTRIC USE
$1,250.21
JPMORGAN CHASE BANK
AIR COMPRESS -PARTS
$315.00
JPMORGAN CHASE BANK
AMERIFLEX -PARTS
$176.35
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
$14.97
JPMORGAN CHASE BANK
DIESEL - SOFTWARE
$150.00
JPMORGAN CHASE BANK
FASTENAL- SUPPLIES
$29.19
JPMORGAN CHASE BANK
HESSELBEIN -TIRES
$768.44
JPMORGAN CHASE BANK
JIM NORTON -PARTS
$107.95
JPMORGAN CHASE BANK
LENOX- TOWING
$95.00
JPMORGAN CHASE BANK
LIQUIDSPRING -ERROR
$2,197.34
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$32.26
JPMORGAN CHASE BANK
ODP- SUPPLIES
$56.10
10
Claims List - 02/07/2023
Fund
Vendor Name
Payable Description
Payment
Amount
70 CITY GARAGE
JPMORGAN CHASE BANK
P &K -PARTS
$19.16
JPMORGAN CHASE BANK
PTG -PARTS
$785.58
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$30.66
UNIFIRST HOLDINGS LP
UNIFORMS
$67.74
CITYGARAGE -Total
$6,095.95
CITY GARAGE -Total
$6,095.95
76 WORKERS' COMP SELF -INS
ARTHUR J GALLAGHER
WORK COMP AUDIT
$5,260.00
CITY OF OWASSO IMPREST ACCOUNT
WORKERS COMP CLAIMS
$3,217.28
WORKERS' COMP SELF -INS -Total
$8,477.28
WORKERS' COMP SELF -INS
-Total
$6,477,28
City Grand Total
$901,085.78
11
TO: The Honorable Mayor and City Council
FROM: Earl Farris, Project Administrator
SUBJECT: Acceptance of Infrastructure Improvements for Garrett Creek Mutual Access
Easements
DATE: February 3, 2023
BACKGROUND:
The subject commercial development "Garrett Creek Mutual Access Easements" is located
approximately 2,300 linear feet south of East 116th Street North, off of North 135th East Avenue
(west service road), see map. The public infrastructure improvements consist of a driveway
approach and sidewalk, sanitary sewer infrastructure, and a concrete bridge and headwalls.
FINAL INSPECTIONS:
Final inspections for the infrastructure components were completed in January 2023, by the
Public Works Department. All standards for acceptance have been met. Additionally, the
construction contractor has supplied the necessary two -year maintenance bond.
RECOMMENDATION:
Staff recommends acceptance of the public infrastructure improvements.
ATTACHMENTS:
Location Map
City Attorney Approved Bond
Garrett Creek Mutual Access Easement Roads
r' = 375 n
Location Map
01/17/2023
This map may re resents a visual display of related geographic information. Data provided here on is not guarantee of acutual field conditions. To be sure of complete accuracy please contact the
responsible staffpfor most up- to-date information.
Farris, Earl
From:
Wingert Shellie
Sent:
Monday, October 17, 2022 10:24 AM
To:
Hancock, Brandon
Cc:
Lombardi, Julie; Farris, Earl; Wingert Shellie
Subject:
RE: Bonds for Garrett Creek MAE Projects
Good morning Brandon,
I have reviewed the Garrett Creek MAE Projects maintenance bond at your request. The attorney -in -fact signature is
authorized, the surety is licensed to do business in Oklahoma, and the amount of the bond is well within the surety's
$81,790,000 underwriting limitation. Therefore, the bond is approved.
Thank you,
Shellie
Shellie Wingert
Legal Assistant
City of Owasso
200 S. Main Street
Owasso, OK 74055
swingertt@citvofowasso.com
918 - 376 -1548
From: Hancock, Brandon <BHancock @CityOfOwasso.com>
Sent: Monday, October 17,2022 10:04 AM
To: Wingert Shellie <swingert @cityofowasso.com>
Cc: Lombardi, Julie ULombardi @CityOfOwasso.com >; Farris, Earl <efarris @CityOfOwasso.com>
Subject: Bonds for Garrett Creek MAE Projects
Shellie-
Please review bond and reply all with your findings.
Thanks for your assistance.
Brandon Hancock, CPII
Infrastructure Inspector
Owasso Public Works
office: 918 272 -4959
fax: 918 272 -4996
cell: 918 693 -0373
bhancock@citvofowasso.com
1
Maintenance Bond
PRIVATELY ]FINANCED PUBLIC IMPROVEMENTS
Bond No: 800105617
KNOW ALL MEN BY THESE PRESENTS, That we Paragon Contractors, L.L.C. as
Principal (Developer and Contractor), and Atlantic Specialty Insurance Company as
Surety, are held and firmly bound unto the City of Owasso, Oklahoma, as Obligee, in the
penal sum of Two Hundred Twenty -eight Thousand Three Hundred Fifty -oue and
32/100- ($228,351.32) to which payment will and truly to be made, we do bind ourselves,
and each of our heirs, executors, administrators, successors, and assigns jointly and
severally, firmly by these presents.
WHEREAS, the Principal will furnish a bond conditioned to guarantee, for the
period of TWO YEARS after final approval of the Garrett Creek Mae Drive, a
privately financed public improvement, and acceptance of such by the City
Council of the City of Owasso, Oklahoma, against all defects in workivanship and
materials which may become apparent in such privately financed public
improvement during said period.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH that the
Principal and /or Surety shall indemnify the Obligee for all loss that the Obligee may
sustain by reason of any defective materials or workmanship in the privately financed
public improvement which may become apparent during the said period.
SIGNED, SEALED, AND DATED: October 13, 2022
Paragon Contractors, L.L.C., Principal
Atlantic Specialty Insurance Company, Surety
BY: Attorney -in -Fact
hfqijeffite L, Drey
One Beacon
INSUI(ANCC 0110111'
Former of Attorney
KNOW ALL MEN RY THESE PRESENTS, that ATLANTIC SPECIALTY INSURANCE COMPANY, a New York corporation with Its principal office In Plymouth
Minnesota, does hereby constitute and appoint: David A. Dominion[, Jacqueline L, Drey, Mauro P. Kelly, Joan Lou, Sharon K. Murray, Kevin J. Stanger, each
Individually if there be more than one named, its we and lawful Attorney -In -Pact, to make, execute, seal and deliver, for and on Its behalf as surety, eery and all bonds,
recwgnlzances, contracts of Indemnity, and all other writings obligatory In the nature thereof; provided that no bond or undertaking executed under this authority shall exceed in
amount the sum of; unlimited and the execution of such bonds, recognfzonces, contracts of indemnity, and all other writings obligatory in the nature thereof hr pursuance of
these presents, shall be as binding upon.said Company in If they had been fully signed by all tonhonlzed officer of ilia Company and sealed whit the Company seal. This Power
of Attorney Is made and executed by authority of rite following resolutions adopted by the Hoard of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the
twenty -fifth day of September, 2012:
Resolved: That ilia Presi dent, any Senior Vice President or Vice- President(eadn an"Autmrized OfNcer')may execute for and in behalf of ilia Company any and
all bonds, recognfzances, contracts of indemnity, and all other writings obligatory in the nature thereof, slid affix the scat of lire Company dents; and that the
Authorized Officer may appoint slid authorize an Attorney -0n -Pact to execute on behalf of the Company any and all such instruments and to affix the Company
seal thereto; and that the Authorized Officer pray many (tine remove any such Attomoy -tin -Pact and revoke all power and authority given to any such Attomcy -ln-
Pact.
Resolved: That the Altomey- Infiact may be given full power and authority to execute for and In ilia name and on behalf of the Company any and all bonds,
recognizsuees, contracts of huh milly, slid all other wrl rings obligatory In the Maine thereof, and any such Instrument executed by any sude Altomey -its -Pact shall
be as binding upon the Company as If signed and sealed by nn Authorized Officer and, further, ilia Al amey -In -Pact is hereby aphorized to verify any affidavit
required to be attached to bonds, recognlzonces, contracts of indemnity, and all other writings obligatory In Ore nature thereof,
This power of attorney is signed and sealed by facshnile under the authority of the following Resolution adopted by the Board of Directors of ATLANTIC SPECIALTY
INSURANCE COMPANY on the twenty -fifth day of September, 2012:
Resolved: Thatthesignature of on Authorized Officer, the signature of (he Secretary or the Assistant Secretary, and ilia Company seal maybe affixed by
facsimile to any power of attomey or to any certificate relating thereto appointing an Altomey -in -Pact for purposes only of executing and scaling any, bond,
undertaking, recognizance or other wrillen obilgadon In die nature thereof, and any such signature and seal where so used, being hereby adopted by the Company
as (he original signature of such officer slid (lie original seat of the Company, to he wand and binding upon the Company with the same force and effect as though
manually affixed.
IN WITNESS WHEREOF, ATLANTIC SPECIALTY INSURANCE COMPANY has caused these presents to be signed by an Authorized Officer and the seal of tree Company
to be alibied this twenty - seventh day of April, 2020.
STATE OF MINNESOTA
By
Paul J. Hrebm, Satan Vice President
HENNEPIN COUNTY
On this twenty- seventh day of April, 2020, before me personally came Paul J. Diablo, Senior Vice President of ATLANTIC SPECIALTY INSURANCE COMPANY, (a mo
personally known to be the Individual and officer described ht and who executed the preceding instrument. and he acknowledged the execution of tine same, and being by me
duty sworn, that he is die sold officer afthe Company aforesaid, and that die seal affixed to the preceding laslmment is the seat of said Company and that the said seal and the
signature as such officer was duly affixed and subscribed to the said Ins nimenl by (lie authority and at the direction of the Company.
LQALISON OWAN NAS TROUT
NOTARYPUSLIC IMNNESOTA
My Commission Expires
Notary Public
1, the undersigned, Secretary of ATLANTIC SPECIALTY INSURANCE COMPANY, a New York Corporation, do hereby certify that the foregoing powerof attorney Is In full
force and has not been revoked, and the resolutions set. forth above are now In force.
Signed and sealed. Dated 13th dayor October 22_002
January 3l, 2025
Kam Borrow, Secretary
To be attached to and form a part of
CHANGE RIDER
Maintenance Bond
Bond No. 800105617 Issued by ATLANTIC SPECIALTY INSURANCE COMPANY, 605
Highway 169 North, Suite 800, Plymouth, Minnesota, USA 55441 as Surely on behalf of
Paragon Contractors, LLC , as
Principal in favor of City of Owasso with
reference to Garrett Creek Mae Drive
13th of October 2022
It Is hereby understood and agreed that the following Item is amended:
Bond No. Is changed from 800105617 to 800105619
Signed, seated and dated this 2nd day of November , 2022
BY:
Witness
Paragon Contractors, LLC
Principal
Name: Title:
Atlantic Specialty Insurance Company
ilne s Attcro-IrY-IlUict / Jacqueline L. Drey
B- 20.002
Rev. 11/2021
effective the
605 Highway 169 North, Suite 800 I
Plymouth, Minnesota, USA 55441
Web: Inlactspeciaily.com /surely
E-mail: surety ®Intactinsurance.com
Page 1 of 1
One Beacon Power of Attorney
1 II a UitA nee GROUP
KNOW ALI. MEN BY THESE PRESENTS, that ATLANTIC SPECIALTY INSURANCE COMPANY, a New York corporation with Its principal office in Plymouth,
Minnesota, does hereby constitute and appolm: David A. Dondniani, Jacqueline L. Droy, Moura P. Kelly, Joan Len, Sharon R. Murray, Revin J. Stenger, each
Individually If them be more Ilion one named, its true and lawful Attomey -In-Fact, to make, execute, seal and deliver, for and on Its behalf as surety, any and all bonds,
recognizances, contracts of Indemnity, and all other writings obligatory In the nature thereof; provided that uo bond or underialting executed under this authority shall exceed In
amount the suns of: unlhntied and the execution of such bonds, recognizances, contracts of indemnity, and all other writings obligatory in the nature thereof In pursuance of
These presents, shall be as binding upon said Company as if they had been fully signed by an authorized officer of the Company and sealed with the Company seal. This Power
of Attorney Is made and executed by authority of the following resolutions adopted by the Board of Directors of ATLANTIC SPECIAL'L'Y INSURANCE COMPANY on the
twenty-fifth day of September, 2012:
Resolved: That the President, any Senior Vice President or Vice - President (each ors "Authorized Officer ") may execute for and In behalf of die Company ally and
all bonds, recognizances, contracts of Indemnity, and all other writings obligatory in the nature thereof, and affix the seal of the Company thereto; and that the
Authorized Officer may appoint and authorize an Attomey- In-Pact to execute on behalf of the Company any and all such instruments and to affix the Company
seal thereto; and that the Authorized Officer may at any time remove anysuch Atmmey -In -Fact and revoke all power and authority given to any such Attomey -In-
Fact.
Resolved: That the Attorney -In -Fact may be given full power and authority to execute for and In the name and on behalf of the Company any and all bonds,
recognizances, contracts of Indemnity, and all other writings obligatory In ilia nature thereof, and any such instrument executed by any such Allomey- In- Fact $ball
be as binding upon the Company as If signed and sealed by an Authorized Officer and, further, the Attomey -In -Fact Is hereby authorized to verify any affidavit
required to be attached to bonds, recognizances, contracts of Indemnity, and all other wrongs obligatory In the nature thereof.
This power of attorney is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors of ATLANTIC SPECIALTY
INSURANCE COMPANY oil the twenty -fifth day of September, 2012:
Resolved: Thal the signature of an Authorized Officer, the signature of the Secretary or the Assistant Secretary, and the Company seal may be affixed by
facsinhlle to any power of attorney or to any cenifica e, relating thereto appointing an Allomey -ln -Fact for purposes only of executing and sealing any bond,
undertaking, recognizance or other written obligation fn the nature thereof, and any such signature and seal where so used, being hereby adopted by the Company
as the original signature of such officer and die original seat of the Company, to be valid and binding upon the Company with lite sanne force and effect as though
manually affixed.
IN WITNESS WHEREOF, ATLANTIC SPECIALTY INSURANCE COMPANY has caused these presents to be signed by an Authorized Officer and tie seal of die Company
to be affixed this twenty - seventh day of April, 2020.
STATE OF MINNEPaul J. Brehm, Senior Vice President
HENNEPIN COUNTY
On this twenty- seventh day of April, 2020, before me personally came Paul J. Brehm, Senior Vice President of ATLANTIC SPECIALTY INSURANCE COMPANY, to me
personally known to be the Individual and officer described In and who executed the preceding hu mmem, and lie acknowledged the execution of the same, and being by me
duly sworn, that lie Is the sold officer of the Company aforesaid, and Unit the seal affixed to the preceding Instrument Is die seal of said Company and that the said seal and the
signature as such officer was duly affixed and subscribed to the said Instrument by the authority and at the direction of the Company.
DWAN NASH•TROUT
ARY PUBLIC - MINNESOTA
Commission Explros
January 31, 2025
Notary Public
1, the undersigned, Secretary of ATLANTIC SPECIALTY INSURANCE COMPANY, a New York Corporation, do hereby comfy that the foregoing power of attorney Is In full
force and has not been revoked, and [lie resolutions set forth above are now In force,
Signed and sealed. Dared 2nd day of November .2022.
This Power of Attorney expires y�jw vow j
January 31, 2025
Kam Barrow, Secretary
Farris, Earl
From: Sean Brown <sean @paragontulsa.com>
Sent: Wednesday, November 9, 2022 10:19 AM
To: Hancock, Brandon
Cc: Farris, Earl
Subject: RE: Garrett Creek Mae Drive Maintenance Bond
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content Is safe.
Bridge and Headwalls - $123,875.50
Sanitary Sewer - $92,890.82
Driveway - $11,585.00
From: Hancock, Brandon <BHancock @CityOfOwasso.com>
Sent: Tuesday, November 08, 2022 10:54 AM
To: Sean Brown <sean @paragontulsa.com>
Cc: Farris, Earl <efarris @CityOfOwasso.com>
Subject: RE: Garrett Creek Mae Drive Maintenance Bond
Sean-
We noticed you only sent in one Bond for both projects. This is acceptable and has been approved by City Attorney Staff
however before we can send to council we need a breakdown of the bond amount and item.
Bridge and Headwalls = $$$$$$
Sanitary Sewer= $$$$$$$$
Driveway Approach and public Sidewalk = $$$$$
Total of all 3 need to Add up to Bond amount and signed by Paragon Management.
Please scan letter in and email once complete.
Thanks
Brandon
From: Sean Brown <sean(n)paraeontulsa.com>
Sent: Thursday, November3, 202211:44AM
To: Hancock, Brandon <BHancock(@CitV0fOwasso.com>
Subject: Garrett Creek Mae Drive Maintenance Bond
CAUTION: This email originated from outside of the organization. Do not dick links or open attachments unless you recognize the
sender and know the content Is safe.
Brandon,
The surety company needed to change the bond number in their system and sent us the attached change rider for our
records. Please let me know if you need anything else.
TO: The Honorable Mayor and City Council
FROM: Earl Farris, Project Administrator
SUBJECT:
Acceptance of Infrastructure Improvements for 11396 North 135th East Avenue
DATE: February 3, 2023
BACKGROUND:
The subject commercial development is located at 11396 North 135th East Avenue (Wendy's at
Garrett Creek). The public infrastructure improvements consist of sidewalk and handicap ramps.
FINAL INSPECTIONS:
Final inspections for the infrastructure components were completed in January 2023, by the
Public Works Department. All standards for acceptance have been met. Additionally, the
construction contractor has supplied the necessary two -year maintenance bond.
RECOMMENDATION:
Staff recommends acceptance of the public infrastructure improvements.
ATTACHMENTS:
Location Map
City Attorney Approved Bond
Wendy's @ Garrett Creek
1" = 381 ft
Location Map
01/12/2023
This map may represents a visual display of related geographic information. Data provided here on is no: guarantee of acutual field conditions. To be sure cf complete accuracy, please contact the
responsible staff for most up -to -date information.
Farris, Earl
From:
Wingert Shellie
Sent:
Thursday, June 30, 2022 8:51 AM
To:
Lombardi, Julie
Cc:
Hancock, Brandon; Farris, Earl
Subject:
RE: Wendy's Bond
Hello Brandon,
I am reviewing Maintenance Bonds forJulie. Feel free to send me any future bonds you have.
