HomeMy WebLinkAbout1998.03.17_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY
TYPE OF MEETING: Regular
DATE: March 17, 1998
TIME: 7:00 p.m.
PLACE: Council Chambers, Owasso Community Center
Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin
board at 4:00 p.m. on Friday, March 13, 1998.
Marc Boutwell, Authority Secretary
AGENDA
1. Call to Order
2. Flag Salute
3. Roll Call
4. Consideration and Appropriate Action Relating to a Request for Approval of the Consent
Agenda. All matters listed under "Consent" are considered by the Trustees to be routine
and will be enacted by one motion. Any Trustee may, however, remove an item from
consent by request. A motion to adopt the Consent Agenda is non - debatable.
A. Approval of the Minutes of March 3, 1998 Regular Meeting.
Attachment #4 -A
B. Approval of Claims.
Attachment #4 -13
Owasso Public Works Authority
March 17, 1998
Page 2
5. Consideration and Appropriate Action Relating to a Request for Trustee Approval of an
Engineering Service Agreement for the North Owasso Wastewater Collection System '
Improvements.
Mr Carr
Attachment #5
The staff will recommend Trustee approval of an agreement with Hub +Garver, Tulsa, Ok,
in the amount of $65,000 for engineering services related to improvements of the North
Owasso Wastewater Collection System.
6. Consideration and Appropriate Action Relating to a Request for Authorization for the City '
Manager to Initiate and Develop a Plan for the Authority to Design and Construct, and
Fund Improvements, to the Owasso Wastewater Collection System Referred to as the "Elm
Creek Interceptor. "
Mr Ray
Attachment #6
The staff will recommend Trustee action to authorize the staff to develop and present a
concept plan for the purpose of designing improvements to the wastewater collection
system, estimated to cost approximately 1.5 million dollars, constructing those
improvements and funding the cost of such improvements.
7. Report from OPWA Manager
Owasso Public Works Authority
March 17, 1998
Page 3
8. Report from OPWA Attorney
9. Unfinished Business
10. New Business
11. Adjournment
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, March 3, 1998
The Owasso Public Works Authority met in regular session on Tuesday, March 3, 1998 in the
Council Chambers at the Owasso Community Center per the Notice of Public Meeting and
Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, February 27, 1998.
ITEM 1: CALL TO ORDER
Chairman Barnhouse called the meeting to order at 7:02 p.m.
ITEM 2: INVOCATION
Mr Wilken offered the invocation.
ITEM 3: FLAG SALUTE
led in the flag Dr Bod e g salute.
ITEM 4: ROLL CALL
PRESENT ABSENT
Mary Lou Barnhouse, Chair Michael Helm, Trustee
Tracy Standridge, Vice Chair
Denise Bode, Trustee
Mark Wilken, Trustee
STAFF
Rodney J Ray, City Manager
Ronald D Cates, Authority Attorney
Marcia Boutwell, Authority Secretary
ITEM 5: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR APPROVAL OF THE CONSENT AGENDA.
A. Approval of the Minutes of February 17, 1998 Regular Meeting.
B. Approval of Claims
Dr Bode moved, seconded by Mr Wilken, to approve the consent agenda. The consent agenda
included minutes of the February 17, 1998 regular meeting, by reference made a part hereto.
Item B on the consent agenda included the following claims: (1) OPWA Fund $23,327.84;
(2) OPWA Capital Improvement Fund $87,575.80; (3) OPWA Sales Tax Fund $44,906.47; (4)
Interfund Transfers $37,447.83; (5) Payroll $25,472.43.
A YE: Bode Wilken Standrid e, Barnhouse
NAY: None
Motion carried 4 -0.
Owasso Public Works Authority
March 3, 1998
ITEM 6: CONSIDERATION AND APPROPRIATE ACTION RELATING TO OPWA
RESOLUTION #98 -03, A RESOLUTION OF THE TRUSTEES OF THE
OWASSO PUBLIC WORKS AUTHORITY (THE "AUTHORITY ")
AUTHORIZING THE ISSUANCE OF ITS PUBLIC IMPROVEMENT
REVENUE BONDS, SERIES 1998 (THE "BONDS ") IN THE AGGREGATE
PRINCIPAL AMOUNT OF $8,500,000, FOR THE PURPOSE OF FINANCING
CERTAIN PUBLIC IMPROVEMENTS BENEFITTING THE CITY OF
OWASSO, OKLAHOMA (THE "CITY ") FUNDING A DEBT SERVICE
RESERVE, AND PAYING CERTAIN LEGAL AND FINANCING COSTS:
WAIVING COMPETITIVE BIDDING AND AUTHORIZING THE BONDS TO
BE SOLD ON A NEGOTIATED BASIS AND AT A DISCOUNT• APPROVING
A PURCHASE CONTRACT WITH RESPECT TO THE SALE OF THE
BONDS AND AUTHORIZING AND DIRECTING EXECUTION THEREOF
BY THE CHAIRPERSON OR VICE - CHAIRPERSON OF THE AUTHORITY•
RATIFYING AND CONFIRMING A LEASE AS HERETOFORE AMENDED
(THE "LEASE ") BY AND BETWEEN THE CITY AND THE AUTHORITY
WHEREBY THE CITY LEASES ITS WATER SANITARY SEWER
GARBAGE AND TRASH COLLECTION SYSTEMS AND THE BAILEY
RANCH GOLF CLUB TO THE AUTHORITY• APPROVING AND
AUTHORIZING THE EXECUTION OF A SERIES 1998 SUPPLEMENTAL
BOND INDENTURE, WHICH TOGETHER WITH A GENERAL BOND
INDENTURE DATED AS OF DECEMBER 1 1997 AND AS HERETOFORE
SUPPLEMENTED AND AMENDED, SHALL BE REFERRED TO
COLLECTIVELY HEREIN AS THE "INDENTURE" AUTHORIZING THE
ISSUANCE AND SECURING THE PAYMENT OF THE BONDS
APPROVING THE OFFICIAL STATEMENT PERTAINING TO SAID BONDS
AND AUTHORIZING DISTRIBUTION OF THE SAME AND AUTHORIZING
THE CHAIRPERSON OR VICE - CHAIRPERSON OF THE AUTHORITY TO
APPROVE ANY CORRECTIONS TO SAID OFFICIAL STATEMENT:
PROVIDING THAT THE DECLARATION OF TRUST CREATING THE
AUTHORITY IS SUBJECT TO THE PROVISIONS OF SAID INDENTURE•
AUTHORIZING AND DIRECTING THE EXECUTION OF BONDS AND
OTHER DOCUMENTS RELATING TO THE TRANSACTION INCLUDING
BUT NOT BYWAY OF LIMITATION, DOCUMENTATION NECESSARY TO
SECURE BOND INSURANCE AND A CONTINUING DISCLOSURE
CERTIFICATE: ESTABLISHING THE AUTHORITY'S EXPECTATIONS
WITH RESPECT TO ISSUANCE OF TAX - EXEMPT BONDS IN CALENDAR
YEAR 1998, AND DESIGNATING THE BONDS AS "BANK QUALIFIED " -
AND CONTAINING OTHER PROVISIONS RELATING THERETO.
Mr Ray said that OPWA Resolution #98 -03 relates to the Series 1998 Public Improvement
Revenue Bonds approved by the voters in October 1997. Resolution #98 -03 authorizes the
issuance of the bonds, approves the official statement pertaining to issuing the bonds and
authorizes its distribution, and authorizes the Chair or Vice Chair to approve any corrections to '
4
Owasso Public Works Authority
March 3, 1998
the official statement. The resolution contains other provisions relating to the bond issue.
