HomeMy WebLinkAbout1996.02.06_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY
TYPE OF MEETING: Regular
DATE: February 6, 1996
TIME: 7:00 p.m.
PLACE: Council Chambers, Owasso Community Center
Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin
board at 4:00 p.m. on Friday, February 2, 1996.
Marcia 13outwell, City Clerk
AGENDA
1. Call to Order
2. Invocation
3. Flag Salute
4. Roll Call
5. Request Approval of the Minutes of January 16, 1996 Regular Meeting.
Attachment #5
6. Request Approval of Claims
Attachment #6
Owasso Public Works Authority
February 6, 1996
Page 2
7. Consideration and Appropriate Action Relating to the Presentation of an Independent
Audit of Financial Transactions for the OPWA Fund for FY 1994 -95, and a Request for
the Trustees to Receive the Audit Report.
Ms Bishop
Mr Carlson
Attachment #7
Mr Joe Carlson of the Carlson & Cottrell accounting firm, will present the 1994 -95
annual audit to the Authority. The staff will recommend the Trustees "receive" the audit
for review and information.
8. Update on the Status of the Water and Wastewater Rehab Projects.
Mr Carr
Attachment #8
Staff will update the Council on the status of the three contracts awarded for the manhole
and sewer line replacement project and the contract awarded for the water line I
replacement project.
9. Consideration and Appropriate Action Relating to a Request for Final Acceptance of
Work Performed Under Contract II, Phase II for Manhole and Sewer Line Replacement,
Between the City of Owasso /Owasso Public Works Authority and Insituform Plains Inc,
and Authorization for Final Payment and Release of Retainage to the Contractor.
Mr Groves
Attachment #9
Staff will recommend Trustee acceptance of the work performed under the contract, and
that final payment be authorized to include any retainage held by the City /OPWA.
Owasso Public Works Authority
February 6, 1996
Page 3
10. Consideration and Appropriate Action Relating to the Award of a Contract for Repair and
Restoration to Service of the Santa Fe Lift Station Generator.
Mr Carr
Attachment #10
Staff has completed the bidding process, reviewed the bids received, and will recommend
a contract for the Santa Fe Lift Station auxiliary power generator repair be awarded to
Service & Equipment International Inc, Owasso, OK, in the amount of $2074.25
(including funds for replacement of the fuel pump and injectors, if required); and Trustee
authorization for payment.
11. Report from OPWA Manager
12. Report from OPWA Attorney
13. Unfinished Business
14. New Business
Owasso Public Works Authority
February 6, 1996
Page 4
15. Adjournment
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, January 16, 1996
The Owasso Public Works Authority met in regular session on Tuesday, January 16, 1996 in
the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and
Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, 13, 1996.
ITEM 1: CALL TO ORDER
Chairman Burris called the meeting to order at 7:55 p.m.
ITEM 2: INVOCATION
The invocation was given during the City Council meeting preceding this meeting.
IITEM 3: FLAG SALUTE
The flag salute was held during the City Council meeting.
ITEM 4: ROLL CALL
PRESENT ABSENT
Charles Burris, Chairperson
Danny Ewing, Vice Chairperson
Mary Lou Barnhouse, Trustee
Michael Helm, Trustee
Joe Ramey, Trustee
STAFF
Rodney J Ray, City Manager
Ronald D Cates, Authority Attorney
Marcia Boutwell, Authority Secretary
A quorum was declared present.
ITEM 5: REQUEST APPROVAL OF THE MINUTES OF JANUARY 2, 1996
REGULAR MEETING.
Mr Helm moved to approve the minutes as written, by reference hereto; seconded by
Ms Barnhouse.
AYE: Helm, Barnhouse, Ramey, Ewing, Burris
NAY: None
Motion carried 5 -0.
Owasso Public Works Authority January 16, 1996
ITEM 6: REQUEST APPROVAL OF CLAIMS
Ms Barnhouse moved, seconded by Chairman Burris, to approve the following claims as
submitted: (1) OPWA Fund $84,412.11; (2) Payroll $26,540.75.
AYE: Barnhouse, Burris, Helm, Ramey, Ewing
NAY: None
Motion carried 5 -0.
ITEM 7: REPORT FROM OPWA MANAGER
No report.
ITEM 8: REPORT FROM OPWA ATTORNEY
No r eport.
ITEM 9: UNFINISHED BUSINESS
None.
ITEM 10: NEW BUSINESS
None.
ITEM 11: ADJOURNMENT
Mr Helm moved, seconded by Ms Barnhouse, to adjourn.
AYE: Helm, Barnhouse, Ramey, Ewing, Burris
NAY: None
Motion carried 5 -0 and the meeting was adjourned at 7:56 p.m.
