HomeMy WebLinkAbout1998.05.19_Joint Meeting Agenda_CC_OPWA_SpecialNOTICE OF PUBLIC MEETING AND PUBLIC HEARING
JOINT SPECIAL SESSION OF THE OWASSO CITY COUNCIL
AND THE OWASSO PUBLIC WORKS AUTHORITY
TYPE OF MEETING: Special
DATE: May 19, 1998
TIME: 7:05 p.m.
PLACE: Council Chambers, Owasso Community Center
Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin
board at 4:00 p.m. on Friday, May 15, 1998.
Marci Boutwell, Crty Clerk
AGENDA
1. Call to Order
PUBLIC HEARING
2. Presentation and Open Discussion, Including Public Comment, of the Fiscal 1998-99
Budget.
Mr Ray
Ms Bishop
The staff will make a short presentation of the proposed budget and answer questions,
as well as accept for consideration any public comments offered.
3. Adjournment
PUBLIC NOTICE OF THE MEETING OF THE
OWASSO CITY COUNCIL
TYPE OF MEETING:
Regular
DATE:
May 19, 1998
TIME:
7:00 p.m.
PLACE:
Council Chambers, Owasso Community Center
Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin
board at 4:00 p.m. on Friday, May 15, 1998.
I RA Fri, gwom F % P/rA
Marcia%outwell,
AGENDA
1. Call to Order
Mayor Bode
2. Invocation
Pastor Alex Thornburg
First Presbyterian Church
3. Flag Salute
4. Roll Call
5. Request By Citizens to Address the City Council.
Ms Terry White & Ms Penni Aurilio
Attachment #5
Ms White & Ms Aurilio have provided the City Clerk with a written request to address the
Council relating to facilities for the swim team.
Owasso City Council
May 19, 1998
Page 2 '
6. Consideration and Appropriate Action Relating to a Request for Approval of the Consent
Agenda. All matters listed under "Consent" are considered by the City Council to be '
routine and will be enacted by one motion. Any Councilor may, however, remove an item
from consent by request. A motion to adopt the Consent Agenda is non - debatable.
A. Approval of the Minutes of May 5, 1998 Regular Meeting and May 12, 1998 Special;
Meeting.
Attachment #6 -A '
B. Approval of Claims.
Attachment #6 -B ,
C. Action Relating to Ordinance #518 Amended, an Ordinance Amending a Legal
Description Contained in Ordinance #518.
Attachment #6 -C
The staff recommends Council approval of Ordinance #518 Amended, correcting a
legal description contained in a previously approved ordinance (Ordinance #518).
D. Action Relating to Final Acceptance of Work Performed Under a Contract for a
Restroom Facility at the Owasso Sports Park, Between the City of Owasso and
Pettijohn Construction, and Authorization for Final Payment and Release of Retainage
to the Contractor. '
Attachment #6 -D
The staff will recommend Council acceptance of the work performed under the ,
contract, and that release of retainage and final payment in the amount of $8919.00 be
authorized.
7. Consideration and Appropriate Action Relating to Bids Received on Surplus Vehicles.
Mr Rooney
Attachment #7
Bids have been received and opened on the two surplus vehicles, and the staff will
recommend that the bid received on the 1981 International Bus be rejected and the bid
received on the 1985 Plymouth Grand Fury be accepted.
1
' Owasso City Council
May 19, 1998
' Page 3
8. Consideration and Appropriate Action Relating to Council Approval of a Sports Park
' Building Site Ground Lease with Future Owasso Rams.
Mr Rooney
Attachment #8
The staff will recommend Council approval of a lease agreement with Future Owasso Rams
in the amount of $10.00 per year for land to construct an office building; and authorization
tfor the Mayor to execute the document.
' 9. Consideration and Appropriate Action Relating to City Council Approval of the
Prioritization of Projects to Receive Funding from the "Equipment Contingency Fund" Line
' Item of the General Government Department Budget.
Mr Rooney
Attachment #9
' The staff will recommend funding from the Equipment Contingency Fund in the amount of
$112,000.00 for an emergency services radio system; $43,329.77 for restriping & crack
sealing on 86th St N; $3,000.00 for golf course fencing; $7,957.79 for restriping & crack
' sealing at the 76th & Main intersection; and $8,712.44 for an engine analyzer.
10. Consideration and Appropriate Action Relating to Change Order #2, a Change Order to a
Contract Between the City of Owasso and Horizon Construction Company Inc for the
Construction of Parking Lot Improvements at Owasso Sports Park.
Mr Henderson
Attachment #10
The staff will recommend Council approval of Change Order #2, increasing the contract by
$4384.67, for the purpose of adding flyash to the subsurface soil in two areas for
' stabilization.
1
Owasso City Council
May 19, 1998
Page 4
11. Consideration and Appropriate Action Relating to the Award of Contracts for
Engineering /Architectural Services and Program Management Services for the 1998 Bond
Issue Projects.
Mr Carr
Attachment # 11
The staff will recommend Council approval of a contract for engineering /architectural
services with CH2M Hill /Page. Zabrowski in the amount of $562,171; and a contract for
program management team services to Lioness Realty Group in the amount of $238,080;
and authorization for the Mayor to execute the documents.
12. Report from City Manager
13. Report from City Attorney
14. Reports from City Councilors
15. New Business
1
' Owasso City Council
May 19, 1998
' Page 5
16. Adjournment
1
1
1
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: TIMOTHY ROONEY
ASSISTANT CITY MANAGER
SUBJECT: CITIZEN REQUEST TO ADDRESS THE COUNCIL REGARDING
THE OWASSO SWIMMING POOL
DATE: May 14, 1998
' BACKGROUND:
During the week of May 4, 1998, Ms. Terry White of the Owasso Swim Team , staff
contacted
regarding concerns they were having with the YMCA regarding their ability to utilize the pool
' this summer for their annual swimming am. Ms. White stated that in previous years, when
gP ro g
the pool was being operated by the City of Owasso, the swim team had been able to utilize the
' pool without any fee. Recently, she had contacted the YMCA and was told that they could no
longer offer the pool to the swim team "free of charge."
tI then contacted Mr. John Swift of the YMCA regarding Ms. White's concerns, and expressed
a desire on the city's behalf to reach an agreement. Mr. Swift expressed to me that operating
a pool did require funding, a lifeguard, and insurance and that he would be willing to work out
some form of agreement for a reduced rate this year, but that a "normal" fee should be
anticipated by Ms. White next year.
Ms. White was then contacted and the above agreement was discussed. I asked Ms. White to
fax me a copy of the dates that the swim team needed the pool, and forwarded that information
to Mr. Swift. Ms. White stated that the problem this year was that they had already spoken with
their sponsors and received monetary commitments and that had she known, she would have
requested additional money from the swim team's sponsors. Ms. White seemed satisfied with
the arrangement.
After learning of their request to address the Council, I contacted Ms. White again to see if their
' were any concerns that I did not address. Ms. White stated that I was helpful but that she still
felt that the swim team should be provided a facility to use and that perhaps the City Council
could assist her with her concerns. Ms. White requested a copy of the YMCA lease agreement
and Ms. Aurilio picked up that document from City Hall on Wednesday.
I have asked Mr. Mikos, Manager of the Green Country YMCA (Owasso) to be present on
Tuesday evening to answer any questions that you may wish to address to him.
0
May 11, 1998
To: City of Owasso
Re: City Council Agenda
I
MY 12 1998 � 3
I would like to discuss the lack of city owned swimming facilities. The Owasso
Swim Team is being confronted with a lot of opposition from the YMCA
concerning the pool. Please place this item on the May 19th city council meeting
agenda.
Thank you very much,
Terry White and Penni Aurilio
2rIz- 6- S3 2r7z -L.94
OWASSO CITY COUNCIL
MINUTES OF REGULAR MEETING
Tuesday, May 5, 1998
FP The Owasso City Council met in regular session on Tuesday, May 5, 1998 in the Council
Chambers at the Owasso Community Center per the Notice of Public Meeting and Agenda
14 posted on the City Hall bulletin board at 4:00 p.m. on Friday, May 1, 1998
' ITEM l: CALL TO ORDER
Mayor Barnhouse called the meeting to order at 7:05 p.m.
ITEM 2: INVOCATION
Pastor Arvle Knight of First Assembly of God Church offered the invocation.
ITEM 3: FLAG SALUTE
Councilor Wilken led in the flag salute.
IITEM 4: ROLL CALL
' PRESENT ABSENT
Mary Lou Barnhouse, Mayor Denise Bode, Councilor
Tracy Standridge, Vice Mayor
' Mark Wilken, Councilor
Michael Helm, Councilor
Melinda Voss, Councilor -Elect
' STAFF
Rodney J Ray, City Manager
Ronald D Cates, City Attorney
Marcia Boutwell, City Clerk
A quorum was declared present.
.6v
ITEM 5: READING OF MAYOR'S PROCLAMATION.
'Mayor Barnhouse and City Manager Rodney Ray presented a proclamation to Helen & Buford
Williams in recognition and thanks for their many contributions to the City of Owasso.
' ITEM 6: OATH OF OFFICE ADMINISTERED TO COUNCILOR -ELECT VOSS.
' City Clerk Marcia Boutwell administered the oath of office to Councilor -Elect Melinda Voss.
Councilor Voss then took her seat at the council bench.
Owasso City Council
ITEM 7: ELECTION OF MAYOR
Dr Standridge nominated Dr Bode for Mayor, seconded by Mr Wilken.
AYE: Standridge, Wilken, Voss, Barnhouse
NAY: None
Motion carried 4 -0.
ITEM 8: ELECTION OF VICE MAYOR
May 5, 1998
Dr Standridge nominated Mr Wilken for Vice Mayor, seconded by Ms Barnhouse.
AYE: Standridge, Barnhouse, Voss, Wilken
NAY: None
Motion carried 4 -0, and Vice Mayor Wilken presided over the remainder of the meeting in the
absence of Mayor Bode.
ITEM 9: ANNOUNCEMENT OF APPOINTMENT OF CITY MANAGER AND
INTRODUCTION OF THE SUCCESSFUL CANDIDATE TO THE
COMMUNITY.
Vice Mayor Wilken introduced Mr Jeff Hancock, who has recently been hired by the Council
as Owasso's City manager. Mr Hancock spoke briefly and introduced his wife Sheila, Daughter
JoAnna, and son Clay.
ITEM 10: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR APPROVAL OF THE CONSENT AGENDA.
A. Approval of the Minutes of April 14, 1998 and April 30, 1998 Special
Meetings and April 21, 1998 Regular Meeting.
B. Approval of Claims.
C. Action Relating to the Acceptance of Improvements to the Off -Site Water
and Sanitary Sewer Systems Constructed to Serve Lakeshore Greens, an
Addition to the City of Owasso, Tulsa County, Oklahoma.
D. Action Relating to Ordinance #579, an Ordinance Providing for the
Rezoning of Property Located Immediately North of 704 N Carlsbad;
from AG (Agriculture) to RS -3 (Residential Single- Family High Density).
F]
tOwasso City Council
May 5, 1998
E. Action Relating to the Award of a Contract for a Civil Defense Warning
' Siren.
F. Action Relating to the Settlement of a Worker's Compensation Claim.
' The consent agenda included minutes of the April 21, 1998 regular meeting and the April 14,
1998 and April 30, 1998 special meetings, by reference made a part hereto. Item B on the
consent agenda included the following claims: (1) General Fund $68,836.44; (2) Workers Comp
Self - Insurance Fund $1,435.41; (3) Ambulance Service Fund $732.98; (4) City Garage
$6,686.35; (5) Capital Improvements $17,392.43; (6) Payroll $139,754.62; (7) City Garage
Payroll $2,825.80. Item C requested acceptance of the infrastructure improvements constructed
to serve Lakeshore Greens. Item D requested approval of Ordinance #579, rezoning property
located immediately north of 704 N Carlsbad. Item E requested approval to award a contract
in the amount of $6500 to Goddard Enterprises, Guthrie, OK for the delivery and installation
of a general alarm warning siren. Item F requested the acceptance of a settlement offer of
$20,000 and associated legal and filing fees for Worker's Compensation claims filed by George
Haley, and authorization for payment. Dr Standridge moved, seconded by Ms Barnhouse to
approve the consent agenda.
AYE: Standridge, Barnhouse, Voss, Wilken
' NAY: None
Motion carried 4 -0.
'
ITEM 11: 1 • REPORT FROM CITY MANAGER
' No report.
ITEM 12: REPORT FROM CITY ATTORNEY
No report.
ITEM 13: REPORT FROM CITY COUNCILORS
INo report.
ITEM 14: NEW BUSINESS
None.
Owasso City Council
ITEM 15: ADJOURNMENT
Dr Standridge moved, seconded by Ms Barnhouse, to adjourn.
AYE: Standridge, Barnhouse, Voss, Wilken
NAY: None
Motion carried 4 -0, and the meeting was adjourned at 7:20 p.m.
Marcia Boutwell, City Clerk
0
Denise Bode, Mayor
May 5, 1998
I
6
OWASSO CITY COUNCIL
MINUTES OF SPECIAL MEETING
Tuesday, May 12, 1998
The Owasso City Council met in special session on Tuesday, May 12, 1998 in the Lower Level
Conference Room at City Hall per the Notice of Public Meeting and Agenda posted on the City
Hall bulletin Board at 4:00 p.m. on Thursday, May 7, 1998.
ITEM 1: CALL TO ORDER AND ROLL CALL.
Mayor Bode called the meeting to order at 6:30 p.m. Councilors present: Denise Bode, Mayor;
Mark Wilken, Vice Mayor; Dr Tracy Standridge, Councilor; Melinda Voss, Councilor.
Councilors absent: Mary Lou Barnhouse, Councilor. Staff present: Rodney J Ray, City
Manager; Timothy Rooney, Assistant City Manager; Sherry Bishop, Finance Director.
A quorum was declared present.
ITEM 2: DISCUSSION OF ISSUES OF IMPORTANT TO THE CITY OF OWASSO.
Several items were discussed, including the proposed FY 1998 -99 Budget. No action was taken
on any item.
ITEM 3: ADJOURNMENT
Mr Wilken moved, seconded by Dr Standridge to adjourn.
AYE: Wilken, Standridge, Voss, Bode
NAY: None
Motion carried 4 -0 and the meeting was adjourned at 9:48 p.m.
IMarcia Boutwell, City Clerk
Denise Bode, Mayor
� A�
� U�
CITY OF OWASSO
GENERAL FUND
5/14/98 20:08:43 A/P CLAIMS REPORT
PO # VENDOR DESCRIPTION
---------- ------------------------- --------------------
--
982571 TREASURER PETTY CASH
DEPARTMENT TOTAL ====>
MANAGERIAL
------------------------------
981793 AT&T WIRELESS SERVICES
982306 REASORS
982361 SAM'S CLUB
982449 GO SYSTEMS
982565 EHRLE'S
982569 DOZIER PRINTING
982571 TREASURER PETTY CASH
982571 TREASURER PETTY CASH
982571 TREASURER PETTY CASH
982571 TREASURER PETTY CASH
982582 OFFICE DEPOT CARD PLAN
982582 OFFICE DEPOT CARD PLAN
982589 SUBURBAN OFFICE SUPPLY
982638 MCI TELECOMMUNICATIONS
DEPARTMENT TOTAL ====>
FINANCE
~~ ------ ................................ .............................. ...................
DEPOSIT REFUND
APAPVR PAGE:
AMOUNT
-- -------------
PAGER USE
EMP APPRECIATION
OFFICE FURNITURE/PRINTER
FUEL 4/98
COUNCIL RECEPTION
OFFICE SUPPLIES
COUNCIL RECEPTION
CITY MGR EXPENSE
REIMB PETTY CASH
COUNCIL WORK SESSION
OFFICE FURNITURE
OFFICE SUPPLIES
OFFICE SUPPLIES
4/98 USE
982571 TREASURER PETTY CASH MILEAGE-BISHOP
982571 TREASURER PETTY CASH REIMQ PETTY CASH
982582 OFFICE DEPOT CARD PLAN OFFICE SUPPLIES
DEPARTMENT TOTAL
COMMUNITY DEVELOPMENT -
-----------------------------
mm w� "�°°�, r/xc^ rmwry m�'�
980033 AT&T WIRELESS SERVICES
981793 AT&T WIRELESS SERVICES
982363 CITY GARAGE
982449 GO SYSTEMS
982494 BOCA INTERNATIONAL
982571 TREASURER PETTY CASH
DIAL-UP SERVICE
PHONE USE-ROONEY
PAGER USE
4/98 REPAIRS
FUEL 4/98
STICKERS
LAMINATION
50.00
-------------
50.00
7.07
121.53
596.92
54.12
73.55
60.00
121.34
282.92
6.00
30.15
210.45
16.99
19.20
25.17
1,625.41
28.83
6.00
12.44
---------
47.27
40.00
42.71
33.21
124.13
89.86
54.00
4
5/14/98 20w08w43
PO ##
VENDOR
CITY OF OWASSO
GEhIERAL. FUND
A/P CLAIMS REPORT
982571 TREASURER PETTY CASH
982 592 L. & M OFFICE FURNITURE
982638 MCI TELECOMMUNICATIONS
DEPARTMENT TOTAL_ = = = =.
MUNICIPAL COURT
..... ..................... . ......................... ............................................... ........
982074 OMC;CA
982571 TREASURER PETTY CASH
982638 MCI TELECOMMUNICATIONS
DEPARTMENT TOTAL
ENGINEERING
981793 AT&T WIRELESS SERVICES
982363 CITY GARAGE
932449 GO SYSTEMS
982571 TREASURER PETTY CASH
DEPARTMENT TOTAL_
GENERAL GOVERNMENT
980036 RONALD D CATES
9800::6 RONALD D CATES
980160 IKON OFFICE SOLUTIONS
980247 RETHERFORD PUBLICATIONS
9£:2120 BUILDER'S SQUARE
982173 FEDEX
982361 SAM'S CLUB
982361 SAM'S CLUB
982533 3 TULSA WORLD
982564 ALL COPY SUP'P'LIES
982567 TULSA WORLD
982 560 DOERNER . SAUNDERS .. DANIEL
982570 T- -SHIRT EXPRESS ETC
982571 TREASURER PETTY CASH
982571 TREASURER PETTY CASH
982577 SUBURBAN OFFICE SUP'P'LY
982582 OFFICE DEPOT CARD PLAN
982588 WAL -MART
APAPVR P�.7E a I
DESCRIPTION AMOUNT
REIMB PETTY CASH 1:8.00
OFFICE CHAIR 101.7'..0 ()
4/98 USE 46.01
54-4.7 2
TRAINING - GRIMES /;JACKSON 1505.00
REIMS{ PETTY CASH _,.00
4/98 USE 15-00
11 7.00
PAGER USE 7.07
4/98 REPAIRS ? . 00
FUEL 4/98 1' ?.15
OFFICE SUP'P'LIES 04..00
5-7.22
RETAINER
70D.00
LEGAL SERVICES
1.,5703 _84
COPIER MAINTENANCE
406 .22
LEGAL NOTICES
4i%4.60
MAINT /REPAIR SUPPLIE`:
2x.44
POSTAGE
1227.50
MAINT /REPAIR SUPPLIES
7 j.30
OFFICE SUPPLIES
zol.99
SURPLUS VEHICLE: ADS
41.88
COPIER TONER
2605 .. 00
LEGAL NOTICE
110-40
LEGAL_ SERVICES
2L 'L . 00
DIRECTIONAL SIGNS
6Cj.00
COLOR COPIES
12
ARBITRATION FEE
100.40
OFFICE SUPPLIES
E;2.39
OFFICE SUPPLIES
12.19
OFFICE SUPPLIES
6n.87
CITY OF OWASSO
GENERAL FUND
5/14/98 20:08:43 A/P CLAIMS REPORT APAPVR PAGE:
PO # VENDOR DESCRIPTION AMOUNT
��---------- --------------_-------___ -------------------------- ---------------
5 397 36
982.589
SUBURBAN OFFICE SUPPLY
OFFICE SUPPLIES
16.13
N�
982593
SOUTHWESTERN BELL TELE
4/98 NON-PLEXAR
51.40
«�
982594
PSO
4/98 USE
449.18
981793
982602
THE LOCKSHOP
CHANGE LOCKS,KEYS
142.5O
982361
982616
KIMBALL ACE HARDWARE
REPAIR SUPPLIES
2.97
99.04
982363
982638
MCI TELECOMMUNICATIONS
4/98 USE
5 397 36
IDEPARTMENT TOTAL 564 82
POLICE
N� ------------------------------
SUPPORT SERVICES
-----------------------'------
AT&T WIRELESS SERVICES
PHONE USE-ALL
239.50
U�
980184
CN HASKELL & ASSOC
COMPUTER SERVICES
382.50
981793
AT&T WIRELESS SERVICES
PAGER USE
7.07
N�
982361
SAM'S CLUB
MAINT/REPAIR SUPPLIES
145.58
982363
CITY GARAGE
4/98 REPAIRS
1,58O.58
982363
CITY GARAGE
4/98 REPAIRS
17.98
~~
9G2446
RO��RK TRUE VALUE HARDWARE
MAINT SUPPLIES
2O7.58
-
��
982449
GO SYSTEMS
FUEL 4/98
98
152.98
982582
OFFICE DEPOT CARD PLAN
OFFICE SUPPLIES
28.17
982588
WAL-MART
RETURNED SUPPLIES
-2.O3
-------------
DEPARTMENT TOTAL ====>
2,52'0.41.
CEMETERY
-----------------------------
982363
CITY GARAGE
4/98 REPAIRS
2.06
982449
GO SYSTEMS
FUEL 4/90
34.79
H�
982475
ESTES INC.
WEED CHEMICALS
512 72
^
U�
982594
PSG
4/98 USE
15.25
IDEPARTMENT TOTAL 564 82
POLICE
N� ------------------------------
SERVICES
980004
AT&T WIRELESS SERVICES
PHONE USE-ALL
239.50
U�
980004
AT&T WIRELESS SERVICES
PHONE USE-ALEXANDER
45.57
288.00
980006
L.E.T.N.
SUBSCRIPTION
980010
FIRST BANK CLAREMORE FSB
COPIER LEASE
202.00
980011
THREE LAKES LAUNDRY
UNIFORM CLEANING
550'95
980012
HOWARD STAMPER
RETAINER SERVICES
150.00
~~
980577
FRATERNAL ORDER OF POLICE
LEGAL DEFENSE PLAN
91.00
N�
981.793
AT&T WIRELESS SERVICES
PAGER USE
K-9 TRAINING SUPPLIES
70.70
326.85
982344
RAY ALLEN
6
CITY OF OWASSO
GENERAL FUND
5/14/98
20:08:43 A/F
CLAIMS REPORT APAPVR
= -LAGE:
PO #
----------
VENDOR
-------------------------
DESCRIPTION
------------------------- ---------------
AMOkJ,�'Tr
982344
RAY ALLEN
K-9 TRAINING SUPPLIES
-14.95
982361
SAM'S CLUB
MAINT/REPAIR SUPPLIES
B]5.68
982363
CITY GARAGE
4/98 REPAIRS
0*67.70
982419
CAR SMART
REPAIR AIR COND
0078.75
982420
DOZIER PRINTING
DARE CERTIFICATES
-70.66
982425
EMBLEM ENTERPRISES
CORPORAL UNIFORM CHEVRONS
~55.51
982431
PATROL TECHNOLOGY
BADGES
--29.00
982432
MICHAEL K#EBEL
TECHNICAL ASSISTANCE
-1=60..00
982444
POLICE PETTY CASH
UNIFORM SUPPLIES
8.64
982444
POLICE PETTY CASH
LOCKER/FUEL KEYS
-32..00
982444
POLICE PETTY CASH
TRANSISTORS
6.12
982444
POLICE PETTY CASH
POSTAGE
4.85
982444
POLICE PETTY CASH
REIMB CELL PHONE USE
�3O.00
982444
POLICE PETTY CASH
STAFF TRAINING
�24.41
982449
GO SYSTEMS
FUEL 4/98
1~_i_f58.34
982518
C.M.I.
INTOXILYZER THERMOSTATS
=2.20
982519
JOES PRINT SHOP
PRINTING-ANNUAL REPORT
982553
STEPHEN EARNHEART
SERVICE INT8XILIZER
~5O..0()
982554
C.M.I.
INTOXILYZER PARTS
=64.18
982555
I.A.C.P.
ANNUAL SUBSCRIPTION
160. 00
982556
OK SHERIFFS & PEACE
ANNUAL DUES
=.00
982569
DOZIER PRINTING
LETTERHEAD
�050.08
982571
TREASURER PETTY CASH
REIMB PETTY CASH
6.45
982582
OFFICE DEPOT CARD PLAN
OFFICE SUPPLIES
�790.22
982589
SUBURBAN OFFICE SUPPLY
OFFICE SUPPLIES
"10.32
982590
TUXALL UNIFORM & EQUIP
UNIFORM REPLACEMENTS
=72.95
982591
CROW BURLINGAME
REPAIR PARTS
8.10
982593
SOUTHWESTERN BELL TELE
4/98 NON-PLEXAR
~51.40
982594
PSO
4/98 USE
=6-34
982638
MCI TELECOMMUNICATIONS
4/98 USE
OB7.71
DEPARTMENT TOTAL ====> 7~= 18.13
POLICE COMMUNICATIONS
980011 THREE LAKES LAUNDRY PRISONER LAUNDRY n41.81
982444 POLICE PETTY CASH LAMINATE MAP 12.95
--------------
DEPARTMENT TOTAL ====> ~54.76
ANIMAL CONTROL
------------------------------
980011 THREE LAKES LAUNDRY BULK LAUNDRY -12.00
981793 AT&T WIRELESS SERVICES PAGER USE 7'07
982449 00 SYSTEMS FUEL 4/98 -19-11
5/14/98 2O:08:43
CITY OF OWASSO
GENERAL FUND
A/P CLAIMS REPORT
APAPVR PAGE: 8
PO # VENDOR DESCRIPTION AMOUNl
— .......... ........ _— --_---_____--_--_---_---- -------__-----_---_--_—_— --_----_—
FIRE SERVICES
------------------------------
V�
982558
STRATHE VETERINARY
EUTHANASIA DRUGS
95.66
N�
982571
TREASURER PETTY CASH
DEPOSIT REFUND
20.00
`
982594
PSO
4/98 USE
239 11
^
n�
982638
MCI TELECOMMUNICATIONS
4/98 USE
4.68
N�
U�
982539
AT&T WIRELESS SERVICES
PHONE USE—ALLEN
-------------
63
"=
982539
DEPARTMENT TOTAL ====>
PH04E USE—ALL
397 .
FIRE SERVICES
------------------------------
V�
980039
BMI SYSTEMS OF TULSA
COPIER LEASE/MAINT
165.25
=-
981793
AT&T WIRELESS SERVICES
PAGER USE
7.07
PAGER USE
982449
GO SYSTEMS
FUEL 4/98
363.25
n�
982520
OFFICE DEPOT CARD PLAN
SLIDE PROJECTOR BULBS
39.98
31.87
U�
982539
AT&T WIRELESS SERVICES
PHONE USE—ALLEN
982539
AT&T WIRELESS SERVICES
PH04E USE—ALL
48.40
982563
BAILEY EQUIPMENT
ENGINE REPAIRS
145.49
U�
982571
TREASURER PETTY CASH
PER DIEM—HOLCQMB
49.00
982571
TREASURER PETTY CASH
PER DIEM—HOLCOMB
49.00
982594
PSO
4/98 USE
347.O3
pt
982595
OKLAHOMA NATURAL GAS
4/98 USE
553.46
982638
MCI TELECOMMUNICATIONS
4/98 USE
23.42
DEPARTMENT TOTAL ====> 1,823.22
EMERGERCY MGMT OPERATIONS
......... .......... --------_---_—......
982,593 SOUTHWESTERN BELL TELE 4/98 NON—PLEXAR 53.43
982594 PSO 4/98 USE 64.14
Q� 982638 MCI TELECOMMUNICATIONS 4/98 USE 6.93
DEPARTMENT TOTAL ====> 124.50
STREETS
-------
980072
WELSCO INC
CYLINDER RENT
11.65
98O851
PSO
STREET LIGHTING
2,425.52
U� 981793
AT&T WIRELESS SERVICES
PAGER USE
42.42
982361
SAM'S CLUB
MAINT/REPAIR SUPPLIES
49.93
982363
CITY GARAGE
4/98
REPAIRS
277.39
U� 9Q2446
ROARK TRUE VALUE
HARDWARE WEED
CONTROL CHEMICALS
6O9.93
—
982449
GO SYSTEMS
FUEL
4/98
6O8 78
.
