Loading...
HomeMy WebLinkAbout1998.05.05_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE OWASSO PUBLIC WORKS AUTHORITY TYPE OF MEETING: Regular DATE: May 5, 1998 TIME: 7:00 p.m. PLACE: Council Chambers, Owasso Community Center Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin board at 4:00 p.m. on Friday, May 1, 1998. Marci Boutwell, Authority Secretary AGENDA 1. Call to Order 2. Flag Salute 3. Roll Call 4. Election of Chairperson 5. Election of Vice Chairperson Owasso Public Works Authority May 5, 1998 Page 2 6. Consideration and Appropriate Action Relating to a Request for Approval of the Consent Agenda. All matters listed under "Consent" are considered by the Trustees to be routine and will be enacted by one motion. Any Trustee may, however, remove an item from consent by request. A motion to adopt the Consent Agenda is non - debatable. A. Approval of the Minutes of April 21, 1998 Regular Meeting. Attachment #6 -A ' B. Approval of Claims. Attachment #6 -B ' 7. Consideration and Appropriate Action Relating to a Request for Trustee Authorization to Solicit Bids for the Construction of the Elm Creek Interceptor Sewer. Mr Carr Attachment #7 Bid documents for the construction of the Elm Creek Interceptor Sewer are being ' developed, and the staff will recommend Trustee authorization to advertise for bids for that project. 8. Report from OPWA Manager Owasso Public Works Authority May 5, 1998 Page 3 9. Report from OPWA Attorney 10. New Business 11. Adjournment OWASSO PUBLIC WORKS AUTHORITY MINUTES OF REGULAR MEETING Tuesday, April 21, 1998 The Owasso Public Works Authority met in regular session on Tuesday, April 21, 1998 in the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, April 17, 1998. ITEM 1: CALL TO ORDER Chairman Barnhouse called the meeting to order at 7:05 p.m. ITEM 2: INVOCATION Mr Jim McElrath, Support Services Director, offered the invocation. ITEM 3: FLAG SALUTE Councilor Michael Helm led in the flag salute. ITEM 4: ROLL CALL PRESENT Mary Lou Barnhouse, Chair Michael Helm, Trustee Denise Bode, Trustee Mark Wilken, Trustee STAFF Rodney J Ray, City Manager Ronald D Cates, Authority Attorney Marcia Boutwell, Authority Secretary ABSENT Tracy Standridge, Vice Chair ITEM 5: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR APPROVAL OF THE CONSENT AGENDA. A. Approval of the Minutes of April 7, 1998 Regular Meeting. B. Approval of Claims Dr Bode moved, seconded by Mr Wilken, to approve the consent agenda. The consent agenda included minutes of the April 7, 1998 regular meeting, by reference made a part hereto. Item B on the consent agenda included the following claims: (1) OPWA Fund $21,875.79; (2) OPWA Sales Tax Fund $48,394.40; (3) Payroll $27,083.97. AYE: Bode, Wilken, Helm, Barnhouse NAY: None Motion carried 4 -0. Owasso Public Works Authority April 21, 1998 ITEM 6: CONSIDERATION AND APPROPRIATE ACTION RELATING TO THE AWARD OF A CONTRACT FOR THE BULK PURCHASE OF LOW DENSITY POLYETHYLENE YARD /LAWN WASTE BAGS Mr Roberts said that the City of Owasso began selling plastic yardwaste bags to citizens in the Spring of 1992. The bags are made of a low density polyethylene and are used exclusively for yardwaste disposal. Projections indicate that approximately 20,000 yardwaste bags will be used during the 1998 collection season, and there are currently 10,000 bags on hand. Two vendors responded to a request for sealed bids for bags, and the apparent low bidder is XPEDX of Tulsa. Since the City has had no previous experience with XPEDX, a sample bag was requested. Although the bag is not clear, the contents can be seen and staff believes it meets specifications. Mr Helm moved, seconded by Dr Bode, to approve the purchase of 20,000 yard /lawn waste bags from XPEDX of Tulsa, OK in the amount of $1854, and authorization for payment. AYE: Helm, Bode, Wilken, Barnhouse NAY: None Motion carried 4 -0. ITEM 7: CONSIDERATION AND APPROPRIATE ACTION RELATING TO OPWA RESOLUTION 98 -04, A RESOLUTION ESTABLISHING FEES FOR THE CONNECTION OF ANY WATER OR WASTEWATER SERVICE LINE OR MAIN LINE TO THE CITY'S WATER DISTRIBUTION OR WASTEWATER COLLECTION SYSTEM. I Mr Carr presented the item. The water connection fee represents the cost of installation of a ' new water meter, with associated costs for inspection of the installation and some administrative costs. Fees currently in place have not been revised or updated since being adopted in 1986. The wastewater connection fee is an arbitrary amount established to recapture some of the costs ' of constructing excess capacity in the collection system and treatment plant to handle future users. Resolution #98 -04 establishes fees for connection to the water distribution system and the wastewater collection system. Mr Wilken moved, seconded by Mr Helm, to adopt OPWA ' Resolution #98 -04, increasing the connection fee for wastewater service lines from $375 to $400 and increasing the connection fee for water service from $350 to $400. AYE: Wilken, Helm, Bode, Barnhouse NAY: None Motion carried 4 -0. Owasso Public Works Authority April 21, 1998 ITEM 8: CONSIDERATION AND APPROPRIATE ACTION RELATING TO THE AWARD OF A CONTRACT FOR WATER SERVICE INSTALLATIONS AND PAYMENT FOR WORK PERFORMED UNDER SUCH CONTRACT. Mr Carr said that because of increasing development in the Owasso area, field crews in the Public Works Department Water Distribution Division have been spending considerable time installing new water meters, while needed preventive maintenance for the rest of the system has not been done. Bids have been solicited from private companies to privatize meter installations, including the performance of all work required and the provision of all materials except for the meter. Five vendors submitted bids, with Cunningham Plumbing Co Inc of Tulsa the apparent low bidder. They have been performing similar installations in the City of Tulsa for 15 years. Dr Bode moved, seconded by Mr Wilken, to award a contract for the installation of municipally - owned water meters to