Loading...
HomeMy WebLinkAbout1996.03.19_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE OWASSO PUBLIC WORKS AUTHORITY TYPE OF MEETING: Regular DATE: March 19, 1996 TIME: 7:00 p.m. PLACE: Council Chambers, Owasso Community Center Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin board at 4:00 p.m. on Friday, March 15, 1996. MarAq Boutwell, City Clerk AGENDA 1. Call to Order 2. Invocation 3. Flag Salute 4. Roll Call 5. Request Approval of the Minutes of March 5, 1996 Regular Meeting. Attachment #5 Owasso Public Works Authority March 19, 1996 Page 3 11. New Business 12. Adjournment OWASSO PUBLIC WORKS AUTHORITY MINUTES OF REGULAR MEETING Tuesday, March 5, 1996 The Owasso Public Works Authority met in regular session on Tuesday, March 5, 1996 in the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, March 1, 1996. OF ITEM 1: CALL TO ORDER Chairman Burris called the meeting to order at 7:33 p.m. ITEM 2: INVOCATION The invocation was given during the City Council meeting preceding this meeting. ITEM 3: FLAG SALUTE The flag salute was held during the City Council meeting. ITEM 4: ROLL CALL PRESENT ABSENT Charles Burris, Chairperson Danny Ewing, Vice Chairperson Mary Lou Barnhouse, Trustee Michael Helm, Trustee Joe Ramey, Trustee STAFF Rodney J Ray, City Manager Ronald D Cates, Authority Attorney Marcia Boutwell, Authority Secretary A quorum was declared present. ITEM 5: REQUEST APPROVAL OF THE MINUTES OF FEBRUARY 20, 1996 REGULAR MEETING. Mr Ramey moved to approve the minutes as written, by reference hereto; seconded by Mr Ewing. AYE: Ramey, Ewing, Barnhouse, Helm, Burris ho NAY: None Motion carried 5 -0. Owasso Public Works Authority March 5, 1996 ITEM 9: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR AUTHORIZATION TO PURCHASE FIRE HYDRANT REPLACEMENT MATERIALS AND SUPPLIES. On January 19, 1996, a fire hydrant located at 10104 E 99th St N was struck by an automobile and broken off from the 6 -inch water main. After examination of the hydrant, a determination was made that the hydrant was damaged beyond repair. An insurance claim has been filed. Quotes were requested from three vendors for a new fire hydrant and associated repair hardware, with two vendors responding. Mr Ramey moved, seconded by Ms Barnhouse, to approve the expenditure of $1184 to Water Products, Owasso, OK, for the purchase of a fire hydrant and associated materials; and authorize payment. AYE: Ramey, Barnhouse, Helm, Ewing, Burris NAY: None Motion carried 5 -0. ITEM 10: REPORT FROM OPWA MANAGER No report. ITEM 11: REPORT FROM OPWA ATTORNEY No report. ITEM 12: UNFINISHED BUSINESS None. ITEM 13: NEW BUSINESS None. ITEM 14: ADJOURNMENT Mr Helm moved, seconded by Mr Ramey, to adjourn. AYE: Helm, Ramey, Barnhouse, Ewing, Burris NAY: None Motion carried 5 -0 and the meeting was adjourned at 7:50 p.m. I Marcia Boutwell Authority Secretary Charles L Burris, Chairperson OWASSO PUBLIC WORKS AUTHORITY PAYROLL PAYMENT REPORT PAY PERIOD ENDING 03/02/96 OVERTIME TOTAL DEPARTMENT EXPENSES EXPENSES Water 528.30 3,907.18 Refuse 0.00 3,081.63 OPWA Capital Improvement 39.60 1,094.52 APPROVE 03/19/96 Chairman Trustee Trustee MEMORANDUM TO: RODNEY J. RAY CITY MANAGER FROM: F. ROBERT CARR, JR., P.E. PUBLIC WORKS DIRECTOR Z �0� SUBJECT: AMENDMENT TO ENGINEERING DESIGN SERVICES CONTRACT - WASTEWATER TREATMENT PLANT PHASE I IMPROVEMENTS DATE: March 13, 1996 BACKGROUND: On May 16, 1995, the Trustees awarded a contract to FHC, Inc. to perform engineering design services for Wastewater Treatment Plant improvements. The scope of work and the fee proposal for the project was divided into three (3) work phases as follows: Preliminary Design $84,400 Final Design 64,400 Bidding 9,000 Total Lump Sum $157,800 ORIGINAL PROJECT SCOPE: The existing City of Owasso wastewater treatment facility was constructed in 1986. The plant consists primarily of an oxidation ditch with interchannel boat clarifier, effluent ultraviolet light disinfection and reaeration, and sludge