Loading...
HomeMy WebLinkAbout2007.12.18_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE OWASSO PUBLIC WORKS AUTHORITY TYPE OF MEETING: Regular DATE: December 18, 2007 TIME: 6:30 p.m. PLACE: Council Chambers, Old Central Building 109 N. Birch Notice and agenda filed in the office of the City Clerk and posted at City Hall at 5:00 p.m. on Friday, December 14, 2007. - W Ju ann Nf Stevens, Dep City Clerk AGENDA 1. Call to Order Chairman Stephen Cataudella 2. Roll Call 3. Consideration and appropriate action relating to a request for approval of the Consent Agenda. All matters listed under "Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee may, however, remove an item from the Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable. A. Approval of the Minutes of the December 4, 2007 Regular Meeting. Attachment #3 -A B. Approval of Claims. Attachment #3 -13 C. Acknowledgement of receiving the monthly FY 2007 -2008 budget status report. Attachment # 3 -C S: \Agendas \OP WA \2007\ 1218.doc Owasso Public Works Authority December 18, 2007 Page 2 4. Consideration and appropriate action relating to a request for Trustee approval of an amendment to the Agreement between the Owasso Public Works Authority and Greeley & Hansen, LLC for engineering services related to the Wastewater Treatment Plant Expansion and 117`h Street Pump Station Upgrade and authorization for the Chairman to execute the amended agreement. Mr. Stevens Attachment # 4 Staff will recommend Trustee approval of an amendment to the Engineering Services Agreement between the OPWA and Greely & Hansen, LLC for the purpose of expanding the scope of services to include the design of the 76`h Street Interceptor Sewer Project in the amount of $189,000 and authorization for the Chairman to execute the necessary documents. 5. Consideration and appropriate action relating to a request for Trustee approval of Change Order No. 2 to the construction contract between the City of Owasso and McGuire Bros. Construction Company for the Water Systems Improvements Phase II (West) Water Transmission Main, Booster Pump Station, and Pressure Plane Appurtenances Project, approval of final payment, and acceptance of the project. Mr. Alexander Attachment # 5 Staff will recommend Trustee approval of Change Order No. 2 to the construction contract between the City of Owasso and McGuire Bros. Construction Company for the Water Systems Improvements Phase II (West) Water Transmission Main, Booster Pump Station, and Pressure Plane Appurtenances Project in the amount of $18,839.99 for a revised contract amount of $4,037,413.35. Additionally, staff will recommend Trustee approval of the final payment in the amount of $30,992 and acceptance of the completed project. 6. Report from OPWA Manager. 7. Report from OPWA Attorney. SAAgendas \OP WA\2007\ 121 g.dm Owasso Public Works Authority December 18, 2007 Page 3 8. New Business. (New Business is any item of business which could not have been foreseen at the time of posting of the agenda.) 9. Adjournment. S:Agendas \OP WA \2007\ 1218.doc OWASSO PUBLIC WORKS AUTHORITY MINUTES OF REGULAR MEETING Tuesday, December 4, 2007 The Owasso Public Works Authority met in regular session on Tuesday, December 4, 2007 in the Council Chambers at Old Central per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 5:00 p.m. on Friday, Novemher 30, 2007. ITEM 1. CALL TO ORDER Chairman Cataudella called the meeting to order at 7:30 p.m. ITEM 2. ROLL CALL PRESENT ABSENT Steve Cataudella, Chairman D.J. Gall, Vice Chair Doug Bonebrake, Trustee Susan Kimball, Trustee Jon Sinex, Trustee A quorum was declared present. STAFF Rodney J. Ray, Authority Manager Julie Lombardi, Authority Attorney ITEM 3. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR TRUSTEE APPROVAL OF THE CONSENT AGENDA A. Approval of the Minutes of the November 20, 2007 Regular Meeting. B. Approval of Claims. Mr. Bonebrake moved, seconded by Mr. Gall, to approve the OPWA Consent Agenda with claims totaling $483,290.53 and payroll claims totaling $54,431.26. YEA: Bonebrake, Cataudella, Gall, Kimball, Sinex NAY: None Motion carried 5 -0. Owasso Public Works Authority ITEM 4. REPORT FROM OPWA MANAGER No report ITEM 5. REPORT FROM OPWA ATTORNEY No report ITEM 6. NEW BUSINESS None. ITEM 7. ADJOURNMENT Mr. Bonebrake moved, seconded by Mr. Gall, to adjourn. YEA: Bonebrake, Cataudella, Gall, Kimball, Sinex NAY: None Motion carried 5 -0 and the meeting was adjourned at 7:31 pm. Pat Fry, Minute Clerk 2 December 4, 2007 Stephen Cataudella, Chairman OPWA CLAIMS TO BE PAID 12118/07 VENDOR DESCRIPTION AMOUNT PARKWAY CONSTRUCTION REFUND 100.00 OFFICE DEPOT OFFICE SUPPLES 82.28 UNIFIRST HOLDINGS PROTECTIVE CLOTHING 62.80 WAL -MART SUPPLIES 38.54 LASERWORKS INC PRINTER REPAIR 255.16 GREENWOOD PERFORMANCE SYSTEMS VERSATILITY TRAINING 458.34 GREENWOOD PERFORMANCE SYSTEMS VERSATILITY TRAINING 458.34 GREENWOOD PERFORMANCE SYSTEMS VERSATILITY TRAINING 458.34 ADMINISTRATION DEPT TOTAL 1,913.80 OFFICE DEPOT OFFICE SUPPLIES 295.04 TYRONE EUGENE DINKINS METER READER 356.85 DAVID R. OLINGHOUSE METER READER 443.25 KATHLEEN A BALSIGER METER READER 326.70 TOMMY G ARRINGTON METER READER 128.70 MARK MEYER METER READER 255.15 KATHLEEN A BALSIGER METER READER 167.40 DAVID R. OLINGHOUSE METER READER 270.90 TYRONE EUGENE DINKINS METER READER 238.65 NOLAN RAY LANE METER READER 76.95 MARK MEYER METER READER 237.60 WATER PRODUCTS MAINT- AGREEMENT 3,827.38 TECHNICAL PROGRAMMING SERVICES BILLING SERVICE 1,408.00 TECHNICAL PROGRAMMING SERVICES BILLING SERVICE 2,142.88 UTILITY BILLING DEPT TOTAL 10,175.45 UNIFIRST HOLDINGS PROTECTIVE CLOTHING 120.10 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS -FIRE HYDRANT 1,417.06 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS -METER SPUD 202.14 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS - SUPPLIES 438.25 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS - CREDIT - 694.55 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS - CLAMPS 502.24 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS -METER REPAIR 62.50 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS - HYDRANT 682.31 JPMORGAN CHASE COMMERCIAL CARD LOWES -FLOOD LIGHT 59.86 JPMORGAN CHASE COMMERCIAL CARD LOWES -BULBS 115.04 JPMORGAN CHASE COMMERCIAL CARD LOWES -FLOOD LIGHT 64.98 JPMORGAN CHASE COMMERCIAL CARD LOWES- CREDIT - 124.84 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS -LINE REPAIR 2,469.23 OWASSO TOP SOIL MAINTENANCE SUPPLIES 40.00 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 2,196.04 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 1,184.85 FUELMAN FUEL 1,154.03 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS - SUPPLIES 57.00 JPMORGAN CHASE COMMERCIAL CARD ATWOODS- SUPPLIES 66.28 JPMORGAN CHASE COMMERCIAL CARD CITY OF TULSA -WATER PURCHASE 73,923.63 VENDOR DESCRIPTION AMOUNT WATER PRODUCTS PARTS REFUND -8.91 JPMORGAN CHASE COMMERCIAL CARD CITY OF TULSA -WATER PURCHASE 99,091.07 SANDRA OR JASON QUINTON LEAK REPAIR 195.00 CITY GARAGE CITY OF OWASSO VEHICLE MAINT- SERVICES 833.33 CITY GARAGE CITY OF OWASSO VEHICLE MAINT- SERVICES 833.33 JPMORGAN CHASE COMMERCIAL CARD EQUIPMENT ONE -JACK HAMMER 60.00 GREENWOOD PERFORMANCE SYSTEMS VERSATILITY TRAINING 458.34 JPMORGAN CHASE COMMERCIAL CARD WATER PRODUCTS - SUPPLIES 325.25 WATER DEPT TOTAL 185,723.56 OFFICE DEPOT OFFICE SUPPLES 6.79 JPMORGAN CHASE COMMERCIAL CARD BEST BUY - COMPUTER SUPPLIES 34.99 JPMORGAN CHASE COMMERCIAL CARD N CENTRAL LABS - SUPPLIES 190.01 JPMORGAN CHASE COMMERCIAL CARD N CENTRAL LABS - SUPPLIES 73.59 NORTH CENTRAL LABS MAINTENANCE SUPPLIES 541.97 FORT BEND SERVICES WWTP CHEMICALS 2,790.00 UNIFIRST HOLDINGS UNIFORM /PROTECTIVE CLOTHING 118.14 JPMORGAN CHASE COMMERCIAL CARD GRAINGER- BALLASTS FOR LIGHT 69.20 JPMORGAN CHASE COMMERCIAL CARD GRAINGER- REPLACE HEATER IN 437.40 JPMORGAN CHASE COMMERCIAL CARD LOWES -FLOOD LIGHT FOR WWTP 21.96 JPMORGAN CHASE COMMERCIAL CARD LOWES- CONNECTOR 6.24 JPMORGAN CHASE COMMERCIAL CARD N CENTRAL LAB - SUPPLIES 78.19 JPMORGAN CHASE COMMERCIAL CARD GRAINGER - PHOTOCONTROL 19.00 JPMORGAN CHASE COMMERCIAL CARD LOWES -LIGHT BULBS 175.56 JPMORGAN CHASE COMMERCIAL CARD GRAINGER -LIGHT BULBS 38.60 