Financial Advisor Keith McDonald was present to answer questions. Dr Standridge moved,
seconded by Mr Wilken, to approve OPWA Resolution #98 -03.
AYE: Standridge, Wilken, Bode, Barnhouse
NAY: None
Motion carried 4 -0.
ITEM 7:
CONSIDERATION AND APPROPRIATE ACTION RELATING TO THE
PURCHASE OF A UTILITY TRACTOR.
Mr Carr said that the street division budget includes funds for the purchase of a new utility
tractor. Bid specifications were prepared and sent to local vendors, and a notice to bidders was
advertized on January 29 and February 5. Four bids were received and publicly opened on
February 18. The bid submitted by Enlow Ford for a Kubota M540005 is $9.62 higher than
the lowest bid; however, the equipment provides greater operator comfort and safety than the
lowest bid, and has a delivery time more consistent with department expectations. Mr Ray said
that the item was erroneously placed on the OPWA agenda. After conferring with legal counsel,
staff believes that it is appropriate for the OPWA to award the bid since the advertisement met
all the requirements for trust authority bidding. The payment request will appear on the City
Council claims list, therefore allowing that it be paid for from the correct fund. Dr Bode
moved, seconded by Mr Wilken, to approve an expenditure in the amount of $15,142.06 to
Enlow Ford Tractor Inc, Tulsa, OK for the purchase of one Kubota Model 54005 utility tractor,
and authorization for payment.
AYE: Bode, Wilken, Standridge, Barnhouse
NAY: None
Motion carried 4 -0.
ITEM 8: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR AN AMENDMENT TO THE ENGINEERING CONTRACT
FOR THE CONSTRUCTION OF PHASE I IMPROVEMENTS TO THE
WASTEWATER TREATMENT PLANT.
Mr Carr presented the item to amend the engineering contract with HUB +Garver for wastewater
treatment plant improvements. Adding weather related days to the contract will increase the cost
to $1850 per month for construction phase engineering services and $8550 per month for
resident project representation. The preparation and associated cost of an Operations and
Maintenance Manual is deleted from the contract and will be included in the contract at the next
phase of expansion. The original contract fee of $215,100 will not be exceeded by the change.
Dr Standridge moved, seconded by Mr Wilken, to approve Amendment #1 to the Agreement for
Construction Phase Engineering Services for the Wastewater Treatment Plant Improvements with
Owasso Public Works Authority
March 3, 1998
HUB +Garver, Tulsa, OK, wherein the Construction Phase Service fees will be $1850 per month
and Resident Project Representation fees will be $8550 per month, and to delete the preparation
of the operation and maintenance manual included in the original agreement, and that the original
total fee of $215,100 shall not be exceeded.
AYE: Standridge, Wilken, Bode, Barnhouse
NAY: None
Motion carried 4 -0.
ITEM 9: REPORT FROM OPWA MANAGER
No report.
ITEM 10: REPORT FROM OPWA ATTORNEY
No report.
ITEM 11: UNFINISHED BUSINESS
None.
ITEM 12: NEW BUSINESS
None.
ITEM 13: ADJOURNMENT
Dr Standridge moved, seconded by Dr Bode, to adjourn.
AYE: Standridge, Bode, Wilken, Barnhouse
NAY: None
Motion carried 4 -0, and the meeting was adjourned at 7:20 p.m.
Marcia Boutwell, Authority Secretary
Mary Lou Barnhouse, Chairperson
CITY OF OWASS
OWASSO PUBLIC WORKS
3/13/98 83343 A/P CLAIMS
PO # VENDOR
OPWA ADMINISTRATION
AUTHORITY
REPDRT APAPVR PAGE:
DESCRIPTION AMOUNT
980 0 36
RONALD D CATES
RETAINER
700.00
9'8'0 0'---)6
RONALD D CATES
LEGAL SERVICES
100.00
980 184
CN HASKELL & ASSOC
COMPUTER EQUIPMENT
40.00
980 221
AT&T WIRELESS SERVICES
PHONE USE-CARR
29.50
98O221
AT&T WIRELESS SERVICES
PHONE USE-RDBERTS
23.25
88.71
980 275
WESTERN BUSINESS PRODUCTS
COPIER MAINTENANCE
981074
HOWARD STAMPER
RETAINER/SERVICES
150.00
9820 14
SUBURBAN OFFICE SUPPLY
SUPPLY
OFFICE SUPPLIES
OFFICE SUPPLIES
13.37
23.76
982014
SUBURBAN OFFICE
~~
9820 32
OFFICE DEPOT CARD PLAN
OFFICE SUPPLIES
75.67
982O32
9821O5
OFFICE DEPOT CARD PLAN
KIMBALL ACE HARDWARE
OFFICE SUPPLIES
MAINT/REPAIR SUPPLIES
45.99
10.83
982113
MILL CREEK LUMBER & SUPPL
MAINT/REPAIR SUPPLIES
6.86
982140
PSO
2198 USE
1O1.O3
H�
982143
SOUTHWESTERN BELL TELE
2/98 PLEXAR
USE
95..40
33.76
982161
MCI TELECOMMUNICATIONS
2/98
-------------
DEPARTMENT TOTAL
N�
UTILITY BILLING
------------------------------
981921
CSC CREDIT SERVICES, INC
COLLECTIONS-O2/98
25.00
981971
MARK MEYER
METER READER
241.65
981974
BRANDON HAMILTON
METER READER
153.00
-
982O21
SAM'S CLUB
COMPUTER PAPER
23 99
^
U�
982O36
982038
OSCAR MCLAURIN
TYRONE DINKINS
METER READER
METER READER
251.70
349.O5
982040
BRAD SPARKMAN
METER READER
151.65
982O52
OSU ' '
LEADERSHIP CONFERENCE
125 OO
.
N�
N�
-------------
1,321.O4
DEPARTMENT TOTAL ====>
WATER
��
------------------------------
W�
980423
WATER PRODUCTS INC
WATER METERS 3/18/97
1,586.60
980 423
WATER PRODUCTS INC
WATER METERS 3/18/97
1,586.60
980656
YALE UNIFORM RENTAL
UNIFORM CLEAN/RENT
94.40
980994
WATER PRODUCTS INC
REPAIR SUPPLIES
293.99
981816
KIMBALL ACE HARDWARE
MAINT/REPAIR SUPPLIES
43.O1
^
981845
WATER PRODUCTS INC
REPAIR SUPPLIES
75.00
�
981845
WATER PRODUCTS INC
REPAIR SUPPLIES
2,246.29
981.864
VERDIGRIS VALLEY SOD FARM
SOD-REPAIRS
60..00
��
�~
ik�
CITY OF OWASSO
OWASSO PUBLIC WORKS AUTHORITY
3/13/98 8:33:43 A/P CLAIMS REPORT
PO # VENDOR DESCRIPTION
981919 FREEDOM
981919 FREEDOM
981939 CITY GA R
982137 CITY OF
982140 PSO
PERSONNEL INC
PERSONNEL INC
TULSA
982143 SOUTHWESTERN BELL TELE
982161 MCI TELECOMMUNICATIONS
982162 SOUTHWESTERN BELL TELE
DEPARTMENT TOTAL ====>
WASTEWATER TREATMENT PLANT
TEMPORARY PERSONNEL
TEMPORARY PERSONNEL
REPAIRS-02/98
1/98 WATER PURCHASE
2/98 USE
2/98 PLEXAR
2/98 USE
2/98 NON-PLEXAR
APAPVR PAGE
AMOUNT
980656
YALE UNIFORM RENTAL
UNIFORM CLEAN/RENT
980836
SHERRY LABORATORIES INC
SLUDGE ANALYSIS
981421
W W GRAINGER INC
FUSES-UV SYSTEM
981939
CITY GARAGE
REPAIRS-02/98
982051
ADVANCED CHEMICAL
CHLORINE
982054
DEPT OF ENVIRONMENTAL QUA
WASTEWATER PERMIT FEE
982122
TREASURER PETTY CASH
OFFICE SUPPLIES
982140
PSO
2/98 USE
982143
SOUTHWESTERN BELL TELE
2/98 F'LEXAR
982161
MCI TELECOMMUNICATIONS
2/98 USE
DEPARTMENT TOTAL ====>
WASTEWATER COLLECTION
980656
YALE UNIFORM RENTAL
UNIFORM
981421
W W GRAINGER INC
LIFT STATION PARTS
981816
KIMBALL ACE HARDWARE
MAINT/REPAIR SUPPLIES
981903
DEPT OF ENVIRONMENTAL QUA
EXAM FEE-STEVENS
981969
W W GRAINGER INC
EXHAUST BLOWER
981988
T.G. EXCAVATING INC
REPAIR FORCE MAIN
982017
WASTE MGMT INDUSTRIAL SVS
LIFT STATION SERVICE
982018
APAC-OKLAHOMA, INC.