Cunningham Plumbing Co Inc, Tulsa, OK, and to authorize payments in accordance with the submitted bid schedule. AYE: Bode, Wilken, Helm, Barnhouse NAY: None Motion carried 4 -0. IITEM 9: REPORT FROM OPWA MANAGER Mr Ray reported on the success of the City's privatization programs. ITEM 10: REPORT FROM OPWA ATTORNEY No report. ITEM 11: UNFINISHED BUSINESS None. ITEM 12: NEW BUSINESS None. Owasso Public Works Authority ITEM 13: ADJOURNMENT Dr Bode moved, seconded by Mr Helm, to adjourn. AYE: Bode, Helm, Wilken, Barnhouse NAY: None Motion carried 4 -0, and the meeting was adjourned at 7:30 p.m. Marcia Boutwell, Authority Secretary April 21, 1998 Mary Lou Barnhouse, Chairperson DEPARTMENT TOTAL ====> OPWA ADMINISTRATION ..... OSCAK ITI[ nuxIn nc/cn 98O221 CITY OF OWASSO TYRONE DINKINS 980221 OWASSO PUBLIC WORKS AUTHORITY 981O74 HOWARD STAMPER RETAINER/SERVICES 5/01/98 8:24:39 A/P CLAIMS REPORT APAPYR PO # VENDOR REPAIR/MAINT SUPPLIES DESCRIPTION DEPARTMENT TOTAL ====> OPWA ADMINISTRATION OSCAK ITI[ nuxIn nc/cn 98O221 AT&T WIRELESS SERVICES PHONE USE,PURCHASE TYRONE DINKINS 980221 AT&T WIRELESS SERVICES PHONE USE-ROBERTS 982353 981O74 HOWARD STAMPER RETAINER/SERVICES 981.764 BOLAY MOBILECOM INC RADIO REPAIR PARTS READER 982386 WAL-MART REPAIR/MAINT SUPPLIES METER 982464 SUBURBAN OFFICE SUPPLY OFFICE SUPPLIES DEPARTMENT TOTAL ====> WATER 982351 OSCAK ITI[ nuxIn nc/cn 11.1-1-1 980423 982352 TYRONE DINKINS METER READER YALE UNIFORM RENTAL 982353 RANDY ALEXANDER METER READER 982354 BRAD SPARKMAN METER READER 982355 BRANDON HAMILTON METER READER 982272 COOPER WHOLESALE DEPARTMENT TOTAL ====> 982391 WATER ----- WASTEWATER 98O656 98O836 TREATMENT PLANT YALE UNIFORM RENTAL UNIFORM CLEAN/RENT SLUDGE ANALYSIS Wal AMOUNT 211.O8 1O.65 98O221 AT&T WIRELESS SERVICES PHONE USE-ALL 980423 WATER FSODUCTS INC WATER METERS 3/18/97 980656 YALE UNIFORM RENTAL UNIFORM CLEAN/RENT 980994 WATER PRODUCTS INC REPAIR SUPPLIES 982269 GRAPHIC CONTROLS CORP CHART RECORDER PAPER 98227O ARMY NAVY SURPLUS HIP WADER BOOTS 982272 COOPER WHOLESALE HYDRANT EXTENSION 982391 ROD HUNT TOP SOIL 982392 BROWN FARMS SOD SOD-REPAIRS 982395 DEPT OF ENVIRONMENTA\- QUA TEMP WATER LICENSE-JOHNSO 982474 BROWN FARMS SOD SOD-REPAIRS 982487 WATER PRODUCTS INC REPAIR SUPPLIES N� DEPARTMENT TOTAL ====> WASTEWATER 98O656 98O836 TREATMENT PLANT YALE UNIFORM RENTAL UNIFORM CLEAN/RENT SLUDGE ANALYSIS Wal AMOUNT 211.O8 1O.65 150.00 38.55 5.41 28.99 ------------- 444.68 358.65 264.60 359.10 254.70 225.45 37.31 3,173.2O 187.40 73.89 158.97 160.00 1.501.00 35.00 40.00 60..00 55.74 4,563.51 126.60 160.O0 OWASSO REFUSE COLLECTIONS 980656 OWASSO PUBLIC WORKS AUTHORITY 147.40 5/01/98 8:24:39 A/P CLAIMS REPORT APAPVR PAGE: 10 PO # VENDOR DESCRIPTION AMOUNT 981190 FISHER SCIENTIFIC LAB SUPPLIES 637.75 982051 ADVANCED CHEMICAL CHLORINE 605.00 982284 WATER PRODUCTS INC RAIN GAUGE 110.00 982300 ALSUMA TRUCK REPAIR INC REPAIR 1984 INTERNATIONAL 53.90 982386 WAL-MART REPAIR/MAINT SUPPLIES 29.62 982390 HOWARD STAMPER INSTALL RADIO-TRUCK 35.00 982505 GRAPHIC CONTROLS CHARTS,MARKERS 257.30 N� 982389 DEPARTMENT TOTAL ====> ............ .................. .............. - 0905'17 ~ WASTEWATER COLLECTION VEHICLE LIGHT BARS 168..87 _________________________ CROW BURLINGAME REPAIR SUPPLIES 52.93 � 980221 AT&T WIRELESS SERVICES PHONE USE-ALL 39.11 + 980656 YALE UNIFORM RENTAL UNIFORM CLEAN/RENT 126.60 � 981867 LARRY SPENCER CHEVROLET PICKUP TRUCK-1/20/98 16,246.13 ~ 982085 WAL-MART JEANS-FRANCISCO/DICKINSON 36,078.26 ` 202.84 982194 SMITH & LOVELESS IMPELLER PUMP-117TH ST 2,777.26 � 982270 ARMY NAVY SURPLUS HIP WADER BOOTS 264.95 982465 CROW BURLINGAME VEHICLE LIGHT BARS 168.87 ^ 982466 WOODS PORTABLE WELDING WELD PLATE 60.00 � 982473 CROW BURLINGAME REPAIR SUPPLIES 22.76 982482 PACE PRODUCTS OF TULSA IN OXYGEN CYLINDERS 90.00 ' 982492 WATER PRODUCTS INC SEWER LINE REPAIRS 72.57 ~ DEPARTMENT TOTAL -------------- 20,071.09 REFUSE COLLECTIONS ------------------------------ 980656 YALE UNIFORM RENTAL UNIFORM CLEAN/RENT 147.40 ' 981764 BOLAY MOBILECOM INC RADIO REPAIR PARTS 16.55 ` 981867 LARRY SPENCER CHEVROLET PICKUP TRUCK-1/20/98 17,O36.13 982085 WAL-MART JEANS-MARADOS 96.88 - 982158 WASTE MANAGEMENT OF OKLA COMMERCIAL REFUSE 3/98 14,311.66 982278 HANES SHOE & ARCH SHOP SAFETY BOOTS-BURTON 110.00 982300 ALSUMA TRUCK REPAIR INC REPAIR 1984 INTERNATIONAL 1,711.44 " 982388 WILLIAMS REFUSE EQUIPMENT POLYCART AXLE CAPS 32.88 982389 HUGHES LUMBER CO CEMENT GRAVEL MIX 61.30 ~ 982465 CROW BURLINGAME VEHICLE LIGHT BARS 168..87 982473 CROW BURLINGAME REPAIR SUPPLIES 52.93 � 982480 DOZIER PRINTING PRINTED FORMS 42..22 + 982481 OWASSO GLASS DOOR GLASS-INTERNATIONAL 85.00 982516 M.E.T. HOUSEHOLD POLLUTANT PROGR 2,205.00 � DEPARTMENT TOTAL ====> ------------- 36,078.26 ` = RECYCLE CENTER ^ ------- ....................... ~ CITY OF OWASSO OWASSO PUBLIC WORKS AUTHORITY 24 A/P 8:39 CLAIMS REPORT APAFVR PAGE: 11 5/01/98 i PO # VENDOR DESCRIPTION AMOUNT 980656 YALE UNIFORM RENTAL UNlFORM CLEAN/RENT 56.00 1,7O1.17 982071 WASTE MANAGEMENT OF OKLA RECYCLE-REFUSE DEPARTMENT TOTAL ====> 1 757 17 66 282 38 CITY OF OWASSO OPWA CAPITAL IMPROVEMENT FUND 5/01/98 8:24:39 A/P CLAIMS REPORT APAPVR PAGEI: PO # VENDOR DESCRIPTION AMOUNT DEBT SERVICE 980003 BANK ONE 980003 BANK ONE DEPARTMENT TOTAL ====> WASTEWATER 980309 HUB + GARVER DEPARTMENT TOTAL WWTP IMPROVEMENTS OWRB LOAN OWRE LOAN 980023 WALTERS MQRGAN CONSTRUCTI WWTP IMP 11/05/96 DEPARTMENT TOTAL FUND TOTAL 3,390 .24 21,116-11. 