JPMORGAN CHASE COMMERCIAL CARD GRAINGER -LIGHT BULBS 77.20 HAYNES EQUIPMENT COMPANY MAINTENANCE SUPPLIES 515.25 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 1,332.94 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 0.00 FUELMAN FUEL 566.08 JPMORGAN CHASE COMMERCIAL CARD N CENTRAL LAB -UV SPECOMETER 558.00 JPMORGAN CHASE COMMERCIAL CARD DRUMMOND -METER PARTS 548.22 GEMPLER'S MAINTENANCE SUPPLIES 582.10 WASTE MANAGEMENT QUARRY LANDFILL SLUDGE REMOVEL 1,377.95 CITY GARAGE CITY OF OWASSO VEHICLE MAINT- SERVICES 250.00 CITY GARAGE CITY OF OWASSO VEHICLE MAINT- SERVICES 250.00 WW TREATMENT PLANT DEPT TOTAL 10,659.38 UNIFIRST HOLDINGS PROTECTIVE CLOTHING 75.50 JPMORGAN CHASE COMMERCIAL CARD CARLTON BATES -SEALS 259.15 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 0.00 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 26.75 FUELMAN FUEL 1,471.01 CITY GARAGE CITY OF OWASSO VEHICLE MAINT- SERVICES 625.00 CITY GARAGE CITY OF OWASSO VEHICLE MAINT- SERVICES 625.00 WASTEWATER DEPT TOTAL 3,082.41 CROW BURLINGAME COMPANY MAINTENANCE SUPPLIES 29.88 REHRIG PACIFIC CO. MAINTENANCE SUPPLIES 400.00 TREASURER PETTY CASH PETTY CASH 36.81 UNIFIRST HOLDINGS PROTECTIVE CLOTHING 75.06 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 4,949.47 CITY GARAGE CITY OF OWASSO VEHICLE MAINT -PARTS 3,017.10 VENDOR FUELMAN LOWES JPMORGAN CHASE COMMERCIAL CARD O'REILLY AUTOMOTIVE NATIONAL POWER WASH CITY GARAGE CITY OF OWASSO CITY GARAGE CITY OF OWASSO WASTE MANAGEMENT QUARRY LANDFILL UNIFIRST HOLDINGS CITY GARAGE CITY OF OWASSO CITY GARAGE CITY OF OWASSO VACUUM & PRESSURE TANK CITY GARAGE CITY OF OWASSO CITY GARAGE CITY OF OWASSO WASTE MANAGEMENT QUARRY LANDFILL DESCRIPTION AMOUNT FUEL 5,517.57 EXTENSION CORDS 99.88 LOWES- CLEANER PARTS 52.96 SUPPLIES 3.29 REFUSE VEHICLES 180.00 VEHICLE MAINT- SERVICES 3,333.33 VEHICLE MAINT- SERVICES 3,333.33 LANDFILL TIPPING FEES 7,661.23 REFUSE DEPT TOTAL 28,689.91 PROTECTIVE CLOTHING 17.42 VEHICLE MAINT -PARTS 0.00 VEHICLE MAINT -PARTS 16.76 MAINTENANCE SERVICES 200.00 VEHICLE MAINT- SERVICES 41.66 VEHICLE MAINT- SERVICES 41.66 LANDFILL TIPPING FEES 4,765.01 RECYCLE DEPT TOTAL 5,082.51 OPWA OPERATING FUND TOTAL 245,327.02 OWASSO PUBLIC WORKS AUTHORITY PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 12/8/2007 FUND TOTAL " 3,339.69 66,628.74 OVERTIME TOTAL DEPARTMENT EXPENSES EXPENSES OPWA Administration 53.37 6,382.75 Utility Billing 191.97 6,716.52 Water 1,026.28 15,435.37 Wastewater 1,535.06 16,644.61 Wastewater Collection 533.01 8,539.44 Refuse - 11,485.51 Recycle Center - 1,424.54 FUND TOTAL " 3,339.69 66,628.74 CITY OF OWASSo OWASSO PUBLIC WORKS AUTHORITY - OPERATING FUND FISCAL YEAR 2007 -2008 Statement of Revenues & Expenses As of November 30, 2007 MONTH YEAR TO -DATE TO -DATE OPERATING REVENUES Water 291,509 1,594,437 Wastewater 86,664 545,874 Refuse & recycle 98,894 556,373 Other fees 49,906 180,814 Interest & other 1,420 7,872 TOTAL OPERATING REVENUES 528,394 2,885,370 OPERATING EXPENSES: Personal services 122,590 789,757 Materials & supplies 195,593 1,116,798 Other services 61,202 351,224 Capital outlay 4,475 82,778 Debt service - - TOTAL OPERATING EXPENSES 383,861 2,340,557 REVENUES OVER EXPENSES 144,534 544,813 NET INCOME (LOSS) 144,534 WORKING CAPITAL - Beginning Balance WORKING CAPITAL - Ending Balance 876,381 BUDGET 3,400,000 1,378,000 1,309,000 401,000 26,000 6,514,000 2,079,983 2,961,515 1,069,365 718,625 6,829,488 (315,488) 800,000 484,512 PERCENT 46.90% 39.61% 42.50% 45.09% 44.29% 37.97% 37.71% 32.84% 11.52% 34.27% 102 1 flu 111W.11 0 111 U01 TO: THE HONORABLE CHAIR AND TRUSTEES OWASSO PUBLIC WORKS AUTHORITY FROM: ROGER STEVENS INTERIM PUBLIC WORKS DIRECTOR SUBJECT: AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES WASTEWATER TREATMENT PLANT, PUMP STATION AND COLLECTION SYSTEM EXPANSION AND UPGRADE DATE: December 13, 2007 BACKGROUND: The City of Owasso provides wastewater collection, conveyance and treatment services for over 8,500 residential, business and industrial customers. The existing collection system consists of over 100 miles of sanitary sewer line (ranging in size from 4 to 21 inches in diameter), 12 pump stations and a 3.3 million gallon per day (MGD) treatment facility. In response to rapid growth, in 2005 the City of Owasso commissioned the update of its 1997 Wastewater Master Plan. The update, now completed, provides a 20 -year guide for the prioritization and construction of upgrades to the City's conveyance and treatment infrastructure. Among the immediate needs, the plan recommends the investment of approximately $7 million for the upgrade of the Wastewater Treatment Plant and the 117th Street Pump Station. The recommended improvements will increase the average treatment plant capacity to 4.5 mgd — which is anticipated to meet treatment demand for the next 10 years. Similarly, improvement to the 117th Street Pump Station will upgrade existing facilities thereby increasing pumping capacity to accommodate present and future needs. In order to meet these needs, the City of Owasso invited Statements of Qualifications for Professional Engineering Services from three consulting firms to provide design services for these improvements. Following an evaluation and recommendation by both engineering and operations staff, the Authority awarded a contract for engineering services to Greeley & Hansen in the amount of $545,000 during it's regularly scheduled meeting of July 13, 2007. Design work under this agreement is on -going and on schedule. ADDITIONAL PROJECT SCOPE: Extensive current and proposed development in the southwestern corner of Rogers County, east of Owasso, has created an opportunity for the extension of City of Owasso sanitary sewer to this area. In September 2007, City of Owasso engineering and operations staff began discussions with Greeley & Hansen concerning the development of a design for a sanitary sewer interceptor Amendment to the Agreement for Engineering Services Sanitary Sewer Treatment and Collection Improvements Page 2 of 3 along the E. 76th Street North alignment to serve an area generally bounded by E. 76th Street North to the north, Verdigris River to the east, E. 59th Street to the south, and N. 143rd East Avenue to the west. This area consists of all or portions of Sections 25, 26, 35 and 36 of Township 21 North, Range 14 East, Sections 1 and 2 of Township 20 North, Range 14 East and Section 31 of Township 21 North, Range 15 East. In all, some 4,708 Gross Acres are drained by the service area and 3,136 Net Acres are available for development. The estimated build -out population of the service area is 8,727. The proposed 76th Street Interceptor would be a gravity sewer and would extend east from the Elm Creek Interceptor (west of the 76th Street North/145th East Avenue intersection) to approximately 177th East Avenue, a distance of 2.2 miles. The western 8,200 lineal feet of the interceptor is proposed to be constructed of 18" PVC pipe; the eastern 3,500 lineal feet of the interceptor (76th Street North Interceptor – East Extension) is proposed to be constructed of 10" PVC pipe. Planning -level construction cost for these two components is estimated to be $3,100,000. Early in November, Greeley & Hansen furnished for staff review a memorandum providing a preliminary evaluation of estimated wastewater flows and sewer infrastructure necessary to serve the proposed basin. This memorandum is provided as Attachment A AMENDMENT TO THE ENGINEERING SERVICES AGREEMENT: Based on the memoranda of additional project needs and scope for the 76th Street Interceptor Sewer, City staff requested from Greeley & Hansen an amendment to the previously approved Engineering Services Agreement. Engineering Services to be performed by the engineer under this amendment include: — Preparation of a preliminary engineering report (PER) to qualify the proposed project for ODEQ State Revolving Fund financing. — Preparation of preliminary and final design for approximately 11,700 lineal feet of gravity sewer (including design survey, mapping and geotechnical investigation). — Preparation of contract documents including drawings, specifications and permit applications for