ROCK-117 LIFT STATION
982019
HANES SHOE & ARCH SHOP
BOOTS-MCKNIGHT
982019
HANES SHOE & ARCH SHOP
SAFETY BOOTS-FRANCISCO
982060
EQUIPMENT ONE RENTAL & SA
EQUIPMENT RENTAL
982061
SOONER RENTAL
EQUIPMENT RENTAL
982062
WHITE STAR
117TH LIFT STATION REPAIR
982083
UNIVERSAL ELECTRONICS SUP
REPAIR PARTS
982122
TREASURER PETTY CASH
TRAINING-STEVENS
982140
PSO
2/98 USE
982162
SOUTHWESTERN BELL TELE
2/98 NON-PLEXAR
338.56
370.30
148.56
75,531.35
268.50
48.64
2.53
140.50
82,834
23.20
i6O.00
29.60
1,4O7.87
405.00
988.00
.
52.60
4,580.42
47.70
6.27
7,700.66
41.60
2.71
67.14
40.00
83.76
3,144.00
360.00
128.76
100. 00
100.00
28.60
96.25
300.00
154.26
21.O8
660.68
319.07
CITY OF OWASS�
OWASSO PUBLIC WORKS
3/13/98 8:33:43 A/P CLAIMS
PO # VENDOR
DEPARTMENT TOTAL ====>
REFUSE COLLECTIONS
------------------------------
AUTHORITY
REPORT APAPVR PA8|
DESCRIPTION AMOUNT
980656
YALE
981852
981939
WASTE
CITY
MANAGEMENT OF OKLA
GARAGE
TIPPING FEES
REPAIRS—O2/98
982O19
982138
HANES
WASTE
SHOE & ARCH SHOP
MANAGEMENT OF OKLA
SAFETY BOOTS—MORADOS
2/98 COMML REFUSE
WASTE MANAGEMENT OF OKLA
DEPARTMENT
TOTAL ====>
981852
98214O
RECYCLE CENTER
FUND TOTAL ====>
5,647.91
83.20
98O656
YALE UNIFORM RENTAL
UNIFORM CLEAN/RENT
115.00
981816
KIMBALL ACE HARDWARE
MAINT/REPAIR SUPPLIES
N�
981851
WASTE MANAGEMENT OF OKLA
RECYCLE—REFUSE
981851
WASTE MANAGEMENT OF OKLA
RECYCLE—GLASS
U�
981852
98214O
WASTE MANAGEMENT OF OKLA
PSO
TIPPING FEES
2/98 USE
��
982143
SOUTHWESTERN BELL TELE
2/98 PLEXAR
N� FUND TOTAL ====>
-------------
5,647.91
83.20
6,124.43
6,946.94
115.00
14,347.89
-------------
27,617.46
18.4O
7.O5
1,599.74
120.00
75O.80
198.21
22.32
-------------
2,716.52
-------------
129,376.55
CITY OF OWASSO
OPWA SALES TAX FUND
3/13/98 8:33:43 A/P CLAIMS REPORT APAPVR PAGE:
PO # VENDOR DESCRIPTION AMOUNT
REVENUE BONDS
981652 NASH & BOELTE, CPA
FUND TOTAL ====>
GRAND TOTAL ====>
ARBITRAGE CALCULATION 1,500.00
-------------
1,500.00
-------------
1,500.00
-------------
245,462.60
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 02/28/98
FUND TOTAL $1;870.62 $27,991:15
APPROVED: 03/17/98
Chairman
Trustee
Trustee
OVERTIME
TOTAL
DEPARTMENT
EXPENSES
EXPENSES
OPWA Administration
0.00
$5,055:50
Utility Billing
0.00
1,745.29
Water
831.75
3672:13
Wastewater
338.73
5,457.38
Wastewater Collection
587.70
6,080:56
Refuse
.112.44
4563.66
Recycle Center
1,416:63
FUND TOTAL $1;870.62 $27,991:15
APPROVED: 03/17/98
Chairman
Trustee
Trustee
MEMORANDUM
TO: HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: F. ROBERT CARR, JR., P.E.
PUBLIC WORKS DIRECTOR
SUBJECT: AGREEMENT FOR ENGINEERING DESIGN SERVICES -
NORTH OWASSO WASTEWATER COLLECTION SYSTEM
IMPROVEMENTS
DATE:
BACKGROUND:
March 11, 1998
The 1997 Wastewater Master Plan, adopted by Resolution No. 98 -01 on January 6, 1998, indicated
the need for improvements in the wastewater collection system in the vicinity of the existing 106th
Street lift station (106th Street west of Mingo Road). Over the past few years, staff has identified
needed infrastructure improvements in this area as a result of residential growth and increased sewage
flow in the system, deteriorated and undersized collection lines, and severe infiltration/inflow
conditions during wet weather. These needs were evaluated and included in the Master Plan.
During the past weeks of extensive wet weather, large volume overflows have occurred near the
106th Street Lift Station from the collection system into the adjacent drainage channel. These
overflow conditions have been due largely to inadequate capacity of the lift station and the large
amounts of infiltration/inflow from the Hillside, Hale Acres and Steed Additions. Although the
Master Plan indicated needed improvement options, selection of the most cost - effective alternative
will require site - specific engineering to determine the best corrective actions needed.
MASTER PLAN OPTIONS:
The 1997 Wastewater Master Plan indicates the following pertaining to the 106th Street Lift Station:
The 106th Street lift station currently experiences wet weather flows which exceed the
station's pumping capacity. This [situation] has resulted in overflows from the collection
system upstream of the station. The additional development that is expected within 5 -years
will increase these occurrences of overflow. The situation was addressed by evaluating two
Page 2
Agreement for Engineering Design Services
alternatives. The first alternative consists of increasing the lift station capacity to handle the
increased flows. The second alternative is to relieve the lift station with a gravity line.
Although the capital cost of upgrading the station is less than the cost to construct a relief
line, the present worth analysis demonstrates that the construction of a gravity line to relieve
the 106th Street lift station is economically preferable.
The options presented in the Master Plan were developed without having the benefit of detailed field
survey data and elevations. As a result, it is possible that construction of a gravity line to relieve the
106th Street lift station could be eliminated once actual ground elevations are established or other site
construction- related problems are identified. Detailed design engineering is needed to verify site
conditions.
