AGENDA
Call to Order
Mayor Stephen Cataudella
2. Presentation provided by the Assistant City Manager for Administrative Services for the
purpose of reviewing various City policies, procedures, and funds.
Ms. Bishop
3. Discussion relating to Operational Items
Mr. Lehr
Attachment # 3
A. Proposed Engineering Services Agreement Santa Fe Lift Station
B. Proposed Improvements Rayola Park
4. Discussion relating to City Manager Items
Mr. Ray
A. City Manager Report
a. FY 2010-2011 budget preparation
b. 2010 Owasso Economic Summit
c. Sales Tax Report
Owasso City Council
February 9, 2010
Page 2
5. Legislative Update
Mr. Yancey
6. Report from City Councilors
7. Consideration and appropriate action relating to a request for an executive session for the
purpose of discussing personnel matters relating to the office of the City Manager, such
executive session provided for in O.S. 25, Section 307(B)(1).
Mayor Cataudella
Adjournment
MEMORANDUM
TO: THE HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: ROGER STEVENS
PUBLIC WORKS DIRECTOR
SUBJECT: AGREEMENT FOR ENGINEERING SERVICES
SANTA FE LIFT STATION AND FORCE MAIN IMPROVEMENTS
DATE: February 5, 2010
BACKGROUND:
The City of Owasso commissioned the update of its 1997 Wastewater Master Plan in 2005. The
update provides a 20-year guide for the prioritization and construction of upgrades to the City's
conveyance and treatment infrastructure. Among the current needs, the plan recommends the
investment of approximately $2 million for the upgrade of the Santa Fe Lift Station and Force
Main. Specifically, the recommended improvements are outlined as follows:
• Replace existing lift station with a new submersible style pump station with odor control
facilities
• Replace standby power facilities
• Upgrade existing electrical and instrumentation equipment
• Upgrade existing 12" force main to a new 24" diameter
The recommended improvements will increase the pumping capacity to 9 million gallons per
day, which is anticipated to meet pumping capacity needs for the next ten years.
ENGINEERING SERVICES AGREEMENT:
Based on past performance, staff intends to recommend Greeley and Hansen due to their
qualifications, proven track record, and familiarity with the project. Engineering Services to be
performed under this agreement include:
• Preparation of a preliminary engineering report (PER) to qualify the proposed project
for OWRB State Revolving Fund financing
• Preparation of preliminary and final design for the Santa Fe Lift Station and Force
Main (including design survey, mapping and geotechnical investigation)
• Preparation of contract documents including drawings, specifications, and permit
applications for the project
• Bid related assistance
Following several discussions concerning fee schedules and the scope of work, Greely and
Hansen submitted a fee proposal in the amount of $145,874 for engineering services.
Agreement for Engineering Services
Santa Fe Lift Station and
Force Main Improvements
Page 2 of 2
PROJECT SCHEDULE:
If approved by OPWA Trustees, it is anticipated the design work will be completed by
September, 2010, enabling the start of construction by April, 2011. The proposed schedule is as
follows:
• Notice to Proceed to Greeley & Hansen from OPWA - March, 2010
• Complete Design Process September, 2010
• OPWA Review October, 2010
• OWRB/ODEQ Review - December, 2010
• Advertise for Bids January, 2011
• Receive Bids - February, 2011
• Request for OPWA Approval/Notice to Proceed - April, 2011
FUNDING:
Funding for engineering services is included in the FY 2009-2010 Wastewater Collection
Operating Budget.
RECOMMENDATION:
Staff intends to recommend Trustee approval of an Agreement for Engineering Services for the
Santa Fe Lift Station and Force Main Improvements with Greeley and Hansen, LLC (Chicago,
Illinois) in the amount of $145,874 and authorization for the Chairman to execute the document
during the February 16, 2010 OPWA Regular Meeting.
