HomeMy WebLinkAbout2026.03.03_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY (OPWA)
Council Chambers Old Central Building 109 North Birch, Owasso, OK
Tuesday, March 3, 2026 - 6:30 PM
NOTE: APPROPRIATE ACTION may include, but is not limited to: acknowledging, affirming, amending, approving, authorizing,
awarding, denying, postponing, or fabling. RECEIVED
AGENDA
1. Call to Order - Chair Alvin Fruga FEB 2 6 2026 A-19-
2. Roll Call City Clerk's Office
3. Consideration and appropriate action relating to the Consent Agenda. (All matters listed under
"Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee
may, however, remove an item from the Consent Agenda by request. A motion to adopt the Consent
Agenda is non -debatable.)
A. Approve minutes - February 17, 2026, Regular Meeting
B. Approve claims
4. Consideration and appropriate action relating to items removed from the Consent Agenda
5. Consideration and appropriate action relating to bids received for the Redbud District Public Parking
Project
Daniel Dearing
Staff recommends awarding the construction contract to Pinney Dozer Service, LLC of Skiatook,
Oklahoma, in the amount of $187,777.35, and authorization to execute all necessary documents.
6. Report from OPWA Manager
7. Report from OPWA Attorney
B. Official Notices (documents for acknowledgment or information only, no discussion or action will be
taken)
Payroll Payment Report- pay period ending date February 21, 2026
9. New Business (New Business is any item of business which could not have been foreseen at the time of
posting of the agenda)
10. Adjournment
Notice of Public Meeting filed in the office of the City Clerk on Thursday, December 11, 2025, and the
Agenda posted at City Hall, 200 South Main Street, at 00 pm on Thursday, February 26, 2026.
J 'I nn M. Stevens, City Irk
The City of Owasso encourages citizen participation. To request an accommodation due to a disability, contact the City Clerk by
phone 918-376-1502 or by email to istevens@citvofowasso.com
OWASSO PUBLIC WORKS AUTHORITY (OPWA)
MINUTES OF REGULAR MEETING
TUESDAY, FEBRUARY 17, 2026
The Owasso Public Works Authority (OPWA) met in regular session on Tuesday, February 17, 2026, in the
Council Chambers at Old Central, 109 North Birch, Owasso, Oklahoma per the Notice of Public Meeting
filed Thursday, December 11, 2025; and the Agenda filed in the office of the City Clerk and posted at City
Hall, 200 South Main Street, of 11:30 am on Friday, February 13, 2026.
1. Call to Order -Chair Alvin Fruga called the meeting to order at 6:54 pm.
2. Roll Call - A quorum was declared present.
Present Absent
Chair- Alvin Fruga Trustee - Cody Walter
Vice Chair- Dr. Paul Loving
Trustee - Dr. Chad Balthrop
Trustee - Jamie Dunn
Staff: Authority Manager- Chris Garrett / Authority Attorney - Julie Lombardi
3. Consideration and appropriate action relating to the Consent Agenda. (All matters listed under
"Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee
may, however, remove an item from the Consent Agenda by request. A motion to adopt the Consent
Agenda is non -debatable.)
A. Approve minutes - February 3 2026, and February 10, 2026, Regular Meetings
B. Approve claims
C. Accept the 2025 E 76th Water Line Relocation Mingo to Atlanta Project and authorize final
payment of $61,119.25 to Creek Construction, LLC. of Skiatook, Oklahoma
Mr. Balthrop moved, seconded by Ms. Dunn, to approve the Consent Agenda as presented, with claims
totaling $667,939.89.
YEA: Loving, Balthrop, Dunn, Fruga
NAY: None
Motion carried: 4-0
4. Consideration and appropriate action relating to items removed from the Consent Agenda - None
5. Consideration and appropriate action relating to the purchase of a service truck with a crane for the
Wastewater Treatment Plant
Robert Allison presented the item, recommending approval to purchase a 2025 Ford F550 4X4 Service
Truck with Crane for $186,105.26 from Precision Truck and Equipment Sales Inc. of Oklahoma City,
Oklahoma, and authorization to execute all necessary documents. There were no comments from the
audience. Mr. Fruga moved, seconded by Mr. Balthrop, to approve the purchase and authorize
execution of all necessary documents, as recommended.