Marcia Boutwell, Authority Secretary
Charles L Burris, Chairperson
VENDOR
TRANSFERS
CITY GARAGE
WORKERS' COMP SELF -INS
GENERALFUND
TRANSFERS TOTAL
CITY OF OWASSO
OPWA
A/P TRANSFER REPORT
DESCRIPTION
TRANSFER FROM OPWA
TRANSFER FROM OPWA
TRANSFER FROM OPWA
AMOUNT
5,125.00
3,842.50
25, 265.67
34, 233.17
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 01/20/96
OPWA Capital Improvement 0.00 1,048.45
APPROVE 02/06/96
Chairman
Trustee
Trustee I
OVERTIME
TOTAL
DEPARTMENT
EXPENSES
EXPENSES
Water
480.84
3 912.67
11 Refuse
36.90
3,149.50
OPWA Capital Improvement 0.00 1,048.45
APPROVE 02/06/96
Chairman
Trustee
Trustee I
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: SHERRY BISHOP
FINANCE DIRECTOR
1 SUBJECT: AUDIT REPORT FOR FISCAL 1994 -95
DATE: February 2, 1996
BACKGROUND:
An independent audit, performed by a certified public accountant, is required by City Charter
and state statutes. The report of the independent auditor must be filed with the governing body
and with the office of the State Auditor and Inspector.
On May 16, 1995, the City Council and OPWA Trustees selected the firm of Carlson & Cottrell
CPA's to perform audits for the city for FY 1994 -95, with provisions for two annual extensions
should the city desire such extensions. Upon its selection and execution of a "letter of
agreement ", the firm began its initial work and review of our financial operations.
The firm has now completed its work and has provided my office copies of the audit document
containing its report and comments. That document is enclosed for your information and
review. Overall, the audit process went very well. In fact, in many ways this firm was much
more detailed than previous auditors. Field checks and employee interviews were more
extensive than prior years, and the auditor's field team seemed well prepared and qualified.
They also were obviously experienced in the real world of government financial operations and
asked questions designed to evaluate our internal controls and procedures. A preliminary
examination of the report indicates there are no surprises contained in the document or comments
of which we were not aware nor were there any comments that indicated any material
weaknesses in the system.
During the next two weeks, I will conduct a more detailed review of the audit and the letter
outlining "observations and recommendations ". At that point, I will prepare for you a
memorandum that evaluates the report, summarizes its content and compares its numbers with
' those provided you throughout the year. Additionally, I will prepare a response to the letter of
AUDIT REPORT FOR FISCAL 1994 -95
FEBRUARY 2, 1996
PAGE 2 '
observation and recommendations indicating a course of action, where necessary, to improve
upon our existing system. I am pleased to note that the number of recommendations relating
to the financial operations of the city have again decreased this year and that the auditors report
that "all findings in the prior audit have been satisfactorily resolved ".
RECOMMENDATION:
The staff recommends that the City Council and Owasso Public Works Authority receive the
audit report and direct it to be filed as required by statute.
NOTE: There is not a requirement nor provision for the Council to take any action other than
to "receive" the audit. Since the staff has only just taken delivery of the report
(on 2/1/96), it is recommended that the Council vote to receive the document and that,
after your review of the report and any follow -up memorandum, an opportunity for
questions from the Council be listed on a subsequent agenda.
ENCLOSURE:
1. Report on Audit of Financial Statements FY 1994 -95
2. Letter of Observations and Recommendations
MEMORANDUM
TO: RODNEY J. RAY
CITY MANAGER
FROM: F. ROBERT CARR, JR., P.E.
PUBLIC WORKS DIRECTOR
SUBJECT: STATUS REPORT UBJ PO O F
WATER LINE REPLACEMENT PROJECT
(Owasso Project Number G3.100 -94) and
MANHOLE AND SEWER LINE REPLACEMENT PROJECT
(Owasso Project Number G2.100 -94)
DATE: February 1, 1996
BACKGROUND:
The City of Owasso secured a low interest loan from the Oklahoma Water Resources Board for
improvements to the water distribution system, wastewater collection system and wastewater
treatment plant. Approval of the loan required selection of an engineering firm for the design
of the improvements. The Trustees selected NOVA Engineering to design the improvements
to the water distribution and wastewater collection systems.
SCOPE OF PROJECTS:
WATER LINE REPLACEMENT PROJECT -
Approximately 15,500 linear feet of cast iron water lines are old and deteriorated in the older
sections of town (essentially south from 86th Street North /west of Highway 169 and south
of 76th Street North /east of Highway 169). These lines are located in the oldest, most
mature section of the city. The cast iron lines are filled with deposits which restrict the
water pressure and hamper the flow of water to the customers and inhibit the flow of water
for fire fighting purposes. Conditions causing deterioration of these lines will continue
because of the types of chemicals in the treated water needed to comply with drinking water
standards, soil characteristics, and weather conditions. Therefore, deterioration of this
portion of the system requires replacement of the lines to provide for proper pressure, flow
and safety for the community.
As designed, the water line project consisted of replacement and upgrading of approximately
15,000 linear feet of 6 -, 4 -, and 2 -inch cast iron water lines with 6- and 4 -inch AWWA 0-
900 polyvinylchloride (PVC) piping. The location of the lines to be replaced are shown on
' the attached map (see Attachment 1).
