Loading...
HomeMy WebLinkAbout1996.07.25_City Council Agenda_Special ' PUBLIC NOTICE OF THE MEETING OF THE OWASSO CITY COUNCIL TYPE OF MEETING: Special DATE: July 25, 1996 TIME: 6:30 p.m. PLACE: City Hall Conference Room, City Hall Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin board at 5:00 p.m. on Tuesday, July 23, 1996. Timothy D. Room, Community Devel~ment Director r 1. Call to Order 2. Roll Call AGENDA 3. Presentation and Discussion of Street Improvement Projects for FY 1996-97. Mr. Robert Can • Attachment #3 ' The staff will solicit input regarding the street improvement projects for FY 1996-97. No formal action will be taken on this item. 4. Adjournment 1 1 i MEMORANDUM TO: RODNEY J. RAY CITY MANAGER FROM: F. ROBERT CARR, dR•, P.E. `~ ' PUBLIC WORKS DIRECTOR , f SiJBrJECT: STREET REPAIR PRIORITIES DATE: July 22, 1996 BACKGROUND: ' Public Works Department Engineering Division staff have compiled information pertaining to needed street repairs in response to the establishment of funding in the FY96-97 Street Division Capital Outlay Budget. Sites within the city limits were visited, investigated and repair components identified. As a result, potential repair projects have been identified and located as shown in Figure 1. Costs for each of the identified projects have been calculated using FY95-96 street repair program actual repair costs and other recent similar projects. Available funding for FY96-97 is budgeted at $68,000 (Fund 51-410-5461). Estimated costs for these projects are $869,802. Therefore, prioritization of projects is required, since the list exceeds the budget. PRIORITIZATION: Each of the projects was evaluated by staff to determine a prioritized ranking. Projects were given a numerical score and the combined scores were tabulated to assess ranking. Criteria used in the scoring included: Affordability -The total cost of each project was compared with the other projects. The ability to complete a number of projects within the established budget is limited by the relative cost of the repair. A high score in this category was indicative of a low cost of repair. Page 2 Traffic Volume - In this category, projects were scored based upon location and traffic volumes. A high score was indicative of projects on collector or arterial streets and locations near public buildings and schools. Work Orders -Many of the projects included on the listing have also been called in by residents. A high score in this category is indicative of projects currently on the work order program. FY95-96 Project -Projects received points in this category if they were also , included on the FY95-96 Street Repair program list. Prioritization ranking of each project are listed on Table 1. A cumulative summary of the ~' project costs based on the rank prioritization is shown on Table 2. (Table 3 is prioritization ranking by each category and is included for reference.) FUNDING AVAILABILITY: In June 1995, Council approved a $1.50 per month increase in residential refuse collection rates. ~ specifically for the street repair program. As a result of this action, the FY96-97 Street Division Capital Outlay available budget for street repairs is $68,000 (51-410-5461). Based on cumulative costs of repairs using ranking prioritization, sufficient funds are available to complete the first twenty-three (23) repair projects. The total cost of the identified projects is $66,330. The remaining available funds is $1,270, should the identified projects be completed within each budget estimate. Staff proposes that these funds be classified as contingency in case of unforseen construction difficulties. As progress on these projects is made, a status report will be prepared to summarize estimated costs versus actual expenditures. The status report will be used to revise availability for additional projects based upon the prioritized ranking, Purchases and/or contract items requiring prior authorization will be brought before Council as work at each location proceeds. Most of the projects are small enough that Street Division personnel may be able to complete the needed repairs. Bid specifications may be prepared to enable a contractor to be hired for multiple locations. In addition, materials purchased by the city to be used by our crews may require prior authorization. Page 3 ItECONIlVIENDA'I`ION: Staff recommends Council authorization to proceed on the following street repairs as part of FY96-97 Capital Outlay Street Repair program: Resultant Ranking Location Estimated Cost 1 8605 NORTH 120TH EAST AVENUE $1,165 2 7TH STREET & ATLANTA 4,610 3 77TH STREET & 120TH EAST AVENUE 3,600 4 12530 EAST 83RD STREET 4,665 5 710 NORTH ATLANTA 6,860 6 7703 OWASSO EXPRESSWAY 1,155 7 8808 NORTH 119TH EAST AVENUE 1,375 8 11017 EAST 114TH STREET 2,215 9 12526 EAST 83RD STREET 7.340 10 97TH STREET & 110TH EAST AVENUE 1,015 11 2304 NORTH DOGWOOD 1,015 12 8013 NORTH 119TH EAST AVENUE 1,265 13 9702 NORTH 111TH EAST AVENUE 1,265 14 126TH EAST AVENUE & 82ND STREET 1,365 15 8TH STREET & MAIN STREET 1,905 16 6TH STREET & MAIN INTER. 1,945 17 78TH PLACE & 117TH EAST AVENUE 2,015 18 BETWEEN 7TH & 8TH ON MAIN STREET 2,290 19 87TH STREET & 124TH EAST AVENUE 2,340 20 8800 NORTH GARNETT ROAD 5,655 21 127TH EAST AVENUE & 73RD ST INTER. 8,315 22 322 NORTH ELM PLACE 1,415 23 127TH EAST AVENUE & 82ND STREET 1,540 TOTAL $66,330 Page 4 r ATTACgitlVfENTS: 1. Figure 1 -Potential Street Repair Projects (North and South Portions) ' 2. Figure 2 - FY96-97 Recommended Street Repair Projects 4. Table 1 -Prioritization Ranking 5. Table 2 -Cumulative Costs Summary 6. Table 3 -Detailed Prioritization 1 t 1 1