AGENDA
1. Call to Order
2. Flag Salute
3. Roll Call
4. Request Approval of the Minutes of February 2, 1993 Regular Meeting
Attachment #4
5. Request Approval of Claims
Attachment #5
Owasso Public Works Authority
February 16, 1993
Page 2
6. Consideration and Appropriate Action Relating to an Agreement Between the Owasso
Public Works Authority and Rogers County Rural Water District #3, Providing for the
Purchase of Certain Portions of the Water District's Service Area
Mr Ray
Attachment #6
Staff will recommend Trustee approval of the Agreement, authorization of the
Chairperson to execute the necessary documents, and the expenditure of $49,750.00 to
the District as compensation for the service area.
7. Consideration and Appropriate Action Relating to a Presentation Regarding the
Continuation of a Yardwaste Separation Program
Mr Augustine
Mr Knebel
Staff will present a report outlining options available to the Trustees relative to the
yardwaste separation program and recommending continuation of this program and the
construction of a compost site.
8. Consideration and
Polycarts
Mr Augustine
Appropriate Action Relative to a Request to Purchase 100 Red
1
Staff will recommend Trustee approval of the expenditure of $6100.00, payable to ,
Williams Refuse Company, for the purchase of 100 red polycarts for use in the
yardwaste separation program.
71
Owasso Public Works Authority
February 16, 1993
Page 3
9. Consideration and Appropriate Action Relating to a Request for Authorization to Solicit
Bids for the Purchase of Yardwaste Collection Bags
Mr Augustine
Staff will recommend that the Trustees authorize the solicitation of bids for 40,000
yardwaste collection bags for delivery in July 1993.
10. Report from OPWA Manager
11. Report from OPWA Attorney
12. Unfinished Business
13. New Business
14. Adjournment
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, February 2, 1993
The Owasso Public Works Authority met in regular session on Tuesday, February 2, 1993 in
the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and
Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, January 29, 1993.
ITEM 1: CALL TO ORDER
Chairperson Marlar called the meeting to order at 8:18 p.m.
ITEM 2: FLAG SALUTE
' The flag salute was held during the Owasso City Council meeting preceding this meeting.
ITEM 3: ROLL CALL
' PRESENT ABSENT STAFF
Patricia Marlar, Chairperson Rodney J Ray, City Manager
' Jason Gittelman, Vice Chairperson Ronald D Cates, Attorney
John Phillips, Trustee Marcia Boutwell, Secretary
Bob Randolph, Trustee
tJim Smalley, Trustee
A quorum was declared present.
ITEM 4: REQUEST APPROVAL OF THE MINUTES OF JANUARY 19. 1993
' REGULAR MEETING
John Phillips moved to approve the minutes as written, by reference hereto; seconded by Jason
Gittelman.
AYE: Phillips, Gittelman, Randolph, Smalley, Marlar
NAY: None
Motion carried 5 -0.
Owasso Public Works Authority February 2, 1993
ITEM 5: REQUEST APPROVAL OF THE CLAIMS
John Phillips moved, seconded by Jim Smalley, to approve the following claims as submitted:
(1) $97,187.90 and (2) Payroll $17,812.21.
AYE: Phillips, Smalley, Randolph, Gittelman, Marlar
NAY: None
Motion carried 5 -0.
ITEM 6: CONSIDERATION AND APPROPRIATE ACTION RELATING TO THE
ACCEPTANCE OF THE WATER TOWER PAINTING PROJECT FROM
SEFCO. INC.
Mr Augustine presented this item stating that the Trustees, at their September 1, 1992 meeting,
awarded the bid for the water tower painting project to Sefco, Inc. The contract was in the
amount of $23,419.00 and contained a one year guarantee of the workmanship and materials
used. Upon completion of the painting, staff conducted an inspection of the project and
determined that there were areas on the tower that required attention before staff would accept
the project. The required rework was completed January 15, 1993 and staff conducted a final
inspection on January 22, 1993 and found that the project met the specifications of the City.
Jim Smalley moved to accept the project, authorize final payment, and begin the one -year
maintenance bond period. Motion was seconded by John Phillips.
AYE: Smalley, Phillips, Randolph, Gittelman, Marlar
NAY: None I
Motion carried 5 -0.
'
ITEM 7: REPORT FROM OPWA MANAGER
No report.
'
ITEM 8: REPORT FROM OPWA ATTORNEY
No report.
ITEM 9: UNFINISHED BUSINESS
'
None t
2 '
Owasso Public Works Authority
ITEM 10: NEW BUSINESS
None
ITEM 11: ADJOURNMENT
John Phillips moved, seconded by Jason Gittelman to adjourn.
AYE: Phillips, Gittelman, Randolph, Smalley, Marlar
NAY: None
Motion carried 5 -0 and the meeting was adjourned at 8:23 p.m.
Marcia Boutwell, Secretary
3
February 2, 1993
Patricia K Marlar, Chairperson
CITY OF OWASSO
OWASSO PUBLIC WORKS AUTHORITY
2/11/93 15:48:44 A/P CLAIMS REPORT
PO # VENDOR DESCRIPTION
---- - - - - -- ------------------- - - - - -- ----------- - - - - --
* NO DEPARTMENT MASTER FOUND *
------------------------ - - - - --
931650 OPWA RECYCLE CENTER REIMB CASH DRAWER
931688 RICHARD WISSINGER REFUND
DEPARTMENT TOTAL
OPWA ADMINISTRATION
------------------------ - - - - --
APAPVR PAGE:
AMOUNT
- - - - -- ------ - - - - --
930023 RONALD D CATES RETAINER /SERVICES
930024 CPS BUSINESS, INC. LIC & ASSIST FEE
930043 US POSTMASTER UTILITY BILL POSTAGE
931505 HAMILL CO. WORK ORDERS
931631 CELLULAR ONE -TULSA 1/93 USE
931648 TREASURER PETTY CASH REIMB PETTY CASH
931683 CSC CREDIT SERVICES, INC SERVICES
DEPARTMENT TOTAL = = = =>
WATER
931520 BOBBY TAYLOR
931521 MICHAEL KAISER
931522 MICHAEL MILLER
931524 DAVID HARRIS
931526 LOYD LEACH
931604 CINTAS CORP.
931645 KIMBALL ACE HARDWARE
931673 CITY GARAGE
931674 CITY GARAGE
931679 MCCAW COMMUNICATIONS
931682 WATER PRODUCTS INC
r WASTEWATER
r
DEPARTMENT TOTAL = = = =>
931527 HAYNES EQUIP.
931601 ZEE MEDICAL SERVICE
931602 ADVANCED CHEMICAL
931603 GRAINGER,W W INC
931604 CINTAS CORP.
METER READER
METER READER
METER READER
METER READER
METER READER
UNIFORM RENTAL
SUPPLIES
FUEL
PARTS
PAGER RENTAL
SUPPLIES
PUMP SEAL
SUPPLIES
GAS CHLORINE
SUPPLIES
UNIFORM RENTAL
1,418.54
4.28
1,422.82
800.00
217.00
1,500.00
224.00
30.00
122.06
185.50
3,078.56
285.40
155.25
180.15
255.15
166.05
120.25
105.07
236.05
1,092.01
21.95
1,073.09
3,690.42
514.13
15.95
379.22
151.65
323.00
�]
CITY OF OWASSO
OWASSO PUBLIC WORKS AUTHORITY
2/11/93 15:48:44 A/P CLAIMS REPORT APAPVR PAGE:
PO # VENDOR DESCRIPTION AMOUNT
---- - - - - -- ------------------- - - - - -- ------------------- - - - - -- ------ - - - - --
931605
CURTIN MATHESON SCIENTIFI
SUPPLIES
302.36
931610
W.L. SUMPTER & ASSOC
PARTS
94.00
931611
FORESTRY SUPPLIERS, INC
PARTS
29.71
931642
CARLTON BATES
PARTS
167.54
931645
KIMBALL ACE HARDWARE
SUPPLIES
60.21
931646
WATER PRODUCTS INC
SUPPLIES
44.02
931648
TREASURER PETTY CASH
REIMS PETTY CASH
15.53
931673
CITY GARAGE
FUEL
101.15
931674
CITY GARAGE
PARTS
281.52
931679
MCCAW COMMUNICATIONS
PAGER RENTAL
43.90
DEPARTMENT TOTAL =___>
2,523.89
REFUSE COLLECTIONS
------------------------ - - - - --
931437
KIMBALL ACE HARDWARE
SUPPLIES
57.43
931529
WASTE MANAGEMENT OF OKLA
TIP FEES
5,970.01
931630
TULSA WORLD
LEGAL NOTICE
72.45
931673
CITY GARAGE
FUEL
441.67
931674
CITY GARAGE
PARTS
1,144.47
DEPARTMENT TOTAL = = = => 7,686.03
RECYCLE CENTER
931437
KIMBALL ACE HARDWARE
SUPPLIES
61.26
931529
WASTE MANAGEMENT OF OKLA
TIP FEES
94.58
931648
TREASURER PETTY CASH
REIMS PETTY CASH
7.06
931673
CITY GARAGE
FUEL
48.99
DEPARTMENT TOTAL = = = => 211.89
FUND TOTAL =___> 18,613.61
10
CITY OF OWASSO
CITY GARAGE
2/11/93 15:48:44 A/P CLAIMS REPORT APAPVR PAGE: 11
PO # VENDOR DESCRIPTION AMOUNT
CITY GARAGE
931437 KIMBALL ACE HARDWARE
931528 OK TRUCK SUPPLY
931608 HI -LINE
931648 TREASURER PETTY CASH
931673 CITY GARAGE
931674 CITY GARAGE
DEPARTMENT TOTAL =___>
FUND TOTAL
GRAND TOTAL
SUPPLIES
86.85
PARTS
32.70
SUPPLIES
52.84
REIMB PETTY CASH
72.82
FUEL
24.70
PARTS
26.23
296.14
296.14
67,432.63
t
0
NO
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 02/06/93
DEPARTMENT
AMOUNT
^O^:Ni"•'•v:.. '?CM; N•Lfl.?!. vi0.� \ +.v,.��•.�• '^:. \ yi \'CT �'^n �'( .V'{CCS �P'\ .x.