24,5O6..35 1O,4O0 OO 1O,4OO-OO 27,3O9-3O 27,309..3O 62,215..65 CITY OF OWASSO OPWA SALES TAX FUND 5/O1/98 8:24:39 A/P CLAIMS REPORT APAPVR PAGE: PO # VENDOR DESCRIPTION AMOUNT REVENUE BONDS 9800O2 BANK ONE TRUST CO, NA DEPARTMENT TOTAL ====> FUND TOTAL ====/ N� TOTAL ====> GRAND 98 REVENUE BONDS 85,595.42 ------------- 85,595.42 85,595.42 ------------- 3O6,177.O6 CITY OF OWASSO OPWA A/P TRANSFER REPORT VENDOR DESCRIPTION AMOUNT TRANSFERS CITY GARAGE TRANSFER FROM OPWA 5,750.00 WORKERS' COMP SELF -INS TRANSFER FROM OPWA 3,842.50 GENERAL FUND TRANSFER FROM OPWA 27,855.33 TRANSFERS TOTAL 37,447.83 OWASSO PUBLIC WORKS AUTHORITY PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 04/25/98 DEPARTMENT OVERTIME TOTAL OPWA dmin sirat�on 0 00 $4,T30 87: Utility Billing 0.00 17740.82 Wastewater Refuse 295.14 5,430.15 91.82 FUND TO'TAi. $1;278 90 $27,811;:18 APPROVED: 05/05/98 Chairman Trustee Trustee MEMORANDUM TO: HONORABLE CHAIR AND TRUSTEES OWASSO PUBLIC WORKS AUTHORITY FROM: F. ROBERT CARR, JR., P.E. PUBLIC WORKS DIRECTOR SUBJECT: ELM CREEK INTERCEPTOR AUTHORIZATION TO BID DATE: April 29, 1998 BACKGROUND: The impact of growth places demands on the infrastructure of the city, specifically on the wastewater collection and treatment system. It is the policy of the Owasso Public Works Authority to be proactive, rather than reactive in matters of growth and development. On January 6, 1998, Owasso Public Works Authority Resolution No. 98 -01 adopted the 1997 Wastewater Master Plan as a policy statement for the extension, expansion and development of privately- financed and publicly - financed improvements of the City of Owasso municipal wastewater collection and treatment system (see Attachment 1). Proper planning and development of infrastructure directly impacts future growth and the 1997 Wastewater Master Plan was prepared to serve as the "road map" for present and future wastewater collection system infrastructure needs. The document incorporates a methodology that combines detailed sewer drainage basins, projected land uses and estimated population densities to calculate wastewater flow in the basin. The flow values were then evaluated to determine collection line and lift station pump sizes, which are computer- modeled to assess existing and future system needs. System needs are detailed in the report based on the present, 5 -, 10- and 20 -year growth projections. It was recognized that implementation of the Wastewater Master Plan has the potential to have significant wide - ranging impacts concerning present and future infrastructure. Costs associated with expansion and extension of the wastewater collection and treatment system can affect development feasibility. SYSTEM GROWTH REQUIREMENTS: As new development occurs in Owasso, wastewater collection system expansion is generally projected to be divided into two (2) major collection zones. These zones are east of Highway 169 and west of Highway 169. Presently, all collected flow is ultimately transported to the Wastewater Treatment Plant. ELM CREEK INTERCEPTOR APRIL 29, 1998 PAGE 2 Flows from the east side of Highway 169 are pumped to the plant through a lift station located at 117th E. Avenue near 71st Street North. The Master Plan indicates that a significant portion of the future development that is projected to occur in the next 20- years will contribute flow to the 117th E. Avenue Lift Station. The growth that is projected on the eastern side of Highway 169 will require that some improvements are made in order to allow these higher flows to reach the main plant. In addition, the Master Plan provides detail concerning development in the Elm Creek drainage basin as follows: The Elm Creek basin is projected to have a substantial amount of development within the next 20- years. A large portion of this growth will occur in the next 5 -years in the vicinity of the Brentwood lift station [located on 86th Street North east of the Junior High School]. The station itself has adequate ability to serve all of the new development that is projected to the north of 86th Street North and east of the existing development; however, the flows will cause severe overloading in the Elm Creek interceptor downstream of the Brentwood discharge... Ultimately, the construction of a gravity along Elm Creek will relieve the Brentwood station and in doing so will relieve the overloadiniz. Some development is expected to occur south of the Brentwood lift station within the next 5- years. These areas cannot be served by gravity lines into the Brentwood lift station or into any part of the existing collection s sy tem. Additional development is projected further south (downstream) of the area within 10- years. Further downstream more development is projected within 20- years. Development of this basin from upstream to downstream prevents the natural iterative construction of the East Elm Creek Interceptor. Because of this, intermediate alternatives [were] evaluated to determine the most cost - effective method of providing sewer service to these areas. Proposed development in this area has been occurring as described in the Master Plan. At present, development plans have been submitted that will require wastewater collection for essentially the entire undeveloped area south of 86th Street North between North 129th E. Avenue and North 145 E. Avenue (Albertson's and Owasso Golf and Athletic Club). Other development is likely to occur north and east of 86th Street North and North 145th E. Avenue, as well as with continued development north of 86th Street North west of North 145th E. Avenue (Silvercreek Addition). To accommodate growth as projected, the Master Plan incorporates scenarios that combine expansion of gravity interceptors, interim lift stations and force mains over a 20 -year period. The 5 -year development plan (see Attachment 2 - Figure V -15 from the Master Plan) includes extension of the interceptor to the north, flow diversion from the Brentwood lift station and construction of two (2) interim lift stations and force mains. As development continues, the 10- year development plan includes elimination of the two lift stations, extension of the interceptor south to 76th Street north and construction of another interim lift station and force main (see ELM CREEK INTERCEPTOR APRIL 29, 1998 PAGE 3 Attachment 2 - Figure V -16 from the Master Plan). The 20 -year development plan (see Attachment 2 - Figure V -17 from the Master Plan) shows the elimination of the lift station and continuation of the interceptor south toward the 