HomeMy WebLinkAbout1993.12.07_OPWA Agenda1
' PUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY
1
TYPE OF MEETING: Regular
DATE: December 7, 1993
TIME: 7:00 p.m.
PLACE: Council Chambers, Owasso Community Center
Notice and Agenda filed in the office of the City Clerk and posted on the City Hall bulletin
board at 4:00 p.m. on Friday, December 3, 1993.
' Marcia outwell, Coun 1 Clerk
' AGENDA
1. Call to Order
1
2. Flag Salute
3. Roll Call
1
1
1
1
1
4. Request Approval of the Minutes of November 16, 1993 Regular Meeting
Attachment #4
5. Request Approval of Claims
Attachment #5
Owasso Public Works Authority
December 7, 1993
Page 2
6. Consideration and Appropriate Action Relating to a Supplemental Appropriation to the
OPWA Fund Water Department 1993 -94 Budget.
Ms Bishop
Mr Compton
Attachment #6
7.
3
a
The staff will recommend Trustee approval of a supplemental appropriation in the
amount of $7895.00 to the Water Department budget.
Report from OPWA Manager
Report from OPWA Attorney
Unfinished Business
10. New Business
�1
Owasso Public Works Authority
December 7, 1993
Page 3
' 11. Adjournment
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, November 16, 1993
The Owasso Public Works Authority met in regular session on Tuesday, November 16, 1993
in the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and
Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, November 12, 1993.
ITEM 1: CALL TO ORDER
Chairman Randolph called the meeting to order at 7:00 p.m.
II ITEM 2: FLAG SALUTE
The flag salute was led by Recreation Center Director Jan Worley.
STAFF
Rodney J Ray, City Manager
Ronald D Cates, Authority Attorney
Marcia Boutwell, Recording Secretary
01 A quorum was declared present.
ABSENT
ITEM 4: REQUEST APPROVAL OF THE MINUTES OF NOVEMBER 2, 1993
REGULAR MEETING.
John Phillips moved to approve the minutes as written, by reference hereto; seconded by Charles
' Burris.
AYE: Phillips, Burris, Bowen, Barnhouse, Randolph
NAY: None
Motion carried 5 -0.
ITEM 3: ROLL CALL
PRESENT
'
Bob Randolph, Chair
John Phillips, Vice Chair
Mary Lou Barnhouse, Trustee
'
Rex Bowen, Trustee
Charles Burris, Trustee
STAFF
Rodney J Ray, City Manager
Ronald D Cates, Authority Attorney
Marcia Boutwell, Recording Secretary
01 A quorum was declared present.
ABSENT
ITEM 4: REQUEST APPROVAL OF THE MINUTES OF NOVEMBER 2, 1993
REGULAR MEETING.
John Phillips moved to approve the minutes as written, by reference hereto; seconded by Charles
' Burris.
AYE: Phillips, Burris, Bowen, Barnhouse, Randolph
NAY: None
Motion carried 5 -0.
Owasso Public Works Authority November 16, 1993
ITEM 5: REQUEST APPROVAL OF THE CLAIMS
John Phillips moved, seconded by Rex Bowen, to approve the following claims as submitted:
(1) OPWA Fund $13,076.03; (2) OPWA Capital Improvement Fund $2,925.00; (3) Payroll
$20,613.33.
AYE: Phillips, Bowen, Barnhouse, Burris, Randolph
NAY: None
Motion carried 5 -0.
ITEM 6: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST BY A CUSTOMER FOR AN ADJUSTMENT TO THEIR
CHARGES FOR WATER USAGE
Mr Dick O'Connell, office manager for Lewis Travel Trailer, requested an adjustment to their
water bill. He stated that their bill had been high because of leaks at abandoned mobile home
sites. One meter covers both the Lewis Travel Trailer property and the mobile home park site.
He said that steps were now being taken to cap off those lines not in use. City Manager Rodney
Ray gave a brief history of this account, stating that an adjustment of $441.60 was made to the
July bill, making the fourth time since 1987 that their bill had been adjusted. The company has
made only a partial payment on their bill each month since July. At 6:00 p.m. on November
2, 1993, water service was terminated due to non - payment. At 6:15 p.m. on that same date
payment in full was received and water service was restored at 7:20 p.m.
Staff has met with Gary Burger, owner of Lewis Travel Trailer, and the owner of the mobile
home park property, resulting in a effort to serve each property with separate meters.