YEA: Loving, Balthrop, Dunn, Fruga
NAY: None
Motion carried: 4-0
6. Report from OPWA Manager -None
7. Report from OPWA Attorney -None
8. Official Notices -The Chair acknowledged receipt of the following:
• Payroll Payment Report - pay period ending date February 7, 2026
• Monthly Budget Status Report- dated January 31, 2026
9. New Business - None
10. Adjournment
Mr. Loving moved, seconded by Ms. Dunn, to adjourn the meeting.
YEA: Loving, Balthrop, Dunn, Fruga
NAY: None
Motion carried: 4-0 and the meeting adjourned at 6:58 pm.
Juliann M. Stevens, Authority Clerk
Alvin Fruga, Chair
Owasso Public Works Authority
February 17, 2026
Page 2
Claims List - 03/03/26
Fund Fund Title - Transact Vendor Name
Payable Description
Payment Amount
61 OPWA CITY OF OWASSO
ADMIN OVERHEAD
$33,333.33
JPMORGAN CHASE BANK
HDEPOT-RADIO HARDWARE
$135.76
JPMORGAN CHASE BANK
ONG-GAS
$1,407.89
JPMORGAN CHASE BANK
SAMS-PW FOOD
$192.82
JPMORGAN CHASE BANK
SHI-ADOBE RENEWAL
$586.62
JPMORGAN CHASE BANK
STAPLES -SUPPLIES
$43.80
STANDLEY SYSTEMS LLC
COPIER SERVICES
$15.47
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$74.04
OPWA ADMINISTRATION -Total
$35,789.73
JPMORGAN CHASE BANK
AMAZON -CABLES
$828.05
JPMORGAN CHASE BANK
AMAZON -SHELF
$94.07
JPMORGAN CHASE BANK
BH PHOTO -RADIOS
$1,167.68
JPMORGAN CHASE BANK
SHPHOTO-ACCESS POINTS
$2,588.28
OPWA BUILDING RENOVATION -Total
$4,678.08
BANCFIRST
800469017109B
$55,960.39
BANCFIRST
800470015109C
$23,361.35
BANCFIRST
8004710131SANTA FE
$14,375.72
BANCFIRST
800472011/RANCH CREEK
$25,377.29
BANCFIRST
800780017/19C
$121,284.32
BANCFIRST
801008012123C
$47,289.60
OPWA DEBT SERVICE -Total
$287,648.67
JPMORGAN CHASE BANK
LOWES-METAL
$99.92
JPMORGAN CHASE BANK
WM-TIPPING FEES
$1,897.05
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$59.92
RECYCLE CENTER -Total
$2,056.89
FULLERTON HYDRO -TEST INC.
CYLINDER LEASE
$52.00
JPMORGAN CHASE BANK
A+TRNG-CDL TRAINING
$2,475.00
JPMORGAN CHASE BANK
BATTLE -HEATER/ AC UNIT
$1,370.23
JPMORGAN CHASE BANK
BUMPER -AIR CHUCK
$18.09
JPMORGAN CHASE BANK
BUMPER-AIRVALVE
$402.02
JPMORGAN CHASE BANK
BUMPER -WIPER BLADES
$32.64
JPMORGAN CHASE BANK
JENI-BEANIE HATS
$172.50
JPMORGAN CHASE BANK
SEMI -TRUCK WASH
$350.84
JPMORGAN CHASE BANK
SOUTHERN -TIRES
$2,867.73
JPMORGAN CHASE BANK
VERIZON-WIRELESS CONN
$241.98
JPMORGAN CHASE BANK
WM-TIPPING FEES
$16,336.60
SPOK INC.