117th E. Avenue lift station. Ultimately, the Elm Creek basin will be served by a gravity sewer interceptor system. Three (3) interim lift stations and three (3) force mains will be removed or abandoned. PROPOSED ELM CREEK INTERCEPTOR PROJECT: Recent activity involving the undeveloped area south of 86th Street North between North 129th E. Avenue and North 145 E. Avenue (Albertson's and Owasso Golf and Athletic Club) has resulted in discussion concerning a long -term method to provide wastewater collection. Provision of interim lift stations and force mains for this area and their short -term costs have been evaluated. Consulting engineers (Crafton, Tull & Associates, Inc.) for Lindsey Properties (Owasso Golf and Athletic Club) have approached engineering staff to determine feasibility of constructing the interceptor. Constructing the interceptor would eliminate costs of constructing lift stations that are intended to be rather short - lived. The majority of expense of lift station and force main construction would be lost once the interceptor is ultimately constructed. Crafton, Tull has proposed that Lindsey construct the portion of the interceptor from 76th Street North to a point on the south side of the Owasso Golf and Athletic Club property (see Attachment 3). The portion of the interceptor from the 117th E. Avenue lift station to 76th Street North would be constructed by the City of Owasso. Construction of the interceptor in this manner (i.e., from south to north) will enable wastewater collection to be accomplished without The need for interim facilities and enable the system easily to be extended north. PROJECT COSTS: The interceptor is sized and designed to carry additional flows for the total area to be served ultimately. As a result, costs of construction should be allocated to appropriate undeveloped property in the basin in order to proportionately distribute construction expenses to present and future users of the interceptor. A detailed evaluation of construction costs has been performed by Crafton, Tull & Associates. Considerable effort was also expended to identify the extent of rock in along the route of construction in order to prepare a realistic cost estimate. As a result of this work, the interceptor has a total probable construction cost of approximately $1,587,382. The line will continue through a portion of the Club property at the developer's expense and then extended to the intersection of 86th Street North and North 145th E. Avenue. Engineering for the project is estimated to be $75,000 and a right -of -way acquisition allowance of $50,000 has been included. Total probable project cost is estimated to be $1,712,382. Users of the interceptor are expected to contribute to the project costs based upon their contribution to the amount of wastewater generated. Staff believes that this contribution is ELM CREEK INTERCEPTOR APRIL 29, 1998 PAGE 4 directly attributed to development acreage. Therefore, the present undeveloped interceptor drainage area has been compiled to determine a per acre charge for the interceptor construction. A total of 1378 undeveloped acres were identified (see Attachment 3). Present and near -term development potential Reimbursement of project costs have been estimated as $1,242.66 per undeveloped acre (total project cost of $1,712,382 =1378 acres). Based on present and near -term development plans, approximately 909.6 acres (areas D, F, H, I, J, K, L, P, and Q) are identified to develop relatively quickly. Reimbursable costs of $1,130,324 (approximately 66% of the total estimated project costs) are associated with these areas. Short -term development potential Another 369.4 acres (areas E, G, M and N) can be expected to develop in the in the next few years. Reimbursable costs of $459,039 (or an additional 27% of the total estimated project costs) area associated with these areas. Long -range development The remaining 99 acres (areas A, B, C and O) are not expected to develop in the immediate future. Associated costs of $123,023 (7% of the total project) would remain uncollected until development occurs. OTHER PUMPING AND TREATMENT CONSIDERATIONS: Flow Equalization at 117th E. Avenue lift station Wastewater flows in the Elm Creek Interceptor to the 117th E. Avenue lift station. As the flows increase, the Master Plan indicates that some improvements will need to be made in order to allow these higher flows to reach the Main Plant. The most cost - effective improvement will be the construction of a flow equalization basin near the lift station to provide storage and constant pumping to the plant. Land will need to be acquired near the lift station to accommodate a total of 10- million gallons of wastewater storage. It is projected that the facility would be constructed in two 5- million gallon phases by year 2002 and 2007. Total present worth capital cost is estimated as approximately $3,600,000. Wastewater Treatment Capability The present Wastewater Treatment facility will have capacity to treat 2.15 million gallons per day (MGD) at the completion of Phase I improvements presently under construction. Phase II improvements will need to be operational in the year 2001 to increase capacity to 3.3 MGD (see Attachment 4 - Phasing of Improvements). Future planning for additional capacity will need to be initiated in the year 2012. Treated wastewater flows to Owasso Creek, then ultimately to Bird Creek. The discharge effluent quality to the creek is modeled based on Bird Creek water quality criteria. An amendment to the Facility Plan for the Wastewater Treatment Plant (prepared in September 1994) indicates that ELM CREEK INTERCEPTOR APRIL 29, 1998 PAGE 5 the present [treatment plant] site may not be cost - effective for expansion beyond the proposed planning period [through the year 20151. Future growth will more than likely occur east of Highway 169 in which case a new second plant in that area may yrove to be more cost - effective than to pump the flow top the present