ENGINEERING PROPOSALS:
Staff requested qualification statements on January 13, 1998 from engineering firms capable of
providing engineering design services for the wastewater collection system improvements. A packet
of information was advertised and sent to twenty -five (25) area engineering firms. Responses were
received from seven (7) firms on January 23, 1998. Statements were ranked according to the total
number of evaluation points assigned by the Review Committee (consisting of Robert Carr (Public
Works Director), Dwayne Henderson (Capital Projects Manager) and Phil Lutz (Engineering Project
Manager). Based upon the initial evaluation, the Review Committee identified CTE Engineers, Inc.,
Dewberry Design Group, Horizon Engineering and HUB +Garver as "Qualified and Highly
Responsive Firms ". These four (4) firms were requested to submit a detailed Scope of Services and
their proposed fee for final evaluation by the Review Committee.
Each firm submitted their detailed scope of services on February 16; 1998. Each submittal was
evaluated and ranked by the Review Committee. HUB +Garver was selected as the top ranked firm
for fee negotiations. Fees were to be provided with a breakdown for each alternative (i.e., upgrading
the lift station and gravity relief line) since definition of scope would be defined as the project
proceeded. For comparison, the fee proposals submitted by each firm are summarized as follows:
Engineering Firm Lift Station Gravity Relief
CTE Engineers $145,467 No data submitted
Dewberry Design Group $82,262 $75,482
Horizon Engineering $78,944 $94,536
HUB +Garver $65,000 $62,500
No budget had been established for the engineering work.
Page 3
Agreement for Engineering Design Services
ENGINEERING SERVICES AGREEMENT:
Staff met with a representative from HUB +Garver on March 4, 1998 to discuss the scope of work
and fee proposal. As a result of the meeting, the overall scope of work and fee proposed was not
changed. An Agreement was drafted and reviewed by the City Attorney. The attached Agreement
for Engineering Design Services has been prepared as a result of the review comments.
The Agreement is divided into four (4) work phases as follows:
Preliminary Design $26,500
Final Design 22,000
Bidding 3,500
Construction Administration 13,000
Total Lump Sum $65,000
PROJECT SCHEDULE:
The project design is scheduled to complete design in July 1998. Construction should be able to start
in early Fall 1998. A fast -track response time is included in order to expedite the project to correct
overflow conditions.
FUNDING SOURCE:
In 1992, the Owasso Public Works Authority secured a low interest loan from the Oklahoma Water
Resources Board (OWRB) for improvements to the water distribution system, wastewater collection
system and wastewater treatment plant. Projects involving upgrading the water distribution and
wastewater collection systems in the older portion of the city and expansion of the wastewater
treatment plant have already been completed or are in progress. The FY97 -98 Budget includes
$600,000 as part of the proposed expenditures in the OPWA Capital Improvements Fund for
wastewater collection system 'rehabilitation. These funds are a portion of the OWRB loan funds and
were allocated to improvements to the wastewater collection system in this north Owasso area.
IRECOMMENDATION:
Staff recommends the Trustees authorization of an Agreement for Engineering Design Services with
' HUB+Garver Engineers for North Owasso Wastewater Collection System Improvements in the lump
sum amount of $65,000.
ATTACHMENTS:
1. Engineering Agreement
Agreement
FOR
Engineermig Services
North Owasso Wastewater Collection
System Improvements
THIS AGREEMENT, made and entered into this day of , 199,
between the Owasso Public Works Authority, Owasso, Oklahoma, hereinafter referred to as CI'T'Y.
and HUB+Cymer, hereinafter referred to as ENGINEER;
WITNESSETH:
WHEREAS, CITY intends to construct improvements to the wL5tewater collection system in the
vicinity of 1061 Street North and Mingo Road.
WHEREAS, CITY requires certain professional services in connection with the PROJECT,
hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER is prepared to provide such SERVICES;
WHEREAS, funding is available for the PROJECT.
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree as
follows:
SCOPE OF PROJECT. The scope of this PROJECT is described in Attachment A, SCQPE
OF PROJECT, which is attached hereto and incorporated by reference as part of this
AGREEMENT.
?. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF_SERVICES, which is attached hereto
and incorporated by reference as part of this AGREEMENT.
3. CITY'S RE PQNSIBI,LITTES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBILITIES OF THE F CITY, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D.
COMPENSATION, and further described in Attachment E, FEE[ T HOUR
BREA DQYQ N, which are attached hereto and incorporated by reference as part of thi,
AGREEMENT.
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B.
gCOpE QF SERVICES, in accordance with the schedule set forth in Attachment 1, which
is attached hereto and incorporated by reference as part of this AGREEyfENZ .
6. STANT7ART7 t�F PFTZFORNjAN . ENGINEER shall perform the SERVICES undertaken
in a manner consistent with the prevailing accepted standard for similar services with respei t
to projects of comparable function and complexity and with the applicable laws and
regulations published and in effect at the time of performance of the SERVICES. The
PROJECT shall be designed and engineered in a good and workmanlike manner and in strict
accordance with this AGREEMENT. All engineering work shall be performed by or under
the supervision of Professional Engineers licensed in the State of Oklahoma, and properly
qualified to perform such engineering services, which qualification shall be subject to review
by CITY. Other than the obligation of the ENGINEER to perform in accordance with the
foregoing standard, no warranty, either express or implied, shall apply to the SERVICES to
be performed by the ENGINEER pursuant to this AGREEMENT or the suitability of
ENGINEER'S work product.
MITATIQN QF RESPQNSIBILITY.
7.1 ENGINEER shall not be responsible for construction means, methods, teelmiques,
sequences, procedures, or safety precautions and programs in connection with the
PROJECT.
1 8. OPINIQNS QF CQ_�I.ANDSCHEDULE.
8.1 Since ENGINEER has no control over the cost of labor, materials, equipment, or
services furnished by others, or over contractors', subcontractors'. or vendors'
methods of determining prices, or over competitive bidding or market conditions,
ENGINEER'S cost estimates shall be made on the basis of qualification and
experience as a Professional Engineer.
8.2 Since ENGINEER has no control over the resources provided by others to meet
construction contract schedules, ENGINEER'S forecast schedules shall be made oil
the basis of qualification and experience as a Professional Engineer.
9. I iARILiTY ANIp I; MNJF1 ATI N.
9.1 ENGINEER shall defend and indemnify CITY from and against legal liability for
damages arising out of the performance of the SERVICES for CITY including but
not limited to any claims, costs, attorney fees, or other expenses of whatever nature
where such liability is caused by the negligent act, error, or omission of ENGINEER
or any person or organization for whom ENGINEER is legally liable. Nothing in
this paragraph shall make the ENGINEER liable for any damages caused by the
CITY or any other Contractor of the CITY.
10.
9.2 ENGINEER shall not be liable to CITY for any special, indirect or consequential
damages, such as, but not limited to, loss of revenue, or loss of anticipated protits.
QMPLIANCE WITH LAWS,
10.1 In performance of the SERVICES. ENGINEER shall comply with applicable
regulatory requirements including federal, state, and local laws, rules, regulations,
orders, codes, criteria and standards. ENGINEER shall procure the permits,
certificates, and licenses necessary to allow ENGINEER to perform the SERVICES.
ENGINEER shall not be responsible for procuring permits, certificates, and license$
required for any construction unless such responsibilities are specifically assigned
to ENGINEER in Attachment B, SCOPE OF SERVICES.