Mr Phillips asked Mr O'Connell what type of relief they were requesting. Mr O'Connell stated
that the city should recover their costs and an adjustment made beyond those costs. Following
further discussion of the problem, Chairman Randolph moved that the request for an adjustment
to the water use charges be denied. Motion was seconded by Rex Bowen.
AYE: Randolph, Bowen, Burris, Phillips, Barnhouse
NAY: None
Motion carried 5 -0 and the request was denied.
2
Owasso Public Works Authority November 16, 1993
' ITEM 9: CONSIDERATION AND APPROPRIATE ACTION RELATING TO THE FY
1992 -93 INDEPENDENT AUDIT OF THE OWASSO PUBLIC WORKS
' AUTHORITY FUND.
City Treasurer Sherry Bishop requested acceptance of the reports from the auditors for FY 1992-
' 93. Those three reports were transmitted to the Trustees for their review prior to the meeting.
Mr Craig Leigner of the firm of Stanfield & O'Dell, auditors for the city and OPWA, was
present to answer questions. With no questions forthcoming, Charles Burris moved that the
' Trustees accept the audit report and direct it to be filed as required by law. Motion seconded
by Rex Bowen.
AYE: Burris, Bowen, Barnhouse, Phillips, Randolph
NAY: None
' Motion carried 5 -0.
ITEM 7: CONSIDERATION AND APPROPRIATE ACTION RELATING TO
' RESOLUTION #93 -05 A RESOLUTION ESTABLISHING WATER RATES
WITHIN AND WITHOUT THE CORPORATE LIMITS OF THE CITY OF
OWASSO.
On March 2, 1993, OPWA Trustees approved a concept for the purchase of one and one -half
IP sections of "protected service area" from the Rogers County Rural Water District #3. On that
same date, the OPWA entered into a contract with the district. Resolution #93 -05 provides the
proper legal authority to establish water rates as agreed to in the concept. Chairman Randolph
moved, seconded by Charles Burris, to approve Resolution #93 -05.
AYE: Randolph, Burris, Bowen, Barnhouse
NAY: Phillips
Motion carried 4 -1.
1
1
3
Owasso Public Works Authority
November 16, 1993
ITEM 8: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR TRUSTEE APPROVAL OF A CONTRACT BETWEEN THE
OWASSO PUBLIC WORKS AUTHORITY AND DELOITTE & TOUCHE FOR
THE PURPOSE OF CALCULATING AND REPORTING ARBITRAGE
LIABILITY FOR THE PERIOD NOVEMBER 1 1988 THROUGH
OCTOBER 31, 1993
In connection with the issuance of the 1988 OPWA Revenue Bonds, the Trustees certified that
requirements of the IRS code of 1986 would be met. Ms Bishop stated that the tax code requires
that excess interest earned must be rebated to the United States Treasury. A calculation of that
amount must be made annually on November 1 and any rebate due the federal government must
be reported and paid at least once every five years. The firm of Deloitte & Touche performed
the computations last year and staff is requesting that they again be retained to perform the
arbitrage calculations and report the same.
Charles Burris moved, seconded by John Phillips, to approve a contract in the amount of $2500
with the firm of Deloitte & Touche to provide bond rebate computation services for the 1988
Series Revenue Bonds for the period of November 22, 1988 through November 1, 1993.
AYE: Burris, Phillips, Bowen, Bamhouse, Randolph
NAY: None
Motion carried 5 -0.
ITEM 10: REPORT FROM OPWA MANAGER
No report.
ITEM 11: REPORT FROM OPWA ATTORNEY
No report.
ITEM 12: UNFINISHED BUSINESS
None
ITEM 13: NEW BUSINESS
Mayor Randolph introduced members of the Leadership Owasso class. The class subject for the
evening was on municipal government, and several elected officials and city staff made
presentations to the class prior to the Council meeting.
4
Owasso Public Works Authority
ITEM 14: ADJOURNMENT
Charles Burris moved, seconded by John Phillips to adjourn.
AYE: Burris, Phillips, Barnhouse, Bowen, Randolph
NAY: None
Motion carried 5 -0 and the meeting was adjourned at 7:42 p.m.
Marcia Boutwell, Recording Secretary
5
November 16, 1993
Bob Randolph, Chairperson
CITY OF OWASSO
OWASSO PUBLIC
WORKS AUTRORITI?