site for treatment. Further expansion of the existing site will require considerable amount of fill and flood protection. Construction of a new facility on the east side of Highway 169 would be expected to be in the vicinity of the 117th E. Avenue lift station, since the station is the terminus of the gravity collection system and the proposed location of flow equalization. Discharge of treated wastewater from the facility would likely be to another location on Bird Creek. Water quality modeling for this discharge would be performed by INCOG. Based on conversations with modeling personnel, it is anticipated that modeling will result in significantly higher treatment requirements for a new facility as well as for the existing plant. Advanced treatment to remove more organics, suspended solids and to include nutrient removal should be expected for both discharges. Construction costs of a new facility and needed retrofitting of the existing plant cannot be accurately determined until the level of treatment is defined. However, the 1.15 MGD expansion for Phase II improvements at the existing facility is projected to be approximately $6.7 million. If construction of a 2 MGD plant is needed on the east side of Highway 169 in year 2015, costs at that time can be expected to exceed $12 million. INTERCEPTOR DESIGN DOCUMENTATIONS: Crafton, Tull & Associates have developed design documents and specifications for the interceptor. Public Works Department Engineering Division staff have reviewed the documents. The final plans have been approved by Engineering. Bid documents and the advertisement are ready to be published. PROJECT SCHEDULE: The proposed schedule for the project is as follows: Advertisement Pre -bid Conference Bid Opening Award of Bid Notice to Proceed Construction Complete May 7 and 14, 1998 May 27 June 9 June 16 June 24 November 21 (150 calendar days) The developer desires to have the first phase of apartments completed around October 1st. As a result, means to expedite construction will be evaluated. ELM CREEK INTERCEPTOR APRIL 29, 1998 PAGE 6 PROJECT FUNDING: During the March 17, 1998 meeting of the OPWA, the staff reported to the Trustees that there was a "unique window of opportunity" available to partner with the private sector in constructing this interceptor (see attached memo dated March 13, 1998). The concept forwarded was one that allows the entire interceptor to be constructed (rather than utilizing costly temporary solutions) with city- backed financing supported by a private sector "pay- back" as property develops. The Trustees directed the staff to further develop the financing concept, as well as the construction plans for the project. As stated above, the plans and specifications have been completed and the project is ready for bid. Additionally, the staff has explored three options as viable approaches to financing the project using the "pay- back" concept. Those options are 1) a self - funding (revenue anticipation note to the OPWA from the City of Owasso) method; 2) use of a local financial institution (direct loan to the OPWA); and 3) a revenue bond issued by the OPWA. An analysis of those options is currently in progress, with a recommendation expected within the next week. RECOMMENDATION: Staff recommends Trustees authorization to bid construction of the Elm Creek Interceptor. ATTACHMENTS: 1. Memorandum Dated March 13, 1998 2. Resolution No. 98 -01 3. Elm Creek Basin plans from 1997 Wastewater Master Plan (3 sheets) 4. Elm Creek Interceptor Drainage Area 5. Phasing of Improvements 6. Design Drawings MEMORANDUM TO: FROM: THE HONORABLE CHAIR & TRUSTEES OWASSO PUBLIC WORKS AUTHORITY RODNEY J RAY CITY MANAGER SUBJECT: REQUEST TO DEVELOP CONCEPT PLAN FOR CONSTRUCTION OF ELM CREEK INTERCEPTOR (WASTEWATER COLLECTION LINE) DATE: BACKGROUND: March 13, 1998 For the past several months, the staff has monitored the increasingly rapid development of the area east of 129th East Ave between 76th St N and 96th St N. Recent land purchases and residential development in that area have, predictably, resulted in development plans that are even greater than originally thought (and a more rapid rate of development). A factor influencing growth in that area is the ability/capability to provide wastewater collection and treatment facilities in order to create an economically feasible development. The City has recently adopted a wastewater master plan that addresses the needs and projections for the development of the area east of 129th East Ave (specifically) as a part of the entire system. Generally, the plan notes the need for an interceptor line (a major collector line that serves to collect wastewater from a large area) to be constructed to collect wastewater from a significant area east of 129th East Ave and north of 76th St N. That interceptor is planned to "gravity flow to the 117th St lift station where the flow would be "pumped" to the city's treatment plant. Eventually, the city's facility plan and master plan call for the construction of a second treatment plant at the 117th St lift station site. Based on the known development plans for the area, the staff believes the city has a unique window of opportunity to partner with the private sector. The concept is for the construction of the base portion of the proposed gravity flow interceptor line, thus avoiding costly temporary lift stations and "forced mains." While the temporary solutions that would be allowed under the city's development plans will allow development, they will have to eventually be removed and the interceptor constructed. The problem with the immediate construction of the interceptor by the private sector is that it is not economically feasible for one developer to undertake. Additionally, it is difficult for developers to jointly undertake such a project because those separate projects do not generally take place in the same time frame. ATTACHMENT ELM CREEK INTERCEPTOR MARCH 13, 1998 _ PAGE 2 There is, however, an opportunity for