PAGER USE
$81.00
UNIFIRST HOLDINGS LP
SAFETY SHIRTS
$68.64
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$139.34
REFUSE COLLECTIONS -Total $24,608.61
TECHNICAL PROGRAMMING SERVICES INC BILLING SERVICES $4,110.13
1
Claims List - 03/03/26
Fund Fund Title - Transact Vendor Name
Payable Description
Payment Amount
61 OPWA UTILITY BILLING -Total
$4,110.13
JPMORGAN CHASE BANK
AMAZON -UPS
$75.24
JPMORGAN CHASE BANK
BOOTBARN-SAFETY BOOTS
$144.49
JPMORGAN CHASE BANK
JENI-BEANIE HATS
$172.50
JPMORGAN CHASE BANK
LOWES-PAINT WAND
$37.98
JPMORGAN CHASE BANK
ONG-GAS
$345.80
JPMORGAN CHASE BANK
RWD3-SERVICE FEE
$8,62
JPMORGAN CHASE BANK
RWD3-WATER
$369.92
JPMORGAN CHASE BANK
VERIZON-WIRELESS CONN
$140.05
SPOK INC.
PAGER USE
$99.34
UNIFIRST HOLDINGS LP
SAFETY SHIRTS
$68.64
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$140.55
UNIFIRST HOLDINGS LP
UNIFORMS
$71.76
WASTEWATER COLLECTIONS -Total
$1,674.89
COMMERCIAL DOOR LLC
GARAGE DOOR
$7,995.50
FULLERTON HYDRO -TEST INC.
CYLINDER LEASE
$104.00
HAWKINS INC
CHEMICALS
$10,820.43
JPMORGAN CHASE BANK
ACCURATE -LAB TEST
$330.00
JPMORGAN CHASE BANK
AMAZON -BATTERIES
$16.69
JPMORGAN CHASE BANK
AMAZON -REFUND
($199.98)
JPMORGAN CHASE BANK
DELL -BATTERIES
$79.49
JPMORGAN CHASE BANK
EUROFINS-BIOMONITORING
$1,820.00
JPMORGAN CHASE BANK
GRAING-DISTILLED WATER
$74.68
JPMORGAN CHASE BANK
GRAINGER-FUSES
$370.00
JPMORGAN CHASE BANK
HACH-AMMONIA TEST
$104.85
JPMORGAN CHASE BANK
HDEPOT-PULL STRING
$19.97
JPMORGAN CHASE BANK
JENI-BEANIE HATS
$172.50
JPMORGAN CHASE BANK
NCL WI -FILTERS
$377.75
JPMORGAN CHASE BANK
USABLUEBOOK-PIPETS
$548.50
JPMORGAN CHASE BANK
USABLUEBOOK-REAGENT
$241.79
JPMORGAN CHASE BANK
VERIZON-WIRELESS CONN
$221.03
JPMORGAN CHASE BANK
WALMART-DISTILLED WATER
$36.99
JPMORGAN CHASE BANK
WM-SLUDGE REMOVAL
$9,033.91
JPMORGAN CHASE BANK
WM-SLUDGE REMOVAL
$8,675.88
JPMORGAN CHASE BANK
YSI-TARRIFF CHARGE
$21.00
SPOK INC.
PAGER USE
$37.00
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$312.98
WASTEWATER TREATMENT -Total
$41,214.96
CITY OF TULSA DEPT OF FINANCE
LAB SERVICES
$500.00
JPMORGAN CHASE BANK
ADVANCE -TRUCK CLEANER
$35.32
JPMORGAN CHASE BANK
ATWOOD-BOOTS
$131.98
JPMORGAN CHASE BANK
CORE -METER CANS
$2,210.20
2
Claims List - 03/03/26
Fund Fund Title - Transact
Vendor Name
Payable Description
PaymentAmount
61 OPWA
JPMORGAN CHASE BANK
JENI-BEANIE HATS
$172.50
JPMORGAN CHASE BANK
VERIZON-WIRELESS CONN
$360.12
SPOK INC.
PAGER USE
$103.00
UNIFIRST HOLDINGS LP
SAFETY SHIRTS
$68.64
UNIFIRST HOLDINGS LP
UNIFORM SERVICES
$138.52
WATER -Total
$3,720.28
OPWA -Total
$405,502.24
67 OPWA SALES TAX
BANCFIRST
800650012/2016 NOTE
$234,486.25
BANCFIRST
800730038/2018 NOTE
$94,792.00
BANCFIRST
800826026/2020 NOTE
$95,133.00
BANCFIRST
80103301012024 NOTE
$184,073.00
OPWA STF DEBT SERVICE -Total
$608,484.25
OPWA SALES TAX
-Total
$608,484.25
OPWA Grand Total
$1,013,986.49
3
TO: The Honorable Mayor and City Council
The Honorable Chair and Trustees - Owasso Public Works Authority (OPWA)
FROM: Daniel Dearing, CFM, PE, Assistant City Engineer
SUBJECT: Recommendation for Contract Award - Redbud District Public Parking Project
DATE: February 26, 2026
BACKGROUND:
• In February 2025, Council and OPWA approved the expenditure to purchase a lot at 15t
Avenue and Atlanta to construct a public parking lot.