10.2 The ENGINEER shall take the necessary actions to ensure its facilities are in
compliance with the requirements of the Americans With Disabilities Act_ It is
understood that the program of the ENGINEER is not a program or activity of the
OWASSO PUBLIC WORKS AUTHORITY. The ENGINEER agrees that its
program or activity will comply with the requirements of the Americans With
Disabilities Act. Any costs of such compliance will be the responsibility of the
ENGINEER- Cinder no circurnstances will ENGINEER conduct any activity which
it deems to not be in compliance with the .Americans With Disabilities Act.
INS1� RANCE.
11.1 During the performance of the SERVICES under this AGREEMENT, ENGINEER
shall maintain the following insurance:
General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the
aggregate, and with property damage limits of not less than $100,000 for
each occurrence and not less than $100,000 in the aggregate.
11.1.2. Automobile Liability Insurance with bodily injury limits of not less than
$1,000,000 for each person and not less than $1,000,000 for each
accident and with property damage limits of not Iess than $100,000 for
each accident.
11.1.3. Worker's Compensation l surance in accordance with statutory requirements
and Employers' Liability Insurance with limits of not less than 5100,000 for
each occurrence.
11.1.4. Errors and Omissions Insurance to remain in effect during the PROJECT
and the term of any legal Iiability. Errors and Omissions coverage to be for
a minimum of $500,000, deductibles subject to approval.
11.2 ENGINEER shall furnish CITY certificates of insurance which shall lticlude a
provision that such insurance shall not be canceled without at least 30 days written
notice to the CITY.
12.1 All documents, including original drawings, estimates, specifications, field notes and
data shall become and remain the property of the CITY.
12.2 CITY'S reuse of such documents without written verification or adaptation by
ENGINEER for the specific purpose intended shall be at CITY's risk.
13, T RUINATION OF AOR) EMENT•
13.1 The obligation to continue SERVICES under this AGREEMENT may be terminated
by either party upon fifteen days written notice in the event of substantial failure by the other party
to perform in accordance with the terms hereof through no fault of the terminating party.
13.2 CITY shall have the right to terminate this AGREEMENT, or suspend performance
thereof, for CITY'S convenience upon written notice to ENGINEER; and ENGINEER shall
terminate or suspend performance of SERVICES on a schedule acceptable to CITY. In the event
R of termination or suspension for CITY'S convenience, CITY shall pay ENGINEER for all
SERVICES performed in accordance with provisions of Attachment D, CQMEENSATION. Upon
restart of a suspended project, payment shall be made to ENGINEER in accordance with Attachment
D, CON TENS
1.4. NOTICE.
14.1 Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the United States
mail, postage prepaid, to the address specified below.
To ENGINEER: HUB+Garver
5415 So. 125' East Avenue
Suite 201
Tulsa, Oklahoma 74146
Attention: Jay Updike
To CITY: OWASSO PUBLIC WORKS AUTHORITY
P.O. Box 180
Owasso, Oklahoma 74055
Attention: F. Robert Carr, Jr.
14.2 Nothing contained in this Article shall be construed to restrict the transmission of
routine communications between representatives of ENGINEER and CITY.
15. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considered to be
in default of this AGREEMENT if delays in or failure of performance shall be due to forces
which are beyond the control of the parties; including, but not limited to: tire, flood,
earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage; inability to
procure permits, licenses, or authorizations from any state, local, or federal agency or person
for any of the supplies, materials, accesses, or services required to be provided by either
CITY or ENGINEER under this AGREEMENT; strikes, work slowdowns or other labor
disturbances, and:judicial restraint.
I6. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court of
competent jurisdiction as unenforceable, such portion shall be severed herefrom, and the
balance of this AGREEMENT shall remain in full force and effect.
17. INTEGRATION-AND MODIFICATION. This AGREEMENT includes Attachments A,
E, C, D, E, and represents the entire and integrated AGREEMENT between the Parties; and
supersedes all prior negotiations, representations, or agreements pertaining to the SCOPE,
OF SERVICES herein, either written or oral. This AGREEMENT may be amended only
by a written instrument signed by each of the Parties.
I& DURi.TEE _ RESOLUTION Pte, OCEDU F'. In the event of a dispute between the
ENGINEER and the CITY over the interpretation or application of the terms of this
AGREEMENT, the matter shall be referred to the City's Director of Public Works for
resolution_ If the Director of Public Works is unable to resolve the dispute, the matter may,
in the Director's discretion, be referred to the City Manager for resolution. Regardless of
these procedures, neither party shall be precluded from exercising any rights, privileges or
opportunities permitted by law to resolve any dispute.
19. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to this
AGREEMENT, provided that nothing contained in this para,g'raph shall prevent ENGINEER
from employing such independent consultants, associates, and subcontractors as ENGINEER
may deem appropriate to assist ENGINEER in the performance of the SERVICES
hereunder.
20. APPROVAL. It is understood and agreed that all work performed under this AGR.EENMNT
shall be subject to'inspection and approval by the Public Works Department of the City of
Owasso, and any plans or specifications not meeting the terms set forth in this
AGREEMENT will be replaced or corrected at the sole expense of the ENGINEER. The
ENGINEER will meet with the City staff initially and monthly thereafter and will be
available for public meetings and/or City of Owasso presentations.
21. KEY PERSONNEL. ENGINEER has designated Jay Updike, P.E., as Project Manager in
the performance of the SERVICES hereunder. ENGINEER agrees that no change will be
made in the assignment of this position without prior approval of CITY.
IN WITNESS WHEREOF, the parries have executed this AGREEMENT in multiple copies on the
respective dates herein below reflected to be effective on the date executed by the Chairman of the
Owasso Public Works Authority.
APPROVED:
HUB +-Garver
Jay Updike, Partner
Date:
OWASSO PUBLIC WORKS AMORI'I "
Secretary Chairman
Date:
APPROVED AS TO FORM:
Authority Attorney
Agreement
for
Engineering Services
North Owasso Wastewater Collection System Improvements
Scope of Project
Attachment A
SCOPE OF PROTECT. The PROJECT shall include:
Upgrading or replacement of the 106" Street Lift Station, the enlargement of the force maid frorn
the lift station south to the existing gravity system on Mingo Road, and the enlargement of the
existing gravity system south and west across 961 Street Noah as required. (17,500 LF of force
main and gravity line.)
or
The elimination of the 106'' Street Lift Station by a gravity interceptor south from the lift station '
across 106' Street North, on south across 96�°' Street North to an existing 15" sewer line ( +-8,700 LF
of gravity line). '
Agreement
for
Engineering Services
North Owasso Wastewater Collection System Improvements
Responsibilities of the City
Attachment C
RESPONSIBILITIES OF THE CITY. The CITY agrees:
1.0
Reports Record& etc To furnish, as required by the work, and not at expense to the
ENGINEER:
1
1.1
Records, reports, studies, plants, drawings, and other data available in the files of the CITY
which may be useful in the work involved under this AGREEMENT.
'
1.2
Standard construction drawings and standard specifications.
2.0
A_cg, `1'o provide access to public and private property when required in performance of
ENGINEER'S services.
3.0
Staff Assistance. Designate in writing a person to act as its representative in respect to the
work to be performed under this AGREEMENT, and such person shall have complete
authority to trwmnit instructions, receive information, interpret and define CITY'S policies
and decisions with respect to materials, equipment, elements and systems pertinent to the
services covered by this taGkEEMENT.
3.1
Furnish staff assisthnce in locating, both horizontally and vertically, existing CITY owned
utilities and in expediting their relocation as described in Attachment B. Further, CITY will
'
fumish assistance as required in obtaining locations of other utilities, including "potholing"
3.2
Furnish legal assistance as required in the preparation of construction and other supporting
documents.
r
4.0
Revie . Examine all studies, reports, sketches, estimates, specifications, drawings,
in decisions
proposals and other documents presented by ENGINEER and render writing
pertaining thereto with a reasonable time so as not to delay the services of ENGINEER.