I have reviewed the Wendy's Bond at your request. The attorney -in -fact signature is authorized, the surety is licensed to
do business in Oklahoma, and the amount of the bond is well within the surety's $112,159,000 underwriting
limitation. Therefore, the bond is approved.
Thank you and have a great day.
Shellie
Shellie Wingert
Legal Assistant
200 S. Main St.
Owasso, OK 74055
918 - 376 -1548
swingert@cityofowasso.com
From: Lombardi, Julie <JLombardi @CityOfOwasso.com>
Sent: Thursday, June 30, 2022 8:43 AM
To: Wingert Shellie <swingert@cityofowasso.com>
Subject: Fwd: Wendy's Bond
Sent from my iPhone
Begin forwarded message:
From: "Hancock, Brandon" <BHancock @citvofowasso.com>
Date: June 30, 2022 at 8:42:17 AM CDT
To: "Lombardi, Julie" <JLombardi @cityofowasso.com>
Cc: "Farris, Earl" <efarris @cityofowasso.com>
Subject: Wendy's Bond
Julie-
Maintenance Bond
PRIVATELY FINANCED PUBLIC IMPROVEMENTS
Bond No: RCB0037551
KNOW ALL MEN BY THESE PRESENTS, That we HERITAGE CONCRETE
CONSTRUCTION. INC. as Principal (Developer and Contractor), and RLI
INSURANCE COMPANY. as Surety, are held and firmly bound unto the City of
Owasso, Oklahoma, as Obligee, in the penal suns of THREE THOUSAND SEVEN
HUNDRED FIFTY DOLLARS ($3,750.00) to which payment will and truly to be made,
we do bind ourselves, and each of our heirs, executors, administrators, successors, and
assigns jointly and severally, firmly by these presents.
WHEREAS, the Principal will furnish a bond conditioned to guarantee, for the
period of TWO YEARS after final approval of the WENDY'S #13348. 11396 N
135"11 E AVE., CITY SIDEWALK, a privately financed public improvement, and
acceptance of such by the City Council of the City of Owasso, Oklahoma, against
all defects in workmanship and materials which may become apparent in such
privately financed public improvement during said period.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH that the
Principal and /or Surety shall indemnify the Obligee for all loss that the Obligee may
sustain by reason of any defective materials or workmanship in the privately financed
public improvement which may become apparent during the said period.
SIGNED, SEALED, AND DATED: June 29.2022
HERITAGE CRETE CONSTRUCTION INC., Principal
BY: MaY17. 2012
BY: , Attorney -in -Pact
Annissa R. DeJarnett
Attach Power of Attorney
POWER OF ATTORNEY
RLI Insurance Company
Contractors Bonding mEd Insurance Company
9025 N. Lindbergh Dr. Peoria, IL 61615
Phone: 800 - 645.2402
Know All Alen by These /'resents:
That (his Power of Attorney is not valid or in effect unless attached to Elie bond which it authorizes executed, but may be detached by the
approving officer if desired.
That RLI Insurance Company and /or Contractors Bonding and Insurance Company, each an Illinois corporation, (separately and
together, the "Company ") do hereby make, constitute and appoint:
Ronald L Hammond Jennifer L Deatherage, Susan E. Travis Annissa R DeJarInd. jointly or several)
, state or Oklahoma its true and lawful Agent(s) and Altorney(s) in Fact, with
fill] power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all
bonds and undertakings in an umount not to exceed Twenty Five Million Dollars
(_$25.000.000.00 ) for any single obligation.
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been
executed and acknowledged by the regularly elected officers of the Company.
RLI Insurance Company and /or Contractors Bonding and Insurance Company, as applicable, have each further certified that Ore
following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation. and is now in force rn_wtr
"All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of
the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board
of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint
Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate
seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The
signature of any such officer and the corporate seal may be printed by facsimile."
IN WITNESS WHEREOF, the RLI Insurance Company and /or Contractors Bonding and Insurance Company, as applicable, have
caused these presents to be executed by its respective Vice President with its corporate seal affixed this 6th day of
Aueust 2020 .
Insurance Company
Contractors Bonding and Insurance Company
By Barton W. Davis
Vice President
Slate of Illinois , N "pss
County of Peoria J} SS
CERTIFICATE
On this 6111 day' of August . 2020 before me, n Notary Public,
Personally appeared Benin W Davis , who being by me duly swom,
acknowledged that he signed the above Power of Attorney as the aforesaid
officer of the RLI Insurance Company and/or Contractors Bonding and
Insurance Company and acknowledged said instrument to be die voluntary
act and decd of said corporation.
Catherine D. Glover Notary Public
1, Ilse undersigned officer of RLI Insurance Company and/or
Contractors Bonding and Insurance Company, do hereby certify,
that [lie attached Power of Attorney is in fill force and effect and is
irrevocable; and furthermore, dial the Resolution of the Company ns
set font in the Power of Attorney, is now in force. In testimony
whereof, have have hereunto set my hand and die seal of the RLI
Insurance Con) and/or Co tractos Bondin,pnd Insurance
Company— day or
RLI Insurance Company
Contractors Bonding and Insurance Company
Strong Nei
ghbor
Initiative
Building Relationships Today
For Stronger Neighborhoods Tomorrow
and A Better Community For ALL
Strong Neighbor ood Initiative
Building a REAL Community
Starts with Your Participation
Why We Are Here
Strong Neighborhoods are the primary
component of an attractive and vibrant community.
Key to success - Building relationships:
1) Build partnerships between residents and City government
2) Encourage citizens to become engaged in their neighborhoods
3) Foundation of building relationships has expanded to
neighborhoods building relationships with other neighborhoods
How OSNI HELPS
• Establish Neighborhood Networks where no HOA
• Work with all neighborhoods to develop plans
• Serve as a point of contact between citizens and City departments
Neighborhoods
56 Homeowners Associations and
Neighborhood Networks /Affiliations,
or Apartment complexes are
registered with OSNI representing
10,082 Households
Nei hborhood
Lea ership Conference
& Workshops
Annual Neighborhood Leadership
Conference and Workshops
provide leadership training for
neighborhood leaders; as well as
an opportunity to meet and share
ideas with other leaders.
Deputy Chief of Police Woodruff
presenting at Safety Workshop
Neighborhood Grant Program,
administered by the Owasso Community
Foundation, provides grant funds to recognized
neighborhoods in the City of Owasso.
Grants have funded a range of beautification
Neighborhood projects by supplementing neighborhoods' investments.
Grant Program
# Neighborhood Grant Neighborhood Total
Grants Amount Investment Impact
2019 15 $16,013 $34926 $50939
2020 10 $15447 $49424 $64872
2021 13 $26,077 $86,539 $112,616
2022 9 $23309 $55198 $78507
ENCOURAGE SERVICE
Led by a volunteer
team of neighborhood
& community leaders
for project service day
in our neighborhoods
and community
Leadership Team
Litter cleanup
program and
education
initiative
Dumpster Day - Neighborhood
Partnership with
Urban Soul Youth
Sign Topper Program
Partnership with Public Works Department
Increases Neighborhoods visibility
Sense of belonging and neighborhood pride
Alert Neighborhood Program
Partnership with Owasso Police Department
Custom designed program specific to Owasso neighborhoods
Develops neighborhood -based crime prevention organizations
Neighborhood Block Part
Block parties are an opportunity to encourage neighbors
to get to know each other and to renew neighborhood
awareness, exchange greetings, and to celebrate the
importance of neighborhood relationships.
Girl Scout Troop 661 &
OSNI as partners received
the Youth Achievement
Award for our Keep
Owasso Clean program
Mac - OSNI Leader and
KOB Affiliate Champion
OSNI web pages:
http: [/www.cityof6wasso.c0m /241 1
Free and private social network for
neighbors to communicate within their
neighborhood and connect to the City.
18,967 members
As of January 2023
Owasso Neighborhoods
Registered Neighborhoods
F Yes, HOA /POA
Yes, Neighborhood Network
Yes, Apartment
No, HOA /POA
E 12t Not Registered
0 0.5 1 2 Miles
Owasso Boundary
Fenceline
Owasso City Limits
City of Owasso, INCOG, ESRI
The Patriot
TO: The Honorable Mayor and City Council
FROM: Jason Woodruff, Deputy Chief of Police
SUBJECT: Owasso Police Department Multi- Purpose Building and Alternate Police Shoot
House
DATE: February 3, 2023
BACKGROUND:
In 2004, the Owasso Police firearms range was closed due to safety issues. The department
borrowed range facilities from various agencies until 2008, when the department began leasing
a range from a private range facility at a substantial annual rate. In 2011, the decision was
made to invest in a new firearms range. The plan was to build the range in phases, with a goal
of completion by the end of 2015.
The plans for the range included extensive dirt work to build high safety berms around the
various shooting areas, concrete walkways, multi - position handgun and rifle lanes, an
observation tower, a turning target system, outdoor lighting, covered pavilions for inclement
weather, a 360 degree shoot house structure and a multiuse training structure. The handgun and
rifle ranges have been completed with a turning target system installed at the handgun range.
The range tower has been constructed and the majority of the dirt and concrete work have
been completed as well as the outdoor lighting. The next phase of proposed construction is the
multiuse structure and the shoot house.
PROJECT DESCRIPTION:
The multiuse structure would be a 60' x 90' steel and metal building containing an open
classroom, restrooms, equipment storage, a rolling overhead door to allow vehicles to be
parked inside for scenario training, and two (2) offices for training staff. The building would be
used for general classroom instruction as well as training for firearms, SWAT, defensive tactics, K9,
TASER, traffic stop practicums, and less lethal munitions. An integrated computer simulator
system would be utilized inside the building for various scenario -based trainings.
The shoot house structure would be a 30' x 60' steel and metal building constructed with
permanent and mobile interior walls, as well as Styrofoam exterior walls designed to allow bullets
to pass through the walls into the dirt berms surrounding the structure. The building would be
equipped with an elevated catwalk system to allow range staff to safely monitor the activities
inside the building as training is being conducted.
Professional architectural and engineering services were procured for the design of the shoot
house and multiuse structure and a project consultant was hired to assist with preparation of the
bid specifications. Owasso Public Works staff has been consulted extensively for the entire
project, including design specifications due to the range being located in a flood zone. The
base bid consists of the construction of the multiuse structure and alternate bid #I consists of the
construction of the shoot house.
BID ADVERTISEMENT:
Advertisements for bids were published on December 12, 2022, and again on December 19,
2022. The bid opening was held on January 12, 2023, at City Hall. Seven (7) contractors
submitted a bid for the project. The bid results are summarized below.
PD Multi- Purpose Building and Shoot House
Page 2
Bidder Information
Base Bid
Alternate #1
Total Bid
Ascend Commercial Builders
2828 E 15th St
$1,270,000.00
$304,500.00
$1,574,500.00
Tulsa, OK 74104
Bravo Builders LLC
114SBroadway
$1,110,000.00
$293,000.00
$1,403,000.00
Coweta, OK 74429
Brewer Construction
PO Box 967
$1,737,353.00
$246, 830.00
$1,737,353.00
Chouteau, Ok 74337
Builders Unlimited
9835 S 219th E Ave
$1,191,981.00
$294,423.00
$1,486,404.00
Broken Arrow, Ok 74014
Hoey Construction
3310 Southwest Blvd
$1,242,000.00
$396,000.00
$1,638,OOOA0
Tulsa, OK 74107
Magnum Construction
P. O. Box 707
$1,257,000.00
$275,000.00
$1,532,000.00
Broken Arrow, OK 74013
Reco Construction
7033E40thSt
$1,241,300.00
$373,630.00
$1,614,930.00
Tulsa, OK 74145
Staff reviewed the bids and verified that the lowest bid, submitted by Bravo Builders LLC, meets
all requirements outlined in the bid specifications.
FUNDING:
Funding is available for this project in the FY23 Police Services Budget and the Capital
Improvements Fund.
RECOMMENDATION:
Staff recommends awarding the base bid and alternate bid #1 to Bravo Builders LLC, of
Coweta, Oklahoma, in the amount of $1,403,000.00 and authorization to execute the
agreement.
ATTACHMENT:
Agreement
SECTION 9 - AGREEMENT and GENERAL CONDITIONS
THIS AGREEMENT is dated as of the day of . by
and between THE City of Owasso, Oklahoma (hereinafter called OWNER) and
Bravo Builders LLC (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Project Documents.
All local, state, and federal laws, etc. shall govern every aspect of work. The Work is
generally described as follows:
Owasso Police Multi- Purpose Building And /or Alternate Owasso Police Shoot House
CITY OF OWASSO, OKLAHOMA
The project for which the Work under the Project Documents may be the whole or only a
part, is described as follows: New Construction of an Owasso Police Multi- Purpose Building
and /or Owasso Police Shoot House.
ARTICLE 2. DEPARTMENT
The project has been assigned by OWNER to the responsible City Department. The
Department Director, or his /her duly authorized representative, who is hereinafter called
PROJECT MANAGER, will assume all duties and responsibilities and will have the rights and
authority assigned to DEPARTMENT in the Project Documents in connection with the
completion of the Work in accordance with the Project Documents.
ARTICLE 3. CONTRACT TIME
3.1 The Owasso Police Multi- Purpose Building Work will be substantially completed
within One Hundred Eighty (180) calendar days from the date of Notice to Proceed; and
completed and ready for final payment in accordance with the General Conditions
within One Hundred Eighty (180) calendar days from the date of Notice to Proceed,
which will be on or before . The Owasso Police Shoot House Work
will be substantially completed within One Hundred Twenty (120) calendar days from the
date of Notice to Proceed; and completed and ready for final payment in accordance
with the General Conditions within One Hundred Twenty (120) calendar days from the
date of Notice to Proceed, which will be on or before
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
17
substantially complete within the time specified in paragraph 3.1 above, plus any
extensions thereof allowed in accordance with the General Conditions. They also
recognize the delays, expense and difficulties involved in proving in a legal or arbitration
proceeding the actual loss suffered by OWNER, if the Work is any such proof. OWNER
and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty)
CONTRACTOR shall pay OWNER FIVE HUNDRED Dollars ($500.00) for each consecutive
calendar day that expires after the time specified in paragraph 3.1 for substantial
completion until the Work is substantially complete. After Substantial Completion, if
CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time
specified in paragraph 3.1 for completion and readiness for final payment or any proper
extension thereof granted by OWNER, CONTRACTOR shall pay OWNER FIVE HUNDRED
Dollars ($500.00) for each consecutive calendar day that expires after the time specified
in paragraph 3.1 for completion and readiness for final payment.
ARTICLE 4. CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance
with the Project Documents in current funds the amount agreed upon in CONTRACTOR'S
bid.
4.2 CONTRACTOR understands that the estimated quantities are not guaranteed,
and that the determination of actual quantities and their classification is to be made by
the OWNER at the time of application for payment.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with the General
Conditions an the Pay Estimate Forms included as Exhibit "A" to this Agreement.
Applications for Payment will be processed by OWNER as provided in the General
Conditions.
5.1 Progress Payments. OWNER shall make progress payments on account of the
Contract Price based on CONTRACTOR's Applications for Payment in accordance with
the City of Owasso's Payment Schedule included as Exhibit "B" to this Agreement during
construction as provided below. All progress payments will be on the basis of the progress
of the Work.
5.1.1 Progress payments shall not exceed an amount equal to 90% of the
WORK completed until such time as CONTRACTOR shall complete in excess of fifty
percent (50 %) of the contract amount.
5.1.2 Upon completion in excess of fifty percent (507o) of the total contract
amount, OWNER shall pay an amount sufficient to increase total payments to
CONTRACTOR to 95% of the WORK completed, less such amounts as OWNER shall
determine in accordance with the General Conditions, provided that OWNER has
determined that satisfactory progress is being made, and upon approval by the Surety.
18
5.2 Final Payment. Upon final completion and acceptance of the Work in
accordance with the General Conditions, OWNER shall pay the Contract Price.
ARTICLE 6. CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the
following representations:
6.1 CONTRACTOR has familiarized himself /herself with the nature and extent of
Project Documents, Work, locality, and with all local conditions and federal, state and
local laws, ordinances, rules and regulations that in any manner may affect cost, progress
or performance of the Work.
6.2 CONTRACTOR has studied carefully all reports or explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical conditions
in or relating to existing surface or subsurface structures at or contiguous to the site
(except underground facilities) which have been identified in the Supplementary
Conditions as provided in the General Conditions. Contractor accepts the
determination set forth in the General Conditions of the extent of the "technical data"
contained in such reports and drawings upon which Contractor is entitled to rely.
Contractor acknowledges that such reports and drawings are not Project Documents
and may not be complete for Contractor's purposes. Contractor acknowledges that
Owner and Project Manager do not assume responsibility for the accuracy or
completeness of information and data shown or indicated in the Project Documents with
respect to underground facilities at or continuous to the site. Contractor has obtained
and carefully studied (or assume responsibility for having done so) all such additional
supplementary examinations, investigations, explorations, tests, studies and data
concerning conditions (surface, subsurface and underground facilities) at or contiguous
to the site or otherwise which may affect cost, progress, performance or furnishing of the
Work or which relate to any aspect of the means, methods, techniques, sequences and
procedures of construction to be employed by Contractor, and safety precautions and
programs incident thereto. Contractor does not consider that any additional
examinations, investigations, explorations, tests, studies, or data are necessary for the
performance and furnishing of the Work at the Contract Price, within the Contract Times
and in accordance with the other terms and conditions of the Project Documents.
6.3 CONTRACTOR has made or caused to be made examinations, investigations,
tests and studies of such reports and related data in addition to those referred to in
paragraph 6.2 as deemed necessary for the performance of the Work at the Contract
price, within the Contract Time and in accordance with the other terms and conditions
of the Project Documents; and no additional examinations, investigations, tests, reports
or similar data are or will be required by CONTRACTOR for such purposes.
6.4 CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Project Documents with respect to existing Underground Facilities at or
contiguous to the site and assumes responsibility for the accurate location of said
Underground Facilities. No additional examinations, investigations, explorations, tests,
reports, studies or similar information or data in respect of said Underground Facilities are
19
or will be required by CONTRACTOR in order to perform and furnish the Work at the
Contract Price within the Contract Time and in accordance with the other terms and
conditions of the Project Documents, including the General Conditions.