12/0?/93 16:56:33 &/P CLA.IMS REPORT
AP&P VR PAGE� : 10
pO it VENDOR
DESCRIPTION
-------------------------
AMOUNT
-------------
N�
---------- -------------------------
* NO DEPARTMENT MASTER FOUND *
------------------------------
940059 OKLAHOMA ?&X COMM ISSlOR
SATES ?&X/GRASS BAGS
15.19
-------------
DEPARTMENT TOTAL
15. 19
O9WA ADMINISTRATION
-----------------------------
940117 CPS BUSINESS, IRC.
�lCE.NSE FE ES
217.00
940119 WESTERN 8�SI0ESS PROD�C?S
C I�R M�IM7
323.40
94 fl, l39 LIBERTil ?V[S&
FIEvENTUS BONDS
491786,00
17.91
9407 51 014A5SO LUMBER CO
S��P?ISS
941.035 SECURITY 6-1 ROSE, IBC,
S�=YlCSS
52.O0
941067 SUBURBAN OFFICE 5UPPL 7
5��P�ICS
ST pP- ISS
27.44
5,69
941105 OFFICE DEPOT CARD PLAN
-^
041119 EMPIRE PLUMBING SUPPLY l8
SUPPLIES
25.9�
941134 CE T [UI &R 00E-?ULS&
SIG0S
CrT T UT AF., �FO E
SIG0
199,00
.
155 00
941160 SARRC7T
941224 SOUTHWESTERN BELL ?SLS.
10/93 PLSXAR
222.43
9426 OK�& �&7UR�� GAS
12
10/93 V5�
54.O1
941227 LDCC INC-A?�7
1V/93 USE
8.97
12.24
9«1229 TREASURER PET AT"! CASH
RE MB PST?" CLS8
-------------
DSPAP?MS07 7O7�� `=��}
51 107 02
, .
m�
WATER
------------------------------
940554 NCGVIRE BROTHERS
COBS?RVC�IO0/8UCR&R AR
7,895.O0
940751 OWASSO 'LUMBER CO
S PPLTES
11.14
354.45
941032 BRAD SPARDM&0
ME7S� READER
941039 LOYD LEACH
METER READER
9V
54.90
NN ��
941040 OSCAR MCL&UPIN
RS&Dr?R
SUIFPLISS
157 .0 5
85'O9
9410 42 KIMBALL ACE HARDWARE
941107 TYRONE DINKI8S
METER READER
11O.25
941117 RAMSY TESTING LAB
941120 OSCAR MCL&URIR
S�RvICES
METER 8S&DEF
1010.00
348.30
941121 BRAD SPARDMAB
METER READER
235.90
941122 TYRONE DINKINS
METER READER
132.75
941133 NORLSY5 GREENHOUSE
SDD/TRC2
RSE ME 1 ?
85.00
80.00
94��4� F ROBSR? C�RR, JR,
RE IM8U
--
941254 CITY GARAGE
P�R?5
69.41
'
p411 CD�S�R�C?I
GARAGE,
18O.00
��
741195 CITY
941193 CIT? OP TULSA
10/»3 USG
66,219.60
CITY OF OWA5SO
ONASSO PUBLIC WORKS AUTHORITY
22/02/93 16:56:33 A/P CLAIMS REPORT A PA' PVR PA(-i£: 11
___PO_#___ _________nEDDOR__________ ______DESCRIFTIOH AMOUNT
-------------- -------------
941216
OUl8 ?RIP CORp
FUEL
4O6 22
941042
941223
SOUTHWESTERN BELL 7SLE.
10/93
0O0-P�SX�R
17 83
63`96
941224
SOUTHWESTERN BET L ?SLS.
10/93
PLSXAR
GAS CBL DRIVG
941225
PSO
10/93
USE
26^48
^
67`23
941229
TREASURER PGITY CASH
R2IMB
FS?�� C&S8
33.28
DEPARTMENT 7D?A.11 ===} 76,518.88
WAS7EWli7S9
___________________________
941037
ADVANCED CF GMICAL
GAS C8LORI0S
4O6 22
941042
KIMBALL ACE B&RDWIFC
SU PP , IES
250^66
941O4u
�D��BC�D CyGMTCM�
GAS C8L ORIU:
406~22
941096
ADVANCED CHEMICAL
GAS CBL DRIVG
506^22
94lO9r
AUTOMATIC ENGINEERING
PARTS
^
159 OO
941115
CIBTAS CORP.