the project. — Bid related assistance. Greeley and Hansen has developed staff -hour projections for the additional scope and submitted a fee proposal in the amount of $189,000.00 (Attachment B). PROJECT SCHEDULE: The design of the 76th Street Interceptor will be performed concurrently with the design of the Wastewater Treatment Plant Expansion and Pump Station Upgrade. It is anticipated that design for the project will require approximately six months to complete. The schedule below illustrates Amendment to the Agreement for Engineering Services Sanitary Sewer Treatment and Collection Improvements Page 3 of 3 a proposed start date of January 2, 2008 and an approximate completion date of July 3, 2008 (for engineering services). — Notice to Proceed to Greeley & Hansen from the City of Owasso – December 19, 2007. — Project Start Date – January 2, 2008. — Complete Design Survey and Geotechnical Investigation – February 15, 2008. — Complete Preliminary Design/Utility Coordination – April 25, 2008. — Complete Final Design – May 23, 2008. — Complete DPW /ODEQ Review –June 27, 2008. — Advertise for Bids – July 3, 2008. — Receive Bids – August 5, 2008. — Council Approval/Notice to Proceed – September 9, 2008 — Construction Complete – July 6, 2009 FUNDING: Funding for this project will be obtained from the Oklahoma Water Resources Board (OWRB) via a loan from the Drinking Water State Revolving Fund. Resolution No. 2007 -06, passed by the Authority during its meeting of July 13, 2007 declares the Authority's intent to be reimbursed from proceeds of the OW" loan for project expenses incurred by the OPWA prior to loan closing. FY 2007 -2008 allocation for Wastewater Improvements provides sufficient temporary funding pending reimbursement from OW". RECOMMENDATION: Staff recommends OPWA Trustee approval of an amendment to the Agreement for Engineering Services for the Wastewater Treatment Plant Expansion and 117th Street Pump Station Upgrade with Greeley and Hansen, LLC (Chicago, Illinois) for the purpose of expanding the scope of services to include the design of the 76th Street Interceptor Sewer project in the amount of $189,000 and authorization of the Chairman to execute the document. ATTACHMENTS: A. Project Scope Memorandum B. Engineering Services Agreement with Greeley and Hansen C. Service Area Map GREELEYAND HAIVSEM MEMO Date: November 6, 2007 To: Roger Stevens and Joe Nurre From: Joe Teusch Subject: Proposed 76th Street Interceptor General The following is a preliminary evaluation of estimated wastewater flows and sewer infrastructure needed to serve the proposed Stone Canyon development and surrounding areas. Figure 1 shows the proposed sewer service area which is generally bordered by 765` Street to the north, the Verdigris River to the east, 59t" Street to the south and 143`d Street to the west. It is anticipated that sewer flows from this area will be conveyed to the Elm Creek Interceptor located one -half mile west of the 76th Street and 143`d Street intersection. Estimated Wastewater Flows Table 1 shows the estimated average and peak flows for the service area to be 1.10 mgd and 2.75 mgd, respectively. Estimated average and peak flows, tributary to specific sewer reaches, are shown in the table below. East Extension J:1ProjectM0791C OwassoW General Project CommunicalioWNurre MF071106.doc Service Area Sewer Flows Sewer Reach Designation Average Peak North Branch Sewer A, B, 1 /2E 0.31 mgd 0.78 mgd South Branch Sewer C, D, 1 /2E, 1/2H 0.45 mgd 1.13 mgd Lift Station A, B, C, D, E, 1 /2H 0.77 mgd 1.91 mgd 76th Street Interceptor A thru H 1.10 mgd 2.75 mgd 76th Street Interceptor — 1/3A, 2 /3F 0.15 mgd 0.59 mgd East Extension J:1ProjectM0791C OwassoW General Project CommunicalioWNurre MF071106.doc To: Roger Stevens and Joe Nurre From: Joe Teusch Sewer Infrastructure Needs November 6, 2007 Page 2 Figure 1 shows the proposed sewer infrastructure needed to serve the Stone Canyon development and other developing areas within the drainage basin boundary. A lift station (by others) is proposed approximately one -half mile north of the 66'h Street and 161s1 Street intersection at the junction of the north and south branch sewers (by others). The lift station would pump flow approximately one -half mile north to the 7611h Street and 1615 Street intersection. A new interceptor (by City) is proposed to convey the flow approximately 1.5 miles west, from the 76`h Street and 1615' intersection, to the existing Elm Creek Interceptor. Extending the interceptor to the east would help to spur development north of 76'" Street and would allow future service to the residential areas currently on septic systems. The table below summarizes the preliminary bases of design for the proposed sewers and lift station. Estimated Construction Costs The table below summarizes the planning -level (25% contingency) construction costs for the various sewer infrastructure elements. Pipe Size Pipe Depth Pipe Length Description Peak Flow Pipe Size Pipe Slope Pipe Capacity LS Capacity FM Velocity Sewer Reach rrgd in u an d an Ud (fps) North Branch 0.78 12 1.00 2.30 -- -- South Branch 1.13 12 1.00 2.30 -- -- Lift Station 1.91 -- -- -- 2.50 -- Force Main 1.91 10 - -- -- 7.1 761h St. Interceptor 2.75 18 0.65 5.50 -- -- 76'h St. Interceptor 0.59 10 0.65 1.15 -- -- -East Extension Estimated Construction Costs The table below summarizes the planning -level (25% contingency) construction costs for the various sewer infrastructure elements. Pipe Size Pipe Depth Pipe Length Description in Unit Price M North Branch Sewer 12 10 6,800 South Branch Sewer 12 10 6,200 Lift Station (2.5 mgd) -- -- - Force Main 10 4 2,650 76th St. Interceptor 18 10 8,200 76'h St. Interceptor 10 10 3,500 - East Extension J:WrojedsN0791C Owassa103 General Project CommunicalionslNurre MF071106.doo TOTAL $6,437,000 Cost Unit Price M $220 /LF 1,496,000 $220 /LF 1,364,000 $375,000 375,000 $60 /LF 159,000 $290 /LF 2,378,000 $1 90/1-F 665,000 TOTAL $6,437,000 To: Roger Stevens and Joe Nurre November 6, 2007 From: Joe Teusch Page 3 Recommended Plan It is recommended that the City of Owasso finance only the construction of the 76th Street Interceptor and 76`h Street Interceptor — East Extension. The estimated construction cost for these items is approximately $3,100,000. The remaining sewer and lift station components described above are recommended for construction by others. JAProjeclsW791C OwassoM General Project CommunicationslNurre ME071108.doc CITY OF OWASSO, OKLAHOMA 76TH STREET INTERCEPTOR TABLE 1 Estimated Future Wastewater Flows to 21" Elm Creek Interceptor Greeley and Hansen November 2007 Subtotal 4,708 3,136 8,727 1.10 2.50 2.75 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gped for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the W WTP. 5. Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. PEAK TRIBUTARY AREAS AVG SANITARY FLOWS LAND GROSS EST. % NET RES. SANITARY PEAK FLOW AREA USE ACRES DEVELOP ACRES POP. FLOW (MGD) FACTOR (MGD) A RE 681 70 477 1,430 0.14 2.5 0.36 B RE 512 70 358 1.075 0.11 2.5 0.27 C RE 767 70 537 1.611 0.16 2.5 0.40 D RE 549 70 384 1.153 0.12 2.5 0.29 E RE 695 60 417 1.251 0.13 2.5 0.31 F RE 715 70 501 1,502 0.15 2.5 0.38 G RE 336 70 235 706 0.07 2.5 0.18 H GB 453 50 227 0.23 2.5 0.57 Subtotal 4,708 3,136 8,727 1.10 2.50 2.75 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gped for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the W WTP. 5. Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. CITY OF OWASSO, OKLAHOMA 76TH STREET INTERCEPTOR TABLE 1 (Cont'd) Estimated Future Wastewater Flows - North Branch Sewer Greeley and Hansen November 2007 Subtotal 1.541 1.044 3.132 0.31 2.5 0.78 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the WW1 5. Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. PEAK TRIBUTARY AREAS AVG SANITARY FLOWS LAND GROSS EST. % NET RES. SANITARY PEAK FLOW AREA USE ACRES DEVELOP ACRES POP. FLOW (MGD) FACTOR (MGD) A RE 681 70 477 1.430 0.14 2.5 0.36 B RE 512 70 358 1.075 0.11 2.5 0.27 1/2E RE 348 60 209 626 0.06 2.5 0.16 Subtotal 1.541 1.044 3.132 0.31 2.5 0.78 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the WW1 5. Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. CITY OF OWASSO, OKLAHOMA 76TH STREET INTERCEPTOR TABLE 1 (Cont'd) Estimated Future Wastewater Flows - South Branch Sewer Greeley and Hansen November 2007 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents /unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total' row are based on total sanitary flow to the interceptor and indicate flow to the W WTP 5. Peaking Factor was taken from the Design and Construction ojSanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974, PEAK TRIBUTARY AREAS AVG SANITARY FLOWS LAND GROSS EST. % NET RES. SANITARY PEAK FLOW AREA USE ACRES. DEVELOP ACRES POP. FLOW (MGD) FACTOR (MGD) C RE 767 70 537 1,611 0.16 2.5 0.40 D RE 549 70 384 1,153 0.12 2.5 0.29 1/2E RE 348 60 209 626 0.06 2.5 0.16 1/211 GB 227 50 114 0.11 2.5 0.28 Subtotal 1,891 1,244 3,390 0.45 2.5 1.13 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents /unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total' row are based on total sanitary flow to the interceptor and indicate flow to the W WTP 5. Peaking Factor was taken from the Design and Construction ojSanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974, CITY OF OWASSO, OKLAHOMA 76TH STREET INTERCEPTOR TABLE 1 (Cont'd) Estimated Future Wastewater Flows - Interceptor East Extension Greeley and Hansen November 2007 Subtotal 702 491 1.474 0.15 4.0 0.59 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the W WTF 5, Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. PEAK TRIBUTARY AREAS AVG SANITARY FLOWS LAND GROSS EST. % NET RES. SANITARY PEAK FLOW AREA USE ACRES DEVELOP ACRES POP. FLOW (MGD) FACTOR (MGD) 1 /3A RE 225 70 158 473 0.05 4.0 0.19 2/3F RE 477 70 334 1,002 0.10 4.0 0.40 Subtotal 702 491 1.474 0.15 4.0 0.59 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the W WTF 5, Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. CITY OF OWASSO, OKLAHOMA 76TH STREET INTERCEPTOR TABLE 1 (Cont'd) Estimated Future Wastewater Flows to Stone Canyon Lift Station Greeley and Hansen November 2007 Subtotal 3,431 2,287 6,520 0.77 2.50 1.91 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the WWTP. 5. Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. PEAK TRIBUTARY AREAS AVG SANITARY FLOWS LAND GROSS EST. % NET RES. SANITARY PEAK FLOW AREA USE ACRES DEVELOP ACRES POP. FLOW (MGD) FACTOR (MGD) A RE 681 70 477 1,430 0.14 2.5 0.36 B RE 512 70 358 1.075 0.11 2.5 0.27 C RE 767 70 537 1.611 0.16 2.5 0.40 D RE 549 70 384 1.153 0.12 2.5 0.29 E RE 695 60 417 1,251 0.13 2.5 0.31 1 /2H GB 227 50 114 0.11 2.5 0.28 Subtotal 3,431 2,287 6,520 0.77 2.50 1.91 NOTES: 1. RE Sanitary Flow based on: 1 unit/net acre; 3 residents/unit; 100 gpcd for 300 gpd/net acre. 2. All Industrial, General Business (or Commercial) Sanitary Flows - 1000 gpd/net acre. 3. Maximum residential percent development is 70% to provide allowance for streets, public facilities, stormwater retention, etc. 4. Peaking Factor, peak sanitary flow, and peak flow rate in the "Total" row are based on total sanitary flow to the Interceptor and indicate flow to the WWTP. 5. Peaking Factor was taken from the Design and Construction of Sanitary and Storm Sewers, WPCF Manual of Practice No. 9, 1974. EXHIBIT A AGREEMENT FOR PROFESSIONAL SERVICES between CITY OF OWASSO, OKLAHOMA and GREELEY AND HANSEN LLC 76" STREET INTERCEPTOR Scope of Services The scope of engineering services includes planning, design and bid assistance in connection with the 76'h Street Interceptor. The proposed interceptor is needed to extend sewer service in the southeast region of the service area. The proposed project will serve the area generally bordered by 76'" Street to the north, the Verdigris River to the east, 59'" Street to the south and 143`d Street to the west. It is anticipated that sewer flows from the project area, which will include the Stone Canyon development will be conveyed to the existing Elm Creek Interceptor located one -half mile west of the 76`" Street and 143d Street intersection. The scope of work includes the following major elements: a. Prepare a preliminary engineering report (PER) to qualify the proposed project for ODEQ State Revolving Fund financing. b. Prepare Contract Documents and provide bid related assistance for the design of approximately 11,700 feet of gravity sewer. TASK 1.0 - PRELIMINARY ENGINEERING REPORT 1.1 Progress Meetings. Meet monthly with Owasso utility staff to review technical aspects of the project. Prepare meeting notes and distribute. 1.2 Gather Basic Data. Collect relevant information on the planning area, including land uses, zoning and any available reports and drawings on the existing sewer system. 1.3 Summarize Basic Data for Service Area. Prepare spreadsheets showing projected wastewater flow rates from the service area based upon anticipated land use and development rate. Prepare an electronic base map (USGS topo map or equivalent) to show the proposed sewer facilities. Page 1 of 3 1.4 Alternatives Evaluation. Develop and screen two alternative alignments for the interceptor sewer. Compare alternatives based upon cost and other non - monetary factors. Analyze the capacity of the Elm Creek Interceptor to receive flow from the service area. 1.5 Environmental Information Document. Discuss and show project impacts to: soils and geology; wetlands; floodplain; groundwater; air quality; biota; historic /architectural /archeological sites; national landmarks; open space and indirect impacts. 1.6 Project Implementation. Coordinate with Owasso's financial and rate consultant regarding SRF financing for the selected plan. Develop a schedule for design and construction of the selected plan. Arrange for necessary resolutions to be issued, including resolutions identifying the designated wastewater management agency (City of Owasso Public Works Department), designating the authorized loan signatory and indicating the Owasso's acceptance of the preliminary engineering report. 1.7 Pubic Participation. Participate in the public hearing, to be attended by members of the City of Owasso Department of Public Works, and interested citizens. Prepare handouts and graphics for the meeting. The public hearing will present and receive public comments on the selected plan. 1.8 Preliminary Engineering Report. Prepare a draft report for review by City of Owasso Public Works Department. Incorporate Owasso comments in draft report. After public hearing, incorporate into the final report the hearing transcript, written comments and response and any resulting modifications to the selected project. Submit 6 copies of the final report to Owasso. Respond to ODEQ comments on the preliminary engineering report and revise the plan as necessary in response to ODEQ comments. TASK 2.0 - PRELIMINARY DESIGN 2.1 Aerial Mapping. Arrange for and provide, through a subcontract, aerial survey and topographic mapping for an area approximately 2.5 miles in length and 400 feet in width. The topographic survey will provide 1 -foot contour intervals at a scale of l" = 40'. 2.2 Utilities and Right -of -Way Survey. Arrange for and provide, through a subcontract, ground survey to locate buried utilities and existing right -of -way along the project route. 2.3 Geotechnical Report. Arrange for and provide, through a subcontract, soil borings and a geotechnical report for the project. 2.4 Easement Requirements. Determine the number, size and type of easements that will be required for the construction of the project. 2.5 Preliminary Construction Cost Opinion. Prepare a preliminary construction cost opinion consisting of quantity takeoffs and unit costs for the Project. Page 2 of 3 TASK 3.0 - FINAL DESIGN 3.1 Drawings. Prepare Construction Drawings for use, together with the Construction Specifications, in taking competitive bids and entering into a construction contract with an experienced and competent contractor. 3.2 Specifications. Prepare Construction Specifications for use, together with the Construction Drawings, in taking competitive bids and entering into a construction contract with an experienced and competent contractor. 3.3 Final Construction Cost Opinion. Upon completion of the Drawings and Specifications, prepare final construction cost opinion. 