....."� ::..i ..••.. mhJY..i.hY..:: • i;? 3; �<;: �•:' 5�.• :.::::::::::::::::::::: :Ji }:v::.v::.:v::.:::::::::.i':
... .:'.}[.���....' ?: {:jii�: ii:f ijji: i:�:S•ii:'i:v�:i':' }: ?•iiii ii:•i:�vit:
�. �:�%•} MSUrY: t: Ct •.1+::.:^'?!MJ<;T4.S.w;y,.�nv,. COCM,P NOON,.!,:.,
i:::i }i }ii} iii}} i::?: i ::v:::iiiiiiii::ti::::i::i::i::: : v. .. '. : ?.:
�yii {•i:•:'i:':v''u:i'�:� u:•::• }:�:'v:: • +:•:•:�:•:�:. ...... Y.•.'•%?.iO ?L ?.} .i: } }:?
.....:.: ...........:. ...............:,.....3,321.74
Water
Refuse
3 , 346.41
.'.� .. '. ���!idAk .M+� : i:;' �:`';} i' �' �<?;';: �r: �':%;:;:':,:<': y''';':': i'::::: ti;:: �i: �: �' �: �r:$:;:'
�''' ' ;:: <N;::::r��`'�:':�X' ?�•�''�: i'':'':�:..... :.t.+�c:S.�:..a:• •n
APPROVED: 02/16/93
Chairman
ITrustee
Trustee
i
i
CITY GARAGE
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 02/06/93
APPROVED: 02/16/93
Mayor
Council Member
Council Member
1
NWMoxnivnuM
TO: CHAIRWOMAN AND TRUSTEES
' OWASSO PUBLIC WORKS AUTHORITY
0 FROM: RODNEY J. RAY
SUBJECT: PROPOSED PURCHASE OF SERVICE AREA FROM ROGERS RURAL
WATER DISTRICT #3
DATE: FEBRUARY 12, 1993
' BACKGROUND:
Over two years ago City staff members and Rogers County Rural Water District staff initiated
' discussions relating to a long -term philosophy regarding the future relationship between the two
organizations. At that time it was reported to the Council that a viable option for addressing the
long -term relationship would be for the City and District to agree to a concept that would allow
' the City to acquire certain portions of the District as the City's growth moved into the District's
service area. Additionally, it was reported that our staff team believed that eventually the City
could serve water to the entire area west of the Verdigris River. It was believed that such a
relationship would best serve the interest of the citizens and customers of both the City and the
Water District.
It was recognized that the first phase of such acquisition would, most likely, be in the area
immediately north of the Owasso High School and east of 129th East Avenue. That area
includes approximately one and one -half sections that is primarily undeveloped, and would be
a logical acquisition because of its proximity to the existing City boundary.
' Subsequent to those discussions the majority of the section around the school was annexed by
the City Council upon request from the property's owners. After annexed pieces of the area
began to sell and development of those parcels was begun, each time a tract began to develop
' the developer and City of Owasso would petition the Water District to remove that tract from
the District's service area so water could be supplied by the City along with other municipal
services. Initially, the District was understanding and did, in fact, detach two areas so the City
could provide service. At that time, however, there were concerns that the City seemed to want
to "piece -meal" the undeveloped portions of that area into our service area leaving the District
to serve their existing customers. That concern was heightened when the City later requested
that additional property be released from the District for development within the City. At that
PROPOSED PURCHASE OF SERVICE AREA
FEBRUARY 12, 1993
PAGE TWO
point the District's Board adopted a policy that prohibited the release of any other tracts until
the City of Owasso would agree to take the entire one and one -half sections east of 129th E.
Avenue north of 86th Street and west of 145th East Avenue.
The District took that position, because it believed that to allow the City to have all of the area
that would produce future revenue, while being forced to maintain the existing customers of that
area, was a poor business decision. They did not want the responsibility of having to maintain
their own lines along side City lines and have the maintenance cost associated with the upkeep
of what would eventually become a kind of "no -mans area ". That feeling resulted in the District
telling our staff that they felt an agreement should be finalized for the City to take over the
entire area and include the purchase of their existing lines as a part of the "deal" criteria.
After reviewing the District's proposal the City staff review team was of the opinion that the
proposal for taking over water service for that area was premature and would result in a large
capital liability for the City. Although the District's lines in the area under discussion are in
good condition, it was the staff position that development in the area was not occurring, that
land prices were too high to promote the sale and development of the area, and that absent
development the City would be forced to do substantial capital investment to maintain service
to the existing 66 customers. It was also the staff opinion that the existing customers would not
provide enough revenue to offset the capital, operating and maintenance cost. Based on that
evaluation the staff was not receptive to accepting a deal for a buy -out at that point.
Subsequent to that opinion, several things happened that forced the staff to rethink its position.
First, all of the undeveloped land in the section around the high school has sold to parties
interested in development. Fox land to Windsor Lake Developer, Synar land to Terrill Taylor -
Brentwood and Trayband property to Charlie Helscel. Second, housing developments will
accomplish most of the capital cost needed to continue service to the existing customers. Lastly,
the recent creation of an Enterprise Fund could certainly use the revenue generated by an
additional thousand water taps during the next five to ten years.
In reviewing the land available for development in the areas under discussion, it is the staff
opinion that a conservative figure of 1600 new water customers could be used to calculate
revenue /expense figures for analyzing this proposal. That number of customers will eventually
generate $96,000 per year in contribution to the Enterprise Fund Capital Program alone.
Additionally, that number of water customers will increase the OPWA bottom line by
approximately 20 % over our current level. When considering that capital costs are minimal (less
than $5,000 to hook up to system) the financial impact of acquiring the area is significant. It
is also anticipated that the acquisition fee of $49,750 can be recouped by adding a fifty dollar
($50) extra charge on the tap fee for all water taps in that area. Based on our data it is expected
that the acquisition cost would be recouped in the following manner:
PROPOSED PURCHASE OF SERVICE AREA
FEBRUARY 12, 1993
PAGE THREE
1993 -94
$ 6,000
(120 lots)
1994 -95
5,000
(100 lots)
1995 -96
15,000
(300 lots)
1996 -97
17,500
(350 lots)
1997 -98
15,000
(300 lots)
1998 -99
11,500
(230 lots)
1999 -2000
10.000
200 lots
Total surcharge
$ 80,000
1,600 lots
Thus a $50 per tap extra charge assessed to that one and one -half section will, over a seven year
period produce enough revenue to pay the $49,750 acquisition cost plus add an additional
$30,250 to the OPWA to offset any maintenance cost on the existing system as its mains are
replaced by development.
ACOUISITION COST:
The proposal from the District requests payment (lump sum) of $49,750. That payment is in
consideration for acquiring the following areas and lines.
