HomeMy WebLinkAbout2023.03.07_City Council AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO CITY COUNCIL
Council Chambers Old Central Building 109 North Birch, Owasso, OK
Tuesday, March 7, 2023 - 6:30 PM
NOTE: APPROPRIATE ACTION may include, but is not limited to: acknowledging, affirming, amending, approving, authorizing,
awarding, denying, postponing, or tabling.
AGENDA RECEIVED
1. Call to Order -Mayor Kelly Lewis
MAR 03 2023 �5
2. Invocation -Scott French, Pastor, Discovery Church City Clerk's Office
3. Flag Salute
4. Roll Call
5. Presentation of the Character Trait of Enthusiasm - Roger Stevens
6. Consideration and appropriate action relating to the Consent Agenda. (All matters listed under
"Consent" are considered by the City Council to be routine and will be enacted by one motion. Any
Councilor may, however, remove an item from the Consent Agenda by request. A motion to adopt the
Consent Agenda is non - debatable.)
A. Approve minutes - February 21, 2023, Regular Meeting
B. Approve claims
C. Accept public infrastructure improvement of a concrete approach located at 14501 East
89th Street North
D. Accept a donation in the amount of $300.00 and approve a budget amendment increasing
the estimate of revenues and the appropriation for expenditures in the Half -Penny Sales Tax
Fund (Police) by $300.00
7. Consideration and appropriate action relating to items removed from the Consent Agenda
8. PUBLIC HEARING - The City Council will conduct a public hearing for the purpose of receiving citizen
input on proposed amendments to the boundaries of each City Council ward
Juliann M. Stevens
9. PUBLIC HEARING - The City Council will conduct a public hearing for the purpose of receiving citizen
input on a proposed amendment to the list of Capital Improvement Projects eligible for funding from
the Capital Improvements Fund to include East 86th Street North Widening from North 145th East Avenue
to North 161 -t East Avenue
Chris Garrett
10. Consideration and appropriate action relating to the 2021 Annual Street Rehabilitation Program
Earl Farris
Staff recommends acceptance of the street rehabilitation project and authorization for final payment
to Becco Contractors Inc. of Tulsa, Oklahoma, in the amount of $143,523.39.
11. Report from City Manager
Monthly Public Works Project Status Report
12. Report from City Attorney
13. Report from City Councilors
14. Official Notices (documents for acknowledgment of receipt or information only, no discussion or action
will be taken)
• Payroll Payment Report - Pay Period Ending Date February 25, 2023
• Health Care Self- Insurance Claims - dated as of February 28, 2023
• Change Order executed by the City Manager or designee for the Wastewater Treatment
Plant and Main Plant Lift Station Expansion Project
Owasso City Council
March 7, 2023
Page 2
15. New Business (New Business is any item of business which could not have been foreseen at the time of
posting of the agenda)
16. Adjournment
Notice of Public Meeting filed in the office of the City Clerk on Friday, December 9, 2022, and the Agenda
posted at City Hall, 200 South Main Street, at 1:00 pm oq Friday, March 3, 2023.
L ll ;
Juliann M. Stevens, City erk
The City of Owasso encourages citizen participation. To request an accommodation due to a disability, contact the City Clerk at
least 48 hours prior to the scheduled meeting by phone 918 - 376 -1502 or by email to Isteyen5@CitVafawa550.COm
OWASSO CITY COUNCIL
MINUTES OF REGULAR MEETING
TUESDAY, FEBRUARY 21, 2023
The Owasso City Council met in regular session on Tuesday, February 21, 2023, in the Council Chambers at
Old Central, 109 North Birch, Owasso, Oklahoma per the Notice of Public Meeting filed Friday, December
9, 2022; and the Agenda filed in the office of the City Clerk and posted at City Hall, 200 South Main Street,
at 1:00 pm on Friday, February 17, 2023.
1. Call to Order -Mayor Kelly Lewis called the meeting to order at 6:30pm.
2. Invocation - The Invocation was offered by Pastor Bill Ascol of Bethel Baptist Church
3. Flag Salute - Councilor Lyndell Dunn led the flag salute.
4. Roll Call - A quorum was declared present.
Present Absent
Mayor - Kelly Lewis None
Vice Mayor- Alvin Fruga
Councilor- Doug Bonebrake
Councilor- Bill Bush
Councilor - Lyndell Dunn
A quorum was declared present.
Staff: City Manager - Warren Lehr; City Attorney - Julie Lombardi
5. Consideration and appropriate action relating to the Consent Agenda. (All matters listed under
"Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee
may, however, remove an item from the Consent Agenda by request. A motion to adopt the Consent
Agenda is non - debatable.)
A. Approve minutes - February 7, 2023, and February 14, 2023, Regular Meetings
B. Approve claims
Mr. Bonebrake moved, seconded by Mr. Dunn to approve the Consent Agenda as presented, with
claims totaling $870,207.92.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
6. Consideration and appropriate action relating to items removed from the Consent Agenda -None
Consideration and appropriate action relating to Ordinance 1204, approving a Planned Unit
Development (PUD) for Twill Johnson Ranch and a rezoning request from Residential Estate (RE) to
Residential Neighborhood Mixed (RNX) - approximately 22.55 acres located at the northwest corner of
the East 101st Street North and North 1291h East Avenue Intersection as referenced in Applications OPUD
23 -10 and OZ 23 -01
Alexa Beemer presented the item, recommending adoption of Ordinance 1204. There were no
comments from the audience. After discussion, Mr. Bush moved, seconded by Mr. Bonebrake to adopt
Ordinance 1204, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
Owasso City Council
February 21, 2023
Page 2
S. Consideration and appropriate action relating to bids received for the Owasso Police Department
Sallyport Door Replacement Project
Jason Woodruff presented the item, recommending award of the base bid to Overhead Door
Company of Tulsa, Oklahoma, in the amount of $68,500.00 and authorization to execute the
agreement. There were no comments from the audience. After discussion, Mr. Bonebrake moved,
seconded by Mr. Dunn to award the bid and authorize execution of the agreement, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
9. Consideration and appropriate action relating to bids received for the East 116th Street North Roadway
Improvements from Mingo Road to Garnett Road
Daniel Dearing presented the item, recommending award of the construction contract to Crossland
Heavy Contractors, Inc., of Tulsa, Oklahoma, in the amount of $17,387,000.00, and authorization to
execute all necessary documents. There were no comments from the audience. After discussion, Mr.
Bush moved, seconded by Mr. Bonebrake to award the construction contract and authorize the
execution of documents, as recommended.
YEA: Bonebrake, Bush, Dunn, Frugal, Lewis
NAY: None
Motion carried: 5 -0
10. Consideration and appropriate action relating to the agreement for the purpose of leasing various City
fleet vehicles
Chris Garrett presented the item, recommending approval of an Open -End (Equity) Lease from
Enterprise Fleet Management, Inc., of Clayton, Missouri, for a lease period of forty -eight months,
contingent upon annual appropriations by the City Council, and authorization to execute the
necessary documents to lease two (2) 2023 GMC Sierra 250OHD pickup trucks at a lease rate of
$1,026.75 per month, per vehicle. There were no comments from the audience. After discussion, Mr.
Dunn moved, seconded by Mr. Bonebrake to approve the lease and authorize the execution of
documents, as recommended.
YEA: Bonebrake, Bush, Dunn, Fruga, Lewis
NAY: None
Motion carried: 5 -0
11. Report from City Manager - None
12. Report from City Attorney - None
13. Report from City Councilors - None
14. Official Notices - The Mayor acknowledged receipt of the following:
• Payroll Payment Report- Pay Period Ending Date February 11, 2023
• Health Care Self- Insurance Claims - dated as of February 16, 2023
• Monthly Budget Status Report - January 2023
• Change Order executed by the City Manager or designee for the Wastewater Treatment Plant and
Main Plant Lift station Expansion Project
• Change Order executed by the City Manager or designee for the East 116th Street North
Improvement Project from Garnett Road to North 129th East Avenue
15. New Business - None
16. Adjournment
Mr. Bush moved, seconded by Mr. Dunn to adjourn the meeting.
YEA: Bonebrake, Bush, Dunn, Frugo, Lewis
NAY: None
Motion carried: 5 -0 and the meeting adjourned at 7:15 pm.