the city government to play a role in the project by providing financing to the project under a "payback" concept. While the base portion of the project is larger than a single developer can justify, the city could use its borrowing powers to 1 6W complete that portion of the project and require developers to tie into the system and "payback" the city its proportional share of the cost of the design, construction and financing of the project. This concept is widely utilized in most growth cities as a means to develop large areas by ' sharing the cost of infrastructure. In 1982, the City of Owasso (OPWA) determined that the western and northern areas of the city needed a development incentive (as well as an improvement to some existing facilities) and constructed the "Ranch Creek Interceptor." The entire project cost was born by the city using borrowed funds. While the project did accomplish an immediate goal of improving the collection system (and allowing for the shutdown of several costly lift stations), its success as an incentive for development was not as hoped. Eventually, the interceptor proved beneficial as a relief for the rest of the system, but only now are we realizing the originally planned benefits for growth. The proposed Elm Creek Interceptor, however, differs conceptually from that previous project in that development plans (Owasso Golf and Athletic Club, KMO Commercial Development, Silver Creek residential and two unnamed office -type developments) are currently being processed by the city. Additionally, the use of a "payback" concept should result in the city having only to pick up about $132,000 of the estimated 1.8 million dollar project (due only to the fact that some of the property in the collection area may not develop in the foreseeable future. REQUEST: The request is for authorization for the staff to develop a plan for the design, construction and funding of a 1.8 million dollar wastewater project based on the above - described "payback" concept. If the request is approved, the staff will further develop the concept and present options to the Trustees as soon as possible. NOTE: Approval of this request does not authorize the project or expenditure of any funds without future Trustee approval. RECONVAENDATION: The staff recommends Trustee approval of a request to authorize the City Manager to develop a plan for presentation to the OPWA that relates to the use of a "payback" concept in the design, construction and funding of the Elm Creek Interceptor project. ELM CREEK INTERCEPTOR MARCH 13, 1998 PAGE 3 NOTE: Please review the attached detailed memorandum from Robert Carr outlining cost and other issues relating to this project. ATTACHMENTS: 1. Memorandum from Robert Carr 2. Maps showing proposed project and areas subject to payback provisions OWASSO PUBLIC WORKS AUTHORITY OWASSO, OKLAHOMA RESOLUTION NO 98 -01 A RESOLUTION ADOPTING THE WASTEWATER 1IASTER PLAN AS A STATEMENT OF THE AUTHORITY'S POLICY FOR THE EXTENSION, EXPANSION AND DEVELOPMENT OF THE CITY OF OWASSO MUNICIPAL WASTEWATER COLLECTION AND TREATMENT SYSTEM. WHEREAS, the City of Owasso, Oklahoma is one of the fastest growing communities in the state; and, WHEREAS, the impact of that growth places it great deal of stress on the infrastructure of the city, specifically on the wastewater collection system: and, WHEREAS, proper planning and development of infrastructure today will directly impact growth development tomorrow; and, WHEREAS, it is the policy of the Owasso Public Works Authority to be proactive rather than reactive in matters of growth and development; and, WHEREAS, FHC Inc was awarded a contract on December 5, 1995 to develop a wastewater master plan; and, WHEREAS, a wastewater master plan, dated September 1997, has now been completed; and WHEREAS, the Trustees of the Owasso Public Works Authority, Owasso, Oklahoma have reviewed the 1997 Wastewater Master Plan as developed by FHC Inc and desire to adopt the plan as a policy statement for the development, expansion and extension of privately financed and publicly financed improvements to the municipal wastewater collection and treatment system of the City of Owasso. NOW, THEREFORE, BE IT RESOLVED BY THE TRUSTEES OF THE OWASSO PUBLIC WORKS AUTHORITY, OWASSO, OKLAHOMA that the Trustees of the Owasso Public Works Authority hereby adopt the 1997 Wastewater Master Plan as a policy statement for the Authority. PASSED AND APPROVED this 6th day of January, 1998 by the Trustees of the Owassq Ptitilic: Works Authority, Owasso, Oklahoma. Mary Lo arnhouse, Chairperson Marcia Boutwell, Authority Secretary APPROYO AS TO FORM: D Cates, Authority Attorney ATTACHMENT 2 BENCH MARKS BASED ON MEAN SEA LEVEL, NDVO 1929 ADMTYCNT Number D- Aplian BM -1 NORTH RIM OF EXISTING MANHOLE /325 ELEV. 592.69 SM -2 NORTH RIM OF EXISTING MANHOLE 9300 ELEV. 589.92 BM -3 60d NAIL IN THE SOUTHEAST FACE OF 14' HACK BERRY TREE ELEV. 586.22 BM -4 50d NAIL IN THE SOUTH FACE OF 22' LOCUST TREE EU.EV. 598.12 BM -5 SOD NAIL IN THE SOUTH FACE OF FENCE POST ELEV. 59621 BM -6 60d NAIL IN THE NORTH FACE OF POWER POLE ELEV. 599.11 BM -7 GPS 9203 ELEV. 600.24 BM -8 CHISELED SQUARE ON THE SOUTHEAST CORNER OF BR!CGE AT 129th AVENUE ENV. 593.47 SM -9 ECd NAIL IN THE SOUTH FACE OF 24" =SCAN TREE E 'v. 590.82 BM -1C ECC NA :L IN T -E SOUTH FACE OF 14' E.M. TREE ELEV. 590.82 SM -11 E,c NAIL IN T c SOUTHEAST FACE OF 20' EYCAMORE IRE= ELEV. 586.22 BM -12 15, NAIL IN THE SOUTH FACE OF 26' HACK BERRY TREE ELEV. 597.86 BM -13 EOd NAIL IN THE SOUTH FACE OF 24' ELM TREE ELEV. 600.80 BM -14 6011 NAIL IN THE WEST FACE OF 30' HACK BERRY TREE ELEV. 604.30 BM -15 CDS 92 ELEV. 605.40 SM -16 600 NAIL IN THE NORTH FACE OF 10' ELM TREE ELEV. 606.79 BM -17 CHISELED SOUARE ON THE SOUTHWEST CORNER OF LOW' WATER BRIDGE AT 78th ST. ELEV. 605.57 BM -16 604 NAIL IN Tn'E NORTHEAST FACE OF 18' -ACK BERRY TR_E ELEV. 610.54 SM -19 6% NAIL IN TE EAST FACE OF 12' -ACK BERRY -EE ELEV. 615.29 4 6 9 r y SURVEY CONTROL SANITARY SEWER MANHOLE COOR. LIST NAD 81 06A1WA STATE PLANE NOR1H TONE PT. NO. NORTHING EASING OESCRIphON PT. N0. NORTHING EASDNG DESCWTION 1 6]341 ASIO x33,.1750 GPS 209 645a1.9am 5729.19. OS-2 2 67391.7620 10959.eno WS 210 64362. .79 5793.3818 O5-] 3 5 67421.6]60 ro139.0460 13650.3880 10667.8170 OPS 6'S 211 212 641224375 637914706 5795.5261 05-4 5]90.4702 OS-5 6 9 70037.4110 72 71.7050 i1S36.Se90 1]33421]0 CPS CPS 213 214 61811.2291 6]529.91576 6198.030, OS-8 6597.5901 05-7 13 IS 72665.2061 n68SZ75 125657521 12206.3160 SET NAIL FOUND NAL 215 216 S3a73.2075 63925.0154 5944.9113 OS-e 7291.0557 05-9 15 19 72699.3750 71756.6265 1x924.2455 129422590 FOUND Nu_ FOUNC 11. PN 7] 216 63917.9573 6395,.3016 7620.2566 05-1C ]919.9601 OS-,•. 