SECTION 21, TOWNSHIP 21N, RANGE 14E
1. 100 acres with 1400 feet of 2" pvc
2. 40 acres with 1500 feet of 4" pvc (Pleasant View)
3. 180 acres with undeveloped land
SECTION 16, TOWNSHIP 21 N. RANGE 14E
Total feet of 4" pvc - 8,000
Total feet of 3" pvc - 4,600
Total feet of 2" pvc - 3,100
Total feet of 1 1/2" pvc - 1,500
Total acres undeveloped - 600
Total projected taps when fully developed - 1,600
PROPOSED CONTRACT:
The contract proposed by the District contains the following items:
1. Lump sum payment of $49,750 upon presentation of mortgage free deed
2. Transfer of ownership of all existing lines and easements to OPWA and engineering plans
for all lines
PROPOSED PURCHASE OF SERVICE AREA
'
FEBRUARY 12, 1993
PAGE FOUR
'
1. 160
acres with 4,600 feet of 3" pvc
900 feet of 4" pvc
t
1,700 feet of 2" pvc
'
1,500 feet of 1 1/2" pvc
2. 60 acres with 5,600 feet of 4" pvc
'
3. 420 acres of undeveloped land
Total acres developed - 360
Total number of customers now - 66
Total feet of 4" pvc - 8,000
Total feet of 3" pvc - 4,600
Total feet of 2" pvc - 3,100
Total feet of 1 1/2" pvc - 1,500
Total acres undeveloped - 600
Total projected taps when fully developed - 1,600
PROPOSED CONTRACT:
The contract proposed by the District contains the following items:
1. Lump sum payment of $49,750 upon presentation of mortgage free deed
2. Transfer of ownership of all existing lines and easements to OPWA and engineering plans
for all lines
PROPOSED PURCHASE OF SERVICE AREA
FEBRUARY 12, 1993
PAGE FIVE
' 3. Six months for City to assume service to existing customers of the District
' 4. Agreement to charge only in -City water rates to 66 existing District customers
5. Detachment of all of Section 21 and Section 16 from Rural Water District service area
' with lien releases from F. H. A.
ICOMMENTS:
1. The acquisition of this area will create a positive revenue source for the OPWA. The area
' is already developing and the only reason for the lack of additional development is the lack of
desire to develop while this issue is unresolved.
2. Even though we can work out a deal with the District for them to provide water while the
City provides sewer, refuse and other services, it is logical to have only one provider for all
P services.
3. Under the staff proposal, all acquisition costs would be returned to the City as taps were
requested, thus no current citizen would be paying for the acquisition, additionally the extra tap
ft fee would produce funds for any maintenance and operation needs of the existing system.
4. The existing lines serving the 66 customers will not provide adequate fire protection. While
there is no law or requirement for that protection the Trustees should note that fire fighting
capacity in the currently developed areas of section 16 and 21 will be limited until housing
' developmentS replaces all of the main lines. Even then the lines within the County subdivisions
would not be replaced and would not support fire fighting equipment.
5. Mr. Cates has reviewed and commented on the proposed contract. All changes requested
were approved by the District's Board.
6. While I do understand the natural reluctance of the Trustees to pay for what we consider sub-
standard lines and then assume responsibility for those lines, I strongly believe that the City is
the logical provider of services to that area and should move to acquire the rights to service the
property with a municipal water service.
PROPOSED PURCHASE OF SERVICE AREA
FEBRUARY 12, 1993
PAGE SIX
RECONIlIZENDATION:
The staff recommends Trustee approval of the attached agreement and authorization for the
Chairwoman to execute the necessary documents, and approval of an expenditure of $49,750 to
the Rogers Rural Water District #3 as compensation for the service area.
ATTACHMENTS:
L Proposed contract
2. Map showing area under discussion
IT $ w v
::. bm■° mod fir rl■6 9hor bmd 1
it
I MEMORANDUM
TO: CHAIRWOMAN AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: RODNEY J. RAY, CITY MANAGER
SUBJECT: YARDWASTE SEPARATION PROGRAM REVIEW
DATE: FEBRUARY 12, 1993
1 BACKGROUND
I In November 1992, a special project review committee was formed to evaluate the City of
Owasso's yardwaste separation program. During a series of meetings, this committee
addressed questions which focused on the merit of the program, its cost, convenience, and
' future.
Attached for your review and consideration is the complete report from the committee.
1
IRECOMMENDATIONS
' Based on the content of the attached Yardwaste Separation Program Review, the staff
recommends:
1) Continuation of the yardwaste /compost program as a service to the public,
2) Inclusion of the option of the yardwaste -only red polycarts for those homeowners who
would find this method more convenient than the bags that are currently in use. The
committee recommends proceeding with the purchase of 100 such receptacles so that
they can be made available to the public this growing season.
3) Preparing bid information for an order of 40,000 City - approved yardwaste bags for
' delivery in July when the current inventory is depleted.
1
YARDWASTE SEPARATION PROGRAM REVIEW
BACKGROUND
On March 1, 1990, "A Proposal for the Removal of Yardwaste from the Residential Refuse
System" was presented to the City Council to offer a comprehensive approach to Owasso's
yardwaste disposal concerns and as an enhancement to the City's recycling efforts. Each year
that Owasso has operated its mandatory yardwaste separation program, it has done so in an
effort to:
1) reduce the volume of biodegradable waste that is buried in the landfill,
2) to control waste disposal costs by reducing (stabilizing) landfill tipping fees,
3) to reduce the wear and tear on equipment and,
4) philosophically, to plan for the future of the community and its citizens by careful stewardship
of the area's finite natural resources.
During the 1990 growing season, special bio- degradable bags were put into use for the curbside
collection system. In addition to these special bags, the yardwaste separation program included:
*Maintaining the current level of household refuse collection (one full polycart and three 30
gallon bags of household refuse per week) at a cost of $6.50 per month.
*Requiring total separation of yardwaste from other residential refuse.
*Providing curbside pickup of yardwaste one day per week, or allowing citizens the opportunity
to drop yardwaste off at the recycle /convenience station.
and
*Requiring all residents who choose to use the curbside pickup option to use city - approved
yardwaste bags that could be purchased at selected city facilities.
A statistical database was developed using the information from the first year's operation and
measured the volume of waste collected, the number of bags sold, etc. This historical
information is attached for your review (see attachments 1, 2 and 3).
R
YARDWASTE SEPARATION PROGRAM REVIEW
PAGE TWO
The second and third years of the yardwaste separation program expanded the pick -up schedule
from one day per week to two days per week dividing the community into two specified
' collection routes. The bio- degradable bags had not proven to be efficient or practical within the
separation /composting program. As a result, bags that had the City of Owasso's identification
printed on them (but were not classified as "biodegradable ") were put into use for city residents
' who chose to participate in the 1991 and 1992 curbside pickup programs. During the 1992
program, a small pilot project was also undertaken that offered a special polycart option to ten
homeowners. This pilot project was very well received although the cost of the program to the
user did not match the cost of the service.
COMMITTEE REVIEW AND PROPOSAL FOR 1993
'
In November of 1 ram review committee was formed to take a detailed look at the
9 92 a program
efficiency of the existing program and the realities involved in establishing a properly permitted
tcompost program in concert with the yardwaste separation effort. This evaluation committee
included Rodney Ray, Mike Augustine, Ralph Griffin, Sonny Veppert, Mike Knebel and
' Jo Ellen Krantz. Through a series of meetings, this committee sought to analyze the program's
current costs, the system's level of effectiveness, the degree of convenience to the citizens and
its operational and economic practicality for the city and its environmental impact.
' Through this review process, the committee has
1) determined the yardwaste separation program should be continued,
2) devised three customer options to be implemented with the beginning of this collection season
(April 5 - October 28),
3) completed estimates of the cost of a fully permitted Health Department approved compost
project and
4) outlined a comprehensive marketing plan to inform the customer /citizen of all aspects of the
1993 yardwaste separation program.
1
YARDWASTE SEPARATION PROGRAM REVIEW
PAGE THREE
DATA EVALUATION USED IN PROGRAM ANALYSIS
The environmental impact of the yardwaste separation program is obvious from the statistics '
accumulated since the program's inception. A total of 1.684 tons (over 3.3 million pounds) of
yardwaste has been kept from the landfill over the last three years Last year alone, Owasso's
program collected an average of 773 bags per week from approximately 10 percent of Owasso's
residential refuse customers. Specific weeks with more than 680 yardwaste bags (or 100 cubic
yards of material) stand out as peaks in the season. If the yardwaste separation program was
not in place, one or more extra hauls to the landfill per truck would be necessary on each of the
regular refuse pick -up days to handle the peak volume. (See attachments 1, 2, and 3 for detailed
statistics).