3.4 Permit Applications. Prepare project information submissions, including permit applications and review comments, to the ODEQ for Construction Permit and to the U.S. Department of Army for Section 404 Water Quality Permit. Provide in the specifications a list of permits which must be obtained by the construction contractor. It is understood that the construction contractor must obtain the ODEQ Stormwater and Erosion Control Permit. TASK 4.0 - BID ASSISTANCE 4.1 Bidder Inquiries. Respond to bidder inquiries during the bidding period. 4.2 Addenda. Prepare addenda as needed to clarify the Contract Documents. 4.3 Pre -Bid Meeting. Attend pre -bid meeting and prepare meeting notes. 4.4 Bid Re ort. Tabulate bids and prepare bid report including recommendation on award of contract. Page 3 of 3 EXHIBIT B AGREEMENT FOR PROFESSIONAL SERVICES between CITY OF OWASSO, OKLAHOMA and GREELEY AND HANSEN LLC 76th Street Interceptor Level of Effort Page 1 of 1 Estimated Workdays Project Senior Project Designer Word Task Description Principal Manager Engineer Engineer /CAD Oper Processor Totals 1.0 PRELIMINARY ENGINEERING REPORT 1.1 Progress Meetings 0.0 2.0 0.0 2.0 0.0 0.0 4.0 1.2 Gather Basic Data 0.0 0.5 0.0 2.0 0.0 0.0 2.5 1.3 Summarize Basic Data for Service Area 0.0 1.0 0.0 2.0 0.0 0.0 3.0 1.4 Alternatives Evaluation 0.0 1.0 0.0 4.0 2.0 0.0 7.0 1.5 Environmental Information Document 0.0 2.0 0.0 6.0 4.0 0.0 12.0 1.6 Project Implementation 0.0 0.5 0.0 1.0 0.0 0.0 1.5 1.7 Public Participation 0.0 1.0 0.0 2.0 0.0 0.0 3.0 1.8 Preliminary Engineering Report 0.5 2.0 0.0 5.0 4.0 2.0 13.5 Subtotal - PER 0.5 10.0 0.0 24.0 10.0 2.0 46.5 2.0 PRELIMINARY DESIGN 2.1 Aerial Survey & Mapping 0.0 0.5 0.0 1.0 2.0 0.0 3.5 2.2 Utilities & ROW Survey 0.0 0.5 0.0 1.0 2.0 0.0 3.5 2.3 Geotechnical Report 0.0 1.0 0.0 2.0 0.0 0.0 3.0 2.4 Easement Requirements 0.0 1.0 0.0 2.0 0.0 0.0 3.0 2.5 Preliminary Cost Opinion 0.0 0.5 0.0 2.0 0.0 0.0 2.5 Subtotal - Preliminary Design 0.0 3.5 0.0 8.0 4.0 0.0 15.5 3.0 FINAL DESIGN 3.1 Drawings (14 total drawings) 0.5 5.0 5.0 25.0 40.0 0.0 75.5 3.2 Specifications 0.5 10.0 0.0 20.0 0.0 0.0 30.5 3.3 Final Cost Opinion 0.0 1.0 0.0 2.0 0.0 0.0 3.0 3.4 Permit Applications 0.0 2.0 0.0 5.0 0.0 0.0 7.0 Subtotal - Final Design 1.0 18.0 5.0 52.0 40.0 0.0 116.0 4.0 BID ASSISTANCE 4.1 Bidder Inquiries 0.0 1.0 0.0 2.0 0.0 0.0 3.0 4.2 Addenda 0.0 1.0 0.0 1.0 1.0 0.5 3.5 4.3 Pre -Bid Meeting 0.0 1.0 0.0 0.0 0.0 0.5 1.5 4.4 Bid Report 0.0 0.5 0.0 1.0 0.0 0.5 2.0 Subtotal - Bid Assistance 0.0 3.5 0.0 4.0 1.0 1.5 10.0 Totals 1.5 35.0 5.0 88.0 55.0 3.5 188.0 Page 1 of 1 EXHIBIT B AGREEMENT FOR PROFESSIONAL SERVICES between CITY OF OWASSO, OKLAHOMA and GREELEY AND HANSEN LLC 76th Street Interceptor Estimated Compensation Task 1.0 - Preliminary Engineering Report Direct Labor: a. Principal b. Project Manager c. Senior Engineer d. Project Engineers e. Designers/CAD Operators f. Word Processors Subtotal 2. Greeley and Hansen Labor Costs with 2.99 Multiplier 3. Subtotal - Preliminary Engineering Report Task 2.0 - Preliminary Design Direct Labor: a. Principal b. Project Manager c. Senior Engineer d. Project Engineers e. Designers/CAD Operators f. Word Processors Subtotal 2. Greeley and Hansen Labor Costs with 2.99 Multiplier 3. Subconsultant Costs a. Aerial Mapping - ADS, Inc. b. Utilities and ROW Survey c. Geotechnical - Terracon Total 4. Subconsultant Costs with 1.05 Multiplier $39,647 Estimated Days Hours/Day Rates Cost 0.5 8 $75 $300 10.0 8 $45 $3,600 0.0 8 $50 $0 24.0 8 $35 $6,720 10.0 8 $30 $2,400 2.0 8 $15 $240 46.5 $13,260 $39,647 $12,000 $4,000 8,000 $24,000 $13,335 $25,200 $39,647 5. Subtotal - Preliminary Design $38,535 Page 1 of 2 Estimated Days Hours /Day Rates Cost___ 0.0 8 $75 $0 3.5 8 $45 $1,260 0.0 8 $50 $0 8.0 8 $35 $2,240 4.0 8 $30 $960 0.0 8 $15 $0 15.5 $4,460 $12,000 $4,000 8,000 $24,000 $13,335 $25,200 $39,647 5. Subtotal - Preliminary Design $38,535 Page 1 of 2 EXHIBIT B AGREEMENT FOR PROFESSIONAL SERVICES between CITY OF OWASSO, OKLAHOMA and GREELEY AND HANSEN LLC 76th Street Interceptor Estimated Compensation Task 3.0 - Final Design 1. Direct Labor: a. Principal b. Project Manager c. Senior Engineer d. Project Engineers e. Designers /CAD Operators f. Word Processors Subtotal 2. Greeley and Hansen Labor Costs with 2.99 Multiplier 3. Other Direct Costs a. Airfare/ Travel b. Reproduction /Printing Subtotal 4, Subtotal - Final Design Task 4.0 - Bid Assistance 1. Direct Labor: a. Principal b. Project Manager c. Senior Engineer d. Project Engineers e. Designers /CAD Operators f. Word Processors Subtotal 2. Greeley and Hansen Labor Costs with 2.99 Multiplier 3. Subtotal - Bid Assistance 3 Trips @ $750 / Trip $99,388 $2,250 $1,000 $3,250 Estimated Days Hours /Day Rates Cost 1.0 8 $75 $600 18.0 8 $45 $6,480 5.0 8 $50 $2,000 52.0 8 $35 $14,560 40.0 8 $30 $9,600 0.0 8 $15 $0 116.0 $33,240 3 Trips @ $750 / Trip $99,388 $2,250 $1,000 $3,250 $8.372 $102,638 $8,372 Total Compensation (Rounded) $189,000 Page 2 of 2 Estimated Days Hours /Day Rates Cost 0.0 8 $75 $0 3.5 8 $45 $1,260 0.0 8 $50 $0 4.0 8 $35 $1,120 1.0 8 $30 $240 1.5 8 $15 $180 10.0 $2,800 $8.372 $102,638 $8,372 Total Compensation (Rounded) $189,000 Page 2 of 2 Elm Creek a: �I INTERCEPTOR - EAST EXTENSION (BY CITY) F Copp Er t�- -Meado s �It1ili VAMOM1' (OA(tlt It ti t�!'IT thY ti'G t +I;It 11,: o a . E 76TH ST Baptist INTERCEPTOR G (� Cam) O FORCE MAIN a " (BY OTHERS), CA A Village N 1 „ „R NORTH ® NIX a ! r x� BRANCH LIFT (BY OTHERS) © �n STATIQN (BY OTHERS) # z ... ,...�.4_ ". "_________ _________ .: -E-6 _ST _- _ {. .tea. ........ ...���s�=._._.._.. SOUTH P BRANCH (BY OTHERS) � ,I LEGEND .. BASIN BOUNDARY SUB —AREAS PROPOSED SEWER INFRASTRUCTURE IGREELEYANo HANSEN s 2000 0 2000 4000 FT I �� ���I 1 1 1" =2000' FIGURE 1 w i w ❑Q' CITY OF OWASSO, OK 76TH STREET INTERCEPTOR MEMORANDUM TO: THE HONORABLE CHAIR AND TRUSTEES OWASSO PUBLIC WORKS AUTHORITY FROM: J.B. ALEXANDER PROJECT MANAGER SUBJECT: WATER SYSTEM IMPROVEMENTS PHASE II WEST TRANSMISSION MAIN, BOOSTER PUMP STATION AND PRESSURE PLANE APPURTENANCES; CHANGE ORDER NUMBER 2 AND ACCEPTANCE OF PROJECT DATE: December 13, 2007 BACKGROUND: Included as part of the improvements recommended by the Water Master Plan, this project represents the last phase of enhancements to the City's water distribution system to address water demands for the next twenty years. Specifically, the improvements include approximately two miles of 30 -inch water transmission piping along East 106th Street North, a new booster pump station (located in the base of the recently completed 2 million gallon water tower) to maintain transmission pressure during periods of peak demand and pressure regulating appurtenances to allow the separation of pressure planes. Bids for the project were received on January 9, 2006. McGuire Bros. Construction Company was determined to be the lowest responsive and responsible bidder and the Public Works Authority awarded the construction contract in the amount of $3,848,184.63 to them during its regular meeting of January 17, 2006. On March 20, 2007 Council approved Change Order No. 1 in the amount of $170,389.73 to bring the overall contract amount to $4,018,574.36. CONTRACT CHANGES: The work was awarded as a unit price contract where the quantities presented in the Bid Form were estimated based on expected conditions and used solely for the purpose of comparing bids. It was therefore anticipated that a quantity adjustment would be made at final payment to reflect actual quantities provided, as well as any changes in the scope which may have developed during construction. Funding for final quantity adjustments, and other necessary changes, was included under the Project Allowance Line Item ($210,000) listed in the Bid Tabulation and Project Schedule of Values. Acceptance of Project Change Order No. 2 Water System Improvements Phase H Page 2 of 17 The Summary of Project Over -runs and Under -runs (Attachment A) indicates each item that varied from 100% completion. Many of these costs are associated with small amounts of an item either unused or used in addition to the estimated quantity. This