Page 2
Status Reports - Water Line Replacement and
Sewer /Manhole Rehabilitation Projects
MANHOLE AND SEWER LINE REPLACEMENT PROJECT -
In the older sections of town (essentially south from 86th Street North, west of Highway 169
and south of 76th Street North, west of Highway 169), there are approximately 60,000 feet
of aged vitrified clay pipe (VCP) that are considered to be a problem. This pipe material is
relatively old and has been largely found to be cracked, broken, collapsed or filled with
roots. Many manholes in the area are deteriorated, in varying degrees, which allow water
to enter the system.
Some older parts of the sanitary sewer system in the City of Owasso currently exhibit
excessive amounts of rainwater (inflow) and groundwater (infiltration) during wet weather
conditions. These types of water utilize capacities of the collection system and treatment
plant that would otherwise be used to convey and treat wastewater. The inflow and
infiltration of water leads to unnecessary hydraulic loads in the system and plant.
As designed, the project consists of approximately 290 items of manhole rehabilitation and
replacement, approximately 7,245 LF of cured -in -place pipe lining, approximately 41,300
LF of high density polyethylene slip lining and approximately 12,500 LF for removal of
existing line and replacement with 8 -inch PVC pipe. The locations of sewer lines included
in the limits of this project are shown on the attached figure (see Attachment 2).
Bidders were required to provide a unit price for cleaning and television inspection of some
lines in the project area. Specifications for sliplining, cured -in -place or formed -in -place
portions already include pay elements for this work. This items is to aid in the determination
of the extent of repairs needed in the direct replacement of pipe. By televising the existing
line section, pipe replacement has the potential to be reduced. An associated reduction in
cost would result.
CONTRACTS AWARDED-
WATER LINE REPLACEMENT PROJECT -
A contract was awarded on August 16, 1994 to JEPCO, Inc., Poteau, Oklahoma for
replacement of the water lines in the old portion of town. Actual construction started on
October 5, 1994.
MANHOLE AND SEWER REHABILITATION PROJECT
Contracts to three (3) contractors were awarded on April 4, 1995 for the project. The
overall project was divided into two phases in order to take advantage of a potential source
of Community Development Block Grant (CDBG) funding from the Department of
Page 3
Status Reports - Water Line Replacement and
Sewer /Manhole Rehabilitation Projects
Commerce. The Phase I area was defined as that portion of the project in the CDBG target
area. The Phase II area was the remaining portion of the design project area show on the
figure. The projects were awarded as follows:
Contract Tyne
Phase No.
Contractor
Amount of Contract
Pipebursting
Phase I
T -G Excavating, Inc., Catoosa, OK
$41,385.00
Phase II
T -G Excavating, Inc., Catoosa, OK
$885,092.00
Cured in -place
Phase II
Insituform Plains, Inc.,
$323,015.80
Chesterfield, Missouri
Sliplining
Phase I
T -G Excavating, Inc., Catoosa, OK
$83,335.20
rPhase
T -G Excavating, Inc., Catoosa, OK
$894,178.80
Manholes
Phase I
Manhole Recovery Systems, Inc.,
$12,235.00
Midwest City, OK
Phase II
Manhole Recovery Systems, Inc.,
$119,989.00
Midwest City, OK
ST_ A S OF WORK:
WATER LINE REPLACEMENT PROJECT -
Replacement of the water lines in the old portion of town has been completed. All pipe was
in the ground and services transferred to the new water lines by the contract completion date
of April 2, 1995. The original contract amount approved by the Authority was
$488,028.40. The final pay request included a total request of $510,445.46 for work
completed. The difference in costs of $22,417.06 (4.59 % of the original contract total) was
largely due to quantity adjustments between those originally estimated by the design
engineer and the actual materials required during construction.
MANHOLE AND SEWER REHABILITATION PROJECT -
Sewer line rehabilitation has been progressing according to the contracts provisions.
Construction crews have completed installation of cured -in -place pipe lining and
pipebursting. Work continues on the sliplining and manhole rehabilitation portions of the
project. A summary table of each contract status is attached (see Attachment 3).