Other pertinent information was also collected during 1992. This information was utilized to
derive actual costs such as curbside collection:
Truck Driver (52 days annually) $ 2,500
Fuel 700
Truck Maintenance 1,000
DOC Workers (labor) no cost
TOTAL ANNUAL COLLECTION COST $4,200
When the collection cost ($4,200) is divided by the number of bags collected last year (24,000),
it reveals an actual cost of 17.5 cents per bag for curbside collection. If this collection cost
continues to be included in the charge for the purchase of each bag, the City can maintain a true
"user pays" system.
These and other statistics were used to produce ten -year projections of the yardwaste separation
program's basic costs and the indirect savings inherent in the program. The following tables
contain summary information from the analysis.
Ten -year average landfill tipping fee savings (per year)
$14,000
,
Refuse truck life increased by 1/7 (annual savings)
2,857
Extra residential route driver salary (annual savings)
2.632
'
ANNUAL SAVINGS FROM PROGRAM CONTINUATION
1 4
$ 9, 89
YARDWASTE SEPARATION PROGRAM REVIEW
PAGE FOUR
Part time (1 /2 days) compost operator (annual cost) $9,600
' Administration, marketing, bag sales, and misc. (annual cost) 1.000
BASIC ANNUAL COST OF PROGRAM CONTINUATION $10,600
AVERAGE ANNUAL LOSS IF PROGRAM DISCONTINUED $ 8.889
Please note that the ten -year average annual summary may not give a clear picture of the
immediate financial impact on the City if the decision was made to terminate the yardwaste
program this year. Another complete residential refuse route and truck (to handle the previously
mentioned peaks) would need to be budgeted into the next fiscal year instead of the '94 -'95 or
'95 -'96 budget. Also note that the summary does not include the capital costs required for the
+ compost site permit, construction, and equipment.
THE 1993 PROGRAM PROPOSAL
THREE CUSTOMER OPTIONS
A) Curbside pickup is recommended for continuation using City - approved bags available from
various points of purchase. The cost of these bags is used as a means to defray the expense of
the program with a "user pays" philosophy. This year, in addition to being available at city hall
and the recycle center, we are working with the 24 -hour Owasso locations of both Texaco and
QuikTrip to provide easy, convenient access for citizens who wish to purchase bags at any time
of day.
Due to price increases from the supplier and the handling of the bags and organic material, the
price of the bags should be increased five cents /per bag over the price paid last year. Bringing
the cost of a ten -bag package from $3.00 to $3.50.
Currently, the City has an inventory of 12,000 yardwaste bags. Historically, the program has
made use of 27,000 bags per year. In light of the existing supply and due to the fact that the
greater the number of bags ordered the better the price, the committee recommends initiating
the bid process now for a 40,000 bag order but delaying delivery of the order until July (at that
point in time the staff estimates the existing inventory will have been depleted).
1
YARDWASTE SEPARATION PROGRAM REVIEW '
PAGE FIVE
A review of bag sales during the past three years indicates that (at that point in the growing
season) we would have sold a sufficient amount of the current inventory to be in a position to
place a cost - effective order (adequate volume). This would also minimize the time that we must
store an excessive supply of bags. The projected total need for the 1993 season is 22,000 bags.
This estimate is somewhat lower than the 1992 bag use total in anticipation of the acceptance
of the convenience and dependability of the new yardwaste /red polycart option (see part B).
The statistical data indicated that the 1992 program handled 23,975 bags of yardwaste (see
attachment #3) with approximately 1/5 of that total being brought to the recycle center by
individual citizens or by commercial yard care service providers.
B) Yardwaste Only Polycarts - Due to the success of the 1992 program, which placed ten red
polycarts throughout the community for yardwaste collection, it is proposed that this special, red
polycart option be expanded to the general citizenry and that citizens be given the option to use
these containers in lieu of the yardwaste bag option. These polycarts will be picked up at the
curb on the same day that the city - approved bags are collected during the growing season.
The cost of the polycart service is recommended to be $6.50 per month during the seven -month
yardwaste collection season. Of that amount, $3.50 will be allocated for material disposal costs
and $3.00 for the capital costs of the carts. Use of the polycart option will require the citizen
to contact the utility billing department of the City to arrange service. Carts will be delivered
at the beginning of the yardwaste collection season each year and picked up at the end of the
season for cleaning and storage.
In order to provide this option, the committee recommends Trustee authorization for the
purchase of 100 red polycarts at a cost of $6,100.00 for the expanded yardwaste polycart
collection program in 1993. With a seven -month use period and $3.00 per month being
allocated to capital costs, it will take approximately three years to pay off the cost of a cart.
Since the normal "life" of a polycart is five years, the fees paid (during the carts third and fourth
year of service) by customers who put those carts into use would then be put back into the
program.
C) Recycle Center Drop -off Option - The committee also recommends the continuation of the
practice of accepting yardwaste delivered by the citizens to the recycle center (in any type of
yardwaste bag or container).
5 1
YARDWASTE SEPARATION PROGRAM REVIEW
PAGE SIX
YARDWASTE COMPOST PROGRAM
The process of composting is being used to reduce the volume of this organic material. In the
' committee's evaluation of the yardwaste separation program, all of the costs of constructing and
properly equipping a fully- permitted compost site have been identified and analyzed. Although
this is would be a costly endeavor, the evaluation committee supports the establishment of such
' a site and recommends the continuation of the process that is now underway in an effort to
obtain a compost site construction permit from the State Health Department.
Development of the compost site could be a phased -in program. Associated estimated costs are
shown in attachments 4, 5, and 6.
' *During FY 1992 -93 the first step in the process would be to conduct all needed soil tests.
These would determine the suitability of the site for the compost purpose at a cost of $1,500.
If those tests return with positive results the next steps would be the site survey and the
' necessary engineering. Should the initial soil tests, survey or engineering uncover factors that
would preclude use of the designated area for this compost site, the Council would be asked to
' reevaluate the project and its realistic feasibility. All of these components could be undertaken
at a cost of $7,500. These funds are contained in the FY '92 -'93 budget.
' *In FY 1993 -94 $29,000 is recommended for the initial steps in construction based on tables 4
and 5. In this phase, money should be budgeted for fencing, trash container, a sump pump
system with electric service, grading of the site, compost machine and establishment of a wash
' down area. All of these elements are requirements of the State Health Department's permit
process. Please note that the "worst case" scenario (attachment 6) shows contingency
expenditures in the amount of $9,000.
*The 1994 -95 phase offers several possibilities:
1) "best case low -tech scenario" would require $5,500 for a building.
2) "best case (with ultimate equipment) scenario" requires $155,500 for a building and a tub
grinder
3) "worst case (most costly) scenario" requires $164,500 for building, tub grinder, and
' protection of clay liner.
*1995 -96 phase $9,400 for a staging area and a road to compost site.
' In the worst case scenario (attachment 6), the estimated cost of $98,400 would provide for a
staging area, road to compost site, clay liner repair and fill over clay liner.
A
1 6
J
YARDWASTE SEPARATION PROGRAM REVIEW ,
PAGE SEVEN
Though composting at the recommended level ( "low- tech" equipment and processing of a '
relatively low volume of organic matter) is not economically profitable, it is a means to address
environmental concerns of tomorrow by acting today. Development of such a facility will allow
the City of Owasso to continue its mandatory yardwaste separation program, protect the existing
landfill space and give a start on the road toward composting wastewater sludge and eventually
composting paper and other biodegradable materials that is are a part of Owasso's waste stream.
MARKETING STRATEGY
This year, in an effort to provide even greater convenience to the yardwaste program participants
and in response to the sales data that has been compiled from the City's existing points of
purchase, the City has sought the cooperation of Texaco and QuikTrip as points of purchase for
the city- approved yardwaste collection bags.
During last year's growing season, the City offered three city - facility points of purchase for
yardwaste bags. Total sales at those locations included:
recycle center 11,640 bags
city hall 10,483 bags
police station 4,367 bags
The staff views convenience as a significant factor in purchasing habits. With the cooperation
of Texaco and QuikTrip in providing additional locations for the sale of bags, the community
would have 4 new locations for 24 -hour access to approved yardwaste collection bags.
The sale of these bags would be handled much like the sale of the daily or weekly newspapers
with a small display of packaged City - approved bags located in each store. A city employee
would be responsible for monitoring inventory on a weekly basis through the use of an inventory
verification sheet that is signed by both the city employee and the convenience store employee
to document the inventory sold and the money collected for that sale. These small displays
would be maintained during the city's yardwaste collection season April - October.