report indicates $194,442.78 in quantity under -runs and $383,671.50 in quantity over -runs; of which $183,600.00 is accounted for by the single item relating to extended temporary pump station use. The net cost of contract quantity over -runs is $189,228.72. The Project Allowance Summary (Attachment B) summarizes items not anticipated in the original scope but required for the proper completion of the project. These items included an additional pressure regulating structure between the 30" transmission line and the 12" distribution line, conduit and telemetry circuits to allow for remote monitoring of the status of the new Tulsa master meter vault, valves and fittings to increase the efficiency of the temporary pumping facility, and other miscellaneous fittings, services and items. Total charges against the Project Allowance, as additions in the scope of this project, total $135,998.06. This amount is included as Item 63 on the "Summary of Project Over -runs and Under -runs (Attachment A). It also appears on the "Final Pay Request" (Attachment C) as Item 63. Change Order No. 1 (approved by Council on March 20, 2007) included all quantity adjustments and scope changes as of March 20, 2007 for a total additive sum of $170,389.73 to the contract amount. Change Order No. 2 includes re- establishing a five- strand barb wire fence removed during construction ($4,950.00) along East 106th Street North, the connection of a 12" DIP line north of East 106th Street North at Mingo Road ($5,242.00) which established a second source of water to the northwest corner of the city's water distribution system, re- installing two (2) Pressure Reducing Valves ($2,000.00) which were installed improperly due to a miscommunication between city officials and the contractor, and miscellaneous fittings, services and items ($6,646.99). The amount requested for Change Order No. 2 is $18,838.99. The following is a re -cap of the funding (to include approved Change Order No. 1 and requested Change Order No. 2) for this project: Original Contract: $3,848,184.63 Change Order No. 1 170,389.73 Change Order No. 2 18,838.99 Final Contract Amount $4,037,413.35 Acceptance of Project Change Order No. 2 Water System Improvements Phase II Page 3 of 17 FUNDING: Funding for this project is provided by the Oklahoma Water Resources Board as a loan from the Drinking Water State Revolving Fund. Additional funding for acquisition of Right -of -Way was provided by remaining Vision 2025 funds. The DWSRF loan application was approved for $4,643,250.00 to compensate construction, easement and right -of -way acquisition, engineering, bonding and financing costs and an allowance of $200,000. Additional funding to compensate for Change Order No. 1, in the amount of $170,389.73 and for Change Order No. 2, in the amount of $18,838.99, will be obtained from savings in right -of -way acquisition and engineering costs (approximately $500,000 savings). RECOMMENDATIONS: Staff recommends Trustee approval of Change Order No. 2 in the amount of $18,838.99, for a revised contract amount of $4,037,413.35, approval for staff to make final payment to McGuire Brother Construction, Incorporated in the amount of $30,992.00, and acceptance of the Phase II (West) Transmission Main, Booster Pump Station and Pressure Plane Appurtenances Project. ATTACHMENTS: A. Summary of Project Over -runs and Under -runs B. Project Allowance Summary C. Pay Request No. 15 (Final) Attachment A Acceptance of Project Change Order No. 2 Water System Improvements Phase Id Page 4 of 17 Summitry of Project Over-runs and Under-runs Item t to. Description Unit Unit Cost I Quantity Scheduled Value I Work Completed I Quantity over-runUnder run Part I - Transmission Line and Booster Punip Station 5- 30" DIP. Class 250 LF $99.00 9445.00 5935.055.00 5889.515.00. ($45.54C. O,'Y. 6 30" DIP, Class 250 Restrained LF 3141.00 1365Z0 3192,465.00 5273,258.04 $80,793.00 10 17'x12'xl2 Tee Restrained EA $461.00 2.00 $922.00 $0.00 (392100) 12 8'x8"x6' Tee Restrained FA 5260.00 1-00 $260,00 54 .00 (5260.001 13 6'x6"x6 Tee Restrained EA S220.G0 1. GO $220.00 $000 (522G.M 14 130" Send Restrained EA S3,700.00 8-00 $29,600.00 $51,80O.G0 $22,200.00 15 12" Bend Resyained EA 5350.00 1.011 $35C,GO 53,850.00) S3,500.00 16 10" Bend Restrained EA $275.00 1 GO $275.G0 $o. GO (S275M) 17 8' Bend Restra#ned EA 5225.00 1,00 $225,GO 3675.00 5450.00 18 6' Band Restrained EA $185.00 1'GO $185.00 $1,480.00 $1,295.00 20 12" Plug Restrained EA 5205.00 100 $615.GO $1,025.00 5410.GO 21 10" Plu,. Restrained EA MGM, 1.00 $180.00 $OM (3180.00 22 8' Plug Restrained EA 5155.0121 1.001 $155-00 $G.GO (Sirnaoo) 23 16' Plug Restrained EA $140.00 3.00 $420.00 $0.00 (5420.00) 24 12" Gate Valvew,?Extensioa and Box. EA 51,360.00 2,G0 $21720.00 55,440.04 52J20M 25 10" Gate Valve w!Extension and Box EA $1,100.04 IM 51,100.00 $0-00 (51.100.00i 26 8' Gate %1afvew.Exemon and Box EA $855.00 1.07 $255.00 S&GO (S855.03j 3-5 Wid Sleeve, Restrained, 16" -ET- -- -56-5UT- 1.00 $M.GO $c UU (50501rJ) 36 Solid Sleeve. Restrained, 12" EA MGM 400 51;200.00 5300.00 (5900.00 37 Solid Steeve, Restrained, 8" EA 1 $210.00 5.00 51.050.00 SMOM (S210.00) 38 Solid Sleeve, Restrained, 6' EA $18G.00 1,G0 I 5180. GO $1,080.00 5900-00 39 1 Concrete Encasement CY S105.00 32. GO 53,360.00 56,300.00 $2,940.00 Soddina LF $5.00 4G0O-G0 $20,00.00 $11,785.00 ($8,215.00 44 Seeding LF $1.50 7169,00 $10,753.50 $14,994.00 $4,240.50 45 Street .'Vashdom LF $0.01 11169.00 $111.69 $0-Go (5111.69) 4 F3 7rafflc Control Device, Type I Barricade -99-- -$GAS -- �r=Gi' $270.G0 $94.50 S 48 Traffic Control Device. Type 11 Barricade SD $0.45 00.0111 $27000 $99.00 IS171M)l 49 Traffic Control Device, Type III Barricade SD 1 $1.10 t-00-al $660.00 $242.00 I5418.00 50 Traffic Control Device, Safe Barr wi Lights SD $0.55 3600-67 I S1,9130.00 32128.80 r$1 751.20- 51 Pavement Rernovat and Replace. Asphalt SY $A5MJ 75.GO $4.875.001 $6,305.04 $1,430.00 52 Pavement Removal and Replace, Concrete SY s80.00 50.00 $4.00O.Go $20,720.00 $16,720.00 53 Szvcut LF $2.50 120.GO $3,00, GO 3445.00 5145.GO 54 Straw Bale Emm CorFol EA $2.00 200, GO $40000 Woo (5000.04. 55 Straw Mulch Erosion Czntrol SY $1.00 20C,GO $200 (M $0 (S200.00) 56 Sig Fence LF $1.00 1655.65 51'Gacm KGO f$1,03C.004 57 Flowable Fill CY $75.00, 50,00 $2,75G.00 KGO k$3,75G.9j) 60 Project Sign EA 5500.001 ZGOI 51.00.00 Siam is1'000.00)1 62 ITemporary Pumping; Station AX $30,600.0✓ 8,00 $244.800.00 $428;400.00 $183,600.00 63 Project A] vvance LS S210,000.00 1. GO S210,000-00 S135,996.06 474,001.94' Pan 2 -12" Distribution Line 65 12" DIP. Class 51 LF $4.00 5740.00 5229,600.00 5201,240.00 422,360M',, C7 12" DIP, Class 51, Restrained LF $54.00 490,G4 $26:460.00 $68,688.G7 $42:228.00 69 12 "x1 Z'xF Tee Restrained EA 5450.00 2.GO $900-09 S450.00 79 12" Plug Restrained EA $205.00 7. GO 51,43-5.00 $410.00 1 ($1.025.00) 71 12" olid Sleeve EA 5300.00 100 $900-00 $1,800.00 GO 3900.00 72 12" Gate Valve wlExtension and Box, EA 61,300.0c, 9,00 $11,700.00;1 ($3,900.00) 1; ! 76 Concrete Encasement CY $105.01: 10.00 51.050-04 silr2,20 (1), 563O.G0 77 24" Conduit, Steel. 318" Wall, Bored LF 5207.00 120.00 $24.840.00 On, 11 iS4 14(0�lw " -'w' Acceptance of Project Change Order No. 2 Water System Improvements Phase 11 Page 5 of 17 Sum of Contract Quantity Under-runs <SI94,442.78;' Sum of Contract Quantity Over-runs $383,671.50 Net of Contract Quantity Over-runs $189,228.72 Part 3 - U.S. Hwy. 169 Crossing 78 Rant of Way Clear and Restoration LF $2.03 704.00 $1,408.0-0 $1,092.00 G 81 20" DIP, Class 250, Rest4ned LF $93.00 704.00 $65,472.00 $58.401.99 ($7.07C 01:! 