982571 TREASURER PETTY CASH REIMB PETTY CASH 10.00
N� 982591 CROW BURLIN8AME REPAIR PARTS 325.70
��
CITY OF OWASSO
GENERAL FUND
5/14/98 20:08:43 A/P CLAIMS REPORT
PO # VENDOR DESCRIPTION
---------- ------------------------- -----------------
982594 PSO 4/98 USE
DEPARTMENT TOTAL
COMMUNITY CENTER
------------------------------
982361 SAM'S CLUB MAINT/REPAIR SUPPLIES
982497 ROBERTSON PLUMBING SUPPLY WATER FOUNTAIN SUPPLIES
982566 W W GRAINGER INC TIMER-OUTDOOR LIGHTS
982578 T-SHIRT EXPRESS ETC MAINT SUPPLIES
982594 PSO 4/98 USE
982638 MCI TELECOMMUNICATIONS 4/98 USE
DEPARTMENT TOTAL
PARK MAINTENANCE
------------------------------
APAPVR
981793
AT&T WIRELESS SERVICES
PAGER USE
982449
GO SYSTEMS
FUEL 4/98
982456
J B STIGALL
NOW ATOR PARK
982456
J B STIGALL
NOW RAM PARK
982515
BRUSHHOG SERVICES
NOW ELM CREEK
982531
SHERWIN-WILLIAMS PAINT
TRIM PAINT
982559
BROKEN ARROW ELECTRIC SUP
LIGHT BULBS-RAYOLA FIELD
982576
BAILEY EQUIPMENT
WEEDEATER PARTS
982576
BAILEY EQUIPMENT
SAFETY SUPPLIES
982594
PSO
4/98 USE
982616
KIMBALL ACE HARDWARE
REPAIR SUPPLIES
982638
MCI TELECOMMUNICATIONS
4/98 USE
DEPARTMENT TOTAL
ECONOMIC DEVELOPMENT
--------------------
982571 TREASURER PETTY CASH MILEAGE-TOBIAS
DEPARTMENT TOTAL
PAGE:
AMOUNT
----------
345.59
.... .... .... ...................................
4,706.91.
19.24
35.70
25.00
360.06
10.06
459.O5
14.14
109.42
75.00
47.00
200.00
80.00
454.40
9.75
100.00
590.36
113.62
4.93
1,798.62
327.0,3
----------
327.O3
-------------
FUND TOTAL 27,094.26
CITY OF OWASSO
WORKERS' COMP SELF-INS PLAN
5/14/98 20:O8:43 A/P CLAIMS REPORT AFAPVR PAGE:
P8 # VENDOR DESCRIPTION AMOUNT
GENERAL GOVERNMENT
N� ------------------------------
982571 TREASURER PETTY CASH
U� 982571 TREASURER PETTY CASH
DEPARTMENT TOTAL ====>
F'UND TOTAL
H08017 14.30
T4138 14.15
_____________
28.45
- -------- -
28.45
CITY OF OWASSO
AMBULANCE SERVICE FUND
511114/98 20 :08:43 A/P CLAIMS REPORT APAPVR PAGE:
PO # VENDOR DESCRIPTION AMOUNT U�
--------- ------------------------- ------------------------- -_--------_-__ N�
AMBULANCE
------------------------------
980550 MEDIC-AIMS, INC.
982307 MED SOURCE CORP
98240 0 MED SOURCE CORP
982426 MOORE MEDICAL CORP
982428 ALLIANCE MEDICAL INC
982430 MED SOURCE CORP
982539 AT&T WIRELESS SERVICES
DEPARTMENT TOTAL
F'UND TOTAL
MONTHLY SERVICE FEE
AMBULANCE SUPPLIES
AMBULANCE SUPPLIES
AMBULANCE SUPPLIES
AMBULANCE SUPPLIES
AMBULANCE SUPPLIES
PHONE USE-ALL
2,653.97
524.22
213.10 N�
91.O0
249.21
121.88 N�
39.79
3,893.17- U�
---------
3,893.1� U�
m�
Ip
PM
CITY OF OWASSO
E - 911
' - CLAIM)
5/14/98 2O:O8:43 */r u-��M) xt:.run/
PO # VENDOR DESCRIPTION
�������������� ������-----------
w�---------- --------------���
POLICE COMMUNICATIONS
��----......................... ............ ............................................................
980037 SOUTHWESTERN BELL TELE
DEPARTMENT TOTAL
FUND TOTAL
E-911 SERVICE
APAPVR PAGE:
AMOUNT
----- -------------
1,874.18
-------------
1.874.18
-------------
1,874.18
I
CITY OF OWA SSO
L.`1:TY BARAGE::
5/14/98 20.0884:3 A/P CLAIMS REPORT APAPVR PAGE:
PO # VENDOR DESCRIPTION AMOUNT
CITY GARAGE
980072
WELSCD INC
CYLINDER RENT
980090
YALE UNIFORM RENTAL
UNIFORM CLEAN /RENT
981793
AT &T WIRELESS SERVICES
PAGER USE
982361
SAM'S CLUE{
MAINT /REPAIR SUPPLIES
982371
BROKEN ARROW ELECTRIC SUP
MAINT SUPPLIES
982449
GO SYSTEMS
FUEL 4/93
982 ::34
TULCO OILS INC
OILS,LUBES
982535
JIM LANG'S UPHOLSTERY
REUPHOLSTER SEAT
982537
PAULS ALTERNATOR SERVICE
ALTERNATOR
932571
TREASURER PETTY CASH
MANUALS
9c32571
TREASURER PETTY CASH
REIMB PETTY CASH
98 579
WHITE STAR
REPAIR FARTS
9E:32580
RELIABLE TIRE AND AUTO
REPAIR PARTS
982 581
OWASSO TIRE BARN
TIRES /REPAIRS
982584
MASTHEAD HOSE & SUPPLY
REPAIR PARTS
932585
LESTER'S GEAR & PARTS
REPAIR FARTS
982 587
CCN,fTINENTAL. BATTERY CO
BATTERIES
942591
CROW BURLINGAME
REPAIR SUP'P'LIES
982591
CROW BURLINGAME
REPAIR PARTS
982591
CROW BURLINGAME
ENGINE
982594
PSO
4/96 USE
98 638
MCI TELECOMMUNICATIONS
4/98 USE
DEPARTMENT TOTAL
FUND TOTAL
36..90
58..80
7..07
85..94
91.81.
1.7..66
592.90
117..00
153.83
39.98
6.00
44.67
60.00
1.0'5..94
44.14
25..77
45.95
1.7.9`5
—39.49
1, 556..87
121.64
17..57
3,206.70
3,206.70
CITY OF OWASSO
BOND PROJECTS FUND
5/14/98 20:08:43 A/P CLAIMS REPORT APAPVR PAGE:
PO # VENDOR DESCRIPTION AMOUNT
-------------- ------------------------- -------------
SPORTS PARK IMPROVEMENTS
------------------------------
982245 HORIZON CONST CO INC
DEPARTMENT TOTAL ====>
FUND TOTAL
SPORTS PARK LOT 3y17/98 80,174.91
-------------
00,174.91.
-------------
80,174.91
14
1
CITY OF OWASSO '
A/P TRANSFER REPORT
VENDOR DESCRIPTION AMOUNT '
TRANSFERS
CEMETERY CARE REVENUE TRANSFER FROM GENERAL FUND 346.88
AMBULANCE CAPITAL REVENUE TRANSFER FROM AMBULANCE FUND 5,576.54
TRANSFERS TOTAL
5,923.42
CITY OF OWASSO
A/P TRANSFER REPORT
VENDOR
DESCRIPTION
AMOUNT
TRANSFERS
CITY GARAGE
TRANSFER FROM GENERAL FUND
4,562.50
WORKER'S COMP SELF INS
TRANSFER FROM GENERAL FUND
10,000.00
GENERAL FUND
TRANSFER FROM AMBULANCE FUND
17,916.66
GENERAL FUND
TRANSFER FROM E -911 FUND
1,515.92
GENERAL FUND
TRANSFER FROM BOND PROJECT FUND
4,007.04
GENERAL FUND
TRANSFER FROM CAPITAL IMPROVEMENT FUND
5,367.03
TRANSFERS TOTAL
43,369.15
CITY OF OWASSO
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE
05/09/98
Department Overtime Expenses Total Expenses
General Fund
......
Finance 0.00 7.586.02
Municipal Court 0.00 2M6.58
Support Services 60.00 3,488.16
Central Dispatch 433.53 51264.00
Animal
ol . ::: ntr 1643 6S > Q Q .. ............... . ...O.
Fire 354.03 36,541.29
for Center
9 1N
Economic Development 0.00 1,800.66
General Fund Total $3,081.94 $140,013.32
Garage Fund
_
. .
: :;;: : ::.:.:.:.. :G ; : . $ ,....
Garage Fund Total $0.00 $31690.15
APPROVED: 05/19/98
Mayor
Council Member
Council Member
c
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: TIMOTHY ROONEY
ASSISTANT CITY MANAGER
SUBJECT: ORDINANCE NO. 518, AMENDED
DATE: May 12, 1998
BACKGROUND:
In January of 1996, the Owasso City Council adopted Ordinance No. 518 in order to close a
drainage easement located within Lots 4 & 5, Block 4, Country Estates Addition. Ordinance
No. 518 contained an error within the legal description of the described drainage easement to
be closed and Ordinance No. 518 Amended would correct that error.
Attached is a copy of Ordinance No. 518 as well as Ordinance No. 518 Amended, which
corrects the error and formally closes the drainage easement.
RECOMMENDATION:
Staff recommends Council approval of Ordinance No. 518 Amended.
ATTACHMENTS:
1. Ordinance No. 518
2. Ordinance No. 518 Amended
I ULJA l.UUiY I Y ULGMr, - J VAN IINd 11IVUJ K%lr I I vaY VU Uv/ U4/ 70 1 0. I I : U 1
VOC 0 96033806 FCC 0.00 PGS 1 S/P 5798/1428 -1428
CITY OF OWASSO CITY OF OWASSO
P.O. Box 180 ORDINANCE NO. 518
Owasso, OK 74055
AN ORDINANCE CLOSING TO THE PUBLIC USE A DRAINAGE
EASEMENT LOCATED WITHIN LOTS FOUR AND FIVE (4 & 5),
BLOCK FOUR (4), COUNTRY ESTATES ADDITION, AN ADDITION TO
THE CITY OF OWASSO, TULSA COUNTY, STATE OF OKLAHOMA,
AND RETAINING UNTO SAID CITY OF OWASSO, OKLAHOMA; THE
ABSOLUTE RIGHT TO REOPEN SAME WITHOUT EXPENSE TO THE
co ABSOLUTE
AND REPEALING ALL ORDINANCES OR PARTS OF
cv ORDINANCES IN CONFLICT HEREWITH.
WHEREAS, the City of Owasso, Oklahoma, has deemed it necessary and expedient
to close to public use a certain drainage easement;
rn
t,— WHEREAS, said drainage easement is described as follows:
trn
The drainage easement located on Lots 4 & 5, Block 4, of Country Estates Addition.
WHEREAS, pursuant to Title II, Oklahoma Statutes, Section 42 -110, the only holders
of a franchise or purported holders of a franchise that may purport to have a special
right or privilege to use said drainage easement are Public Service Company of
Oklahoma, and /or Oklahoma Natural Gas Company, and /or Southwestern Bell
Telephone Company, and /or TCI Cable Television Company; and,
WHEREAS, the above holders of franchise or purported holders of a franchise that
may purport to have a special right or privilege to use said drainage easement have
waived their objections to the closure of said easement, if any.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
OWASSO, OKLAHOMA, THAT,
Section 1. The following described drainage easement, be, and the same is hereby
closed to the public use, to-wit:
The drainage easement located within Lots 4 & 5, Block 4, Ram Plaza
Addition.
Section 2. The municipality shall retain the absolute right to reopen the public way
or easement without expense to the municipality. Closing of the public
way or easement shall not affect the right to maintain, repair,
reconstruct, operate or remove utility, public service corporation, or
transmission company facilities of service therein, nor shall a closing
affect private ways existing by operation of law unless released in
writing by the owners thereof.
Section 3. All ordinances or parts of ordinances in conflict herewith be, and the
same are hereby expressly repealed.
PASSED AND APPROVED this 16th day of January, 1996.
City of Owasso, Oklahoma
v `8 Char es L. Burris, Mayor
S
Clerk
AS TO FORM:
D. Cates, City Attorney
RK TS
,9
oS
.k4ANOMP....•••••.
n
1
1
n
CITY OF OWASSO, OKLAHOMA
ORDINANCE NO. 518, AMENDED
AN ORDINANCE PROVIDING AMENDMENT TO ORDINANCE NO. 518 AND
CLOSING TO THE PUBLIC USE A DRAINAGE EASEMENT LOCATED
WITHIN LOTS FOUR AND FIVE (4 & 5), BLOCK FOUR (4), COUNTRY
ESTATES ADDITION, AN ADDITION TO THE CITY OF OWASSO, TULSA
COUNTY, STATE OF OKLAHOMA, AND RETAINING UNTO SAID CITY OF
OWASSO, OKLAHOMA, THE ABSOLUTE RIGHT TO REOPEN SAME
WITHOUT EXPENSE TO THE MUNICIPALITY, AND REPEALING ALL
ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT HEREWITH.
WHEREAS, Ordinance No. 518 contained a scriveners error in the described drainage
easement to be closed, such error being Lots 4 & 5, Block 4, of Ram Plaza Addition and Ordinance
No. 518, Amended provides the correct legal description; and
WHEREAS, The City of Owasso, Oklahoma, has deemed it necessary and expedient to close
to public use a certain drainage easement; and
WHEREAS, said drainage easement is correctly described as follows:
The drainage easement located on Lots 4 & 5, Block 4, of Country Estates Addition; and,
WHEREAS, pursuant to Title II, Oklahoma Statutes, Section 42 -110, the only holders of a
franchise or purported holders of a franchise that may purport to have a special right or privilege to
use said drainage easement are Public Service Company of Oklahoma, and /or Oklahoma Natural Gas
Company, and /or Southwestern Bell Telephone Company, and /or TCI Cable Television Company;
and
WHEREAS, the above holders of franchise or purported holders of a franchise that may
purport to have a special right or privilege to use said drainage easement have waived their
objections to the closure of said easement, if any.
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF OWASSO, OKLAHOMA, THAT:
SECTION 1. The following described drainage easement be, and the same hereby is, closed
to the public use, to -wit:
The drainage easement located within Lots 4 & 5, Block 4, Country Estates Addition.
SECTION 2. The municipality shall retain the absolute right to reopen the public way or
easement without expense to the municipality. Closing of the public way or easement shall not affect
the right to maintain, repair, reconstruct, operate or remove utility, public service corporation, or
transmission company facilities of service therein, nor shall a closing affect private ways existing by
operation of law unless released in writing by the owners thereof.
SECTION 3. All ordinances or parts of ordinances in conflict herewith be, and the same
hereby are, expressly repealed.
PASSED, APPROVED AND ADOPTED by the City Council of the City of Owasso,
Oklahoma this 19th day of May, 1998.
(SEAL)
FIN to 0—MIM
Marcia Boutwell, City Clerk
APPROVED AS TO FORM:
Ronald D Cates, City Attorney
Denise Bode, Mayor
I D
I MEMORANDUM
I TO: THE HONORABLE MAYOR AND COUNCIL
CITY OF OWASSO
FROM: TIMOTHY ROONEY
ASSISTANT CITY MANAGER
' SUBJECT: FINAL ACCEPTANCE AND PAYMENT
RELEASE OF RETAINAGE
SPORTS PARK RESTROOM FACILITY
DATE: May 14, 1998
BACKGROUND:
In May of 1997, the Parks Department staff and the Sports Park User Groups began a process
to develop a design, obtain approval of that design, solicit bids, and award bids for the
' construction of a restroom facility at the Owasso Sports Park. After a rejection of the first
submitted bids, and redesign/rebid of the proposed facility, it is with great pleasure that I may
report to you that the construction of the restroom facility is complete.
The contract for the construction of the restroom facility was awarded to Pettijohn Construction
of Owasso, Oklahoma for a total cost of $85,405.00, however, due to several change orders
' throughout the construction project, the final contract price is $84,070.00. Payments to
Pettijohn Construction have been processed at various stages of the construction of the restroom
and this action, if approved by the Council, would be the final step in the payment process. The
' final application and certificate for payment is attached for your information and review.
The final walk through inspection of the restroom facility occurred on Friday, May 1, 1998.
All items and aspects of the construction contract have been met. The final product is one of
quality and durability, providing a low lifetime maintenance cost to the City of Owasso. Please
note that the restroom facility has been open for public use the last two weeks and has been
' warmly received.
Several finishing touches to the facility will be completed by the Parks Department including the
' installation of a sidewalk around the restroom, as well as the placement of sod and landscaping.
Staff is currently working with PSO toward the placement of two overhead lights outside of the
' restroom for security purposes and lighting needs within the facility itself. The lights are
anticipated to be in place prior to Memorial Day Weekend.
' If you have not had an opportunity to visit the facility and would like to visit it when it is not
in use, please contact Mr. Warren or me.
RECOMMENDATION:
Staff recommends Council final acceptance of the Sports Park restroom facility and authorization
for the release of retainage and final payment in the amount of $8,919.00.
ATTACHMENTS:
1. Application and Certificate for Final Payment
A+�,�CA'�ION AND ��T$ FQR PAYM�T
PuBe One of
TO (ownar)
City of Owasso
FROM
Jim pettijohn
Pettijohn Construction
. ;1
AppUcWm
Pad To.—
Db lbcttion To-.
NMI. ility at the Owasso Sports Park
Cbftm Restraam Facility at the Owasso Sports Park
'S AMjCA'i' ON FOR PAXMM4T
Owner
AtCWOW
Contra W
Bnginecr
Ap ►liioatlaa is poAdo p"m ss Chown below, in CODWCtiot with the ContrW.
Condnad n greet is awted.
X, orwod C" nuw Stith
2, Not Chits by OuP Otders
' 3. CantrWt Sum to DvA WN i & 2)
4, TOW CoWate5 & SwfA to Data
( Columm G on C.oadaaAon Sbeat)
1
85 405.00
s 1,335.00
84,070.00
S
84,070.00
S, tea: 8 4.�' ° 7,°- �°lumn D & E L °90 of CM4 Wak
b., 0 % of SWW Mata� 5- .' (Column F on Coutinuad" Shoat)
TOW Ratalup (LW Sa & Sb)
d, Too ftned Lot ReWOP
4 leas Um 5 Total)
7, Lm Frauds Cadfkates for Paymnt
ow
0.00
X4,070.00.
75,151.00
9 of 14
ARCHITECT'S I ENGINEER'S CERTIFTCAn FOR PAYMENT
Wed on On-site observations and the data '
In acxordance with the contract documents r certifies to the Owner that to the beat
comprising the above application, the AtchitectlB � Work has progressed as '
of the phi +sffinginw's knowtiedge, information and belief,
the
indicated, the quality of the Work is in accordance with the Contract Documents, and .
Contractor is entitled to payment of the amount certified.
!►FOUNT CERTIFIED $— differs from the amount applied for.)
(Attach Explanation if amount
ARCHITECT' / ENGINEER: '
By. Date:
This certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the contractor
named berets. Issuance, payment and awepto= of payment without prejudice to any rights of '
the Owner or Contactor under this Contract.
f
r
1b
1�
1
p030o .10 of 14 '
0997
I �
i
1 a. CURRENT PAYMffiN T DUE
4. 8alan6 W Finish, Plus Rataina8e
' (Tina 3 less Line 6)
CHANGE ORDER SUMMARY:
ChMe, Ordas gpproved is pravIcM
Mo'M by OWM TOTALS
8,919.00
ADDITIONS
DEDUCTIONS
1,335.00
AppmVCd this Month
Numbu ^__.. --«
Due Approved
TOTALS �
1,335.00
Net dWV by Change Orders
• s kr�wiedge, formation
The undersigned Ctaatcr ceartifia that to the, best of the Canua=l � been �nf � th Apphcadoa for Payme b the CotPrectos' for
and bolK the waRx r MUM, that au amts have been paid Y
w=danca with the Cantrac outs r=ivcd f OM the
Work for which previous {�dfu ates for Fay is now due. PaYm
1 QQVm, and that current PaYMW shomm bemin
CONTRA R:
'r
AT8 OF OKLAHOMA )
} as
COUNTY OF -- -
this day of `� , pg�
Subscribed and sworn to before m e
(SEAL) Notary Public
idly Commission �xpizeso �
M
p- -9of14
27- Apr -98 PETTIJOHN CONSTRUCTION Page 1 of 1
8100 N 177 E AVE
OWASSO, OK 74055 -8450
A
B
C
D
E
F
G
H
I
ITEM
NO.
DESCRIPTION OF WORK
SCHEDULED
VALUE
WORK COMPLETED
FROM PREVIOUS
APPLICATION
(D +E)
WORK COMPLETED
THIS PERIOD
MATERIALS
PRESENTLY
STORED (NOT IN
D OR E)
TOTAL
COMPLETED
AND STORED
TO DATE
(D +E +F)
%
(G /C)
BALANCE
TO FINISH
(C -G)
RETAINAGE
Insurance Policy & Surety Bond
2,285.00
2,285.00
-
-
2,285.00
100%
-
-
Footing Labor
300.00
300.00
-
-
300.00
100%
-
Masonry (Materials Stored)
20,385.00
20,385.00
-
20,385.00
100%
-
Masonry Benches
700.00
700.00
-
700.00
100%
-
Pad Clearing & Digging Footing
350.00
350.00
-
350.00
100%
Dig, Form & Pour Interior Footings
500.00
500.00
-
500.00
100%
-
Termite Pretreat
150.00
150.00
150.00
100%
Place Steel
600.00
600.00
-
-
600.00
100%
-
Install Visqueen wiremesh
& Pour Concrete
950.00
950.00
-
-
950.00
100%
-
Install Wall Louvers
1,000.00
1,000.00
-
-
1,000.00
100%
-
Drywall
1,450.00
1,450.00
-
-
1,450.00
100%
-
-
Roofing Metal
1,500.00
1,500.00
-
-
1,500.00
100%
-
Roofing Labor
6,000.00
6,000.00
-
-
6,000.00
100%
-
Skylights
450.00
450.00
-
-
450.00
100%
-
Framing
5,500.00
5,500.00
-
5,500.00
100%
-
Steel Structure
1,900.00
1,900.00
-
1,900.00
100%
-
Door & Frames
2,140.00
2,140.00
-
2,140.00
100%
-
Hardware & Hollow Metal
1,641.00
1,641.00
-
-
1,641.00
100%
-
Toilet Partitions
1,135.00
1,135.00
-
-
1,135.00
100%
-
Painting
2,750.00
2,750.00
-
-
2,750.00
100%
-
-
Misc. Trim
800.00
600.00
200.00
-
800.00
100%
-
-
Plumbing
15,300.00
13,770.00
1,530.00
-
15,300.00
100% i
-
1p
0 - Apr -98 PETTIJOHN CONSTRUCTION Page 2 oft
�
8100 N 177 E AVE
OWASSO, OK 74055 -8450
A
B
C
D
E
F
G
H
I
ITEM
NO.
DESCRIPTION OF WORK
SCHEDULED
VALUE
WORK COMPLETED
FROM PREVIOUS
APPLICATION
(D +E)
WORK COMPLETED
THIS PERIOD
MATERIALS
PRESENTLY
STORED (NOT IN
D OR E)
TOTAL
COMPLETED
AND STORED
TO DATE
(D +E +F)
%
(G /C)
BALANCE
TO FINISH
(C -G)
RETAINAGE
Sealants
1,530.00
-
1,530.00
-
1,530.00
100%
Two outside slabs
254.00
-
254.00
-
254.00
100%
Overhead
6,500.00
5,850.00
650.00
-
6,500.00
100%
Profit
8,000.00
7,200.00
800.00
-
8,000.00
100%
-
TOTALS
84,070.00
79,106.00
4,964.00
-
84,070.00
0.00
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
' FROM: TIMOTHY ROONEY
ASSISTANT CITY MANAGER
SUBJECT: SURPLUS VEHICLE BIDS
DATE: May 13, 1998
BACKGROUND:
At the April 21, 1998 regular meeting, the Owasso City Council declared two vehicles no longer
' needed for city operations as surplus, thus authorizing staff to solicit bids for the purchase of
those vehicles. The vehicles declared a surplus consisted of a 1985 Plymouth Grand Fury and
a 1981 International 27- passenger bus.
Advertisements for sealed bids were published in the April 23rd issue of the Owasso Reporter,
as well as the April 26th issue of the Tulsa World. In addition to the newspaper publications,
' information regarding the vehicles was placed on the Community Center marquee in front of
City Hall and forwarded to the monthly letter sent to area ministers.
Bids for both vehicles were opened on May 5, 1998 at 1:30 PM. A total of two bids were
submitted, one for each vehicle:
1985 Plymouth Grand Fury
Dan McElrath, Owasso, $310.00
1981 International Bus
James Gibbs, Coweta, $1,150.00
' ANALYSIS:
Staff's review of the submitted bids indicates that while the bid submitted on the 1985 Plymouth
Grand Fury is acceptable, the bid submitted on the 1981 International Bus is not. The Grand
Fury has a 156,000 mile history and is in poor condition, while the International Bus has a new
engine and is in relatively good condition. It is staff's opinion that the value of the bus far
exceeds the bid submitted.
With the above information in mind, staff would recommend that the Council accept the bid on
the Plymouth Grand Fury as an additional solicitation of bids is not likely to result in a higher
bid being submitted. In addition, staff would also recommend the Council reject the bid
' submitted for the International Bus, thus allowing staff to re- advertise.
1
RECOMMENDATION:
Staff recommends Council acceptance of the bid submitted by Dan McElrath to purchase of the
1985 Plymouth Grand Fury for the amount of $310.00. Furthermore, staff recommends Council
reject the sole bid submitted for the purchase of the 1981 International Bus.
ATTACHMENTS:
1. Copies of submitted bids.
2. Copies of advertisements.
Y
1
1
1
1
1
1
1
1
1
103 / 0, C-)
- 3 E A
ZL- 41 ) -
Affidavit Of Publication
OWASSO REPORTER
STATE OF OKLAHOMA, TULSA COUNTY, ss:
Bill R. Retherford, of lawful age, being duly sworn
and authorized, says that he is the publisher of the
Owasso Reporter, a weekly newspaper published in
the City of Owasso, Tulsa County, Oklahoma, a news-
paper qualified to publish legal notices, advertise-
ments and publications as provided in Section 106 of
Title 25, Oklahoma Statutes 1971 and 1983 as
amended, and thereafter, and complies with all other
requirements of the laws of Oklahoma with reference
to legal publications.
That said notice, a true copy of which is attached
hereto, was published in the regular edition of said
newspaper during the period and time of publication
and not in a supplement, on the following dates:
April 23rd 199 8
av ea
Subscribed and sworn to before me this
n
day of A, ,
'P�b�ic;
�) ��o j' �1y.;. j , i GIs y
My Commission expires -`
' ' :,j� ..: ., 11-2001 ,
` V,arv.: G �K�'� -ci �5,::•'.i;:.:' -. :I:;i:::.t".v.°.C.'i.,.�
PUBLISHER'S FED•$
Published in the Owasso Reporter,
Owasso, Tulsa County, Okla -
homa, April 23,1686.
NOTICE TO BIDDERS
The City of Owasso Is receiving
;salad bids for the sale of: 1686
Plymouth Grand Fury, 166,000
miles, &a 1861 International 27-
passenger bus, new engine. May
be soon at Community Center 307
S. Cedar. Bids must be separate
and Identified for each vehicle and
received In the office afthe City
Clark at 207 South Cedar until 1:30
p.m., May ti, 1686.