In addition to expanding the number of locations at which yardwaste bags can be purchased, a
series of informational news articles will be submitted to the Owasso Reporter, Tulsa World and
Tulsa Sentinel to publicize the program (beginning in the month of March) before actual
yardwaste collection begins, as well as during the initial month of the program. Follow -up
information will also be provided periodically during the summer. Printed information regarding
the program's rules and regulations will be available at City points of purchase and, a house -to-
house sticker campaign will be conducted where a small sticker will be placed on empty green
(household refuse) polycarts after the residential collection is completed notifying the homeowner
of the red polycart option and providing a source for more information.
City staff members will also be available to address local civic and professional organizations
to disseminate information about the changes in the program and to promote polycart use.
7
' YARDWASTE SEPARATION PROGRAM REVIEW
PAGE EIGHT
' CONCLUSION /RECOMMENDATIONS
Although yardwaste separation and composting are costly processes, the discontinuation of these
programs would also bring about additional expenses. The refuse collection program's third
trash collection route would have to be expanded from a one -day per week run to a four -day per
week collection schedule. This would also include the related tipping fees for the added trips
' to the landfill and would bring about the need for a new refuse collection vehicle to handle the
demand.
' The City Council, staff and citizens of Owasso have worked diligently to establish Owasso as
an environmentally -aware community. Owasso has developed programs that have made this
community a regional leader in this effort, not for the sake of leadership, but rather because
' these programs are good for our community's future and because the community has an eye to
the future and a responsibility to its children. It can be argued that although the
yardwaste /compost effort has an expensive price tag in terms of time, equipment, manpower,
and regulation compliance, it is a program that not only provides a service, it also sets an
example and seeks to find new and better ways to deal with the global concern of finite space
for a seemingly infinite amount of waste. For these reasons, the review committee recommends:
1. Continuation of the yar dwaste /com po st program as a service to the public.
t 2. Inclusion of the option of the yardwaste -only red polycarts for those homeowners who
would find this method more convenient than the bags that are currently in use. The
committee recommends proceeding with the purchase of 100 such receptacles so that they
' can be made available to the public this growing season.
3. Preparing bid information for an order of 40,000 city - approved yardwaste bags for
delivery in July when the current inventory has been sufficiently depleted.
l
Bio -bags received 1990
Week Bio -bags Monthly
Ending Received Bag Total
18- Apr -90
54
25- Apr -90
175
02- May -90
208
09- May -90
291
16- May -90
165
23- May -90
337
30- May -90
252
06- Jun -90
222
13- Jun -90
199
20- Jun -90
446
27- Jun -90
626
04- Jul -90
335
11- Jul -90
510
18- Jul -90
425
25- Jul -90
391
01- Aug -90
492
08- Aug -90
549
15- Aug -90
338
22- Aug -90
1,042
29- Aug -90
847
05- Sep -90
635
12- Sep -90
309
19- Sep -90
301
26- Sep -90
753
03- Oct -90
309
10- Oct -90
305
17- Oct -90
452
24- Oct -90
178
31- Oct -90
128
07- Nov -90
112
14- Nov -90
139
21- Nov -90
126
28- Nov -90
121
430
229
1,253
1,493
1,661
3,268
1,998
4
This compilation shows exactly how many bags of yard
waste Owasso kept out of the landfill each week during
the summer of 1990. These numbers are much lower than
expected for a typical summer growing season. Owasso
experienced an unusually cool and wet spring season in
1990. This factor, in combination with the near drought
conditions in mid - summer, caused the lawns in the area
to grow very slowly. Next year, the City should expect
a considerably larger quantity of yardwaste materials. '
Some of the conversion factors used include:
7.48 gallons per cubic foot
1,372 which = 202 gallons per cubic yard
404 pounds per cubic yard of grass clippings
30 gallon bio -bags = 6.8 bags per cubic yard
498 or 59.41 pounds per full bio -bag.
average bags per week at curbside
11,772 bags picked up at curb
1,334 at recycle center
13,106 bags full received - (6.8 bags per cubic yd.)
or 1,927 cubic yards kept out of landfill - 390 tons or $4723
or 96 hauls saved in 1 990 - (20 yards per truck)
Attachment 1
2,906 cubic yards kept out of landfill - 612 tons or $7,411 in tipping fees
145 hauls saved in 1992 - (20 yards per truck)
IAttachment 2
Bio -bags received 1991
Week
Bags
Monthly
Households with
Average
Brush
Ending
Collected
Bag total
yard waste bags
per house
Bundles
03- Apr -91
392
133
2.9
174
10- Apr -91
897
315
2.8
195
17- Apr -91
736
317
2.3
130
24- Apr -91
563
2,588
244
2.3
92
01- May -91
652
318
2.1
132
08- May -91
738
304
2.4
137
15- May -91
857
360
2.4
142
22- May -91
764
314
2.4
116
29- May -91
997
4,008
335
3.0
141
'
05- Jun -91
1,237
459
2.7
160
12- Jun -91
994
398
2.5
267
19- Jun -91
904
371
2.4
201
'
26- Jun -91
857
3,992
366
2.3
144
03- Jul -91
937
378
2.5
140
10- Jul -91
796
353
2.3
146
17- Jul -91
671
308
2.2
127
'
24- Jul -91
423
225
1.9
46
31- Jul -91
521
3,348
278
1.9
75
07- Aug -91
452
247
1.8
67
'
14- Aug -91
408
213
1.9
43
21- Aug -91
657
305
2.2
88
28- Aug -91
645
2,162
288
2.2
75
'
04- Sep -91
333
157
2.1
65
11- Sep -91
1,331
439
3.0
87
18- Sep -91
1,031
337
3.1
57
25- Sep -91
473
3,168
261
1.8
110
02- Oct -91
499
226
2.2
93
09- Oct -91
379
155
2.4
82
16- Oct -91
221
103
2.1
27
23- Oct -91
140
71
2.0
66
30- Oct -91
96
1,335
35
2.7
46
Total
19,765
8,249
2.4
3,250
'
Avg. per week
665
278
112
2,906 cubic yards kept out of landfill - 612 tons or $7,411 in tipping fees
145 hauls saved in 1992 - (20 yards per truck)
IAttachment 2
Attachment 3 1
_
Bio -bags received 1992
'
Week
Bags
Calculated
Monthly
Households with
Average
Brush
Ending
@ Curb
Quantity
Bags Total
yard waste bags
per house
Bundles
08- Apr -92
396
'
527
2,711
137
2.9
122
15- Apr -92
567
754
191
3.0
63
22- Apr -92
443
589
195
2.3
84
29- Apr -92
632
841
234
2.7
74
06- May -92
603
802
2,483
275
2.2
88
13- May -92
257
342
126
2.0
8
20- May -92
561
746
244
2.3
90
27- May -92
446
593
179
2.5
99
03- Jun -92
393
523
3,854
168
2.3
45
10- Jun -92
611
813
256
2.4
103
17- Jun -92
731
972
302
2.4
136
24- Jun -92
1,163
1, 547
>> €'« >??> ;;'
:.,:.,,295
2.8
348
01- Jul -92
785
1,044
5,960
: :., „
2.7
101
08- Jul -92
1,136
1,511
3.0
229
15- Jul -92
734
976
305
2.4
191
22- Jul -92
821
1,092
325
2.5
208
29- Jul -92
1,005
1,337
335
3.0
84
05- Aug -92
588
782
3,973
271
2.2
136
12- Aug -92
1,126
1,498
<? >
::.::.::.232
2.7
143
19- Aug -92
636
846
:::.:::...........
2.7
81
26- Aug -92
637
847
289
2.2
95
02Sep -92
234
311
3,442
199
1.2
84
09- Sep -92
583
775
238
2.4
52
16- Sep -92
639
850
254
2.5
85
23- Sep -92
617
821
246
2.5
44
30- Sep -92
515
685
231
2.2
73
07- Oct -92
401
533
1,552
193
2.1
60
14- Oct -92
255
339
113
2.3
62
21- Oct -92
157
209
70
2.2
33
28- Oct -92
255
339
102
2.5
47
04- Nov -92
99
132
42
2.4
20
TOTAL
18,026
23,975
7,254
2.4
3,08
,
Avg. per week
773
260
112
3,525
cubic yards
kept cut of landfill
- 712 tons or $9151 in tipping fees
176
hauls saved
in 1992 - (20 yards per truck)
'
* Approximately 26,850 bags sold in 1992
1
Attachment 3 1
ITEM
" ! wo r r �- I M A f M M f
ESTIMATED COMPOST CONSTRUCTION AND EQUIPMENT COST
(BEST CASE "LOW TECH" OPERATION)
FY 92 -93 FY 93 -94 FY 94 -95 FY 95 -96
PHASE I PHASE II PHASE III FULL SITE
TOTAL
ELECTRIC FOR SUMP PUMP 4,500 4,500
COMPOST MACHINE 7,800 7,800
--- - - - - --
STAGING AREA 1, 500 1..,500
TOTALS $7,500 $29,000 $5,500 $9,400 $51,400
Attachment 4
ESTIMATED COMPOST CONSTRUCTION AND EQUIPMENT COST
(BEST CASE WITH "ULTIMATE" EQUIPMENT)
FY 92-93 FY 93-94 FY 94-95 FY 95-96
ITEM PHASE I PHASE 11 PHASE III FULL SITE TOTAL
SOIL TESTING
1,500
1,500
r. Mf gg
gg,— . ... ... .