drying beds. The plant was originally designed to treat an average daily flow of 1.56 million gallons per day (MGD). With the current average daily flow approaching the original design capacity and new effluent limitations that require increasing the treatment capabilities of the existing plant, an amendment to the Facilities Plan was completed in order to obtain funding through the State Revolving Fund (SRF) loan program to include the needed modifications. The document has received approval from the Oklahoma Water Resources Board. The approved Facilities Plan serves as the mechanism for selection of the most cost - effective treatment system for the 20 -year planning period. The document is the basis for detailed engineering design and ultimate construction of the needed improvements. Page 3 Amendment to Agreement for Engineering Services Oxidation Ditch: ' The existing building used to house chlorine for oxidation ditch bacteria control is located adjacent to the ditch. The improvements designed addition of chlorine at another location that would enable easier handling of the chlorine cylinders. Relocation of the building was proposed by staff and was included in the design work with compensation. The south end of the oxidation ditch presently is covered with a redwood decking to control splash from the aerator. The decking is extremely difficult to keep clean of algae. Staff desired to have the deck replaced with a solid material that would keep the splash below the deck. Additionally, a manhole near the aerator was requested to enable operators access to more safely tighten the aerator bolts was requested. Additional compensation of $1,900 was requested for this item. A summary of the additional items is as follows: Relocate Control Building (Influent Lift Station area) $2,900 Headworks 1,000 Oxidation Ditch 1.900 Total additional services $5,800 Staff requested FHC to provide documentation of the use of the original design hours. It was felt that it would be difficult to recommend additional compensation without knowing what level of effort had been spend on the original scope of work. A summary of the original manhour budget versus actual hours is presented below: Position Proposed Manhours Budgeted Manhours Actual Manhours Principal Engineer 133 Project Manager 548 571 470 Project Engineer 575 611 745 Staff Engineer/Technician 460 502 1138 Draftsman 258 242 323 Clerical 131 135 103 TOTALS 2,005 2,061 2,779 Actual manhours spent on the project exceed those budgeted by 718 hours. Staff believes that FHC has legitimate reasons to request the additional compensation detailed above. AMENDMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WASTEWATER TREATMENT PLANT IMPROVEMENTS THIS AMENDMENT NO. 1 made and entered into this day of , by and between Owasso Public Works Authority, hereinafter referred to as Owner, and FHC, Inc., hereinafter referred to as Engineer, said parties being the same who executed the original Agreement for Engineering Services, dated the 16th day of May, 1995. WITNESSETH: WHEREAS, Owner requires certain engineering services outside the Scope of Services stated in Attachment A or the aforementioned original Agreement; and WHEREAS, Engineer is prepared to provide said additional services; NOW THEREFORE, Engineer and Owner agree to amend certain items of the original Agreement as follows: Add to the end of Attachment A, Scope of Services: III. ADDITIONAL IMPROVEMENTS The following items of additional work shall be included into the final design. A. Relocate Control Building (Influent Lift Station Area). Relocate the existing influent lift station control building to an elevation above the flow equalization pond maximum water surface. Raise wet well and the valve vault walls to the same elevation. Relocate the fuel tank to above ground adjacent to the generator. B. Headworks. Remove existing mechanical bar rack and install a grinder ( "channel monster "). C. Oxidation Ditch Deck. Replace the