ATTACHMENTS:
A. Site Map
B. Proposed Engineering Services Agreement with Greeley and Hansen
ATTACHMENT B
Agreement for Professional Engineering Services
between
Owasso Public Works Authority
Owasso, Oklahoma
and
Greeley and Hansen LLC
THIS AGREEMENT, made and entered into this February 2010 between the Owasso
Public Works Authority, Owasso, Oklahoma, a Municipal Corporation, of Oklahoma,
hereinafter referred to as AUTHORITY, Greeley and Hansen LLC, an Illinois Limited
Liability Company with its principal office at 100 South Wacker Drive, Chicago, Illinois,
60606-4004, hereinafter referred to as ENGINEER,
WITNESSETH:
WHEREAS, AUTHORITY intends to design the Santa Fe Lift Station and Force Main
Replacement, hereinafter referred to as the PROJECT; and,
WHEREAS, AUTHORITY requires certain professional services in connection with the
design services of the PROJECT, hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROTECT. The scope of the PROJECT is described in Attachment A,
SCOPE OF PROTECT, which is attached hereto and incorporated by reference as part
of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. AUTHORITY'S RESPONSIBILITIES. AUTHORITY will be responsible for all matters
described in Attachment C, RESPONSIBILITIES OF THE AUTHORITY, which is
attached hereto and incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. AUTHORITY will pay ENGINEER in accordance with
Attachment D, COMPENSATION, and further described in Attachment E,
FEE/MANFIOUR BREAKDOWN, which are attached hereto and incorporated by
reference as part of this AGREEMENT.
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B,
SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F,
SCHEDULE, attached hereto and incorporated by reference as part of this
AGREEMENT.
6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with the
applicable laws and regulations published and in effect at the time of performance of
the SERVICES. The PROJECT shall be completed and engineered in a good and
workmanlike manner and in strict accordance with this AGREEMENT. All
engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by AUTHORITY.
Other than the obligation of the ENGINEER to perform in accordance with the
foregoing standards, no warranty, either express or implied, shall apply to the
SERVICES to be performed by the ENGINEER pursuant to this AGREEMENT or the
suitability of ENGINEER'S deliverables.
7. LIMITATION OF RESPONSIBILITY.
7.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
7.2. The presence of ENGINEER's personnel at a construction site is for the
purpose of providing to the AUTHORITY a greater degree of confidence that
the completed construction work will conform generally to the construction
documents and that the integrity of the design concept as reflected in the
construction documents has been implemented and preserved by the
construction contractor(s).
7.3. In soils, foundation, groundwater, and other subsurface investigations, the
actual characteristics may vary significantly between successive test points
and sample intervals and at locations other than where observations,
exploration, and investigations have been made. Because of the inherent
uncertainties in subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total PROJECT cost
and/or execution. These conditions and cost/execution effects are not the
responsibility of ENGINEER.
7.4. Record drawings will be prepared, in part, on the basis of information
compiled and furnished by others, and may not always represent the exact
location, type of various components, or exact manner in which the PROJECT
was finally constructed. ENGINEER is not responsible for any errors or
omissions in the information from others that are incorporated into the
record drawings.
7.5. ENGINEER's deliverables, five (5) hard copies of record drawings are to be
provided upon the completion of the project. Computer-generated drawing
files furnished by ENGINEER are for AUTHORITY or others' convenience.
Any conclusions or information derived or obtained from these files will be
at user's sole risk.
SCHEDULE.
8.1. Since ENGINEER has no control over the cost of labor, materials, equipment,
or services furnished by others, or over contractors', subcontractors',
vendors' methods of determining prices, or over competitive bidding or
market conditions, ENGINEER'S cost opinion of probably construction cost
shall be made on the basis of qualifications and experice as a Professional
Engineer.
8.2. Since ENGINEER has no control over the resources provided by others to
meet construction contract schedules, ENGINEER'S forecast schedules shall
be made on the basis of qualifications and experience as a Professional
Engineer.
9. LIABILITY AND INDEMNIFICATION.
9.1. ENGINEER shall defend and indemnify AUTHORITY from and against legal
liability for damages arising out of the performance of the SERVICES for
AUTHORITY, including but not limited to any claims, costs, attorney fees, or
other expenses of whatever nature where such liability is caused by the
negligent act, error, or omission of ENGINEER, or any person or organization
for whom ENGINEER is legally liable. Nothing in this paragraph shall make
the ENGINEER liable for any damages caused by the AUTHORITY or any
other contractor or consultant of the AUTHORITY.