The City of Owasso reserves the
right to rood any and all Bide.
hl Marcia Boutwell
Marda Boutwell,
City Clark
LJ�
1
1
1
1
1
1
1
1
1
1
MEMORANDUM
TO: THE HONORABLE MAYOR AND COUNCIL
CITY OF OWASSO
FROM: TIMOTHY ROONEY
ASSISTANT CITY MANAGER
SUBJECT: REQUEST FOR COUNCIL AUTHORIZATION OF SPORTS PARK
GROUND LEASE FOR FUTURE OWASSO RAMS BUILDING SITE
DATE: May 11, 1998
BACKGROUND:
Over the past six months, the Future Owasso Rams (FOR) has been in negotiations with the City
of Owasso regarding the ability to lease a portion of land at the Owasso Sports Park in order to
construct an office /storage building for the FOR. A copy of the proposed lease agreement is
attached for your information and review, as well as a site map.
The lease agreement would provide an area of land of sufficient size to construct a building
measuring 40' x 80', approximately 20' east of the existing concession stand. The agreement,
if approved, would provide a meeting place and storage facility for the FOR program. Space
currently needed for these activities is being rented by the FOR.
The agreement itself requires the FOR to insure the proposed building, pay all utilities associated
with the proposed building, and complete the construction of the facility in a timely manner.
All building codes of the City of Owasso will be applied and any utility extensions (water,
sewer, and electric) would be at the FOR's expense. The structure itself must also "match" the
Park Office building located at the Sports Park in terms of color scheme.
The proposed lease agreement is for a ten (10) year period, and renews automatically every ten
(10) years unless terminated by the FOR. If terminated by the FOR at any time, the building
would become the property of the City of Owasso.
Mr. Cates has reviewed the proposed lease agreement and is comfortable with its language.
Staff has no concerns with this request.
RECOMMENDATION:
Staff recommends Council approval of the Sports Park ground lease for the FOR building site
and authorization for the Mayor to execute the lease.
ATTACHly, EN!
1. Propowo Lease Agreement
2. Site flan
FUTURE OWASSO RAMS SPORTS PARK BUILDING SITE GROUND LEASE I
THIS LEASE, made at Owasso, Oklahoma on the day of ,
1 1998, by and between the CITY OF OWASSO,
OKLAHOMA, an Oklahoma municipal corporation, its successors
and assigns, hereinafter called "LESSOR ", and FUTURE OWASSO '
RAMS ( "FOR ") YOUTH SPORTS, hereinafter called "LESSEE ".
W I T N E S S E T H:
That LESSOR does hereby let and lease unto LESSEE the
premises situated in the City of Owasso, County of Tulsa and
State of Oklahoma, and further described as follows:
An area, located at the Owasso Sports Park,
Area "A ", at 116th Street North, West of
Old HWY 169, and 20 feet from the existing
concession stand, of sufficient size to
construct a 40 feet by 80 feet office and
provide ample parking space adjacent to
the office structure. (See EXHIBIT "A ")
To have and to hold unto LESSEE for the term of ten (10)
years, commencing on the 1st day of April, 1998, and ending
on the 31st day of March, 2008, upon the covenants and agreements
herein set forth.
1. The LESSEE hereby covenants and agrees to pay to the
LESSOR as rent for said premises during the said term, the sum
of Ten Dollars and no /100's ($10.00) per year upon execution
of this lease and each extension hereof.
Construction at the facility shall be the sole obligation
and responsibility of the LESSEE. Such construction shall be
accomplished in a workmanlike manner and shall comply with all
local, state and federal laws pertaining thereto. LESSEE shall
hold harmless LESSOR, LESSEE agreeing to indemnify LESSOR, from
and against any and all claims, cost, damage, expense, including
any LESSOR incurred Attorneys fees, cost of Alternative Dispute
Resolution Attorneys fees and costs, or loss incurred or suffered
by LESSOR arising out of LESSEE'S construction. Lessee further
warrants and agrees that the construction shall be conducted
and completed free and clear and that LESSEE shall prevent the
filing of liens by any contractor or subcontractor.
If, upon the expiration of the term hereof, and for a period
of Five (5) years thereafter, LESSOR sells such Sports Park
herein demised, then, in such event LESSOR shall pay LESSEE,
solely from the proceeds of such sale, an amount of money for
the construction value enhancement resulting from the improvement
by LESSEE; provided, however, such value enhancement repayment
from proceeds shall equal the value of the construction from
A
the date of completion as depreciated on a straight line basis
over the term of years from date of completion until the date
of sale. For the purposes of this Lease depreciable life of
said construction shall be fifteen (15) years.
2. Not withstanding any other provision hereof to the
contrary, either party hereto may terminate this Lease Agreement
at any time upon one hundred twenty (120) day written notice
to the other party.
If LESSEE so terminates, it shall forfeit all its right,
title and interest to said construction to LESSOR.
If LESSOR so terminates, the parties hereto shall seek
to negotiate a mutually satisfactory settlement. In the event
the parties cannot agree, determination of LESSEE'S damages
shall be settled by arbitration. Such arbitration shall be
before three disinterested arbitrators, one named by LESSOR,
one by LESSEE and one by the two thus chosen. The arbitrators
shall determine the controversy and their determination shall
be final and binding on both LESSOR and LESSEE. Any mandatory
award issued by the arbitrators against LESSOR shall be payable
by LESSOR to LESSEE solely from revenue derived by LESSOR from
LESSOR'S operation of the Sports Park.
3. LESSOR shall not allow said premises to be used in
any manner which shall unreasonably interfere with LESSEE'S
occupancy and /or programs, nor which shall, in any way, cause
' any damage to the facility or to LESSEE'S equipment located
thereon.
17
4. LESSEE will use and occupy said premises and
appurtenances in a careful, safe and proper manner, in accordance
with the ordinances of the City of Owasso, Oklahoma; and LESSEE
will not allow said premises to be used for any purpose in any
way that will increase the rate of insurance thereof, nor for
any purpose other than as offices for FOR and storage of FOR
equipment, nor to be occupied in whole or in part by any other
persons; and will not permit liquor to be sold at wholesale
or retail, or consumed on the premises; nor assign this Lease,
without in each case, the written consent of LESSOR first
obtained; and will not permit any transfer by operation of law
of LESSEE'S interest in said premises. LESSEE shall not use
the premises for any unlawful purpose or in any way that will
injure the reputation of the same, or disturb the neighborhood;
and will not permit any substantial alteration of or upon any
part of said demised premises, nor allow any sign or placard
posted or placed thereon, except by written consent of LESSOR
unless otherwise provided in said written consent.
A 5. LESSEE shall have the
to said premises:
following duties with reference
2
a) to keep said premises clean, as stated herein;
b) to properly use, operate, maintain and replace,
if reasonably necessary, any building constructed upon the
premises;
c) to maintain the grounds of the leased premises
in a clean, safe and sanitary condition.
6. LESSOR may have free access to the premises at all
reasonable times for the purpose of examining the same.
7. Every demand for rent due wherever and whenever made
shall have the same effect as if made at the time it falls due
and at the place of payment or on the premises. LESSOR may
receive and collect any rent due, and such collection or receipt
shall not operate as a waiver of, nor affect such notice, suit
or judgment. Any notice or summons to be served by or on behalf
of LESSOR upon LESSEE under this Lease or in connection with
any proceeding or action growing out of this Lease or the tenancy
arising therefrom, may be sufficiently served by leaving such
notice or summons addressed to LESSEE upon the said demised
premises.
8. The LESSEE shall insure the subject premises against
loss by personal injury or property damage. Such insurance
shall be at LESSEE'S cost and in an amount not less than
One- m1140 J dd llamas ( 4 /, 000, 000 C°— ) , and
shall name the City of Owasso as a co- insured. A copy of the
evidence of insurance shall be supplied to the City Manager
of LESSOR.
9. The LESSOR shall pay any and all property tax
obligations imposed upon the property of LESSEE during the term
of this Lease, including any increases thereon. LESSEE shall
pay any such tax upon the building to be constructed. LESSEE
shall pay all utility expenses of the building to be constructed.
10. And the LESSOR hereby covenants and agrees that if
the LESSEE shall perform all the covenants and agreements herein
stipulated to be performed on LESSEE'S part, the LESSEE shall
at all times during said term have the peaceable and quiet
enjoyment and possession of said premises without any manner
of let or hindrance from LESSOR or any person or persons lawfully
claiming said premises.
11. LESSOR and LESSEE mutually agree that LESSOR and
LESSEE may terminate this Lease at the end of the above - stated
initial term by giving LESSOR written notice thereof at least
sixty (60) days prior thereto. In the absence of such notice,
this Lease shall continue on the terms and conditions contained
herein and in force prior to the expiration of the above - stated
initial term for an additional Ten (10) year term unless
3
G
w
1
terminated by LESSEE upon sixty (60) days written notice.
12. LESSEE shall hold the City of Owasso, Oklahoma, its
officers, agents, employees and independent contractors, harmless
and fully indemnify said City of and from any and all claims
of neglect, negligence, liability for personal injury or property
damage occurring during the term of this Lease, except as the
same may arise from the negligence of LESSOR, LESSOR'S agents
or employees. This indemnification and hold harmless agreement
shall extend to reasonable attorneys fees and costs incurred
in defending itself from any claims made during the term of
the Lease, including therewith Alternative Dispute Resolution
Attorneys fees and costs.
13. LESSOR or LESSEE may request that the terms and
provisions of this Lease be reopened upon thirty (30) days notice
in writing to the other party. Each party shall attempt, at
this point, to address any such issues raised by the other,
but the process of reopening or renegotiating shall not obligate
either party to accept the proposal of the other party or to
vary the terms of this agreement.
IN WITNESS WHEREOF, the parties have hereunto set their
hands on the day and year first above written.
ATTEST:
APPROVED AS TO FORM:
CITY OF OWASSO, OKLAHOMA
BY:
LESSOR
4
FUTURE OWASSO RAMS
MAYOR
ATTEST:
SECRETARY
5
LESSEE
[am
CHAIRMAN
1
MEMORANDUM
TO: THE HONORABLE MAYOR AND COUNCIL
CITY OF OWASSO
FROM: TIMOTHY ROONEY
ASSISTANTCITY MANAGER
' SUBJECT: FY 1997 -98
EQUIPMENT CONTINGENCY FUND
iDATE: May 12, 1998
BACKGROUND:
The FY 1997 -98 budget for the City of Owasso contained an "Equipment Contingency Fund"
line item within the General Government Department. This appropriation was requested as a
result of increased revenues during FY 1996 -97 and the desires of staff to provide additional
funding for capital purchases utilizing a surplus carry -over from the previous year. The concept
is based on a determination that, when the General Fund's rainy day reserve is adequately
funded, surplus monies from the previous operating year should be "put to work" in the
succeeding fiscal year. The "Equipment Contingency Fund" line item contains $175,000.00.
The ability to utilize funds from this line items involved a several step process. The first step
in the process involved the department directors submitting requests for project funding. The
' second step was for a prioritization process to occur, in which, all submitted requests for project
funding would be reviewed by the management team, and priorities for funding established. The
third and final step involved the presentation of those project priorities to the City Council for
review and allocation of funds.
On April 27, 1998, the department directors submitted requests for the funding of projects from
' that line item. The following list, in no particular order, contains all projects that were
submitted:
Emergency Services Radio System ...................... $ 200,000.00
' Restriping /Crack Sealing - 86th Street North .................. 43,329.77
Restriping /Crack Sealing - 76th and Main Intersection ............. 7,957.79
Industrial Power Broom Attachment to Backhoe ................ 51,287.56
Pavement Router ..... ............................... 1,650.00
Engine Analyzer .... ............................... 12,714.50
Storage Building ..... ............................... 5,725.00
' Vehicle Maintenance Parking Lot Paving .................... 40,000.00
Golf Course Fencing ... ............................... 3,000.00
Gazebo Repairs /Painting ............................... 5,000.00
TOTAL AMOUNT REQUESTED ...................... $ 370, 664.62
I
Upon the completion of the staff review, it was agreed that the Emergency Services Radio
System was a priority. While the total cost of the project is currently estimated at $200,000.00,
partial funding for that project was already allocated in the FY 1997 -98 budget. The amount '
already allocated to that project was $88,000.00, thus reducing the amount needed to completely
fund that project to $112,000.00.
With the knowledge that the Emergency Services Radio System was a priority and was to receive ,
funding, this reduced the amount of projects for consideration to a total of 9 projects, at a total
estimated cost of $170,664.62. The total funds available for funding, after the allocation of
$112,000.00 to the Emergency Services Radio System was $63,000.00. The department ,.
directors agreed to review their requests for accuracy, review their department's budget for
possible carry-over to fund their requests, and prioritize the need of their projects (if multiple
projects were submitted).
On May 4, 1998, the department director's met to prioritize the projects submitted for funding. ,
At that time, the following projects were removed from consideration due to the ability to fund
the requests either within the existing budget or through a carry -over request, or the feeling by
the department director that the submitted project should no longer be considered to receive
funding:
Gazebo Repairs /Repainting ............................. $ 5,000.00
Industrial Power Broom Attachment to Backhoe ................ 51,287.56
Pavement Router ..... ............................... 1,650.00
Storage Building ..... ............................... 5,725.00
Upon the elimination of those items, the amount of projects for consideration was reduced to a '
total of 5 projects, at a total estimated cost of $107,002.06.
At that point, the department directors prioritized the five remaining projects based on the
information submitted by the requesting department director and the discussion regarding that
request. The highest priority project was given a value of 1, the lowest priority was given a
value of 5. The following table is the result of that process:
1. Restriping /Crack Sealing - 86th Street North .................. 43,329.77
2. Golf Course Fencing ... ............................... 3,000.00
3. Restriping /Crack Sealing - 76th and Main Intersection ............. 7,957.79
4. Engine Analyzer .... ............................... 12,714.50
5. Vehicle Maintenance Parking Lot Paving .................... 40,000.00
A review of the prioritization indicates that the first three projects (Restriping /Crack Sealing -
E. 86th Street North, Golf Course Fencing, and Restriping/Crack Sealing - 76th and Main) could
be completely funded through the funds in the Equipment Contingency Fund, resulting an a
remaining balance of $8,712.44. The next project on the list (Engine Analyzer - 12,714.50)
would still need an additional $4,002.06 to be funded. Upon review of the Garage Budget, it '
was determined by Ms. Bishop that the remaining $4,002.06 to fund the Engine Analyzer could
be realized through money not likely to be spent in the Personal Services portion of that budget.
This money is the result of a mechanic's helper position that was vacant for a period of time I
between the existing employee and the former employee.
I �
In conclusion, it was recommended that any remaining funds that may be available as a result
of a cost savings on the Emergency Services Radio System be allocated to the Vehicle
Maintenance Parking Lot Paving project.
RECOMMENDATION:
The Management Team of the City of Owasso recommends the following projects receive the
followings funds from the Equipment Contingency Fund:
Emergency Services Radio System ...................... $ 112,000.00
Restriping /Crack Sealing - 86th Street North .................. 43,329.77
Golf Course Fencing ... ............................... 3,000.00
Restriping /Crack Sealing - 76th and Main Intersection ............. 7,957.79
Engine Analyzer ..... ............................... 8,712.44
TOTAL........ ............................... $ 175,000.00
ATTACHMENTS:
' 1. Project Request Memos
II
11
1
NOTE:
If the Council agrees with the staff's recommendations for project funding, the staff will proceed
with the necessary bidding and /or purchasing process for the above recommended projects.
Depending upon the project and the total cost of the project, several of the projects will be
subject to additional Council review and approvals.
MEMORANDUM
TO: Rodney J. Ray q�
City ,Manager\
FROM: M. A. Alexander�F
Chief of Police
Bob Allen
Fire Chief
SUBJECT: Radio Cost Estimate
DATE: 4 -23 -98
The radio consultant hired to perform the needs assessment for the City of Owasso Fire and
Police communication has completed his analysis and will be forwarded his recommendation to
the radio committee very soon.
The expected cost of the stand alone commercial radio system is estimated at a cost not to exceed
$200,000.
61
C
City of Owasso
Radio Feature /System Format Comparison
Y Y
Y
N
10 portable coverage y y
Z'
Y
16 Channel Mobile y
N Y
Y
16 Channel Portable Y N y
Y
25 mile mobile coverage Y y
N
Y1
Y
Back up Power y
N2 y
Data Capable (Future) N Y
y
N
Intrinsically Safe Portables N2 y
N
Y
Mobile Data Terminals y
Y Y
N7
Multiple Sites Y
Multiple Talk Groups ( >5) N N3 N4 Y
Y8
Y
Mutual Aid Tulsa N N4
Y Y
N4
Mutual Aid UHF
N N4 NA
N4
Mutual Aid VHF y y
Y
SCBA Compatible N y
N
Speaker
Y
Scrambling Y y
mikes Y y
Y
Y
Y
Status Messaging N
N y y
NS
System Redundancy Y y
N
N6
Telephone Interconnect
1. This needs to be confirmed with Tulsa. Most likely they do have backup power.
New may not be available when needed.
2. The adding of data will require a separate channel for data. channels
Adding talk will require additional channels that may not be available when needed.
3. groups
be by cross patching in the console via the dispatcher. The reason for a no classification is that it is not
4. This can accomplished
part of the system.
5. It is not known what type of alternate system Tulsa uses when main system is down.
6. Tulsa system has this capability but it is not known if this is available and what the charge will be.
7. The location of the multiple sites may not provide coverage for Owasso.
with the City of Tulsa for use of system, attention should be given to the future needs of Owasso with
8. In the contracting process
the total number of talk groups the city will be allowed for growth.
an agreement concerning
Requirements for SRD
(Tasks to be included in report) ,
1. Study the structure of various mobile radio systems.
Completed with results in the Radio Feature/System Comparison Document
2. Study channel loading for all radio systems.
Completed with results in the Radio Feature/Systems Comparison Document
3. Determine equipment age and projected life.
The assumption is made that the question is directed toward the existing equipment.
The existing equipment has been used beyond its useful life. The exception is some
of the new equipment that has been purchased in the last few years. The condition of
the station equipment is not known with the exception of a site visit to determine the
model and type of repeaters that are being used. The 2 stations observed do have a
useful life if it can be determined that they will operate at factory specs. At the time
of this report the city was trying to get keys to the site. Concerning the life of any
new equipment purchased the assumption can be made that all equipment will last a
minimum of 10 years.
4. Review control equipment medium costs.
Not - Completed. More definition is needed before this objective can be met. ,
■
5.
Study dispatcher's equipment and methods of handling traffic.
Not - Completed. This will require knowledge of how the dispatch center operates
'
and some observation in the dispatch center to watch the flow of traffic. Based on
traffic flow findings a methods recommendation can be made along with the
equipment that will be needed to accomplish those objectives.
'
6.
Determine coverage and coverage requirements for Police and Fire departments.
Completed — This finding was reached in the survey results and also in the interview
'
sessions. Results are listed in the survey results document.
7.
Study maintenance methods and costs.
'
Not - Completed. This issue will be addressed later.
8.
Project radio needs for at least the next 10 years.
Not - Completed. A discussion with the department leadership needs to address this
issue. This has not taken place.
'
9.
Make recommendations as to whether existing radio's can be improved.
M g P
Completed. The existing system does not meet the needs of the departments today.
Most of the radio equipment has been used beyond its useful life. The exception is
,
that equipment that is still operating at factory specifications. The other issue is that
of capacity. The existing system simply cannot handle the division requirements
a
(channels or talk groups) both police and fire need. The only way the existing
radio's can be improved is remove those units that are not functional and replace
' them. The other issue of adding capacity to the existing system is one of the options
that are being evaluated at this time.
'
10. Evaluate possibilities of consolidating mobile radio systems to improve overall
operations and /or reduce costs.
Not - Completed. More evaluation needs to take place concerning this matter. Some
study of communication efficiency versus manpower will need to take place to
the
answer this question. This discussion will need to take place with management of
various departments.
'
11. Evaluate technologies such as mobile data terminals, 450, 800, 900 MHz systems
that may be available to improve overall operations and/or to reduce cost.
'
Not - Completed. This is partially completed with the exception of the reducing cost
portion. Again, management will need to be in this discussion to make the judgement
calls concerning how the communications efficiency will impact the organization.
'
the
12. Interview each of the police and fire personnel to assist in the defining of
needs of the various departments within the city.
'
Completed — See the attached results of the survey and focus group meetings.
13. Inventory the present system and determine the value of that system in relation
to the present and future needs of the city. Does the old system have a trade -in
value and how much?
Not - Completed. This will be resolved at a later date when the plans for the old
'
system are determined. Typically the trade in process is more of a give away process
since vendors don't like to sell used equipment. Depending on which direction the
a
city goes with the system format decision; the equipment may be able to be passed
down to other departments in the city. This will be determined at a later date.
a_ 14. Present a plan for a dispatch center for the City of Owasso. This would include
the cross patching, if necessary, to the various groups that need to interact with
the City of Owasso, including 911 service.
Not Completed. This one will be interesting!
1
15. Examine the issue of redundancy. How will the communications system are
exposed during system failure? How will the city function during this outage?
Not Completed. Some initial study has been done to look at various sites and
alternatives. We have listed as one of the requirements for the new system to have
back up power and redundancy due to lightning strikes. This will be refined as the
process unfolds.
1
1
MEMORANDUM
TO: RODNEY J. RAY
CITY NIANAGER
FROM: F. ROBERT CARR, JR.. P.E. i
PUBLIC WORKS DIRECTOR ' �1
SUBJECT: CAPITAL CONTINENCY FUND UTILIZATION
DATE: April 24, 1998
The following items are submitted for consideration by the Department Directors for the Capital
Continency Fund included in the FY97 -98 City of Owasso Budget:
CAPITAL PROJECTS:
86th Street North (from Dogwood to 129th E Avenue) RestrippingKrack Sealing
The FY97 -98 Public Works Department Street Division budget includes $15,000 as part of Operating
Supplies (51- 410 -5220) for repairs to 86th Street North. The roadway was constructed
approximately 8 years ago. Very little has been done since that time to repair the surface. No
stripping has been replaced and the reflectivity of the existing stripping is very low.
Drawings and specifications for the project have been prepared by the Engineering Division (see
attached). The most current estimate of cost for this project is $58,329.77. Insufficient funds are
available to make these repairs unless supplemented by the Capital Continency Fund. A total of
$43,329.77 would be required from the fund.
Main Street/76th Street Intersection North Restripping /Crack Sealing
In addition to the above project, similar repairs are needed at the intersection of 76th Street North
and Main Street. Improvements to the intersection were completed approximately 4 years ago. Very
little has been done since that time to repair the surface. No stripping has been replaced and the
reflectivity of the existing stripping is very low.
Dra-.Ings and specifications for the project iii. Z-ee,. prepared by dr :e En-gin Bring Divisio, (See
attached). The most current estimate of cost for this proiect is S7,957.79. insufficient funds are
available to make these repairs unless supplemented by the Capital Continency Fund. Should the
C
I �
Page 2
capital Contingency- Fund
above project be approved, all of the funds to complete this project would be required from the fund.
EQUIPMENT:
Industrial Power Broom Attachment to Backhoe
Removal of accumulated dirt and debris from curbed streets is important for the overall appearance
of the community. In specific areas of the community, dirt/debris accumulation occurs frequently.
In other situations, both private and public construction activities results in- dirt/debris in the roadway.
The method to remove this material is labor intensive and usually involves hand push brooms, shovels
and trash cans. Although the FY 98 -99 budget includes some funds for contracted street sweeping
along the major arterials in the city, Streets Division projects at various locations, such as Hale
Acres, would be able to utilize this equipment. Total cost of the equipment is $4,400 (see attachment
for equipment details).
IPavement Router
' The FY97 -98 Public Works Department Street Division budget includes $2,500 as part of Operating
Supplies (51 -410 -5220) for street repair crack sealing. In order to accomplish this objective in an
efficient and long - lasting manner, cracks should be removed with a router and sealant material
applied to the exposed area. A router machine is needed to accomplish this work. Cost of the
machine is $1,650 (see attachment for equipment details).
I RECOMMENDATIONS:
tPublic Works Department Staff recommends to the following uses for the Capital Continency Fund:
CAPITAL PROJECTS:
86th Street North Restripping/Crack Sealing $43,329.77
Main Street/76th Street Intersection North $7,957.79
Restripping/Crack Sealing
Subtotal $51,287.56
EQUIPMENT:
Industrial Power Broom Attachment to Backhoe $4,400.00
Pavement Router $1,650.00
Subtotal S6,`?5!).;,Q
TOTAL 557,337.5-6
go
MEMORANDUM
TO: ALL DEPARTMENT DIRECTORS
FROM: TIM LAMPTON
GOLF COURSE SUPERINTENDENT
SUBJECT: FENCE PROPOSAL
DATE: May 5, 1998
BACKGROUND:
Since the opening of the Golf Course in August 1993, there has been a problem
with golfers trying to retrieve golf balls on holes # 1 and 410 which is property
owned by Mrs. Mills. The fence which borders these two holes is not much of a
deterrent to golfers and has gradually deteriorated over time and is in need of some
repair. Golfers have ignored the ten "No Trespassing" signs that were set out in
May 1997 by the Golf department. Mrs. Mills, Rodney Ray, Warren Lehr, and Tim
Lampton met March 27, 1998 to discuss the issue.
RECOMMENDATION:
The staff feels their is no legal obligation at hand, however, there is the
responsibility of the city and the Golf Course to protect its investment (i.e. cows
walking across greens), while acting as a "Good Neighbor 'towards Mrs. Mills.
Quotes for new fencing along hole # 1 and # 10 are as follows:
1. Five foot chain link with 3 barbed wires $10,202
2. Five foot chain link $7,400
3. Five foot barb wire with 6 barbs $2,400
An additional amount of $600 may be needed for clearvng trees and brush before
installaz.ion.
MEMORANDUM
TO: DEPARTMENT DIRECTORS
FROM: JIM McELRATH
SUBJECT: PURCHASE OF ENGINE ANALYZER AND SOFTWARE
DATE: April 24, 1998
BACKGROUND:
Vehicle Maintenance needs to purchase additional equipment in order to be able to
adequately maintain and repair late model vehicles, as well as to provide more accurate
diagnosis for all vehicles. At the present time the garage has plans from budgeted funds
for the immediate purchase of a engine scanner with certain diagnostic capabilities. While
this addition will be welcome and helpful, it will still leave the garage with diagnostic gaps
in two areas: engine analysis and complete factory/diagnostic manuals for all
passenger/light truck vehicles. In addition to a scanner, both of these are also needed to
accurately diagnose and repair the highly sophisticated modem engines, brake systems and
all electronic components and to more fully resolve driveability symptoms.
' These needs have been all too evident recently, particularly this current fiscal year, in the
outside repairs that have been necessary on late -model patrol cars that are no longer under
warranty. Since July 1, 1997, alone the City of Owasso has spent $3,600.00 for outside
t repairs that could not be accomplished due to lack of technical equipment. Also, there
have been numerous times that, while the Garage has not sent vehicles out for repairs,
added service time had to be spent on vehicles due to the lack of proper diagnostic
equipment. Finally, at times, the necessity of using a "trial and error" method of removal
and repair of electronic parts has also added to the expense of in -house repairs.
Although the Garage has a set of generic manuals that cover basic repairs and provide
safety - related information -- such as torque settings -- full diagnostic and repair capacity
can only be achieved with the ability to refer to factory manuals. This is particularly true,
and becoming more critical with each year, as pertains to the computerized and/or
electronic components of vehicles. Dealerships and some private shops, while possessing
the needed information, usually cannot take the time to look it up for the City's
technicians. Also, even when such research is graciously provided, Garage technicians are
hesitant to keep calling back to do the depth of analysis that is often necessary in the
course of a given repair. One also has to ask whether it is right constantly to ask these
sources to provide information, at the cost of their time and money.
MEMORANDUM
ANALYZER AND SOFTWARE PURCHASE
April 24, 1998
PAGE 2
ENGINE ANALYZER:
Garage staff has researched a number of possibilities for the purchase of an engine
analyzer. Many manufacturers provide such equipment. Two analyzers currently under
consideration are models made by Interro and Snap -On. All models provide an ignition
scope and four channel multimeter that allow complete diagnosis of ignition and
driveability problems. For the purposes of portability and use in driving tests, a handheld
device is considered to be the most suitable. All models under consideration provide the
feature of providing recording of data while test- driving an vehicle and electronically
"marking" the spot during the recording that the driveability problems occur. Prices for a
handheld analyzer are in the $6,000 to $6,500 range.