6.5 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Project
Documents.
6.6 CONTRACTOR has given OWNER written notice of all conflicts, errors or
discrepancies that he has discovered in the Project Documents, and the written
resolution thereof by OWNER is acceptable to CONTRACTOR.
6.7 CONTRACTOR has obligated himself /herself to the OWNER to be responsible
for the workmanship, labor and materials used in the project for two (2) years after the
project has been accepted by the OWNER.
6.8 CONTRACTOR understands that they will be exempt from all sales tax on
materials and other items necessary for the completion of the project. The OWNER has
issued him a Certification of Tax - Exempt Project enclosed as Exhibit "C" of this Agreement.
ARTICLE 7. PROJECT DOCUMENTS
The Project Documents which comprise the entire agreement between OWNER and
CONTRACTOR are attached to this Agreement, made a part hereof, and consist of the
following:
7.1 This Agreement and General Conditions
7.2 Exhibits'W', "B ", and "C" to this Agreement
7.3 Advertisement for Bids
7.4 Requirements for Bidders
7.4 Project and Bid Specifications
7.6 Bid
7.7 Bid Bond
7.8 Bid Affidavits
7.9 Statement of Bidders Qualifications
7.10 Certificate of Non- Discrimination
7.11 Performance Bond / Maintenance Bond / Statutory payment Bond
7.12 Notice of Award and Notice to Proceed
7.13 Change Order
7.14 Project Drawings, consisting of Sheets 1 to inclusive, and Standard
Drawings.
7.15 Addendum Numbers _ to —, inclusive.
7.16 Documentation submitted by CONTRACTOR prior to Notice of Award
7.17 Any Modification, including Change Orders, duly delivered after execution of
Agreement
There are no Project Documents other than those listed above in this Article 7. The Project
Documents may only be altered, amended or repealed by a Modification.
20
ARTICLE 8. MISCELLANEOUS
8.1 Terms used in this Agreement which are defined in the General Conditions shall have
the meanings indicated in the General Conditions.
82 No assignment by a party hereto of any rights under or interests in the Project
Documents will be binding on another party hereto without the written consent of the
party sought to be bound: and specifically, but without limitation, monies that may
become due and monies that are due may not be assigned without such consent
(except to the extent that the effect of this restriction may be limited by law) and unless
specifically stated to the contrary in any written consent to an assignment, no assignment
will release or discharge the assignor from any duty or responsibility under the Project
Documents.
8.3 OWNER and CONTRACTOR each bind himself /herself, his /her partners, successors,
assigns, and legal representatives to the other party hereto, his /her partners, successors,
assigns and legal representatives in respect to all covenants, agreements and obligations
contained in the Project Documents.
8.4 The Agreement (or remaining portions thereof) should continue in effect, be valid
and binding upon both parties even if a provision or part of the Project Documents should
be held void or unenforceable by law.
ARTICLE GENERAL CONDITIONS OF THE AGREEMENT
SECTION 101 DEFINITIONS AND TERMS
Whenever in these specifications and contracts, or in any documents or instruments
pertaining to construction where these specifications govern, the following terms or
pronouns in place of them are used, the intent and meaning shall be interpreted as
follows:
101.01 - ABBREVIATIONS: Whenever the following abbreviations are used in these
specifications or on the plans, they are to be construed the some as the respective
expressions represented:
A.A.S.H.O.
American Association of State Highway Officials
A.A.S.H.T.O.
American Association of State Highway Traffic Officials
A.I.A.
American Institute of Architects
A.S.A.
American Standards Association
A.S.C.E.
American Society of Civil Engineers
A.S.T.M.
American Society of Testing & Materials
A.W.W.A.
American Water Works Association
MUTCD
Manual on Uniform Traffic Control Devices
O.D.O.T.
Oklahoma Department of Transportation
21
101.02 - ADVERTISEMENT: The public announcement, as required by law, inviting bids for
work to be performed or materials to be furnished.
101.03 - AWARD: The acceptance by the Owner of a bid.
101.04 - BASE COURSE: The layer or layers of specified or selected materials of design
thickness placed on a sub -base or a sub -grade to support a surface course.
101.05 - BIDDER: The individual, company, partnership or corporation submitting a bid for
the advertised work.
101.06-BRIDGE: A structure, including supports, erected over a depression or obstruction
as water, highway, or railway, and having a track or passageway for carrying traffic, and
having an opening measured along the center of the roadway of more than 20 feet
between abutments or spring line of arches or extreme ends of openings for multiple
boxes.
101.07 - CITY: The City of Owasso, Oklahoma, a municipal corporation, acting through
its duly authorized officers or agents.
101.08 - CALENDAR DAY: Every day shown on the calendar.
101.09 - CHANGE ORDER: A written order issued by the Department to the contractor,
covering changes in the plans or quantities or both, within the scope of the contract and
establishing the basis of payment and time adjustments for the work affected by the
change.
101.10-CHANNEL: A natural or artificial watercourse.
101.11 —CONSULTANT: - Architect, Engineer, or other outside firm hired by the Owner to
design or administer the construction of the Project.
101.12 - CONTRACT: The written agreement between the Owner and the contractor
setting forth the obligations of the parties thereunder, including, but not limited to the
performance of the work, furnishing of materials, and the basis of payment.
The contract includes the invitation for bids, proposal, addenda, contract form and
contract bonds (statutory, performance and maintenance bond), specifications,
supplemental specifications, special provisions, general and detailed plans, and notice
to proceed, also any change orders and agreements that are required to complete the
construction of the work in an acceptable manner, including authorized extensions
thereof, all of which constitute one instrument.
101.13 - CONTRACT ITEM (PAY ITEM): A specifically described unit of work for which a
price is provided in the contract.
22
101 14 - CONTRACT PAYMENT BOND (STATUTORY BOND): The security furnished by the
contractor and his /her surety to guarantee payment of prescribed debts of the
contractor covered by the bond.
101.15 -CONTRACT PERFORMANCE BOND: The security furnished by the contractor and
his /her surety to guarantee complete execution and performance of the work in
accordance with the contract.
101.16 - CONTRACT TIME: The number of workdays or calendar days allowed for
completion of the contract, including authorized time extensions.
In case a calendar date of completion is shown in the proposal in lieu of the number of
working calendar days, the contract shall be completed by that date.
101.17 - CONTRACTOR: The individual, company, partnership or corporation contracting
with the City of Owasso for performance of prescribed work.
101.18 - CONTROL OF ACCESS: The condition where the right of owners or occupants of
abutting land or other persons to access, light, air or view in connection with a roadway
is fully or partially controlled by public authority.
101.19 - CULVERT: Any structure not classified as a bridge which provides an opening
under the roadway.
101.20 - DEPARTMENT: A Department of the City of Owasso operating under the direction
and authority of the Owner.
101.21 - DRAINAGE DITCH: A constructed open excavation or ditch constructed for the
purpose of carrying off surface water.
101.22- EASEMENT: A grant of a right of use of the property of an owner for a certain
purpose at the will of the grantee.
101.23 - EQUIPMENT: All machinery and equipment, togetherwith the necessary supplies
for upkeep and maintenance, and tools and apparatus necessary for the proper
construction and acceptable completion of the work.
101.24 - EXTRA WORK: An item of work not provided for in the contract as awarded but
found essential to the satisfactory completion of the contract within its intended scope.
101.25 - EXTRA WORK ORDER: A change order concerning the performance of work or
furnishing of materials involving extra work. Such extra work may be performed at agreed
prices or on a force account basis as provided elsewhere in these specifications.
101.26 - INSPECTOR: The Department's authorized representative assigned to make
detailed inspections of contract performance.
23
101 27 - INVITATION FOR BIDS: The advertisement for proposals for all work or materials on
which bids are required. Such advertisement will indicate the time and place of the
opening of proposals.
101.28 - LABORATORY: The official testing laboratory of the city or any other testing
laboratory which may be designated by the Department.
101.29 - MATERIALS: Any substances specified for use in the construction of the project
and its appurtenances.
101.30 - MAYOR: The Mayor of the City of Owasso as constituted by charter to administer
the affairs of the City of Owasso.
101.31 - NOTICE TO PROCEED: Written notice to the contractor to proceed with the
contract work.
101.32 - OWNER: City of Owasso, Owasso Public Works Authority, Owasso Public Golf
Authority, or other entity of the City.
101.33 - PARKING: That portion of the right -of -way on city streets or urban projects not
covered by paved surface or sidewalk.
101.34 - PAVEMENT STRUCTURE: The combined sub -base, base and surface courses
placed on the sub -grade to support the traffic load and distribute it to the roadbed.
101.35 - PLANS: The approved plans, profiles, typical cross sections, working drawings and
supplemental drawings, or exact reproductions thereof, which show the location,
character, dimensions, and details of the work to be done.
101.36 - PROJECT: The specific section of construction to be performed thereon under
the contract.
101.37 - PROPOSAL: The written offer of the bidder, submitted on the prescribed proposal
form, to perform the work described in the plans and specifications and to furnish the
labor and materials at the prices quoted by the bidder.
101.38 - PROPOSAL GUARANTY: The security to be fumished by the bidder as a guaranty
of good faith to enter into a contract and to execute the required bonds covering the
work contemplated if his /her proposal is accepted.
101.39 - SHOULDER: The portion of the roadway contiguous with the traveled way for
accommodation of stopped vehicles, for emergency use, and for lateral support of base
and surface courses.
101.40 - SPECIAL PROVISIONS: Additions and revisions to the standard and supplemental
specifications covering conditions peculiar to an individual project.
24
101.41 - SPECIFICATIONS: A general term applied to all directions, provisions and
requirements pertaining to performance of the work.
101.42 - SPECIFIED COMPLETION DATE: The date on which the contract work is specified
to be completed.
101.43 - STATUTORY BOND: The approved forms of security furnished by the contractor
and his surety as a guaranty that (s) he will pay in full all prescribed debts of the contractor
covered by the bond.
101.44 - SUBBASE: The layer or layers of specified or selected material of designed
thickness placed on a subgrade to support a base course.
101.45 - SUBCONTRACTOR: An individual, company, partnership or corporation to whom
the contractor contracts part of the contract
101.46 - SUBGRADE: The top surface of a roadbed upon which the pavement structure
and shoulders are constructed.
101.47 — SUBSTANTIAL COMPLETION: The time at which the Work (or specified part
thereof) has progressed to the point where, in the opinion of the Department, the Work
(or a specified part thereof) is sufficiently complete, in accordance with the Project
Documents, so that the Work (or specified part thereof) can be utilized for the purpose
for which it is intended. The terms "substantially complete" and "substantially
completed" as applied to all or part of the Work refer to Substantial Completion thereof.
101 48 - SUBSTRUCTURE: All of that part of the structure below the bearings of simple and
continuous spans, skewbacks or arches and tops of footings of rigid frames, together with
the backwalls, wingwalls and wing protection railings.
101.49 - SUPERINTENDENT: The designated representative of the contractor present on
the work at all times during progress, authorized to receive and execute instructions from
the Department and capable of superintending the work effectively.
101.50 - SUPERSTRUCTURE: The entire structure except the substructure.
101.51 - WORK: Work shall mean the furnishing of all labor, materials, equipment, and
other incidentals necessary or convenient to the successful completion of the project
and the carrying out of all the duties and obligations imposed by the contract.
101.52 - WORKING DAY: A working day shall be any day, other than a holiday, Saturday,
or Sunday, on which weather and working conditions would permit the normal forces of
the contractor to proceed with regular work for a period of at least six hours toward the
completion of the work, unless work is suspended for causes beyond the contractor's
control. Saturdays, Sundays, and holidays on which the contractor's forces engage in
regular work, requiring the presence of an inspector, will be considered as working days.
25
101.53 - WORK ORDER: A written order, executed by the Department, of a contractual
status requiring performance by the contractor without negotiation of any sort.
101.54 - WORKING TIME: The working time stated in the proposal and the contract shall
be definite number of working days or calendar days and shall be considered an
essential part of the contract.
101.55 - In order to avoid cumbersome and confusing repetition of expressions in these
specifications, it is provided that whenever anything is, or is to be, done, if, as, or, when
orwhere "contemplated, required, determined, directed, specified, authorized, ordered,
given, designated, indicated, considered necessary, deemed necessary, permitted,
reserved, suspended, established, approval, approved, disapproved, acceptable,
unacceptable, suitable, accepted, satisfactory, unsatisfactory, sufficient, insufficient
rejected, or condemned," it shall be understood as if the expression were followed by the
words "by the Department' or "to the Department."
SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS
102.01 - INTERPRETATION OF ESTIMATES: The estimate of quantities of work to be done
and materials to be furnished listed in the Plans and on the Bid Form are to be considered
as approximate only and are to be used as a basis for the comparison of bids and the
award of the contract. The Owner does not expressly or by implication agree that the
actual quantities involved will correspond exactly therewith; nor shall the bidder plead
misunderstanding or deception because of such estimate of quantities, or of the
character, location or other conditions, pertaining to the work. Payment to the
contractor will be made only for the actual quantities of work performed or materials
furnished in accordance with the plans and specifications, and it is understood that the
quantities of work to be done and the materials to be furnished may each be increased,
diminished or omitted as hereinafter provided without in any way invalidating the bid
prices.
102.02 EXAMINATION OF PLANS SPECIFICATIONS SPECIAL PROVISIONS SITE OF WORK:
The bidder is required to examine carefully the site of the proposed work and the
proposal, plans, specifications, special provisions, and contract forms, and satisfy
himself /herself as to the character, quality and quantities of work to be performed and
materials to be furnished and as to the requirements of these specifications,
supplemental specifications, special provisions and contract. The submission of a
proposal shall be prima facie evidence that the bidder has made such an examination.
102.03 — PRICE IN WORDS OR FIGURES: (1) The bidder shall specify a unit price in words
and figures for each pay item for which a quantity is given and shall also show the
products of the respective unit prices and quantities written in figures in the column
provided for that purpose and the total amount of the proposal obtained by adding the
amounts of the several items. All the words and figures shall be in ink or typed. In case
of a discrepancy between the prices written in words and those written in figures, the
prices written in words shall govern.
26
Any change in the unit price, words or figures, or the product of the unit price, shall be
acknowledged by the initials of the person signing the bid, adjacent to each such
change or alteration.
(2) LUMP SUM - The bidder shall specify a lump sum price when called for either in words
or in figures for each item requested and shall also show the products when applicable.
Any change in the lump sum, words or figures, or the product, shall be acknowledged by
the initials of the person signing the bid, adjacent to each such change or alteration.
102.04 SIGNATURE OF PROPOSAL CONTRACTS STATUTORY BOND
IF A CORPORATION: Title of officer signing, Secretary's attest and Seal
should be shown.
IF A COMPANY: Title of officer signing. (If incorporated, following the
Company name with "A Corporation" and title of
officer signing, along with Secretary's attest and
company seal or corporate seal.)
IF A PARTNERSHIP: Indicate following firm name "A Partnership" and
"Partner" following signature of partner signing.
IF AN INDIVIDUAL: Show individual, D /B /A (show firm name) and following
signature, show "Owner."
102.05 - MATERIAL GUARANTY: The successful bidder may be required to furnish a
complete statement of the origin, composition, and manufacture of any or all materials
to be used in the construction of the work together with samples, which samples may be
subjected to tests to determine their quality and fitness for the work.
10206 - CONTRACTOR AND THEIR EMPLOYEES: The General Contractor and
subcontractors employed upon the work shall and will be required to conform to the
labor laws of the State of Oklahoma and the various acts amendatory and
supplementary thereto, and to all laws, ordinances, and legal requirements applicable
thereto. Each bidder agrees to comply with all terms of relating to equal employment
opportunity. The contractor shall employ competent foremen, experienced mechanics,
and others skilled in the several parts of the work given them to do, for performance of
the work embraced in this contract; and shall promptly discharge all incompetent or
otherwise unsatisfactory employees. Contractor's employees directly employed in
performance of the work shall not be paid less than the prevailing minimum wage scale.
Necessary sanitary conveniences for the use of employees on the work, properly
secluded from public observation, shall be provided and maintained by the contractor.
The construction and location of the facility and disposal of the contents shall comply
with all laws of the Owner and State, relating to health and sanitation regulations.
27
The contractor hereby agrees to comply with the provisions of Title 40 Oklahoma Statutes
(Supp.9181) Sections 196.1 et.seq. relating to minimum wage scale of public projects.
The Contractor and each Subcontractor shall pay the contributions required by the
Social Security Act, U.S. Current Tax Payment Act (withholding tax) and the public laws
of the State and shall accept exclusive liability for said contributions. The Contractor
further shall indemnify and hold harmless the Owneron account of anysuch contributions
assessed against the Owner.
The contractor agrees to keep an accurate record showing the names and occupation
of all employees, including the employees of any subcontractor, employed on the
contract and showing the actual wages paid to each of the employees, which record
shall be open at all reasonable hours to the inspection of the Owner or the Commissioner
of Labor, State of Oklahoma.
The contractor further agrees that it (and contractor's subcontractors, if any) will not fail
or refuse to hire or discharge any individual, or otherwise discriminate against any
individual with respect to this compensation, terms, conditions, or privileges of
employment, because of such individual's race, color, religion, sex, age or national origin,
and further agrees that it will not (nor will its subcontractors, if any) limit segregate or
classify its employees in any way which would deprive or tend to deprive any individual
of employment opportunities or otherwise adversely affect his /her status as an employee,
because of such individual's race, color, religion, sex, age, physical handicap or national
origin. Contractor further agrees with the Owner that this contract may be terminated
by the Owner in the event there shall be a violation of any of the provisions of this
paragraph, upon notice in writing given, and all monies to become due pursuant to any
other provisions of this contract from the date of termination shall thereafter be forfeited
the contractor being entitled only to monies expended and services performed up to
and including the date of termination.
SECTION 103 AWARD AND EXECUTION OF CONTRACT
103.01 - AWARD OF CONTRACT: Award of contract will be made by the Owner, upon
the recommendation of the Department to the lowest responsible bidder meeting the
requirements of the Oklahoma "Public Competitive Bidding Act". The award of contracts
involving the expenditure of federal funds is contingent on concurrence of the federal
agency or any other agency whose funds are being used. The award, if made, will be
within thirty (30) calendar days after the opening of proposals.