9.2. ENGINEER shall not be liable to AUTHORITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
10. CONTRACTOR INDEMNIFICATION AND CLAIMS.
10.1. AUTHORITY agrees to include in all construction contracts the provisions of
Articles 7.1, and 7.2, and provisions providing contractor indemnification of
AUTHORITY and ENGINEER for contractor's negligence.
10.2. AUTHORITY shall require construction contractor(s) to name AUTHORITY,
Greeley and Hansen LLC and Klein and Hoffman, Inc. as additional insureds
on the contractor's general liability insurance policy.
H. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any construction unless such responsibilities
are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
12. INSURANCE
12.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
12.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the aggregate,
and with property damage limits of not less than $100,000 for each
occurrence and not less than $100,000 in the aggregate.
12.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each accident
and with property damage limits of not less than $100,000 for each accident.
12.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not less than
$100,000 for each occurrence.
12.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions coverage
to be for a minimum of $1,000,000, deductibles subject to approval.
12.2. ENGINEER shall furnish AUTHORITY certificates of insurance which shall
include a provision that such insurance shall not be canceled without at least
30 days written notice to the AUTHORITY.
13. OWNERSHIP AND REUSE OF DOCUMENTS.
13.1. All documents, including record drawings, field notes and data shall become
and remain the property of the AUTHORITY.
13.2. AUTHORITY'S reuse of such documents without written verification or
adaptation by ENGINEER for the specific purpose intended shall be at
AUTHORIY'S risk.
14. TERMINATION OF AGREEMENT.
14.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
14.2. AUTHORITY shall have the right to terminate this AGREEMENT, or
suspend performance thereof, for AUTHORITY'S convenience upon written
notice to ENGINEER; and ENGINEER shall terminate or suspend
performance of SERVICES on a schedule acceptable to AUTHORITY. In the
event of termination or suspension for AUTHORITY'S convenience,
AUTHORITY shall pay ENGINEER for all SERVICES performed to the date
of termination in accordance with provisions of Attachment D,
COMPENSATION. Upon restart of a suspended project, ENGINEER's
contract price and schedule shall be equitably adjusted.
15. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: Paul J. Vogel, P.E.
Attn: Joseph M. Gorgan
Greeley and Hansen LLC
100 S. Wacker Drive, Suite 1400
Chicago, Illinois 60606
To AUTHORITY: Owasso Public Works Authority
P.O. Box 180
Owasso, Oklahoma 74055
Attention: Roger Stevens
15.1. Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and AUTHORITY.
16. UNCONTROLLABLE FORCES. Neither AUTHORITY nor ENGINEER shall be
considered to be in default of this AGREEMENT if delays in or failure of
performance shall be due to forces which are beyond the control of the parties;
including, but not limited to: fire, flood, earthquakes, storms, lightning, epidemic,
war, riot, civil disturbance, sabotage; inability to procure permits, licenses, or
authorizations from any state, local, or federal agency or person for any of the
supplies, materials, accesses, or services required to be provided by either
AUTHORITY or ENGINEER under this AGREEMENT; strikes, work slowdowns or
other labor disturbances, and judicial restraint.
17. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
18. INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments
A, B, C, D, E, F and represents the entire and integrated AGREEMENT between the
parties; and supersedes all prior negotiations, representations, or agreements
pertaining to the SCOPE OF SERVICES herein, either written or oral. AUTHORITY
may make or approve changes within the general Scope of Services in this
AGREEMENT. If such changes affect ENGINEER's cost of or time required for
performance of the services, an equitable adjustment will be made through an
amendment to this AGREEMENT. This AGREEMENT may be amended only by
written instrument signed by each of the Parties.
19. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the AUTHORITY over the interpretation or application of the terms
of this AGREEMENT, the matter shall be referred to the AUTHORITY's Director of
Public Works for resolution. If the Director of Public Works is unable to resolve the
dispute, the matter may, in the Director's discretion, be referred to the AUTHORITY
Manager for resolution. Regardless of these procedures, neither party shall be
precluded from exercising any rights, privileges or opportunities permitted by law
to resolve any dispute.