FACTORY MANUALS:
In addition to an analyzer, it is also necessary to subscribe to one of the services that
provides electronic, CD ROM service manuals for vehicles in our fleet. As already
indicated, present manuals, with a few exceptions during the last two years, are generic
and do not contain the information necessary for the advanced electronic diagnosis that
will be possible with a scanner and analyzer. Subscription to one of these services will
allow the discontinuance of purchase of expensive and bulky factory manuals and will also
provide the only means available to receive the Technical Service Bulletins that the
Manufacturers send out regularly. This is particularly critical in the case of our late -model
Police Vehicles as they continually go out of warranty. The information is updated four
times a year to ensure the availability of the latest information.
Cost, of a subscription to `Mitchell On- Demand' runs $5,652 for a five year subscription,
or approximately $1,130 per year. At the present time, depending upon the number of
new models purchased each year, the City is already spending from $150 to $300 per set
of bound factory and parts manuals, per vehicle model purchased. In the future, it would
no longer be necessary to spend these monies. Also, the latest set of parts manuals that
we received came on microfiche, a medium that we cannot utilize without the purchase of
a microfilm reader.
In addition to the Mitchell on Demand software, in order to fully utilize the capabilities of
the electronic equipment, it would also be necessary to purchase a subscription for GM
chassis software that would allow diagnosis and repair of such vehicle functions as
computerized brakes, not covered in software that is provided with engine software. The
cost of this software is $562.50 for a three year subscription.
MEMORANDUM
ANALYZER AND SOFTWARE PURCHASE
April 24, 1998
PAGE 3
RECOMMENDATION:
The total of the analyzer and software needed comes to $12,714.50. Vehicle Maintenance
staff recommends that the City set as ide this amount from the Equipment Contingency
Fund for the purchase of these items.
1
f]
MEMORANDUM
TO: DEPARTMENT DIRECTORS
FROM: JIM WELRATH
SUBJECT: VEHICLE MAINTENANCE PARKING LOT
DATE: April 24, 1998
BACKGROUND:
The parking lot at the City Vehicle Maintenance Facility is in need of a variety of repairs
or work:
1. For the sake of safety, the lot needs to reconfigured so as to remove the existing
northern entrance, which is too close to the intersection to be safe. Removal of
this entrance would also remove the possibility of vehicles driving too rapidly
through the parking lot from one entrance to the other. In conjunction with this
change, the southern entrance would have to be widened to allow adequate access
for two -way traffic. The lot itself would also need to be somewhat widened on the
west side to allow for the widened south entry and for the adequate width needed
for vehicles to turn around in the parking lot itself.
2. The drainage ditch is in need of erosion repair and beautification.
3. The parking lot itself has begun tp deteriorate in some areas due to constant, heavy
traffic and is in-need of repair.
4. The entire lot needs to be paved to provide the hard surface that would bring it
into conformance with City code. Paving would also provide a solution for the
constant problem with dust from the gravel surface.
Robert Carr has allowed Phil Lutz and Eric Mikel to do work providing preliminary cost
estimates for the above - listed work. Total cost is estimated at $35,500, but because of the t
preliminary basis of this projection, Mr. Lutz has recommended that $40,000 be set aside
for this project. '
J
MEMORANDUM
VEHICLE MAINTENANCE PARKING LOT
April 24, 1998
PAGE 2
RECOMMENDATION:
Support Services staff recommends that the Vehicle Maintenance Facility parking lot be
reconfigured and paved in accordance with the preliminary drawings and cost estimates of
the City of Owasso Engineering Department and that $40,000.00 be set aside from the
Equipment Contingency Fund and designated for these purposes.
ATTACHMENT:
Drawing and preliminary cost estimates for parking lot as provided by City of Owasso
' Engineering Department.
1
MEMORANDUM
TO: MANAGEMENT TEAM
CITY OF OWASSO
FROM: TIMOTHY ROONEY
ASSISTANT CITY MANAGER
SUBJECT: EQUIPMENT CONTINGENCY FUND
REQUEST FOR ALLOCATION OF FUNDS
DATE: April 27, 1998
BACKGROUND:
In FY 1997 -98, the Parks Department budget included $5,000.00 for the replacement of the
Gazebo roof at Friendship Park. This project, completed two weeks ago, has addressed the
water entering the structure through the roof through the entire replacement of the wood shingles
with heritage shingles. However, with the completion of this project, additional areas of
refurbishing are needed.
The water entering the roof has warped and/or water marked several areas of the "natural"
interior ceiling of the gazebo and should be replaced. Additionally, several of the floor boards
within the gazebo area also warped and /or water marked and should be replaced, if not the entire
floor itself. Both of these portions of the project will also require the "staining" of the wood
to a natural state.
Perhaps the more significant problem is the condition of the paint on the gazebo. If funded,
staff will be recommending a lighter color than the dark brown that the gazebo is currently
painted, hopefully selecting a color that will tie the structure into the new fence along the
Owasso Expressway.
Finally, upon the completion of these improvements, staff would also like to plant azalea bushes
around the base of the gazebo, between the sidewalk and the gazebo itself. This area is slightly
elevated, drains well, and should provide the necessary environment for that type of plant's
success. While significant discussion has been conducted regarding the need for Owasso to have
a "focal point," the current "focal point" identified by many who reside within or pass through
our community is the gazebo. The improvements outlined above will ensure a proud "focal
point."
RECOMMENDATION:
$5,000.00 be allocated to the "Buildings" line item of the Parks Capital Outlay Budget for
gazebo repairs.
I I
F1
LI
i
MEMORANDUM
TO: DEPARTMENT DIRECTORS
' FROM: JIM McELRATH
1 SUBJECT: SUPPORT SERVICES BUILDING
' DATE: April 24, 1998
1
BACKGROUND:
The Support Services Department has grown in both numbers of employees and in pieces
of equipment over the last few years. At the present time, since Support Services
'
administration is located in the City Garage, equipment for Support Services is kept in one
of the garage workbays. The accumulation of equipment in the garage welding/fabrication
1
bay has begun to infringe upon the garage facility to such an extent that it has begun to
interfere with garage functions. In addition to the overcrowding, there have been
numerous times that the need to perform maintenance /repairs or to accomplish fabrication
1
have also interfered with garage functioning, and, at times, even the safety of operations.
One partial remedy to this problem came earlier this fiscal year in the provision of a walled
trailer for storage of a good deal of the mowing/spraying equipment assigned to Support
Services. However, the need has not been erased, and nothing but further accumulation
and growth can be anticipated with future growth.
1
There is also a growing need on the part of Support Services to make and to warehouse
bulk purchases for savings of scale. At the present time there are very few options for
1
long -term storage except in rental spaces. Finally, for some time, Support Services has
been exploring the possibility of acting as a depository and check out point for various
1
tools needed by departments on an occasional basis.
The negative overcrowding and the positive need to expand services both point to the
1
need for an expansion of facilities. Support Services has done research and determined
that a storage /work building of 30 feet by 15 feet would serve the department's needs
described above for the next five years. Although this would by nature be a somewhat
'
temporary solution, it would alleviate current overcrowding and also allow Support
Services to begin to explore some long - considered expanded avenues of service.
' Support Services has researched various possibilities for buildings, and has determined
that the best site for such a building would be immediately adjacent to and west of the City
Garage. It is proposed that a 4,500 square foot building be built on a concrete slab, from
1 -
MEMORANDUM
SUPPORT SERVICES BUILDING
April 24, 1998
PAGE 2
a custom pre -cut kit, with a garage door at the south end and two steel entry doors, with
three windows on each side. The and w d be insulated and sheetro ked. eat. It would
be wood frame, with shingle roof would
Proposed plans for the building have been drawn up utilizing as a basis plans drawn up by
the plans department at Builder's Square. Electrical costs are based upon two. estimates
received from Electrical contractors. Except for electrical and plumbing work, labor for
the construction of the buildingwould
tedphat provided by
onssruc�on would be employees,
the the
assisted by DOC workers. It is
September 1, 1998.
Costs would break down as follows:
I. Building and slab: $3.075.00
2. Electrical installation: $2,150.00
3. Gas plumbing and heater: 4
Total: $5,725.00
RECOMMENDATION:
Support Services staff recommends that the City set aside $5,725.00 of the Equipment
Contingency Fund for the construction of a building for the use of Support Services
Department.
ATTACHMENTS:
Various documents relating to the plans and estimates for building construction.
I MEMORANDUM
TO: HONORABLE MAYOR AND COUNCIL
CITY OF OWASSO
FROM: H. DWAYNE HENDERSON, P.E.
CAPITAL PROJECTS MANAGER
' SUBJECT: REQUEST FOR APPROVAL OF CHANGE ORDER NO. 2
1998 BOND ISSUE PROJECTS - SPORTS PARK PARKING LOT
EXPANSION
DATE: MAY 12, 1998
BACKGROUND:
in
On March 17, 1998, the City Council awarded a bid to Horizon Construction Co. Inc., of Owasso
for the purpose of constructing the expansion of the large parking lot at the Owasso Sports Park.
Necessary documents were returned to the City Clerk's office and the construction of the
improvements began on Monday, April 13, 1998. The total contract amount for the improvements
was $77,777.77.
On April 21, 1998 Change Order No. 1 for this project was approved by City Council for a not to
' exceed cost of $8,299.75 for the repair of unstable subgrade. The soil encountered in the subgrade
was a mixture of silt and clay. The top 18 inches of the unstable areas was comprised of silt with the
clay layer below. Horizon Construction Co. Inc., suggested that the most cost effective alternative
' was to excavate the subgrade to a depth of 24 inches and mix the silt and clay materials together. This
process would bind the two soils together and allow for adequate stability and compaction. Change
Order No. 1 was recommended by staff as a trial solution to the problem.
This olution roved successful on 80% of the unstable are but unsuccessful on an area at the
s p a,
' southwest corner of the parking lot and a small area at the northeast corner of the parking lot. These
two areas have a high silt and high moisture content and a low clay content. These conditions warrant
the need for fly ash to be incorporated into the top 24 inches of the soil to help reduce the moisture
and stabilize the silt.
Horizon Construction Co. Inc., has submitted a proposed cost estimate to repair the two areas with
fly ash.(Attachment 1) A copy of the proposed parking lot expansion with the two areas
r superimposed is included for your review (Attachment 2), as well as the proposed cost estimate
submitted by Horizon Construction Co. Inc.
�1
Page 2
Request for Approval of Change Order No. 2
1998 Bond Issue Projects - Sports Park Parking Lot Expansion
May 12, 1998
FUNDING:
The allotted funding for this project, through the bond election, is $150,000.00. The original cost of
the bid awarded to Horizon Construction was $77,777.77 and the addition of Change Order No. 1,
Attachment 3, increased the total cost by $6,616.87 to $84,394.64. Change Order No. 2,
(Attachment 4) increases the project cost by $4,384.67 to $88,779.31. The budgeted surplus for this
project is $65,605.36, therefore sufficient funding is available.
RECOMMENDATIONS:
Staff recommends Council approval of Change Order No. 2, a change order in the amount not to
exceed $ 4,384.67.
ATTACHMENTS:
1. Proposed Cost Estimate
2. Site Map
3. Change Order No. 1
4. Change Order No. 2
S -07 -1998 7.07AM FROM HORIZON CONST CO 9182346507 P.7
a
PROPOSAL REQUEST NO.TWO
nC10 ON CONSTRUCTION COMPANY INC.
PARKING LOT AT OWASSO SPORTS PARK
J 0.1042
OWASSO, OKLAHOMA
MATOR: MAX WOLF
OWNER: CITY OF OWASSO
RATE: — _ 07- May -98
DESCRIPTION AND ITEMS
-- .,......
I J MATERIAL J
LABOR
I QUANITY UNIT I UNIT I EXTENSION I CODE I
UNIT 1 EXTENSION I `COOS
- _._ - --
J PRICE I TOTAL I NO, J
- -------- - - - - -- I — I -- I - -•- - -- I --
PRICE I TOTAL J NO.
_.-- --
I
I I 1 0.001 !
-- I — - -----
i 0.00 — I
-Y -ASH UNSTABLE SUBGRADE
, . . 1 33.3
, 0
0.45 600.00 i J
_Y.ASH
�
I 80.50 1 TN 22.00 1,771.00 I
I o.00 I I
i i 1 I 0.00 I 1
0.00 I I
I i I 0.00 i f
I 0.0o I i
!
J
I
f f ! ! 0.00j I
I 0.00j I
I I I I 0.00 ; I
I 0.00 ! I
I I I I 0.00 J I
1 0.00 ! j
I I I 0.00 I i
I 0.00 J I
E I I 0.00 I I
I 0.00
SUB -TOTAL MATERIALS
, — °.- . — 2,904.33
0.00 j I
SUB -TOTAL LABOR
- --
SUPERVISION I J WKS (
600.00 I I
950,00 j 0.00 I 1
DRAY I I J
I 0.00 ]
EQUIPMENT RENTAL J I LS I
450.00 I 0.00 I I
SALES TAX ON MATERIAL I j 0.00% J
PAYROLL INS. & TAXES I 1 42.00% I
I 0,00 I I
I 252.00 ] )
TOTAL HORIZON HORIZON WORK
- — - i
3_._7_56_.33
SU9CONTRACTS
I
�
�S
0.02
J 56.34 J I
SUBTOTAL I 3,812.67 I
I _ VERHEAD AND PROFIT
15% 1
J 572.00 1 1
f TOTAL ADD
PER $Y 3.29
I 4,384.67 I I
—7V Gam.
APPROVED
DATES= J
DATE
RIZON CONSTRUCTIP< COMPANY INC.
-
OWNER -� --
— -- -_ �� - - --
1
i )
TRAN. #1
(EX.)
EX, FIELD #E PROPOSED
PARKING
LOT
FILL AREA 1
D 250'
Lso X.50
PROPOSED
PARKING
LOT
0
0
0
0o
EXISTING EXISTING
FIELD #2 'FIELD##5'
PROP,
❑ C °mil F-----,
PROPOSED I PROPOSED
FIELD #1 FIELD #6
PROPOSED
FIELD #12
PROP,
❑ CON,
PROPOSED
FIELD# 7
FILL AREA 2
'ROP. TRAN42
CITY OF ❑WASSO OK,
n,
❑WASS❑ SPORTS —PARK
PROP. PSO TRANS. LOCATION "iG'
■ V,
s
PROJECT:
Parking Lot at Owasso Sports Park
TO CONTRACTOR:
Horizon Construction Co Inc
CHANGE ORDER
CHANGE ORDER NUMBER: 1
DATE: April 21, 1998
CONTRACT DATE: March 17, 1998
CONTRACT FOR: Parking Lot
'
The Contract is changed as follows:
'
Stabalize subsurface soil conditions
'
Not valid until signed by the Owner and Contractor
The original Contract Sum was
$77,777.77
Net change by previously authorized Change Orders
$ -0-
The Contract Sum prior to this Change Order was
$77,777.77
'
The Contract Sum will be (increased) (docseased) (efthmind) by this
Change Order in the amount of
$ 66 1 6.87
The new Contract Sum including this Change Order will be
$
The Contract Time will be One (demr me (unchanged) by
—o— days.
The date of Substantial Completion as of the date of this Change
Order therefore is
'
NOTE: This summary does not reflect changes in the Contract Sum Time
which have been authorized by Construction
Change Directive.
Horizon Construction Co Inc
CONTRACTOR
PO Box 690
ADDRESS
Owasso OK 74055
BY
DATE April 21 1998
wpdata\fomrs\d nordr.frm
City of Owasso
OWNER
PO Box 180
ADDRESS
Owasso OK 74055
BY 42)G2,(z
DATE April 21 1998
PROJECT:
Parking Lot at Owasso Sports Park
TO CONTRACTOR:
Horizon Construction Co Inc
CHANGE ORDER
CHANGE ORDER NUMBER: 2
DATE: May 12, 1998
CONTRACT DATE: March 17, 1998
CONTRACT FOR: Parking Lot
The Contract is changed as follows:
Add flyash to subsurface soil conditions to stabalize
Not valid until signed by the Owner and Contractor
The original Contract Sum was $77,777.77
Net change by previously authorized Change Orders $ 6,616.87
The Contract Sum prior to this Change Order was $84,394.64
The Con_ tract Sum will be (increased) (dee£essed) (uae4maged) by this
Change Order in the amount of $ 4,384.67
The new Contract Sum including this Change Order will be $88,779.31
The Contract Time will be (ifressed) (deffeased) (unchanged) by ( -0- ) days.
The date of Substantial Completion as of the date of this Change
Order therefore is
NOTE: This summary does not reflect changes in the Contract Sum Time which have been authorized by Construction
Change Directive.
Horizon Construction Co Inc
CONTRACTOR
PO Box 690
ADDRESS
Owasso, OK 74055
BY
DATE mgy 19, 1 94ft
wpd&UWb=\d ngoidr.frm
City of Owasso
OWNER
PO Box 180
ADDRESS
Owasso, OK 74055
DATE
I MEMORANDUM
1
11
1
1
1
TO: HONORABLE MAYOR AND COUNCH,
CITY OF OWASSO
FROM: H. DWAYNE HENDERSON, P.E.
CAPITAL PROJECTS MANAGER
SUBJECT: 1998 BOND ISSUE PROJECTS
ARCHITECTURAL/ENGINEERING (A/E) FIRMS FEE
NEGOTIATIONS
DATE: MAY 12, 1998
BACKGROUND:
In October 1997, the citizens of Owasso approved a $10 million bond issue for Capital Improvement
Projects within the City of Owasso. Projects in the bond issue included street and intersection
improvements, remodeling of two existing facilities, construction of a New City Hall and
improvements to the Owasso Sports Park. In November 1998, the City of Owasso employed a
Capital Projects Manager to oversee the projects and the Architectural/ Engineering (A/E)
procurement and Program Management Team (PMT) negotiation process was initiated. A chronology
of the A/E procurement procedure and the PMT negotiations services is shown as Attachment 1.
In order to compete with the 1998 Oklahoma Department of Transportation Capital Improvement
Program, the City of Owasso combined the Bond Issue Projects into one package for A/E design
services. Staff felt that combining the projects would gain the attention of the larger A/E firms in
Tulsa, which would not have occurred if the projects were separated.
ARCHITECTURAL/ ENGINEERING QUALIFICATIONS:
On December 5, 1997, Request for Qualifications (RFQ) were sent to area A/E firms informing them
of the projects and the intent of the City of Owasso to procure A/E services. On January 9, 1998,
seventeen (17) firms submitted Qualification Statements in response to the RFQ. Each RFQ was
reviewed by members of a Selection Committee, comprised of Mayor Barnhouse; Councilor Bode;
Rodney Ray, City Manager; Robert Carr, Public Works Director; Mark Brown, City of Tulsa Traffic
Engineer and Owasso resident; and Dwayne Henderson, Capital Projects Manager. The Statements
were ranked according to the total number of evaluation points assigned by the committee and the
three (3) top ranked firms were determined to be "Qualified and Highly Responsive." These firms are:
Page 2
Architectural/Engineering (A/E) Firms Fee Negotiations
May 12, 1998
(1) CH2MHill/ Page•Zebrowski (CH2/PZ)
(2) Burns & McDonnell/ Bruton Knowles & Love (BM/BKL)
(3) Dewberry Design Group (DDG).
Each firm was requested to submit a detailed Scope of Services and Fee Proposal for final evaluation.
ENGINEERING PROPOSALS:
The firms submitted Scope of Services and Fee Proposals on March 26, 1998. Office visits to each
firm were conducted by Mr. Carr and Mr. Henderson on March 19, March 20 and April 7, 1998.
Interviews/ presentations of each firm were held with the Selection Committee on March 30 and 31,
1998. On April 6, 1998, the Selection Committee met to review the presentations and tabulate final
scores of each team. The firms were ranked as follows and proposed fees summarized as follows:
The team selected for negotiations was MMHM/Page•Zebrowski.
SCOPE AND FEE NEGOTIATIONS:
On April 23, 1998, Mr. Carr and Mr. Henderson met with CH2/PZ at their offices to discuss the
Scope of Services and A/E fees. The proposed concept presented in the proposal scope of work
detailed the intent of the City to utilize two (2) teams comprised of the A/E and a Program
Management Team (PMT). The PMT is to consist of construction management, engineering and
space planning professionals and is intended to supplement the A/E team during construction. As a
result, some definition of services was needed to clarify the roles of the A/E and PMT for the City
Hall, Community Center and Police Department Projects. Since the A/E portion of work was
expected to be significantly affected by the PMT Scope of Work, Mr. Joe Waters of the Lioness
Group and Cowen Construction, the proposed City of Owasso PMT for the architectural projects,
were asked to be at the meeting to clarify their roles in the project and to resolve any questions
CH2/PZ had in regards to Scope of Work. The Scope of Work of the PMT and the A/E were
discussed in detail, which helped to reduce fees.
Page 3
Architectural/Engineering (A/E) Firms Fee Negotiations
May 12, 1998
Negotiations continued the entire week of April 27, 1998 to reduce the A/E fees to what staff felt was
acceptable. Attachment 2 summarizes the original fee proposal by CH2/PZ and the reductions made
throughout the negotiation process.
The significant reduction in fees from $920,976 to $562,171 was based largely on clarifying the role
of the PMT to the A/E, allowing the A/E to be involved in the planning phase with the PMT and
reducing unnecessary work items. Also, defining the responsibilities of the Capital Projects Manager
helped reduce fees by deleting unnecessary administrative duties proposed by the A/E. A detailed
description of the negotiated items are listed below.
OR Architectural Projects:
Programming - New City Hall and Police Station: The programming document for a new building
' is the first step in an architectural project. The document is a result of interviews with key personnel
to determine departmental needs, such as office and storage space, equipment, parking, electrical and
mechanical upgrades, furniture planning and other items that need to be accounted for before initial
design begins. A planning document will be needed for the New City Hall and the New Police Station
in order to determine the needs before design begins. The PMT has proposed to prepare the
programming document as part of their scope. In order to reduce A/E fees needed to become familiar
' with this document, the A/E proposes to assist the PMT with the programming document.
Community Center: The programming document for this project will be reduced to a Roof Study
where three (3) alternatives and associated sketches of each alternative will be prepared by the A/E.
The PMT will prepare a cost estimate of each alternative and present the information to the City of
r Owasso for selection.
Design, Bidding and Construction: The A/E scope of work was reduced by eliminating unnecessary
details and deleting items that overlapped with the PMT Scope. These items are:
(1) A/E will prepare only one set of contract documents (in lieu of multiple
contracts) and the PMT will administer the individual contracts;
(2) A/E will prepare only one final design and one color rendering after the final
building layout has been accepted. Building selection shall be made by utilizing
schematic plans and pencil sketches;
(3) Value engineering sessions will be combined with the regular progress meetings;
(4) PMT will be responsible for preparing meeting minutes, reviewing pay requests,
approving quantitative change orders (not design change orders); and
(5) PMT will be responsible for bidding the projects by discipline.
10
Page 4
Architectural/Engineering (A/E) Firms Fee Negotiations
May 12, 1998
Engineering Projects:
General: The scope of work of the A/E was reduced by deleting items that overlapped with the duties
of the Capital Projects Manager. They are:
(1) Reviewing and approving all pay requests;
(2) Reviewing and approving all contractor submittals; '
(3) Providing base maps of all utilities; ,
(4) Providing property ownership and right -of -way maps for each project; and '
(5) Providing thorough review of all reports and preliminary plans and specifications
to reduce needed time in final design. I
Intersection Projects: The scope of work for each project was reduced by combining project designs
and several items. Those items are as follows: I I
(1) The preliminary engineering, design phases and contract documents shall be for
the major intersection projects will be combined. Construction shall be in phases; ,
(2) Oklahoma Department of Transportation standard drawings and construction
specifications shall be utilized throughout the projects. These documents are used
by the City of Owasso and will reduce A/E design time.
Street Resurfacing Projects: Carlsbad, Atlanta Beaumont and I' Street shall be combined into one
contract, but constructed in phases.
FUNDING SOURCE:
The funds for the A/E fees are included in the $10 million Bond Issue.
SUMMARY COMMENTS:
Based on previous experience with CH2MHi11 (they presently are providing engineering design
services for the U.S. Highway 169/ East 76'' Street North Interchange Improvements), the final
negotiated A/E fees and our meetings with the design team, staff recommends the award of the A/E
design services for the City of Owasso Capital Improvement (Bond Issue) Projects to CH2MHilU
Page•Zebrowski. Attachment 3 is the completed Agreement of Engineering Services. The contract
has been submitted to the City Attorney for review.
Page 5
Architectural/Engineering (A/E) Firms Fee Negotiations
' May 12, 1998
RECOMMENDATIONS:
r
Staff recommends award of the A/E Design Services for the Owasso Capital Improvement (Bond
Issue) Projects to CH2MHi11/ Page•Zebrowski in the lump sum amount of $562,171.
Pi ATTACHMENTS:
I. Chronology of A/E Procurement Process
' 2. Fee Negotiation Progression
3. Agreement for Engineering Services
t
a
City of Owasso
Bond Issue Projects - Chronology of A/E Procurement Process
Prepared Bv: Owasso Public Works Denartment Mav 12 1 QQR
EVENT
DATE OCCURRED
REQUEST FOR QUALIFICATIONS (RFQS) MAILED TO A/E FIRMS
DECEMBER 5, 1997
SUPPLEMENTAL INFORMATION SENT TO A/E FIRMS
DECEMBER 11, 1997
ADVERTISEMENT PLACED IN TULSA WORLD AND OWASSO REPORTER
DECEMBER 12, 1997
RFQS RECEIVED AT PUBLIC WORKS
JANUARY 9, 1998
RFQS DISTRIBUTED TO SELECTION COMMITTEE
JANUARY 15, 1998
SELECTION COMM 11= RFQ REVIEW MEETING
JANUARY 26, 1998
SELECTION COMMTITEE RFQ FINAL REVIEW MEETING
FEBRUARY 2, 1998
PMT AND ARCHITECTURAL SCOPE OF SERVICES REQUESTED FROM LIONESS
REALTY GROUP
FEBRUARY 5, 1998
PMT SCOPE OF SERVICES RECEIVED FROM LIONESS REALTY GROUP
FEBRUARY 20, 1998
ARCHITECTURAL SCOPE OF SERVICES RECEIVED FROM LIONESS REALTY GROUP
FEBRUARY 25, 19981
REQUEST FOR PROPOSALS (RFPS) MAILED TO SHORT LISTED FIRMS
FEBRUARY 26, 1998
OFFICE VISIT TO CH2MHILL/ PAGE ZEBROWSKI
MARCH 19, 1998
OFFICE VISIT TO BURNS & MCDONNELLJ BRUTON KNOWLES & LOVE
MARCH 20, 1998
RFPS RECEIVED AT PUBLIC WORKS
MARCH 26, 1998
RFPS DISTRIBUTED TO SELECTION COMMITTEE
MARCH 27, 1998
PRESENTATIONS BY BURNS & MCDONNELL/ BRUTON KNOWLES & LOVE
MARCH 30, 1998
PRESENTATIONS BY CH2MHILU PAGE ZEBROWSKI
MARCH 31, 1998
PRESENTATIONS BY DEWBERRY DESIGN GROUP
MARCH 31, 1998
OFFICE VISIT TO DEWBERRY DESIGN GROUP
APRIL 7, 1998
SELECTION COIvIIMITTEE FINAL SELECTION MEETING
APRIL 13, 1998
=N[HILLI PAGE ZEBROWSKI INFORMED OF DTIENT TO NEGOTIATE
APRIL 15, 1998
I �
I I
I i
I �
I �
ATTACHMENT 1 I
I 1
I �
Page 2
Attachment A
Chronology of A/E Procurement Process
NEGOTIATIONS V= CH2MHII.L/PAGE ZEBROWSKI WT-RE HELD AT CF.2,MHILL.