Kelly Lewis, Mayor
Juliann M. Stevens, City Clerk
Owasso City Council
February 21, 2023
Page 3
Claims List - 03/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL AEP /PSO
ELECTRIC USE
$487.51
COX COMMUNICATIONS
PHONE USAGE
$11.56
JPMORGAN CHASE BANK
AMAZON- EQUIPMENT
$1,008.07
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$16.99
JPMORGAN CHASE BANK
EBAY- EQUIPMENT
$38.12
JPMORGAN CHASE BANK
HOBBY LOBBY - SUPPLIES
$54.47
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
$345.32
JPMORGAN CHASE BANK
KETCH ALL- EQUIPMENT
$296.25
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$78.73
JPMORGAN CHASE BANK
PAYPAL- SERVICE
$150.00
JPMORGAN CHASE BANK
PNEU DART - EQUIPMENT
$915.54
JPMORGAN CHASE BANK
TOMMYS- SERVICE
$8.00
JPMORGAN CHASE BANK
WALMART- SUPPLIES
$60.04
GEN ANIMAL CONTROL -Total
$3,470.62
AEP IPSO
ELECTRIC USE
$39.34
JPMORGAN CHASE BANK
BROWN FARMS -SOD
$120.00
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$14.98
JPMORGAN CHASE BANK
OREILLY -TOOLS
$49.99
JPMORGAN CHASE BANK
SITEONE- CHEMICALS
$2,000.00
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$19.48
GEN CEMETERY -Total
$2,243.79
SUSAN R CHERMACK
PAINTING CLASS
$520.00
GEN COMM CTR DONATIONS -Total
$520.00
AEP /PSO
ELECTRIC USE
$664.91
COX COMMUNICATIONS
PHONE USAGE
$19.29
GEN COMMUNITY CENTER -Total
$684.20
COX COMMUNICATIONS
PHONE USAGE
$30.87
JPMORGAN CHASE BANK
ODP- SUPPLIES
$3.89
GEN COMMUNITY DEVELOPMENT - Total
$34.76
COX COMMUNICATIONS
PHONE USAGE
$15.44
L & M OFFICE FURNITURE, INC
FILING CABINETS
$1,688.00
GEN CULTURE & RECREATION -Total
$1,703.44
AEP IPSO
ELECTRIC USE
$21.02
COX COMMUNICATIONS
PHONE USAGE
$7.72
GEN ECONOMIC DEV -Total
$28.74
AEP IPSO
ELECTRIC USE
$76.64
COX COMMUNICATIONS
PHONE USAGE
$3.86
GEN EMERG PREPAREDNESS -Total
$80.70
COX COMMUNICATIONS
PHONE USAGE
$30.87
JPMORGAN CHASE BANK
AMAZON- REFUND
($29.65)
l
Claims List - 03107/2023
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL JPMORGAN CHASE BANK
AUTO DEF- EQUIPMENT
$6,056.59
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$35.02
UNITED STATES CELLULAR CORPORATION
PIN CELL PHONES
$11216
GEN ENGINEERING -Total
$6,204.99
COX COMMUNICATIONS
PHONE USAGE
$30.87
JPMORGAN CHASE BANK
ODP- SUPPLIES
$8.92
SUMNERONE INC
COPIER SERVICES
$49.00
GEN FINANCE -Total
$88.79
AEP IPSO
ELECTRIC USE
$3,226.74
ELIZABETH ANNE CHILDS
LEGAL SERVICES
$1,140.00
JPMORGAN CHASE BANK
MEETING EXP 02/23
$13.50
JPMORGAN CHASE BANK
SAMS - SUPPLIES
$13.88
JPMORGAN CHASE BANK
STAPLES - SUPPLIES
$221.50
GEN GENERAL GOVERNMENT -Total
$4,615.62
AEP /PSO
ELECTRIC USE
$90.02
COX COMMUNICATIONS
PHONE USAGE
$3.86
GEN HISTORICAL MUSEUM -Total
$93,88
JPMORGAN CHASE BANK
SUNDANCE- SUPPLIES
$167.20
GEN HR -CHAR INITIATIVE -Total
$167.20
COMMUNITYCARE EAP
EAP FEE
$468.00
COX COMMUNICATIONS
PHONE USAGE
$15.44
JPMORGAN CHASE BANK
OFFICE DEPOT - REFUND
($8.34)
GEN HUMAN RESOURCES -Total
$475.10
AT &T MOBILITY
PUBLIC SAFE WIRELESS
$83.35
COX COMMUNICATIONS
PHONE USAGE
$23.15
JPMORGAN CHASE BANK
COX - SERVICE
$100.05
JPMORGAN CHASE BANK
TRAVEL EXP 5/6 -10
$559.94
JPMORGAN CHASE BANK
TYLER USER - CONFERENCE
$2,198.00
GEN INFORMATION TECH -Total
$2,964.49
COX COMMUNICATIONS
PHONE USAGE
$23.15
JPMORGAN CHASE BANK
AMAZON- FURNITURE
$1,159.94
JPMORGAN CHASE BANK
CHAMBER -FEES
$480.00
JPMORGAN CHASE BANK
MEETING EXP 02 -15
$185.00
JPMORGAN CHASE BANK
MEETING EXP 02/10
$38.00
JPMORGAN CHASE BANK
ODP- SUPPLIES
$37.98
TREASURER PETTY CASH
PARK FEE REIMS -LEHR
$19.00
GEN MANAGERIAL -Total
$1,943.07
COX COMMUNICATIONS
PHONE USAGE
$15.44
HOUGHTON, TIMOTHY L
BAILIFF
$300.00
JPMORGAN CHASE BANK
DOLLAR GEN- SUPPLIES
$6.26
N
Claims List - 03107/2023
Fund Vendor Name
Payable Description
Payment
Amount
01 GENERAL GEN MUNICIPAL COURT -Total
ELECTRIC USE
$321.70
AEP /PSO
ELECTRIC USE
$2,566.94
BEAUTY- CRETE, INC.
REPAIR STATUE BASE
$2,740.00
COX COMMUNICATIONS
PHONE USAGE
$3.86
ROGERS COUNTY RURAL WATER
CENTENNIAL PARK
$298.30
DISTRICT
BUMPER -PARTS
$13.00
UNIFIRST HOLDINGS LP
PARKS STAFF UNIFORMS
$36.04
WASHINGTON CO RURAL WATER DISTRICT
MCCARTY PARK
$36.00
GEN PARKS -Total
$5,683.14
AEP /PSO
ELECTRIC USE
$306.35
JPMORGAN CHASE BANK
AMAZON- PRISON BOARD
$46.36
JPMORGAN CHASE BANK
WALMART- PRISON BOARD
$206.12
GEN POLICE COMMUNICATIONS -Total
COX - SERVICE
$558.83
JPMORGAN CHASE BANK
AMAZON - UNIFORM
$11.76
JPMORGAN CHASE BANK
BUMPER -PARTS
$13.00
JPMORGAN CHASE BANK
CORNERSTONE -TOOLS
$21.99
JPMORGAN CHASE BANK
FASTENAL- UNIFORM
$63.18
JPMORGAN CHASE BANK
HARD HAT - UNIFORM
$78.00
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$108.94
JPMORGAN CHASE BANK
LOWES -TOOLS
$69.94
JPMORGAN CHASE BANK
OREILLY- SUPPLIES
$120.33
JPMORGAN CHASE BANK
SITEONE- CHEMICALS
$1,298.81
JPMORGAN CHASE BANK
STANDARD -PARTS
$19.99
JPMORGAN CHASE BANK
STANDARD- REPAIR
$690.66
JPMORGAN CHASE BANK
STANDARD - SERVICE
$864.05
SPIRIT LANDSCAPE MANAGEMENT LLC
LANDSCAPE MAINTENANCE
$683.80
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$14822
GEN STORMWATER -Total
$4,192.67
COX COMMUNICATIONS
PHONE USAGE
$11.58
JPMORGAN CHASE BANK
ALARM BILLING- SERVICE
$90.00
JPMORGAN CHASE BANK
AMAZON - REFUND
($49.98)
JPMORGAN CHASE BANK
COX - SERVICE
$69.95
JPMORGAN CHASE BANK
ODP- SUPPLIES
$0.91
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$640.76
JPMORGAN CHASE BANK
SUMMIT FIRE - INSPECT
$586.00
JPMORGAN CHASE BANK
WALMART- REFUND
($13.05)
JPMORGAN CHASE BANK
WALMART- SUPPLIES
$13.05
UNIFIRST HOLDINGS LP
UNIFORMS
$22.50
GEN SUPPORT SERVICES -Total $1,371.72
TREASURER PETTY CASH CC DEP REF -FRADD $50.00
TREASURER PETTY CASH CC DEP REF- KIRK/MORRI $50.00
M
Claims List - 03/07/2023
Fund
Vendor Name
Payable Description
Payment
Amount
01 GENERAL
TREASURER PETTY CASH
CC DEP REF -SAUL
$100.00
TREASURER PETTY CASH
CC DEP REF -SMITH
$50.00
TREASURER PETTY CASH
CC DEP REF - THOMPSON
$50.00
TREASURER PETTY CASH
CC DEP REF - WESTERMAN
$50.00
TREASURER PETTY CASH
CC DEP REF -XIONG
$100.00
GENERAL -Total
$450.00
GENERAL -Total
$37,897.45
20 AMBULANCE SERVICE
JPMORGAN CHASE BANK
AUTOZONE- SUPPLIES
$9.79
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
$2,787.68
JPMORGAN CHASE BANK
BOUND TREE -TOOLS
$887.25
JPMORGAN CHASE BANK
BUMPER - SUPPLIES
$19.38
JPMORGAN CHASE BANK
EB GUARDIANS - TRAINING
$1124
JPMORGAN CHASE BANK
EXCELLANCE- REPAIR
$105.97
JPMORGAN CHASE BANK
FIRE SERVICE - SUPPLIES
$55.00
JPMORGAN CHASE BANK
HENRY SCHEIN- SUPPLIES
$666.73
JPMORGAN CHASE BANK
HOME DEPOT -TOOLS
$11.98
JPMORGAN CHASE BANK
INTERSTATE -PARTS
$183.75
JPMORGAN CHASE BANK
JIM NORTON - EQUIPMENT
$634.62
JPMORGAN CHASE BANK
JIM NORTON -PARTS
$835.95
JPMORGAN CHASE BANK
LIFE ASSIST - SUPPLIES
$902.47
JPMORGAN CHASE BANK
MEDLINE- SUPPLIES
$480.00
JPMORGAN CHASE BANK
SUMNER - SUPPLIES
$17.82
JPMORGAN CHASE BANK
TTC- SCHOOL
$735.00
JPMORGAN CHASE BANK
TULSA TECH- SCHOOL
$735.00
JPMORGAN CHASE BANK
ZOLL - SUPPLIES
$1,206.56
REPUBLIC RECOVERY SERVICES INC
COLLECTION SERVICES
$2,500.00
STRYKER MEDICAL
COT BATTERIES
$1,808.44
STRYKER MEDICAL
POWER LOAD REPAIR
$859.98
STRYKER MEDICAL
PWR COT REPAIR
$280.00
AMBULANCE -Total
$15,735.61
AMERICAN MUNICIPAL SERVICES LTD
COLLECTION SERVICES
$26.00
AMBULANCE SERVICE -Total
$26.00
TYLER TECHNOLOGIES, INC.