UNIFORM R30T/CLS&N
336^20
941141
WAL-MART
SUPPLIES
^
37 74
941154
CITY GARAGE
PARTS
^
941l85
CITY GARAGE
FIE �
635 46
~
9411B7
COLE SHARP ALL
S U P P L I ES
198 99
941223
SO�TRW�S?SR0 BELL ?SLC.
10 /93 00 N -PL 21
41`65
17^59
941224
SOUTHWESTERN B2�� ?ELS.
10/93 P�SX�R
43^77
941225
PSO
10/93 U SS
5 495 ^35
941226
0 L A N A7VRAL S
1O/93 USE
, ^
941227
LDCC INC-AT�T
1O/93 �S�
^
81 25
,S4
DEPARTMENT TOTAL
-------------
R'907,16
REFUSE COLLECTIONS
------------------------------
941025 WASTE MA0AGGMGB7 OF [0L6 TIP FEES
'741106 BPI 10/93 COMM REFUSE
941154 CITY GARAGE P ARTS
941,167 WILLIAMS REFUSE SOUIPMEN7 SUPP LIES
941185 CITY GARAGE FUEL
941-il9 OVt--T Cc DEPOT CARD PLAN FURNITURE
DEPARTMENT TOTAL
PSCYCCC CEB?S9
------------------------------
941O23_WASIG MANAGEMENT OF OBL& TIP FEES
942106 BFI 1O/93 COMM REFUSE
4,326.08
11,630.72
1r584.25
32,90
470.22
278.98
18,323.15
1O5,99
2,072.00
CI "1Y OF OWASSO
OWAS' O PUBLIC. WOPHS AUTHORITY
12/0/93 16:56:3 A/P CLAIM`= REPORT APAPVR PAGE:
PO 4 VENDOR DESCRIPTION AMOUNT
---- - - - - -- ------------------- - - - - -- ------------------ - - - - --
941185
CITY GARAGE
FUEL
39.10
941224
SOUTHWESTERN BELT. TELE.
10/93 PLEXAR
21.23
941225
PSO
10/93 USE
85.62
DEPARTMENT TOTAL = _ _ _ .
2,323.93
FUND TOTAL =___.
157,195.33
12
CIT'17 OF OWA�SSO
OPWA CAPITAL IMPROVEMENT FUND
12
16-:5A:33 A/P CLAIM'F, REPORT AFAPVR PAGE
Flo # VENDOR DESCRIPTION AMOU14T
---------- ------------------------- ------------------------- -------------
DEBT SERVICE
------------------------------
940,--,'17 LIBERTY BAMF & TPU'ST OWK0 LOAN
?,101.54
-------------
DEPARTMEINT TOTAL
-------------
FUND TOTAL �1711[11.54
i
1
1
VENDOR
TRANSFERS
CITY GARAGE
WORKERS' COMP SELF -INS
GENERAL FUND
TRANSFERS TOTAL
CITY OF OWASSO
OPWA
A/P TRANSFER REPORT
DESCRIPTION AMOUNT
TRANSFER FROM OPWA 5,125.00
TRANSFER FROM OPWA 3,842.50
TRANSFER FROM OPWA 22,916.66
31, 884.16
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 11/13/93
APPROVED: 12 -07 -93
Chairman
Trustee
Trustee
I�
J
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 11/27/93
DEPARTMENT
AMOUNT
i,. {.; { :..v,:: {y:.' ?::. wi?i.,•
..... v. v„ n.:. v. 4. wn,: w.,.:: w::. i:•: i{:::::., �f::'{:
y�}
.......................:::.
Water
ti4i}i i.'• ::;.,:.ktii,:4iii� }ivr:i:ii'6:4} iii :4i }iiiiiii'r':::::•i:•i.i��y1.:�t�'.'
x::,' 4�}:'.