ATTACIIMENTS:
1. Water Line Replacement Project Map
2. Manhole and Sewer Line Rehabilitation Project Map
3. Contract Status Summary Table
CONSTRUCTION PLANS FOR
WATER LINE REPLACEMENTS
PROJECT No. G3.100 - 94
EAST 86TH II II lr =IEL II )) ,
BEET NORTH II
85TH PL
OADWAY 77TH PL
p77TH ST m 0 6TH
STREET NO
A PPj COMPANY
5727 SOUTH LEWIS AVENUE
PA-'Ak OKLAHOMA 74105
PHONE : (918) 745 -6682
Attachment 1
A for Helgh is
LEGEND 1
SEWERLINE NOT IN 'PROJECT
SEWERLINE FINISHED
-- SEWERLINE NOT FINISHED
MANHOLE REHAB FINISHED
®
MANHOLE REHAB NOT FINISHED
O MANHOLE NOT IN PROJECT
SEWER REHABILITATION PROJECT
STATUS AS OF FEBRUARY 1, 1996
CITY OF OWASSO, OKLAHOMA
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
Attachment 2
2ND
1 ST
70TH
MAIN
4T Av
LEGEND
SEWERLINE NOT IN PROJECT
SEWERLINE FINISHED
SEWERLINE NOT FINISHED
MANHOLE REHAB FINISHED
MANHOLE REHAB NOT FINISHED
O MANHOLE NOT IN PROJECT
SEWER REHABILITATION PROJECT
STATUS AS OF FEBRUARY i, 996
CITY OF OWASSO, OKLAHOMA
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
CONTRACT STATUS SUMMARY
Water Line Replacement Project (Owasso Project Number G3.100 -94)
Manhole and Sewer Line Replacement Project (Owasso Project Number G2.100 -94)
(through February 1, 1996)
Contracted Amounts Projected Totals Differences
Water Line Replacement $488,028.40 $510,445.46 +$22,417.06
Manhole and Sewer Line
Rehabilitation $2,359,230.80 $2,413,704.00 +$54,473.20
Contractor
Duration
Start Date
Projected
Contract
Amount to
Amount to
Total
Percent
Percent
(days)
End
Amount
Date
Complete
Project
Complete
Complete
Date
ISI
($1
(S)
ISI
(S)
(Time)
WATER LINE REPLACEMENT
Approved
JEPCO, Inc.
180
10/5/94
6/6/95
$488,028.40
N/A
Completed
$510,445.46
104%
100%
MANHOLE AND SEWER LINE
REHABILITATION
Contract 1 - Pipe Bursting
T -G Excavating, Inc.
180
5/31/95
11/27/95
105%
100%
Phase 1
$41,385.00
$37,072.00
Complete
$37,072.00
Phase II
$885,092.00
$931,205.00
Complete
$934,205.00
Contract 2 - Cured -in -place Lining
Insituform Plains, Inc.
Phase II only
180
6/14/95
12/11/95
$323,015.80
$320,432.00
Complete
$320,432.00
99%
100%
Contract 3 - Sliplining
T -G Excavating, Inc.
300
5/31/95
3/26/96
69%
81%
Phase 1
$83,335.20
$79,978.00
$4,233.00
$84,211.00
Phase 11
$894,178.80
$591,521.00
$314,039.00
$905,560.00
Contract I Manhole Rehabilitation
Manhole Recovery Systems, Inc.
180
10/30/95
4/26/96
60%
52%
Phase 1
$12,235.00
$9,770.00
$2,465.00
$12,235.00
Phase 11
$119,989.00
$69,335.00
$50,654.00
$119,989.00
TOTALS
• WATER LINE REPLACEMENT
$488,028.40
$510,445.46
• MANHOLE AND SEWER LINE
REHABILITATION
Phase 1
$136,955.20
$133,518.00
Phase II
$2,222,275.60
$2,280,186.00
Contracted Amounts Projected Totals Differences
Water Line Replacement $488,028.40 $510,445.46 +$22,417.06
Manhole and Sewer Line
Rehabilitation $2,359,230.80 $2,413,704.00 +$54,473.20
MEMORANDUM
TO: RODNEY J. RAY
CITY MANAGER
FROM: DOUG GROVES
ENGINEERING TECHNICIAN
SUBJECT: FINAL ACCEPTANCE - CONTRACT 2 OF MANHOLE AND
SEWER LINE REPLACEMENT PROJECT (INSITUFORM PLAINS,
INC.)
DATE: February 1, 1996
BACKGROUND:
On April 18, 1995 Council awarded a contract to Insituform Plains, Inc. in the amount of
$323,015.08. The contract is one of the four contracts awarded for the manhole and sewer
line replacement project.
This portion of sewer line replacement was designed to consist of 7,245 feet of a cured -in-
place lining. The lining is pulled through a sewer line in a flexible state, then expanded and
cured inside the existing pipe. After curing is complete, the service connections are cut out
internally and the externals service connections are excavated and replaced.
The notice to proceed was issued on June 14, 1995 with a 180 day completion date of
December 11, 1995.
Line cleaning and TV inspection began June 16th and the lining installation started ten days
later on June 26th. Insituform completed the lining work on August 1, 1995. All external
service connections were completed on November 16th.
FINAL CONSTRUCTION COSTS:
Staff has monitored the progress of work and overall costs as the work has been conducted.
The original contract amount was $323,015.80. In the submitted final pay request, the actual
total for all work completed is $320,432.00. The difference in costs is due to quantity
adjustments between those originally estimated by the design engineer and the actual
materials required during construction. Specifically, the traffic control devices were not used
and slightly less lining was necessary. However, fourteen more external services connections
were needed to complete the project. The end result is a decrease in actual costs of
$2,583.80.