LIONESS REALTY GROUP AND COWEN CONSTRUCTION WERE PRESENT TO
CLARIFY PMT SCOPE OF SERVICES
APRIL 23, 1998
RECEIVED FIRST REVISED FEE PROPOSAL FROM CH2MHILL/ PAGE ZEBROWSKI
APRIL 27, 1998
RECEIVED PRELIMINARY PMT FEE PROPOSAL FROM LIONESS REALTY GROUP
APRIL 29, 1998
RECEIVED SECOND REVISED = PROPOSAL FROM C92MHII_L/ PAGE ZEBROWSKI
APRIL 29, 1998
SENT CH2MHIL.L/ PAGE ZEBROWSKI TARGET FEE
APRIL 30, 1998
RECEIVED SAMPLE COMPARATIVE ANALYSIS FROM LIONESS REALTY GROUP
APRIL 30, 1998
RESPONDED TO ORIGINAL PMT FEE PROPOSAL AND SCOPE OF WORK
MAY 1, 1998
STAFF MET TO DISCUSS PMT PROPOSAL AND A/E OPTIONS
MAY 4, 1998
RECEIVED CH2MHII.0 PAGE ZEBROWSKI FINAL FEE PROPOSAL
MAY 4, 1998
STAFF MET TO DISCUSS FINAL A/E PROPOSAL AND DECIDED TO RECOMMEND
CH2M1M.LI PAGE ZEBROWSKI FOR A/E SERVICES CONTINGENT COMMENTS
FROM PMT ON A/E SCOPE.
MAY 6, 1998
RECEIVED FINAL SCOPE AND FEE PROPOSAL FROM PMT
MAY 8, 1998
RECEIVED FINAL REVISED SCOPE AND FEE PROPOSAL FROM A/E
MAY 11, 1998
STAFF RECOMMENDATION OF CONTRACTS
MAY 12, 1998
ATTACHMENT 1
..;
CITY OF OWASSO
BOND ISSUE PROJECTS
A/E FEE COMPARISONS
PREPARED BY:
OWASSO PUBIJC
WORKS
C'H2MIIII,IJPZ
OS/05H8 -- ITEM
ORIGINAL
ADJUSTED
%OF
%
%OF
%OF
CONSTRUCTION
CONSTRUCTION
ORIGINAL
ADJUST.
04/27/98
ADJUST.
04/30/98
ADJUST.
05/04/98
ADJUST.
BUDGET
BUDGET
FEES
CONST.
FEES
CONST.
FEES
CONST.
FEES
CONST.
DESCRIPTION
INTERSECTION AND SIGNALUATION IMPROVEMENTS
861N SIR. N. AND MINOO ROAD INTERSECTION
$580,000,00
$580,000.00
$80,42800
13.9%
9 3°,o
$54 14800
9.3 °0
$43 500.00
7.5%
76TH 3 N. AND N. 1291'1 E. AVE. INTERSECTION
$775 000.00
$775 000.00
$94 75800
10.9%
56 533.00
7 3 °io
556 533 (X)
7.3°0
556 50000
7.3%
.
116TH STR. N. AND OARNETT ROAD INTERSECTION
$510 000.00
$510 000.00
$84 758.00
166%
56 567.00
11 1 °h
$56 567.00
11.1%
543 800.00
i.6%
861 -H STR N. AND N 145111 E. AVE. INTERSECTION
$775,000.00
$773,00000
$94.758,00
10.9%
$56_533,00
73%
$56 533.00
7.3%
$56.5W.00
7.3%
86TH STR N. AND N 123k 1) E. AVE INTERSECTION
$65 0N) (K)
$65.000.00
$28.05300
43.2%
$19,65200
30 2%:
$19,65200
30.2%
$16,47200
%
SUBTOTA I.: INTERSECTION AND SIGNALIZATION PROJECTS
S2,705,000.00
S2 705 000.00
5362 757.00
13.4%
5243 433.00
9 0°/6
S24J 43J.00
9.01/6
S216,772.00
.0%
STREET REHABILITATION
--
-
RESURFACE N MAI N STR I ST TO 9TH STR
$280,00000
$280,000,00
$52,65900
$51.3 27 00
551 327.00
$51 300.00
RESURFACE AII.ANIA 3R1)TOII III SIR .
$I800W.00
__--
-_ -. --
_
RESURFACE CARLSBAD 3RD TO 5111STIL AND BEAUMONT
$175000.00
RESURFACE N 129111 F AVE. HIGH SCHOOL TO E. 93RD ST. N.
S85 000.00
RESURFACE E 86 I'll S'1'K MAIN TO MINOO
$3S OW W
-
-
RESURFACE 1 I II I SI R NIAIN TO CEDAR
$31,000,00
$50,000.00
SUB7'O 'I'A1.: STREET REIIIABILTTATION PROJECTS
S786,000.00
S1,175,000-00
S52,659.00
4.5%
$51 27.00
4.4%
_$51 27.00
4.4%
$51,300.0
4A%
NEW SPORTS PARK CONSTRUCTION
NEW FOUR PLEX SOFI'BAI.L/BASEBALL FIELDS
S241,000.00
$241,000.00
$28,100.00
11.7%
528 100.00
11.7%
S28,100.0
11.7•/.
$25-300.00
1 10.5%
NEW CITS' IIA1.1/EXISTING FACILITY IMPROVEMENTS
CONSTRUCT NEW CITY l{A1.L FACILITY
$2,500,000.00
$277 743.00
11.11/0
$229.000,00
92',/.
$214,000.00
82%
$196491.W
7.9%
RENOVATE EXIS'T'ING CITY HALL FOR POLICE DEPARTMENT
$600000.00
SI32 587.00
22.1%
$125.667.00
20
$8o,667 0o
13.4%
$62,878,00
10.5%
REPLACE ROOF AND CAR PET AT CONOAUMTY CENTER
ES3J35,000.00
$235 000.00
566 630.00
28.4%
$53.925,00
22.9%
$36,300,00
15.4%
$9.43000
4.0%
SUBTOTAL: NEW CITY HALI /EXISTING FACILITY P"ROVEMENTS
u 35 000.00
S476,960.00
14.30/(6
5408 592.00
12.3%
S32U %7.00
9.6%
S268 799.00
8.1%
TOTAL PROJECT BUDGET
f7 067 000.00
197 456 000.00
5920176.00
12 3•N►
S731,452.00
9.8%
S643,827.00
8.6%
'9562-171
7.5%
ATTACHMENT
' Agreement
for
' Engineering Services
Capital Improvement Projects
' City of Owasso, Oklahoma
ITUUGWAS=C1P /C0NTRACT.D0C Attachment 3
THIS AGREEMENT, made and entered into this day of ,
between the City of Owasso, Oklahoma, a Municipal Corporation, of the State of
199
Oklahoma, hereinafter referred to as CITY, and CH2M HILL, INC., hereinafter referred to
'
as ENGINEER;
'
WITNESSETH:
intersection improvements, architectural
WHEREAS, CITY intends to construct street and
and a sports park expansion project, collectively hereinafter referred to as th6
projects,
'
PROJECT; and,
WHEREAS, CTTY requires certain professional services in connection with the PROJECT,
'
hereinafter referred to as the SERVICES; and,
Architects Planning
WHEREAS, ENGINEER, in association with Page•Zebrowski and
Design Group, is prepared to provide such SERVICES;
tWHEREAS,
funding is available for the PROJECT through the 1997 Capital Improvement
Projects bond election.
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROTECT. The scope of the PROJECT is described in Attachment A,
'
SCOPE OF PROTECT, which is attached hereto and incorporated by reference as part
of this AGREEMENT.
'
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. CTI -y�S RESPONSIBILITIES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBIL.TTIES OF THE CITY, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D,
COMPENSATION, and further described in Attachment E, FEE /MANHOUR
'
BREAKDOWN, which are attached hereto and incorporated by reference as part of
this AGREEME'N'T.
SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B,
SCOPE OF SERI VICES, in accordance with the schedule set forth in Attachment F,
SCHEDULE, attached hereto and incorporated by reference as part of this
'
AGREEMENT.
ITUUGWAS=C1P /C0NTRACT.D0C Attachment 3
.8
6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with
the applicable laws and regulations published and in effect at the time of
performance of the SERVICES. The PROJECT shall be designed and engineered in a
good and workmanlike manner and in strict accordance with this AGREIIv1ENT'. All
engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by CITY. All
architectural work shall be performed by or under the supervision of a Professional
Architect licensed in the State of Oklahoma, and properly qualified to perform such
architectural services, which qualification shall be subject to review by CITY. Other
than the obligation of the ENGINEER to perform in accordance with the foregoing
standards, no warranty, either express or implied, shall apply to the SERVICES to be
performed by the ENGINEER pursuant to this AGREEMENT or the suitability of
ENGINEER'S work product
7. LIlyETATION OF RESPONSIBILITY.
7.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
8. OPINIONS OF COST AND SCHEDULE.
8.1. Since ENGINEER has no control over the cost of labor, materials, equipment,
or services furnished by others, or over contractors', subcontractors', or
vendors' methods of determining prices, or over competitive bidding or
market conditions, ENGINEERS cost estimates shall be made on the basis of
qualifications and experience as a Professional Engineer and Professional
Architect
8.2. Since ENGINEER has no control over the resources provided by others to
meet construction contract schedules, ENGINEER'S forecast schedules shall
be made on the basis of qualifications and experience as a Professional
Engineer and Professional Architect
9. USABRM AND INDEMNIFICATION.
9.1. ENGINEER shall defend and indemnify CITY from and against legal liability
for damages arising out of the performance of the SERVICES for CITY,
including but not limited to any claims, costs, attorney fees, or other
expenses of whatever nature where such liability is caused by the negligent
act, error, or omission of ENGINEER, or any person or organization for
whom ENGINEER is legally liable. Nothing in this paragraph shall make the
ENGINEER liable for any damages caused by the CITY or any other
contractor or consultant of the CITY.
92. ENGINELI� shall not be habie to CI Y for any special, indirect or '
consequential damages, such as, but not lirruted to, loss of revenue, or loss of
anticipated profits.
TUL10WASS0VCIPICCNTRAC T. DCC
' 10. COMPLIANCE WITH LAWS.
10.1. In performance of the SERVICES, ENGINEER shall comply with applicable
regulatory requirements including federal, state, and local laws, rules,
' regulations, orders, codes, criteria and standards. ENGINEER shall procure
the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring
permits, certificates, and licenses required for any construction unless such
responsibilities are specifically assigned to ENGINEER in Attachment B,
SCOPE OF SERVICES.
10.2. The ENGINEER shall take the necessary actions to ensure its facilities are in
compliance with the requirements of the Americans With Disabilities Act. It
' is understood that the program of the ENGINEER is not a program or
activity of the CITY OF OWASSO. The ENGINEER agrees that its program or
activity will comply with the requirements of the Americans With
' Disabilities Act. Any costs of such compliance will be the responsibility of
the ENGINEER. Under no circumstances will ENGINEER conduct any
activity deemed to not be in compliance with the Americans With
Disabilities Act
11. INSURANCE.
11.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
11.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the
aggregate, and with property damage limits of not less than $100,000
' for each occurrence and not less than $100,000 in the aggregate.
11.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each
' accident and with property damage limits of not less than $100,000
for each accident
' 11.13. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not
less than $100,000 for each occurrence.
' . 11.1.4. Errors and Omissions Insurance to o remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions
coverage to be for a minimum of $1,000,000, deductibles subject to
approval.
11.2. ENGINEER shall furnish CITY certificates of insurance which shall include a
provision that such insurance shall not be canceled without at least 30 days
w- ritten nctice to the CITY.
12. OWNERSHIP AND REUSE OF DOCliMENTS.
12.1. All documents, including original drawings, estimates, specifications, field
notes and data shall become and remain the property of the CITY.
ITutJQWASSO /aNCONTRACT.DOC
122 CITY'S reuse of such documents without written verification or adaptation
by ENGINEER for the specific purpose intended shall be at CTIY5 risk
13. TERMINATION OF AGREEMENT.
13.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
13.2. CITY shall have the right to terminate this AGREEMENT, or suspend
performance thereof, for CITY'S convenience upon written notice to
ENGINEER; and ENGINEER shall terminate or suspend performance of
SERVICES on a schedule acceptable to CITY. In the event of termination or_
suspension for CITY'S convenience, CTFY shall pay ENGINEER for all
SERVICES performed to the date of termination in accordance with
provisions of Attachment D, COMPENSATION. Upon restart of a suspended
project, payment shall be made to ENGINEER in accordance with
Attachment D, COMPENSATION.
14. NOTICE.
14.1. Any notice, demand, or request required by or made pursuant to this
AGREEMENT shall be deemed properly made if personally delivered in
writing or deposited in the United States mail, postage prepaid, to the
address specified below.
To ENGINEER: CH2M HILL, Inc.
502 South Main, Suite 400
Tulsa, Oklahoma 74103 -
Attention: Jerry Farrar
To CITY: CITY OF OWASSO, OKLAHOMA
P.O. Box 180
Owasso, Oklahoma 74055
Attention F. Robert Carr, Jr.
14.2 Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and CITY.
15. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considereed to
be in default of this AGREEMENT if delays in or failure of performance shall be d1ue
to forces which are beyond the control of the parties; including, but not limited too:
fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance,
sabotage; inability to procure permits, licenses, or authorizations from any state,
local, or federal agency or person for any of the supplies, materials, accesses, or
services required to be provided by either CITY or ENGINEER under this
AGREEMENT.- str es, work slo,.vdow n s or otter labor disturbances, and judicial :
restraint.
TUL/ownsso/aa/C0NTRACT.D0C
'
16. SEVERABILTTY. If any portion of this AGREEMENT shall be construed by a court
herefrom,
of competent jurisdiction as unenforceable, such portion shall be severed
'
and the balance of this AGREEMENT shall remain in full force and effect
includes Attachments
17. INTEGRATION AND MODIFICATION. This AGREEMENT
A, B, C, D, E, F and represents the entire and integrated AGREEMENT between the
'
parties; and supersedes all prior negotiations, representations, or agreements
pertaining to the SCOPE OF SERVICES herein, either written or oral. This
AGREEMENT may be amended only by a written instrument signed by each of the
Parties.
18. DLSPUTE RESOLUTION PROCEDURE. In c: -e event of a dispute between the
ENGINEER and the CITY over the interpretation or application'of the terms of this
AGREEMENT, the matter shall be referred to the City's Director of Public Works for
resolution. If the Director of Public Works is unable to resolve the dispute, the
matter may, in the Director's discretion, be referred to the City Manager for
resolution. Regardless of these procedures, neither party shall be precluded from
exercising any rights, privileges or opportunities permitted by law to resolve any
dispute.
19. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
20. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the Public Works
Department of the City of Owasso, and any plans or specifications not meeting the
'
terms set forth in this AGREEMENT will be replaced or corrected at the sole expense
of the ENGINEER. The ENGINEER will meet with the City staff initially and
'
monthly thereafter and will be available for public meetings and /or City of Owasso
presentations.
21. KEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has
'
designated Jerry B. Farrar, P.E., as Project Manager for the collective projects
described herein; Kathleen Page, AIA, as Project Architect for the architectural
related projects; Kenneth E. Hill, P. E., as Lead Design Engineer for the street and
for
tintersection
improvement projects; and Jim Crosby, ASLA, as Project Architect
°:'
the Sports Park Expansion project. ENGINEER agrees that no change will be made
in the assignment of these positions without prior approval of CM.
ITUtJOWASSOICIPIC- TPACT -DOC
H
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies`
on the respective dates herein below reflected to be effective on the date executed by the
Mayor of the City of Owasso.
APPROVED:
City Clerk
APPROVED AS TO FORM:
City Attorney
TULj0wASS0jCtPIC0NTRACT. DOC
CH2M HILL, Inc.
Murry L. Fleming, Vice President
Date
CITY OF OWASSO, OKLAHOMA
Mayor
Date
0
s
1
7,
Agreement
for
Engineering Services
City of Owasso, Oklahoma
Capital Improvement Projects
Scope of Project
Attachment A
SCOPE OF PROJECT, The PROJECT shall consist of the collective listing of projects
included in this Attachment A and further described as follows:
The 1998 Capital Improvement Projects consist of street and intersection
improvements, a new City Hall, renovations to the existing Community Center,
renovations to the existing City Hall to accommodate the Police Department, and
the addition of a four field softball/ baseball complex. The street improvement,
projects include the widening and signalization of four intersections, signalization of
an improved intersection, and rehabilitation and resurfacing of six streets.
Intersection and Signalization Improvements
' East 86th Street North and North Mingo Road Intersection
• East 76th Street North and North 129rtfi Fast Avenue Intersection
• East 116th Street North and North Garnett Road Intersection
' East 86th Street North and North 145th East Avenue Intersection
• East 86th Street North and North 123rd East Avenue Intersection
Street Rehabilitation
• Resurface North Main Street (1n Street to 9th Street)
' Resurface Atlanta Street (3rd Street to 11th Street)
• Resurface Carlsbad (3rd Street to 5th Street) and Beaumont Street (5th Street to 7th
Street)
Resurface North 129th East Avenue (High School to East 93,d Street North)
• Resurface East 86'h Street North (North Mingo Road to Main Street)
• Resurface 11th Street (Main Street to Cedar Street)
1
1
1
Sports Park Projects
• New Four -Field Softball /Baseball Complex
Architectural Projects
• New City Hall
• Community Center Renovations
• EYistina City Hall Renovations
TWOWASS01GPIATTAC4_A DOC
A -1
Agreement
for
Engineering Services
City of Owasso, Oklahoma
Capital Improvement Projects
Scope of Services
Attachment B
The services to be performed b-%- the ENGINEER, CH2_%1 HILL, under this AGREEN F, NT
will consist of three phases, as stated below. Further, it is understood and agreed that the
date of beginning, rate of progress, and the time of completion of the work to be dome
hereunder are essential provisions of this AGREEMENT; and it is further understoomd and
agreed that the work embraced in this AGREEMENT shall commence upon executiaon of
this AGREEMENT and receipt of Notice to Proceed. It is further understood that the_
PROJECT will be designed and constructed in accordance with the City of Owasso cdesign
criteria and specifications for construction.
The Basic Services of ENGINEER include, but are not necessarily limited to, the follcowing
tasks:
• Designate a representative to coordinate all information between ENGINEER anad CITY.
• Perform necessary surveys and investigations for the PROJECT.
• Prepare all drawings in conformance with CITY requirements.
• Provide routine project progress reports to CITY staff and City Council, as requeested.
• Act as liaison to the CITY in communicating with Page•Zebrowski Architects amd
Planning Design Group, subconsultants to CH2M HILL, in matters related to thee
PROJECT.
A. Intersection and Signalization Improvements
CH21M HILL shall furnish the CITY the following professional engineering services
for the proposed intersection and signalization improvements projects:
A.I. Investigation
A.1.1. Attend initial design workshop with CTTY to review generail
requirements for each of the five (5) intersection projects, esstablish
critical design parameters, and discuss scheduling for the prroeects.
A.1.2. Collect and review available documents pertaining to each Troject
and sites, including but not limited to record drawings, utiliity
plans, accident records, traffic counts, and other pertinent
documents provided civ the CITY.
A.1.3. Existing right -of -way- and abutting ownerships will be reseaarched
and information provided on the drawings.
TUUO W ASSO/CIPIATTACH_B.DOC
" I I
1
A.1.4. Design and topographic surveys will be performed to establish
design/ construction horizontal and vertical control points. Surveys
will reflect planimetrics, utilities, drainage structures, and right -of-
way. The horizontal and vertical control will be set in a manner to
allow the contractor to use the same points during construction.
A.1.5. Conduct traffic turning movement countsat each intersection.
Turning movement counts are necessary to determine phasing
requirements, and timing calculations..
:x.1.6. Existing utilities will be located by field surveying, including
"potholing" when required, to determine the horizontal and
vertical location of affected utilities. "Potholing" of CITY -owned
facilities will be coordinated with CITY Staff. ENGINEER will
coordinate with other utility owners to obtain utility locations,
including "potholing." ENGINEER is not responsible for actual
"potholing' or digging.
A.1.7. Review accident history. Accident records will be furnished by
CITY.
A.1.8. Videotape each of the projects to record current conditions,
including but not limited to pavement, sidewalks, driveways, right -
of -way, structures in close proximity to proposed construction
limits and aboveground utilities. Provide one copy of recorded tape
to CITY prior to bidding of each project.
A.2. Predesign
A.2.1. Develop a conceptual layout of possible intersection improvements.
The conceptual layout will be a single -line drawing overlaying each
of the existing intersections (except East 86th Street North and
North 123rd East Avenue Signalization). The approximate limits of
the intersection improvement projects will be 600 feet in each
direction from the intersection, except the west leg of the East 86th
Street North and North Mingo Road intersection shall extend west
to include the railroad crossing and approach transition from the
west. Current CITY codes, regulations, engineering design criteria
and construction standards will be used for the designs.
A.2.2. Projected traffic volumes for the selected design year will be
developed from existing and new traffic count information
obtained during the Investigation Phase.
A.2.3. Develop conceptual level construction cost estimate of
improvements for each intersection.
A.2.4. Prepare a single Predesign Report, including conceptual layouts
and construction cost estimates for the four major intersection
umprovement projects.
ITWO WASSOICNATTACH B.DOC B'Z
A.2.5. Conduct a meeting with the CITY to present the conceptual layout
and discuss work completed in the Investigation Phase. ENGINEER
will present a report including the recommended layout and a
conceptual cost estimate of the improvements. Boring locations for
geotechnical investigation will be determined at this meeting.
A.3. Preliminary Design
A.3.1. Modifications to the recommended layout resulting from the
Predesign Meeting will be incorporated into the base plan for the '
plan -in -hand design and development of construction drawings.
A.3.2. ENGINEER shall prepare one (1) set of construction documents for '
the four major intersection projects combined for bidding and
construction, and one (1) set of construction documents for the East
86th Street North and North 123rd East Avenue Signalization '
project.
A.3.3. The preliminary design will include:
• Typical Pavement Section Sheet
• Intersection Geometry
• Horizontal and Vertical Alignments
• Grading Plan
• Drainage Plan
• Traffic Signal Plan
• Wiring Diagrams
• Phasing Diagrams /Timing Schedule
• Preliminary Signing and Pavement Marking Plan
• Utility Plan
• Right -of -way Plan
• Construction Sequence /Traffic Control Plan
• Preliminary Pay Quantities and Pay Item Notes Sheet
Prepare construction drawings in accordance with CITY criteria and
format.
A.3.4. Coordinate geotechnical investigations, including soil and
pavement borings. The results will be presented in a report
consisting of subsurface exploration, laboratory testing data, and
pavement design recommendations from a qualified geotechnical
testing company.
A.3.5. Develop phasing sequence and timing schedules for each traffic
signal system.
A.3.6. The OPTiCO%l priority- control system, which provides right-of-
way pre - emption for emergency- vehicles, will be included in the -
design of the signal s-,-stem.
TUUOWASSO1CIP /ATTACH_8.DOC &3 '
A.3.7. Design storm sewer / drainage system within the project limits. The
adequacy of existing drainage systems upstream and downstream
of this project will not be evaluated.
A.3.8. Temporary construction easements, and permanent rights -of -way
needed for the constniction of this project will be shown on the
preliminary plans.
A.3.9. Prepare a detailed est .mate of construction cost for each project.
A.' MO. Meet with CITY staff as requested.
A.3.11. Conduct an internal Quality Assessment/ Quality Control (QA /QC)
review. Following this review and any resulting modifications, the
preliminary plans will be submitted to the CITY for review along
with a preliminary estimate of construction cost.
A.3.12. ENGINEER shall furnish five (5) copies of the Preliminary Design
and other documents listed in A.3. at no additional cost to the CITY.
Drawings shall be furnished in half -size (11" x 17 ") format on bond
paper for review.
A.3.13. Representatives of the project team including the project manager
will be present during the preliminary review meeting and field
review with the CITY. ENGINEER will prepare minutes of the
meeting and disseminate to all attendees.
A.4. Public Meeting
A.4.1. At the CITY's request, CH2M HILL will conduct (or assist, at the
CITY's option) a single public meeting to present an overview of
the street improvement projects and answer questions. Displays of
the projects will be prepared for the presentation that show the
major aspects of each project. A summary of the meeting will be
transcribed and provided to the CITY. This Public Meeting is
intended to cover intersection /signalization projects, signalization
project, and street rehabilitation projects.
AS. Final Design
?; A.5.1. Following the preliminary review, Final Design will be prepared.
a Modifications and comments from the preliminary review will be
incorporated into the design and construction plans, and the Final
Design completed.
A.5.2. Conduct additional field investigations, including field surveys, as
required to complete Final Design.
A.5.3. -1 ne follo,,�-ing draw i.- o-s w ill be developed, as a minimum.
• Title Sheet
• Pay Quantities and Notes
• Typical Pavement Section Sheet
TUUOWASSOICIPIATTACH -B.DOC B-4
• Right -of -Way Map
• Utility Relocation Sheet
• Plan and Profile Sheets
• Construction Sequence and Traffic Control Plan
• Drainage Plan and Details
• Storm Sever Plan and Profile Sheets
• Pavement Mariana and Signing Plan
• Signalization Plan
• Signal Phasing and Sequencing Plan
• Signal Wiring Diagram
• Miscellaneous and Standard Details
• Cross Sections
A.5.4. ODOT standard construction details as required will be referenced
on the Title Sheet. ODOT Standard Specifications for Highway
Construction will be referenced for use on these projects.
A.5.5. Prepare detailed traffic control plans for each phase of construction
for each project. Access to businesses and residences will be
maintained at all times.
A.5.6. Legal descriptions of any right -of -way needs for the project will be
prepared and submitted to the CITY. Proposed permanent and
temporary rights -of -way will be shown on the plans. Legal
descriptions and parcel maps of proposed rights -of -way will be
prepared and provided to the CITY for acquisition. Copies of the
deeds for such properties and other supporting documentation will
also be provided.
A.5.7. Prepare a utility plan identifying utilities that have a potential for
conflict with construction of the proposed improvements.
A.5.8. Assist CITY in coordinating the relocation of those utilities in
conflict with the proposed construction. ENGMER will conduct a
meeting of affected utility providers to receive input in regard to '
the relocation of facilities and projected schedule.
A.5.9. Prepare technical specifications for items of work and materials not '
covered by ODOT Standard Specifications for Highway
Construction.
A.5.10. Prepare bidding documents that include notice- to-bidders, bid '
forms, special provisions, special technical specifications and
construction drawings. CITY shall provide to ENGINEER contract
documents that include bidding requirements, contract forms,
contract conditions, and special provisions for assimilation b ,,-
ENGINEER for reproduction and disbursement to prospective
bidders.
A.5.11. Prepare an updated estimate of construction cost.
TUUOWASSO/CW/ATTACH -B.DOC B -5
'
A.5.12.
Meet with CITY staff as requested.
A.5.13.
An internal QA /QC review will be conducted by a senior engineer
of ENGINEER. Following this review and any resulting
modifications, the construction plans and contract documents will
be submitted to the CITY for review.
1
A.5.14.
ENGINEER shall furnish five (5) copies of the Preliminan.- Design
and other documents listed in A.5. at no additional cost to the CIT`: .
'
Drawings shall be furnished in half -size (11" x 17 ") format on bond
paper for rev.e : , .
A.5.15.
Representatives of the project team including the project manager
'
will be present during the final review meeting with the CITY.
ENGINEER will prepare minutes of the meeting and disseminate to
all attendees.
A.6. Final Revision
A.6.1.
Following receipt of final review comments, final revisions to the
'
construction plans and technical specifications will be made as
appropriate.
'
A.6.2.
Prepare an updated estimate of construction cost.
A.6.3.
An internal QA/ QC review will be conducted by a senior engineer
of ENGINEER. Following this review and any resulting
'
modifications, the Construction Documents will be submitted to the
CITY for review.
A.7. Bidding
A.7.1.
Disburse plans to prospective bidders at no cost to the CM. The
'
ENGINEER may, however, charge the cost of the plans and
specifications to the prospective bidders and suppliers. (CITY has
the option to not use ENGINEER to disburse bid documents. If the
CITY chooses this option, the ENGINEER will furnish CM one
reproducible set of drawings and specifications).
A.7.2.
Answer questions from prospective bidders and suppliers and issue
k
clarifications and interpretations by addenda to plan holders.
A.7.3.
Conduct the pre -bid conference with CTTY staff and prospective
bidders to present project requirements and answer project - related
questions.
A.7.4.
Attend the bid opening(s) and prepare a tabulation(s) of the bid
proposals received. Analyze the bids and low apparent bidder and
provide a recommendation to the CITY for awarding contracts for
'
construction.
A.7.5.
Assist the CITY in preparing final construction contracts.
ITWOWASSOICIPIATTACH B.DCC
y
f-I
A.S. Construction
'
A.8.1.
Furnish sufficient number of sets of drawings and specifications to
the CITY.
'
A.8.2.
Provide sufficient number of sets of drawings and specifications to
the contractor.