2,732.96
i,+¢•? Isisji :'ii:•,.:i;Sii'r�:`•:i} {`.i �x,.;.xv,•::}'iii:'.i4i „r: •::.:}::: •:..t•.w :.4Yi:.nvx:::nx.::.v
t.:. is:. s:•:,.,. s: 4: 4:: iss:: t�:•.,: s'.?::; i' f' ,.: r' rs: �: �ti:: i:: ii`•;:: s•:.::•::' t�? i::::: Sii
:::>:;;s::•::::ii::i:ir::i:::.. �jj�!2 }}:
Refuse
t' tr;;':,:•.?. i:;:•>•:
.i ....:..... n4......v�.v?.;,v.,v::::: ::x:i::r4iiii4i:4:ivi�'A!.}:•:
T•:ii
APPROVED: 12 -07 -93
Chairman
Trustee
Trustee
MIT'
I TO: CHAIRMAN AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
I FROM: STEVE COMPTON
ASSISTANT CITY MANAGER
' SUBJECT: SUPPLEMENTAL APPROPRIATION TO WATER DEPARTMENT
FY 1993 -94 BUDGET
DATE: November 30, 1993
IBACKGROUND:
In September of 1993 the Authority approved Change Order #1 to the industrial infrastructure
' project (Max Buchanan Project). The change order addressed the replacement of a 12" transite
water main located under the new south Main Street with a 12" ductile iron pipe and was for
the amount of $7895.00. Funding for the change order was approved from the OPWA reserve
' fund. It is now necessary to appropriate the previously approved supplemental funds to the
Water Department's FY 1993 -94 budget in order to be able to pay the contractor for work that
has been completed. A background memorandum from the Trustees original action on this
' matter has been attached to assist in your review of the circumstances surrounding this request.
RECOMMENDATION:
The staff recommends Trustee approval of a supplemental appropriation in the amount of
$7895.00 to the Water Department budget.
t
ATTACHMENT:
Memorandum to Council Dated September 2, 1993
NVA-1 D! 8 IT Di
TO: CHAIRMAN AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: STEVE COMPTON
ASSISTANT CITY MANAGER
ROHN MUNN
ENGINEERING TECHNICIAN
SUBJECT: CHANGE ORDER #1 TO McGUIRE BROTHERS CONSTRUCTION, INC
CONTRACT FOR MAX BUCHANAN INFRASTRUCTURE PROJECT
DATE: September 2, 1993
BACKGROUND:
On August 3rd 1993, the City Council approved a contract with McGuire Brothers Construction,
Inc. for the amount of $177,612.20 to construct water and wastewater main lines and extend
streets into the City's municipal/industrial park area (Max Buchanan Project).
A part of the project is a 600 feet southerly extension of Main Street before it turns east and
becomes 5th Avenue. The new street will cross over our existing 12" transite water
transmission line for a distance of approximately 300 feet. During the design phase of the project
this crossing was evaluated by the design engineer and staff. After reviewing the soils reports,
it appeared that the soil and bedding around the line would not have to be disturbed and since
additional fill/cover would be needed to elevate the road there would be in excess of 8 feet of
cover over this existing line. It was believed that this depth of cover and the fact that the line
would not have to be disturbed would adequately serve to protect the line.
During construction the contractor discovered that the soils in a large portion of the area in
question were saturated (most likely caused by this area being flooded in early spring). This
saturation caused the soil to "pump" making it impossible for them to prepare a proper sub -base
without excavating down to and around the existing water line. Construction was stopped
because of the danger to the line.
It was determined that since it was now going to be necessary to disturb the soil around the
existing transite pipe, its long term integrity could no longer be insured. Various alternative
solutions were analyzed (rerouting, reinforcing, replacing etc.) and replacement with ductile iron
pipe emerged as being the most efficient and cost effective solution. Negations were conducted
with the contractor and a price of $7,895 was resolved as a reasonable cost for the replacement
of the existing 12" transite pipe with 12" ductile iron pipe (see attached Change Order #1).
The staff would propose that funding for this change order come from the OPWA reserve funds.
RECOMMENDATION:
The staff recommends Trustee approval of the requested Change Order #1 for the amount of
$7,895 to replace 320 feet of 12" transite (asbestos) water line.
T -M \Nky�.
aNk0lx�ERS
Mr.,
8415 S. Regency Dr. • Tulsa, Oklahoma 74131 -3622 • Phone 224.2764 - 224.2789
August 31, 1993
City of Owasso
207 South Cedar
Owasso, Oklahoma 74055
vAttention: Rohn Munn
As per our
meeting on the Owasso
job
site.
listed
below are
the prices
for replacins4 the 12"
transite
pipe
with
12"
Ductile Iron
Pipe.
2 EA Bolted
Omni Coupling
$
300.00
EA
$
600.00 '
320` of 12"
Ductile Iron Pipe
$
19.00
PF
$
6,080.00
135 CY Type
A Ayg. Base
$
9.00
CY
$
1,215.00 '
sincerely,
Tom McGuire
Accepted BY: _� Date=
-----------