CAD SOFTWARE
$9,407.12
CAD SOFTWARE -Total
$9,407.12
AMBULANCE SERVICE
-Total
$25,168.73
21 E -911
JPMORGAN CHASE BANK
APCO- TRAINING
$170.00
E911 COMMUNICATIONS -Total
$170.00
E -911 -Total
$170.00
25 HOTEL TAX
COX COMMUNICATIONS
PHONE USAGE
$7.72
JPMORGAN CHASE BANK
NATIONAL PEN- SUPPLIES
$227.44
19
Claims List - 03/07/2023
Fund
Vendor Name
Payable Description
Payment
Amount
25 HOTELTAX
STRONG NEIGHBORHOODS -Total
$235.16
HOTELTAX -Total
$235.16
27 STORMWATER MANAGEMENT
AEP /PSO
ELECTRIC USE
$274.50
COX COMMUNICATIONS
PHONE USAGE
$7.72
JPMORGAN CHASE BANK
AMERIFLEX- REPAIR
$846.00
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
$11.98
JPMORGAN CHASE BANK
BLUE BOOK - SUPPLIES
$1,311.25
JPMORGAN CHASE BANK
BROWN FARMS -SOD
$64.00
JPMORGAN CHASE BANK
CHEMETRICS -TOOLS
$2,662.78
JPMORGAN CHASE BANK
CORE &MAIN - SUPPLIES
$57.00
JPMORGAN CHASE BANK
FASTENAL- UNIFORM
$63.18
JPMORGAN CHASE BANK
LOWES- REPAIR
$15.56
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$21.98
JPMORGAN CHASE BANK
ODP- SUPPLIES
$39.39
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
$117.85
JPMORGAN CHASE BANK
OK PRECAST - REPAIR
$728.00
JPMORGAN CHASE BANK
TRACTOR SUP - UNIFORM
$159.99
JPMORGAN CHASE BANK
ULINE- SUPPLIES
$821.81
JPMORGAN CHASE BANK
ULINE -TOOLS
$655.13
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$11.36
UNITED STATES CELLULAR CORPORATION
PW CELL PHONES
$137.98
STORMWATER-STORMWATER -Total
$8,007.46
STORMWATER MANAGEMENT
-Total
$8,007.46
31 AMBULANCE CAPITAL
JPMORGAN CHASE BANK
AMAZON -ALERT SYST
$1,159.89
JPMORGAN CHASE BANK
CORNERSTONE -ALERT SYS
$15.98
JPMORGAN CHASE BANK
HOME DEPOT -ALERT SYST
$9.31
JPMORGAN CHASE BANK
J &K EQUIP -ALERT SYST
$257.50
JPMORGAN CHASE BANK
J &K EQUIP- REFUND
($125.00)
JPMORGAN CHASE BANK
LOWES -ALERT SYST
$85.46
JPMORGAN CHASE BANK
LOWES- ALERTING SYST
$114.91
STATION ALERTING SYSTEM -Total
$1,518.05
AMBULANCE CAPITAL -Total
$1,518.05
34 VISION TAX
GARVER
116 -MINGO TO GARNETT
$2,055.00
116TH -MINGO TO GARNETT RD - Total
$2,055.00
VISION TAX -Total
$2,055.00
36 CAPITAL IMPROV GRANTS
R &L CONSTRUCTION LLC
SPORTS PARK IMPROVE
$51,684.24
VSN 2025 SPORTS PARK RDS - Total
$51,684.24
CAPITAL IMPROV GRANTS -Total
$51,684.24
37 SALES TAX FIRE
A & B ENGRAVING, INC.
UNIFORMS
$22,374.41
AEP /PSO
ELECTRIC USE
$4,638.72
5
Claims List - 03/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
37 SALES TAX FIRE COX COMMUNICATIONS
PHONE USAGE
$127.35
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$174.38
JPMORGAN CHASE BANK
AMAZON -TOOLS
$14.30
JPMORGAN CHASE BANK
AMER WASTE- DISPOSAL
$101.35
JPMORGAN CHASE BANK
CHEWY- SUPPLIES
$55.36
JPMORGAN CHASE BANK
CORNERSTONE - EQUIPMENT
$6.99
JPMORGAN CHASE BANK
CORNERSTONE - REPAIR
$21.98
JPMORGAN CHASE BANK
EB ELLIS- TRAINING
$81.88
JPMORGAN CHASE BANK
HARRISON -HVAC
$1,695.00
JPMORGAN CHASE BANK
LODGING EXP 1/18 -20
$330.98
JPMORGAN CHASE BANK
MEETING EXP 02/10
$96.45
JPMORGAN CHASE BANK
NSC -PARTS
$1,005.44
JPMORGAN CHASE BANK
OREILLY - BATTERY
$32.08
JPMORGAN CHASE BANK
OREILLY- REFUND
($179.14)
JPMORGAN CHASE BANK
OREILLY- SUPPLIES
$179.14
JPMORGAN CHASE BANK
OREILLY -TOOLS
$3.99
JPMORGAN CHASE BANK
ROTO- ROOTER - REPAIR
$242.00
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$21.96
JPMORGAN CHASE BANK
SPRINGDALE- SUPPLIES
$49.68
JPMORGAN CHASE BANK
WALMART- SUPPLIES
$2.48
SALES TAX FUND -FIRE - Total
$31,076.78
SALES TAX FIRE -Total
$31,076,78
38 SALES TAX POLICE AEP /PSO
ELECTRIC USE
$4,88150
AT &T MOBILITY
PUBLIC SAFE WIRELESS
$140.88
COX COMMUNICATIONS
PHONE USAGE
$219.96
GT DISTRIBUTORS INC
FIREARM SUPPLIES
$575.58
HOLOSUN TECHNOLOGIES INC
SWAT EQUIPMENT
$7,596.16
JPMORGAN CHASE BANK
AMAZON -MAINT
$338.00
JPMORGAN CHASE BANK
AMAZON- REFUND
($277.98)
JPMORGAN CHASE BANK
AMAZON- SUPPLIES
$818.45
JPMORGAN CHASE BANK
AMER WASTE- RENTAL
$135.10
JPMORGAN CHASE BANK
AT YOUR SERV- RENTAL
$138.00
JPMORGAN CHASE BANK
GALLS- UNIFORM
$722.80
JPMORGAN CHASE BANK
GLOCK PROF - TRAINING
$250.00
JPMORGAN CHASE BANK
KUM &GO- SUPPLIES
$2.89
JPMORGAN CHASE BANK
LODGING EXP 2119 -20
$135.90
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$66.45
JPMORGAN CHASE BANK
MCALISTERS- SUPPLIES
$66.83
JPMORGAN CHASE BANK
MIDWAYUSA -TOOLS
$79.77
JPMORGAN CHASE BANK
MTM RECOG- UNIFORM
$646.05
JPMORGAN CHASE BANK
ODP- SUPPLIES
$175.52
C
Claims List - 03/07/2023
Fund Vendor Name
Payable Description
Payment
Amount
38 SALES TAX POLICE JPMORGAN CHASE BANK
OK NW AREA - TRAINING
$30.00
JPMORGAN CHASE BANK
REASORS- SUPPLIES
$170.45
JPMORGAN CHASE BANK
SAMS- SUPPLIES
$39.92
JPMORGAN CHASE BANK
SPECIAL OPS- UNIFORM
$566.96
JPMORGAN CHASE BANK
SUMNER- RENTAL
$629.96
THOMAS ALAN HOFFMANN
MMPI FEES
$125.00
TREASURER PETTY CASH
NOTARY FILE FEE -FELL
$10.00
TREASURER PETTY CASH
NOTARY RENEWAL -FELL
$20.00
TREASURER PETTY CASH
TRAINING- ARNOLD/THOR
$100.00
TREASURER PETTY CASH
TRAVEL REIMB - NEWMAN
$102.11
SALES TAX FUND- POLICE -Total
$18,508.26
SALES TAX POLICE -Total
$18,508.26
39 SALES TAX STREETS AEP /PSO
ELECTRIC USE
$2,476.10
COX COMMUNICATIONS
PHONE USAGE
$7.72
JPMORGAN CHASE BANK
AMAZON- UNIFORM
$11.76
JPMORGAN CHASE BANK
AMERIFLEX- SUPPLIES
$115.10
JPMORGAN CHASE BANK
ATWOOD -OIL
$26.99
JPMORGAN CHASE BANK
ATWOOD- SUPPLIES
$95.94
JPMORGAN CHASE BANK
ATWOOD- UNIFORM
$309.99
JPMORGAN CHASE BANK
BROWN FARMS -SOD
$80.00
JPMORGAN CHASE BANK
BROWNCO -PARTS
$100.74
JPMORGAN CHASE BANK
DUNHAMS- ASPHALT
$279.35
JPMORGAN CHASE BANK
DUNHAMS - SUPPLIES
$550.00
JPMORGAN CHASE BANK
FENSCO- REPAIR
$2,975.00
JPMORGAN CHASE BANK
HARD HAT - UNIFORM
$78.00
JPMORGAN CHASE BANK
INTER MUNICIPAL -DUES
$425.00
JPMORGAN CHASE BANK
INTERSTATE -MAINT
$153.60
JPMORGAN CHASE BANK
LOCKE- SUPPLIES
$101.40
JPMORGAN CHASE BANK
LOWES -PARTS
$16.58
JPMORGAN CHASE BANK
LOWES- REFUND
($40.66)
JPMORGAN CHASE BANK
LOWES- REPAIR
$172.76
JPMORGAN CHASE BANK
LOWES- SUPPLIES
$66.38
JPMORGAN CHASE BANK
LOWES -TOOLS
$404.41
JPMORGAN CHASE BANK
MIDLAND VINYL - REPAIRS
$7,868.87
JPMORGAN CHASE BANK
P &K EQUIP- SUPPLIES
$37.31
JPMORGAN CHASE BANK
P &K -KEYS
$21.36
JPMORGAN CHASE BANK
RED WING- UNIFORM
$170.00
JPMORGAN CHASE BANK
SOK -FEES
$118.56
JPMORGAN CHASE BANK
UPS - SUPPLIES
$53.70
JPMORGAN CHASE BANK
VOSS LIGHTING - SUPPLIE
$2,241.00
JPMORGAN CHASE BANK
WARREN -KEYS
$16.00
7
Fund
Claims List - 03/07/2023
Vendor Name
39 SALES TAX STREETS JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
Payable Description Payment
Amount
WELSCO- RENTAL
WHITE STAR -TOOLS
SIGNALTEK INC MAINTENANCE AGREEMENT
TULSA COUNTY HIGHWAY CONSTRUCTION HALEACRESIGNAGE
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
WASHINGTON CO RURAL WATER DISTRICT 116 LANDSCAPE IRRIG
$49.64
$213.96
$1,465.00
$516.20
$272.21
$46.20
SALES TAX FUND- STREETS -Total $21,496.17
SALES TAX STREETS - Total $21,496.17
40 CAPITAL IMPROVEMENTS GARVER ENGINEERING SERVICES - CI $7,074.66
96TH FROM 134TH TO 145TH - Total
PHONE USAGE
$7,074.66
GARVER
DESIGN - 106 & 129 INTER
$1,057.05
CIP 106 /129 INTERSECT IMP -Total
AMAZON- REFUND
$1,057.05
GARVER
DESIGN - 96 & 145
$1,376.03
CIP 961145TH INTERSECT -Total
ARROWHEAD -PARTS
$1,376.03
JPMORGAN CHASE BANK
EATON ELECT - VEHICLE
$1,760.00
CIP FIRE DEPT VEHICLES -Total
BUMPER- SUPPLIES
$1,760.00
LIMESTONE CONSTRUCTION LLC
ST1 AND ST2 REMODEL
$3,500.00
FIRE STAT #1 RENOVATION -Total
HOME DEPOT -PARTS
$3,500.00