• The closing settlement for the purchase of the lot occurred in September 2025.
• City Engineering staff surveyed and prepared design plans for the parking lot.
• Plans were completed in January 2026.
SOLICITATION OF BIDS:
In January 2026, City Engineering staff completed final bid documents and published advertisements
in accordance with state statutes. A mandatory pre -bid meeting was held on February 12, 2026, with
22 different construction and supply companies represented. Bids were opened on February 19,
2026, with a total of twelve contractors submitting bids.
City Engineering staff completed a Bid Tabulation, showing the bid amounts and engineering
estimate, and it is attached to this memo.
Pinney Dozer Service, LLC, submitted the lowest bid of $187,777.35, which is below the engineering
estimate. Included in the project is a project allowance of $25,000.00, should the final project cost
require additional scope of work unforeseen at the time of bidding.
FUNDING:
Funding is available from the incremental revenues in the OPWA Tax Increment Financing (TIF) Fund,
as authorized by the Owasso Redbud District Project Plan.
RECOMMENDATION:
City Council - Staff recommends authorizing the Trust Authority, acting on behalf of the City as
beneficiary of the Trust, to award a public construction contract for the parking lot project and to
expend TIF funds in accordance with the adopted project plan and budget.
OPWA - Staff recommends awarding the construction contract to Pinney Dozer Service, LLC of
Skiatook, Oklahoma, in the amount of $187,777.35, and authorization to execute all necessary
documents.
ATTACHMENTS:
Site Map
Bid Tabulation
Project Contract Agreement Section
r
rd
I
W,
CITY OF OWASSO, OKLAHOMA
REDBUD DISTRICT PUBLIC PARKING PROJECT
BID OPENING: FEBRUARY 19, 2026 2:30PM
BID DOCUMENTATION
Number of Bids: 12
Bids Opened By: Daniel Dearing
Witness: Brandon Savoy and Krystal Amberg
BIDDER
BASE BID
Pinney Dozer
$187,777.35
Rosten Construction
$195,011.00
Construction Enterprises
$200,960.86
Tektone Builders
$201,885.03
SouthStone Construction
$215,000.00
The Inspired Group Concrete
$218,178.61
Regional Groundwork LLC
$218,632.71
Sparrow Construction
$249,617.90
Stronghand LLC
$252,468.41
Core Civil Construction
$294,100.00
Central Contractors
$312,886.55
VOY Construction
$322,049.92
Engineer's Estimate
$272,450.75
Certification:
I, Krystal Amberg, Contract Administrator, do hereby certify that, to the best of my knowledge, this Bid
Documentation is true and correct.
Signature:
Dat ary 19, 2026
SECTION 00300
AGREEMENT
THIS AGREEMENT is dated as of the 3rd day of March 1 2026 , by
and between The Owasso Public Works Authority/City of Owasso (hereinafter called OWNER)
and Pinney Dozer Service LLC (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows:
REDBUD DISTRICT PUBLIC PARKING PROJECT
"Grading, paving, and striping of an asphalt parking lot addition within the Redbud District.
Minor sidewalk, drainage and concrete work included."
ARTICLE 2. ENGINEER
The project has been assigned to the Project Manager or his/her duly authorized representative,
who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will
have the rights and authority assigned to ENGINEER in the Contract Documents in connection
with the completion of the Work in accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIME
3.1 The Work will be substantially completed within Ninety (90) calendar days from the
date of Notice to Proceed, and completed and ready for final payment in accordance with the
General Conditions within One Hundred (100) calendar days from the date of Notice to Proceed.