10302 — CANCELLATION OF AWARD: The Owner reserves the right to cancel the award
of any contract at any time before the execution of said contract without any liability
against the Owner /City of Owasso.
103.03 - RETURN OF PROPOSAL GUARANTIES: The guaranty deposited with bids will be
returned to unsuccessful bidders within fourteen (14) days after the Bid Opening. The
guaranty of the successful bidderwill be retained until after the contract is executed and
bonds approved, after which it will be returned. The Proposal Guaranty of any Bidder
28
whom Owner believes to have a reasonable chance of receiving the award, may be
retained by Owner until after the contract of the successful bidder is executed and the
bonds approved.
103.04 - INSURANCE AND BONDS: The successful bidder will be required to carry such
compensation and public liability insurance as may be required under the laws of the
State of Oklahoma and shall execute and furnish a statutory surety bond guaranteeing
that the contractor shall pay all indebtedness incurred for materials and labor furnished
in the performance of the contract in a sum equal to one hundred percent (100 %) of the
contract price. The successful bidder shall furnish a performance surety bond in the
amount of one hundred percent (100 %) of the contract guaranteeing the proper and
prompt completion of the work in accordance with the provisions of the contract and
the plans and specifications. The successful biddershall also furnish a maintenance bond
in the amount of one hundred percent (100 %) of the contract, guaranteeing public
improvement projects for two (2) years against defective workmanship and materials
from the date of acceptance of the project. CONTRACTOR MUST USE THE BOND FORMS
SUPPLIED IN THIS DOCUMENT and MAY ATTACH SAID BOND.
The contractor (and any subcontractors) shall carry and keep in force during this
contract, policies of public liability insurance, including any contractual liability assumed
under this contract, in the minimum amounts set forth below, and workmen's
compensation and employers liability insurance in the amounts required by law. The
contractor shall also furnish an Owner's Protective Policy in the same amounts with the
Owner as the named insured, issued by the some insurance company as the issuer of
Contractor's Liability Coverage.
Public Liability, other than automobile:
Personal Injury, each person
$ 100,000.00
Personal Injury, each accident
$1,000,000.00
Property Damage, each person
$ 100,000.00
Property Damage, each occurrence
$ 100,000.00
Automobiles and Trucks; Owned Hired and Non - owned:
Personal Injury, each person
$ 100,000.00
Personal Injury, each accident
$1,000,000.00
Property Damage, each accident
$ 100,000.00
The policy shall provide a clause stating that it cannot be canceled by the insurer without
the insurer first giving the Owner ten (10) day written notice of cancellation. The
contractor shall furnish the Owner an original and duplicate certificate of insurance at
the time contracts are prepared.
10105 - FORFEITURE OF PROPOSAL GUARANTY: The individual, partnership, company or
corporation to whom a contract is awarded shall, within ten (10) days after such contract
is awarded, execute and deliver to the Owner the contract required under such award,
and execute and deliver all bonds required for the protection of the Owner against the
claims of every person whomsoever and against the claims of all persons resulting from
the acts or act, or the omissions or defaults of the contractor, in such amounts as may be
29
required by the Owner. Such bonds to be executed and approved prior to the execution
of said contract by the Owner.
Upon the failure of the bidder to execute said bonds, or any of them, and said contract
within said ten (10) days after the same is awarded, (s)he will be considered to have
abandoned said bid, and the Owner may re -let the same. By reason of the uncertainty
of the market prices of material and labor, and it being impracticable and extremely
difficult to fix the amount of damages and expenses which the Owner would be put to
by reason of said bidder's failure to execute said bonds and contracts within said ten (10)
days, the proposal guaranty accompanying the bid shall be the agreed amount of
damages which the Owner will suffer by reason of such failure upon the part of the
bidder, and shall thereupon immediately be forfeited to the Owner. The filing of a bid
under these instructions will be considered as an acceptance of this provision.
103.06 — PRELIMINARY MATTERS: Before starting construction, the Contractor shall
carefully study and compare the Project Documents and check and verify pertinent
figures therein and all applicable field measurements. Contractor shall promptly report
in writing to the Department any conflict, error, ambiguity, or discrepancy which the
Contractor may discover and shall obtain written interpretation or clarification from the
Department before proceeding with any work affected thereby.
With 10 days after the Notice to Proceed, the Contractor shall submit to the Department
for its timely review:
1. A preliminary progress schedule indicating the times (number of days or dates)
for starting and completing the various stages of the Work, including any
Milestones specified in the Project Documents.
2. A preliminary schedule of Shop Drawings and Sample submittals which will list
each required submittal and the times for submitting, reviewing, and processing
such submittal; and
3. A preliminary schedule of values for all the Work which includes quantities and
prices of items which, when added together, equal the Contract Price and
subdivides the Work into component parts in sufficient detail to serve as the basis
for progress payment during performance of the Work. Such prices will include
an appropriate amount of overhead and profit applicable to each item of Work.
103.07 — PRECONSTRUCTION CONFERENCE: Within 20 days from Notice to Proceed, but
before any Work at the site is started, a conference attended by the Contractor,
Department, and others as appropriate will be held to establish a working understanding
among the parties as to the Work and to discuss the schedules referred in paragraph
103.07, procedures for handling Shop Drawings and other submittals, processing
applications for payment and maintaining required records. At the present time, the
OWNER has not set aside a particular area to store materials and heavy equipment. At
the pre - construction conference, specific locations will be presented by the Contractor
for approval by the Department.
30
SECTION 104 SCOPE OF WORK
104.01 - INTENT OF CONTRACT: The intent of the contract is to provide for the construction
and completion in every detail of the work described. The contractor shall furnish all
labor, materials, equipment, tools, transportation, and supplies required to complete the
work in accordance with the plans, specifications, and terms of the contract.
104.02 - ALTERATION OF PLANS OR CHARACTER OF WORK: The Owner reserves the right
to make at any time during the progress of the work, such increases or decreases in
quantities an such alterations in the details of construction, including alterations in the
grade or alignment of the road or structure or both, as may be found to be necessary or
desirable. Such increases or decreases and alterations shall not invalidate the contract
nor release the surety, and the contractor agrees to accept the work as altered, the
some as if it had been a part of the original contract.
All claims, disputes and other matters in question between Owner and Contractor arising
out of, or relating to, the Project Documents or the breach thereof are not subject to
arbitration. The Owner will be the sole judge in all claims and disputes.
104.03 - EXTRA WORK: The contractor shall perform unforeseen work, for which there is
no price included in the contract, whenever it is deemed necessary or desirable in order
to complete fully the work as contemplated. Such work shall be performed in
accordance with the specifications as directed in writing by the Department and will be
paid for as provided under extra or force account work.
104.04 - MAINTENANCE OF TRAFFIC: The project, while undergoing improvements, shall
be kept open to all traffic by the contractor unless approved otherwise in writing by the
Department. Temporary traffic control devices shall be furnished and maintained by the
contractor. Methods of traffic control, including a traffic control plan, shall be submitted
by the Contractor for approval before construction activities begin. All traffic control
devices shall conform to the most recent Manual for Uniform Traffic Control Devices
(MUTCD).
10405 - REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS: All materials,
structures, or obstructions found on the project which are not to remain in place, orwhich
are not to be used in the new construction shall be carefully dismantled and salvageable
materials stored in accessible locations as directed by the Department. Unless specified
on the plans or in the proposal, this work will not be paid for separately but will be
included in the price bid for other items. Unless otherwise shown, materials not
considered salvageable for use by the Owner or not incorporated in the work shall
become the property of the contractor and shall be removed from the work site in a
timely manner and disposed of by him /her.
104.06 - SITE MAINTENANCE: The work site shall be kept free from construction debris. At
the end of each work shift, the site shall be policed for objectionable debris which could
be deposited off site by wind or storm runoff. Other materials for use in the construction
of the project shall be maintained in orderly storage and protected from elements which
could hinder incorporation into the work.
31
104.07 - CONTROL OF STORM RUNOFF: The contractor shall take preventive measures to
minimize polluted runoff from the work site. Pollution includes, but is not limited to, silt or
mud from disturbed area, construction debris, any petroleum products, or other
objectionable materials. The contractor shall correct immediately any violation of this
paragraph under current state and local ordinances. Failure to comply may result in shut
down of all work as directed by the Department.
104.08 - FINAL CLEAN UP: Upon completion of the work and before acceptance and
final payment will be made, the contractor shall remove from the right -of -way all
machinery, equipment, surplus and discarded materials, rubbish, temporary structures
and stumps or portions of trees. Contractor shall cut all brush and weeds Within the limits
of the right -of -way and shall leave the project and borrow pits in a neat condition.
Material, cleared from the right -of -way will not be considered as having been disposed
of satisfactorily. The contractor shall leave any areas or slopes, where any work is
performed, in a neat and workmanlike condition. Contractor shall repair at their own
expense and to the satisfaction of the Department, any areas, slopes, or turfing that have
been damaged by the Contractor operations.
SECTION 105 CONTROL OF WORK
105.01 — AUTHORITY OF THE CONTRACTOR: The Contractor shall supervise, inspect, and
direct the Work competently as efficiently devoting such attention thereto and applying
such skills and expertise as may be necessary to perform the Work in accordance with
the Project Documents. Contractor shall be responsible to see that the completed Work
complies accurately with the Project Documents.
105.02 - AUTHORITY OF THE DEPARTMENT: The Department's status during construction is
to assist the Owner in answering questions which may be brought forth by the Contractor
during construction. However, final decisions will be made by the Owner. The
Department will decide all questions which may arise as to the quality and acceptability
of materials furnished and work performed and as to the rate of progress of the work; all
questions which may arise as to the interpretation of the plans and specifications; all
questions as the acceptable fulfillment of the contract on the part of the contractor. The
Department Will have the authority to suspend or change the sequence of work wholly
or in part due to the failure of the contractor to correct conditions unsafe fort he workmen
or the general public; for failure to carry out provisions of the contract; for failure to carry
out orders; for such periods as deemed necessary due to the unsuitable weather; for
conditions considered unsuitable for prosecution of the work or for any other condition
or reason deemed to be in the public interest. If the contractor ignores the authority of
the Department under subsection 105.01, the Department may withhold partial
payments due the contractor upon due notice in writing.
Any notice to any Contractor from the Owner relative to any part of this Contract shall
be in writing and considered delivered and the service thereof completed, when said
notice is posted, by certified or registered mail, to the said Contractor at his /her last given
address or delivered in person to said Contractor or his /her authorized representative on
the work.
32
105 03 - PLANS AND WORKING DRAWINGS: The Owner shall furnish the Contractor with
three (3) sets of Plans and Specifications at no cost to the Contractor. Plans will show
details of all structures, lines, grades, typical cross sections of the roadway, location, and
design of all structures. The contractor shall always keep one set of plans available on
the work. The plans will be supplemented by such working drawings as are necessary to
adequately control the work. Working drawings for structures shall be furnished by the
contractor and shall consist of such detailed plans as may be required to adequately
control the work and are not included in the plans furnished by the Owner. They shall
include stress sheets, shop drawings, erection plans, false -work plans, cofferdam plans,
bending diagrams for reinforcing steel or any other supplementary plans or similar data
required of the contractor. All work drawings must be approved by the Department and
such approval shall not operate to relieve the contractor of any of his /her responsibility
under the contract for the successful completion of the work. The contract price will
include the cost of furnishing all working drawings.
After the Awarding of Contract and prior to the Pre - Construction Conference, the
Contractor shall furnish copies of each submittal required, along with a list of all
subcontractors, telephone numbers, addresses, etc. Exceptions will be made on an
individual basis concerning submittal time frames if manufacturer needs additional time.
Generally, Notice to Proceed will be issued once the City Attorney has approved the
contract and all bond, and the submittals and list of subcontractors have been
submitted.
105.04 - CONFORMITY WITH PLANS AND SPECIFICATIONS: All work performed, and all
materials furnished shall be in reasonably close conformity with the lines, grades, cross
sections dimensions and material requirements, including tolerances, shown on the plans
or indicated in the specifications.
In the event the Department finds the materials or the finished product in which the
materials are used, or the work performed are not in reasonably close conformity with
the plans and specifications and have resulted in an inferior or unsatisfactory product,
the work or materials shall be removed and replaced or otherwise corrected by and at
the expense of the contractor.
105.05 COORDINATION OF PLANS SPECIFICATIONS SUPPLEMENTAL SPECIFICATIONS
AND SPECIAL PROVISIONS: These specifications, the supplemental specifications, the
plans, special provisions, and all supplementary documents are essential parts of the
contract, and a requirement occurring in one is as binding as though occurring in all.
They are intended to be complimentary and to describe and provide for a complete
work.
The contractor shall take no advantage of any apparent error or omission in the plans or
specifications. In the event the contractor discovers such an error or omission, they shall
immediately notify the Department. The Department will then make such corrections
and interpretations as may be deemed necessary for fulfilling the intent of the plans and
specifications.
33
105 06 - COOPERATION BY CONTRACTOR: The contractor shall give the work the constant
attention necessary to facilitate the progress thereof, and shall cooperate with the
Department, his /her inspectors, and other contractors in every way possible.
The contractor shall always have on the work, as his /her agent, a competent
superintendent capable of reading and thoroughly understanding the plans and
specifications and thoroughly experienced in the type of work being performed, who
shall receive instructions from the Department or his /her authorized representatives. The
superintendent shall have full authority to execute order or directions of the Department
without delay, and to promptly supply such materials, equipment, tools, labor, and
incidentals as may be required. Such superintendence shall be furnished irrespective of
the amount of work sublet.
105.07 - PROTECTION OF PROPERTY: The protection of City, State and Government
monuments, street signs and other City property is of prime importance, and if the same
be damaged, destroyed, or removed, they shall be repaired, replaced, or paid for by
the contractor. Disturbance to this property must first be approved by the agency which
controls it.
At places where the contractor's operations are adjacent to the plant of railway,
telegraph, telephone, electric, gas water, sanitary sewers, or storm sewers, damage to
which might result in expense, loss, or inconvenience, work shall not be commenced until
all arrangements for relocation or revisions have been made.
The Owner has attempted to locate all storm sewers, culverts, and buried telephone or
electrical conduits, sanitary sewers, water mains, and gas mains that might interfere with
the construction of this project. The contractor shall cooperate with fhe owners of any
underground or overhead utility lines in their removal and rearrangement operations in
order that these operations may progress in a reasonable manner and duplication, or
rearrangement work may be reduced to a minimum and that services rendered by those
parties will not be unnecessarily interrupted. The revision and crossings of the various
types of lines shall be made as follows:
A. Storm sewers and culverts may be removed at the time of crossing or may be
adequately braced and held in position while the pipe is placed beneath them. If the
storm sewer or culvert is removed, it shall be replaced with pipe of the some type and
size as that removed and it shall be rejoined to the undisturbed line with a joint satisfactory
to the Department. Backfill over and around the storm sewer shall be thoroughly
compacted in order that no settlement will occur. The revision and crossing shown on
the drawing shall be at the expense of the contractor. In the event line other than those
shown on the drawing are encountered and fall within the standard trench limit or within
12" of subgrade and, in the opinion of the Department, revision of the line is necessary for
the construction of the project, the contractor will be reimbursed for the extra cost of the
crossings or revision, provided the Owner can't fix the problems themselves.
B. All overhead and buried telephone and electrical conduits and gas mains to
be revised or crossed by the construction of this project shall be protected in accordance
with the directions of the utility company owning the conduits and /or mains. The
34
contractor shall notify the companies and obtain their permission before making any
crossing or revisions. In the event lines other than those shown on the drawing are
encountered, and in the opinion of the Department revision of the line is necessary for
the construction of the project, the contractor will be reimbursed for the extra cost of the
crossing or revision provided the utility can't fix the problem themselves. Any overhead
cables, buried cables, conduits or gas mains shown on plans and damaged by the
contractor shall be repaired, at his /her expense, to the satisfaction of the Department
and of the utility.
C. The contractor shall not remove any water or sanitary sewer lines except as
directed by the Department or as required by the drawing and specification and shall
adequately brace and protect them from any damage during construction. Any existing
water main or sewer main or lateral damaged by the contractor's operations will be
repaired by the Owner's maintenance forces at the Contractor's expense. The
contractor shall notify the Owner immediately after damaging any pipe.
The location of utility lines serving individual properties may or may not be shown on the
drawings. All plans have been reviewed by the respective owners of the utilities and
locations have been verified. If service lines are encountered which are not shown on
the plans or are shown in the wrong location, the contractor shall notify the owner of the
utility and the Department for relocation of the lines. If the lines are broken or damaged
from construction and were not shown or were shown erroneously, the contractor shall
not be liable for the cost of repairs.
105.08 - COOPERATION BETWEEN CONTRACTORS: The Owner reserves the right at any
time to contract for and perform other or additional work on or near the work covered
by the contract.
When separate contracts are let within the limits of any one project, each contractor
shall conduct his /her work to minimize interference with the progress or completion of the
work being performed by other contractors. Contractors working on the same project
shall cooperate with each other as directed.
Each contractor involved shall assume liability, financial or otherwise, in connection with
his /her contract and shall protect and save harmless the Owner from all damages or
claims that may arise because of inconvenience, delay or loss experienced by him /her
because of the presence and operations of other contractors working within the limits of
the same project.
The contractor shall arrange his /her work and shall place and dispose of the materials
being used to minimize interference with the operations of the other contractors within
the limits of the same project. The Contractor shall join their work with that of the others
in acceptable manner and shall perform it in proper sequence to that of the others.
105.09 - CONSTRUCTION STAKES, LINES AND GRADES: Unless otherwise shown on plans,
the Contractor will set vertical and horizontal controls provided by the Consultant or
Department or shown on the construction plans. It shall be the responsibility of the
35
contractor to confer with the Consultant or Department and satisfy himself /herself as to
the accuracy of the controls prior to the commencement of work.
It shall also be the responsibility of the contractor to protect and maintain those controls
and to replace immediately any or all controls should they be damaged or altered in
any manner.