86 12" Gate Valve w!Extension and Box EA SI,350.w 2,00 $2,720.00 $5,440.00 $2,720.00 87 12" Solid Sleeve EA 5300200 2,00 seoc,clo 50.CD 6600.60 88 Concrete Encasement CY S105.00 1,001 $105L0 WOO i$105.00)J 89 36" Conduit. Steel, 18' Wal?, Bored LF $317.00 360,00 5114,120.00 $15,850 DO 90 Sodding LF S5M 344.00 S1,720.03 31 ($1.405.00) 92 Street "A'ashdown LF $0.01 344 GO $3,44 $0,00 ($2,44) 93 Traffic Control device, Orange Safe Fence LF 51.00 400. CO $400 co $0.00 (5400.00) 94 Traffic Control Device, Type I Barricade SD $0.45 90,00 WEID SUM (W.5U 95 Traffic Control Device, Type 11 Barricade SD $0.45 90,00 540,510 $0.00 (340.50) 96 Traffic Control Dveiice, Type III Barricade SD $1.10 90.Go $99.00 sr. Co �IS99.00) 97 Traffic Control Device, Safe Barr wi Lights SD S0.55 240 GO $132,00 K G3 ; _ -1 52.00) 98 Favernent Remove and Replace, Asphalt SY $85.00 5.00 $325.0 $C.CJ ,0325.00)1 99 Faveinent Remove and Re lace Concrete SY $80.00 60.00 $4.800.00 $2,800.N 1$2-, 0 100 Sawcut LF $2.50 60-00 $150,00 5G,C i NO 101 Straw Bale Frosion Control EA $2.00 1()0.CD 5200.D0 30.00 (*-200.00 102 Straw Mulch Erosion Control SY $1.00 50,00 $50,00 FG GO ( "r,O()) 103 Flowa!)le F41 CY $75,00 10.00 $750,00 S0.00 ($750.00) Sum of Contract Quantity Under-runs <SI94,442.78;' Sum of Contract Quantity Over-runs $383,671.50 Net of Contract Quantity Over-runs $189,228.72 Attachment B Acceptance of Project Change Order No. 2 Water System Improvements Phase II Page 6 of 17 City of Owasso - Water Systems Improvement Projects - Phase 11 (West) McGuire Brothers Construction. Inc.. 8415 S. Regency Drive. Tulsa. OK 74131 Project Allowance Surnmary Pay Request Description Quantity Units Unit Price Price 6 12" PRV & Vault I EA 529.250.00 529,250.00 6 12" Check Valve 1 EA 517.525.00 $17,525.00 6 20 "x20`x20Y Tees 2 EA 54,800.00 59,600.00 6 12" Cross 1 EA $580.00 $580.00 6 Conduit under Sheridan Rd. for Tulsa Meter Telemetry 1 LS $4;600.03 S4,600.00 I 6 16" Butterfly Valve and 12" PRV @ Temporary Pumps 1 LS $15:273,44 $15.273.44 6 Telemetry at Tulsa PSV Vault 1 LS $19,140.00 $19,140.00 8 Laptop Computers 2 EA 53:365.00 56,730.00 8 30 "x24' Reducer I EA 53,550.00 S1550.00 9 Concrete Testing I LS $2,125.62 52,125M 11 Valve Box Pad {41" Thick Y. 24" Diameter) 74 EA $40.00 32,960.00 12 Relocate Transformer Pad at Pump Station 1 LS $5,709.00 $5,70.00 13 Replace 2 1 -Phase Buckets & Breakers W 3-Phase 1 LS $2,656.00 52.656.00 14 Add Electric Service to Tulsa Vault 1 LS 54,111.00 S4,11 1.00 14 Programing by SEI and Power Pole instalt at Tulsa Vault 1 LS $5,238.03 55238-00 15 5 Stran Barb vVire Fence 660 LF $7.50 $4,950.00 15 8° Check Valve re- installation I LS 3850,00 58510.00 15 12 PRV re installation 1 LS 51,150.00 1 S1,1 50.00 Total Charges Against Project Allowance Project Allowance Amount $210,4900.00 Balance of Project Allowance Remaining $74,001.44 Acceptance of Project Change Order No. 2 Water System Improvements Phase H Page 7 of 17 Attachment C APPLICATION AND CERTIFICATE FOR PAYMENT -TP-AGE I OF 4 10 OWASSID PUBLIC WORKS AUTHORITY ' Cmitract Date. February 7, 2006 111 NORI H MAIN owaIiso' Ok 740S6 ftolicWwi DWO, W2=007 Panod To w2X2007 TO 1112082007 FROM: MCGUIre RriAhsts constructVnl Inc. 84'15 S Rwjenoy Dove AppEa;; .inn NUMMer 15 tPINAL) Tuisa, M 7413'1 DISIrbution To Owner Architect PROJECT, Contractor PHAZW ? M;iDIRAMIAMMPA."N AMQAQQ*TLfl_FWeJAT Engineer J JVlJ VW$RF PRWECT NO, P40•3007218,01 CONTRACT FOR. JOB NO, 200$08 CONTRACTOR'S APPLICATION FOR PAYMENT Application Is made for payment, as shown below in ck,,, lection with the Contract. Continuation sheet is attached. I Original Contract Slim. 2 Net Change by Change Orders 3 Contract Sum to Date il-ine 4 & 2) 4. Total Completed & Stored To Date (Column J+L On Continuation Sheet) 5 Retainaqe: a. LS of Completed'Nork (Column 0 On Continuation Sheet) - Final b. LS of Stored Material (Column J on Continuation Sheet) Total Retaimage (Line 5a & 5b) 6 Total Earned Less Retainage (Line 4 less Line 5 Total ) $3.848,184,63 $170,389,73 $4,018,574,36 $4,037,413,35 $0,00 $4,037,413.35 7 Less Previous Certificates tar Payment 4,006,421,35 3. CURRENT PAYMENT DUE $30==2-00 �j' Balance to Finish, Plus Retairiage -$18,338.99 (Line 3 less Line 6) gy " "'YAMIQ Change Orders approved in previous months by Owner ADpravt,a this fronth Nomber Datt Appmvod Net Change by Change Orders TOTALS TOTALS Acceptance of Project Change Order No. 2 Water System Improvements Phase 11 Page 8 of 17 The undersigned Contractor certifies that the best of the Contractor's knowledge, information, and belief, the Work covered by this Application for payment has been completed in accordance with the Contract Documents, that all arnounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: MCGUfRE BROTHERS CONSTRUCTION, INC. STATE OF OKLAHOMA ) SS COUNTY OF CREEK ) Subscribed and sworn to before me this 20TH day of NOVEMBER Acceptance of Project Change Order No. 2 Water System Improvements Phase H Page 9 of 17 ARCHITECT'S I ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the contract documents, based on on-site observations and the date comprising the above applications.. the Architect/Engineer certifies to the Owner that the best of the Architect's/Engineer's knowledge. Information, and belief, the work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the amount certifed AMOUNT CERTIFIED $ 01 (Attached explanation if amount certified differs from the amount applied ARCHITECT I ENGINEER: Date: This certificate is not negotiable. The AMOUNT CERTIFED is payable only to the Contractor named herein, Issuance, payment, and acceptance of payment without prejudice to any rights of the owner or Contractor under this Contract. 9_VM,25Q @;Q0 -R T 10 N P_W_ ti BE z5JL_e2W._$)LA_ — Acceptance of Project Change Order No. 2 Water System Improvements Phase H Page 10 of 17 The undersigned (Architect, Contractor, Supplier, Engineer, or Supervisory Offical), of lawful age being first duly sworn on oath says that this (invoice, Claim, or Contract) is true and correct. Affiant further states that the (work, services, or materials) as shown by this Invoice or Claim have been (completed or supplied) in accordance with the Plans, Specifications, orders, or requests furnished to the Affiant. Affiant further states that (s)he has made no payment, nor given, nor donated, or agreed to pay, give, or donate, either directly or indirectly, to any elected official, officer, or employee of the State, County, or City of money or any other thing of value to obtain payment for the award of this Contract, fil ell '14 Contractor or Supplier Subscribed and sworn to before me this 20TH day of ? = I �- -hAect, Engineer, or other Supeivisory Official Subs,cnbed and sworn to before me the day of Nota,-y Public Commission # NOVEMBER Im My Cornmissuon Exputes NOTE,, Strike out words not appropriate and sign appropriate signature line, Architect, Engineer approval is not required for Contractor or Supplier Affidavit. Q%kAS'Q'RH-AAE--A1 TRA CD CD CD CD Uq El CD CD a " CD CD (n 0 0 " C) C 102. D (-D = 10+ ........... I MS #'d W, M N t i,K�m N VA 9k N" QJAN �11� PA 9k N1 kN k%lm 41 F'be34F#k AN A SSA VR I M� IE IM it L( TS Ml,,LE 2 1) (Vk U S MANSMISSJON 1ANE .%,ND W",.'TP.R PUMP SlA I WN OWSIRV llR0jF( I NO, *: -%.i. 0 ............. ORO w W, i 0 it, KA ANI, f: y . . .... $1 rv) 149" 0 Ulm . . ...................................... ......................... S %4.%66 i W-10n, ............ ......... . ... LS MOW s3t�.,M) w I W, U.00 I 4.1ti.01a ;k? I M, 0 0 m Ls 000 f'<* Vl.:Vll.w 1" i w $000 1 311,00X, imwm $4 w Di w Vli:do SSBiS I889.615.134€ M. I S45.114;.,X ... .. ............... . ... . ... . ........ .... . ......... .. .... .... ........ — — ------- - - — ------- I V'O LF 91 ".Vi Me 521148 00 Woo "9u $273,2581::3 W 41 64% . ....................... lmwff W, m R! ...... — f EA OP W $000 t"1001,M)f, I W. OW, VC I IN ....... . ....... 339."M w ... ....... $000 119=00 loo.wxq Try. MS ................................................................................... z fA Ufil 0* woo 0 SOM 0 00, W2 00 . . ........... . M:ORAIN D i LA uw 04 &45 -3.€9F 1 $41,0 Y) $o, DO WO.O(? IOU WX, tl m mNu) I EA --------------- SM.00 w $o 00 0 $0.M 0 W" $22,0 010 —CA 351,w IM $000 14 w,sw.w 17- 00% Pk 21MM E FA $150 oc $w bo VW 118 11 $3 860 W f tw W1 $1,640.00 ... . .... . ..... - ------- 50 o? al $2"5 CIO CD CD CD CD Uq El CD CD a " CD CD (n 0 0 " C) C 102. D (-D = 10+ OWASSO PHASE 2IWES1) 1� CD CD 5 C C ro CD CD CD N O _ Q+ N � CD O D O J = N I n CD n CD O O CD 0 1+ 13et °,( €.(: tl 1,%iFF:1 IM, €`£.pAKM3 'rt SEf tdd! €,`_°. Wit, £' €'i7F 3[rA 4 @i l�, F'P F'vih6 a,l af:9C k< V"a ti>7 'd3 :aR 0"d l4B "I e;E #•t'd a4iio€ +€ �vM:Sr; i' FA $2215 ON $22500 3 $& e =i*v 3t3.0 :, 3 :15500 ;HJE one ....a.. $ #45.00 $ _. .. _ R $1+g6a560'. ik03 ,fob 7 EA $2F3J6043 #!:dm .w 2; $4.Wi0lf C. L3:� _. EA. mt, _W #bt4- 4?