A.8.3.
Conduct preconstruction conference to discuss project
requirements.
ry
A.S.4.
Provide horizontal and vertical controls so the contractor can stake
and construct the project. Detailed horizontal and vertical
construction staking shall be the responsibility of the contractor.
A.8.5.
Issue interpretations or clarifications of the intent of the drawings
and specifications to protect the CITY against deficiencies in
construction on the part of the contractor(s).
A.8.6.
Conduct periodic inspections of work performed by the
contractor(s) as construction progresses.
A.8.7.
Prepare Change Orders and Work Change Directives as required,
for modifications, additions, and deletions in work.
A.8.8.
Upon request by the contractor and after confirmation by CITY staff
that the project is complete, the ENGINEER will conduct a final
inspection with CITY staff and the contractor to examine all
construction and prepare a punch list of items to be corrected or
completed. Provide copies of the punch list to the contractor and
CITY.
'
A.8.9.
ENGINEER will furnish the CITY one set of "Record" drawings on
mylar reproducible media and the electronic files on CD -ROM in
'
AutoCAD Release 13 format. "Record" drawings shall reflect all
changes in the plans as directed through change orders, and other
changes recorded by the CTTY resident project representative and
the contractor.
Street Rehabilitation
ENGINEER shall furnish the CITY the following professional engineering services
for the proposed street rehabilitation projects:
B.1. Investigation
B.1.1. Attend initial design workshop with CITY to review general
requirements, establish critical design parameters, and discuss
scheduling for each of the projects.
B.1.2. Collect and review available documents pertaining to each project
and sites, including but not limited to record drawings, utility
plans, and other pertinent documents provided by the CITY.
TuUowasso1aPAT-rAcH_s. Doc
B -7
1
B.1.3. Design and topographic surveys will be performed, as required, to
establish design/ construction horizontal and vertical control points.
Surveys will reflect planimetrics, utilities, and drainage structures.
The horizontal and vertical control will be set in a manner to allow
the contractor to use the same points during construction.
B.1.4. Existing utilities will be located, as necessary, by field surveying,
including "potholing " when required, to determine the horizontal
and vertical location of affected utilities. "Potholing" of CITY -
e,�.-ned facilities will be coordinated with CITY Staff. ENGINEER
it coordinate with other utility- owners to obtain utilitv locations,
including "potholing. ENGINEER is not responsible for actual
"potholing" or digging.
B.1.5. Videotape each of the projects to record current conditions,
including but not limited to pavement, sidewalks, driveways, right -
of -way, structures in close proximity to proposed construction
limits and aboveground utilities. Provide one copy of recorded tape
to CITY prior to bidding of the project.
B.2. Preliminary Design
' B.2.1. Evaluate the condition of the existing pavement to verify existing
pavement structure or base stability. ENGINEER will perform a
visual inspection of the existing pavement and review the
' pavement borings to determine the extent of pavement removal and
replacement and/or rehabilitation.
' .
B.2.2. Develop typical sections and details for pavement removal and
replacement.
B.2.3. Coordinate geotechnical investigations, including soil and
pavement borings. The results will be presented in a report
consisting of subsurface exploration, laboratory testing data, and
pavement design recommendations from a qualified geotechnical
testing company.
B.2.4. A single set of construction plans and documents will be prepared
for the combined projects as follows:
• Resurface Atlanta Street (3rd Street to 11th Street)
• Resurface Carlsbad Street (3rd Street to 5th Street) and
Beaumont Street (5th Street to 7th Street)
• Resurface 11th Street (Main Street to Cedar Street)
' B.2.5. The preliminary design will include:
• Typical Pavement Sections Sheet
• Preliminary Pay Quantities and Pav Item Notes Sheet
• Plan Sheets
• Preliminary Signing and Pavement Marking Plan
ITUUOWA=/aP/ArrACH_B.DOC B$
• Traffic Control Plan
• Utility Plan
• Miscellaneous Details, including Pavement Removal and
Replacement
Prepare construction drawings in accordance with CITY criteria and
format.
B?.e. Evaluate drainage conditions within the project limits. The
adequacy of the existing drainage collection systems %-ill not be
evaluated.
B.2.7. Prepare a detailed estimate of construction cost for each project.
B.2.8. Meet with CITY staff as requested.
B.2.9. Conduct an internal Quality Assessment/ Quality Control (QA /QC)
review. Following this review and any resulting modifications, the
preliminary plans will be submitted to the CITY for review along
with a preliminary estimate of construction cost.
B.2.10. ENGINEER shall furnish five (5) copies of the Preliminary Design
and other documents listed in B.2. at no additional cost to the CITY.
Drawings shall be furnished in half -size (11" x 17') format on bond
paper for review.
B.2.11. Representatives of the project team including the project manager
will be present during the preliminary review meeting and field
review with the CITY. ENGINEER will prepare minutes of the
meeting and disseminate to all attendees.
B.3. Final Design
B.3.1. Following the preliminary review, Final Design will be prepared.
Modifications and comments from the preliminary review will be
incorporated into the design and construction plans, and the Final
Design completed.
B.3.2. Conduct additional field investigations, including field surveys, as
required to complete Final Design.
B.3.3. The following drawings will be developed, as a minimum.
• Title Sheet
• Pay Quantities and Notes
• Typical Pavement Sections Sheet
• Plan Sheets
•
Pavement %lar king and Signing Plan
• Miscellaneous and Standard Details
• Cross Sections
TuUowAsso/CIP /ArfACH_B.DOC a -9
IODOT standard construction details as required will be referenced
TUUOWASSO /OPIATTACH -B.DOC B-10
on the Title Sheet. ODOT standard specifications will be referenced
'
for use on these projects.
B.3.4.
Prepare miscellaneous details including typical sections for the
'
removal of fatigued or failed pavement areas prior to resurfacing.
B.J.J.
Prepare detailed traffic control plans for each phase of construction
for each project. access to businesses and residences will be
'
maintained at all times.
B.3.o.
Identifv utilities that have a potential for conflict within the
'
pavement section or proposed construction of improvements.
B.3.7.
Assist CITY in coordinating the adjustment of those utilities within
the pavement section in conflict with the proposed construction.
'
ENGINEER will coordinate with affected utility providers in regard
to the relocation of facilities and projected schedule, if required.
'
B.3.8.
Prepare technical specifications for items of work and materials not
covered by ODOT standard specifications.
B.3.9.
Prepare bidding documents that include notice - to-bidders, bid
'
forms, special provisions, special technical specifications and
construction drawings. CITY shall provide to ENGINEER contract
documents that include bidding requirements, contract forms,
contract conditions, and special provisions for assimilation by
ENGINEER for reproduction and disbursement to prospective
'
bidders.
B.3.10.
Prepare an updated estimate of construction cost.
B.3.11.
Meet with CITY staff as requested.
B.3.12.
An internal QA /QC review will be conducted by a senior engineer
of ENGINEER. Following this review and any resulting
modifications, the construction plans and contract documents will
be submitted to the CTTY for review.
B.3.13.
ENGINEER shall furnish five (5) copies of the Preliminary Design
and other documents listed in B.3. at no additional cost to the CTI'Y.
Drawings shall be furnished in half -size (11" x 17 ") format on bond
paper for review.
B.3.14.
Representatives of the project team including the project manager
gill be present during the final review meeting with the CITY.
'
ENGINEER will prepare minutes of the meeting and disseminate to
all attendees.
TUUOWASSO /OPIATTACH -B.DOC B-10
B.4.
B.5.
B.6.
Final Revision
B.4.1. Following receipt of final review comments, final revisions to the
construction plans and technical specifications will be made as
appropriate.
B.4.2. Prepare an updated estimate of construction cost.
B.4.3. An internal QA /QC review will be conducted by a senior engineer
of ENGINEER. Following this review and any resulting
rnodifications, the Construction Documents will be submitted to the
CITY for review.
Bidding
B.5.1. Disburse plans to prospective bidders at no cost to the CITY. The
ENGINEER may, however, charge the cost of the plans and
specifications to the prospective bidders and suppliers. (CITY has
the option to not use ENGINEER to disburse bid documents. If the
CITY chooses this option, the ENGINEER will furnish CITY one
reproducible set of drawings and specifications).
B.5.2. Answer questions from prospective bidders and suppliers and issue
clarifications and interpretations by addenda to plan holders.
B.5.3. Conduct the pre -bid conference with CITY staff and prospective
bidders to present project requirements and answer project related
questions.
B.5.4. Attend the bid opening(s) and prepare a tabulation(s) of the bid
proposals received. Analyze the bids and low apparent bidder and
provide a recommendation to the CITY for awarding contracts for
construction.
B.5.5. Assist the CITY in preparing final construction contracts.
Construction
B.6.1. Furnish sufficient number of sets of drawings and specifications to
the CITY.
B.6.2. Provide sufficient number of sets of drawings and specifications to
the contractor.
B.6.3. Conduct preconstruction conference to discuss project
requirements.
B.6.4. Provide horizontal and vertical controls so the contractor can stake
and construct the project. Detailed horizontal and vertical
construction staking shall be the responsibility of the contractor.
B.6.5. Issue interpretations or clarifications of the intent of the drawings
and specifications to protect the CITY against deficiencies in
construction on the part of the contractor(s).
TUUOWASSO /CIP /ATTACH_B. DOC
B-11 I
r
1
u
B.6.6. Conduct periodic inspections of work performed by the
contractor(s) as construction progresses.
B.6.7. Prepare Change Orders and Work Change Directives, as required,
for modifications, additions, and deletions in work.
B.6.8. Upon request by the contractor and after confirmation by CITY staff
that the project is complete, the ENGINEER will conduct a final
inspection with CITY staff and the contractor to examine all
construction and prepare a punch list of items to be corrected or
completed. Provide copies of the punch list to the contractor and
CITY.
B.6.9. ENGINEER will furnish the CITY one set of "Record" drawings on
mylar reproducible media and the electronic files on CD -ROM in
AutoCAD Release 13 format. "Record" drawings shall reflect all
changes in the plans as directed through change orders, and other
changes recorded by the CITY resident project representative and
the contractor.
C. Sports Park Expansion Project
C.1. Project Statement and Program Analysis Phase
C.1.1. Conduct introductory meeting with City of Owasso.
C.1.2. Review previous plans, studies and proposal for the Owasso Sports
Park.
C.13. Interview CITY's key personnel.
• Public Works Director
• Capital Projects Manager
• Park Director / Park Staff
C.1.4. Interview user groups.
• Girls Softball Association
• Baseball Association
C.1.5. Perform Site Evaluation/ site analysis
C.1.6. Develop guidelines, goals, evaluate design criteria, and planning
objectives.
• Develop two (2) fields being approximately 250 feet along the foul
line.
• Develop two (2) fields being approximately 200 feet along the foul
line.
• Fields will be designed with recreation lighting (20/30) for night
play.
' 8 -t2
TuU0wASSOJCIPIArrACH_0.000
I
• Fields will be designed with an automatic underground sprinkler
system.
• Fields will be designed with adequate fencing and backstops.
• Fields will have Proper grading and underground drainage to
allow for well- drained fields.
C.1.7. Prepare program summary.
C.1.8. Assist CITY in organizing public workshop for public viewing and
input.
C.1.9. Attend and facilitate public workshop.
C.1.10. Document planning alternatives.
C.2. Project Statement and Program Analysis Phase
C.2.1. Develop base plans showing existing site features.
• Existing Topography
• Buildings and structures
• Roads, drives, parking, sidewalks, and railroads
• Property lines
• Easements and setbacks
• Utilities and overhead lines
C.2.2. Develop and evaluate optional design solutions where necessary.
C.2.3. Design Phase
• Develop site plan.
• Develop grading and drainage plan.
• Develop lighting and electrical plans
• Develop underground irrigation plans.
• Develop fencing and backstop details.
• Develop miscellaneous details.
• Develop project specifications
C.2.4. Conduct a plan review and evaluation with City of Owasso staff
• Supply two (2) sets of plans and specifications to the City.
• Supply one (1) set of plans for public viewing.
C.2.5. Prepare project preliminary cost estimate.
C.3. Design Phase
C.3.1. Based on approved preliminary plans and cost estimate prepare
final construction dccaments.
TWOWASSO/CIP/ATTACH -B.DOC
B -13 '
C.4.
C.5.
C.3.2. Prepare technical construction specifications to accompany the
plans.
C.3.3. Prepare bidding information, proposal forms and other contract
documents require to bid the project.
C.3.4. Conduct final plan in hand review with city.
C3.5. Make any final adjustments to the plans based on plan in hand
review.
C3.6. Prepare project final cost estimate.
Construction Document Phase
C.4.1. Advertisement for bidders.
C.4.2. Conduct a pre -bid conference.
C.4.3. Answer questions and issue addenda as required.
C.4.4. Bid opening.
C.4.5. Prepare bid tabulations from all bids received.
C.4.6. Recommend award of contract.
Construction Phase
C.5.1. Conduct a pre - construction meeting.
C.5.2. Review and approve contractors shop drawings and submittals.
C.5.3. Review and approve contractors pay requests.
C.5.4. Make regular visits to the project site to observe construction
procedures.
C.5.5. Respond to construction questions and give proper direction.
C.5.6. Make and issue change order recommendations.
C.5.7. Prepare and administer contract close out.
C.5.8. Produce "Record" drawings from contractor mark ups.
• One (1) set of reproducible mylar
• One (1) set of electronic files on CD ROM in AutoCad version 13
format
Architectural Projects
D.1. New City Hall
The scope of services includes architectural, interior, and landscape design;
1 TUUOWASSO/CIPIATTACH3 .DOC B-14
1
1
D.
i
C.4.
C.5.
C.3.2. Prepare technical construction specifications to accompany the
plans.
C.3.3. Prepare bidding information, proposal forms and other contract
documents require to bid the project.
C.3.4. Conduct final plan in hand review with city.
C3.5. Make any final adjustments to the plans based on plan in hand
review.
C3.6. Prepare project final cost estimate.
Construction Document Phase
C.4.1. Advertisement for bidders.
C.4.2. Conduct a pre -bid conference.
C.4.3. Answer questions and issue addenda as required.
C.4.4. Bid opening.
C.4.5. Prepare bid tabulations from all bids received.
C.4.6. Recommend award of contract.
Construction Phase
C.5.1. Conduct a pre - construction meeting.
C.5.2. Review and approve contractors shop drawings and submittals.
C.5.3. Review and approve contractors pay requests.
C.5.4. Make regular visits to the project site to observe construction
procedures.
C.5.5. Respond to construction questions and give proper direction.
C.5.6. Make and issue change order recommendations.
C.5.7. Prepare and administer contract close out.
C.5.8. Produce "Record" drawings from contractor mark ups.
• One (1) set of reproducible mylar
• One (1) set of electronic files on CD ROM in AutoCad version 13
format
Architectural Projects
D.1. New City Hall
The scope of services includes architectural, interior, and landscape design;
1 TUUOWASSO/CIPIATTACH3 .DOC B-14
mechanical, electrical, and plumbing engineering; structural engineering;
and civil engineering for the new City Hall. These services include
supervision of and coordination with the following sub - consultants:
• Bellwether Design - Interior Design and Space Planning
• CEI, Inc. -Mechanical, Electrical, & Plumbing Engineering (MEP)
• Wallace Engineering - Structural Engineering
• Planning Design Group - Landscape and Irrigation Design
• CH2LI HILL - Civil Engineering
As indicated in the Request for Proposal, the architectural services would
begin with the review of the Site Selection and Project Planning information
developed by the Project Management Team (PMT). Scope of services and
fees are based upon the following assumptions:
• The building size remains 25,000 square feet, plus/ minus 10 percent
• The construction budget remains $90 per square foot, plus/ minus 10
percent
• Construction period not to exceed 52 weeks.
D.1.1. Site Evaluation and Selection Review (Not in contract)
D.1.2. Project Planning
D.1.2.1. Site research.
• Zoning (Review of work product developed by PMT)
• Boundary and legal survey '
• Topographic survey
• Geotechnical investigations and report '
• Utility locations (facility capacities to be provided by
City and utility owner) '
• Parking and access requirements
D.122. Space and Use Planning (Review of work product
developed by PMT)
D.1.2.3. Furruture, Fixture, and Equipment Planning (Review of
work product developed by PMT)
D.12.4. Preliminary Budget (Review of work product developed
by PMT)
D.1.2.3. Prelin- nan- Schedule (Review of work product developed
by P%1T)
I �
TUUoWAwo/aP /ArfACN_s.occ 8_15 1
D.1.3. Schematic Design
During the Schematic Design Phase, basic building code constraints
will be established, and three conceptual designs will be developed
and presented. These alternate designs may vary both in exterior
appearance and in functional layout.
D.1.3.1. Preliminary Building Code review
D.13.2. Site Plan and conceptual landscape plan
D.1.3.31. Floor Plan
D.1.3.4. Elevations
D.1.3.5. Presentation Meetings (limited to 8 staff hours)
D.1.3.6. Review Meetings (limited to 16 staff hours)
D.1.3.7. Exterior material recommendations
D.1.3.8. Provide input to PMT to update schedule
D.1.3.9. Provide input to PMT to update budget
D.1.4. Design Development
'
One of the three alternatives, or combination of the three
alternatives, will be selected by the CITY for continued
development. During the Design Development Phases, the
engineering sub - consultants will develop preliminary design of
'
structural and MEP systems, layout and sizing, and establish the
rough grading of the site. The interiors subconsultant will make
preliminary selection of interior finishes. This information will be
integrated by ENGINEER into the selected alternative and
presented to the CITY.
D.1.4.1. Building, Fire, and MEP Code Review
D.1.4.2. CAD base of Site Plan, including utilities
'
D.1.4.3. CAD base of Floor Plan
D.1.4.4. CAD base of exterior elevations
'
D.1.4.5. Wall Sections
D.1.4.6. Outline specifications, including MEP
'
D.1.4.7. Preliminary Structural Drawings
' D.1.4.8. Preliminar MEP Drawings
D.1.4.9. Prelimirar: Civil Site Plan including parking and access
ps
`.
ITUL/OWASSO/CIP/ATTACH_B.DOC B -16
D.1.5
D.1.6.
Tul10WASSO/CIPIATTACH -e DOC
D.1.4.10. PMT coordination, reviews, and revisions including
continuous Value Engineering review through the
coordination meeting process.
D.1.4.11. Provide input to P% LIT to update Schedule
D.1.4.12. Provide input to PMT to update budget
D.1.4.13. Preparation of presentations drawings
Construction Documents
Upon approval of the development alternative by the CITY, the
ENGINEER will complete the Construction Documents (CD).
Detailed drawings and specifications will be prepared to convey to
construction contract bidders all of the information required to
price and build the new City Hall.
D.1.5.1. Prepare CD drawings as single package
D.1.5.2. Prepare Project Manual, including finish schedules and
specifications
D.1.5.3. Coordination and review with PMT
D.1.5.4. Provide input to PINT to update schedule
D.1.5.5. Provide input to PMT to update budget
D.1.5.6. Review, seal, and issue CD's to PMT/ City of Owasso
D.1.3.7. Furnish the CITY one set of construction drawings on
mylar reproducible media and the electronic files on CD-
ROM in AutoCAD Release 13 format.
Bidding
D.1.6.1. ENGINEER will furnish CITY one reproducible set of
drawings and specifications for reproduction and
disbursement of plans to prospective bidders by the
PMT. PMT to reproduce and distribute plans and
specifications including multiple construction trade
documents if necessary to bidders.
D.1.6.2. Answer questions from Project Management Team
(PMT) and issue clarifications and interpretations in
writing to PI MT.
D.1.6.3. Attend the pre -bid conference with CITY staff, PMT,
and prospective bidders to present project requirements
and answer project related questions.
D.1.6.4. Attend the bid opening. PMT to prepare a tabulation of
the bid proposals received.
&17
1
1
1
D.1.6.5. PMT to assist CITY in preparing final construction
contract documents.
D.1.7. Construction Phase
During the Construction Phase, ENGINEER and appropriate sub -
consultants will:
D.1.7.1. Attend pre - construction conference
D.1.7.2. Respond to requests for information from the PMT
D.1.7.3. Attend weekly construction meetings with PMT, and
contractor(s), all trades
D.1.7.4. PLAIT to receive, log, and review all shop drawings and
submittals. Submittals will be reviewed with ENGINEER
at weekly construction meetings. Shop drawings will be
reviewed and approved by the ENGINEER.
D.1.7.5. PMT to perform construction inspection. ENGINEER
will not perform construction inspection and will not be
responsible for quality of completed work or assure
completed work is in compliance with construction
documents.
D.1.7.6. Respond to qualified requests for clarifications from
PMT only.
D.1.7.7. PMT will prepare change orders. ENGINEER will
review and approve change orders, with Contractor and
CITY.
D.1.7.8. PMT will receive, review, and approve contractor pay
applications.
D.1.7.9. Attend final inspection
D.2. Existing City Hall Renovations
The scope of services outlined herein for the renovation of the existing City
Hall to accommodate the Police Department assumes that the "detention'
facilities are to be designed for 24 -hour detention. The Scope of Services
assumes the drawings of the existing facility are reasonably accurate and
provide adequate information. Scope of Services assumes construction phase
is concurrent with the New Cit•,- Hall.
TWOWASSOICIP/ATTACH 8.000
B-18
Dal. Schematic Design
D.2.1.1. ENGINEER shall review the program furnished by the CITY
to ascertain the requirements of the project and shall arrive
at a mutual understanding of such requirements with the
CITY. It is understood that the planning phase or
development of the programming documents, including
space planning requirements, will be performed by the
Program Management Team (PINT).
D.2.1.2. ENGINEER shall provide a preliminary evaluation of the
CITY's program, schedule and construction budget
requirements.
D.2.1.3. ENGINEER shall evaluate and present three (3) alternate
solutions available to the CITY, and after consultation with
the CITY, recommend to CITY the solution which in the
ENGINEER's judgment best meets the CITY's requirements
for the project.
D.2.1.4. ENGINEER shall prepare a Report containing schematic
layouts, sketches and conceptual design criteria. This Report
will be accompanied by ENGINEER's opinion of Total
Project Costs for each alternative. Estimate of construction
cost will be provided by the PMT.
D.2.2. Design Development
TUUOWASSOICIPIATTACH_B LOC
One of the three alternatives, or combination of the three alternatives,
will be selected by the CITY for continued development. During the
Design Development Phases, the engineering sub - consultants will
develop preliminary design of structural and MEP systems, layout
and sizing, and establish the rough grading of the site. The interiors
sub - consultant will make preliminary selection of interior finishes.
This information will be integrated by ENGINEER into the selected
alternative and presented to the CITY.
D.2.2.1.
Building, Fire, and MEP Code Review
D.2.2.2.
CAD base of Site Plan, including utilities
D22.3.
CAD base of Floor Plan
D.2.2.4.
CAD base of exterior elevations, if required
D.2.2.5.
Wall Sections, if required
D.2.2.6.
Outline specifications, including MEP
D.2?.77 .
Preliminary Structural Drawings, if required
D.2.2.8.
Preliminary MEP Drawings
a -1s 1
' D.2.2.9. Preliminary Civil Site Plan including parking and access
D.2.2.10. PMT coordination, reviews, and revisions including
' continuous Value Engineering review through the
coordination meeting process.
' D.2.2.11. Provide input to PIT to update schedule
D.2.2.12. Provide input to PtiIT to update budget
D.21.2.13. Preparation of presentation drawings
D.2.3. Construction Documents
Upon approval of the development alternative by the CITY, the
ENGINEER will complete the Construction Documents (CD).
Detailed drawings and specifications will be prepared to convey to
construction contract bidders all of the information required to price
and build the renovation of City Hall into a Police Department.
D.2.3.1. Prepare CD drawings as single package
D.2.3.2. Prepare Project Manual, including finish schedules and
specifications
D.2.3.3. Coordination and review with PMT
D.2.3.4. Provide input to PMT to update schedule
D.2.3.5. Provide input to PMT to update budget
D.2.3.6. Review, seal, and issue CD's to PMT /City of Owasso
D.2.3.7. Furnish the CITY one set of construction drawings on mylar
reproducible media and the electronic files on CD -ROM in
AutoCAD Release 13 format.
D2-4. Bidding
TUU0WASS0 /CIP /ATTACN3.DCC
D.2.4.1. ENGINEER will furnish CITY one reproducible set of
drawings and specifications for reproduction and
disbursement of plans to prospective bidders by the PMT.
PMT to reproduce and distribute plans and specifications
including multiple construction trade documents if
necessary to bidders.
D.2.4.2. Answer questions from Project Management Team (PINT)
and issue clarifications and interpretations in writing to
P-NIT.
D.2.4.3. Attend the pre -bid conference with CITY staff, PLAIT, and
prospective bidders to present project requirements and
answer project related questions.
B -20
D3.
D.2.4.4. Attend the bid opening. PMT to prepare a tabulation of the
bid proposals received.
D.2.5. Construction Phase
During the Construction Phase, ENGINEER and appropriate sub -
consultants will:
D.2.5.1. Attend pre - construction conference
D.2.3.2. Respond to requests for information from the PMT
D.2.5.3. Attend weekly construction meetings with P'.vIT,
contractor(s), all trades
D.2.5.4. PMT to receive, log, and review all shop drawings and
submittals. Shop drawings to be reviewed with ENGINEER
at weekly construction meetings. Submittals will be
reviewed and approved by ENGINEER.
D.2.5.5. PLATT to perform construction inspection. ENGINEER will
not perform construction inspection, will not be responsible
for quality of completed work, and will not assure the
conformance of the completed work with the Construction
Documents..
D.2.5.6. Respond to qualified requests for clarifications from PMT
only.
D.2.5.7. PLAIT will prepare change orders. ENGINEER will review
and approve change orders with the Contractor and the
CITY.
D.2.5.8. PLAIT will receive, review, and approved contractor pay
applications.
D.2.5.9. Attend final inspection
Community Center Renovations
D.3.1. ENGINEER shall review the program furnished by the CITY to
ascertain the requirements of the project and shall arrive at a mutual
understanding of such requirements with the CITY.
D.3.2. ENGINEER shall provide a preliminary evaluation of the CITY's
program, schedule and construction budget requirements.
D.3.3. ENGINEER will evaluate the current roof and source of leaks. Both
TUVOWASSO /CtP!ATTACN B.00c
sloped - design and "improved" flat roofs will be evaluated and
presented in a roof study.
B -21
'
D.3.4.
ENGINEER shall evaluate and present three (3) alternate solutions
available to the CITY and PINT, and after consultation with the CITY
D3.8.5.
and PITT. P?NIT shall recommend to CITY the solution, which in the
'
ENGNEER's and PIIT's judgment, best meets the CITY's
requirements for the project.
'
D.3.5.
ENGINEER shall prepare a Report containing the statement of the
CITY's requirements for the project, as well as, schematic layouts,
'
D3.8.6.
sketches and conceptual design criteria. Estimate of construction costs
'
will be provided by the PITT.
'
D.3.6.
After selection of an alternative by the CITY, the ENGINEER shall
prepare a "performance specification' for the roof system. The
'
D.33.8.
specification shall require the successful contractor to submit detailed
'
roof installation shop drawings as a part of their contract.
D.3.7.
Bidding
D.3.7.1. Answer questions from PLATT and issue clarifications and
'
interpretations in writing to PMT.
D.3.8.
Construction Phase
During the Construction Phase, ENGINEER and appropriate
subconsultants will:
'
D.3.8.1. Attend pre - construction conference
D.3.8.2. Respond to requests for information from the PMT
'
D.3.8.3. Attend weekly construction meetings with PMT and
contractor(s), all trades providing construction concurrent
with New City Hall.
ITUUOWASSOI01PlATTAOH_8.000 B-22
D.3.8.4.
The ENGINEER will receive, log, and review all shop
drawings.
D3.8.5.
PITT to perform construction inspection. ENGINEER will
not perform construction inspection, will not be responsible
for quality of completed work, and will not assure
M
conformance of the completed work with the Construction
Documents.
'
D3.8.6.
Respond to qualified requests for clarifications from PMT
only.
'
D3.8.7.
PITT will prepare change orders. ENGINEER will review
and approve change orders, with Contractor and CITY.
D.33.8.
P%IT to receive, review, and approve contractor pay
'
applications.
D.3.8.9.