LIMESTONE CONSTRUCTION LLC
ST1 AND ST2 REMODEL
$3,500.00
FIRE STAT #2 RENOVATION -Total
HOME DEPOT- SUPPLIES
$3,500.00
R &L CONSTRUCTION LLC
SPORTS PARK IMPROVE
$107,993.76
SPORTS PARK IMPROV -Total
JIM GLOVER - REFUND
$107,993.76
STRONGHAND LLC
STREET REHAB FY21 -22
$41,970.10
STREET REHAB FY21.22 -Total
$41,970.10
CAPITAL IMPROVEMENTS -Total $168,231.60
70 CITY GARAGE AEP /PSO ELECTRIC USE $1,097.38
COX COMMUNICATIONS
PHONE USAGE
$15.44
JPMORGAN CHASE BANK
AMAZON -PARTS
$182.97
JPMORGAN CHASE BANK
AMAZON- REFUND
($125.98)
JPMORGAN CHASE BANK
AMAZON -TOOLS
$40.57
JPMORGAN CHASE BANK
ARROWHEAD -PARTS
$144.00
JPMORGAN CHASE BANK
BUMPER -PARTS
$2,808.37
JPMORGAN CHASE BANK
BUMPER- SUPPLIES
$213.40
JPMORGAN CHASE BANK
GOODYEAR -TIRES
$1,504.07
JPMORGAN CHASE BANK
HOME DEPOT -PARTS
$98.00
JPMORGAN CHASE BANK
HOME DEPOT - REFUND
($12.56)
JPMORGAN CHASE BANK
HOME DEPOT- SUPPLIES
$12.56
JPMORGAN CHASE BANK
JIM GLOVER -PARTS
$159.26
JPMORGAN CHASE BANK
JIM GLOVER - REFUND
($250.00)
1.1
Fund
70 CITY GARAGE
Claims List - 03/07/2023
Vendor Name
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
JPMORGAN CHASE BANK
UNIFIRST HOLDINGS LP
Payable Description
Payment
Amount
JIM GLOVER - REPAIR
$598.13
JIM NORTON -PARTS
$1,407.47
JIM NORTON - REFUND
($250.00)
NAPA STORE -PARTS
$279.03
QUIKSERVICE -PARTS
$60.00
SP PEDAL -PARTS
$310.96
SPRINGDALE -PARTS
$111.07
SUPERBRIGHT- SUPPLIES
$61.40
TERMINAL- SUPPLIES
$584.80
UNITED FORD -PARTS
$284.53
UNIFORMS
$107.26
CITY GARAGE -Total $9,442,17
CITY GARAGE -Total $9,442.17
76 WORKERS' COMP SELF -INS CITY OF OWASSO IMPREST ACCOUNT WORKERS COMP CLAIMS $1,049.36
WORKERS' COMP SELF -INS -Total $1,049.36
WORKERS' COMP SELF -INS -Total $1,049.36
City Grand Total $376,540.43
sd
TO:
The Honorable Mayor and City Council
FROM:
Earl Farris, Project Administrator
SUBJECT:
Acceptance of Infrastructure Improvements at 14501 East 89th Street North
(Focus Financial)
DATE:
March 3, 2023
BACKGROUND:
The subject commercial development is located at 14501 East 89th Street North. Public
infrastructure improvements consist of a concrete approach.
FINAL INSPECTIONS:
Final inspections for the infrastructure components were completed in January 2023, by the Public
Works Department. All standards for acceptance have been met. Additionally, the construction
contractor has supplied the necessary two -year maintenance bond.
RECOMMENDATION:
Staff recommends acceptance of the public infrastructure improvements located at 14501 East
89th Street North, consisting of a concrete approach.
ATTACHMENTS:
Location Map
City Attorney Approved Bond
Focus Financial
1" = 464 ft
Location Map
02/21/2023
Sly
This map may rep p accuracy, , p resents a visual display of related geographic information. Data provided here on is not guarantee of acutual field conditions. To be sure of complete lease contact the
responsible staff for most up -to -date information_
Farris, Earl
From:
Wingert Shellie
Sent:
Thursday, February 9, 2023 3:52 PM
To:
Farris, Earl; Lombardi, Julie
Cc:
Hancock, Brandon; Wingert Shellie
Subject:
RE: Focus Financial Bond Approval
Good afternoon Earl,
I have reviewed the Driveway /Entryway at 14501 E 89 St N maintenance bond at your request. The attorney -in -fact
signature is authorized, the surety is licensed to do business in Oklahoma, and the amount of the bond is well within the
surety's $152,157,000 underwriting limitation. Therefore, the bond is approved.
Thank you,
Shellie
Shellie Wingert
Legal Assistant
City of Owasso
200 S. Main Street
Owasso, OK 74055
swingertOcitvofowa sso. co m
918 - 376 -1548
From: Farris, Earl <efarris @CityOfOwasso.com>
Sent: Thursday, February 9, 2023 3:46 PM
To: Lombardi, Julie <1Lmbardi @CityOfOwasso.com>
Cc: Wingert Shellie <swingert @cityofowasso.com >; Hancock, Brandon <BHancock @CityOfOwasso.com>
Subject: Focus Financial Bond Approval
Ms. Lombardi,
Please see attached bond foryour review and/ or approval.
Earl Farris
Project Administrator
City Of Owasso Public Works
efarrisCW citvofowasso.com
ph918- 272 -4959 /fax 918- 272 -4996
MAINTENANCE BOND
Bond Number: 72529874
KNOW ALL PERSONS BY THESE PRESENTS, That we Bcummett construction Tnc
of
2401 W 133rd St N, Skiatook, OK 74070 ,hereinafter
referred to as the Principal, and WESTERN SURETY COMPANY
as Surety, are held and firmly bound unto city of Owasso
of 200 S. Main St., Owasso, OK 74055 ,hereinafter
referred to as the Obligee, in the sum of Ten Thousand and 00 /100
Dollars ($10.000.00 ), for the payment of which we bind ourselves, our legal representatives, successors
and assigns, jointly and severally, firmly by these presents.
WHEREAS, the said Principal entered into a contract with the city of Owasso
dated
,for Driveway /Entryway at 14501 E 89th St. N
WHEREAS, said contract provides that the Principal will furnish a bond conditioned to guarantee for the period of
TWO ( 2 ) year(s) after approval of the final estimate on said job, by the owner, against all defects In
workmanship and materials which may become apparent during said period, and
WHEREAS, the said contract has been completed, and was approved on February 9th , 2023
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH that, if the Principal shall Indemnify the
Obligee for all loss that the Obligee may sustain by reason of any defective materials or workmanship which
become apparent during the period of Two (-2 ) year(s) from and after February 9th, 2023
then this obilgation shall be void, otherwise to remain in full force and effect.
SIGNED, SEALED AND DATED this 9th day of February 2023
���SUaery��
0
3 � e
* ��ITH.DPK�P
Form F4721
By ak (Seal)
SHA ON KAY STONE, Attorney -In -Fact
Western Surety Company
POWER OF ATTORNEY - CERTIFIED COPY
Bond Nc.72529874
Rnow All Men By These Presents, that WESTERN SURETY COMPANY, a corporation duly organized and existing under the
laws of the State of South Dakota, and having its principal office in Sioux Falls, South Dakota (the "Company'), does by these presents
malce, constitute and appoint SHARON KAY STONE
its true and lawful atturney(s) -in -fact, with full power and authority hereby conferred, to execute, acknowledge and deliver for and on
its behalf as Surety, bonds far:
Principal: Brummett construction Inc
Obligee: city of Owasso
Amount: $1, 000, 000. 00
and to bind the Company thereby as fully and to the same extent as if such bonds wore signed by the Vice President, sealed with the
corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said attorneys) -fn-
fact may do within the above stated limitations. Said appointment is made under and by authority of the fallowing bylaw of Western
Surety Company which remains in full force and effect.
"Section 7. All bends, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President or by such
other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Socretary, or the
Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bends, policies, or undertakings in the name of
the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other
obligations of the corporation. The signature of any such officer and the corporate seal maybe printed by facsimile."
IFBend No.72529874 is not issued on or before midnight of February 9th, 2025 ,all
authority conferred in this Power of Attorney shall expire and terminate.