From these vertical and horizontal controls, the contractor shall layout and stake the
project for construction in accordance with construction plans and in a manner that is
satisfactory to the Department prior to setting forms or batter boards. From these vertical
and horizontal controls, the contractor shall provide competent personnel to layout the
project in accordance with construction plans.
10510 - INSPECTION OF WORK: Inspectors employed by the Department will be
authorized to inspect all work done and materials furnished. Such inspection may extend
to all or any part of the work and to the preparation, fabrication or manufacture of the
materials to be used. The inspector will not be authorized to alter or waive the provisions
of the contract.
All materials and each part or detail of the work shall be subject to inspection by the
Department. The Department shall be allowed access to all parts of the work and shall
be furnished with such information and assistance by the contractor as is required to
make a complete and detailed inspection.
If the Department requests it, the contractor, at any time before acceptance of the work,
shall remove or uncover such portions of the finished work as may be directed. After
examination, the contractor shall restore said portions of the work to the standard
required by the specifications. Should the work thus exposed or examined prove
acceptable, the uncovering, or removing, and the replacing of the covering or making
good of the parts removed will be paid for as extra work but should the work so exposed
or examined prove unacceptable, the uncovering or removing, and the replacing of
covering or making good of the parts removed, will be at the contractor's expense.
Any work done or materials used without inspection by the Owner's representative may
be ordered removed and replaced at the Contractor's expense. The Department must
be notified within twenty -four (24) hours before placement of any concrete, asphalt, or
pipe and an inspector must be present during these operations. The inspector will not be
authorized to issue instructions contrary to the plans and specifications, or to act as
foreman for the contractor.
105.11 - REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK: All work which does
not conform to the requirements of the contract will be considered as unacceptable.
Unacceptable work, whetherthe results of poor workmanship, use of defective materials,
damage through carelessness, or any other cause, shall be removed immediately and
replaced in an acceptable manner.
Work done contrary to the instructions of the Department, work done beyond the line
shown on the plans, or any extra work done without authority, will be considered as
36
unauthorized and will not be paid for under the provisions of the contract. Work so done
may be ordered removed or replaced at the contractor's expense.
Upon failure on the part of the contractor to comply with any order of the Department
made under the provisions of this article, the Department will have the authority to cause
unacceptable work to be remedied or removed and replaced and unauthorized work
to be removed and to deduct the costs from any monies due or to become due to the
contractor.
Any defects in workmanship or materials will be corrected by the CONTRACTOR at no
additional expense to the OWNER. All adjustments called to the attention of the
CONTRACTOR by the OWNER will be corrected within a reasonable time. The term
"reasonable" will be interpreted as being within thirty (30) days or less, unless the OWNER
agrees to extend this schedule.
105.12 - LOAD RESTRICTIONS: The contractor shall comply with all legal load restrictions
in the hauling of materials on public roads beyond the limits of the project. A special
permit will not relieve the contractor of liability for damage which may result from the
moving of equipment.
The operation of equipment of such weight or so loaded as to cause damage to
structures or the roadway or to any other type of construction will not be permitted.
Hauling of materials over the base course or surface course under construction shall be
limited as directed. No loads will be permitted on a concrete pavement, base or
structure before the expiration of the curing period. The contractor shall be responsible
for all damage done by his /her hauling equipment.
105.13 - MAINTENANCE DURING CONSTRUCTION: The contractor shall maintain the work
during construction and until the project is accepted. This maintenance shall constitute
continuous and effective work prosecuted day by day, with adequate equipment and
forces to the end that the construction will be always kept in satisfactory condition.
All cost of maintenance work during construction and before the project is accepted
shall be included in the unit prices bid on the various pay items and the contractor will
not be paid an additional amount for such work.
105.14 - FAILURE TO MAINTAIN CONSTRUCTION: If the contractor, at any time, fails to
comply with the provisions of maintenance, the Department will immediately notify the
contractor of such non - compliance. If the contractor fails to remedy unsatisfactory
maintenance within 24 hours after receipt of such notice, the Department may
immediately proceed to maintain the project, and the entire cost of this maintenance
Will be deducted from monies due or to become due the contractor on this contract.
10515 - FINAL INSPECTION: Upon due notice from the contractor of presumptive
completion of the entire project, the Department will inspect with the contractor. If all
construction provided for and contemplated by the contract is found completed to
his /her satisfaction, that inspection shall constitute the final inspection.
37
If, however, the inspection discloses any work, in whole or in part, as being unsatisfactory,
the Department will give the contractor the necessary instructions for correction of same,
and the contractor shall immediately comply with and execute such instructions. Upon
correction of the work, another inspection will be made which shall constitute the final
inspection provided the work has been satisfactorily completed.
SECTION 106 CONTROL OF MATERIAL
106.01 - SOURCE OF SUPPLY AND QUALITY REQUIREMENTS: The materials used on the work
shall meet all quality requirements of the contract. In order to expedite the inspection
and testing of materials, the contractor shall notify the Department of his /her proposed
sources of materials prior to delivery. At the option of the Department, materials may be
approved at the source of supply before delivery is started. If it is found after trial that
sources of supply for previously approved materials do not produce specified products,
the contractor shall furnish materials from other sources.
106.02 - SAMPLES. TESTS. CITED SPECIFICATIONS: All materials will be inspected, tested and
accepted by the Department before incorporation in the work. Any work in which
untested and unaccepted materials are used without approval or written permission of
the Department shall be performed at the contractor's risk and may be considered as
unacceptable and unauthorized.
All materials required to be tested by a private laboratory shall be approved by the
Department. Reports of such tests shall be forwarded to the Department.
106.03 - PLANT INSPECTION: The Department may undertake the inspection of materials
at the source. In the event plant inspection is undertaken, the following conditions shall
be met:
A. The Department shall have the cooperation and assistance of the contractor
and the producer with whom (s)he has contracted for materials.
B. The Department shall always have full entry to such parts of the plant as may
concern the manufacture or production of the materials being furnished.
C. If required by the Department, the contractor shall arrange for an approved
building for the use of the inspector, such building to be located conveniently near the
plant, independent of any building used by the material producer.
D. Adequate safety measures shall be provided and maintained.
It is understood that the Owner reserves the right to retest all materials prior to
incorporation into the work which have been tested and accepted at the source of
supply after the some have been developed and to reject all materials which, when
retested, do not meet the requirements of these specifications.
106.04 - UNACCEPTABLE MATERIALS: All materials not conforming to the requirements of
the specification shall be considered as unacceptable and all such materials will be
38
rejected and shall be removed immediately from the site of the work unless otherwise
instructed by the Depart ment. No rejected material, the defects of which have not been
corrected, shall be used until approval has been given.
SECTION 107 LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC
107.01 - LAWS TO BE OBSERVED: The contractor shall keep fully informed of all Federal
and State laws, all local laws, ordinances, and regulations and all orders and decrees of
bodies or tribunals having any jurisdiction or authority, which in any manner may affect
those engaged or employed on the work, or which in any way affect the conduct of the
work. The Contractor shall at all times observe and comply with all such laws, ordinances,
regulations, orders and decrees; and shall protect and indemnify the Owner and its
representatives against any claim or liability arising from or based on the violation of any
such law, ordinance, regulations, order, or decree, whether by himself /herself or his /her
employees.
107.02 - PATENTED DEVICES, MATERIALS AND PROCESSES: If the contractor employs any
design, device, material, or process covered by letters of patent or copyright, they shall
provide for such use by suitable legal agreement with the patentee or owner. The
contractor and the surety shall indemnify and save harmless the Owner, any affected
third party from any and all claims for infringement by reason of the use of any such
patented design, device, material, or process, or any trademark or copyright, and shall
indemnify the Owner for any costs, expenses, and damages which it may be obliged to
pay by reason of any infringement, at any time during the prosecution or after the
completion of the work.
107.03 - PUBLIC CONVENIENCE AND SAFETY: The contractor shall comply with all
applicable Federal, State, and local laws governing safety, health and sanitation. The
contractor shall provide all safeguards, safety devices and protective equipment and
take any other needed actions, on his /her own responsibility or as the Department may
determine, reasonably necessary to protect property in connection with the
performance of the work covered by the contract.
Materials stored upon the roadway shall be so placed and the work shall, at all times, be
so conducted as to cause no greater obstruction to the traveling public than is
considered necessary by the Department.
107.04 - USE OF EXPLOSIVES: When the use of explosives is necessary for the prosecution
of the work, the contractor shall exercise the utmost care not to endanger life or property,
including new work. The contractor shall be responsible for all damage resulting from the
use of explosives.
In handling explosives used during the construction of the project, the contractor shall
adhere to all Federal and State laws and City ordinances regulating the purchase,
transportation, storage, handling and use of such explosives. No blasting shall be done
without the approval of the Department.
39
107 05 - CONTRACTOR'S RESPONSIBILITY FOR WORK: The performance of the contract
and the work, as well as the full dollar amount of the contract, is at the risk of the
contractor. The contractor shall take all responsibility of the work, and shall bear all losses
from any cause whatsoever, including, but not limited to, losses resulting because of the
amount or character of the work, or because the nature of the land in or on which the
work is done is different from what is assumed or expected, or on account of the weather,
floods, fire, windstorm, or other actions of the elements, or any cause or causes
whatsoever for which the Owner is not responsible.
If the work or any part or parts thereof is destroyed or damaged from any of the aforesaid
causes prior to Owner's final acceptance of same, the contractor, at contractor's
expense, shall restore the some or remedy the damage.
The Consultant or Department will provide necessary datum to begin construction,
however, it shall be the responsibility of the Contractor to provide all grade stakes, etc.
along with any surveying needed to produce a finished product. The Contractor will be
responsible for supplying copies of all field notes gathered in determining grades, etc.
during the construction of this project.
SECTION 108 PROSECUTION AND PROGRESS
108 01 - ASSIGNMENT AND SUBLETTING OF CONTRACT:
A. The contractor shall give his /her personal attention to the fulfillment of this
contract, and shall not let, assign, or transfer it or his /his right, title, or interest in or to the
same or any part thereof, by attorney or otherwise, or sublet any part of the work to any
other person without the previous consent of the Owner in writing.
B. Should any subcontractor fail to perform in a satisfactory manner the work
undertaken by him /her, his /her subcontract shall be immediately terminated by the
contractor upon notice from the Owner. The contractor shall be as fully responsible to
the Owner for the acts and omissions of persons directly employed by them, as (s)he is
for the acts and omissions of persons directly employed by him /her. Nothing contained
in these Project Documents shall create any contractual relationship between any
subcontractor and the Owner.
108.02 - TIME AND PROGRESS:
A. The work shall be commenced on or after the date of the Notice to Proceed
from the Owner. The contractor agrees that the work shall be prosecuted regularly,
diligently, and uninterruptedly at a uniform rate of progress so as to ensure completion
within the number of days stated in the Bid Proposal. It is expressly understood and
agreed that the said time for the completion of the work described herein is a reasonable
time for the completion of the same.
B. The contractor is required to furnish the Department with progress schedules,
in a format approved by the Department, setting forth in detail the procedure (s)he
proposes to follow, and giving the dates on which (s), he expects to start and to complete
separate portions of the work. If at any time, in the opinion of the Department, proper
progress is not being maintained, such changes shall be made in the schedule of
40
operations which will satisfy the Department that the work will be completed within the
period stated in the proposal.
C. Except as otherwise required for the safety or protection of persons or the Work
or property at the site or adjacent thereto, and except as otherwise stated in the Project
Documents, all Work shall be performed during regular working hours, and the Contractor
will not permit overtime work or the performance of Work on Saturday, Sunday, or any
legal holiday without the Owner's written consent (which will not be unreasonably
withheld) given after prior written notice to the Engineer. The Contractor is to
compensate the Owner for any charges incurred by the Owner for the inspection of the
Work outside regular business hours.
D. If the contractor shall fail to complete the work within the specified, then the
contractor agrees to pay to the Owner, not as penalty, but as liquidated damages for
such breach of contract, the sum specified in the Agreement for each day of failure to
complete the work after the specified time set forth in the Bid Proposal. The said amount
is fixed and agreed upon because of the impracticability and extreme difficulty of fixing
and ascertaining the actual damage the Owner would in such event sustain.
E. It is further agreed that time is of the essence of each and every portion of this
contract and the specifications wherein a definite and certain time is fixed for the
performance of any act whatsoever; and where under the contract an allowance of
additional time for the completion of any work is made, the new time fixed by such
extension shall be of the essence of this contract.
F. Should the contractor be delayed in the final completion of the work by any
act or neglect of the Owner or Consultant, or of any employees of either, or by strikes,
injunctions, fire, or other cause or causes outside of and beyond the control of the
contractor and which, in the opinion of the Department, could have been neither
anticipated nor avoided, then an extension of time sufficient to compensate for the
delay, as determined by the Department, shall be granted by the Owner, provided,
however, that the contractor shall give the Owner and the Department notice in writing
of the cause of the delay in each case within ten (10) days after the delay.
G. Time extensions may be granted for unusually inclement weather occurring
more often than anticipated at the project location during any given month.
Anticipated weather delays (days) included in the contract period at time of award are
based on the following:
41
Monthly Anticipated Adverse Weather Delay
Workdays Based on Five (5) Day Work Week
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
10 6 8 6 6 4 3 3 6 5 3 6
The contractor's progress schedule must include these anticipated adverse weather
delays in all weather - dependent activities. Time extensions to the contract period will be
granted only under the following conditions.
1. The delay has been documented with Owner in a timely manner and
Owner agrees that the delay occurred, and
2. The delay affects work in progress and causes a delay in project
performance.
H. Extensions of time will not be granted for delays caused by inadequate or
insufficient construction force or the failure of the contractor to place orders for
equipment or materials a sufficient time in advance to ensure delivery when needed.
Any extension of time by the Owner shall not release the contractor and surety herein
from the payment of liquidated damages for a period of time not included in the original
contract or the time extension as herein provided.
I. Failure to complete project within specified time, as set forth in this contract,
may be grounds for disqualification for future consideraffon for contracts with the City of
Owasso.
108,03 - CHARACTER OF WORKERS METHODS AND EQUIPMENT: The contractor shall
always employ sufficient labor and equipment for prosecuting the several classes of work
to full completion in the manner and time required by these specifications.
All workers shall have sufficient skill and experience to perform properly the work assigned
to them. Workers engaged in special work or skilled work shall have sufficient experiences
in such work and in the operation of the equipment required to perform all work properly
and satisfactorily.
Any person employed by the contractor or by any subcontractor who does not perform
his /her work in a proper and skillful manner or is intemperate or disorderly shall, at the
written request of the Department, be removed forthwith by the contractor or
subcontractor employing such person and shall not be employed again in any portion
of the work without the approval of the Department.
Should the contractor fail to remove such person or persons as required above or fail to
furnish suitable and sufficient personnel for the proper prosecution of the work, the
Department may suspend the work by written notice until such orders are complied with.
108.04 - LIMITATION OF OPERATIONS: contractor shall always conduct the work in
such a manner and sequence to the satisfaction of the Department. (S)he shall not open
up work to the prejudice or detriment of work already started. The Department may
42
require the contractor to finish a section on which work is in progress before work is started
on any additional sections if the opening of such section is in the public interest orwelfare.
108.05 - CONTRACTOR'S RIGHT OF PROTEST: If the contractor considers any work
demanded of him /her to be outside the requirements of the contract, or considers any
record or ruling of the Department to be unfair, (s)he shall, immediately upon such work
being demanded or such record or ruling being made, ask for written instructions or
decisions, whereupon (s)he shall proceed without delay to perform the work or to
conform to the record or ruling. Within ten (10) days after the date of receipt of written
instructions or decisions, (s)he shall file a written protest with the Department, stating
clearly and in detail the basis of his /her objections. Exceptforsuch protest and objections
as are made of record in the manner herein specified and within the time stated, the
records, rulings, instructions, or decision of the Department shall be final and conclusive.
108.06 - RIGHT OF OWNER TO TERMINATE CONTRACT: If the work to be done under this
contract shall be abandoned by the contractor, or if this contract shall be assigned by
him /her otherwise than as herein provided, or if the contractor should be adjudged as
bankrupt, or if a general assignment of his /her assets be made for the benefit of his
creditors, or a receiver should be appointed for the contractor or any of his /her property;
or if at any time the Department shall certify in writing that the performance of the work
under this contract is being unnecessarily delayed, or that the contractor is willfully
violating any of the conditions or covenants of this contract or the specifications
therefore, or that (s)he is executing the some in bad faith or otherwise not in accordance
With the terms of this contract; or if the work be not substantially completed within the
time named for its completion, or within the time to which such completion date may be
extended then the Owner may serve written notice upon the contractor and his /her
surety of said Owner's intention to terminate this contract, and unless within five (5) days
after the serving of such notice upon the contractor a satisfactory arrangement is made
for the continuance thereof, this contract shall cease and terminate. In the event of such
termination, the Owner shall immediately serve notice thereof upon the surety and
contractor, and the surety shall have the right to take over and complete the work,
provided, however, that if the surety does not commence performance thereof within
thirty (30) days from the date of said notice of termination, the Owner may take over the
work and prosecute some to completion, by contract, or otherwise for the account and
at the expense of the contractor; and the contractor and his /her surety shall be liable to
the Owner for any and all cost sustained by the Owner by reason of such prosecution
and completion. In such event the Owner may take possession of, and utilize in
completing the work, all such materials, equipment, tools and plant as may be on the
site of the work and necessary, therefore.
108.07 - FINAL ACCEPTANCE: It shall be the duty of the Department to determine when
the work is completed and the contract fulfilled, and to recommend its acceptance by
the Owner. The work therein specified to be performed shall not be considered finally
accepted until all the work has been accepted by the City of Owasso and /or Owasso
Public Works Authority.
43
SECTION 109 MEASUREMENT AND PAYMENT
109.01 - PAYMENT FOR CONTRACTOR'S PLANT AND MISCELLANEOUS ITEMS: For providing
plant, tools, and equipment; for furnishing, erecting, maintaining and removing the
construction plant, construction roads, camps, sanitary convenience, temporary water
supply, de- watering and other temporary works; for furnishing insurance, bonds,
drawings, records, payment of fees, defense of suits, and any all incidental requirements,
whether or not they are enumerated in this paragraph, the contractor shall receive no
direct payment. Compensation for them shall be considered as having been included
In the prices stipulated for the bid items, the payment forwhich, calculated in the manner
specified, shall constitute the total compensation due contractor for the performance of
this contract.