The date of final completion will, therefore, be on or before
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in paragraph 3.1 above, plus any extensions
thereof allowed in accordance with the General Conditions. They also recognize the delays,
expense and difficulties involved in proving in a legal or arbitration proceeding the actual loss
suffered by OWNER, if the Work is any such proof. OWNER and CONTRACTOR agree that as
liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Five
Hundred Dollars ($500.00) for each consecutive calendar day that expires after the time specified
in paragraph 3.1 for substantial completion until the Work is substantially complete. After
Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining
Work within the time specified in paragraph 3.1 for completion and readiness for final payment or
any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Five
Hundred Dollars ($500.00) for each consecutive calendar day that expires after the time specified
in paragraph 3.1 for completion and readiness for final payment.
ARTICLE 4. CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with
the Contract Documents in current funds the amount agreed upon in CONTRACTOR'S bid.
4.2 CONTRACTOR understands that the estimated quantities are not guaranteed and that
the determination of actual quantities and their classification is to be made by the OWNER at the
time of application for payment.
4.3 CONTRACT AMOUNT: Contract amount is One Hundred Eighty -Seven
Thousand Seven Hundred and Seventy-seven and thirtv-five cents ($ 187.777.35 1.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with the General
Conditions on the Pay Estimate Forms included as Exhibit "A" to this Agreement. Applications
for Payment will be processed by OWNER as provided in the General Conditions.
5.1 Progress Payments. OWNER shall make progress payments on account of the Contract
Price on the basis of CONTRACTOR's Applications for Payment in accordance with the Owasso
Public Works Authority Payment Schedule included as Exhibit 'B" to this Agreement during
construction as provided below. All progress payments will be on the basis of the progress of the
Work.
5.1.1 Progress payments shall not exceed an amount equal to 95% of the WORK
completed until such time as CONTRACTOR shall complete in excess of fifty percent (50%) of
the contract amount.
5.1.2 Upon completion in excess of fifty percent (50%) of the total contract amount,
OWNER shall pay an amount sufficient to increase total payments to CONTRACTOR to 97.5%
of the Contract Price, less such amounts as OWNER shall determine in accordance with the
General Conditions, provided that OWNER has determined that satisfactory progress is being
made, and upon approval by the Surety.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with
the General Conditions, OWNER shall pay the Contract Price.
ARTICLE 6. CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following
representations:
6.1 CONTRACTOR has familiarized himself/herself with the nature and extent of
Contract Documents, Work, locality, and with all local conditions and federal, state and local laws,
ordinances, rules and regulations that in any manner may affect cost, progress or performance of
the Work.
6.2 CONTRACTOR has studied carefully all reports or explorations and tests of subsurface
conditions at or contiguous to the site and all drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the site (except underground facilities)
which have been identified in the Supplementary Conditions as provided in the General
Conditions. Contractor accepts the determination set forth in the General Conditions of the extent
of the "technical data" contained in such reports and drawings upon which Contractor is entitled
to rely. Contractor acknowledges that such reports and drawings are not Contract Documents and
may not be complete for Contractor's purposes. Contractor acknowledges that Owner and
Engineer do not assume responsibility for the accuracy or completeness of information and data
shown or indicated in the Contract Documents with respect to underground facilities at or
continuous to the site. Contractor has obtained and carefully studied (or assume responsibility for
having done so) all such additional supplementary examinations, investigations, explorations,
tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or
contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of
the Work or which relate to any aspect of the means, methods, techniques, sequences and
procedures of construction to be employed by Contractor, and safety precautions and programs
incident thereto. Contractor does not consider that any additional examinations, investigations,
explorations, tests, studies, or data are necessary for the performance and furnishing of the Work
at the Contract Price, within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents.
6.3 CONTRACTOR has made or caused to be made examinations, investigations, tests and
studies of such reports and related data in addition to those referred to in paragraph 6.2 as (s)he
deems necessary for the performance of the Work at the Contract price, within the Contract Time
and in accordance with the other terms and conditions of the Contract Documents; and no
additional examinations, investigations, tests, reports or similar data are or will be required by
CONTRACTOR for such purposes.
6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated
on the Contract Documents with respect to existing Underground Facilities at or contiguous to the
site and assumes responsibility for the accurate location of said Underground Facilities. No
additional examinations, investigations, explorations, tests, reports, studies or similar information
or data in respect of said Underground Facilities are or will be required by CONTRACTOR in
order to perform and furnish the Work at the Contract Price within the Contract Time and in
accordance with the other terms and conditions of the Contract Documents, including the General
Conditions.