20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
21. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the AUTHORITY, and
any plans or specifications not meeting the terms set forth in this AGREEMENT shall
be replaced or corrected at the sole expense of the ENGINEER. The ENGINEER shall
meet with the AUTHORITY staff initially and periodically thereafter and will be
available for public meetings and/or AUTHORITY presentations.
22. KEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has
designated Ryan M. Christopher as Project Manager for the PROJECT. ENGINEER
agrees that no change will be made in the assignment of this position without prior
approval of AUTHORITY.
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Chair of the AUTHORITY.
APPROVED:
Authority Clerk
APPROVED AS TO FORM:
Greeley and Hansen LLC
Date
OWASSO PUBLIC WORKS AUTHORITY
Chair
Date
Authority Attorney
Ji~-
Paul J. Vogel,
Executive Vice President
Attachment A
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Scope of Project
Greeley and Hansen LLC
February 2, 2010
SCOPE OF PROTECT. The PROJECT consists of the Santa Fe Lift Station and Force Main
Replacement as described. Final engineering design services include providing detailed
design drawings and specification and provide bidding services for the lift station and force
main replacement.
The Santa Fe Lift Station and Force Main Replacement will incorporate information from the
following studies as well as past design projects:
• Wastewater Master Plan, May 2005, prepared by Greeley and Hansen LLC
• Wet Weather Study, April 2007, prepared by Greeley and Hansen LLC
• Wastewater Treatment Plant Expansion and 117th Street Pump Station Upgrade,
September 2009, prepared by Greeley and Hansen LLC
The execution of the services will be broken up into four major tasks:
1. Detailed Design
2. Detailed Specifications
3. Soils Exploration and Geotechnical Report
4. Ground Survey
5. Bid Assistance
A more detailed description of each work task is provided as part of Attachment B.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT A.DOC A-1
Attachment B
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Scope of Services
Greeley and Hansen LLC
February 2, 2010
The services to be performed by the ENGINEER, Greeley and Hansen LLC, under this
AGREEMENT consists of designing the Santa Fe Lift Station and Force Main Replacement,
execution of the work will be broken into five major work tasks, as stated below. Further, it
is understood and agreed that the date of beginning, rate of progress, and the time of
completion of the services to be done hereunder are essential provisions of this
AGREEMENT; and it is further understood and agreed that the services embraced in this
AGREEMENT shall commence upon execution of this AGREEMENT and receipt of Notice
to Proceed.
Scope of Services
Greeley and Hansen LLC will furnish the AUTHORITY the following professional
engineering services for the Santa Fe Lift Station and Force Main Replacement:
1. Detailed Design
1.1 Meetings - Meet once every other month with the wastewater staff to review
technical aspects of the project.
1.2 Project Management - Project management activities include preparing the
monthly invoices and project status reports for City of Owasso review.
1.3 Drawings - Prepare Construction Drawings for the Santa Fe Lift Station and
Force Main Replacement project.
2. Detailed Specifications
2.1 Detailed Specifications - Prepare Construction Specifications for use, together
with the Construction Drawings, in taking competitive bids and entering into
a construction contract with an experienced and competent contractor for the
Santa Fe Lift Station and Force Main Replacement project. Specifications will
include bid information and contract terms as required by the Engineers Joint
Contract Documents Committee documents and will be in CSI format.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT B.DOC B - 1
3. Soils Exploration and Geotechnical Report
3.1 Soils Exploration and Geotechnical Report - Arrange for and provide soil
borings for the force main replacement and lift station design. Prepare a
geotechnical report for the design of the lift station and force main
replacement using information from the subsurface evaluation portion of the
work.
4. Surveying
4.1 Ground Survey - Arrange for, as needed, a survey of the lift station and force
main. The survey shall consist of:
• Establish a temporary benchmark on the site from an established
existing monument.
• Verify elevations of structures as needed.
5. Bid Assitance
5.1 Bidder Inquiries - Respond to bidder inquiries during the bidding process.
5.2 Addenda - Prepare addenda as needed to clarify the Contract Documents.
5.3 Pre-Bid Meetings - Attend pre-bid meeting and prepare meeting notes.
5.4 Bid Report - Tabulate bids and prepare bid report including recommendation
on award of contract.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT B.DOC B - 2
Attachment C
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Responsibilities of the AUTHORITY
Greeley and Hansen LLC
February 2, 2010
RESPONSIBILITIES OF THE AUTHORITY. The AUTHORITY agrees:
A. Scheduling. Provide notice to proceed at least 14 days prior to actual project start
date.