Attend final inspection
ITUUOWASSOI01PlATTAOH_8.000 B-22
E. Schedule
The design, bidding and construction phase services shall be performed and
completed within timeframes shown on Attachment F, Projects Schedule, for each
respective project.
Architectural scope of services and fees assumes concurrent construction of New
City Hall and Existing City Hall Renovation.
TUUOW ASSO/C!P /ATTACH_B.DOC
B-23
' Agreement
for
Engineering Services
tCity of Owasso, Oklahoma
Capital Improvement Projects
' Responsibilities of the City
Attachment C
t
RESPONSIBILITIES OF THE CITY. The CITY a, ees:
' 1.0 Reyorts, Records, etc. To furnish, as required by the work, and not at expense to the
ENGINEER:
1.01. Records, reports, studies, plans, drawings, and other data available in the
' files of the CITY that may be useful in the work involved under this
AGREEMENT.
' 1.02. Standard construction drawings and standard specifications.
' 2.0 Access. To provide access to public and private property when required in
performance of E NGINEER's services.
' 3.0 Staff Assistance. Designate in writing a person to act as its representative in respect
to the work to be performed under this AGREEMENT, and such person shall have
complete authority to transmit instructions, receive information, interpret and
' define CITY'S policies and decisions with respect to materials, equipment, elements
and systems pertinent to the services covered by this AGREEMENT.
' 3.01. Furnish staff assistance in locating, both horizontally and vertically, existing
CTTY owned utilities and in expediting their relocation as described in
Attachment B. Further, = will furnish assistance as required in obtaining
' locations of other utilities, including N potholing " .
3.02. Furnish legal assistance as required in the preparation of bidding,
construction and other supporting documents.
1.
4.0 Review. Examine all studies, reports, sketches, estimates, specifications, drawings,
tProposals and other documents presented by ENGINEER and render in writing
decisions pertaining thereto within a reasonable time so as not to delay the services
' of ENGINEER.
5.0 Construction Phase Services For Street Projects. Review and take appropriate
action on contractor shop drawings and material submittals, and review of
' contractor pay estimates.
6.0 New City Hall and Renovation of Existing City Hall. Contract with Program
' Management Team (PMT) to perform planning, review of architectural design,
C -1
' TULIOWASS0JC1P1ATTACH_C.00C
I
continuous value engineering reviews, and provide construction phase services,
including construction inspection, review of contractor shop drawings and material t
submittals, review of contractor pay estimates, and coordinate scheduling of project
with the CITY. '
TULIOWAS=CIPIATTACH- C.DOC
I I
'
Agreement
for
'
Engineering Services
City of Owasso, Oklahoma
'
Capital Improvement Projects
Compensation
Attachment D
1
The CITY agrees to pay, as compensation for services set forth in Attachment B, a total lump
'
sum fee of Five Hundred Sixty Two Thousand One Hundred Seventy -One Dollars
(5562,171) for the services described in Attachment B.
'
ENGINEER shall submit monthly invoices based upon the proportion of the total services
actually completed at the time of billing. Invoices are due and payable within 30- calendar
days of receipt by the CM. A breakdown of the lump sum amount to be billed for each of
the projects is shown as follows:
CAPITAL IMPROVEMENT PROJECTS
'
City of Owasso, Oklahoma
Fee
Project No. Project Description Fee
Intersection and Signalization Improvements
'
1 East 86th Street North and North Mingo Road Intersection $ 43,500
2 East 76th Street North and North 129th East Avenue Intersection $ 56,500
3 East 116th Street North and North Garnett Road Intersection $ 43,800
4 East 86th Street North and North 145th East Avenue Intersection $ 56,500
5 East 86th Street North and North 123rd East Avenue Intersection $ 16,472
Total Intersection and Signalization Improvements $216,772
1
S'
Street Rehabilitation
'
6 Resurface North Main Street (1 st Street to 9th Street) $ 51,300
(Combined fee for all
Street Rehabilitation
Projects 6 through 11 as
'
reflected below)
7 Resurface Atlanta Street (3rd Street to 11th Street)
'
8 Resurface Carlsbad Street (3"d Street to 5th Street and Beaumont
Street (5th Street to 7th Street)
9 Resurface North 129th Eat Avenue (High School to East 93rd
'
Street North)
'
TULIOWASSOICIP(ATTACH_D.DOC t
CAPITAL IMPROVEMENT PROJECTS
City of Owasso, Oklahoma
Fee
Project No. Project Description Fee
10 Resurface East 86th Street North (North Mingo Road to Main
Street)
11 Resurface 11 th Street (Main Street to Cedar Street)
Total Street Rehabilitation 5 51,300
Sports Park Projects
12 New Four -Field Softball /Baseball Complex
Total Sports Park Projects
Architectural Projects
13 New City Hall
14 Community Center Renovations
15 Existing City Hall Renovations
TU U0 W ASS0 /C; P /ATTACH_D.DCC
Total Architectural Proejcts
$ 25,300
$ 25,300
$196,491
$ 9,430
$ 62,878
$268,799
Total Fee $562,171
D-2
1
r
1
1
1
t
do
MEMORANDUM
TO: HONORABLE MAYOR AND COUNCIL
CITY OF OWASSO
FROM: H. DWAYNE HENDERSON, P.E.
CAPITAL PROJECTS MANAGER
SUBJECT: 1998 BOND ISSUE PROJECTS
PROGRAM MANAGEMENT TEAM (PMT) FEE NEGOTIATIONS
DATE: MAY 12, 1998
PROJECT BACKGROUND:
In October of 1997, the citizens of Owasso approved a $10 million bond issue for Capital
Improvement Projects within the City of Owasso. The projects included for funding within that bond
issue included street and intersection improvements, remodeling of two existing facilities,
construction of a New City Hall and improvements to the Owasso Sports Park. In November 1998,
the City of Owasso employed a Capital Projects Manager to oversee the projects and the
Architectural/ Engineering (A/E) procurement and Program Management Team (PMT) negotiation
process was initiated. A chronology of the A/E procurement procedure and the PMT negotiations
services is shown as Attachment 1.
NEW CITY HALL SITE SELECTION:
The City of Owasso formed a Citizens Advisory Committee shortly after the passing of the Bond
Issue. The committee met several times to identify potential sites, develop selection criteria for the
sites, assign values to the criteria and evaluate sites based on the assigned criteria.
After the committee had reduced the sites to the top four and ranked them in order of preference,
the Lioness Group, of Kansas City, Missouri, was retained to perform site evaluations of the four
sites and give their recommendations.
Page 2
May 12, 1998
Program Management Team (PMT) Fee Negotiations
PMT SERVICES:
A Program Management Team is a team of construction management, engineering, and space
planning consultants that assist clients by preparing intial programming documents, providing
design management, ancillary design and construction management during the construction phase
of an architectural project.
The programming document for a new building is the first step in an architectural project. The
document is a result of interviews with key personnel to determine departmental needs, such as
office and storage space, equipment, parking electrical and mechanical upgrades, furniture
planning and other items that need to be accounted for before initial design begins. A planning
document will be needed for the New City Hall and the New Police Station in order to determine
the needs before design begins.
Design and cost management are provided by the PMT throughout the Schematic Design
(preliminary), Design Development (details) and Construction Document (final) phases of the
design process. The PMT updates budgets and schedules weekly to keep the project on track.
Ancillary design is the design of all telephone and computer cabling systems that A/E firms would
normally provide. The Lioness Realty Group, the proposed City of Owasso PMT, is qualified to
provide this design.
In construction management a PMT has the ability to save funds by acting as the general
contractor and dividing the projects into sub - contracts and managing the construction. PMTS
claim that a general contractor will add 15 % overhead to a project, while the PMT fees range
from 4 -6 %.
Therefore the benefits of using a PMT on an architectural project is to assure that proper planning
is provided for the project, budgets are maintained during the design and an excellent facility is
constructed with a cost savings.
PMT AND A/E SCOPE OF SERVICES:
During the preparation of the Request for Proposals for A/E services, the City of Owasso
requested a proposed PMT Scope of Services from the Lioness Group in order to prepare the
A/E Scope of services for the three (3) architectural projects. The PMT prepared their proposed
scope of services, as well as a preliminary A/E Scope of Services for the A/E firms to use in
establishing their fee proposals.
The purpose for requesting the PNIT to provide the two scopes was to reduce overlap between
the PMT and A/E. Both the PMT and A/E are capable of providing programing documents,
design budgeting and various duties in construction management, but only one firm is needed for
these services.
1 Page 3
May 12, 1998
' Program Management Team (PMT) Fee Negotiations
A/E NEGOTIATIONS:
On April 23, 1998, Joe Waters of the Lioness Group met with Mr. Carr and Mr. Henderson at
the offices of CH2MHil1 assist in clarifying the PMT Scope of Services in order for the A/E to
find reductions in their fees. Mr. Waters was assisted by Cowen Construction.
PMT SCOPE OF SERVICES AND FEE PROPOSAL:
After the initial negotiations with the A/E, the Lioness Realty Group was requested to formally
submit their proposed Scope of Services and Fee Proposal for the architectural projects.
' Fee Proposal:
Attachment 2 shows the original fee submitted by the Lioness Realty Group for their proposed
' scope of services and the changes made through the A/E negotiations because of project
scheduling.
Scope of Services:
The Lioness Realty Group proposes design management services that will assist the Capital
' Projects Manager, professional services that are needed to complete these projects and
construction management for the projects. A/E design management by the PMT will be used to
coordinate the architectural projects, monitor schedule and provide updated construction
estimates throughout the A/E design.
Professional services that normally are provided by the building architect are needed with or
without a PMT are space and equipment planning, cost estimating for the facilities, scheduling the
A/E projects design, Environmental Assessments (if necessary), systems furniture design,
telephone and data systems cabling design.
Construction Management services to be provided will be used to keep the project on schedule
and within the budget. Constriction inspection is to be provided, along with pay application
review, shop drawing review, value engineering, testing, and change orders.
The Lioness Realty Group proposes to reduce costs by dividing the construction contracts into
multiple sub - contracts, thereby bypassing a general contractor. The Lioness Realty Group
proposes to coordinate and inspect the individual contracts for a considerable cost savings.
1
Page 4
May 12, 1998
Program Management Team (PMT) Fee Negotiations
Cost Savings Evaluation
The budget for each architectural project and proposed fees of the A/E and the Lioness Realty
Group have been tabulated to compare budgets of each project with and without PMT services.
Lioness Realty Group has claimed that the savings in using a PMT is in the construction phase of
a project.
Lioness Realty Group stated that a general contractor will add up to 15% overhead to each
contract for overhead and bonds. We have contacted two general building contractors, Ross
Construction of Tulsa and Chambers Construction of McAlester, about the overhead costs for a
building the size of our New City Hall. Both contractors mentioned that their overhead for this
facility would be between 8 -9 %.
In order to compare the other proposed services of the PMT we contacted York Electronic
Systems of Tulsa for telephone and data cabling design and reviewed the CH2M1-1ill/ Page
Zebrowski proposal for furniture systems design. The findings are that the Lioness Realty Group
fees are lower than other firms in the area.
The following tables lists the anticipated savings by using the Lioness Realty Group. The bottom
line in each table is the funds available for building construction by using the PMT versus using a
general contractor.
FUNDING SOURCE:
The funds for the PMT fees is included in the $10 million Bond Issue.
SUMMARY COMMENTS:
Based on the cost savings evaluation and previous similar projects performed by the PMT, staff
recommends the award of the Program Management Services for the City of Owasso Capital
Improvement (Bond Issue) Projects to the Lioness Realty Group. Attachment 3 is the completed
Agreement of Program Management Services. The contract has been submitted to the City
Attorney for review.
RECOMMENDATIONS:
Staff recommends award of the Program Management Services for the Owasso Capital
Improvement (Bond Issue) Projects to the Lioness Realty Group in the lump sum amount of
$238,080.
I I
I I
I I
I I
I I
1 7,11
2
w
Page 5
May 12, 1998
Program Management Team (PMT) Fee Negotiations
T ,1,1e 1 'Mu 1-41, Wnll Prnfacc;nnal QPrviCPS Cmmnarison
NEW CITY HALL
W/ PMT"
W/O PMT
USING 9%
MARKUP
W/O PMT
USING 15%
MARKUP
PROJECT BUDGET
$ 2,500,000.00
$ 2,500,000.00
$ 2,500,000.00
CONTRACTOR FEE
N/A
$167,975.00
$264,930.00
PMT SERVICES
Site Selection
$15,800.00
$15,800.00
$15,800.00
Programming
$13,320.00
$13,530.00
$13,530.00
Design Management
$52,670.00
IN-HOUSE
IN-HOUSE
Cabling Design
$2,610.00
$5,000.00*
$5,000.00*
Furniture Design
$3,960.00
$3,300.00 **
$3,300.00 **
Construction Management
$75,630.00
IN-HOUSE
IN-HOUSE
Anticipated Expenses
$26,508.00
N/A
N/A
SUBTOTAL
$190,708.00
$37,630.00
$37,630.00
A/E DESIGN FEE
$197,000.00
$228,000.00 * **
$228,000.00 * **
LAND COST * **
$200,000.00
$200,000.00
$200,000.00
AVAH,ABLE BUILDING
CONSTRUCTION FUNDS
$1,912,502.00
$1,866,394.00
$1,764,470.00
* Estimate provided by York Electronics Systems
** Estimate from the CH2MIEll/PZ proposal
Speculative number - used for this estimate only
Page 6
May 12, 1998
Program Management Team (PMT) Fee Negotiations
Table 2 - New Police Statinn Prnfecc;nnal CPnnrrac Cmmnaricnn
NEW POLICE STATION
W/ PMT
W/O PMT
USING 9°f
MARKUP
W/O PMT
USING 15 %
MARKUP
PROJECT BUDGET
$ 600,000.00
$ 600,000.00
$ 600,000.00
CONTRACTOR FEE
N/A
$70,887.00
$67,118.00
PMT SERVICES
Programming
$9,100.00
$3,560.00
$3,562.00
Design Management
$12,960.00
IN-HOUSE
IN-HOUSE
Construction Management
$17,040.00
IN-HOUSE
IN-HOUSE
Anticipated Expenses
$7,005.00
N/A
N/A
SUBTOTAL
$46,105.00
$3,560.00
$3,560.00
A/E DESIGN FEE
$62,878.00
$84,885.00 * **
$84,885.00 * **
AVAILABLE BUILDING
CONSTRUCTION FUNDS
$491,017.00
$472,582.00
$447,923.00
fable 3 - Community Center Professional Services Comparison
COMNIINTTY CENTER
W/ PMT
W/O PMT
USING 9%
MARKUP
W/O PMT
USING I5%
..
PROJECT BUDGET
$ 235,000.00
$.235,000.00
$ 235,000.00
CONTRACTOR FEE
N/A
$18,488.00
$29.217.00
PMT SERVICES
Programming
$5,880.00
$3,560.00
$3,560.00
Design Management
$3,050.00
IN-HOUSE
IN-HOUSE
Construction Management
$5,750.00
IN-HOUSE
IN-HOUSE
Anticipated Expenses
$2,597.00
N/A
N/A
SUBTOTAL
$17,277.00
$3,560.00
$3,560.00
A/E DESIGN FEE
$9,430.00
$11,080.00 * **
$11,080.00 * **
AVAILABLE BUILDING
CONSTRUCTION FUNDS
$208,293.00
$201,872.00
$191,143.00
I I
Page 7
May 12, 1998
Program Management Team (PMT) Fee Negotiations
ATTACHMENTS:
1. Chronology of A/E and PMT Procurement Process
2. Fee Negotiation Progression
3. Agreement for Program Management Services
City of Owasso I
Bond Issue Projects - Chronology of PMT Procurement Process
Preoared Bv: Owasso PiNic Work,, T)PnartmPnt M-:317 1) I ooQ
EVENT
DATE OCCURRED
REQUEST FOR QUALIFICATIONS (RFQS) MAILED TO A/E FIRMS
DECEMBER 5, 1997
SUPPLEMENTAL INFORMATION SENT TO A/E FIRMS
DECEMBER 11, 1997
ADVERTISEMENT PLACED IN TULSA WORLD AND OWASSO REPORTER
DECEMBER 12, 1997
RFQS RECEIVED AT PUBLIC WORKS
JANUARY 9, 1998
RFQS DISTRIBUTED TO SELECTION COIvIIviTI-IEE
JANUARY 15, 1998
SELECTION COMMITTEE RFQ REVIEW MEETING
JANUARY 26, 1998
SELECTION COMMITTEE RFQ FINAL REVIEW MEETING
FEBRUARY 2, 1998
PMT AND ARCHITECTURAL SCOPE OF SERVICES REQUESTED FROM LIONESS
REALTY GROUP
FEBRUARY 5, 1998
PMT SCOPE OF SERVICES RECEIVED FROM LIONESS REALTY GROUP
FEBRUARY 20, 1998
ARCHITECTURAL SCOPE OF SERVICES RECEIVED FROM LIONESS REALTY GROUP
FEBRUARY 25, 1998
REQUEST FOR PROPOSALS (RFPS) MAILED TO SHORT LISTED FIRMS
FEBRUARY 26, 1998
OFFICE VISIT TO CH2MHILL/ PAGE ZEBROWSKI
MARCH 19, 1998
OFFICE VISIT TO BURNS & MCDONNELL/ BRUTON KNOWLES & LOVE
MARCH 20, 1998
RFPS RECEIVED AT PUBLIC WORKS
MARCH 26, 1998
RFPS DISTRIBUTED TO SELECTION COMMITTEE
MARCH 27, 1998
PRESENTATIONS BY BURNS & MCDONNELL/ BRUTON KNOWLES & LOVE
MARCH 30, 1998
PRESENTATIONS BY CH2MHILL/ PAGE ZEBROWSKI
MARCH 31, 1998
PRESENTATIONS BY DEWBERRY DESIGN GROUP
MARCH 31, 1998
OFFICE VISIT TO DEWBERRY DESIGN GROUP
APRIL 7, 1998
SELECTION COMMITTEE FINAL SELECTION MEETING
APRIL 13, 1998
CH2MHILL/ PAGE ZEBROWSKI INFORMED OF INTENT TO NEGOTIATE
APRIL 15, 1998
ATTACHMENT 1 I
I I
11
7-]
W
Page 2
Attachment 1
Chronology of PMT Procurement Process
NEGOTIATIONS WITH CH2MHILL/PAGE ZEBROWSKI WERE HELD AT CH2MHILL.
LIONESS REALTY GROUP AND COWEN CONSTRUCTION WERE PRESENT TO
CLARIFY PMT SCOPE OF SERVICES
APRIL 23, 1998
RECEIVED FIRST REVISED FEE PROPOSAL FROM CMMHILL/ PAGE ZEBROWSKI
APRIL, 27, 1998
RECEIVED PRELIMINARY PMT FEE PROPOSAL FROM LIONESS REALTY GROUP
APRIL 29, 1998
RECEIVED SECOND REVISED FEE PROPOSAL FROM CH2Mi L/ PAGE ZEBROWSKI
APRIL 29, 1998
SENT CH2M11ILL/ PAGE ZEBROWSKI TARGET FEE
APRIL 30, 1998
RECEIVED SAMPLE COMPARATIVE ANALYSIS FROM LIONESS REALTY GROUP
APRIL 30, 1998
RESPONDED TO ORIGINAL PMT FEE PROPOSAL AND SCOPE OF WORK
MAY 1, 1998
STAFF MET TO DISCUSS PMT PROPOSAL AND A/E OPTIONS
MAY 4, 1998
RECEIVED CH2MHILL/ PAGE ZEBROWSKI FINAL FEE PROPOSAL
MAY 4, 1998
STAFF NET TO DISCUSS FINAL A/E PROPOSAL AND DECIDED TO RECOMMEND
CH2MHILI/ PAGE ZEBROWSKI FOR A/E SERVICES CONTINGENT COMMENTS
FROM PMT ON A/E SCOPE.
MAY 6, 1998
RECEIVED FINAL SCOPE AND FEE PROPOSAL FROM PMT
MAY 8, 1998
RECEIVED FINAL REVISED SCOPE AND FEE PROPOSAL FROM A/E
MAY 11, 1998
STAFF RECOMMENDATION OF CONTRACTS
MAY 12, 1998
ATTACHMENT 1
CITY OF OWASSO
BOND ISSUE PROJECTS
PMT FEE COMPARISONS PREPARED BY: OWASSO PUBLIC WORKS
05/11/98
PROJECT
NEW CITY HALL
CONSTR.
BUDGET
F04130/98
S
%
CONST
BUDGET
OS /08/98
FEES
ORIGINAL
FEE
W/O PMT
Project Planning
$13200.00
S13,320.00
Schematic Design
S 17,040.00
S17,760.00
Design development
S17,200.00
S17,920.00
Construction Documents
S22,940.00
$23,560,00
Bidding
S10,560.00
$10,560.00
Construction
S651070.00
S65,070.00
Anticipated Expenses
S26,508.00
Subtotal: New City Hall
$2,500 000.00
S145 910.00
5.8%
$174,698.00
7.0%
POLICE STATION
Project Planning
S9,100.00
S9.100.00
Schematic Design
$3,840.00
S3 840.00
Design development
S3990.00
$3,99000
Construction Documents
S5'130.00
$5,130'00
Bidding
$2,400.00
S2,400.00
Construction
S14,6-40.00
S14,640.00
Anticipated Expenses
S71005.00
Subtotal: Police Station $600,000.00
S39,100.00
6.5%
S46,105.00
7.7%
COMMUNITY CENTER
Project Planning
S5,340.00
S5880.00
Schematic Design
$900.00
$900.00
Design development
5940.00
5940.00
Construction Documents
S1,210.00
$1 10.00
Bidding
5560.00
S1,060.00
Construction
S3,440.00
S41690.00
Anticipated Expenses
S21597.00
Subtotal: Conununity Center
S235,000.00
S12 90.00
5.3%
$17,277.00
7.4%
TOTAL
S3,335,000.00
S197,400.00
5.9%
S238,080.00
7.1%
Note 1 - Anticipated expenses were not included in the original fee proposal
Note 2 - Costs were increased in the design process because the PMT anticipated a shorter A/E design schedule in their initial proposal
ATTACHMENT 2
' AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL, POLICE DEPARTMENT AND COMMUNITY CENTER
THIS AGREEMENT, made and entered into this day of
1998, between the City of Owasso, Oklahoma, hereinafter referred to as CITY, and Lioness
Realty Group Inc. representing the Program Management Team, hereinafter referred to as PMT;
' WITNESSETH:
WHEREAS, CITY intends to construct a new City Hall at 1 st Street and Main, renovate the
texisting City Hall for the Police Department and replace the roof, carpet, heating, ventilation and
air conditioning systems and other cosmetic items at the Community Center.
WHEREAS, CITY requires certain professional services in connection with the PROJECTS,
hereinafter referred to as the SERVICES; and,
WHEREAS, PMT is prepared to provide such SERVICES;
WHEREAS, funding is available for the PROJECTS.
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree
as follows:
1. SCOPE OF PROJECTS . The scope of the PROJECTS is described in Attachment A
' SCOPE OF PROJECTS, which is attached hereto and incorporated by reference as part of
this AGREEMENT.
' 2. SERVICES TO BE PERFORMED BY PMT. PMT shall perform the SERVICES
described in Attachment B,SCOPE OF SERVICES, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBILITIES OF CITY, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
- 4. COMPENSATION. CITY shall pay PMT in accordance with Attachment D,
COMPENSATION, and further described in Attachment E, FEE/MAN -HOUR
BREAKDOWN, which are attached hereto and incorporated by reference as part of this
AGREEMENT.
5. SCHEDULE. PMT shall perform the SERVICES described in Attachment B,
' SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F, which
is attached hereto and incorporated by reference as part of this AGREEMENT.
Attachment 3
6. STANDARD OF PERFORMANCE. PMT shall perform the SERVICES undertaken in a
manner consistent with the prevailing accepted standard for similar services with respect
to projects of comparable function and complexity and with the applicable laws and
regulations published and in effect at the time of performance of the SERVICES. The
PROJECTS shall be managed and implemented in strict accordance with this
AGREEMENT. Other than the obligation of the PMT to perform in accordance with the
foregoing standard, no warranty, either express or implied, shall apply to the SERVICES
to be performed by the PMT pursuant to this AGREEMENT or the suitability of PMT'S
work product.
7. LIMITATION OF RESPONSIBILITY. PMT is not serving as Architect, Engineer or
Contractor for the record for these projects, rather as the CITY'S representative in the
management of the projects. The responsibilities of those parties are not intended or
implied to be transferred to the PMT.
8. OPINIONS OF COST AND SCHEDULE.
8.1. Since PMT has no control over the cost of labor, materials, equipment, or services
furnished by others, or over contractors', subcontractors`, vendors', Architects' or
Engineers' methods of determining prices, or over competitive bidding or market
conditions, PMT'S cost estimates shall be made on the basis of qualification and
experience as a PMT active on a daily basis in the Tulsa market.
8.2. Since PMT has influence but not ultimate control over the resources provided by
others to meet construction contract schedules, PMT'S forecast schedules shall be
made on the basis of qualification and experience as a PMT active on a daily basis
in the Tulsa market.
9. LIABILITY AND INDEMNIFICATION
9.1. Because in this engagement the PMT is not rendering the services of Contractors,
Architects or Engineers, the PMT cannot be responsible for these functions. the
PMT role is to coordinate and manage the service of these professionals,
accordingly, the CITY agrees to waive any claims against the PMT for these
professional services and to hold the PMT harmless, insure, defend and indemnify
PMT, against any and all claims arising from the prudent execution of the PMT
duties as contained in this AGREEMENT. All Contractors, Architects, Engineers
and others retained under the scope of these PROJECTS will be required to supply
proof of insurance for their respective services. Of course, hold harmless and
indemnification would not extend to gross negligence or malicious acts on the part
of the PMT.
9.2. PMT shall not be liable to CITY for any special, indirect or consequential
damages, such as, but not limited to, loss of revenue, or loss of anticipated profit.
10. COMPLIANCE WITH LAWS
10.1. In performance of the SERVICES, PMT shall comply with applicable regulatory
requirements including federal, state and local laws, rules regulations orders, codes
' and standards. PMT shall procure the permits, certificates and licenses necessary
to allow PMT to perform the SERVICES. PMT shall not be responsible for
' procuring permits, certificates and licenses required for any construction unless
specifically included as an item to be procured on the CITY'S behalf as a
reimbursable item.
' 11. INSURANCE
' 11.1. During the performance of the SERVICES under this AGREEMENT, PMT shall
maintain the following insurance-.
' 11.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the
aggregate, and with property damage limits of not less than $100,000 for
' each occurrence and not less than $100,000 in the aggregate.
11.1.2 Automobile Liability Insurance with bodily injury limits of not less than
' $1,000,000 for each person and not less than $1,000,000 for each accident
and with property damage limits of not less than $100,000 for each
' accident.
11.1.3. Workers Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not less
than $100,000 for each occurrence.
12. OWNERSHIP AND REUSE OF DOCUMENTS
12.1. All documents, including reports, estimates, specifications, notes and data shall
become and remain the property of the CITY.
12.2. CITY'S reuse of such documents without written verification or adaptation by
PMT for the specific purpose intended shall be at CITY'S risk.
13. TERNUNATION OF AGREEMENT
13.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
INS substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
13.2 CITY shall have the right to terminate this AGREEMENT, or suspend
performance thereof, for CITY'S convenience upon written notice to PMT; and
' PMT shall terminate or suspend performance of SERVICES on a schedule
acceptable to CITY. In the event of termination or suspension for CITY'S
convenience, CITY shall pay PMT for all SERVICES performed to the date of
' termination in accordance with provisions of Attachment D, COMPENSATION.
Upon restart of a suspended project, payment shall be made to PMT in accordance
with Attachment D, COMPENSATION.
11
14. NOTICE.
14. 1. Any notice, demand, or request required by or made pursuant to this
AGREEMENT shall be deemed properly made if personally delivered in writing or
deposited in the United States mail, postage prepaid, to the address specified
below.
To PMT: Lioness Realty Group, Inc.
3100 Broadway, Suite 303
Kansas City, Missouri 64111
ATTN: Joe Waters
To CITY: CITY OF OWASSO, OKLAHOMA
P.O. Box 180
Owasso, Oklahoma 74055
ATTN: F. Robert Carr, Jr.
14.2. Nothing contained in this Article shall be construed to restrict the transmission of
routine communications between representatives of PMT and CITY.