Page 2
Sewer Line Replacement Project
FINAL PAY REQUEST:
A punch list had been prepared and all items have been completed on the project (see
attached). The final pay request, based upon total actual costs of construction, has been '
submitted in the amount of $35,373.20. It consists of $3,330.00 in unit price items and
$32,043.20 in retainage (10% of the submitted contract pay items).
FUNDING SOURCE:
This contract is funded using the loan from the Oklahoma Water Resources Board (OWRB). i
RECONUMT2E DATION• I
Staff recommends Council acceptance, release of retainage and authorization for final
payment to Insituform Plains, Inc. in the amount of $35,373.50.
ATTACHMENTS:
1. Final pay request from Insituform Plains, Inc.
2. Final Punch List
FINAL
APPLICATION AND CERTIFICATE FOR PAYMENT
Page One of 3
TO (Owner): City of Owasso Contract Date: 4/18/95
Public [forks Department
P.O. Box 180
Owasso Oklahoma 74055 ,
at Date: 01/19/96
FROM (Contractor): Period l.1% 12/07/95 .
Insituform Plains, Inc
17988 Edison Avenue
Chesterfield, Missouri 63055 Distribution To: Owner
Architect
PROJECT: Project Number G2/100 -94 Contractor
Manhole & Sewer Line Replacement Engineer
CONTRACfk :II, Alternate I
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below, in connection with the Contract.
Continuation sheet is attached.
1.
Original Contract Sum
$ 323,015.80
2.
Net Change by Change Orders
$ -0-
3.
Contract Sum to Date (Line 1 & 2)
$ 323,015.80
4.
Total Completed & Stored to Date
$ 320,432.00
(Column G on Continuation Sheet)
5.
Retainage: a. -0 =% of Completed Work $
-0_ (Column D & E on
Continuation Sheet) - FINAL
b— n- n - % of Stored Material $
_ p= (Column F on Continuation Sheet)
Total Retainage (Line 5a & 5b)
$
6.
Total Earned Less Retainage
$ 320,432.00
(Line 4 less Line 5 Total)
7.
Less Previous Certificates for Payment
$ 285,058.80
8. CURRENT PAYMENT DUE
9. Balance to Finish, Plus Retainage $ -0-
(Line 3 less Line 6)
CHANGE ORDER SUMMARY:
ADDITIONS DEDUCTIONS
Change Orders approved in previous
months by OWNER
TOTALS $ $
Approved this month '
Number $ $
Date Approved '
TOTALS $ $
Net change by Change Orders $ I
The undersigned Contractor certifies that to the best of the Contractor's knowledge,
information and belief, the WORK covered by this Application for Payment has been
completed in accordance with the Contract Documents, that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR: Insituform Plains, Inc.
By: Date: 1/19/96
Jos . 0 son, Vice President, Finance & Administration
STATE OF OMARONM Missouri )
) SS
COUNTY OF St. Louis )
Subscribed and sworn to before me this 19th day of January 19 96
(SEAL) -
No ary ublic oann mit
My Commission Expires: 9/7/98 JoANr, snntTM
Notary Public -State of Missouri
Sl
My Comm:,ber 7, 1998
CONTINUATION SHEET Page 3 of 3
Application and Certification for Payment, containing Contractor's signed Certification is
attached.
Application Number: 5 Application Date: 1/19/96
Period To: 12/7/95
In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts
where variable retainage for line items may apply.
A
B
C
D
E (cont) ->
ITEM
NO.
DESCRIPTION SCHEDULED
OF WORK VALUE
WORK COMPLETED
FROM PREVIOUS
APPLICATION
WORK COMPLETED
THIS PERIOD
SEE ATTACHED
INVOICE
(cont) F
G
H
I
MATERIALS
PRESENTLY STORED
(NOT IN D OR E)
TOTAL COMPLETED
AND STORED
TO DATE
(D +E +F)
%
(G /C)
BALANCE
TO FINISH
(C -G)
REI'AINAGE
NOTE: At bottom of each column, run totals.
ARCHITECT'S / ENGINEER'S CERTIFICATE FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the data
comprising the above application, the Architect/Engineer certifies to the Owner that to the
best of the Architect 's /Engineer's knowledge, information and belief, the Work has
progressed as indicated, the quality of the Work is in accordance with the Contract
Documents, and the Contractor is entitled to payment of the amount certified.
AMOUNT CERTIFIED $�1 5, 373 2 0
(Attach Explanation if amount certified differs from the amount applied for.)
ARCHITECT / ENGINEER: _ City o f owa s so
By: Date: February 1 , 1 996
This certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
contractor named herein. Issuance, payment and acceptance of payment without prejudice to
any rights of the Owner or Contractor under this Contract.