..................
: ........ .. .. .
ENGINEERING DESIGN
3,500
....
.....
....... . .
3,500
TRASH CONTAINER
1,200
1,200
. ...........
...... .... ..* .
... . ....................... .. ..
.. . .......................... ..................... ....
........................
.............................
. . ..........
. . ................
...................
.. . ...................
... .. ...............
: ........ .. .. .
. .. .. . . ....
......... . ......... .. A A
.........
... . ....................
........ ............................... .... ..... . .
................... . " . '' . ......
....
.....
....... . .
.. .. ..... .. . ...
Me.
ELECTRIC FOR SUMP PUMP
4,500
4,500
...........
..............
..............
.............
COMPOST MACHINE
7,800
7,800
.......................
..........................
.. ....... ............
. ...... ...............
..... ..............
............................
K . ......
. .
.... ........ . ...........
... ..... .
....................
..... ...................
..................
...
.
.... ........ . ..
.... ........ .
...... ......... .
. ....
STAGING AREA
1,500
1,500
.....................................................................................................
................
...............................................I
...............................................I
........................... ........
.........................
...... ............ . ..
:
...... .. ... v
.g. 0-j-
. . ............ I ............
. . . ........ ............ . ...... ...... ...... .........
.............. ........ I ................
...... . ......... I .........
... .. .............................................
................ ... ......... .......
..... .. .......... ... . .....
........... ....
......... . .
........... ........ .... . .....
...... . . �0. ......
. - - - . .... .......
. ...
TUB GRINDER
150,000
150,000
TOTALS $7,500 $29,000 $155,500 $9,400 $201,400
Attachment 5
m m m m m m m m r-,90
� m m m®! m m f m mw
ESTIMATED COMPOST CONSTRUCTION AND EQUIPMENT COST
(WORST CASE SCENARIO - IF SITE FAILS SOIL TESTS)
FY 92 -93 FY 93 -94 FY 94 -95 FY 95 -96
ITEM PHASE I PHASE II PHASE III FULL SITE TOTAL
SOIL TESTING 1,500 1,500
:.......... n.. n .....................i ..\ n....v...., {......v .. ,. ............. ::: n4.vv4Gw:r:: n. \............... .}:: tv
...........:.. ., ......................:.. .... .. .. ..r .... ..................... ..............................:::.•:::::::.:. tr:-) r:.}:-) :.ii;•r:..................,•::: )::::. �::....... ...>.,• :.�firi: {•:;•rr:;:i:;:i;:;:i....
•'.?•: tr:. i;•:?.> r: t•):- 5)):-)::- Y:+>:•> i:.r:.r::.r:.r:.r:.: {:; {. } }:• }} :•}:• r:.;};• i>:. i):.);.?):•;:•);+: i•• r:.}:{;•);•:;. i;• i?:;•; ii>{:.::. i:. r:.>:.>::.):.. v::?:. r. v. v:::{::•;? iS•: i•?:. rtr;:. 5;::}::: :i:::: ?�::i ?�:.;;.i:i;:ii::i::> :.
% ri :. } .... - : .... ... x:;,:{ 4Y• r. tri`}:' :n: }i; {n;• ? };•i;nii:Or })'.) }):: n• v.4.... .
:: %i; {i;;4,i:i:x: } {i: {? �!:i:• iii {ii irii :'i' "• ?:•i• }::4::i: } }tri } }:•:;:
r. ......: r..n .. F R:YY:v:.}•J.kv ? {.i: }:{ .... rr::4r:{ F .i4 : :• } { .:::: : ^:$i'r:
r.: / } !.. F.n..r ! r r r... ...r.Y ..:.::v: v :rY. •. >�
... ..... ::::.:...r ••... .i :. r :. xJ ..:....r r....n:......... ... v... .....r ..4.. .. .: ..h. }ii.. !}.. }.) }' •.J
.� I�,M}.Y�:��:. •: /• t• ?�1�4 {jjj�� : • /.. :x {.., : +•::: .r.. � xvW?�r' v'.
r r .r ::.. n.: ;:.. ., .. n,. nr r +3. rr. .M. v. ?•;• ..... J7.C....:.1: :: .v::: �.; :n; J.. .. r: tv :JGi })Gr:r::�'�i0iv:4 %"�li�vvr >Av�
:? w•r:,: 4rarrw} w�c4S: u>:• rx• Ys}: �5:' ti�' s; oc{ r:• r5:.• r, �rr,r k rd�dcfw.t�4.dC4rarfaCrrrcr„ALry •xt•••:r.•: �•rx:rrrxx.Gr: Sr:::. v: ntt•/.::. E• r�;.?.'•, cGn• �. c,• r�G:i•'SiG:�;��'lc:{4:•Sxh•.r., :.:: r.•: F,< oor, �' �nd: 6'. C:S.'L2sNS;$��%iv3�::k:w»tscw }%
ENGINEERING DESIGN 3,500
3,500
rv: •.v .: .r F:
F ..n.•{i.:.r
f .. ..
f...
i. ..
.... .. .... ... .. .. .... ... .......... ..............:: •:.v:.v:::::.v
4�
:}:. x.r r. :..; v {. .vxF .. F•:rv.,',:;: •:.::vv:;:
F :::1.: ? {.: rriC {.r • }% :h r4 $ wir:. r}.:.:ir.;.yYV:i•.::... n•.:r n...'
! .$'. ... r.: r.... rr/frr1 i ..r. hi. ... .v.n. vtr .... ... r....¢.Y.n.x::.. r ..................n....
.} �. .. f F n. ...n.. r:::.•r: •:. .. : ...... .. ...... .............
... .. v: .: r.},?.r Jv ::r. .: r# �. f . � �.... i . .. .......... ..v ..... r......-
vrv; •::. :F' f..F. J %�. r!.!. fl: f r / •f4':u F. 1... r. :} v. r...
i . :! /i�. .,. :. :.! r.1Nf f 'ii: }:. >.. ? +. • }: ?i ?�iiiii�
� �:•:•x4: + : {• !./ ! f �: !n .r .. i... /.�.:.{v: •.v::
•f• ;r �.. /.:..ffk'•rr •..:
.vv •.:u•rn..; . .:....v:.vv; .. w::nv
:, }.... n4 . >.
i.. .,. •.h. :�... }n {.:: +• %:.:.v:
•: •: ,...
... ..... ).::-w::;.
:....; :•. :•.. .n?4;•:n„
��++++
.. }:Y{.{ ., : :�Yx4:r. }y ?:v...}:.
.. r.. { ..b:
,h:.•r.: >.. �.: :r .. }Y: }: .x�i:
ui\4? +... . }:. \' 4: ' t ^} ?,:•YY•U:,:h. Y }4Y•'•U}}v:}' {it: \�v,
:•i?.Q}ikii? ivv:Sit.4ii... .?4i:{,•• :. }<. ? ?. \\...v. . \..4,k v \�''�ti .�
v: Fv } }:,, ..::. }.
•. ?..•.n v: }}}k �. ..�, ... }..v...... %,•...:n i{•n.. • \ .. }. • }. i ' , . }..: }' \: { >. v:? \.