Agreement
for
Engineering Services
North Owasso Wastewater Collections System (improvements
Compensation
Attachment D
CONIPENSATION. The CITY agrees to pay, as compensation for services set forth in Attaclunent
B, a total lump sum fee of Sixty -five Thousand Dollars ($65,000.00). ENGINEER shall submit
monthly invoices based upon the proportion of the total services actually completed at the time of
billing. Invoices are due and payable within 30- calend2r days at receipt by the City. The maximum
amount to be billed for each phase of work is as follows:
Phase I Preliminary Design $26,500.00
Phase II Final Design 22,000.00
Phase III Bidding 3,500,00
Phase IV Construction Administration 13,000.00
Total Lump Sum Fee 565,000.00
Attachment E
Fee/Manhour Breakdown
No,'tb Owasso Wastewater Collection System Improvements
Pcrscmnel
1.1
1 11.2 and 1.3 I 1.4 1
10 1 3 -0
I 4.0
1 ITotal lours
Project Manager
12
70
12
86
40
60
280
Project Engineer
-
20
50
-
-
50
120
Design Engineer
4
j: -
4
180
-
-
188
afterfTechnician
-
i 40
120
100
-
20
280
'lzrical
2
I ' 30
2
30
10
26
i
, 1 120
Survev Crew -
-
30
30
30
i -
10
100
Personnel
Fours 1! !
Rate I I i i Total
Project Manager
300
x
$75.00
1:)escrt�o
i
$22.500.00
Project Engineer
120
i x
65.00
Subtotal - Expew
7,800.00
Design Engineer or RLS
200
I x
52.00
10,400.00
after/Teclmician
280
x
35.00
i
9,800 -00
ericat
120
i
x
25.001
1 85.00!
I
I
3,000.00
8,500.00
Sury Crew
100
x
Ih— � ^A A�
x
0
200.00
100.00
Total Lump Sum Fee S65 000.00
Subtotal for Labor
1:)escrt�o
Printing and Mrepp
Survey Supplies
Equipmam Rental
Mil e/Travel .
Subtotal - Expew
x
0
200.00
100.00
Total Lump Sum Fee S65 000.00
ODEQ
Submission
Final Design
Easement
Preparation
Plan -ire -Hand
Preliminary
Design
Report
Review
Preliminary
Shady & Report
Notice To
Proceed
April May June Jule August September
Attachment E
Design Schedule
North Owasso Wastewater
Collection System Improvements
N li B+, Garver
MEMORANDUM
TO: THE HONORABLE CHAIR & TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: RODNEY J RAY
CITY MANAGER
SUBJECT: REQUEST TO DEVELOP CONCEPT PLAN FOR CONSTRUCTION
OF ELM CREEK INTERCEPTOR (WASTEWATER COLLECTION
LINE)
DATE: March 13, 1998
BACKGROUND:
For the past several months, the staff has monitored the increasingly rapid development of the
area east of 129th East Ave between 76th St N and 96th St N. Recent land purchases and
residential development in that area have, predictably, resulted in development plans that are
even greater than originally thought (and a more rapid rate of development).
A factor influencing growth in that area is the ability/capability to provide wastewater collection
and treatment facilities in order to create an economically feasible development. The City has
recently adopted a wastewater master plan that addresses the needs and projections for the
development of the area east of 129th East Ave (specifically) as a part of the entire system.
Generally, the plan notes the need for an interceptor line (a major collector line that serves to
collect wastewater from a large area) to be constructed to collect wastewater from a significant
area east of 129th East Ave and north of 76th St N. That interceptor is planned to "gravity
flow" to the 117th St lift station where the flow would be "pumped" to the city's treatment plant.
Eventually, the city's facility plan and master plan call for the construction of a second treatment
plant at the 117th St lift station site.
Based on the known development plans for the area, the staff believes the city has a unique
window of opportunity to partner with the private sector. The concept is for the construction
of the base portion of the proposed gravity flow interceptor line, thus avoiding costly temporary
lift stations and "forced mains." While the temporary solutions that would be allowed under the
city's development plans will allow development, they will have to eventually be removed and
the interceptor constructed. The problem with the immediate construction of the interceptor by
the private sector is that it is not economically feasible for one developer to undertake.
Additionally, it is difficult for developers to jointly undertake such a project because those
separate projects do not generally take place in the same time frame.
ELM CREEK INTERCEPTOR
MARCH 13, 1998
PAGE 2
There is, however, an opportunity for the city government to play a role in the project by
providing financing to the project under a "payback" concept. While the base portion of the
project is larger than a single developer can justify, the city could use its borrowing powers to
complete that portion of the project and require developers to tie into the system and "payback"
the city its proportional share of the cost of the design, construction and financing of the project.
This concept is widely utilized in most growth cities as a means to develop large areas by
sharing the cost of infrastructure.
In 1982, the City of Owasso (OPWA) determined that the western and northern areas of the city
needed a development incentive (as well as an improvement to some existing facilities) and
constructed the "Ranch Creek Interceptor." The entire project cost was born by the city using
borrowed funds. While the project did accomplish an immediate goal of improving the
collection system (and allowing for the shutdown of several costly lift stations), its success as
an incentive for development was not as hoped. Eventually, the interceptor proved beneficial '
as a relief for the rest of the system, but only now are we realizing the originally planned
benefits for growth.
The proposed Elm Creek Interceptor, however, differs conceptually from that previous project '
in that development plans (Owasso Golf and Athletic Club, KMO Commercial Development,
Silver Creek residential and two unnamed office -type developments) are currently being '
processed by the city. Additionally, the use of a "payback" concept should result in the city
having only to pick up about $132,000 of the estimated 1.8 million dollar project (due only to
the fact that some of the property in the collection area may not develop in the foreseeable '
future.
REOUEST:
The request is for authorization for the staff to develop a plan for the design, construction and
funding of a 1.8 million dollar wastewater project based on the above - described "payback"
concept. If the request is approved, the staff will further develop the concept and present
options to the Trustees as soon as possible.
NOTE: Approval of this request does not authorize the project or expenditure of any funds
without future Trustee approval.
RECOMMENDATION:
The staff recommends Trustee approval of a request to authorize the City Manager to develop
a plan for presentation to the OPWA that relates to the use of a "payback" concept in the design,
construction and funding of the Elm Creek Interceptor project.
ELM CREEK INTERCEPTOR
MARCH 13, 1998
PAGE 3
NOTE: Please review the attached detailed memorandum from Robert Carr outlining cost and
other issues relating to this project.
ATTACHMENTS:
1. Memorandum from Robert Carr
2. Maps showing proposed project and areas subject to payback provisions
MEMORANDUM
TO: RODNEY J. RAY
CITY MANAGER
FROM: F. ROBERT CARR, JR., P.E.
PUBLIC WORKS DIRECTOR �Q�
SUBJECT: ELM CREEK INTERCEPTOR
DATE: March 10, 1998
BACKGROUND:
The impact of growth places demands on the infrastructure of the city, specifically on the wastewater
collection and treatment system. It is the policy of the Owasso Public Works Authority to be
proactive, rather than reactive in matters of growth and development. On January 6, 1998, Owasso
Public Works Authority Resolution No. 98 -01 adopted the 1997 Wastewater Master Plan as a policy
statement for the extension, expansion and development of privately- financed and publicly- financed
improvements of the City of Owasso municipal wastewater collection and treatment system (see
Attachment 1).