15. UNCONTROLLABLE FORCES. Neither CITY nor PMT shall be considered to be in
default of this AGREEMENT if delays in or failure of performance shall be due to forces
which are beyond the control of the parties; including, but not limited to: fire, floor,
earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage; inability to
procure permits, licenses, or authorizations from any state, local, or federal agency or
person for any of the supplies, materials, accesses, or services required to be provided by
either CITY or PMT under this AGREEMENT; strikes, work slowdowns or other labor
disturbances, and judicial restraint.
16. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court of
competent jurisdiction as unenforceable, such portion shall be severed herefrom, and the
balance of this AGREEMENT shall remain in full force and effect.
17. INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments A,
B, C, D, E, & F and represents the entire and integrated AGREEMENT between the
parties; and supersedes all prior negotiations, representations, or agreements pertaining to
the SCOPE OF SERVICES herein, either written or oral. This AGREEMENT may be
amended only by a written instrument signed by each of the Parties.
18. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the PMT
and the CITY over the interpretation or application of the terms of this AGREEMENT,
the matter shall be referred to the City's Director of Public Works for resolution. If the
Director of Public Works is unable to resolve the dispute, the matter may, in the Director's
discretion, be referred to the City Manager for resolution. Regardless of these
procedures, neither party shall be precluded from exercising any rights, privileges or
opportunities permitted by law to resolve any dispute.
19. ASSIGNMENT. PMT shall not assign its obligations undertaken pursuant to this
AGREEMENT, provided that nothing contained in this paragraph shall prevent PMT from
4
e
e
employing such independent consultants, associates, and subcontractors as PMT may
deem appropriate to assist PMT in the performance of the SERVICES hereunder.
20. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the Public Works
Department of the City of Owasso, and any plans not meeting the terms set forth in this
AGREEMENT will be addressed immediately by the PMT. The PMT will meet with the
City staff' initially and monthly thereafter and will be available to public meetings and/or
City of Owasso presentations as referenced in Attachment B, SCOPE OF SERVICES.
21. KEY PERSONNEL. In performance of the SERVICES hereunder, PMT has designated
Jim Stacy of Lioness Realty Group, Inc. (LRG) as Project Principal, Joe Waters, R. A. of
LRG as PMT Manager, John Cowen of Cowen Construction as Construction Principal,
Fred Schmidt, P.E. of Schlagel & Schmidt P.A. as Engineering Principal. PMT agrees
that no change will be made in the assignment of these positions without prior approval of
CITY.
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies on
the respective dates herein below reflected to be effective on the date executed by the Mayor of
the City of Owasso.
APPROVED:
City Clerk
_,- APPROVED AS TO FORM:
City Attorney
1
1
1
LIONESS REALTY GROUP, INC.
James M. Stacy, President
Date
CITY OF OWASSO, OKLAHOMA
Mayor
Date
Attachment A
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL, POLICE DEPARTMENT & COMMUNITY CENTER
SCOPE OF PROJECT
** Lioness Realty Group Inc * Cowen Construction * Schlagel & Schmidt PA **
1. New City Hall I
The new City Hall will be located on the "Police Department" site at 1 st and Main. The
facility is projected by staff to be 20,000 sf when opened with the ability to expand on site to '
an additional 10,000 sf. The facility will house the City offices currently located in City Hall
(City Manager, Finance, Planning, etc.) as well as Public Works. The project budget is
$2,500,000 including fees. Sequencing moves with construction and renovation will be
required; however, the City is anxious to move quickly with the project and may make interim
moves to expedite work. Close coordination with anticipated Main Street road improvements
will be required. The site will require demolition of existing structures and preparation of the
site in advance of general construction. The downtown site was selected in large part because
the project is expected to take advantage ofthe excellent opportunity to create a lasting image
for the City and provide a catalyst for rejuvenating the area.
2. Police Department Renovation
The Police Department will be located in the existing City Hall, a building that was originally
constructed as a fire station. The building is approximately 16,000 sf and staff projects that '
this is adequate space for the Police Department. The facility will house the existing Police
Department functions. In addition, the department is investigating the required number of
holding cells and the duration of detainee stay in the facility and is pursuing funding for this '
from grant sources (if not affordable within the budget). The project budget is $600,000
including fees. Staff reports that specific issues for the project, in order of priority, are: 1.
electrical system upgrade, 2. constructing communications center, 3. constructing holding '
cells, 4. roof repair/modification and 5. Heating, Ventilation and Air Conditioning (HVAQ
systems.
3. Community Center
The Community Center project includes re- roofing, HVAC replacement and then cosmetic
improvements to the interior such as carpet replacement and potentially ceiling replacement.
The project budget is $235,000 including fees. The selected roofing system may significantly
impact HVAC system locations, structural requirements, etc. Early investigation of
alternatives and then identification of the re -roof system to be used is critical.
i
Attachment B
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL, POLICE DEPARTMENT & COMMUNITY CENTER
** Lioness Realty Group Inc * Cowen Construction * Schlagel & Schmidt PA **
SCOPE OF SERVICES
Our quotation for services are based upon the following scope for each of the three projects and the
general description of the projects in Attachment A, SCOPE OF PROJECT. Variations from the
description in the SCOPE OF PROJECT, such as a change in the project site or an increase in excess
of 10% in; the number or type of departments to occupy the building, the building square footage,
the total project cost or the total project duration, will require an adjustment in fees to be negotiated
between the PMT and the City based upon the hourly rates presented in Attachment D,
COMPENSATION or upon a negotiated flat fee.
The City is planning interim moves for the Police and City Hall departments in order to allow the
work to be done simultaneously. This will also allow the PMT to work as efficiently as possible and
our fee has been reduced accordingly. The Preliminary Schedule in Attachment F, SCHEDULE is
the basis of our fee proposal and reflects these two projects being done concurrently. Similar to the
variations above, if this schedule is increased more than 10% in any stage of the work, an adjustment
in fees will be negotiated between the PMT and the City based upon the hourly rates presented in
Attachment D, COMPENSATION or upon a negotiated flat fee.
1. New City Hall
1. Site evaluation and selection recommendation - COMPLETE
2. Project Planning functional evaluation of needs assessment or Programming
a. Project Planning is the process of identifying the specific needs and expectations of
the departments, user groups and others affected by the project, preparing a budget
' and establishing a schedule for the project. Two 2 -day sessions with staff to gather
and then review information are planned.
' The programming report will include:
1. Site information -from site selection process.
2. Parking requirements - public & staff, current & future
3. Traffic flows
4. Space requirements -by department & including future projections as well as
private office & work station space allocations
In
5. Future expansion - facility & parking expansion needs
6. Departmental needs - specialty equipment & functions, adjacency needs, public
interaction
7. Equipment requirements
8. Interior furnishings- intentions & general needs relative to work station and /or
reuse of existing furniture
9. HVAC systems- special requirements & minimum needs
10. Electrical/lighting needs -light level requirements & electrical special needs
11. Communications -basic & special needs by the department
12. Computer networking
b. Project Budget - prepare a preliminary project budget that addresses the full scope of
expenses that can be expected on the project including: fees, construction, property
acquisition (information from City if requested), moves, telephones, cabling, furniture,
specialty systems and equipment.
c. Project Schedule - prepare a schedule for the work that incorporates the Police
Station Renovation in order to assure the work is accomplished as efficiently as
possible with as little disruption as possible to City services.
d. In addition, the PMT, utilizing the project cost and schedule information, will prepare
an analysis that compares constructing the facility in the traditional method utilizing
Program Management cost control with a lease/purchase scenario in which a private
entity designs and constructs the facility.
3. Schematic Design
Schematic Design is the phase in which the Programming document, adjacency requirements
and site conditions begin to define the shape of a building. Three on -site sessions to review
design with A/E and staff are anticipated.
a. Manage and coordinate A/E and the City
1. communicating between all parties
2. documenting decisions & needs
3. clarifications and changes
4. expediting timely /critical information.
b. Environmental Assessments - procure for the A/E on the City's behalf, any necessary
information, such as environmental assessments as needed by the A/E and/or as
required by good practice.
c. Systems Furniture Schematic Design
1. this proposal presumes new or used systems furniture will be acquired as a part
of the project
2. provide alternatives and then finalize with staff systems furniture and office
standards.
' d. Inventory Existing Furniture
1. areas such as private offices, conference rooms, break rooms, etc. will be
furnished from the City's existing inventory of furniture
' 2. gather inventory data on all pertinent furnishings
e. Cabling
' 1. identify requirements for telephone and data systems, outline requirements for
staff and equipment connectivity.
2. preliminary planning for location of wiring closets and computer rooms.
f Value Engineering - ongoing VE and constructability reviews with A/E and City staff.
' g. Project Budget - manage and update.
c. Existing Furniture - existing furniture to be reused will be located on the plans.
' d. Cabling - service entry, riser locations, distribution closets, horizontal distribution
systems, termination hardware, etc. will be identified with the City staff.
' e. Value Engineering - ongoing VE and constructability reviews with A/E and City staff.
f. Project Budget - manage and update.
' Pr ject Schedule - manage and update.
g 1 b
1�
h. Project Schedule - manage and update.
4. Design Development
'
Design Development is the phase in which the site plan, floor plan, building elevations, etc.
become hard line drawings and finish materials are selected. Three on -site visits to review
design with A/E and staff are anticipated.
a. Manage and coordinate A/E and the City
'
1. communicating between all parties
2. documenting decisions & needs
3. clarifications and changes
' ..
4. expediting timely /critical information.
'
b. System Furniture Design Development
1. coordinate the A/E work with the ongoing development of furniture standards
and layouts
2. establish the systems furniture components and variations within the standards
(i.e. panel heights, file storage, side chairs, overhead storage, visibility and
transaction tops).
c. Existing Furniture - existing furniture to be reused will be located on the plans.
' d. Cabling - service entry, riser locations, distribution closets, horizontal distribution
systems, termination hardware, etc. will be identified with the City staff.
' e. Value Engineering - ongoing VE and constructability reviews with A/E and City staff.
f. Project Budget - manage and update.
' Pr ject Schedule - manage and update.
g 1 b
1�
0
5. Construction Documents
Construction Documents is the phase in which the Design Development documents are
detailed for construction purposes. The documents will be prepared as a single package and
separated by the PMT in the bid phase as needed by trade. Three on -site visits to review and
coordinate details with A/E and staff are anticipated.
a. Manage and coordinate A/E and the City
1. communicating between all parties
2. documenting decisions & needs
3. clarifications and changes
4. expediting timely /critical information
5. coordinate systems furniture, cabling, telephones and specialty equipment with
A/E documents is required to minimizes electrical and rough in changes in the
field during construction.
b. Systems Furniture Construction Documents
1. prepare performance specifications and plans
2. review and approve with City staff
c. Cabfing
1. prepare bid documents
2. review and approve with City staff
d. Value Engineering
1. ongoing VE and constructability reviews with A/E and City staff
2. specific attention to review of construction details.
e. Project Budget - manage and update.
f. Project Schedule
1. manage and update
2. attention focused on move sequencing for City planning
6. Bidding
a. Bid Documents
1. separate the Construction Documents as needed by trade in order to achieve the
most cost effective combination of bids
2. incorporate the "Boiler Plate" requirements of the City
b. Advertise & Print
1. City to advertise bids on PMT schedule
2. printing by PMT as a reimburseable expense
� I
'
c. Pre -Bid Conference
1. conduct meeting and answer all pre -bid questions
2. support as needed by A/E
'
d. Award
1. evalute and qualify the bids
2. review for gaps or variances from the documents
3. compare the bids with the established budget and schedule and recommend
awards accordingly.
7. Construction Phase
'
The PMT will manage and coordinate contractors and vendors on the project in the
implementation phase on the City's behalf.
'
Schedule
a. Project
1. prepare detailed critical path schedule from the project schedule which overlays
all major components of the project
'
2. manage critical activities and issues to maintain schedule.
'
b. Pre - Construction Meeting - conduct a pre - construction meeting to initiate the project
and outline responsibilities, expectations, parking, security, materials delivery, safety,
'
etc.
c. Progress Meetings - conduct scheduled project meetings throughout the construction
process with contractor superintendents to discuss schedule, coordination, etc.
'
d. A/E & City Meetings s - schedule City and A/E meetings on a less frequent basis to
coincide with these sessions.
e. Management -
1. monitor progress of the work
2. maintain the critical path schedule and anticipating and resolving obstacles to
the schedule or the budget
r f. Information -
1. review, process and expedite shop drawings, requests for information,
clarifications, change orders, etc.
2. clarifications or changes requiring A/E review and approval will be
communicated-to the A/E with PMT comments and cost review.
3. shop drawing review by A/E.
4. communications between contractors, City, A/E, etc. will be managed by the
PMT.
g. Change Orders -
1. review and analyze, seeking A/E support as needed
2. review and negotiate price changes with contractors
3. prepare C.O. documents and recommend approval to City as required.
h. Pay Applications - review and recommend approval to the City on applications for
payment.
Resident Project Manager -
1. on -site daily
2. conduct periodic inspections of the site in the course of the daily services
3. call for necessary inspections by the A/E, owner and code officials
4. punch lists will be prepared and followed up with each contractor /vendor until '
completion
5. coordinate systems start ups, project close out manuals, as- builts, and owner
training. ,
2. Police Department Renovation
The description of the scope of work for the New City Hall is virtually identical to the Police `
Department Renovation. The work will be approached in the same fashion and for purposes of our
proposal is presumed to be done concurrently to expedite both projects and to maximize efficiency. '
Renovation, particularly for a special use such as a Police Department, may require involvement of
special consultants and vendors on issues such as: environmental conditions and materials,
communications/dispatch, detention housing and security, etc. These special considerations will taken
into consideration early in the project to assure initial planning and budgeting are done accurately.
While the priorities have been clarified for the Police Department, the work that becomes clear after
the Project Planning is complete could vary a great deal. The extent of demolition, inclusion of
extended -stay holding cells, etc. will impact both the design and construction trades involved. After
discussion with Public Works, both the PMT and A/E are proposing fees for services through Project
Planning - Programming. Fees for the balance of the work are provided as an estimate based upon
a percentage of the construction cost. It is understood that when the extent of the work has been
defined and estimated at the completion of Project Planning, the estimated fee we are providing will
be re- visited.
3. Community Center
Due to the limited size and scope of the Community Center work, the scope of work for the PMT
can also be limited in order to reduce fees. The Project Planning can be reduced described below.
2. Project Planning '
a. Report -
1. A/E will prepare three alternative roofing sketches. '
2. PMT will address the impact on HVAC systems, skylights, etc.
3. PMT will prepare cost comparisons and preliminary schedules for each alternative.
'I
I I
The remainder of the work (design, documents, bid and construction) will follow the same procedure
as the City Hall, with the exception of staff level approval at project milestones, combination of
Schematic Design and Design Development phases, far fewer contractors and a more simple schedule
' and budget. In addition, the A/E Construction Documents will be a "performance specification" with
details reviewed at the shop drawing stage by PMT & A/E.
' Similar to the Police Department Renovation, the PMT and A/E are proposing fees for services
through Project Planning - Programming. Fees for the balance of the work are provided as an
estimate based upon a percentage of the construction cost. It is understood that when the extent of
' the work has been defined and estimated at the completion of Project Planning, the estimated fee we
are providing will be re- visited.
4. General Terms
Our Program Management Team, Lioness Realty Group Inc., Cowen Construction and Schlagel &
Schmidt PA, will exercise our best efforts and call upon our collective experience to serve in the
capacity of your consultant. We will of course, hold any information we receive in the strictest
confidence.
We will provide reports, drawings, etc. in a concise and professional manner and in the format
rdescribed in the assignment. You will be copied on all correspondence and you will receive minutes
of all significant meetings and conversations.
1
1
Attachment C
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY HALL, POLICE DEPARTMENT & COMMUNITY CENTER
RESPONSIBILITIES OF THE CITY
"Lioness Realty Group Inc * Cowen Construction * Schlagel & Schmidt PA **
1. The process of planning, designing, constructing and occupying requires a teamwork
approach between the CITY, PMT and other professionals and contractors outside this
agreement. Full participation by the CITY departments involved in each project will be
required and timely and unwavering decisions at each step in the process by the CITY will be
required as well as full participation in planning sessions of appropriate staff and department
managers.
2. Staff Assistance. Designate in writing a person to act as its representative in respect to the
work to be performed under this AGREEMENT, and such person shall have complete
authority to transmit instructions, receive information, interpret and define CITY'S policies
and decisions with respect to materials, equipment, elements and systems pertinent to the
services covered by this AGREEMENT.
3. Timely reviews of all documents requested, such as programming data, cost estimates,
drawings, etc. ranging from several days for more basic or repetitive documents to a
maximum of 2 weeks for architectural detailed documents.
4. Information systems department provide CITY standards or desires for cabling types and
termination devices as well as computer or LAN system requirements.
5. Furnish legal assistance as required in the preparation of construction and other supporting
documents. Bid phase support with; advertising of bids, timely contracts review, provision
of contract "boiler plate" or AIA standard modifications, accessibility for pre -bid walk -
throughs.
Attachment D
AGREEMENT
' FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
' CITY HALL, POLICE DEPARTMENT & COMMUNITY CENTER
I** Lioness Realty Group Inc * Cowen Construction * Schlagel & Schmidt PA **
ICOMPENSATION & STAFF FEE SCHEDULE
' COMPENSATION. The CITY agrees to pay, as compensation for PMT staff services set forth, a
total lump sum as scheduled below. PMT shall submit monthly invoices based upon the proportion
of the total services actually completed at the time of billing. Invoices are due and payable within 30-
' calendar days at receipt by the CITY. The terms of this agreement will be for 21 months (refer to
Attachment F, SCHEDULE). The maximum amount to be billed for staff services for each phase of
work is as follows:
' STAFF SERVICES FEES
7
r
u
1
*As per Attachment B, the Police Department Renovation fee is estimated at 5% of the project
budget for phases 3 through 7.
* *As per Attachment B, the Community Center projects fee is estimated at 3.75% of the project
New City Hall
Police Dept. Renov.
Community Center
1. Site Evaluation (complete)
done
n/a
n/a
2. Project Planning
$13,320.00
$9,100.00
$5,880.00
3. Schematic Design
$17,760.00
*$3,840.00
* *$900.00
4. Design Development
$17,920.00
*$3,990.00
* *$940.00
5. Construction Documents
$23,560.00
*$5,130.00
* *$1,210.00
6. Bidding
$10,560.00
*$2,400.00
* *$1,060.00
7. Construction Phase
$65,070.00
*$14,640.00
* *$4,690.00
Subtotal
$148,190.00
*$39,100.00
* *$14,680.00
S. Nnticipated Expenses
$26,508.00
$7,005.00
$2,597.00
TOTAL
$174,698.00
$46,105.00
$17,277.00
*As per Attachment B, the Police Department Renovation fee is estimated at 5% of the project
budget for phases 3 through 7.
* *As per Attachment B, the Community Center projects fee is estimated at 3.75% of the project
budget for phases 3 through 7.
STAFF FEE SCHEDULE
Lioness Realty Group
Jim Stacy,
President
$lzs/hr
Joe Waters, R. A.
Project Director
90/hr
Technical and
Financial Analysis
$60/hr
Paraprofessional
45/hr
Cowen Construction
John Cowen,
Principal
Cindy Fuller,
Estimator/
Proj. Dev.
Project Manager
ANTICIPATED EXPENSES BREAKDOWN
Schlagel & Schmidt
Ed Schlagel, P.E.
$90/hr Principal
Project Engineer
60/hr Design Engineer
Engineering Tech.
$60/hr Clerical
Estimated reimbursable expenses
ITEM
1. printing, reproduction, photography, freight/postage
2. travel expenses to include:
meals (for overnight travel)
lodging
mileage @ $.32 /mi
air fare and car rental/parking if required
3. job -site expenses include:
job office (if rental is needed)
utilities
telephone
office supplies
lab tests (if not included under separate agreements)
building permit
job sign
BUDGET ESTIMATE
$7,700.00
200.00
300.00
$5,150.00*
$8,000.00**
1,250.00 **
5,000.00**
1,500.00
5,000.00
by City
2,000.00
0
90/hr
75/hr
60/hr -
$50/hr
30/hr
TOTAL $36,110.00 PP Y
* Assumes air travel. If by vehicle, will lower costa approximately $1,500.00 '
** These items could be reduced or eliminated if the City can provide a structure or space on
site. 9
All reimbursable expenses will be invoiced to you at direct cost without any mark -up for profit.
Additional services of outside consultants, such as environmental specialists, security or detention
specialists, communications systems (typically by selected vendor) is not anticipated at this time,
however, ifit becomes necessary, proposals and recommendations for these services will be presented
to the City for approval prior to proceeding with the work.
N
0
a
N
00
In
rn
ro
a
1
0
c�
+J
ro
Q)
a
V1
v
c
0
•r
J
a
N
N
r�
0
00
rn
a�
v
4.0 Design Development
1 manage/coord. A/E & owner 2
2 systems furniture d.d.
3 cabling d.d.
4 value eng. /construcability
5 meetings and presentations
6 project budget & schedule
12
Staff
Totals:
3,120.00
3,580.00
4,200.00
2,420.00
2,970.00
3,120.00
1,530.00
450.00
4,140.00
2,760.00
2.790.00
4,210.00
1,260.00
990.00
4,020.00
3,960.00
3,480.00
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL, POLICE DEPARTMENT AND COMMUNITY CENTER
FEEJMANHOUR BREAKDOWN
Attachment E
PROGRAM MANAGEMENT TEAM
Project PMT
Const. Project Eng.
Admin. Other Principal Manager Other Princi al E ineer Clerical
New City Hall
Principal Manager
$45/hr $60 /hr $901hr $60/hr $801hr $90mr $75/hr $30/hr
$1251hr $90/hr
Category of Services
1.0 Site evaluation and selection
COMPLETE
2.0 Project Planning
8
4
1 meetings and interviews
24
1
2 draft and final doc. prep.
2
32
8
2
40
3 project budget and schedule
16
4
2
1
2
4 traditional vs lease /purchase
4
12
8
_
3.0 Schematic Design
1
1 manage/coord. A/E & owner
30
4
32
2
2 manage soils, surveying, etc
10
4
3 furniture inven., systems
16
2
4 cabling schematics
4
2
2
32
2
2
10
5 value eng. /construcability
10
2
_
g
8
6 meetings and presentations
16
4
--"
2
32
4
7 project budget & schedule
4
2
4.0 Design Development
1 manage/coord. A/E & owner 2
2 systems furniture d.d.
3 cabling d.d.
4 value eng. /construcability
5 meetings and presentations
6 project budget & schedule
12
Staff
Totals:
3,120.00
3,580.00
4,200.00
2,420.00
2,970.00
3,120.00
1,530.00
450.00
4,140.00
2,760.00
2.790.00
4,210.00
1,260.00
990.00
4,020.00
3,960.00
3,480.00
�1
0
d
N
00
rn
LD
H
00
a
0
U
41
ro
v
V)
v
c
0
a
N
0
00
rn
a�
0
TOTAL HOURS: 10 457 56
GRAND TOTAL STAFF FEE:
514 � I `d `i II�J it
8 115 1353 142 4 32 0 148,190.00
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL, POLICE DEPARTMENT AND COMMUNITY CENTER
FEEIMANHOUR BREAKDOWN
Attachment E
PROGRAM MANAGEMENT TEAM
Staff
Project PMT
Principal Mama er
Const. Project
Admin. Other Princiral Ma a er
Eng.
$90/hr al of Clerical
New City Hall
$125 /hr $90/hr
$45 /hr $60 /hr $901h $60
Sher $75/hr 530/hr
Category of Services
5.0 Constrlctim Documents
8 1B
6
4890,00
1 manage/coord. A/E & owner
2 28
4
1,170.00
2 systems furniture d.d.
12
2
1,170.00
3 cabling d.d.
12
2
4 60
16 2 10
6,750.00
4 value eng. /construcability
10
8 16
16
4,080.00
5 meetings and presentations
16
4 60
-
12
5,400 00
6 project budget d, schedule
7
2
6.0 Bidding
4
—
4 40
2
3,240.00
1 prepare bid packages
2 8
2
1,140.00
2 pre -bid and Q& A
4
2 24
2
1,920.00
3 bid open, rev., recommend
2
4 60
2
4,260.00
4 project budget & schedule
2
7.0 Construction Phase
__.
6 40
10
4,980.00
1 construction meetings
16
12 40
10
8,240.00
2 A/E meetings
24
28
12 40
10
6,600.00
3 City meetings
4 construction coordination
18
2 12 710
10
45,990.00
5 system. fum. ccord.Anspec.
6
2
630.00
630.00
6 cabling coord.Anspec.
6
2
TOTAL HOURS: 10 457 56
GRAND TOTAL STAFF FEE:
514 � I `d `i II�J it
8 115 1353 142 4 32 0 148,190.00
N
00
H
m
rn
00
a
D
0
L
C7
r
ro
v
a
0
W
c
0
J
a
a
N
m
0
rn
0
tr . r it it r it Ir it r r r � r r
6.0 Bidding
SEE PERCENTAGE BELOW
7.0 Constnx1ion Phase
SEE PERCENTAGE BELOW
TOTAL HOURS: 2 52 12 0 11 40 —4 0 0
GRAND TOTAL STAFF FEE:
$9,100 for Project Planning, estimated fee
for balance of PMT work Is 5% of projeELtact of
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL, POLICE DEPARTMENT AND COMMUNITY CENTER
FEE/MANHOUR BREAKDOWN
Attachment E
PROGRAM MANAGEMENT TEAM
Staff
Project
Principal
PMT Const Project Eng
Manager Admin. Other Principal Maur er al
Totals;
Police Department Renov.
$125/hr
$90 /hr $45/hr $60/hr $90/hr $80 Amer �90mr $75/ht�r $30/hr
Category of Services
2.0 Project Planning
2,580.00
8
4
1 meetings and interviews
18
2,880.00
1
2 draft and final doc. prep.
2
24
8
5,660.00
2
40
3 project budget and schedule
10
4
3.0 Schematic Design
SEE PERCENTAGE
BELOW
4.0 Design Development
SEE PERCENTAGE
BELOW
5.0 Construction Documents
SEE PERCENTAGE
BELOW
6.0 Bidding
SEE PERCENTAGE BELOW
7.0 Constnx1ion Phase
SEE PERCENTAGE BELOW
TOTAL HOURS: 2 52 12 0 11 40 —4 0 0
GRAND TOTAL STAFF FEE:
$9,100 for Project Planning, estimated fee
for balance of PMT work Is 5% of projeELtact of
LD
0
a
H
N
03
r,
rn
LD
00
a
0
c�
r
ro
a�
w
0
0
c
0
a
Ln
N
M
0
ro
o�
0
6.0 Bidding
SEE PERCENTAGE BELOW
7.0 Construction Phase E-=--
SEE PERCENTAGE BELOW
TOTAL HOURS: 0 22 6 0 11 40 4
GRAND TOTAL STAFF FEE:
$5,880 for Project Planning, estimated fee
0 0
$30/hr
Totals:
1,880.00
990.00
3,210.00
0 5,880.00
AGREEMENT
FOR
PROGRAM MANAGEMENT SERVICES
CITY OF OWASSO
CITY HALL,
POLICE DEPARTMENT AND COMMUNITY CENTER
FEEJMANHOUR BREAKDOWN
Attachment E
PROGRAM MANAGEMENT TEAM
Project
Princi at
PMT Const Project Eng.
Mana er Admin. el Manager Other
Community Center
$125/hr
$90/hr $4 5/hr $t3 0/hrr j90/hr $90/hr
Category of Services
2.0 Project Planning
8
8
4
1 meetings and interviews
1
2 draft and final doc. prep.
8
4
2
40
6
2
3 project budget and schedule
LEE
3.0 Schematic Design
SEE PERCENTAGE BELOW
4.0 Design Development
SEE PERCENTAGE BELOW
5.0 Construction Documents
E::�
SEE PERCENTAGE BELOW
6.0 Bidding
SEE PERCENTAGE BELOW
7.0 Construction Phase E-=--
SEE PERCENTAGE BELOW
TOTAL HOURS: 0 22 6 0 11 40 4
GRAND TOTAL STAFF FEE:
$5,880 for Project Planning, estimated fee
0 0
$30/hr
Totals:
1,880.00
990.00
3,210.00
0 5,880.00