•...... ij.,
v',::::4:?• : >i {rvv:: ..n.. v..,..::• v::.:.)•: Fvr••,;::;. •: {Y::i. :}• .. 4. ::;: .. ...
v. ,, �'
•..4 : }v :.K::: }'.;v .. •r\. :n •:: i•::i: +:i:::
h: • ::• :`l •} . > /•)'hti ?• }..,.Y: •Y. ; �.,i• y .. 4 J +Sv W/•} } } >' }' � :F •.
r, .,�•.: •:Yx • 1 +. �. %� . . }•fi'.'r i •
/S •r' ;Y.C... ? .:r9:• '
}?�f.. }�.�f
.FN:�Mf:�:�i\M
S• % +i:{•YfiiY / /.CFix•::
.:c . r! h .. �v ,ri�xn ::
... xf5.:: f .: {3�. :
{r••; {.. r ,, r :. r r: r:.. r :r•:fv. .r�.f.. .��.... rt .i' ii ,y� y "4" +•• /+raj yf,,'1
f:� f ;.: xr ...... n.......... }: r
•Y:4'Fr} }:Yl. ✓�•}�r;:4� %h! fi7lF$��4�•�.i•$W ir�r: rnr Flv. xr.... r.n.......• i:i %f•4:r:i ? {: :: 'r:•::iYf.•:• %�v: fvn.::� : v�vv' Crii74in�F: t•:, f-:•? i�Yr `irff.4FkM4:L{Yf..�s{�,i:{4f :IR'4fF A r. ?•.G.vn4ri .��4�?
FILL OVER CLAY LINER **
9,000
9,000 63,000 811000
:. :...:: :::•: •: •v: •:; •x: ;v:: .- ••:::: ... ... .. ... n4Y.n. .....i ... ..........
yy
:..iG:7f -- >:: iii. ^•.:': iiir iiiii: Y% ii ::'ri.` ?i:::::i:::iiiiiiii:iiiY iii :: ? -i}i.'- ii:'t:j:'t ^:'v�i: {: iii ?
�'
.........................
{2�ij'iiji} �$::$ijiiii::`v �::iii:iii:<: ?ijii: i::i:�iii }ii
:
...:. • . - • •. x:: n)-i:ti4;oriy; +•55Y: ih:':4) }:: {• }: +r. `: tixv }i) ?'tr}}} S:itr::
}..5 ..3. w:.v.v:. :•
?iiiiY �i {::iii: iYiii?iL:� }4, -
ntr::.. ?:.:.hii'v n.. n....
:::::::.v::.v.: r:::::::;; �.:::::::•)-•}:: ;.?'::: {::::::::::.v::::::Y•;:: •}v::::: :v::::.v::::::::
..:. ..�� .. ....................:.. ........:w.....................
:::.: vvv: m:: r:::: x:::: nvnwn+ Cwfx: n{. x.: nnun. r... rv... v.. n. n, r... i.. n..... n,. n. n......... n . ...............................
•;:::::: • }w:.v:::n ::.)' {:.:�.::::.�::::::::.�:.v:::::
•• v:: v:: v:{ 4xi4} r?}}: vv}:. v::::: w::::
•Y:: w::
..: ,n .... • {: ..:...:ice: x .... •. .. ,..... .. }::. {.:::v::: r::: x: ..n.. n...uv1Y:
n:::•:t 4:• i:•: unn4 }.}.f;{.xx...:n.wrnu.f.....vn nS•r:v }x:hvx::n...n Y.:: x::: v•
TRASH CONTAINER
1,200
1 200
.. .. ...... ...... .......... ........... ......... ... .......... ...............................
......................... ....... ........... .. ... :..:......:........ .....................,........,.......:....... ..............................:
... ........nn...n:....v...,...1... ..v .... \. h .n..... .. ...............5.:::•: ?::::: N:.v:
...........n• : ............. x.. \.......:............ n... � ............................. }........v..•
:.. .. n ........................................... ...............................
?:•)i: 4i }i:t•YY.• } }ii):v:v })): { ?4:4;?t: n'• is4:•i:::::::. v::::::::: :::w:::.v:::: {4:w::6::.v::::::: nv:::. v:::.
.................. ............................... xr...•v:::::::::: : v::::: nv:::: ::::::::::::::::::.v::::::::.v:
�.
..r.:v.,w: :•.,v.:.v::. �.v: vv.� .:., ,. .. ... ..:.::.,...rv; v":.}}: Y'.?? i? xt{ 4: {-5:{::v, ?:ti4Y:ti•Y'4::.''Y: {.v: ...i(v.:�
...:..5•t: )..... ...{.tin................,.,
:.: ::v:::........ r.... ::.... ...v..........................: i },\, -i: :, •:• nom• :fi: Q ?:.i•w: ..... .., w:.. .. v::::. \..:{. ?iv :•
Y:.:v......... �,p X} ...� .. .n... 4r:�i` } }4Y:r: \::•r ?:{{ { {...... )n..v...... ).... r� C5X {•: h:
:............... ::: }}:: ^•: n :..v:::; rvnv; :•:::: nv::::. v::::+{:: Yw :::::::5:...v: {::::::::4'v'4))v 4:
4} }X4:4i ?Y:4:•:: ^:•)'rY: ?4 } } ? } }:? ::) }.4 LvY ?,? {•i:•: {•r'nt4 } } ? ?: ? ? ? ? +n:4:0 } ?: }::: ??? ? ? {4Y4:•: {:v:: ?: {hiY'•r Y: L:::'r :. �:::
fii?::iJiiiiii ?iiii.
:. ...... v:..:..... :nv:::...., ...:..n........., .. ..........v.........::::::.v::: S:::.v::::::: n.v.... n::. .. .� ?:Y:
...
:. ............................:........................................................................................................
.. .E .. . .......................... r.....:.:::::.v.v:::::::::: r. ...........................................
.. .4��� .n ................ .............. ................ ...............................
• w::. v ::::::.�.v::::::r:.uw::.tx.4x:: x:.,•nv.�v: r: x:: x: :• Y.:.......... A.. .. {.v........:::nv:::: :::::::r: } Y: 4??: 4?:? 4::::
........................v...... :•
............................... v..•w;r•w:.:
...................... ....
n; } }i
..... .jj..(i�j... ............... ............v.................. ;•• ........ ......... ... . ........... .. r
.��.1.,r T.. ....
....... . . . ..... .,: •:: • : : }..: •::.••: •: • •: w: v: v: v. �::::::rv.: n...::.v.Aw::::.,h.:: vL•:nun-.uxx: �w.vkv:.4n }.:.
R MP PUMP
FOR
ELECTRIC O SU
4,500
4,500
.v... ?S. n... \nn .. .................. v....... v. ...........................n.ry n.........., ]i::......v...:: {:::.n }•: r..::.wn•:
.. \. ........... K..: f .... ............................... ....................... ...... .....::........,:t•:;•::::: ::•: ......t.. r: ::...�::•::: •. .... Yt v::::::: �::?•{:? ::i.ii: %n ?:• } ?:4i : } }iYSi'.: {.wn nYnf.::::::: x..n :.: ... .;. :.. ..' {55+
... . .. .. .... n. .. .\ .. .. ..: :.. .}A:. n: ; v........ v ......... .........:..................... n............................ .. .. .:.........,.........v.... .v t n....:::: nv::. v.:;..:. .:...n.............n..v::::.::. ::•: •v.:v ..v: A•: ? ?• iF.:.
,y�.4i .•
. ..:• }' .:. .� .: is .. 4;• }Jt ?:?�:.y::::::::::- } } }w:: t.::::.i }::::..v• }Yry
........ : .:pvr •.:.:. ::..:n :.:::::.::::• :::::::::.:..:.. : v:: ._::::::::::::::::::::.v::::::: n:.: x {: i:. ?'..{ { ?4:4 } }ri }rY. :. ��
. +�/ T mnv::.•iii } }Ar:4::: r.:v: nvn xn nvw: n4.r vhr: �.• xr.{ y: x: m:: A::.vx:::xw::::x ::::::::::::::: r: xw::::::::::: nv::::.:::. v..nn.rxvr..n...�...:G... n.......... n.v... }...., n.: n,.v. ............... . •v. -.., ..
..yJl"!Y��. .. .... �..........:... ..............: ..... ....................................... ............................... :...:::.�::::: •::.:. :.:... .. .........:::: •::::::::::: •:...... :.o., r is n•. r:.,.}}::::::.,•::::.,-::::: :::::.,,- ..:,.:...,....:.n.....
COMPOST MACHINE
7,800
7,800
..... , .:. ..v., .n.v......,
. .. .. ... ... ... ........................... .........................:.....
W�
..........................:::::::::::.+.•);• i:.r:.)::.:::. v.:}. vtrv::.:.:•:::. v:::.::::::.:::::::::;:t tr):{: 4r;{• ri>.•:{ . } }:. }:. }:. } ?:. ?: { >.tt• }: {{.i..
^:•} v:.
. ............. .................... ................. ...................:.:.::.:::::
...�. .W .. .....+�f .. .... ... ............ ........ ............ ...... ...............................