In Witness Whereof, Western Surety Company has caused these presents to be signed by its Vice President, Paul T. Bruflat, and
its corporatg,fippjto be affixed this 9th day of February 1 2023
°aAFLT),- ,',
" ^: ^d WES SUR Y COMPANY
t X3 Paul T. BruuIlxC,
fj C&t BagU I�A't$,6 A Vice President
$ ss
tJr hII,NW11 1'A
,6.,**
a >
Ori'tiliYfigi B 'EPi day of February , in the year 2023 , before me, a notary public, personally appeared
Paul T. Brullat, who being to me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of
WESTLR{N SURETY COMPANY aul acknowledged said instrument to be the voluntary act end deed of said corp •atioiL��
bi4444Yhh94aa99hhY Yid aikn
M. BENT s
NOTARY PUBLIC r
SEAL SOUTH DAKOTA BFAL i `Notnry Publie - South Dakota
f NSY•s4hhA'a4451S415S64Mb0 t
My Commission Expires March 2, 2026
I the undersigned officer of Western Surety Company, a stock corporation of the State of South Dakota, do hereby certify that the
attached Power of Attorney is in full force and effect and is irrevocable, and furthermore, that Section 7 of the bylaws of the Company
as set forth in the Power of Attorney is now in force,
In testimony whereof, I have hereunto sot my hard and seal of Western Surety Company this 9th day of
February 2023
WES // SSUR Y COMPANY
Paul T ruflat, Vim President
To validate bond authenticity, go to www.enasurety.com > Owner /Obligee Services > Validate Bond Coverage.
Form F5306- 11.2020
ODJ
Western Surety Company
The State of Oklahoma requires we notify you of the following:
WARNING: Any person who knowingly, and with Intent to injure, defraud or deceive any
insurer, makes any claim for the proceeds of an Insurance policy containing any false, incomplete
or misleading information is guilty of a felony,
Forth F2637
TO:
The Honorable Mayor and City Council
FROM:
Jason Woodruff, Deputy Chief of Police
SUBJECT:
John Hudak Donation Acceptance and Budget Amendment
DATE:
March 3, 2023
BACKGROUND:
Owasso resident John Hudak is donating $300.00 to the Owasso Police Department. Mr. Hudak
expressed that he wanted to show his support for the Owasso Police Department and his
appreciation for the work the officers do on a daily basis to keep our community safe.
RECOMMENDATION:
Staff recommends acceptance of the donation from John Hudak, and approval of a budget
amendment increasing the estimate of revenues and the appropriation for expenditures in the
Half -Penny Sales Tax Fund (Police) by $300.00.
O-P-A�5- V
TO:
FROM:
SUBJECT:
DATE:
The Honorable Mayor and City Council
Juliann M. Stevens, City Clerk
Public Hearing - Review of City Council Ward Boundaries
March 3, 2023
PUBLIC HEARING:
A Public Notice was published in the March 1, 2023, edition of the Owasso Reporter, as well as on
the City's website, to announce a public hearing to be held during the March 7, 2023, meeting of
the City Council. The purpose of the public hearing is to receive citizen comments regarding
proposed amendments to each boundary of the City's five (5) City Council wards.
The proposed amendments were presented during the February 14, 2023, worksession meeting of
the City Council.
BACKGROUND:
The City Charter and State Statutes both require periodic review of the City Council Ward
boundaries so that each Ward will be substantially equal in population. The City of Owasso utilizes
the Indian Nations Council of Governments ( INCOG) data analysis services using the most recent
Census data.
INCOG ANALYSIS:
Following the 2020 Census, the City of Owasso's population was determined to be 38,254 people.
An equal distribution of the population within each of the five Wards would be approximately
7,600 people. The current distribution of the population by Ward is as follows:
Ward
Current Population
Deviation from the Average
1
9,904
2,253
2
8,050
399
3
6,927
-724
4
6,119
-1532
5
7,254
-397
REDISTRICTING CRITERIA:
INCOG provided the following legally mandated requirements for establishment of Ward
boundaries:
• Each Ward shall consist of compact and contiguous territory (State Statute)
• Be as substantially equal in population as practical (State Statute)
In addition, secondary criteria to consider is the use of major physical features, such as rivers, .
expressways, or arterial streets to provide clear and concise boundaries.
ATTACHMENTS:
Current City Council Ward Boundaries
Proposed Plan 1
Proposed Plan 2
Legend E 136TH S.T.N I -! ____ w —' ' Q�k' -- w' ' -
Current Wards
r
(�3w E126TH JN _
;s , I i j L Corporate Nmits CDundlors
Courtly Boundary z i �, Major Medals ' E 116,TH STANgym — -r -. —� '—Ld '^
Water Bodies r:' - -rTT:�
3 s I1 I to'
Ln +rur I r J
E:106TH:
k� r< J
_ '1 r
I.Z �L
.r `E -961
�4
s'
®3
1 L
j E 86TH 5T N
BLVD
Owasso City Council Districts
Current Ward Boundaries
Current Time: 5/13/2022 4:17 PM
Source: 2020 Census PL94 -171 Redistricting Data File
r �
I
�I
E 767�H,yST N�
1 q:5A�i — I ,
E 56TH ST N —
r
1
i Iw- biz
a
L
U `
I
Y / M
1 I
1
� I
�C
m
K ,
NI
y
M
�DOLIL air
t
� II
y I 6531
( NCOG
Ell
E 590 RD
A
1 2 Miles
Planl Legend
L
n 2
Q3
�4
6
r 1 Corporate Limits
® County Boundary
-- Major Arterials
Streets
Water Bodies
s
2
w
z
_ - I �I
I � LEI -JIrL I
'�Iw�E126TH IN
TU
++ a,h�' E •11fiTH STIN -
I Sri
Li,i� iY� +o:I r z
�•� _ u�,I -� , t 'L l , w lE(106TH STN
� rz C 1 t.�.
J I
z / I
r --
f 4
102 Q
y �J
1 V LL_CJ I_ �t L_J s EB6TH STN
F1 u
E76 ISF
�� -µms,
3 I, .
� ' i — — E i
I o)
K
O
F
z'
MOHAWK BLVD - --
Owasso City Council Districts
Plan 1 - Ward Boundaries
Current Time: 5/18/2022 10:40 AM
tI I�u
IIIF --
'I N
TI�
56TH ST N —i.
�Ep
M
u
41'
M
E 5,40 RC
INCOG A
Legend E136TI I I_I c���
r
Corporate
oundlor LImI�
� [oundlors
® County Boundary ti
Malar Arterials
— Streets j I E 126TH STN
1- _ _ s _ .� y
Water Bodies
3 E 116,TH ST N ++ >0 1
� Ir F-- `� A �-
a I � �b s
rw E:106TH
J
90 RE
Z �__�•�/ - u.rz JCS J-/F>a- f.-
f a L JIB
z M
i lTi N7 1-
— `E'96TH
J z
v-41 r
• 3 <- M
�I L E86TH ST ., 7— j� �_.—
i 1 J -•� __ J
I
ri
E Iy_ (�'��c�,���� ar
135 . _3 ', •� r � � a., fl - � -- - - - - _ -C� 714 -1}'-
: ��1 µµµyyy ` �y I I r[
J- E 66TH Si N _ _ P�L�
0
z
0
C
Z
z _ T— E 540 RD
E 56TH ST
BLVD C _ t
MOHAWK B - -: =_� _ -._ —__ -I
Owasso City Council Districts
Plan 2 - Ward Boundaries
Current -nrne: 717/2022 2:49 PM
CINCOG A
TO: The Honorable Mayor and City Council
FROM: Christopher A. Garrett
Assistant City Manager
SUBJECT: Capital Improvements Project Eligibility Public Hearing
DATE: March 3, 2023
EXECUTIVE SUMMARY:
The City Council conducts a public hearing regarding any project being considered for funding
from the Capital Improvement Fund. The project being considered at this time is East 861h Street
North Widening from North 145th East Avenue to North 1610 East Avenue.
BACKGROUND:
The Capital Improvement Committee conducted a public meeting on January 24, 2023, to
consider a proposed amendment to the list of eligible Capital Improvement Fund projects.
As per the resolution defined procedures, the City Council conducts a public hearing to receive
and consider citizen input relevant to the recommendation made by the Capital Improvement
Committee. Notice of the public hearing must be made no less than 5 days prior to the public
hearing. At the conclusion of the public hearing, the City Council must continue the matter for at
least 2 weeks before taking any action to amend the listing of projects. Any action taken by the
City Council to amend the current list of projects must be made by approving a resolution.
PROJECT INFORMATION:
East 86th Street North from North 1451h East Avenue to North 161 :t East Avenue is a 2 -lane secondary
arterial roadway which is a heavily trafficked area that conveys residential and commercial traffic
as well as commuter traffic to and from Owasso. Currently, the roadway has approximately 9,000
vehicles per day traveling east /westbound. The Transportation Master Plan forecasted this section
of East 86th Street North to be improved by Fiscal Year 2020. The proposed roadway improvements
include four lanes, bridge replacement, traffic signals, sidewalk, multi -use trail, bike - lanes,
curb /gutter, and underground storm drain systems along the one -mile section. The estimated
project cost is $20.5 million, which includes, engineering, land acquisition, utility relocation, and
construction costs.