€i'. a $i.Wd 'Wl 50.0 5 1 c fG .15'50 34t`2: €`t „1 10 YE. €'£x. lt,S R49":>E.`. E'A : Sim 00 ffi WAX 4 wO-v $tl. G 0 $r 00 OAK,% 3 5164. iY ..,.... ............... ......______ .e ....................... ,,.,,.,,........ _ = 51ti3.01 LA iP.MW 0 $x.:3°3 k6 33 tP &G !?!;3 ,�.., ... ..�.., ,,, _._ ,........- _._..... ,,,,,,,..,.. ....� EA $9,:?BC.C£i $2,TMW 4 VT At`.,5O $000 4 ?44�1DO 2DD `J4% 6274r :.; 41 0, ts'F:.'a: kt €,N A, F01. EA $i.1� »0 $f,16RS.46 G $0 . N)l 00 0 $ W 0'"'A $ #.. €W.. M, s %i z WD 1s EA $$55 00 $856.91515 E $0 1o€ 3v fya 0 10 00 0 W7 ...... _.... ... _.... �... ».,....,..»,�, _�...,..t.__ ,.. t x A rIx T7 4, 0ON - -A $Y7S.�€6 $4,fR5.66 _ #4:..:.ft� $f 15:3 $d. "25:1530 l;70.3"?4 63 RA, vc\FA ?W » "KA£teF' A ` $15.( J.GKt $*✓5.ti .6C $tiE'a.6ft l,uf; Eli G(i . $:#"0:?:?:'?l #13e3:,°.,. k('<^,) '3 r mk!t.,43 $SO,€10i€ti#: $5",9Li:}.66. 1 $59,6Df''4. R $6 to 3 S", Miw I tIVI, $C P:d's n,.........�.� ... .......... k3: 4., l' «! R'tiCS v ........ ...._ ....,....._ .... DO ..........» < $44,15.1£ EH3 loo CO%, $1:515€ 'r m) t $d„'.i'Si'J.C.€[f wo Cw'.W $,3::t3 3;2`2.940 t#! 2 $23Gd^4o tM U'...a: F r hIj >l EfF iki (( €Ci :1 €40 3f,i,LNRSw $330 ucK $.D4 $ #3. ? ""0 .fk. ti36t +£ @,to "'. Y'kMNP 0.,r. € 6;A 1 5809.94 "6000 v 30 in 59�' 6 $G -w r .. k..� $5159: u ; ,6 soi 10 ;L.XI.A+'. Rf"i RM{ 4 CA $360.00 $f, 7fl4 €"Fi.� # $:§i Nn $.. :+3 f 1:SDi3.30 25. C ll7 $9N:.£.<i 1� CD CD 5 C C ro CD CD CD N O _ Q+ N � CD O D O J = N I n CD n CD O O CD 0 1+ UnIASSO PHASE 1: V 01 � C, I 0 CD CD CD 0 a 0 CD CD 0 uJ z En C 0 C . D - CD = tj Cll+ -M-77-1 V t NQ 1"I I I dgl, 11 k 9it 3t €9 F it9 U AN I NH 100 mnm ""H WON $IjM.QQ 4 wo Qw U, al A VON . ......... . . . ... . . .... . .... . . . ...... sw ...... W0.1141, . ................... . . ........... 00 60 vl.304�10 fft, �rdAll 113 IC ir. RIAKI) M Lf S$4500 $t3 ,6SfF ,00 1,0 S15,V53 L10 woo 170 ... . . ....... . . . . . . ..._..__W__ .. . . . ............................ ... ... kk fl C*3% Y. & N f% €_€ 1 $74 W, 00 $74,M-, Fk V, sl 1; t'i I Rk. W L i,' PLA(f, :.S V% OW.00 $49,000.00 V4,00-0 $6.00 1 $79,00M ... . ....................... L.F S5.00 w 0.00 tivwtv mom 05 w $wum &M M"Aw !NO% $t <0 2;i j 45 pw iii ww"M\ UK pnol 0 3120000 'Z -A ON L10 100,0 4% ........... 4R ------ ---- . . . . ...... N)F- so omw 25 $m woo 20 $wN UWE v A ll"� 0 wx umou 22.0 $000 $000 220 sw("o ........ w,.,____... . . . . .... . .. .. . ... . .. ....................... ..... .................. ...... .......... ......... ............ 4, ME M 'C', 220 $242 to $0 ul 2ZC 4242W $4M .......... . SIM00 498 SVl 4N li%% $ ...... . .... ........... . .. Sy womw WD $ &. F M UK 1,19Y `a. $ !Allifl� 4 R"L W =M so No N 34 -03 2ND SAM MID M, 260 ".7wN &MW% 4"My MW A: ttu 50 L NNW M UK 00 S445,10 f4s . . . ..... ... .......... . .. - — — --- . . ..... .............. No NNN 0 V00 0 $4 00 v li�`E U00 SY x 11 40 $Mi M 0 M"a 00 lUT,;;-�- FHAl"; 10[ Lr 00 ....................................................... ------- . . ............... C, I 0 CD CD CD 0 a 0 CD CD 0 uJ z En C 0 C . D - CD = tj Cll+ ' . ;VVASSO PHASE 2 CD i cn CD >0 0 CD CD CD (D cro � O CD CD CD o CD CD 102. = N 10+ He. 1918 1M, Vf iM,,,P ............ ..... ............ T V, CY $75 . 5371 , 00 .1 W, 00 . ......... .......... . IS S920,owk0 $920.W— w 0998 VIM 2M.00 0 V ,"w 52*5wW $26.6N M $26,60000 so W . .. . .... . ........... V6,50401, ioUvlru ".00 PROl M! il, CA 15M lft;' iw 00 0 1.5 $74 omoc VAAMWI 00 1 x . ............ V,4 DW 00 . . ..... VIM 0 4,M,00 MIX% VI) w 'S'K $ao 6w M $244.�Nl� OD 14 ... . ......... . ... -.— 54M 40VIM -- $0 IN . . 14 . . .. . . . . .......... ................... ..................................... . 342a 41010 M 1 115 00% W, 5?4-X,! 1)4 VAMI.-. U, . .... . ... ......... . .. . . .................. . . . . ...... ................ . . . ........... ..... , It aN A"OM K I t. . ... ... ..... CY $1 or 7233 W, .10 DI 572340:_; , " v ......... .... Ls s" Ov 00, V, Wi 00 low ... ........ it, L14V 0^1 Na W, Vu 2U 01� - — ----- U VIA (10 s7l'.VAI,w llc*: WA Wk ulo ?3 "a 01"i 2619 FAll 9 1000 I, At `= pm lall EA, $450 00 sww.w 40 90 _--_a .... . ................. -A 5i05.w $1 4M. 00 z w EA SSly� rd $91M, 00 4 2w C : "Co CIC3 11 .............. . LA IlIsxv.w 514.7MO4 6 3000 .. . .......... ............ ........... . ............. .. . ......... — . .... .... - ... . ....... ------ . . . . . ...... .... . ......... ..... OARk EA V,wn M 011�3,00 I Ww A RF M: 'NO VAINT & 4Ai t;T. sii,ow,w V �Oixl 00 1 SOW F t Si3mloolo I CID ciclm? -V CD i cn CD >0 0 CD CD CD (D cro � O CD CD CD o CD CD 102. = N 10+ .'xV" 3t . P > +<;*SE 2 (WE:c, QQ CD 0 C- ,,CD^ VJ CD CD C 5 CD y b CD 1 UQ CD M z 0 = N n C7 CD n CD �h b r"t a. t AMI 4'4 kPIt, SS.k IF Rl W E's tot t[ 3£E01t 4 e"l6 AN 4 F,t Ht{{ 1 ,3r;:'k I,E owl N1 � i)E ?.`> ! 4E4:iE *+i iil.4t k,,Ptl 12 #:Y $tGS.U.O :.SO v�T IS 11.6w ou '5`.'00 it $ €fifKl.04 °Wl LCvk V111 ,._ ._. .._ ...,.. ..,,, ,_ �...... ...... ., �......�........, ... __.�.,.. s= $x�loa $114.&47,'P7 10 8 Ufw (((( 3f'00 pv0 $3Q. +E-v &3 833351 -�-,.. _....... €'aeFl s 3 a arC .:ea t) ;wa =recta ae:, t i 5�, . X y. � E 9 E { M 0'[ �I'M CU kRA. -. >> Rt,*<,T>€..,4r t0" 'at a.€ ( $2 :o $1.449.1301 'W> VJ< 11):'016 S�3.tX3 'aeKi 54. r32.a!: $ "6Ao .. fib, at,k €14:x' k°.4s€ • {- rs.l.E. :"i CY 5300 $1,083 on Mi. $1,08;900] $60111 '391 3 tW3(Y3 M. :I, ')% v00 MM W SM.00. 1 { I'M 001 E $9C t}^ ?WF Xq "s4 i E - R {35ER ?ii4 ;i 54: ?0a $�r5,4 "Z 39 1M9 $;,;,; F9.44E 53::3x' SAS SS],r "s.€);•; •'•'.=,.ti -a S14,SYM.i UZI, 00 "✓ $fl ?7 20? .$0.30 Z $932.flC? i:?f:30°A, i ^.C;43 :.:140 s:0 S7.4x'�€,+.0ti $3 m S C0 $0 a S3 4�3.£E! t'M 3^r"x.. 5 ::.;'.p 9 G4 Mtow $t_ ON, 00 2 1lt'C 00 ':. 1 .. EA $.,ibw VA "to :?0 ;3 61.6'sts.4ce1 51,530.E CA .360 -m $2. .mod A $S <4t i S 3 ' & 3v 4A� -30' 2i€.O'k .$$2 W. W .. .,.._ ....... ___.. ...�_..... ...... .__..... _...................... _ ..... _ .... ... _ .......... ..... ......... _ ...... ._............... _,... .... $10 CXi 0`:95 Sf G SG. "u0 SST (k3. ?? 3J lY" 'j 0-J , $'R`v.SU {`k .,.W.....,.._. tiiS i2£>`,s 13 .a. t.' $347.281 i114,Y$;,V AS& S*S� Aa70.m so MI 410 $5iw.£3'TJ.� fF:?.3i 4F+ •$t5.85c. ""t t, IS DO 5 1.77.0.{}0 Ak $395:0$ $4 M3 53 $51$ !ti #93t% $340,-0 ';ii'1 $S „0 t€."'• 4p(; Si4'X'r Sv uti4 !II Or + S(i.C.1 5:}.444 £' .. .,....._. _____W_W ______._ _ ,�_._..�.....� f i4d F. � YtCi3 $1.00 F t.§ i_ 'f { $400.:0 ,t . V.45 3A`; , 9 t; $b t'}t7l 50 "v 0 $T. ?',� G i49su $40.:0 QQ CD 0 C- ,,CD^ VJ CD CD C 5 CD y b CD 1 UQ CD M z 0 = N n C7 CD n CD �h b r"t a. PHASE 2 (WESTj CD 0 CD CD CD 0 a CD CD Cn Q, 0 0--d CD 0-t C., " I-d 0 Z" cn 0 IC?. CD - CD = tQ 10+ i F A i V i l N - M I . . ....................................... $1. .N3 5c. UM 0 0011f, 50.:: R 4VR WI Moo 3G.00 v SO 0113 0.00% 00 KF SY aQ sc CIO Kull ...................... VAV� kVL. Ct N(R: 3y t,, 00 &5 &28.^o 33% 00 $ 50 . . . ...... ..... . CV, CIO N . . . . ....................... .......... . . ................ . . . LI CY V5 ODI S-fj.,)�Oo sc"A WIX .............. $0 "0 .. . ....... 5.1. 010 f�wlo. to .... . ............ . .. "k IM Ktsi SIM 491 00 om, 0 w.. .. ........... ji W,00 S1 Dc'! ------------- ......... . 00 E L5 sow C, 10,00 — — --------------- — - i $0,00; "WM, IF MY t vg f so 00 C� $0.00 0 WOO S ^ .w N mr, "MEN l,R, A t, so ............ . . .... F--i— so ---- 13 "'Oo K.00 — — $o C4' I'S W $ow ---. .. .................... CD 0 CD CD CD 0 a CD CD Cn Q, 0 0--d CD 0-t C., " I-d 0 Z" cn 0 IC?. CD - CD = tQ 10+ OWASSO PHASE 2;WEST) CD K CD C CI'D CD cro O CD co G- p CD '-h �s 0 �. i18 i�'. d� E.ii68`YI�Pt; �'3k k4 € § &K 'A Mll3 101 ii 11 {M141t1F1 b'iHN'>35 +4 -ii � utsE+.. 'x(33SE En's €i.V3F Ioti1.::l6 (-WAN tits, a. ',n a ty o33:3 r $0w Sti.OV ik Ufa S3t7 ltT:.'33f7� ;i.9} ✓. 86 -i3? . _.,_...._ .............._.._.._. _____ —�.- .— - ---... ___._...._.... ..... __.,,.... .. ._.� .. ..__ ____.._. ____._. _...... . . 6k5 - ..z�, vxr LT. M 2 8�C9:i ......._ .. 13,6s6.rsa:63 '3a,ikf3.397.86 25,993.0`3 37,531.99 fd,a29; 789.36 •3'4i3.idg7.7d CD K CD C CI'D CD cro O CD co G- p CD '-h �s 0 �.