CLAIM OR INVOICE AFFIDAVIT
PM
STATE OF OlUARGMA Missouri )
) SS
COUNTY OF St. Louis )
The undersigned (Architect, Contractor, Supplier, Engineer or Supervisory Official), of
lawful age, being first duly sworn, on oath says that this (Invoice, Claim or Contract) is true
and correct. Affiant further states that the (work, services or materials) as shown by this
Invoice or Claim have been (completed or supplied) in accordance with the Plans,
Specifications, orders or requests furnished to the affiant. Affiant further states that (s)he has
made no payment, nor given, nor donated, or agreed to pay, give, or donate, either directly
or indirectly, to any elected official, officer, or employee of the State, County, or City of
money or any other thing of value to obtain payment or the award of this contract.
Insituform Plains, Inc.
c&, L
Con& ctor or Supplier Joseph F. Olson, Vice President, Finance & Administration
Subscribed and sworn to before me this
l otary Iublic Joann Smith
Ml y Commission Expires: 9/7/98
r
19th day of January , 19 96.
JOANN SMM
- --Notary Public -State Of M19~1
St. Louis County
My Commission Expires Septembw 7. IMM
' Architect, Engineer or other Supervisory Official
Subscribed and sworn to before me this
' Notary Public
My Commission Expires:
day of , 19_
va NOTE: Strike out words not appropriate and sign appropriate signature line.
Architect, Engineer approval is not required for Contractor or Supplier
Affidavit.
10
40
INSITUFORM PLAINS, INC.
17988 EDISON AVENUE
CHESTERFIELD, MISSOURI 63005
314 - 532 -6137
TO: City of Owasso
Public Works Department
P.O. Box 180
Owasso, Oklahoma 74055
ATTENTION: Doug Groves
PROJECT: Project Number G2.100 -94
Insituform Reconstruction
Manhole & Sewer Line Replacement
Phase II, Alternate I
ESTIMATE #
5 & Final
INVOICE #
06 -761R
JOB #
6950025
WORK COMPLETED THRU:
12107/95
RETENTION INVOICE DATED:
01/19/96
ITEM
CONTRACT
COMPLETED -TO -DATE
Total Contract Earned
NO.
DESCRIPTION
QUANTITY
UNIT PRICE
QUANTITY
%
AMOUNT
325.
TRAFFIC CONTROL DEVICES
Less:
Jim Tadtman /Linda
Joe Devasher
Net Amount Due:
a.
90 Sign Days,Type II Barricades w /Flasher
90 EA.
0.50 /EA.
0 EA.
0%
0.00
b.
360 Sign Days, Drums w /Steady Bum Light
360 EA.
0.50 /EA.
0 EA.
0%
0.00
C.
144 Sign Days, Warning Signs, Over 16 SF
144 EA.
0.70 /EA.
0 EA.
0%
0.00
d.
20 L.F., Plastic Safety Fence
20 L.F.
4.00 /L.F.
0 L.F.
0%
0.00
502.
SEWER LINE REPAIR
a.
Up to 10 L.F.of 8" Sewer Line Replacement
3 EA.
1,500.00 /EA.
1 EA.
33%
1,500.00
503.
SEWER LINE REPLACEMENT
a.
8" Cured -in -Place Pipe Lining
7,245 L.F.
36.00 /L.F.
7,064 L.F.
98%
254,304.00
b.
Service Connections (Excavate)
76 EA.
550.00 /EA.
90 EA.
118%
49,500.00
C.
Service Connections (Internal)
5 EA.
200.00 /EA.
5 EA.
100%
1,000.00
504.
CLEANING AND TELEVISION INSPECTION
a.
Cleaning and Television Inspection
7,245 L.F.
2.00 /L.F.
7,064 L.F.
98%
14,128.00
TOTAL CONTRACT: $
323,015.80
EARNED TO DATE: $
320,432.00
Cust. #95422
CONTRACT SUMMARY
Month Gross $ 3,330.00
Month Retention 32,043.20 R
Month Open 35,373.20
Total Contract Earned
Less Retainage
bt
Add:
cc: Boyd Hirtz
Howard Hawkins
Less:
Jim Tadtman /Linda
Joe Devasher
Net Amount Due:
Paid to Date:
If there are any questions TOTAL DUE:
regarding this invoice, please
contact Barb Trende at the
phone number listed above. AMOUNT PAST DUE:
Less: Retainage @
320,432.00 Previous Estimates
0.00
Other
Total Deductions from
Earned to Date
320.432.00
285,058.80
35,373.20
0.00
AMOUNT DUE
THIS ESTIMATE: $
0% 0.00
285,058.80
285,058.80
35,373.20
PLEASE REMIT TO:
P.O. BOX 1026
CHESTERFIELD, MO 63006 -1026
INSPECTION PUNCH LIST
Sewer Line Replacement
Contract No. 2
Insituform Plains, Inc.