CURRENT PROJECT PRIORITIES:
Adopted July 5, 2022, Resolution 2022 -09 designated the following list of projects as eligible for
funding from the Capital Improvements Fund:
• East 76th Street North Widening Project (Hwy 169 to North 1291h East Avenue)
• East 76th Street North and US 169 Interchange Improvements
Garnett Road Widening Project (East 96th Street North to East 106th Street North)
• Garnett Road Widening (East 106th Street North to East 116th Street North)
• East 96th Street North Widening from North 134th East Avenue to North 145th East Avenue
• East 96th Street North and North 145th East Avenue Intersection Improvements
CIP Public Hearing
Page 2 of 2
• East 106th Street North and North 129th East Avenue Intersection Improvements
• East 1061h Street North and North 1451h East Avenue Intersection Improvements
• East 116th Street North Widening from North Garnett Road to North 1291h East Avenue
• East 1 16th Street North and North 1291h East Avenue Intersection Improvements
• East 1 16th Street North and North 140th East Avenue Intersection Traffic Signal Improvements
• Annual Street Rehabilitation Program
• Highway 169 East and West Service Roads (East 66th Street North to East 1261h Street North)
• Central Park I Lakeridge Subdivision Stormwater Improvements
• Rayola Park and Elm Creek Tributary 5A Stormwater Improvements
• Northwest Regional Detention
• South Sports Park Regional Detention Pond Project
• Parks Facility
• Public Works Facility
• Vehicle Maintenance Facility
• Firing Range Multi- Purpose Facility
• Firing Range Shoot House
• Fire Station #I Renovations
• Fire Station #2 Renovations
• Public Safety Vehicles
• Fiber Installation Owasso Police Department to Public Works
• 5K Heart Healthy Trail
• Elm Creek Park Improvements
• Funtastic Island Renovations and Splash Pad
• Sports Park
CAPITAL IMPROVEMENTS COMMITTEE RECOMMENDATION:
On January 24, 2023, the Capital Improvements Committee held a meeting in accordance with
the Oklahoma Open Meeting Act and City Council Resolution 2003 -14. The purpose of the
meeting was to consider a recommendation to the City Council to amend the current list of
projects eligible to be funded through the Capital Improvements Fund. Committee members
discussed the proposed interchange improvements. At the conclusion of the discussion, the
Capital Improvements Committee voted in favor of submitting a recommendation to the City
Council amending the list of eligible projects to include:
East 86th Street North Widening from North 1451h East Avenue to North 161st East Avenue
PUBLIC HEARING:
Notice of the public hearing was published in the Owasso Reporter February 22, 2023, as required
by Resolution 2003 -14, as well as posted to the Public Notices section of the City website.
ATTACHMENTS:
Memoranda to Owasso Capital Improvements Committee dated January 20, 2023
Site Map
BACKGROUND
East 86th Street North from North 145th East Avenue to North 161st East Avenue is a 2 -lane
secondary arterial roadway which is a heavily trafficked area that conveys residential and
commercial traffic as well as commuter traffic to and from Owasso. Currently, the roadway has
approximately 9,000 vehicles per day traveling east /westbound. The Transportation Master Plan
forecasted this section of East 86th Street North to be improved by Fiscal Year 2020.
SCOPE OF WORK:
The proposed roadway improvements include four lanes, bridge replacement, traffic signals,
sidewalk, multi -use trail, bike - lanes, curb /gutter, and underground storm drain systems along the
one -mile section. The estimated project cost is $20.5 million, which includes, engineering, land
acquisition, utility relocation, and construction costs.
FUNDING:
The bridge replacement will be funded by the Capital Improvements Fund, Rogers County
District #2 (Federal Funding), and the Cherokee Nation.
Roadway and Intersection improvements will solely be funded by the Capital Improvements
Fund.
RECOMMENDATION:
Staff requests the Capital Improvements Committee submit a recommendation to the Owasso
City Council to include the East 86th Street North Widening from North 145th East Avenue to North
161 st East Avenue as a project eligible for the Capital Improvement Fund,
ATTACHMENT:
Site Map
TO:
Capital Improvements Committee
FROM:
Roger Stevens
Public Works Director
SUBJECT:
East 861h Street North Widening from North 145th East Avenue to North 161 sr
East Avenue
DATE:
January 20, 2023
BACKGROUND
East 86th Street North from North 145th East Avenue to North 161st East Avenue is a 2 -lane
secondary arterial roadway which is a heavily trafficked area that conveys residential and
commercial traffic as well as commuter traffic to and from Owasso. Currently, the roadway has
approximately 9,000 vehicles per day traveling east /westbound. The Transportation Master Plan
forecasted this section of East 86th Street North to be improved by Fiscal Year 2020.
SCOPE OF WORK:
The proposed roadway improvements include four lanes, bridge replacement, traffic signals,
sidewalk, multi -use trail, bike - lanes, curb /gutter, and underground storm drain systems along the
one -mile section. The estimated project cost is $20.5 million, which includes, engineering, land
acquisition, utility relocation, and construction costs.
FUNDING:
The bridge replacement will be funded by the Capital Improvements Fund, Rogers County
District #2 (Federal Funding), and the Cherokee Nation.
Roadway and Intersection improvements will solely be funded by the Capital Improvements
Fund.
RECOMMENDATION:
Staff requests the Capital Improvements Committee submit a recommendation to the Owasso
City Council to include the East 86th Street North Widening from North 145th East Avenue to North
161 st East Avenue as a project eligible for the Capital Improvement Fund,
ATTACHMENT:
Site Map
East 86th Street North from North 145th East Avenue to North 161 st East Avenue
1^ = 732 ft
Sub Title
10/20/2022p
PFII. P]LM.PE�PlL CIIUl1 A'
This map may represents a visual display of related geographic information. Data provided here cn is net guarantee of acutual field conchicns. To be sure of co iiplete accuracy, please contact the
responsible stagy, Icr most up -to -date inform
adon.
sd
TO:
The Honorable Mayor and City Council
FROM:
Earl Farris
Project Administrator
SUBJECT:
Acceptance of the 2021 Annual Street Rehabilitation Program and Authorization
for Final Payment
DATE:
March 3, 2023
BACKGROUND:
In February 2022, City Council approved a construction contract with Becco Contractors Inc, in
the amount of $1,397,000.00, to perform repairs and maintenance on multiple roads throughout
Owasso.
2021 -22 Street Rehabilitation Program Project List:
• East 106th Street North from North 145th East Avenue to North 161st East Avenue
• Elm Place
• North 120th East Avenue from East 80th Place North to East 83rd Street North
• East 82nd Street North from North 1 18th East Avenue to North 1201h East Avenue
• East 83rd Street North from North 120th East Avenue to North 122nd East Avenue
• North 121 st East Avenue from East 81 st Street North to East 83rd Street North
• East 8111 Street North from North 121st East Avenue to North 122nd East Avenue
• East 81 :t Place North from North 122nd East Avenue to North 124th East Avenue
• East 82nd Street North from North 122nd East Avenue to North 124th East Avenue
In February 2023, Becco Contractors Inc. completed all work within the contract. City staff
inspected the improvements and agree that all requirements and standards have been met. The
final payment of $143,523.39 will result in a final contract amount of $1,238,693.60, a contract
underrun of $158,306.40.
FUNDING:
Funding for this project is included in the Capital Improvements Fund and the Half -Penny Sales Tax
Fund (Streets).
RECOMMENDATION:
Staff recommends acceptance of the street rehabilitation projects and authorization for final
payment to Becco Contractors Inc. of Tulsa, Oklahoma, in the amount of $143,523.39.
ATTACHMENTS:
Final Pay documents
Location Map
PO 20230570 39- 300 - 168 - 54210
Becco Contractors Inc.
P.D. Box 9159
Tulsa Ok. 74157 -0159
Periodical Estimate for
8- FINAL.
Application
1. ORIGINAL CONTRACT PRICE ._............. .... ................ ..............
S 1,397,000.00
Pa ment No:
$
Date.
211712023
Application Period:
1/112023 To 7!1612073
To (Owner):
City of Owasso
Via(Engineer):
City crowasm
From (Contractor):
BMW Contractual, Inc.
Project:
2021 Paving Repair Project
Contract
Number:
N/A
Purchase Order f{:
Becco Job 680
NTP Date:
Monday, May 23, 2022
Contract Time:
270 Days
Contract Time
269 of 270
8. LESS LIQUIDATED DAMAGES .... ..... ............ _._ ...... ..._..............
S
9. AMOUNT ELIGIBLE THIS APPLICATION .. ...............................
Elapsed (Day of):
contractor, Collocation
The undersigned Camacterceni6es that to be best of its knowledge: (1) all previous progress
payments rccsived from Ownereo account of Work done under the Canvact have been applied on
account to discharge Connadors legitimem obligations incurred m connection with Work covered by
Print Appliralioos for Payment, (2) till. of all Work, materials and equipment inmrpoated is said Wad
or otherwise listed in or covered by this AppScation for Payment will pass to Owner actions ofpayonenl
free and elearof all Liens, security interests and encumbrances (except such as are covered by a Bond
acceptable to Owner indemnifying Owner ageitm any such Liens, security interest or encumbrances);
and (3) all Work coverts by this Applicomen for Payment is in accordance with the Contract Documents
and is not defective
Date:
INVOICES from
Payment of: S N/A TD: Authorized Vendors
and
Payment of: $ 143$23.39 TO: Becco Contractors, Inc.
Signature Date Owner Representative
— 23 -2mz
Signatlue Date
Signature Date
Signal.
Date
1. ORIGINAL CONTRACT PRICE ._............. .... ................ ..............
S 1,397,000.00
2. Net change by Change Orders................................................ _.........
$
3. Current Contract Price (Line I t 2)............... ......................... ........
5 1,397, 00100
4. TOTAL COMPLETED AND STORED TO DATE
(Total Installed to nah+ Total stand Materialr RemalnMg l...._.._.- .....__._,,..�....$
1,230,693.60
/
S. RETAINAGE:
a. X $1,238,693.60 Work Completed ................$
6. AMOUNT ELIGIBLE TO DATE (Line 4 - Line Sc)............. _........
S 1,238,693.60
/
7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)..
S 1'095.170.21
8. LESS LIQUIDATED DAMAGES .... ..... ............ _._ ...... ..._..............
S
9. AMOUNT ELIGIBLE THIS APPLICATION .. ...............................
S 143,52339
10. VENDOR AMOUNT DUE THIS APPLICATION ........................$
N/A
11. CONTRACTOR AMOUNT DUE THIS APPLICATION ..............
5 141,52339
of
INVOICES from
Payment of: S N/A TD: Authorized Vendors
and
Payment of: $ 143$23.39 TO: Becco Contractors, Inc.