109.02 - METHOD OF MEASUREMENT AND BASIS OF PAYMENT FOR ITEMS OF WORK: The
contractor shall be paid for all work performed under the contract based on the
Department's computations of as -built quantities and the contractor's unit price or lump
sum per bid item. This payment shall be full compensation for furnishing all supplies,
materials, tools, equipment, transportation, and labor required to do the work; for all loss
or damage, because of the nature of the work, from the action of the elements or from
any unforeseen obstruction or diff iculty which may be encountered in the prosecution of
the work, and for which payment is not specifically provided; for all expenses incurred by
or because of any suspension or discontinuance of all or any part of the work; and for
well and faithfully completing the work according to the Project Documents and the
requirements of the Department.
109.03- PAYMENTS: If the work is progressing in a satisfactory manner the Contractor shall
prepare an estimate for partial payment per EXHIBIT "B" deadlines of the work completed,
provided said payment is not less than $1,000.00. An estimate for partial payment shall
include items incorporated in the work. The Owner will retain ten percent (10 %) of the
amount due until in excess of fifty percent (50 %) of the contract has been completed.
At that time, Owner shall pay an amount sufficient to increase total payments to ninety -
five (95 %) of the contract price until the final completion and acceptance of all work
included in this contract. Partial payment does not constitute acceptance of that
portion of the work.
Owner has complete responsibility for payment review and approval during construction.
The Contractor's application for progress payments will be made on the form presented
as Exhibit "A" of the Agreement and they will be submitted in accordance with the
payment schedule presented as Exhibit "B" of the Agreement.
When the work has been completed, the Department shall carefully measure and
determine the as -built quantities of each class of work as shown in the schedule of bid
items and such extra work performed by order of the Department. The aggregate cost
of the work done, and the materials furnished shall constitute the amount due for the
completed work. All prior estimates and payments shall be subject to correction in the
final estimate and payment.
44
109.04 - EXTRA WORK:
A. When and as ordered in writing by the Department, the contractor shall do
any work or furnish any materials which cannot reasonably be classified under any of the
items of the contract but which may be found necessary in order to carry out and
complete more fully the work herein agreed to be done and performed; and the
contractor hereby agrees to accept, as full compensation for such extra work, lump sums
or unit prices agreed upon in writing before said work is commenced.
B. Whenever, in the judgment of the Department, it is impracticable because of
the nature of the work or for any other reason to agree upon lump sums or unit prices,
the extra work and materials shall be paid for at actual necessary cost as determined by
the Department, plus fifteen percent (15 %), which fifteen percent (15 %) is hereby
understood and agreed to include all cost of general superintendence, general
expense, overhead, and profit. The actual necessary cost will include expenditures for
material, labor, foremen, insurance, bond premiums, social security, and supplies
furnished by the contractor, and a rental allowance for equipment, where required, to
be agreed upon in writing before the work is begun, but will, in no case, include any
allowance for office expense, general superintendence or other general expense.
C. The contractor shall, on or before the tenth day of the month succeeding that
in which any extra work shall have been performed, file with the Department an account
giving the itemized cost of such extra work, and shall give the Department access to all
accounts, bills, and vouchers relating thereto. In case the contractor fails to file, within
the time above mentioned, such accounts for extra work, (s) he will be deemed to have
performed such extra work without charge and shall be entitled to no compensation,
therefore.
D. The contractor shall file with the Department, certified lists in duplicate, of any
equipment and the schedule of pay rates for common and semi - skilled labor and
operators of various classes which are intended to be used in performing the work
covered by this contract. These rates shall be subject to approval of the Department for
computation of extra work as mentioned above, however, if the contractor fails to file
these lists with the Department prior to starting any work covered by contract, then the
Department's computations shall be based on average wages and rates paid on City
work.
109.05 - PAYMENT OR ACCEPTANCE NOT A WAIVER BY OWNER: Neither acceptance by
the Owner or the Department, or any employee of either, nor any order by the Owner
for payment of money, or the payment thereof, nor any taking of possession by Owner,
nor the granting of any extension of time, shall operate as a waiver of any rights or powers
of Owner hereunder, and in the event that after the work hereunder has been accepted
and final payment made, it should be discovered that any part of this contract has not
been fully performed or has been done in a faulty or improper manner, the contractor
shall immediately remedy such defect, or in the event of neglect to do so within a
reasonable time after notice thereof, shall be liable for the damage caused thereby, as
Owner may elect. The acceptance of the work or final payment therefore shall be no
bar to suit against the contractor or surety, or both.
45
109 .06 - CONTRACTOR'S OBLIGATION AFTER ACCEPTANCE: Contractor further agrees
without cost other than is specially provided for in this contract, at anyond all times during
the guaranty period following the completion and final acceptance of the work
embraced in this contract, without notice from Owner, to refill all trenches or ditches that
may sink or settle; and to repair all breaks or failures that may occur in the construction
work due to defective material or workmanship; and to indemnify, save harmless and
defend Owner from any and all suits and actions of every description brought against
the Owner for, or on account of injuries or damages alleged to have been received or
sustained by any party or parties by reason of, or arising out of the failure of contractor
to refill all trenches or ditches; and to repair all breaks or failures of said construction work,
which said injuries or damages are alleged to have been received during the guaranty
period from the final acceptance of the work hereunder; and to pay any and all
judgments that might be rendered against the Owner in any suits and actions, together
with such expenses or attorney's fees expended or incurred by the Owner in the defense
thereof.
IN WITNESS WHEREOF, the parties hereby have signed this Agreement in duplicate.
One counterpart has been delivered to CONTRACTOR, the other belongs to OWNER. All
portions of the Project Documents have been signed by OWNER and CONTRACTOR.
This Agreement will be effective on
OWNER: CONTRACTOR:
LYA
By
Kelly Lewis, Mayor
(SEAL) (SEAL)
ATTEST:
Title Juliann M. Stevens, City Clerk Title
APPROVED AS TO FORM & CONTENT:
Julie Trout Lombardi, City Attorney
Address for giving notices:
46
TO: The Honorable Mayor and City Council
FROM: Brian Dempster, Director of Community Development
SUBJECT: Real Property Lease - Garnett Right -of -Way
DATE: February 3, 2023
BACKGROUND:
Over the last few months, City Staff has been working with Mr. Jared James ( Redbud Group,
LLC), concerning a request to lease excess right -of -way (ROW) located immediately to the east
of 9202 North Garnett Road. The subject property would be paved and used for additional
parking for the commercial development located adjacent to the subject property.
ANALYSIS:
• The LLC is seeking to lease an area approximately 0.18 acres in size, to accommodate
an expansion of the parking lot located at 9202 North Garnett Road, where the now -
defunct carwash is located.
• The City is currently leasing another excess ROW parcel, immediately to the south of the
subject property and adjacent to the commercial development located at 507 East 19th
Street North. Said ROW agreement was approved by City Council in late 2022.
• Additionally, the City also leases adjacent excess ROW just to the east of 9100 North
Garnett Road. Said ROW lease contains paved parking to serve the adjacent restaurant
and retail developments.
• Further, the City also leases land adjacent to the water tower located at 9540 North 121 st
East Avenue.
o Both of these existing leases were executed to accommodate additional parking
for the adjacent commercial /office developments.
• The Draft Lease Agreement outlines a fifty (50) year term, with four (4) different options to
renew for ten (10) year periods. The Agreement also states that there will be required
payments equating to $1,168.80 per year.
o The monthly payments were calculated using a formula that estimated the total
price of the subject property, if one was to purchase it outright as an easement.
That total amount was then divided by fifty to reach the yearly payment amount.
RECOMMENDATION:
Staff recommends approval of the Memorandum of Lease Agreement and the Lease Agreement
between the City of Owasso, and the Redbud Group, LLC, and authorization to execute the
necessary documents.
ATTACHMENTS:
Aerial Map
Lease Legal Description
Draft Memorandum of Lease
Draft Lease Agreement
Aerial Map
Garnett Right-of-Way Lease, Redbud Group LLC
Subject Tract
EXHIBIT Al
EXHIBIT OF LEGAL DEICRIPTION
NE CORNER LOT 3, BLOCK 1 N
ATOR COMMERCIAL CENTER
Location Map
EXHIBIT Al
LEGAL DEtCRIPTION
(PROPOIED I EAfE ARE,
A PART THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER (SEA NE /4) OF SECTION NINETEEN (19),
TOWNSHIP TWENTY -ONE (21) NORTH, RANGE FOURTEEN (14) EAST OF THE INDIAN BASE AND MERIDIAN,
TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO THE U.S. GOVERNMENT SURVEY THEREOF.
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHEAST CORNER OF LOT THREE (3), BLOCK ONE (1) OF ATOR COMMERCIAL
CENTER FILED AS PLAT NO. 4591; THENCE S 00 °02'34" W, ALONG THE EAST LINE OF SAID PLAT NO. 4591,
ALSO BEING PARALLEL TO AND 115.00 FEET WEST OF THE EAST LINE OF SAID SOUTHEAST QUARTER OF
THE SOUTHEAST QUARTER (SEA SE /4), A DISTANCE OF 196.00 FEET, TO A POINT BEING THE SOUTHEAST
CORNER OF LOT THREE (3), BLOCK ONE (1) OF SAID PLAT NO. 4591; THENCE S 00°02'34" W, CONTINUING
ALONG THE EAST LINE OF SAID PLAT NO. 4591, A DISTANCE OF 59.05 FEET, TO A POINT BEING THE
EASTERLY MOST SOUTHEASTERN CORNER OF LOT FOUR (4) BLOCK ONE (1) OF SAID PLAT NO. 4591, ALSO
BEING A POINT ON THE SOUTH LINE OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER (SEA
NE /4) OF SECTION NINETEEN (19); THENCE S 89°55'26" E, ALONG THE SOUTH LINE OF SAID SOUTHEAST
QUARTER OF THE NORTHEAST QUARTER (SE/4 NE /4), A DISTANCE OF 44.21 FEET; THENCE N 00°34'43" E, A
DISTANCE OF 59.68 FEET; THENCE S 89°51'27" W, A DISTANCE OF 19.09 FEET; THENCE N 00°24'09" E, A
DISTANCE OF 195.45 FEET; THENCE N 89°55'26" W, PARALLEL TO AND 255.05 FEET NORTH OF THE SOUTH
LINE OF SAID SOUTHEAST QUARTER OF THE NORTHEAST QUARTER (SE /4 NE /4), A DISTANCE OF 26.91
FEET, TO THE POINT OF BEGINNING.
SAID TRACT OF LAND CONTAINING 0.18 ACRES / 7,791.98 SQUARE FEET.
THIS LEGAL DESCRIPTION WAS CREATED ON NOVEMBER 11, 2022, BY ALBERT R. JONES, III, OK PLS #1580,
WITH THE BASIS OF BEARINGS FOR SAID TRACT IS S 00 °02'34" W, ALONG THE EAST LINE OF THE ATOR
COMMERCIAL CENTER FILED AS PLAT NO. 4591, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO
THE U.S. GOVERNMENT SURVEY THEREOF.
Surveyor's Statement
I, ALBERT JONES III, CERTIFY THE ATTACHED LEGAL DESCRIPTION CLOSES IN ACCORD WITH EXISTING
RECORDS, IS A TRUE REPRESENTATION OF THE LEGAL DESCRIPTION AS DESCRIBED, AND MEETS THE
MINIMUM TECHNICAL STANDARDS FOR LAND SURVEYING OF THE STATE OF OKLAHOMA.
ALBERT JONES III
OKLAHOMA NO. 1580
918.485.9957 CAM8060 EIM 6J0 -2024
FILE NO. 12593 SHEET 2 OF 2
MEMORANDUM OF LEASE AGREEMENT
This Memorandum of Lease Agreement ( "Memorandum ") made and entered
into this day of February, 2023, by and between CITY OF OWASSO, an
Oklahoma municipal corporation (the "Lessor "), and REDBUD GROUP, LLC, an
Oklahoma limited liability company (the "Lessee ").
WITNESSETH
That effective this date, for good and valuable consideration the undersigned
Lessor and Lessee duly entered into and executed a certain Lease Agreement ( "Lease "),
as amended from time to time, wherein Lessor leased unto Lessee the following
premises described in Exhibit "A" attached hereto and made a part hereof. Unless
otherwise defined herein, all terms shall have the definition provided in the Lease.
The term of the Lease shall expire on February 7, 2073, unless sooner terminated
as provided by the terms of such Lease.
Reference is hereby expressly made to the Lease as though all of the terms,
agreements, conditions and covenants contained therein were set forth in full in this
Memorandum. The Lease contains an express provision binding and rendering
obligatory the terms, covenants and conditions thereof upon Lessor and Lessee and their
respective successors and assigns.
This Memorandum is entered into pursuant to the provision of the Lease, as
amended from time to time; however, it is not intended hereby to amend, change or
modify, in any manner, any of the terms agreements, conditions and covenants of such
Lease.
(Signatures on the following pages)
Page 1
EXECUTED by Lessor on this 7th February, 2023
LESSOR:
CITY OF OWASSO
an Oklahoma Municipal Corporation
by:
Kelly Lewis, Mayor
ATTEST:
Juliann M. Stevens, City Clerk
APPROVED AS TO FORM AND CONTENT:
Julie Trout Lombardi, City Attorney
Page 2
EXECUTED by Lessee on this day of February, 2023.
LESSEE:
REDBUD GROUP, LLC
an Oklahoma limited liability company
by:
Bart James, Manager
The foregoing instrument was acknowledged before me this ISr day of
February, 2023, by Bart James, Manager of Redbud Group, LLC, an Oklahoma limited
liability company, on behalf of the limited liability company.
My Commission Expires:
CINDY L. WORKMAN
Notary Public in and for
STATE OF OKLAHOMA
Commission #16011155
29, 2024
(Notary Seal)
Page 3
EXHIBIT "A"
LEGAL DESCRIPTION
A PART THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER (SE /4 NE /4) OF
SECTION NINETEEN (19), TOWNSHIP TWENTY -ONE (21) NORTH, RANGE FOURTEEN
(14) EAST OF THE INDIAN BASE AND MERIDIAN, TULSA COUNTY, STATE OF
OKLAHOMA, ACCORDING TO THE U.S. GOVERNMENT SURVEY THEREOF.
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHEAST CORNER OF LOT THREE (3), BLOCK ONE (1) OF
ATOR COMMERCIAL CENTER FILED AS PLAT NO. 4591; THENCE S 00°02'34" W,
ALONG THE EAST LINE OF SAID PLAT NO. 4591, ALSO BEING PARALLEL TO AND
115.00 FEET WEST OF THE EAST LINE OF SAID SOUTHEAST QUARTER OF THE
SOUTHEAST QUARTER (SE 14 SE /4), A DISTANCE OF 196.00 FEET, TO A POINT BEING
THE SOUTHEAST CORNER OF LOT THREE (3), BLOCK ONE (1) OF SAID PLAT NO.
4591; THENCE S 00°02'34" W, CONTINUING ALONG THE EAST LINE OF SAID PLAT NO.
4591, A DISTANCE OF 59.05 FEET, TO A POINT BEING THE EASTERLY MOST
SOUTHEASTERN CORNER OF LOT FOUR (4) BLOCK ONE (1) OF SAID PLAT NO. 4591,
ALSO BEING A POINT ON THE SOUTH LINE OF THE SOUTHEAST QUARTER OF THE
NORTHEAST QUARTER (SE/4 NE/4) OF SECTION NINETEEN (19); THENCE S 89 °55'26"
E, ALONG THE SOUTH LINE OF SAID SOUTHEAST QUARTER OF THE NORTHEAST
QUARTER (SE/4 NE/4), A DISTANCE OF 44.21 FEET; THENCE N 00°34'43" E, A
DISTANCE OF 59.68 FEET; THENCE S 89°51'27" W, A DISTANCE OF 19.09 FEET;
THENCE N 00°24'09" E, A DISTANCE OF 195.45 FEET; THENCE N 89°55'26" W,
PARALLEL TO AND 255.05 FEET NORTH OF THE SOUTH LINE OF SAID SOUTHEAST
QUARTER OF THE NORTHEAST QUARTER (SE /4 NE /4), A DISTANCE OF 26.91 FEET,
TO THE POINT OF BEGINNING.
SAID TRACT OF LAND CONTAINING 0.18 ACRES 17,791.98 SQUARE FEET
Page 4
LEASE AGREEMENT
STATE OF OKLAHOMA )
KNOW ALL PERSONS BY THESE PRESENTS:
COUNTY OF TULSA )
THIS LEASE AGREEMENT (the "Lease ") is made and entered into by and between
CITY OF OWASSO, an Oklahoma municipal corporation (the "Lessor "), and REDBUD
GROUP, LLC, an Oklahoma limited liability company (the "Lessee ").
WITNESSETH:
WHEREAS, Lessor is the owner of a parcel of land located in the City of Owasso,
County of Tulsa, State of Oklahoma being more particularly described on Exhibit "A" attached
hereto and made a part hereof for all purposes (the "Lessor's Property"); and
WHEREAS, Lessee is desirous of leasing the Lessor's Property from Lessor, and Lessor
is agreeable to same, subject to the terms and conditions herein.
NOW, THEREFORE, for and in consideration of the foregoing Lessor's Property and the
mutual and respective covenants and undertakings of Lessor and Lessee hereunder, such parties
hereby agree as follows:
ARTICLE I
DEMISE AND DESCRIPTION OF LESSOR'S PROPERTY
1.01. In consideration of the mutual promises herein made, and subject to all of the
terms and conditions hereof, Lessor leases to Lessee, and Lessee accepts from
Lessor, the Lessor's Property free and clear of all liens, restrictions and other
encumbrances other than those matters of public record (the "Permitted
Exceptions "). Notwithstanding anything to the contrary contained herein, Lessor
and Lessee acknowledge and agree that the Lessor's Property may be improved,
in Lessee's sole discretion, with signage, landscaping, parking and related
improvements (the "Improvements "). Improvements shall be at Lessee's sole
expense, and Lessee shall be responsible for construction and maintenance of
Improvements.