6.5 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Contract Documents.
6.6 CONTRACTOR has given OWNER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents, and the written resolution thereof
by OWNER is acceptable to CONTRACTOR.
6.7 CONTRACTOR has obligated himself/herself to the OWNER to be responsible for the
workmanship, labor and materials used in the project for two (2) years after the project has been
accepted by the OWNER.
6.8 CONTRACTOR understands that (s)he will be exempt from all sales tax on materials
and other items necessary for the completion of the project. The OWNER has issued him a
Certification of Tax Exempt Project enclosed as Exhibit "C" of this Agreement.
ARTICLE 7. CONTRACT DOCUMENTS
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR are attached to this Agreement, made a part hereof, and consist of the following:
7.1 This Agreement (pages 1 to 6 inclusive).
7.2 Exhibits "A", "B", "C" and "D" to this Agreement.
7.3 Advertisement for Bids (Section 00100).
7.4 Requirements for Bidders (Section 00110).
7.5 Instructions to Bidders (Section 00120).
7.6 Bid (Section 00200).
7.7 Bid Bond (Section 00210).
7.8 Bid Affidavits (Section 00220).
7.9 Statement of Bidders Qualifications (Section 00230).
7.10 Certificate of Non -Discrimination (Section 00240).
7.11 Performance Bond (Section 00410).
7.12 Maintenance Bond (Section 00420).
7.13 Statutory payment Bond (Section 00430).
7.14 Notice of Award (Section 00510).
7.15 Notice to Proceed (Section 00520).
7.16 Change Order (Section 00600).
7.17 General Conditions (Section 00700).
7.18 Project Specifications (Section 00800).
7.19 Special Provisions (Section 00900).
7.20 Project Drawings, consisting of Sheets 1 to 8 , inclusive, and Standard Drawings.
7.21 Addendum Number 1 , inclusive.
7.22 Documentation submitted by CONTRACTOR prior to Notice of Award.
7.23 Any Modification, including Change Orders, duly delivered after execution of
Agreement.
There are no Contract Documents other than those listed above in this Article 7. The Contract
Documents may only be altered, amended or repealed by a Modification (as defined in the General
Conditions).
ARTICLE 8. MISCELLANEOUS
8.1 Terms used in this Agreement which are defined in the General Conditions shall have
the meanings indicated in the General Conditions.
8.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party sought
to be bound; and specifically, but without limitation, monies that may become due and monies that
are due may not be assigned without such consent (except to the extent that the effect of this
restriction may be limited by law) and unless specifically stated to the contrary in any written
consent to an assignment, no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents.
8.3 OWNER and CONTRACTOR each binds himself/herself, his/her partners, successors,
assigns, and legal representatives to the other party hereto, his/her partners, successors, assigns
and legal representatives in respect to all covenants, agreements and obligations contained in the
Contract Documents.
8.4 The Agreement (or remaining portions thereof) should continue in effect, be valid and
binding upon both parties even if a provision or part of the Contract Documents should be held
void or unenforceable by law.
IN WITNESS WHEREOF, the parties hereby have signed this Agreement in duplicate. One
counterpart has been delivered to CONTRACTOR, and one belongs to OWNER. All portions of
the Contract Documents have been signed by OWNER and CONTRACTOR.
This Agreement will be effective on
OWNER: CONTRACTOR:
By
Alvin Fruga, OPWA Chair
(SEAL) (SEAL)
ATTEST:
Juliann M. Stevens, Authority Clerk Name
Approved as to form:
Julie Lombardi, Authority Attorney
Address for giving notices:
200 South Main St.
Owasso, OK 74055
Title
CITY OF OWASSO
OPWA PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 02/21/26
Department
OPWA Administration
Utility Billing
Water
Wastewater Treatment Plant
Wastewater Collections
Refuse Collections
Total Payroll Expenses
$ 34,643.94
16,247.04
29,157.59
32,867.57
32,650.83
31,405.55
Recycle Center 8,013.81
Total OPWA $ 184,986.33