Signature Date Owner Representative
— 23 -2mz
Signatlue Date
Signature Date
Signal.
Date
K
AFFIDAVIT OF CLAIMANT
IMPORTANT
THIS AFFIDAVIT MUST DE ATTACHED AND RETURNED WITH THE PAYMENT APPLICATION
DESCRIPTION
DATE
PAYMENT APPLICATION AMOUNT
PROfECTNAME 2021 Paving Repair Project
CONTRACT NO. N/A
PAY ESTIMATE
2117/2023
SI43,523.39
AFFIDAVIT OF CLAIMANT
STATE OF OKLAHOMA )
COUNTY OF TULSA )
The undersigned (engineer or supervisory official), of lawful age, being first duly swom, an oath says that this (invoice, claim, or contract) is true and correct.
Affiant further states that the (work, services or materials) as shown by this invoice or claim have been (completed or supplied) in accordance with the plans,
specifications, orders, or requests furnished to the affiant. Affanrfurther states that (s)he has made no payment, given, or donated or agreed to pay, give, or
donate, either directly or indirectly, to any elected official, officer, or employee of the State of Oklahoma, of-mooekor any other thing of value to obtain payment
or the award of this contract. / I
OF
WILLIAM E. SMITH
(PRINTED NAME)
VICEPRESIDENT
Subscribed and sworn to before me this day of gMr 00 ,20 Z3 , Respectfully submitted,
ulmtuut#1111, , FI =010JA Y
............ k IA. N A
_ ?
140.9s:'f
Periodical Estimate - Unit Price Work
Contractor's Application
For
(Contract):
2D21 Paving Rpair Prejrn
Contract Number.
N/A
Application Period:
1/112023 To 2/16/2023
Contractor:
Becw Contmam., Inc.
Application Number:
&FINAL
Application Date:
2117/2023
[ICm
Bid Item
Quantity
Unit Price
Bid Item Value (S)
Quenhty
Installed
Qusnoty
Ivsmlled This
Total Eamcd This
Total lnsmllcd to Dam
Fla
a lance to Finish
Bid Item No.
Description
Units
Previously
Period
period (SJ
BASE BID
I
TYPE 1 REPAIR
SY
3 658
$ 80.00
S292,640.0
3,78633
98.88
4 S7,910.40
S310,816.80
1061%
- $18,176,80
2
6 12" DOWELED CONCRETE TO SURFACE OCTS
SY
6
95.00
538,235.00
503.00
110.00
�' $10,450.00
$58,235.00
100.0%
3
2" FULL WIDTH MILL
SY
20127
$ 2,50
556317.50
18.220.87
415.00
51,037.50
$46,589.68
92.6%
53,727.83
4
2" ASPHALT FULL WITH OVERLAY
SY
12 562
$ 9,00
5113,058.00
11,400.10
$102,600.90
90,8%
510,457.10
5
2" EDGE TO 3" CENTERLINE ASPHALT OVERLAY
SY
7565
11.00
563,215.00
6,620]7
4150D
54,565.00
579,593.47
95.6%
S3,621.53
6
6" CONCRETE CURB AND GUTTER (REMOVE AND REPLACE)_
LF
1783
40.00
571,320.00
1.452.00
263,01-
$10,520.00
568,600.00
961Y.
S2 720.00
7
DRIVEWAY CONCRETE GUTTER ONLY REMOVE AND REP IACE
LF
501
30.00
515;030.00
451.00
24.00
$720.00
514,250.00
94.8%
5780.00
8
CONCRETE DRIVEWAY APPROACH REMOVE AND REPLACE
SY
244
85.00
520,740.00
166.00
61,001
S5,185.00
$19,295.00
93.0%
51,445.00
9
CONCRETE VALLEY GUTTER
SY
32
70.00
S2,240.00
83.55
32.00
' 52,240.00
58,088.50
361.1%
- 55,84850
10
q" CONCRETE SIDEWALK REMOVE AND REPLACE)
SY
172
65.00
SI 1,180.00
132.99
55.00
$3,575.00
512219,35
109.3%
- 51,039.35
1 I
ADJUST WATER VALVES TO GRADE
EA
lfi
250.00
54,000.00
4,00
1.00
5250.00
$1,250,00
31.3 %
52,750.00
12
ADJUST MANHOLE TO GRADE
EA
2
$1-.8-00.00-F
53,600.00
13
EXISTING CONCRETE HANDICAP RAMP MMOVE & REPLACE
EA
9
$ 2,50D.00
S22,5D0.00
6,00
3.00
S7,5DO.00
522,500.00
100.0%
53,600.00
14
NEW CONCRETE HANDICAP RAMP TYPE "B"
EA
3
$ 1700.00
S5,ID0.00
3.00
1:00
$1,700.00
56,800.00
133.3%
- $1,700.00
IS
q "WHITE MULTI - POLYMER STRIPE
LF
10841
1.30
514,09330
10 1,00
438.00
5569.40
$14,662.70
104.0%
456940
16
4" YELLOW MULTI - POLYMER STRIPE
LF
10210
$ 1.30
S13,273:00
101211100
$13.273.00
100.0%
17
WATER METER CAN ADJUSTMENT TO FINISH GRADE CITY P
EA
5
$ 250.00
57,250.00
Is
PLOWABLE FILL CLSM
CY
50
80.00
54,000.00
51,250.00
19.
TRAFFIC CONTROL
LS
1
31397.80
531,397.80
D.84
O.IG
55,023.65
531,397.80
100.0%
54,000.00
20
MOBILIZATION &DEMOBILIZATION
LS
1
125 000.00
5125,000.00
1.00
$125,DOD,00
100.0%
21
EROSION CONTROL
LS
1
5,000.00
55,000.00
0.84
0.16
S800.00
SS,OOD,00
100.0%
22
PROJECF ALLOWANCE
ALLOW
1
150000.00
$150,000.00
5150,000.00
ALTERNATES
IA
TYPE REPAIR
-SY
408
$ 80 OOT
832,640.00
336.54
$26,923.20
82.3%
85,716.80
2A
6 1/2" DOWELED CONCRETE TO SURFACEDCTS
SY
217
95.00
520,615.00
217,00
SZD,G75.00
Io0.0%
3A
2" FULL WIDTH MILL
SY
4011
2.50
S10,027.50
4,01100
510,027.50
100.0%
4A
2" EDGE T03 " CENTERLINE ASPHALTOVERLAY
SY
4,011
9.00
576,099.00
4,011.00
536,099.00
100.0%
5A
6" CONCRETE CURB AND GUTTER REMOVE AND REPLACE
LF
386
40.00
$15,44000
404.00
516,160,00
104.7%
- 5720.00
6A
DRIVEWAY CONCRETE GUTTER ONLY REMOVE AND REPLAC
LF
160
$ 30.00
54,800.00
22L00
56,630.00
138.1%
- 51,870.00
7A
CAST IRON STORM WATER CURB OUTLET ROOF DRAINS FR
EA
5
250.00
$1,250.00
BA
CONCRETE DRIVEWAY APPROACH REMOVE AND REPLACE
SY
87
85.00
57,395.00
UILDO
81,250,00
9A
" CONCRETE SIDEWALK f REMOVE AND REPLACE
SY
55
65.OD
53,575.00
2800
27.00
519,380.00
262.1%
-S 11,985.D0
10A
ADJUST WATER VALVES TO GRADE
EA
3
250.00
5750.00
I.-DO
51,755.00
53,57500
700.0%
IIA
ADJUST MANHOLE TO GRADE
EA
1
1800.00
SI,800.DD
5250.00
33.3%
$500.00
12A
NEW CONCRETE HANDICAP RAMP TYPE "B"
EA
9
1700 00
56,800.D0
2.00
2.OD
83,400.00
86,800.00
100.0%
51,800.00
13A
4 "WHITE MULTI - POLYMER STRIPE
LF
232
1.30
5301.60
232.00
$301.60
5301.60
100.0%
14A
TRAFFIC CONTROL
LS
1
3,500.00
53,500.00
0.84
0.16
5560.00
51500.00
100.0%
ISA
EROSION CONTROL
LS
1 I
S 1500.00 1
51,500.00
0.84
0.16
3240.00
57,500.00
100.0%
ALTERNATE2
I
TYPEI REPAIR
SY 1
229
S 80.00
$18320.00 186,66
514,932.80
81.5%
53,387.T0
2B
6 12" DOWELED CONCRETETOSURFACE DOTS
SY
110
9500
S10,450.00 110.00
510,450.00
100.0%
3B
2" FULL WIDTH MILL
SY
2 327
2.50
55;817.50 2,327.00
55,817.50
10D.0%
4B
2" EDGE TO 3" CENTERLINE ASPHALTOVERLAY
SY
2327
900
530,943.00 2327.00
520,943.00
100,0%
5B
6" CONCRETE CURB AND GUTTER REMOVE AND REPLAC
LF
209
90.00
$8,360.00 209.00
58,360.00
100.0%
6H
DRIVEWAY CONCRETE GUTTER ONLY REMOVE AND REPLAC
LF
241
30.00
57,230.00 241.00
57,210.00
100,0%
7B
CONCRETE DRIVEWAY APPROACH REMOVE AND REPLACE
SY
81
85.0D
%,885.00 81.00
56,885.00
100.0%
8B
4" CONCRETE SIDEWALK REMOVE AND REPLACE
EA
42
65.00
S2,73D.0D 700
35.00
52,275.00 12,730.00
100.0%
9B
ADJUST WATER VALVES TO GRADE
EA
2
$ 250.00
MOM 1.00
S250.60
50.0%
5250.00
108
NEW CONCRETE HANDICAP RAMP TYPE "B"
EA
2
1700.00
53,400.00
2.00
53,400.00 53,400.00
1040%
IIB
12B
138
ALTERNATE3
4" WHITE MULTI - POLYMER STRIPE I LF
TRAFFIC CONTROL I LS
EROSION CONTROL I LS
224 1.30
I 1 1 $ 2,500.00
I I 1 $ 2.000.00
$291.201
S2,500,001
S2.000,001
0,841
U.941
224.00
1 u. i6l
0.161
8291.20
5400MI
NJZU.Uul
1291.201 100.0%
52,500.00 100.0%
S2,000.01 100.0%
IC
2C
3C
4C
SC
6C
7C
8C
9C
IOC
I IC
I2C
IJC
14C
Change Orders ISC
[TYPE[ REPAIR
6 1 2" DOWELED CONCRETE TO SURFACE (DCTSI
2" FULL WIDTH MILL
2" EDGE TO 3" CENTERLINE ASPHALT OVERLAY
6" CONCRETE CURB AND GUTTER REMOVE AND REPLACE
DRIVEWAY CONCRETE GUTTER ONLY REMOVE AND REPLACE
CONCRETE DRIVEWAY APPROACH (REMOVE AND REPLACE )
4" CONCRETE SIDEWALK REMOVE AND REPLACE
AD3UST WATER VALVES TO GRADE
�ADiG6T MANHOLE TO GRADE
EXISTING CONCRETE HANDICAP RAMP REMOVE & REPLACE
NEW CONCRETE HANDICAP RAMP TYPE "B"
4" WHITE MULTI - POLYMER STRIPE
TRAFFIC CONTROL
EROSION CONTROL
SY
SY
SY
SY
LF
LF
SY
SY
EA
EA
EA
EA
LP
LS
LS
134
115
1,786
1,786
87
139
17
24
1
1
1
I
232
1
1
80.00
95.00
$ 2.50
9.00
$ 40.00
$ 30.00
$ 85.00
65.00
$ 250.00
1800.00
2 500.00
1,700.00
1.30
2 500.00
2000.00
510,720.00
81092500
$4,465.00
S16,074,0
S3,4800
%4,170.00
SIA45.00
51,560.00
$250.00
51800.00
52,500.00
51,700.00
5701.60
52,500.60
$200000
10300
57,50
1,786.00
1,786.00
45.00
139.00
33.00
12.00
1.00
O.Bq
0.84
57,501
42.00
12.00
1.00
1.00
232.00
0.16
0.1fi.