existing redwood deck and install an access opening. July 25, 1995 Mr. Robert Carr, P.E. Public Works Director City of Owasso 207 S. Cedar Owasso, Oklahoma 74055 RE: Opinion of Probable Construction Costs Parefiminary Design - 30 % Design Memorandum Submittal Wastewater Treatment Plant Please I Improvements Dear Mr. Carr: Please find enclosed a cop y of the opinion of probable construction costs for your review and comments. Items 1 through 9 correspond to the original scope of services. The estimated construction cast for these items is approximately $2,211,530 and the estimated total project cost is approximately $3,069,604. The cost estimates included in the amendment to the facility plan for the construction cost and total project cost are $1,950,000 and $2,781,500, respectively. However, it is noted that these are 1994 costs, and when adjusted for escalation at 4.0% annually to 1996, they equal $2,109,120 and $3,011,715, respectively. Further, the current cost estimate also includes O&M Manual preparation and Project Certification which were not originally included. These items may be needed per SRF guidelines. Item 10 pertains to various items of work requested by the City since the project started. The total estimated construction cost and project cost for these items are $253,755 and $335,718, respectively. Most of these items can be included in the design without affecting the design compensation and schedule; however, there are a few items that would require additional efforts as described below. Relocate Control Building (Influent Lift Station Area). This item will require additional survey and design efforts as well as development of new drawings. Estimated additional engineering compensation including survey is $2,900. ATTACHMENT B•1 AGREEMENT FOR ENGINEERING SERVICES BETWEEN OWASSO PUBLIC WORKS AUTHORITY, OWNER AND FHC, INC., ENGINEER FOR WASTEWATER TREATMENT PLANT IMPROVEMENTS MANHOUR ESTIMATE WORKSHEET PRELIMINARY DESIGN PHASE FILE: ATTCHB -A.WK3 PREPARED BY: JIDN SCOPE OF SERVICES LABOR Ph / Tsk DESCRIPTION NOTES MANHOURS PER CATEGORY TOTAL MI-I's CAT. 1 PR CAT. 2 PM CAT. 3 PE CAT. 4 SE CAT. 5 DR CAT. a CL CAT. 7 IN Oi / — PROJECT MANAGEMENT / 01 Administration 1 84 la 100 / 02 Project Kickoff Meet 4 4 4 12 / 03 Quality Control Reviews 8 8 le 02 / — SURVEYING / O1 Sco a (2 4 1 5 / 02 Review 2 2 03 / — I GEOTECHNICAL INVESTIGATION / oll Scope 1 4 1 6 / 021 Quotes 4 1 5 / 031 ecommendation 2 2 / 041 Contractual 2 1 3 / 051 Review 2 4 1 7 / 06 Invoices 1 1 04 / — DESIGN MEMORANDUM / 01 General Project Requirements 24 8 32 / 02 Process Design and Evakiations / Influent Lift Station 4 8 24 39 / Oxidation Ditch / Clarifier /Aerator Baffle 1 3 2 6 / Supplemental Aeration 2 24 26 / Outlet Control Structure 2 12 14 / External Clarifiers 2 le 18 / Return/Waste Sludge PS 4 12 24 40 / Sludge Drying Beds 4 12 16 / 03 Drawings and Sketches / P & I Diagram 4 16 16 12 48 / Plant Layout 2 16 18 12 46 / Hydraulic Profile 2 8 8 24 8 50 / Yard Piping 1 2 8 le 8 35 / Influent Lift Station 4 12 16 / Oxidation Ditch 18 le / Clarifier /Aerator Baffle 1 2 e 9 / Supplemental Aeration 1 8 24 33 / Outlet Control Structure 1 e 12 19 / External Clarifiers 1 e le 12 35 / Return/Waste Sludge PS 1 6 8 24 le 55 / Sludge Drying Beds 1 16 12 29 / 04 Equipment and Materials Specs (3 ) 3 11 40 12 16 82 / 05 Electrical, Instr. and Controls 8 24 8 40 / 06 Property Requirements (4 ) 4 4 8 / 07 Project Schedule 1 4 4 9 / 08 Opinion of Probable Costs 4 16 24 24 68 05 / — DELIVERABLES / 01 All Activities 4 4 16 24 06 / -- DESIGN MEMORANDUM WORKSHOP / 01 orkshop 8 B 8 24 / 02 DM Revisions 8 8 8 8 32 07 / — PRESENTATION / 01 All Activities 4 4 8 16 08 / AGENCY WORKSHOP / 01 Workshop 8 8 8 24 / 02 DM Revisions 8 8 Q 20 TOTAL MANHOURS FOR EACH CATEGORY: 70 317 353 176 116 53 O 1 086 PERCENT UTILIZATION: 80 29% 33036 16% 11% 5% 0% PAGE \ Projcct �,,aceue:t Syst»m DOS DATE: 02/14/96 STAFF REPORT DOB TIHE: B2,21 PM FOR TH[ PEF7�D 01/0U8] - 81/31/96