November 17, 1995
Date Completed
1. 502 East 3rd Street - Fill in ruts left by equipment 11 -22 -95
2. 504 and 506 East 3rd Street - Rake and smooth top soil 11 -22 -95
3. 604 and 606 East 3rd Street - Fill in ruts left by equipment between houses. 11 -22 -95
4. 313 North Birch - Replace damaged sod 12 -05 -95
5. 315 North Birch - Place straw over muddy area as per owner request 01 -18 -96
MEMORANDUM
TO:
RODNEY J. RAY
CITY MANAGER
FROM:
F. ROBERT CARR, JR., P.E.
PUBLIC WORKS DIRECTOR
SUBJECT: REPAIR OF SANTA FE LIFT STATION GENERATOR
DATE: January 30, 1996
BACKGROUND:
In conformance with Oklahoma Department of Environmental Quality construction standards,
pumping stations and collection systems are to be designed to prevent or minimize bypassing of
raw sewage (Section 252:655- 11- 6(A)). For use during possible periods of extensive power
outages or storm events, consideration is to be given providing emergency power generation.
This equipment will help to prevent backup of sewage or discharges which may cause adverse
conditions. The standards indicate that overflows may be minimized by engine -driven generating
equipment.
CURRENT CONDITIONS•
Standby power to the Santa Fe Lift Station was a design requirement. The equipment in lace
at the present time is inoperable. Repairs and replacement of arts to the p p
p equipment are needed.
Santa Fe Lift Station repairs have been included in the FY 95 -96 budget.
The Santa Fe Lift Station has a 100 kilowatt generator with a liquid - cooled diesel engine.
Inspection of the unit by Clifford Power Systems indicated that the generator needs several parts
to again become operational. Replacement parts identified were the fuel pump and injectors;
air, oil and fuel filters; batteries, oil and antifreeze. The hoses have dry rotted and also require
replacement. The block heater (also known as the Kim heater) requires repair.
The condition of the engine is believed to be good. The engine has accumulated only 1.5 hours
of operation.
The above repairs are required to restore the engine to operation. Once operational, additional
evaluation of the electrical circuitry, boards and relays can be accomplished.
Page 2
Santa Fe Lift Station Generator
BIDS /PROPOSALS:
Bid packets were mailed to six (6) vendors which provide generator repair services. Three (3)
bids were submitted for repair services. I
All three bidders examined this unit and have varying evaluations of the extent of repairs needed
to the generator. The bids are tabulated below: I
Vendor
Base Repair
Bid
Additional
Services
Total
Bid
Service and Equipment
International, Inc.
$1,384.25
$690.00
$2,074.25
Clifford Power Systems, Inc.
--T
$2,559.00
None
$2,559.00
Southern Plains Power
$4,325.00
None
$4,325.00
Staff desires to return this auxiliary power generator to service in the least expensive way.
Service and Equipment International, Inc. submitted the apparent low bid believing that the
generator can be made operational without replacement of injectors and fuel pump. This
proposal allowed their bid to be substantially lower than the other bidders. Once the unit is
operational, further diagnosis could indicate the injectors and pump require replacement. An
additional amount of $690.00 would be required for these parts, making their total bid
$2,074.25.
FUNDING:
Funding for lift station generator repairs and service were budgeted for FY 95 -96 in the Public
Works Department Wastewater Division (Account number 61- 530 - 5250).
RECOMMENDATION•
Staff recommends Trustees award a contract for the Santa Fe Lift Station auxiliary power
generator repair to Service and Equipment International, Inc., in the amount of $2,074.25
(including funds for replacement of the fuel pump and injectors, if required).
ATTACU MENTS
1. Bid specification.
2. Bid submittals with letter from Service Equipment International, Inc.
3. Vendor repair list.
SPECIFICATIONS FOR THE
IIA REPAIR AND RESTORATION TO SERVICE
OF ONE (1) ONAN 100KW DIESEL GENERATOR
SCOPE:
It is the intent of these specifications to procure for the Owasso Public Works Department,
Wastewater Collection Division, the necessary components and services to repair and restore re to
a fully operational capacity an Onan Generator Set, serial number I840728248. This unit is
powered by an Allis- Chalmers model 670T diesel 6- cylinder turbo; serial number C -3395, model
number 1000DYC -15R- 273555.
rGENERATOR REQUIREMENTS:
' 1. The Santa Fe Lift Station has a 100KW generator with a liquid cooled diesel engine.
This generator set has not been operational for approximately seven (7) years.
2. Initial inspection of the unit indicated that the generator requires air, oil and fuel filters,
' antifreeze and oil, two (2) batteries, a rebuilt fuel pump and six (6) rebuilt fuel injectors.
Additionally, some hoses may require replacement, along with repair to the Kim heater.
' 3. Old or contaminated fuel will be required to be removed and disposed of in accordance
with state regulations.
' 4. All components repaired or replaced will be warranted by the manufacturer for a P eriod
of not less than 90 days.
1
BID PROPOSAL - SUBMITTAL PAGE
REPAIR AND RESTORATION TO SERVICE OF
ONE (1) ONAN 100KW DIESEL GENERATOR
FOR THE OWASSO PUBLIC WORKS DEPARTMENT
(WASTEWATER COLLECTION DIVISION)
COST OF MATERIALS $ lJlo 1r, 2J
COST OF REPAIR $ J 7�, OD
COST TO RESTORE TO SERVICE $
TOTAL BASE BID PER SPECIFICATIONS $ 3
I hereby acknowledge that I have read the specifications and that I am legally bound by
the statements on the Bid Proposal Pages.