B. Reports, Records, etc. To furnish, as required by the work, and at no expense to the
ENGINEER:
Records, reports, studies, plans, drawings, and other data available in the
files of the AUTHORITY that may be useful in the work involved under this
AGREEMENT. ENGINEER may reasonably rely upon the accuracy,
timeliness, and completeness of the information provided by AUTHORITY.
C. Access. To provide access to public and private property when required in
performance of ENGINEER's services.
D. Staff Assistance. Designate in writing a person to act as its representative in respect
to the work to be performed under this AGREEMENT, and such person shall have
complete authority to transmit instructions, receive information, interpret and define
AUTHORITY'S policies and decisions with respect to materials, equipment, elements
and systems pertinent to the services covered by this AGREEMENT.
E. Review. Examine all sketches, cost opinions, specifications, drawings, proposals
and other documents presented by ENGINEER and render in writing decisions
pertaining thereto within a reasonable time so as not to delay the services of
ENGINEER.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT C.DOC
C-1
Attachment D
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Compensation
Greeley and Hansen LLC
February 2, 2010
The AUTHORITY agrees to pay, as compensation for services set forth in Attachment B, a
total lump sum fee of one hundred forty five thousand and eight hundred seventy four
dollars 145,874.00) for the services described in Attachment B.
ENGINEER shall submit monthly invoices based upon the proportion of the total services
actually completed at the time of billing. Invoices are due and payable within 30-calendar
days of receipt by the AUTHORITY. A breakdown of the not to exceed amount to be billed
for each of the tasks is shown as follows:
Work Tasks
1. Detailed Design
2. Detailed Specifications
3. Soils Exploration and Geotechnical Report
4. Ground Survey
5. Bid Assistance
Estimated Fee
$ 97,601
$ 24,289
$ 6,000
$ 9,500
$6,384
Subtotal:
$143,774
Printing
$ 300
Travel
$ 1,800
Total:
$145,874
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT D DOC D-1
ATTACHMENT E
OWASSO PUBLIC WORKS AUTHORITY
SANTE FE LIFT STATION AND FORCE MAIN REPLACEMENT
Estimated Professional Engineering Services Fee
SUMMARY
Greeley and Hansen LLC
February 2010
DESCRIPTION
PROJECT
DIRECTOR
PROJECT
MANAGER
PROJECT
ENGINEER
CADD
TECH
WORD
PROCESS.
TOTAL
DESIGN ENGINEERING
Task 1 - Detailed Design
Task 2 - Detailed Specifications
Task 3 - Soils Exploration and Geotechnical Report
Task 4 - Ground Survey
Task 5 - Bid Assistance
Subtotall
$
$
$
3,413
3,769
1,944
$
$
$
39,547
12,288
4,080
$
$
$
28,49' )
8,232
-
$
$
26,147
360
$ -
$ -
$
$
$
$
$
97,601
24,289
6,000
9,500
6,384
$ 9,126
1 $ 55,915
1 $ 36,725
1 $ 26,507
1 $ -
$
143,774
OTHER DIRECT COSTS
Printing
Travel
Subtotal
$
$
300
1,800
$
2,100
TOTAL FEE
$
9,126
$
55,915
$
36,725
$
26,507
$ -
$
145,874
2/2/201011:45 AMOwasso Santa Fe LS and Force Main Attachment E.xls
Attachment F
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Schedule
Greeley and Hansen LLC
February 2, 2010
SCHEDULE: The design of the Santa Fe Lift Station and Force Main Replacement will be
conducted in a single phase. It is anticipated that the project will require approximately
eleven months to complete. The schedule below illustrates a start date of March 1, 2010 and
an approximate completion date of February 21, 2011. The schedule is as follows:
• Notice to Proceed is provided to ENGINEER from the AUTHORITY -March 1, 2010.