1 55,462.50
51,680.00
8780.00
$25000
51,100.00
8301.60
r 5400.00
5320.00
58,240.00
510,925.00
54,46500
$16,074,00
S3,480.0
54,170.00
52,805.00
%1,560.00
5250.00
52,500 00
31,700.00
%301.60
52,300.00
52000.00
76.9%
100.0%
100.0%
100.0%
100.0%
100.0%
194.1%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
52,480.00
- 51,360.00
51,800.00
Total Stored Materials Remainin
Totals 81,797,000.00 385,882.85 S7,2J8,fi93,60 88.7 " " /o S20I,535.46
EXTENSION OF TIME REQUEST
For (Contract):
2021 Paving Repair Project
Contract Number:
N/A
Contractor:
Becco Contractors, Inc.
Application Number:
&FINAL
Application Period
(/1/2023 To 2/16/1023
Application Date:
2117 /2023
IMPORTANT
THE EXTENSION OF TIME REQUEST MUST BE SUBMITTED WITH EVERY PAY APPLICATION. IF NO TIME
EXTENSION IS REQUESTED, THE CONTRACTOR FORFEITS ANY CLAIMS TO LOST TIME WITHIN THE ASSOCIATED
APPLICATION PERIOD.
Contractor is Requesting a Time Extension: NO
(YES or NO)
Reasons for Request of Contract Extension: (Explain in Detail)
Total Time Contractor is Requesting: n
Submitted By: /�tAOy it / /D7n c IS��O z 9 —1 - ? —A3
C
Name (Print) 4F Signature (Dale)
Review by Engineering & Construction Department
Extension of Time Recommended:
(YES or NO)
Total Time Recommended for Extension:
Additional Comments:
Recommendation by:
Approved by:
(Governing Council)
Construction Division Manager
Name (Print)
Signature
(Date)
(Date)
CONTRACTOR'S FINAL RELEASE AND WAIVER OF LIEN
Project/ Owner Contractor
Project: 2020 -2021 Paving Repair Project Name: Becco Contractors, Inc
Address: 200 South Main
Owasso OK 74055
City State Zip Cade
Owner: City of Owasso
TO ALL WHOM IT MAY CONCERN:
Address: PO Box 9159
Tulsa OK 74157
City State Zip Code
Contractor Licence:
Contract Date: 2 / 15 /2022
For good and valuable consideration, the receipt and sufficiency of which is hereby
acknowledged, the undersigned Contractor hereby waives, discharges, and releases any and
all liens, claims, and rights to liens against the above - mentioned project, and any and all other
property owned by or the title to which is in the name of the above - referenced Owner and
against any and all funds of the Owner appropriated or available for the
construction of said project, and any and all warrants drawn upon or issued against any such
funds or monies, which the undersigned Contractor may have or may hereafter acquire or
possess as a result of the furnishing of labor, materials, and /or equipment, and the performance
of Work by the Contractor on or in connection with said project, whether under and pursuant to
the above - mentioned contract between the Contractor and the Owner pertaining to said project
or otherwise, and which said liens, claims or rights of lien may arise and exist.
The undersigned further hereby acknowledges that the sum of
One hundred forty three thousand five hundred twenty three & 39/100
Dollars ($143,523.39 ) constitutes the entire unpaid balance due the undersigned in
connection with said project whether under said contract or otherwise and that the payment of
said sum to the Contractor will constitute payment in full and will fully satisfy any and all liens,
claims, and demands which the Contractor may have or assert against the Owner in connection
with said contract or project.
Witness to Signatur Qe: ,
,� G� �-
Notary Public
State of Oklahoma
SHELLY BIBLE
TULSA COUNTY
COMMISSION 000013074
pOMM, EX g. 09. 16.2024_
Page 1 of 1
Print Form
2020 -2021 Street Rehabilitation Project
1" = 3408 ft
Location Map
02/22/2023
Sp
RFJL Peen. PE�FTL G�+W P
This map may represems a visual ciisp]ay of related geographic information- Data provided here on is not guarantee of acatual fia Id conditions -To be sure of complete accuracy, please contact the
responsible staff for most up -to -date in-ormation-
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 02125123
Department Payroll Expenses Total Expenses
105
Municipal Court
6,066.24
9,639.03
110
Managerial
26,720.46
36,825.57
120
Finance
19,492.18
30,235.36
130
Human Resources
11,372.28
17,192.20
160
Community Development
20,581.88
31,129.05
170
Engineering
21,773.14
33,409.79
175
Information Systems
19,359.56
27,475.27
181
Support Services
11,185.21
16,602.42
190
Cemetery
1,399.38
2,942.33
201
Police Grant Overtime
-
-
215
Central Dispatch
3,494.56
5,608.69
221
Animal Control
5,657.35
7,998.81
280
Emergency Preparedness
2,627.02
3,654.05
370
Stormwater/ROW Maint.
9,479.84
15,302.66
515
Park Maintenance
10,220.88
15,765.78
520
Culture /Recreation
8,515.40
14,029.62
550
Community- Senior Center
7,435.83
9,909.84
580
Historical Museum
832.40
929.37
720
Strong Neighborhood
406.88
502.04
General Fund Total
186,620.49
279,151.88
185 Garage Fund Total 10,846.56 17,966.61
255 Ambulance Fund Total 553.85 618.38
215 E911 Communication 27,473.23 42,803.20
250 Fire Fund 37 Total 216,537.29 330,895.14
201 Police Fund 38 Total 244,285.17 352,612.55
300 Streets Fund 39 Total 23,244.55 38,680.96
370 Stormwater Fund 27 Total 6,614.77 11,023.01
150 Worker's Compensation Total
720 Strong Neighborhoods Total 4,537.99 6,485.19
CITY OF OWASSO
HEALTHCARE SELF INSURANCE FUND
CLAIMS PAID PER AUTHORIZATION OF ORDINANCE #789 AS OF 2/28
VENDOR DESCRIPTION
AETNA HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
ADMIN FEES
STOP LOSS
HEALTHCARE DEPT TOTAL
DELTA DENTAL DENTAL MEDICAL SERVICE
DENTAL DEPT TOTAL
HEALTHCARE SELF INSURANCE FUND TOTAL
AMOUNT
83,689.04
43, 522.97
80,220.72
4,660.92
96,873.90
308,967.55
5,857.73
5,857.73
314,825.28
SECTION 00600
CHANGE ORDER
PROJECT: OW WTP & Main Lift Station Expansion CHANGE ORDER NUMBER: 18
CONTRACT DATE: December 1, 2020 DATE: March 1, 2023
TO CONTRACTOR: Crossland Heavy CONTRACT FOR: OW WTP Upgrade
The Contract is changed as follows: Additional digester air piping. Includes all materials, labor,
equipment, payroll additives. This change order adds stainless steel air piping to an existing digester to
allow for enough air to help BOD within the digester. This took additional labor and materials to
connect the piping to the air manifold to the digester. Total Cost will be $31,482.04 and includes 6
additional days added to the contract.
No additional money is requested as Project Allowance will be utilized for change order.
Not valid until signed by the Owner and Contractor
The original Contract Sum was $ 21,187,879.00
Net change by previously authorized Change Orders $ $0
The Contract Sum prior to this Change Order was $ 21,187,879.00
The Contract Sum will be (increased) (decreased) (unchanged) by
this Change Order in the estimated amount of $ 0
The new Contract Sum including this Change Order will be $ $21,187,879.00
The Contract Time will be (increased) (decreased) (unchanged) by (_0__) days.
The date of Substantial Completion as of the date of this Change
Order therefore is April 30, 2023. (includes all day through CO 18)
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
CONTRACTOR
m
KM
DATE
City of Owasso
OWNER
200 South Main
ADDRESS
Owasso Ok 74055
BY 4QA�
DATE -3/z- �z3
SPECIAL PROVISIONS
0509 00900 -Page 1 of 4