Signature
Title
Address
"5S0
BID OPENING: JANUARY 29, 1996 @2:00 P.M.
COMPLETE AND ATTACH THE NON - COLLUSION BID AFFIDAVIT TO BID.
IPOWER GENERATION -
Marcia,
Marcia Boutwell
City of Owasso
207 South Cedar
Owasso, Oklahoma 74055
I Re: Bid for repair and restoration to service of
generator at Santa Fe Lift Station.
It is our desire to return this unit to service for the
city at lowest cost possible. We would further offer
that should only a minor problem be found with the fuel
system that would eliminate the need to remove the pump
for repairs we would deduct the $285.00 cost from the
total cost of repairs.
Thank you for allowing us to mace this quote.
Best reg
Don Musick 1 -21 -96
P.O. BOX 708 SHOP 918 - 438 -1678
OWASSO. OK 74055 FA X 918 - 438 -1632
Marcia,
Upon inspection of the generator and conversations with
Cris King I would like to attach to our bid, the
following.
1. Upon inspection of the unit we found that the bat-
tery charger was damaged and needed to be replaced.
Cost to replace the charger will be $268.00. This is
included in our bid.
2. We feel that if any repairs are needed to the fuel
system, based on what City of Owasso personnel have
told us, the fuel pump may need to be removed and
cleaned internally. Thee it would be re- calibrated
and re- installed. Cost for this portion of the
repair would be $285.00. This price is included in
the bid. There is a possibility that a much more
severe problem with the pump, such as a broken shaft
or housing exist. We also feel that the injectors do
not require service. These things we do not know for
certain until we are allowed to work on the unit.
3. We would like to include the following items as an
ADDITIONAL repair if needed.
Major recondition of fuel pump: $450.00
Clean and re- calibrate injectors: @ $40.00 ea. $240.00
Please note that these are not included in our bid.
It is our desire to return this unit to service for the
city at lowest cost possible. We would further offer
that should only a minor problem be found with the fuel
system that would eliminate the need to remove the pump
for repairs we would deduct the $285.00 cost from the
total cost of repairs.
Thank you for allowing us to mace this quote.
Best reg
Don Musick 1 -21 -96
P.O. BOX 708 SHOP 918 - 438 -1678
OWASSO. OK 74055 FA X 918 - 438 -1632
BID PROPOSAL - SUBMITTAL PAGE
REPAIR AND RESTORATION TO SERVICE OF
ONE (1) ONAN 10OKW DIESEL GENERATOR
FOR THE OWASSO PUBLIC WORKS DEPARTMENT
. (WASTEWATER COLLECTION DIVISION)
COST OF MATERIALS
COST OF REPAIR
COST TO RESTORE TO SERVICE
$ 0 0 1 °I , o o
$
TOTAL BASE BID PER SPECIFICATIONS
$ SSS, 0
I hereby acknowledge that I have read the specifications and that I am legally bound by
the statements on the Bid Proposal - Submittal Pages.
Signature
V, cc
Title
Address
BID OPENING: JANUARY 29, 1996 @2:00 P.M.
COMPLETE AND ATTACH THE NON- COLLtiSION BID AFFIDAVIT TO BID.
BID PROPOSAL - SUBMITTAL PAGE
REPAIR AND RESTORATION TO SERVICE OF
ONE (1) ONAN 100KW DIESEL GENERATOR
FOR THE OWASSO PUBLIC WORKS DEPARTMENT
(WASTEWATER COLLECTION DIVISION)
W_ COST OF MATERIALS $
op COST OF REPAIR $
COST TO RESTORE TO SERVICE $
TOTAL BASE BID PER SPECIFICATIONS
I hereby acknowledge that I have read the specifications and that I am legally bound by
the statements on the Bid Proposal - Submittal Pages.
Signature
Title
Address
BID OPENING: JANUARY 29, 1996 @2:00 P.M.
ICOMPLETE AND ATTACH THE NON - COLLUSION BID AFFIDAVIT TO BID.
GENERATOR VENDOR LIST
MR LARRY WELLS
WAUKESHA - PEARCE INDUSTRIES INC
555 S MEMORIAL
TULSA, OK 74157
SERVICE AND EQUIPMENT INTERNATIONAL
PO BOX 708
OWASSO, OK 74055
835 -1141
MIKE BRADLEY
UNITED ENGINES INC
7454 E 41ST ST
TULSA, OK 74145
627 -8080
CLIFFORD POWER SYSTEMS
9310 E 46TH ST N
TULSA, OK 74145
836 -0066
CUMMINS /ONAN POWER GENERATING SYSTEMS
SOUTHERN PLAINS POWER
9725'E ADMIRAL PL
TULSA, OK 74116
838 -2555
EMERGENCY POWER SYSTEMS
PO BOX 9758
TULSA, OK 74157
446 -0404