• Complete Design Process - September 1, 2010
• AUTHORITY Review - October 1, 2010
• ODEQ Review - December 1, 2010
• Advertisement for Bids Date - January 3, 2011
• Receive Bids - February 7, 2011
• Submit Bid Review Report - February 21, 2011
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT F.DOC
F-1
MEMORANDUM
TO: THE HONORABLE MAYOR AND COUNCIL
CITY OF OWASSO
FROM: STEVEN F. ALBERT, P.E., CFM
CITY ENGINEER
SUBJECT: REQUEST FOR PROJECT APPROVAL
RAYOLA PARK IMPROVEMENTS
DATE: February 5, 2010
BACKGROUND:
Improvements at Rayola Park have been identified as a project that is eligible to receive funding
under the Community Development Block Grant (CDBG) program and under the Vision 2025
program. The park serves as an important element of the City's park system and is a valuable
open space serving the surrounding neighborhood, residents of the city, and patrons of the
adjacent YMCA. The engineering Division of the Public Works Department is nearing
completion of the design of the proposed park improvements in order to utilize available funding
opportunities.
The proposed design will improve the appearance and stability of the drainage way that runs
through the park, provide a continuous concrete walking path loop, upgrade the site lighting,
provide ADA compliant handicap accessible entrances, and repair the two park bridges. Major
elements of the proposed design and construction plan include the following:
• Repair of a major erosion problem at the north end of the channel and installation of rock to
stabilize the two major bends in the channel at the north end.
• Installation of 4 small weirs (about 2' high small dams) within the channel to improve the
aesthetics and function of the channel. Pools of water will form upstream of the weir and
small waterfalls will cascade off. Two of the weirs will be located adjacent to the two park
bridges for sound and visual interest. The biology of the stream will be improved using a
"pool and riffle" concept. This has been approved by the Army Corps of Engineers as an
"Aquatic Habitat Restoration" project.
• Creation of a 7' wide concrete walking path extending 3,600' total on both sides of the
creek. Proposed improvements will replace the existing gravel path and will add a new
concrete path to the north of the 6th Street bridge on the west side of the creek. This new
path will complete the walking path loop and will connect directly to 8th Street to provide a
new access point to the park.
• Twelve new lighting fixtures will be installed to replace the existing lights. Staff is
investigating the use of LED fixtures to save on electricity and replacement costs.
• Drainage improvements will be made to resolve a number of standing water problems and to
generally allow for storm water to pass under the new concrete sidewalks.
• Access from the YMCA to the park over the north and south bridges will be made handicap
accessible. The south bridge abutments will be raised about a foot to provide for the required
sidewalk slopes.
• The south bridge will be repainted and re-decked with polymer planking to replace the
existing wood planks.
• The north bridge at 6th Street will have new guardrails added to both sides.
FUNDING:
The estimated cost for these improvements is $300,000. Funding for this project is available
from three sources: funds from the 2008-2009 Community Development Block Grant totaling
$96,429; the 2009-2010 Community Development Block Grant totaling $99,106; and the Vision
2025 grant totaling $114,346.
RECOMMENDATION:
Staff intends to recommend City Council approval of the proposed improvements to Rayola
Park.
ATTACHMENTS:
A. Site development plan
ATTACHMENT A
I s 11 il. I!
4{- _
I II ~ ~ I{ Ig- _ I II
fAREA OF PROPOSED FILL x
x3=I
x - \ +
. jr REPLACE _ x x
,
RAILINGS 0
. BRIDGE _
sb
{ '[n _ l1CV„w t
X ~ s iF S/ f 44}Y O ~ p~
61f
LEGEND a
f
0 d"
7' CONCRETE SIDEWALK OVER EXISTING TRAIL " 'g RAISE BRfDGE &
°x REPLRCO DECK T CONCRETE SIDEWALK- NEW TRAIL 9
x ` ~a D WATER POOLS ABOVE WEIRS r 1_--
F EXISTING PAVEMENT - -
CHANNEL CORNER STONE REINFORCEMENT
.I NEW CONCRETE~y 2' WEIR SET WITHIN CHANNEL
-ENTRANCE DRIVE. g I )1( 1r LIGHT FIXTURE
- r" r I
YOLA PARK IMPROVEMENT PLAN
CITY OF OWASSO
ENGINEERING DIVISION
- Scale: V= 100'
February 3, 2010