Proper planning and development of infrastructure directly impacts future growth and the 1997
Wastewater Master Plan was prepared to serve as the "road map" for present and future wastewater
collection system infrastructure needs. The document incorporates a methodology that combines
detailed sewer drainage basins, projected land uses and estimated population densities to calculate
wastewater flow in the basin. The flow values were then evaluated to determine collection line and
lift station pump sizes, which are computer - modeled to assess existing and future system needs.
System needs are detailed in the report based on the present, 5 -, 10- and 20 -year growth projections.
It was recognized that implementation of the Wastewater Master Plan has the potential to have
significant wide - ranging impacts concerning present and future infrastructure. Costs associated with
expansion and extension of the wastewater collection and treatment system can affect development
feasibility.
SYSTEM GROWTH REQUIREMENTS:
As new development occurs in Owasso, wastewater collection system expansion is generally
projected to be divided into two (2) major collection zones. These zones are east of Highway 169
and west of Highway 169. Presently, all collected flow is ultimately transported to the Wastewater
Treatment Plant.
Page 2
Elm Creek Interceptor '
Flows from the east side of Highway 169 are pumped to the plant through a lift station located at
1 17th E. Avenue near 71 st Street North. The Master Plan indicates that
a significant portion of the future development that is projected to occur in the next 20 -years
will contribute flow to the 117th E. Avenue Lift Station. The growth that is projected on the
eastern side of IEghway 169 will require that some improvements are made in order to allow
these higher flows to reach the main plant.
In addition, the Master Plan provides detail concerning development in the Elm Creek drainage basin
as follows:
The Elm Creek basin is projected to have a substantial amount of development within the next
20- years. A large portion of this growth will occur in the next 5 -years in the vicinity of the
Brentwood lift station [located on 86th Street North east of the Junior High School]. The
station itself has adequate ability to serve all of the new development that is projected to the
north of 86th Street North and east of the existing development; however, the flows will
cause severe overloading in the Elm Creek interceptor downstream of the Brentwood
discharge... Ultimately, the construction of a gravity line along Elm Creek will relieve the
Brentwood station and in doing so will relieve the overloading.
Some development is expected to occur south of the Brentwood lift station within the next
5- years. These areas cannot be served by gravity lines into the Brentwood lift station or into
any _part of the existing collection system. Additional development is projected further south
(downstream) of the area within 10- years. Further downstream more development is
projected within 20- years. Development of this basin from upstream to downstream prevents
the natural iterative construction of the East Elm Creek Interceptor. Because of this,
intermediate alternatives [were] evaluated to determine the most cost - effective method of
providing sewer service to these areas.
Proposed development in this area has been occurring as described in the Master Plan. At present,
development plans have been submitted that will require wastewater collection for essentially the
entire undeveloped area south of 86th Street North between North 129th E. Avenue and North 145
E. Avenue (Albertson's and Owasso Golf and Athletic Club). Other development is likely to occur
north and east of 86th Street North and North 145th E. Avenue, as well as with continued
development north of 86th Street North west of North 145th E. Avenue (Silvercreek Addition).
To accommodate growth as projected, the Master Plan incorporates scenarios that combine
expansion of gravity interceptors, interim lift stations and force mains over a 20 -year period. The 5-
year development plan (see Attachment 2 - Figure V -15 from the Master Plan) includes extension
of the interceptor to the north, flow diversion from the Brentwood lift station and construction of two
(2) interim lift stations and force mains. As development continues, the 10 -year development plan
Page 3
Elm Creek Interceptor
includes elimination of the two lift stations, extension of the interceptor south to 76th Street north
and construction of another interim lift station and force main (see Attachment 2 - Figure V -16 from
the Master Plan). The 20 -year development plan (see Attachment 2 - Figure V -17 from the Master
Plan) shows the elimination of the lift station and continuation of the interceptor south toward the
117th E. Avenue lift station. Ultimately, the Elm Creek basin will be served by a gravity sewer
interceptor system. Three (3) interim lift stations and three (3) force mains will be removed or
abandoned.
PROPOSED ELM CREEK INTERCEPTOR PROJECT:
Recent activity involving the undeveloped area south of 86th Street North between North 129th E.
Avenue and North 145 E. Avenue (Albertson's and Owasso Golf and Athletic Club) has resulted in
discussion concerning a long -term method to provide wastewater collection. Provision of interim lift
stations and force mains for this area and their short-term costs have been evaluated. Consulting
engineers (Crafton, Tull & Associates, Inc.) for Lindsey Properties (Owasso Golf and Athletic Club)
have approached engineering staff to determine feasibility of constructing the interceptor.
Constructing the interceptor would eliminate costs of constructing lift stations that are intended to
be rather short-lived. The majority of expense of lift station and force main construction would be
lost once the interceptor is ultimately constructed.
Crafton, Tull has proposed that Lindsey construct the portion of the interceptor from 76th Street
North to a point on the south side of the Owasso Golf and Athletic Club property (see Attachment
3). The portion of the interceptor from the 117th E. Avenue lift station to 76th Street North would
be constructed by the City of Owasso. Construction of the interceptor in this manner (i.e., from south
to north) will enable wastewater collection to be accomplished without the need for interim facilities
and enable the system easily to be extended north.
PROJECT COSTS:
The interceptor would be sized and designed to carry additional flows for the total area to be served
ultimately. As a result, costs of construction should be allocated to appropriate undeveloped property
in the basin in order to proportionately distribute construction expenses to present and future users
of the interceptor.
A detailed evaluation of construction costs has been performed by Crafton, Tull. Considerable effort
was also expended to identify the extent of rock in along the route of construction in order to prepare
a realistic cost estimate. As a result of this work, construction of the interceptor to the south side of
the Owasso Golf and Athletic Club property has been estimated as approximately $1,526,250 (see
Attachment 4 - Engineer's Cost Estimate). The line will continue through a portion of the Club
property at the developer's expense and then extended to the intersection of 86th Street North and
Page 4
Elm Creek Interceptor
North 145th E. Avenue (approximately 1800 LF) at an estimated cost of $187,500. Engineering for '
the project is estimated to be $75,000 and a right -of -way acquisition allowance of $50,000 has been
included. Total estimated project cost is $1,838,750. M
Users of the interceptor are expected to contribute to the project costs based upon their contribution
to the amount of wastewater generated. Staff believes that this contribution is directly attributed to
development acreage. Therefore, the present undeveloped interceptor drainage area has been
compiled to determine a per acre charge for the interceptor construction. A total of 1378
undeveloped acres were identified (see Attachment 3).
Present and near -term development potential
Reimbursement of project costs have been estimated as $1,334.36 per undeveloped acre (total project
cost of $1,838,750 =1378 acres). Based on present and near -term development plans, approximately
909.6 acres (areas D, F, H, I, J, K, L, P, and Q) are identified to develop relatively quickly.
Reimbursable costs of $1,213,735 (approximately 66% of the total estimated project costs) are
associated with these areas.
Short-term development potential
Another 369.4 acres (areas E, G, M and N) can be expected to develop in the in the next few years.
Reimbursable costs of $492,913 (or an additional 27% of the total estimated project costs) area
associated with these areas.
Long-range development
The remaining 99 acres (areas A, B, C and O) are not expected to develop in the immediate future.
Associated costs of $132,102 (7% of the total project) would remain uncollected until development
occurs.