ARTICLE II
TERM AND RENEWAL OPTION
2.01. The stated term of this Lease shall be for a period of Fifty (50) years,
commencing on February 7, 2023 (the "Commencement Date ") and, unless
sooner terminated, ending on February 7, 2073. The stated term of this Lease, as
same may be and is renewed and extended in accordance with Section 2.02 below
or any amendments properly entered into by and between Lessor and Lessee, shall
be referred to as the "Term" of the Lease.
t
2.02. Provided that Lessee shall not then be in default, then Lessee shall have and is
hereby granted four (4) separate and distinct options to renew and extend the
Term of this Lease, each for an additional ten (10) years upon the same terms and
conditions as herein provided. Such options shall automatically renew and extend
the Term of this Lease unless at least thirty (30) days prior to the expiration of the
preceding term (whether primary term or option term) Lessee shall notify the
Lessor that it has elected not to extend the Lease beyond the current term in
effect.
2.03. During the Term of this Lease, and any extensions, the Improvements shall be
owned by Lessee.
ARTICLE III
RENT
3.01. As base rental (the "Base Rent") for the Term of this Lease, Lessee agrees to pay
Lessor One Thousand One Hundred and Sixty -Eight Dollars and 80/100
($1,168.80.00) upon execution of this Lease and One Thousand One Hundred and
Sixty -Eight Dollars ($1,168.80) per year thereafter on the 1st day of each
February, commencing February, 2024.
ARTICLE IV
TAXES
4.01. Lessor represents and warrants that the Lessor's property is exempt from ad
valorem taxes and, therefore, Lessee shall not be obligated to pay any property
taxes.
ARTICLE V
USE OF LESSOR'S PROPERTY AND COMPLIANCE WITH LAWS
5.01. The Lessor's Property shall be used by Lessee for signage, landscaping, and
ancillary purposes to the commercial business purposes.
5.02. Lessee, at its sole cost and expense, shall promptly execute and fulfill any and all
applicable orders, directives and requirements and otherwise comply with any and
all applicable codes, rules, regulations, ordinances, statutes and laws,
(collectively, the "Applicable Laws ") of the municipal, county, state and federal
governments, and all agencies, commissions, boards or departments thereof and
all other official, public, governmental or quasi - governmental institutions,
authorities, subdivisions or instrumentalities having jurisdiction over the Lessor's
Property.
ARTICLE VI
MAINTENANCE REPAIRS AND PAVED AND LANDSCAPED AREAS
6.01. Lessee, at its sole cost and expense, shall maintain, repair, and replace all portions
of the Improvements on the Lessor's Property. Lessee, at its sole cost and
expense shall at all times keep all portions of the Lessor's Property in good order,
condition, and repair and in a clean, sanitary, and safe condition and in
accordance with any and all Applicable Laws. Lessee shall not cause waste,
damage, or not cause injury to the Lessor's Property. Lessee will surrender and
deliver up the Lessor's Property upon the expiration of the Term of this Lease, or
its earlier termination, in the same condition which existed after the completion of
the Improvements. In the event the Lessor needs to terminate this Lease as to all
or a portion of the Lessor's Property during the Term of this Lease for purposes of
widening the existing right -of -way or utility relocation on the Lessor's Property,
Lessor may do so upon ninety (90) days prior written notice and without penalty
or cost except for reimbursement to the Lessee by Lessor for improvements made
to the property by Lessee. This amount of reimbursement shall decrease annually
as follows: The Lessor shall reimburse the Lessee for the cost of the
Improvements (a) 100 % in Year 1; (b) 80% in Year 2; (c) 60% in Year 3; (d)
40% in Year 4; and (e) 20% in Year 5. Notwithstanding anything herein to the
contrary, except as provided above, the Lessor shall not be responsible for making
any repairs to the property in the event utility construction, maintenance or
relocation is required on the Lessor's Property.
ARTICLE VII
SIGNS
7.01. Lessee, at its sole cost and expense, shall have the exclusive right to erect or
attach to the Lessor's Property such signs as it may deem proper and necessary,
provided that each such sign complies with all applicable laws.
ARTICLE VIII
CASUALTY
8.01. In the event the Lessor's Property, or any part thereof excluding Improvements,
shall sustain damage for which insurance proceeds are recovered, Lessee shall
give prompt written notice thereof to Lessor, and Lessee shall receive all proceeds
from any Casualty Insurance to which it may be entitled.
ARTICLE IX
LESSOR'S LIABILITY
9.01 Except in the event of a wrongful eviction of Lessee by Lessor, Lessor's liability
for breach of any covenant hereof shall be expressly limited to the recovery
against the Lessor's interest in the Property. If Lessor sells or transfers all or part
of the Property, such transfer shall be subject to all the terms and conditions of
this Lease including (without limitation) Lessee's Right of First Refusal. Lessor
shall not be liable for any injuries or damages occurring on the Property during
the term of this lease, and Lessee hereby agrees to indemnify Lessor for any such
damages which Lessor may be required to pay arising out of accidents, injuries or
occurrences on the Property during the lease term.
ARTICLE X
FORCE MAJEURE
10.01. Whenever a period of time is herein prescribed for the taking of any action by
either party, such party shall not be liable or responsible for, and there shall be
excluded from the computation of such period, any delays due to strikes, riots,
acts of God, shortages of labor or materials, war, governmental law, regulations or
restrictions or any other cause whatsoever beyond the control of the obligated
party, not to exceed thirty (30) days.
ARTICLE XI
RECORDATION
11.01. Lessee may record this lease if so desired at its own expense. Additionally, an
approved Memorandum of Lease Agreement will be executed by Lessor and
Lessee which Lessee may record if so desired at its own expense.
ARTICLE XII
QUIET ENJOYMENT
12.01. So long as Lessee shall timely and properly pay the Base Rent, and otherwise
perform and satisfy all other obligations, duties and responsibilities required,
Lessee shall freely, peacefully and quietly enjoy and occupy the Lessor's Property
for the Term of the Lease, subject only to the Permitted Exceptions and the terms
and conditions of this lease.
ARTICLE XIII
MISCELLANEOUS
13.01. No amendment, modification, or alteration of the terms of this Lease shall be
binding unless it is in writing, dated contemporaneous with or subsequent to the
date of this Lease, and duly executed by the parties to this Lease.
13.02. Any notice, demand, request or other communication required, given or made
under or in connection with this Lease shall be deemed delivered, upon receipt, if
hand delivered, or whether actually received or not, when deposited in a regular
receptacle for the mail, sent by certified mail, return receipt requested, postage
prepaid, addressed as follows:
If to Lessor:
City of Owasso
Attn: City Manager
PO Box 180
Owasso, OK 74055
If to Lessee:
Redbud Group, LLC
Attn: Manager
7910 S. 101"East Avenue
Tulsa, OK 74133
13.03. This Lease shall be construed under and in accordance with the laws of the State
of Oklahoma and is performable in Tulsa County, Oklahoma.
13.04. In case any one or more of the provisions contained in this Lease shall for any
reason be held to be invalid, illegal, or unenforceable in any respect, such
invalidity, illegality, or unenforceability shall not affect any other provisions, and
this Lease shall be construed as if such invalid, illegal, or unenforceable provision
had never been contained herein.
13.05. If any action at law or in equity is brought by the Lessee, Lessor shall not be
responsible for the payment of Lessee's attorney's fees.
13.06. The parties hereby declare that it is impossible to measure in money the damages
which will accrue to a party hereto. Therefore, specific performance may be
sought and obtained for any breach of this Lease.
13.07. This Lease and all other copies of this Lease, insofar as they relate to the rights,
duties, and remedies of the parties, shall be deemed to be one Lease. This Lease
may be executed concurrently in one or more counterparts, each of which shall be
deemed an original, but all of which together shall constitute one and the same
instrument.
13.08. This Lease contains the entire agreement between the parties with respect to the
subject matter, and Lessor and Lessee acknowledge that they are not relying on
any representation or promise of the other, or of any agency or cooperating agent,
except as may be expressly set forth in this Lease.
13.09. Whenever herein the singular number is used, the same shall include the plural,
and vice versa, and words of any gender shall include each other gender.
13.10. Lessor hereby grants to Lessee a right of first refusal and option to purchase the
Lessor's Property. This right is fully subject to all statutory requirements
requiring Lessor to obtain bids prior to sale of the property. Provided that Lessee
is not then in default hereunder, upon receipt by Lessor of an acceptable, bona
fide written offer from a third party to purchase the Lessor's Property, as
evidenced by a written contract, Lessor shall provide written notice of the contract
to Lessee. Within thirty (30) business days following Lessee's receipt of the
Notice, Lessee may elect to exercise its right of first refusal and option to
purchase the Lessor's Property upon the same terms and conditions set forth in
the third party contract by delivering written notice thereof to Lessor,
accompanied by a written contract containing the identical terms and conditions
as the third party contract.
(Signatures on the following pages)
EXECUTED by Lessor on this 7th February, 2023
LESSOR:
CITY OF OWASSO
an Oklahoma Municipal Corporation
by:
Kelly Lewis, Mayor
ATTEST:
Juliann Stevens, City Clerk
APPROVED AS TO FORM AND CONTENT:
Julie Trout Lombardi, City Attorney
EXECUTED by Lessee on this ASi day of February, 2023.
LESSEE:
REDBUD GROUP, LLC
an Oklahoma limited liability company
Manager
STATE OF OKLAHOMA )
ss:
COUNTY OF TULSA )
The foregoing instrument was acknowledged before me this 1st day of February,
2023, by Bart James, Manager of Redbud Group, LLC, an Oklahoma limited liability company,
on behalf of the limited liability company.
Notary
CINDY L. WORKMAN
Notary Public in and for
STATE Of OKLAHOMA
Commission #16011155
Expires: November 29, 2024
(Notary Seal)
EXHIBIT "A"
LEGAL DESCRIPTION
A PART THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER (SE14 NE /4) OF SECTION
NINETEEN (19), TOWNSHIP TWENTY -ONE (21) NORTH, RANGE FOURTEEN (14) EAST OF THE
INDIAN BASE AND MERIDIAN, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO THE
U.S. GOVERNMENT SURVEY THEREOF.
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHEAST CORNER OF LOT THREE (3), BLOCK ONE (1) OF ATOR
COMMERCIAL CENTER FILED AS PLAT NO. 4591; THENCE S 00°02'34" W, ALONG THE EAST
LINE OF SAID PLAT NO. 4591, ALSO BEING PARALLEL TO AND 115.00 FEET WEST OF THE
EAST LINE OF SAID SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER (SE /4 SE /4), A
DISTANCE OF 196.00 FEET, TO A POINT BEING THE SOUTHEAST CORNER OF LOT THREE (3),
BLOCK ONE (1) OF SAID PLAT NO, 4591; THENCE S 00°02'34" W, CONTINUING ALONG THE
EAST LINE OF SAID PLAT NO. 4591, A DISTANCE OF 59.05 FEET, TO A POINT BEING THE
EASTERLY MOST SOUTHEASTERN CORNER OF LOT FOUR (4) BLOCK ONE (1) OF SAID PLAT
NO. 4591, ALSO BEING A POINT ON THE SOUTH LINE OF THE SOUTHEAST QUARTER OF THE
NORTHEAST QUARTER (SE /4 NE /4) OF SECTION NINETEEN (19); THENCE S 89°55'26" E,
ALONG THE SOUTH LINE OF SAID SOUTHEAST QUARTER OF THE NORTHEAST QUARTER
(SE/4 NE/4), A DISTANCE OF 44.21 FEET; THENCE N 00°34'43" E, A DISTANCE OF 59.68 FEET;
THENCE S 89°51'27" W, A DISTANCE OF 19.09 FEET; THENCE N 00°24'09" E, A DISTANCE OF
195.45 FEET; THENCE N 89°55'26" W, PARALLEL TO AND 255.05 FEET NORTH OF THE SOUTH
LINE OF SAID SOUTHEAST QUARTER OF THE NORTHEAST QUARTER (SE 14 NE14), A
DISTANCE OF 26.91 FEET, TO THE POINT OF BEGINNING.
SAID TRACT OF LAND CONTAINING 0.18 ACRES / 7,791.98 SQUARE FEET
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 1114123
Department Payroll Expenses Total Expenses
105
Municipal Court
6,258.51
9,838.11
110
Managerial
26,730.45
36,955.21
120
Finance
19,462.18
30,193.27
130
Human Resources
11,432.27
16,674.06
160
Community Development
20,615.78
31,170.01
170
Engineering
21,787.16
33,430.07
175
Information Systems
19,342.25
27,431.74
181
Support Services
11,279.30
16,713.72
190
Cemetery
1,416.35
2,960.01
201
Police Grant Overtime
215
Central Dispatch
2,774.56
4,112.47
221
Animal Control
6,198.31
8,635.77
280
Emergency Preparedness
2,627.02
3,654.05
370
Stormwater /ROW Maint.
8,796.89
14,471.48
515
Park Maintenance
9,497.90
14,886.27
520
Culture /Recreation
8,466.60
13,973.93
550
Community- Senior Center
7,513.83
9,996.49
580
Historical Museum
832.40
929.37
720
Strong Neighborhood
417.38
514.79
General Fund Total
185.449.14
276,540.82
185 Garage Fund Total 10 804.96 17 917.75
255 Ambulance Fund Total 553.85 618.38
215 E911 Communication 26,596.28 40,677.05
250 Fire Fund 37 Total 211,946.69 324,787.32
201 Police Fund 38 Total 220,296.61 328,659.20
300 Streets Fund 39 Total 22,823.86 38,596.67
370 Stormwater Fund 27 Total 6,569.27 10,969.71
150 Worker's Compensation Total
720 Strong Neighborhoods Total 4,503.99 6,440.66
Department
105 Municipal Court
110 Managerial
120 Finance
130 Human Resources
160 Community Development
170 Engineering
175 Information Systems
181 Support Services
190 Cemetery
201 Police Grant Overtime
215 Central Dispatch
221 Animal Control
280 Emergency Preparedness
370 Stormwater /ROW Maint.
515 Park Maintenance
520 Culture /Recreation
550 Community- Senior Center
580 Historical Museum
720 Strong Neighborhood
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 1128123
Payroll Expenses Total Expenses
6,498.35
10,088.29
4,112.47
26,960.45
37,246.29
7,637.93
19,412.17
30,138.95
11, 551.02
16, 818.92
8,545.89
20, 595.00
31,144.99
21,777.62
33,415.22
14,371.32
19,167.25
27,241.60
11,185.21
16,602.42
7,441.33
1,467.79
3,020.80
2,774.56
4,112.47
5,330.38
7,637.93
2,627.02
3,654.uo
8,545.89
14,171.93
9,071.46
14,371.32
8,426.60
13,930.47
7,441.33
9,915.98
832.40
929.37
420.00
517.98
General Fund Total 184,084.50 274,958.98
185 Garage Fund Total 10,804.96 17,917.71
255 Ambulance Fund Total 553.85 618.38
215 E911 Communication 27,481.32 42,155.70
250 Fire Fund 37 Total 217,543.60 332,847.65
201 Police Fund 38 Total 228,274.96 341,053.64
300 Streets Fund 39 Total 22,862.64 38,646.24
370 Stormwater Fund 27 Total 6,564.78 10,965.02
150 Worker's Compensation Total
720 Strong Neighborhoods Total 4,884.25 6,905.92
CITY OF OWASSO
HEALTHCARE SELF INSURANCE FUND
CLAIMS PAID PER AUTHORIZATION OF ORDINANCE #789 AS OF 1131
VENDOR DESCRIPTION
AETNA HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
STOP LOSS FEES
ADMIN FEES
HEALTHCARE DEPT TOTAL
DELTA DENTAL DENTAL MEDICAL SERVICE
DENTAL MEDICAL SERVICE
DENTAL DEPT TOTAL
VSP ADMIN FEES
ADMIN FEES
VISION DEPT TOTAL
AMOUNT
41,753.96
51,254.39
37,774.62
39,932.07
49,30929
59,470.85
94,210.70
4,392.96
378,098.84
5,087.58
4,956.00
10,043.58
87.39
1,462.21
1,549.60
HEALTHCARE SELF INSURANCE FUND TOTAL 389,692.02
Scoff A. Thompson OKLAHOMA
p Kevin Stitt
Executive Director Environmental
Governor
Quality
January 24, 2023
Mr. Roger Stevens, Public Works Director
City of Owasso
P.O. Box 180 (200 S. Main)
Owasso, Oklahoma 74055 -0180
Re: Permit No. SL000072220888
Sanitary Sewer Line to Serve 5th Avenue Business Park
Facility No. S -21310
Dear Mr. Stevens:
Enclosed is Permit No. SL000072220888 for the construction of 711 linear feet of eight (8) inch PVC
sanitary sewer line and all appurtenances to serve 5th Avenue Business Park, Tulsa County, Oklahoma.
The project authorized by this permit should be constructed in accordance with the plans approved by this
Department on January 24, 2023. Any deviations from the approved plans and specifications affecting
capacity, flow or operation of units must be approved, in writing, by the Department before changes are
made.
Receipt of this permit should be noted in the minutes of the next regular meeting of the City of Owasso,
after which it should be made a matter of permanent record.
We are returning one (1) set of the approved plans to you, one (1) set to your engineer and retaining one
(1) set for our files.
Respectfully,
Qusay Kabariti, P.E.
Construction Permit Section
Water Quality Division
QK/RC /md
Enclosure
c: Debbie Nichols, Regional Manager, DEQ
TULSA DEQ OFFICE
Aaron S. Hale, P.E., Engineered By Design, PLLC
707 N. ROBINSON ST., OKLAHOMA CITY, OK 73102 - OFFICE: 405- 702 -0100
STATE OF OKLAHOMA OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY - DEQ.OK.GOV
Scott A. Thompson
Executive Director
OKLAHOMA
Environmental
Quality
PERMIT TO CONSTRUCT
Kevin Stitt
Governor
PERMIT No. SL000072220888
SEWER LINES
FACILITY No. S -21310
January 24, 2023
Pursuant to O.S. 27A 2 -6 -304, the City of Owasso is hereby granted this Tier I Permit to construct 711
linear feet of eight (8) inch PVC sanitary sewer line and all appurtenances to serve the 5th Avenue Business
Park, located in Section 31, T -21 -N, R -17 -E, Tulsa County, Oklahoma, in accordance with the plans
approved January 24, 2023.