39 11 10096.5763 70043611] 1145].5441 12269.5592 SET NA. FOUND IRDw PIN 219 220 6397].2]14 '3971x]14 62,9.7228 OS-12 a]78.722B OS-13 42 47 71365.67]9 700733326 1ZZ36.5]54 1]565.2109 FOUND .. PIN FND PPE 221 222 WOZ7.1011 641]29642 Iw,S Ine 05-14 6320.4794 O5-IS Q1 67307.9435 83511605 FOUND IRON PIN 223 64104.1608 15'15.2414 05-16 61 ISO 700163422 72650.7222 109421694 1}1831555 OENTSEC FOUND IRON RN SET R. RN 224 225 6430x.6392 64262.3665 6900.2968 OS-15 9272.1570 05-18 151 750.8270 13495'9]5 SET 'ON RN 22 64462.72)6 9539.8635 OS-19 152 153 740.'718 70599.1273 12995.7D09 1]321.32W SET RON RN SET IRON RN 227 228 641536.5994 648121429 97841597 05 -2C 99739528 05-21 154 155 70696.0665 703]5.5572 13521//7 13a32e093 SET ROH RN SET RCH RX 229 230 6190].]850 65Q)5.45e4 10094.7009 05-22 10313.9005 05-23 156 157 70]]6.4162 69909.5117 1x27.3670 13191.5607 SET IRON RH SET IRON RN 231 232 65]927]39 65572.1600 10274/317 05-21 10165.8]x6 05-25 156 674763325 13241.6549 SET IRON PIN 233 '5619.5405 99]0.6x45 05-26 159 160 67464.6616 69187.7002 12679.7997 126]6.5063 SET RO RN SET IRON RN 235 276 66149.6047 66324.4971 10056.4166 05-25 10300.3073 OS-29 161 188 89175.9'61 ]111114]1 12264.1619 12300.0'11 SET ROW RN SET IRO: PIN 237 276 6'575.3949 68870.4332 10611.x363 OS-30 10666.06]2 OS-1 189 190 71366.9898 70661.9195 1130' -1448 12'56.8396 SET ROn PIN SET R'J. NN 239 240 67t6511le 8]]04.7011 10720.2902 OS -32 10903.3920 05 -3] 191 roe86.1a12 1292156» SET Ron PIN x41 B7a]L5n9 721024073 os -Y 192 193 88729.0372 6'729.1197 12293.6940 1229e.066C SET RO, PIN SET IRO, 9,N 242 243 66022.1869 68355.1808 7225L4097 OS -3. 11441.3007 05-3E 191 201 67456.Ut46 630614430 12329.9066 5215.7000 SET R0, PiN GPs 244 245 654x0.1945 656'0.1928 116064]49 OS -37 11507.2530 OS -Y 202 .7 DIM, 507:.3900 WS 2b 69iao.9541 11670.9724 05-79 203 205 63246.3150 63398.7530 a415.E?3O 11049.6620 WS WS 147 248 69516.136, 69166.1335 11975.95'5 05-4' 12255.6003 05-42 206 252 67417.5070 '4659.8898 11721.5790 6429.2385 GPS SET NA, 249 272 70046.0601 64934.4435 12279.3726 MN 6 -' 10134.2008 OS -22A 253 254 616'9.669' 11061.9204 8129.2165 8A1C.363J SET NA'. . SET NA', 273 274 64520.6]72 64520.9572 5]54.8810 05-1/ 510'.5'10 05 -,15 251 280 67x61.'972 '15951912 5043.15679 5115.8203 5CT NA', 301 NA 271 176 61575.936] '9]7].7211 We.T432 OS -IC 11911.10'0 M„ -4C Z59 260 64001.15400 64203.1850 766].71)0 67217007 SET NA_ SET N1. 271 278 70562.11175 71064.]466 '3356.5605 12 -� 1331].1933 4N 12 -2 281 6]822]172 7165.5612 5CT 279 71324.2585 13311.1841 MH 12 -3 262 263 6]817.8670 64582.00'4 6111.%57 Sn9.1322 SET NA. SET NA. 2x0 261 71624.2211 ]1924.1542 13305.3489 YH 12 -1 1]299.00]6 YH t] -5 265 611152.7'95 95]9.66]9 SET NA. 2x2 7928.2995 13194.9596 MH 12 -6 266 267 61673.'03' 65075.1788 10[72.'100 10315.9960 SET NA'_ SET NA'. 267 284 712240'71 72521.0200 1J29L'1H YH 12 -7 1]288.]1]1 MH 12 -x 26a 65379.8049 10254.6662 SET NN'. 285 72755.96al 13251.1062 4H 12 -9 269 270 '6254.1016 67126.0139 103914/96 10584.1655 SET N4'_ SET MAL ]00 325 54604.4537 64593.59217 5727.7873 5391.0738 EASING AIAMNOLE EXISTING MANHOLE AWRENCE F. GREGORY 19512 1 Grafton, Tull & Inc. Architects, Engineers k Surveyors 2800 North Seconc St. Rogers, Arkansas 72756 Phone: 501- 636 -4238 ww.craftull.cm- CA 273 (PEAS) EXPRES 06!_'0 {99 019980 owl.. m . Ate..... ELM CREEK INTERCEPTOR SEWER 117th STREET LIFT STATION TO 86th STREET OWASSO, OKLAHOMA acoR Orr- a Nr_r Ku Owns•.. ._ -.. GENERAL NOTES OWNER INDEX ` W'-1 b 18512 : "l I OWASSO PUBUC WORKS DEPARTMENT BOOK 4160 PAGE 7260 �J kCAH��' tai 2 WALTER DON KERR AND SHIRLENE GAYLORD KERR BOOK 4127 PAGE 973 3 JERRY DOUGLAS KEYS BOOK 5196 PAGE 2552 1. The Conttor shall take oil n...e,.'y procautlona to orold damage to rac 4 MARY ELIZABETH SHAFFER AND TERRY LEE, CO- TRUSTEES BOOK 5026 PAGE 592 adj..ant properties and property outside the easements. The Contractor w11 be held solely responsible for any damage to these properties during the 5 HOMER R. AND BETTY J. McCLURE BOOK 5025 PAGE 2566 construction of this project. 6 RE M" RUTH RICHAROSON, TRUSTEE, RENA RUTH RICHARDSON TRUST BOOK 5163 PACE 851 2, It shall be the responsibility of the Contractor to locate all sooting utilities, 7 M. SUE RICHAROSON, ETAL BOOK 4826 PAGE 230 which conflict with the improvements shown on these plans. It shall also be the responsibility of the Contractor to protect and keep In service all existing B W. K. AND JUNE SMITH BOOK 3121 PAGE 676 utilities. My utilities or services damaged by the Contractor's operations shall be repelled at the Controctoi s expense. The C -trod' shall locate, uncover. 9 W. K. AND JUNE SMITH BOOK 3121 PAGE 676 and verify the elevation of all utilities that affect the sewer lines a minimum of 10 MARK ALLEN ECKEN:ELS BOOK M73 PAGE 2305 Craftonr 2000 feel ahead of construction and notify the project engineer of any conflicts. 11 CLYFTON A. AND MILDRED A. RAEUBER BOOK 3129 PAGE 113 Tull & 3. The Cantroct' shall rem any debris, rubbish. or es materials 12 LOREN E. AND HAZEL EPPERSON BOOK 3400 PAGE 161 ■VII resulting from Ponstruclion operations. Such debris and materials shall be AND WANDA BATES BOOK 3650 PAGE 1072 Associates, disposed of off -sit.. Dlaposal shall be In accordance with all local, state and 13 BOBBY D. federal regulations and shall be Incidental to the contract. 