) }):4 ?Y } }rY?�:.�:•':• }: is -Y }ri•Y }iYiGirYrC4i0F'iJ.Wi:}: m:: n4.rYrrrrt•: n0::::: x!ir: r.4::.vw::�:::. f•::::: x},:w:: x:.v:.v :::::::::::::::::::::: nv.:v::xr:.vr..
n::: •:: ., . ::nw::: w..v: nv:::::::::::::.
.......... . .. .. . . .: x. } } : {:::
nT.v:.4...A r. Frv%,..i4x.... x.A,
v...v.. ...:. ... •: v;n. .; .vv..:....nnv..v ).... ..............:.w::::: nv:.:: q':{JY:4):::::: :'•fii
•.:i'.r': {: v••r•: ... :ihJv:4Y::vh: %4.vh�•i. {{v.v }:• ?Yirrrrnnk :vi'ih� >ri�'+'rii iiri: { {:::
n m.WiR. xY.v.{4:.WA)M•:N:h�:4h,
STAGING AREA
TUB GRINDER
500 1,500
150,000 150,000
TOTALS $7,500 $38,000 $164,500 $98,400 $308,400
** CONTINGENCY EXPENDITURES (IF NEEDED)
Attachment 6
1
NMMoRAvnuM
1
TO: HONORABLE CHAIR AND TRUSTEES
IOWASSO PUBLIC WORKS AUTHORITY
1 FROM: MIKE AUGUSTINE, OPWA DIRECTOR
' SUBJECT: REQUEST TO PURCHASE 100 RED POLY -CARTS FOR
YARDWASTE PROGRAM
' DATE: February 11, 1993
BACKGROUND:
' The staff has solicited for quotes for a bulk purchase of red refuse carts for use by yardwaste
separation program customers. The specifications (see attachment) call for a unit price quote
for a 90 gallon minimum size, red in color, poly -carts in order amounts of one hundred (100),
guaranteed unit price for one year from notice of award and a delivery date of April 1, 1993.
Total Truck & Trailer submitted a unit price of $56.00 per cart and a delivery date of 45 days
IR after receipt of order. The cart quoted is a Zarn Roll -A -Waste model 3100 that does not meet
the required specifications.
1b
Staff mailed quote request to the following vendors on February 2, 1993 and required a response
be returned by February 9, 1993.
'
Williams Refuse Equipment Co.
Solid Waste Equipment, Inc.
P.O. Box 1138
P.O. Box 50062
Owasso, OK
Tulsa, OK
'
Water Products of Oklahoma
Total Truck & Trailer
P.O. Box 349
P.O. Box 720660
tOwasso,
OK
Norman, OK
QUOTE INFORMATION:
'
Total Truck & Trailer and Williams Refuse Equipment were the only companies anies to submit
P
quotes.
Total Truck & Trailer submitted a unit price of $56.00 per cart and a delivery date of 45 days
IR after receipt of order. The cart quoted is a Zarn Roll -A -Waste model 3100 that does not meet
the required specifications.
1b
POLY -CART PURCHASE
FEBRUARY 11, 1993
PAGE TWO
Williams Refuse Equipment Co. submitted a unit price of $61.00 per cart and a delivery date
of April 1, 1993. The cart quoted is a Poly -Kart 2000 which meets the required specifications.
EVALUATION•
The differences between the Zarn and Poly -Kart 2000 are substantial. The protection of the
bottom of the tub is very important for the longevity of the cart. The Zarn has a replaceable
wear pad (1" thick) for tub protection. Since this pad is replaceable it could be dislodged from
the tub and thereby having the tub exposed to the rubbing and wearing caused by pavement.
It also presents a maintenance and inspection problem for the refuse collection department. The
poly -kart 2000's tub is protected by a steel frame which takes the abuse of contact with
pavement. The frame will eventually wear through from the pavement but it will still keep the
tub from touching the pavement.
One of the other differences is the stress points of attachment for the lift bar /support frame. The
Zarn does not have the extra support for the bolts which are used to attach the lift bars. The
poly -kart 2000 has steel molded into its tub at the stress points for added durability and strength.
These carts were shown to the Trustees at the September 1, 1992 Authority meeting when staff
made a presentation for the purchase of 300 poly -carts for residential customers.
RECONIlVIENDATION:
Staff recommends to purchase one hundred (100),90 gallon, red in color, poly -kart 2000 for a
unit price of $61.00 and a lump sum price of $6,100.00 from Williams Refuse Equipment Co.
ATTACHMENTS:
1. Zarn brochure
2. Poly -kart 2000 brochure
3. Quote Specifications
POLY -CART SPECIFICATIONS
1. The Owasso Public Works Authority is soliciting a unit price quote for a minimum size
of ninety (90) gallon, red in color, poly -carts in order amounts of one hundred (100).
2. "City of Owasso" text to be embedded in the cart lid and an identification serial number
to be stamped into cart body.
3.
4.
5.
6.
7.
8.
9.
The tub of the cart shall be constructed of a high molecular, ultra violet stabilized
polyethylene.
The tub of the cart shall be constructed in such a manner that the tub bottom will be a
minimum of six (6) inches above ground and protected.
Support frames and lift bars shall be constructed of 16 gauge galvanized steel (minimum)
and all tub stress points supported by steel.
The cart shall have 12 inch diameter wheels with semi - pneumatic tires.
The cart lid shall be fully hinged and shall have a high - tension rubber latch for lid.
These specifications shall be interpreted as minimum requirements.
The bidder shall include brochures that discuss the specifications of the poly -cart with
the bid submittal.
10. A delivery date of April 1, 1993 for the 100 poly -carts is required. If not possible list
earliest delivery date.
11. The purchase price shall be guaranteed for a period of one year from the date of issuance
of "Notice of Award".
ZARN ROLL-A-WASTE _'
CARTS THAT STAND THE TEST OF TIME
Front row From ler to rigs- 3365, 3140 Back row from IeFt to right: 3265, 3200, 3300, 3100
Description
3100
3140
3200
1 3265
3300 i
3365
Capacity
QC Gcl'c-
40 Gallon
90 Gallon
65 Gallon
95 Gallon
65 Gallon
Collection Method
-=
= \_-rc- =
Semi- Automatic
or Manual
Semi-
Automatic
Semi-
Automatic
Semi(S) or Fully(F)
Automatic
Semi(S) or Fully(F)
Automatic
Length
=
28"
35"
34 ' /a"
33 'i a"
341/
width
=
20 '/2"
29 /s"
29
30 '/3"
29 s /s"
Height
-
37"
.:-1
41
45' /.x"
403/8,,
Weight
- __-
20 Lbs.
36 Lbs.
32 Lbs.
36 Lbs. (S)
42 Lbs. (F)
33 Lbs. (S)
39 Lbs. (F)
Wheels
-_ -
;- = e -,• _-
= 6" Dia. -1.5" Tire
Semi- Pneumatic
12" Dia. - 1.75" Tire
Semi- Pneumatic
Blow Molded 10" Dia.
LA Bars
-
- - _ -
16 Ga. Flo -
Coat Steel
!rregral
,old in
Integral
Mold in
Integral
Mold in
Integral
Mold -in
Lid Latch --
Specifications are s.,oject c :norge
Custom stamping or !abelir: :, vYa ooie _r =
Yes
?ARN containers.
Yes
Yes
No
No
XIMoxnrmunz
' TO: HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
1
FROM: MIKE AUGUSTINE, OPWA DIRECTOR
SUBJECT: SOLICITATION OF BIDS FOR YARDWASTE COLLECTION BAGS
t
' DATE: February 12, 1993
' BACKGROUND:
The City of Owasso currently has an inventory of 12,000 yardwaste collection bags on hand in
anticipation of the upcoming yardwaste separation program. It is projected that this number of
bags should last until July 1993. At that point approximately half of the collection season will
have passed. In order to be prepared for the second half of the collection season additional city
approved bags will be needed.
Staff believes that purchasing a larger quantity of bags would enable the city to obtain a lower
cost per bag price. Staff feels that bids could be taken for a quantity of 40,000 collection bags
with delivery of the bags being delayed until July. This would be the most cost effective method
and would minimize the length of time that a substantial inventory of bags must be stored by the
' city.
Staff would like to solicit bids for clear 33- gallon bags with the City of Owasso logo imprinted
on them and specifying a quantity of 40,000 bags.
RECOMMENDATION:
Staff recommends that the Trustees authorize the solicitation of bids for 40,000 yardwaste
collection bags for delivery in July 1993.