OTHER PUMPING AND TREATMENT CONSIDERATIONS:
Flow Equalization at 117th E. Avenue lift station
Wastewater flows in the Elm Creek Interceptor to the 117th E. Avenue lift station. As the flows
increase, the Master Plan indicates that some improvements will need to be made in order to allow
these higher flows to reach the Main Plant. The most cost - effective improvement will be the
construction of a flow equalization basin near the lift station to provide storage and constant pumping
to the plant. Land will need to be acquired near the lift station to accommodate a total of 10- million
gallons of wastewater storage. It is projected that the facility would be constructed in two 5- million
gallon phases by year 2002 and 2007. Total present worth capital cost is estimated as approximately
$3,600,000.
Wastewater Treatment Capability
The present Wastewater Treatment facility will have capacity to treat 2.15 million gallons per day
(MGD) at the completion of Phase I improvements presently under construction. Phase II
improvements will need to be operational in the year 2001 to increase capacity to 3.3 MGD (see
Attachment 5 - Phasing of Improvements). Future planning for additional capacity will need to be
Page 5
Elm Creek Interceptor
initiated in the year 2012. Treated wastewater flows to Owasso Creek, then ultimately to Bird Creek.
The discharge effluent quality to the creek is modeled based on Bird Creek water quality criteria.
An amendment to the Facility Plan for the Wastewater Treatment Plant (prepared in September 1994)
indicates that
the present [treatment plant] site may not be cost - effective for expansion beyond the proposed
planning period [through the year 2015]. Future growth will more than likely occur east of
Highway 169 in which case a new second plant in that area may prove to be more cost -
effective than to pump the flow top the present site for treatment. Further expansion of the
existing site will require considerable amount of fill and flood protection.
Construction of a new facility on the east side of Highway 169 would be expected to be in the vicinity
of the 117th E. Avenue lift station, since the station is the terminus of the gravity collection system
and the proposed location of flow equalization. Discharge of treated wastewater from the facility
would likely be to another location on Bird Creek.
Water quality modeling for this discharge would be performed by INCOG. Based on conversations
with modeling personnel, it is anticipated that modeling will result in significantly higher treatment
requirements for a new facility as well as for the existing plant. Advanced treatment to remove more
organics, suspended solids and to include nutrient removal should be expected for both discharges.
Construction costs of a new facility and needed retrofitting of the existing plant cannot be accurately
determined until the level of treatment is defined. However, the 1.15 MGD expansion for Phase II
improvements at the existing facility is projected to be approximately $6.7 million. If construction
of a 2 MGD plant is needed on the east side of Highway 169 in year 2015, costs at that time can be
expected to exceed $12 million.
ATTACHMENTS:
1. Resolution No. 98 -01
2. Elm Creek Basin plans from 1997 Wastewater Master Plan (3 sheets)
3. Elm Creek Interceptor Drainage Area
4. Engineer's Cost Estimate (Crafton, Tull and Associates, Inc.) dated March 9, 1998
5. Phasing of Improvements
OWASSO PUBLIC WORKS AUTHORITY
OWASSO, OKLAHOMA
RESOLUTION NO 98 -01
A RESOLUTION ADOPTING THE WASTEWATER MASTER PLAN AS
A STATEMENT OF THE AUTHORITY'S POLICY FOR THE
OWASSO
EXTENSION, WASTEWAO R DEVELOPMENT T O
AND
TREATMENT SYSTEM.
WHEREAS, the City of Owasso, Oklahoma is one of the fastest growing communities
in the state; and,
WHEREAS, the impact of that growth places a great deal of stress on the infrastructure
of the city, specifically on the wastewater collection system; and,
WHEREAS, proper planning and development of infrastructure today will directly
impact growth development tomorrow; and,
WHEREAS, it is the policy of the Owasso Public Works Authority to be proactive rather
than reactive in matters of growth and development; and,
WHEREAS, FHC Inc was awarded a contract on December 5, 1995 to develop a
wastewater master plan; and,
WHEREAS, a wastewater master plan, dated September 1997, has now been completed;
and
WHEREAS, the Trustees of the Owasso Public Works Authority, Owasso, Oklahoma
have reviewed the 1997 Wastewater Master Plan as developed by FHC Inc and desire to adopt
the plan as a policy statement for the development, expansion and extension of privately financed
and publicly financed improvements to the municipal wastewater collection and treatment system
of the City of Owasso.
NOW, THEREFORE, BE IT RESOLVED BY THE TRUSTEES OF THE OWASSO
PUBLIC WORKS AUTHORITY, OWASSO, OKLAHOMA that the Trustees of the Owasso
Public Works Authority hereby adopt the 1997 Wastewater Master Plan as a policy statement
for the Authority.
PASSED AND APPROVED this 6th day of January, 1998 by the Trustees of the
Owassg dub i .'Works ,Authority, Owasso, Oklahoma.
Mary LoidBarnhouse, Chairperson
MarcBoutwell, Authority Secretary
APPROydAS TO FORM:
D Cates, Authority Attorney
ATTACHMENT 1
OF CIAASI-1-1
ENGINEER'S COST ESTIMATE
JOB: CITY OF OWASSO OUTFALL LINE
OESCRIPTSON: FROM 117Tri ST. LIFT STATION TO THE
SOUTH UNE OF UNDSEY PROPERTY
JOS NO.: 97254.01
DATE: 21919$ (REV. ROCK COSTS 319188)
BY: W. LANE
ITEM
DESCRIPTION
UNITS
EST.
QUAN.
UNIT
PRICE
TOTAL
$1 '24" PVC PIPE W/ 0' -12' TRENCH 1
L.F.
! 300
$80.00
$24,000.00
S2 18" PVC PIPE W/ 0' -12' TRENCH '.•
S3 !EXTRA TRENCH DEPTH 12` -14' j
L.F.
LF.
j 11,985 1
j 4,620
$70.00
$4.00
$838,950.00
$18,480.00
S4 IEXTRA TRENCH DEPTH 14' -16' I
S5 !EXTRA TRENCH DEPTH 16' -18'
L.F.
L.F.
1 2,780
f 1,773
$8.00
$12.00 j
522,240.00
$21,276.00
SS
EXTRA TRENCH DEPTH 18' -20'
L.F.
! 532
j $16.00 1
$8,512.00
S7
EXTRA TRENCH DEPTH 20' -22' j
L.F.
380
! $20.00 1
J$24.00
$7,600.00
S8
EXTRA TRENCH DEPTH 22' -24' j
L.F.
180
~
$4,320.00
S9
15' DIA. MANHOLE 0'- i2'DEPTH j
EA.
` 51
_j
1 $2,000.00
$102,000.00
S10
5' DIA. MANHOLE OVER 12' DEPTH I
U.F.
! 87
$100.00
$8,700.00
511
136" ROAD BORE W/ CASING i
L.F.
122
$265,00
$32.330.00
S12
;117TH ST. L.S. MODIFICATION
L.S.
1
$100,000.00
8100,000.00
S13
{ROCK
L.F.
1 12,285
! $27.50 i
$337,837.50
f
I
I
I
g1.OaFILES\972sa- OOCCt4ST=rrE'$WR
TOTAL - -
CONTRACT $1,526,245.50
ATTACHMENT 4
2001
1995 2000
YEAR
' 2005 2010 ' 2015
2012 FIGURE 5 -1
AN AMENDMENT TO THE
FACILITY PLAN
WASTE WATER TREATMENT SYSTEM
PHASING OF IMPROVEMENTS
OWASSO OKLAHOMA
INITIATE FUTURE PLANNING
3.3 MGD
2001
1995 2000
YEAR
' 2005 2010 ' 2015
2012 FIGURE 5 -1
AN AMENDMENT TO THE
FACILITY PLAN
WASTE WATER TREATMENT SYSTEM
PHASING OF IMPROVEMENTS
OWASSO OKLAHOMA