By acceptance of this permit, the permittee agrees to operate and maintain the facilities in accordance with
the "Oklahoma Pollutant Discharge Elimination System Standards - OPDES" (OAC 252:606) rules and to
comply with the state certification laws, Title 59, Section 1101 -1116 O.S. and the rules and regulations
adopted thereunder regarding the requirements for certified operators.
This permit is issued subject to the following provisions and conditions.
1) That the recipient of the permit is responsible that the project receives supervision and inspection
by competent and qualified personnel.
2) That construction of all phases of the project will be started within one year of the date of approval
or the phases not under construction will be resubmitted for approval as a new project.
3) That no significant information necessary for a proper evaluation of the project has been omitted
or no invalid information has been presented in applying for the permit.
4) That wherever water and sewer lines are constructed with spacing of 10 feet or less, sanitary
protection will be provided in accordance with OAC 252:656- 5- 4(c)(3) of the standards for Water
Pollution Control Facility Construction.
5) That tests will be conducted as necessary to ensure that the construction of the sewer lines will
prevent excessive infiltration and that the leakage will not exceed 10 gallons per inch of pipe
diameter per mile per day.
6) That the Oklahoma Department of Environmental Quality shall be kept informed of occurrences
which may affect the eventual performance of the works or that will unduly delay the progress of
the project.
7) That the permittee will take steps to assure that the connection of house services to the sewers is
done in such a manner that the functioning of the sewers will not be impaired and that earth and
ground water will be excluded from the sewers when the connection is completed.
8) That any deviations from approved plans or specifications affecting capacity, flow or operation of
units must be approved by the Department before any such deviations are made in the construction
of this project.
707 N. ROBINSON ST., OKLAHOMA CITY, OK 73102- OFFICE: 405 -702 -0100
STATE OF OKLAHOMA - OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY - OEQ.OK.GOV
Scott A. Thompson OKLAHOMA Kevin Stitt
Executive Director aEnvironmental Governor
Quality
PERMIT No. SL000072220888
SEWER LINES
FACILITY No. S -21310
PERMIT TO CONSTRUCT
9) That any notations or changes recorded on the official set of plans and specifications in the
Oklahoma Department of Environmental Quality files shall be part of the plans as approved.
10) That the recipient of the permit is responsible for the continued operation and maintenance of these
facilities in accordance with rules and regulations adopted by the Environmental Quality Board, and
that this Department will be notified in writing of any sale or transfer of ownership of these facilities.
11) The issuance of this permit does not relieve the responsible parties of any obligations or liabilities
which the permittee may be under pursuant to prior enforcement action taken by the Department.
12) That the permittee is required to inform the developer /builder that a DEQ Storm Water Construction
Permit is required for a construction site that will disturb one (1) acre or more in accordance with
OPDES, 27A O.S. 2 -6 -201 et. seq. For information or a copy of the GENERAL PERMIT (OKR10)
FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES, Notice of Intent
(NO]) form, Notice of Termination (NOT) form, or guidance on preparation of a Pollution Prevention
Plan, contact the Storm Water Unit of the Water Quality Division at P.O. Box 1677, Oklahoma City,
OK 73101 -1677 or by phone at (405) 702 -8100.
13) That all manholes shall be constructed in accordance with the standards for Water Pollution Control
Facility Construction (OAC 252:656 -5 -3), as adopted by the Oklahoma Department of
Environmental Quality.
14) That when it is impossible to obtain proper horizontal and vertical separation as stipulated in Water
Pollution Control Facility Construction OAC 252:656- 5- 4(c)(1) and OAC 252:656- 5- 4(c)(2),
respectively, the sewer shall be designed and constructed equal to water pipe, and shall be
pressure tested using the ASTM air test procedure with no detectable leakage prior to backfilling,
in accordance with the standards for Water Pollution Control Facility Construction OAC 252:656-5 -
4(c)(3).
Failure to appeal the conditions of this permit in writing within 30 days from the date of issue will constitute
acceptance of the permit and all conditions and provisions.
Division
707 N. ROBINSON ST., OKLAHOMA CITY, OK 73102 - OFFICE: 405- 702 -0100
STATE OF OKLAHOMA- OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY - DEQ.OK.GOV
Scott A. Thompson OKLAHOMA Kevin Stitt
Executive Director 10" Environmental Governor
Quality
January 24, 2023
Mr. Roger Stevens, Public Works Director
City of Owasso
P.O. Box 180 (200 S. Main)
Owasso, Oklahoma 74055 -0180
Re: Permit No. WL000072220887
Potable Water Line Extension for 5th Avenue Business Park
Facility No. 3002718
Dear Mr. Stevens:
Enclosed is Permit No. WL000072220887 for the construction of 1,239 linear feet of twelve (12) inch PVC,
890 linear feet of eight inch PVC potable water line and all appurtenances to serve the 5th Avenue Business
Park, Tulsa County, Oklahoma.
The project authorized by this permit should be constructed in accordance with the plans approved by this
Department on January 24, 2023. Any deviations from the approved plans and specifications affecting
capacity, flow or operation of units must be approved, in writing, by the Department before changes are
made.
Receipt of this permit should be noted in the minutes of the next regular meeting of the City of Owasso,
after which it should be made a matter of permanent record.
We are returning one (1) set of the approved plans to you, one (1) set to your engineer and retaining one
(1) set for our files.
Respectfully,
Qusay Kabariti, P.E.
Construction Permit Section
Water Quality Division
QK/RC /md
Enclosure
c: Debbie Nichols, Regional Manager, DEQ
TULSA DEQ OFFICE
Aaron S. Hale, P.E., Engineered By Design, PLLC
707 N. ROBINSON ST, OKLAHOMA CITY, OK 73102 -OFFICE: 405402 -0100
STATE OF OKLAHOMA OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY - DEQ.OK.GOV
Scott A. Thompson
Executive Director
OKLAHOMA
Environmental
Quality
PERMIT TO CONSTRUCT
Kevin Stitt
Governor
PERMIT No. WL000072220887
WATER LINES
FACILITY No. 3002718
January 24, 2023
Pursuant to O.S. 27A 2 -6 -304, the City of Owasso is hereby granted this Tier I Permit to construct 1,239
linear feet of twelve (12) inch PVC, 890 linear feet of eight inch PVC potable water line and all
appurtenances to serve the 5th Avenue Business Park, located in Section 31, T -21 -N, R -17 -E, Tulsa
County, Oklahoma, in accordance with the plans approved January 24, 2023.
By acceptance of this permit, the permittee agrees to operate and maintain the facility in accordance with
the Public Water Supply Operation rules (OAC 252:631) and to comply with the State Certification laws,
Title 59, Section 1101 -1116 O.S. and the rules and regulations adopted thereunder regarding the
requirements for certified operators.
This permit is issued subject to the following provisions and conditions.
1) This water line provides adequate fire flow in accordance with the 2009 International Fire Code
through the approved hydraulic analysis. The fire flow provided is 3,250 gpm.
2) That the recipient of the permit is responsible that the project receives supervision and inspection
by competent and qualified personnel.
3) That construction of all phases of the project will be started within one year of the date of approval
or the phases not under construction will be resubmitted for approval as a new project.
4) That no significant information necessary for a proper evaluation of the project has been omitted
or no invalid information has been presented in applying for the permit.
5) That the Oklahoma Department of Environmental Quality shall be kept informed on occurrences
which may affect the eventual performance of the works or that will unduly delay the progress of
the project.
6) That wherever water and sewer lines are constructed with spacing of 10 feet or less, sanitary
protection will be provided in accordance with Public Water Supply Construction Standards [OAC
252:626- 19 -2].
7) That before placing this facility into service, at least two samples of the water, taken on different
days, shall be tested for bacteria to show that it is safe for drinking purposes.
8) That any deviations from approved plans or specifications affecting capacity, flow or operation of
units must be approved by the Department before any such deviations are made in the construction
of this project.
707 N. ROBINSON ST., OKLAHOMA CITY. OK 73102 OFFICE: 405- 702 -0100
STATE OF OKLAHOMA OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY - DEQ.OK.GOV
Scott A. Thompson ►> OKLAHOMA Kevin Stitt
Executive Director Environmental Governor
! ^® Quality
PERMIT No. WL000072220887
WATER LINES
FACILITY No. 3002718
PERMIT TO CONSTRUCT
9) That the recipient of the permit is responsible for the continued operation and maintenance of these
facilities in accordance with rules and regulations adopted by the Environmental Quality Board, and
that this Department will be notified in writing of any sale or transfer of ownership of these facilities.
10) The issuance of this permit does not relieve the responsible parties of any obligations or liabilities
which the permittee may be under pursuant to prior enforcement action taken by the Department.
11) That the permittee is required to inform the developer /builder that a DEQ Storm Water Construction
Permit is required for a construction site that will disturb one (1) acre or more in accordance with
OPDES, 27A O.S. Section 2 -6 -201 et seq. For information or a copy of the GENERAL PERMIT
(OKR10) FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES, Notice of
Intent (NO[) form, Notice of Termination (NOT) form, or guidance on preparation of a Pollution
Prevention Plan, contact the Storm Water Unit of the Water Quality Division at P.O. Box 1677,
Oklahoma City, OK 73101 -1677 or by phone at (405) 702 -8100.
12) That any notations or changes recorded on the official set of plans and specifications in the
Oklahoma Department of Environmental Quality files shall be part of the plans as approved.
13) That water lines shall be located at least fifteen (15) feet from all parts of septic tanks and absorption
fields, or other sewage treatment and disposal systems.
14) That whenever plastic pipe is approved and used for potable water, it shall bear the seal of the
National Sanitation Foundation and meet the appropriate commercial standards.
15) That when it is impossible to obtain proper horizontal and vertical separation as stipulated in Public
Water Supply Construction Standards OAC 252:626- 19- 2(h)(1) and OAC 252:626- 19- 2(h)(2),
respectively, the sewer shall be designed and constructed equal to water pipe, and shall be
pressure tested to the highest pressure obtainable under the most severe head conditions of the
collection system prior to backfilling.
Failure to appeal the conditions of this permit in writing within 30 days from the date of issue will constitute
acceptance of the permit and all conditions and provisions.
Water
707 N. ROBINSON ST., OKLAHOMA CITY, OK 73102 • OFFICE: 405 -702 -0100
STATE OF OKLAHOMA • OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY - DEQ,OK.GOV
SECTION 00600
CHANGE ORDER
PROJECT: OW WTP & Main Lift Station Expansion CHANGE ORDER NUMBER: 11
CONTRACT DATE: December 1, 2020 DATE: August 19, 2022
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OW WTP Upgrade
The Contract is changed as follows: Location for the Back -Flow Preventer (BFP) was moved to the
maintenance building. This proposed cost includes the credit for all the piping, hotbox, and labor that
was bid originally to be constructed outside. The new scope includes removing a portion of the
existing slab, hand excavation and installation of the new BFP inside the building_ There is also a new
valve added that was not a part of the original scope. Change order includes material, labor, payroll
additives, equipment, and profit bring the cost of CO#11 to $15,371.31
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was $ 21,187,879.00
Net change by previously authorized Change Orders $ $0
The Contract Sum prior to this Change Order was $ 21,187,879.00
The Contract Sum will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of $ 0
The new Contract Sum including this Change Order will be $ $21,187,879.00
The Contract Time will be (increased) (decreased) (unchanged) by (-0_) days.
The date of Substantial Completion as of the date of this Change
Order therefore is May 7. 2023. (includes pay app approved days)
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
CONTRACTOR
ADDRESS
L'
M `
DATE
City of Owasso
OWNER
200 South Main
ADDRESS
Owasso Ok 74055
HIM,
�.I
SPECIAL PROVISIONS
0509 00900 - Page 1 of 4
SECTION 00600
CHANGE ORDER
PROJECT: O W WTP & Main Lift Station Expansion CHANGE ORDER NUMBER: 12
CONTRACT DATE: December 1, 2020 DATE: August 22, 2022
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OW WTP Upgrade
The Contract is changed as follows: The addition of an individual submersible pump station for
restroom facilities at the W WTP was added since the accommodations were not a part of the original
contract. Also the substantial roofing material price increases during construction is being adjusted to
make the difference in cost for the new buildings. The documentation for the material is provided
within the allowance authorization. Change order includes material, labor, payroll additives,
equipment, and profit bring the cost of CO #12 to $49,263.67
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was
$ 21,187,879.00
Net change by previously authorized Change Orders
$ $0
The Contract Sum prior to this Change Order was
$ 21,187,879.00
The Contract Sum will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of
$ 0
The new Contract Sum including this Change Order will be
$ $21,187,879.00
The Contract Time will be (increased) (decreased) (unchanged) by
LO_) days.
The date of Substantial Completion as of the date of this Change
Order therefore is May 7.2023. (includes nay son approved
days)
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
CONTRACTOR
ADDRESS
m
DATE
City of Owasso
OWNER
200 South Main
ADDRESS
Owasso Ok 74055
BY
DATE
SPECIAL PROVISIONS
0509 00900 - Page 1 of 4
SECTION 00600
CHANGE ORDER
PROJECT: OW WI"P & Main Lift Station Expansion CHANGE ORDER NUMBER: 13
CONTRACT DATE: December 1, 2020 DATE: October 19, 2022
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OWWTP Upgrade
The Contract is changed as follows: addition of a 4" PVC sludge line to run parallel with the existing
3" line for future expansion of the sludge building with no need to tear up new roadway or existing
structures. This will allow for up to 7" of sludge pump lines to be run independently or in parallel as
needed for maintenance. LS cost of $44,477.53 which includes a credit for change in conduit material
of $9092.00.
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was
$ 21,187,879.00
Net change by previously authorized Change Orders
$ $0
The Contract Sum prior to this Change Order was
$ 21,187,879.00
The Contract Sum will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of
$ 0
The new Contract Sum including this Change Order will be
$ $21,187,879.00
The Contract Time will be (increased) (decreased) (unchanged) by
LION days.
The date of Substantial Completion as ofthe date of this Change
Order therefore is May 17 2023. (includes pay app approved days)
1Q0TE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
CONTRACTOR
ADDRESS
BY
DATE
City of Owasso
OWNER
200 South Main
ADDRESS
Owasso Ok 74055
DATE
SPECIAL PROVISIONS
0509 00900 -Page 1 of 4
SECTION 00600
CHANGE ORDER
PROJECT: OW WTP & Main Lift Station Expansion CHANGE ORDER NUMBER: 14
CONTRACT DATE: December 1, 2020 DATE: October 20, 2022
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OW WTP Upgrade
The Contract is changed as follows: LS payment of $48,635.54 to correct flanges and fitting to allow
for bellows/ exchanges to fit correctly. Multiple places did not fit per plan and supports are vital in
safety and operation of he piping to supply air. Full explanation in change order paperwork attached.
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was
$ 21,187,879.00
Net change by previously authorized Change Orders
$ $0
The Contract Sum prior to this Change Order was
$ 21,187,879.00
The Contract Sam will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of
$ 0
The new Contract Surn including this Change Order will be
$ $21,187,879.00
The Contract Time will be (increased) (decreased) (unchanged) by
(_7_) days.
The date of Substantial Completion as of the date of this Change
Order therefore is May 24 2023. (includes pay app approved daysl
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
CONTRACTOR
ADDRESS
M.
DATE
City of Owasso
OWNER
200 South Main
ADDRESS
Owasso Ok 74055
DATE
i
SPECIAL PROVISIONS
0509 00900 - Page 1 of 4
SECTION 00600
CHANGE ORDER
PROJECT: OW WT? & Main Lift Station Expansion CHANGE ORDER NUMBER 15
CONTRACT DATE: December 1, 2020 DATE: December 13, 2022
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OW WTP Upgrade
The Contract is changed as follows: Total allowance authorization of $111,376.53. Payment includes
changes in Earthwork; Concrete; Asphalt paving; Site Improvements; and additional price increases to
asphalt and sod from bid pricing in 2020. Information sheets for additional costs are attached.
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was $ 21,187,879.00
Net change by previously authorized Change Orders $ $0
The Contract Sum prior to this Change Order was $ 21,187,879.00
The Contract Sum will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of $ 0
The new Contract Sum including this Change Order will be $ $21,187,879.00
The Contract Time will be (increased) (decreased) (unebanged) by C_15___) days.
The date of Substantial Completion as ofthe date of this Change
Order therefore is June 8, 2023. (includes all day through CO 151
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
CONTRACTOR
al9'
M'3`.!
DATE
City of Owasso
OWNER
200 South Main
ADDRESS
Owasso Ok 74055
BY
DATE
SPECIAL PROVISIONS
0509 00900 - Page 1 of 4
SECTION 00600
CHANGE ORDER
PROJECT: OW WTP & Main Lift Station Expansion CHANGE ORDER NUMBER: 16
CONTRACT DATE: December 1, 2020 DATE: January 4, 2023
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OWWTP Upgrade
The Contract is changed as follows: Additional handrail (safety), Roll off Duinpster guide rails,
stainless steel pipe charge increases, Brooks guide rail changes to allow pumps to be removed without
obstruction, also included Credits totaling $20,267.00. Total cost of the changes requested in change
order 16 $13,996.03. (See attached).
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was
$ 21,187,879.00
Net change by previously authorized Change Orders
$ $o
The Contract Sum prim to this Change Order was
$ 21,187,879.00
The Contract Sum will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of
$ 0
The new Contract Sum including this Change Order will be
$ $21,187,879.00
The Contract Time will be (increased) (decreased) (unchanged) by
C_0_) days.
The date of Substantial Completion as of the date of this Change
Order therefore is June 8.2023. (includes all day through CO 15 )
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
Crossland Heavy City of Owasso
Contractors, Inc.
CONTRACTOR OWNER
14149 E Admiral PI 200 South Main
ADDRESS
Tulsa, OK 74116
BY
Jason C. Smith."'0.:."�"'�'�.
DATE
ADDRESS
Owasso Ok 74055
DATE
SPECIAL PROVISIONS
0509 00900 - Page 1 of 4