14 RONALD D. ARMSTRONG BOOK 4594 PAGE 153 Inc. 4. All fencing disturbed due to construction actiNly shall be replaced with new 15 LINDSEY MANAGEMENT Architects. Engineers i fence of equal quality. 16 JOE B. AND KRISANORA WJLiE BOOK 5697 PAGE 2330 Surveyors 5. Maintain a h.6-mtal physical separation of 10 feel and a v -ticel physical 17 THE BAPTIST GENERAL CONVENMON OF THE STATE OF OKLAHOMA BOOK 4195 PAGE 1577 2800 North Second St. separation o! 24 inches between the water and sewer piping of crossings. Rogers, Arkansas 72756 Phone: 501 -636 -4838 6. The Contractor 13 responsible for all surveying including construction *taking. www.craftul', .c-• Coordinates c•e based on NAD83 Oki.,.,. State Plane, North Zone. Vertical datum is based o ea level. NGVD 1929 Adjustment. All surveying spa., CA 273 (PE /L9) FWIRES C6 /70/99 be ...-led under the affect supervision of an Oklahoma Registered Lanc OtsDSS aeon r.0 Surveyor. Benchmarks and reference Information are shown on the draw:,gs. Modify to Surface Coordinates by applying an Average Combined Factor o` ELM CREEK C.999916559 to the State Plane Coordinates. 7. Prior to construction the Contractor shall submit the following: INTERCEPTOR A. Bid breakdown B. ConsUUCtion schedule SEWER C. Cash Flow schedule 0. Plan for layclown Areas E. Concrete m x designs and laboratory test cylinder results F. Gradabon Analysis for all required granule, material G. $hop drawings for all equipment and materials. These shall be submitted 117th STREET within 30 days of notice to proceed. LIFT STATION 8. All manholes shall be 4 foot Inane diameter unless noted atn.rw,se on the TO 86th STREET Plan sheets. 9. '-has Top Elevation shall be 0.30• above the ground surface. The elevations for manhole tops shown on the plans are approximate only. 10. All sewer pipe material will be closed - profile PVC pipe, as manufactured by Lamson Vylon or approved equal, unless otherwise noted on the plane. OWASS Or 11. The Contract' shall relocate andlor repay any water and a er service OKLAHOMA lines a required f' the construction or the sewer project. Cast shall be included with cost of serer pipe . eMxw t2. 'kh re 0:'. i called for over the sews- line to provide cove.. I, shat' Ce nclu ded wit, the cost of the sewe• pipe All drive «aye. sidewalks. curbs. arc stn.• pavement features anal: be _I rylaced i xe kind. The trenches shat: be filled with compacted granu�a• material it cccardonce with the details. T+e disturbed pavement edges s be -. to c nec: saw line prior to pavement replacement. The item shall nog De c pay item but shall be subsidiary to the pipe and trenching Items. - 14. The oe•ic: crossing nos bee, detallea for 18 foot lengths of ZD iner - cJCtile iror. pipe. Realizing that the pipe furnished may be of a different length the contractor shall Submit c shop drawing detailing the crossing with the Pipe lengths fumisned. H this resv Its In different pis• spacing the snop drow�nc s ..,i indicete ;he DroDOsec s_c w it _ - - g� o be c c1c, Tne co,trec :e•r• __ _ csstasj-ce a -o. oe Ix 1:c Pesec or ccPrd, e:l ^ -.,cec . r . a w ,sea h art.• :.. ,I - halc lie[ c c w e — ins fog o! the hall., 2 Pepe eQrne K4 .� .-e •OG -yte fiooc e�evet'.o� e• a otne• wise how- i ^. :ne ararincg. - v_ sate e. a ..proles. -1 Bast ^c w n «ee fro nr.hoie OS -1!. t. ne al. ._ . ser•. -:e P, APR -30 -1998 10 :05 CRAFTON TULL ASSOCIATES P.02/02 Crafton, Tull & Associates, Inc. Architects & Engineers Rogers, Arkansas Client: Owasso Public Works Authority L \� By: LFG Project #: 97254.01 G� Date: 4/30/98 proiection of Probable Costs Item Numoer item Uescrnption Quantity Units Unit Cost Total Amount Elm Creek Basin Interceptor Sewer Mobilization LS 525,000.00 525,000 2 Clearing 1 LS $5,000.00 $5,000 3 24" Closed Profile PVC Pipe 480 LF $35.00 $16,800 4 24" Class 50 Ductile Iron Pipe 10 LF $105.00 $1,050 5 21" Closed Profile PVC Pipe 10,752 LF $30.00 $322,560 6 20" Class 50 Ductile Iron Pipe 1,290 LF $95.00 $122,550 7 Trench Excavation & Backfill, 0' -6' Depth 490 LF $20.00 $9,800 8 Trench Excavation & Backfill, 6' -8' Depth 1,312 LF $27.50 536,080 9 Trench Excavation & Backfill, 8' -10' Depth 4,385 LF $37.50 5164,438 10 Trench Excavation & Backfill, 10' -12' Depth 1,995 LF $47.50 $94,763 11 Trench Excavation & Backfill, 12' -14' Depth 2,045 LF $57.50 $117,588 12 Trench Excavation & Backfill, 14' -16' Depth 738 LF $67.50 $49,815 13 Trench Excavation & Backfill, 16' -18' Depth 457 LF $77.50 $35,418 14 Trench Excavation & Backfill, 18' -20' Depth 515 LF $87.50 $45,063 15 Trench Excavation & Backfill, 20' -22' Depth 135 LF $97.50 $13,163 16 Trench Excavation & Backfill, 22' -24' Depth 220 LF $107.50 $23,650 17 Trench Excavation & Backfill, 24' -26' Depth 240 LF 5117.50 $28,200 18 4' ID Shallow Concrete Manholes, Sealed Lid 2 EA 52,000.00 $4,000 19 4' ID Concrete Manholes, 6' Depth, Solid Lid 8 EA $2,000.00 $16,000 20 4' ID Concrete Manholes, 6' Depth, Sealed Lid 33 EA 52,250.00 $74,250 21 5'11) Concrete Manholes, 6' Depth, Solid Lid 3 EA $2,500.00 $7,500 22 5' ID Concrete Manholes, 6' Depth, Sealed Lid 1 EA $2,750.00 52,750 23 4' ID Concrete Manholes, Extra Depth Over 6' 249 VF $100.00 $24,900 24 5' ID Concrete Manholes, Extra Depth Over 6' 35 VF $110.00 $3,850 25 Asphalt Street Cut and Repair 1 EA $1,000.00 $1,000 26 Fence Cut and Repair 7 EA 5100.00 $700 27 Concrete Cap 20 LF $25.00 $500 28 Wet Well Connection 1 LS $2,000.00 52,000 29 Highway Bore with 30" Welded Steel Casing, Including 160 LF $300.00 $48,000 Pipe Installation 30 Aerial Crossing Complete, Including Piers, 20" Pipe and 1 LS $40,000.00 $40,000 Incidentals 31 Class I Cleanup 3,482 LF 510.00 534,820 32 Class II Cleanup o__i m_ 9,220 LF $5.00 $46,100 vaal i:l SAX %-I CCK LP431LI ILIMECXptor sewer Contractor's Overhead & Profit C 10% Bonding @ 2% Total Probable Construction Cost - Elm Creek Basin Interceptor Sewer Engineering Design Total Probable Cost - Elm Creek Basin Interceptor Sewer Page 1 of 1 51,417,305 $141,731 $28,346 $1,587,382 $75,000 $1,662,382