HomeMy WebLinkAbout2010.02.16_OPWA AgendaF
PUBLIC NOTICE OF THE MEETING OF THEQ/6,
OWASSO PUBLIC WORKS AUTHORITY L-% 1
TYPE OF MEETING: Regular
DATE: February 16, 2010
TIME: 6:30 p.m.
PLACE: Council Chambers, Old Central Building
109 N. Birch
A Notice of the meeting and agenda filed in the office of the City Clerk and posted at City Hall
at 6:00 p.m. on Friday, February 12, 2010. -rr,
l_ )j
J ann M. Stevens, Deputy City Clerk
AGENDA
1. Call to Order
Chairman Stephen Cataudella
2. Roll Call
3. Consideration and appropriate action relating to a request for approval of the
Consent Agenda. All matters listed under "Consent" are considered by the Trustees
to be routine and will be enacted by one motion. Any Trustee may, however, remove
an item from the Consent Agenda by request. A motion to adopt the Consent Agenda
is non - debatable.
A. Approval of the Minutes of the February 2, 2010 Regular Meeting.
Attachment # 3 -A
B. Approval of Claims.
Attachment # 3 -B
C. Acknowledgement of receiving the monthly FY 2009 -2010 budget status report.
Attachment # 3 -C
4. Consideration and appropriate action relating to items removed from the Consent
Agenda.
O: \MANAGER] A 1,\Agendas \0PWA \2010 \021610 posting doc
Owasso Public Works Authority
February 16, 2010
Page 2
5. Consideration and appropriate action relating to a request for Trustee approval of
the Santa Fe Lift Station and Force Main Improvement Project.
Mr. Stevens
Attachment # 5
Staff recommends Trustee approval of the Santa Fe Lift Station and Force Main
Improvement Project.
6. Consideration and appropriate action relating to a request for Trustee approval of an
agreement for engineering services for the Santa Fe Lift Station and Force Main
Improvement Project and authorization for the Chairman to execute the agreement.
Mr. Stevens
Attachment # 6
Staff recommends Trustee approval of an agreement for engineering services for the Santa
Fe Lift Station and Force Main Improvements with Greeley and Hansen, LLC (Chicago,
Illinois) in the amount of $145,874 and authorization for the Chairman to execute the
agreement.
7. Consideration and appropriate action relating to a request for Trustee authorization
for the OPWA Manager to execute ODEQ Consent Order No. 10 -036.
Mr. Stevens
Attachment # 7
Staff recommends Trustee authorization for the OPWA Manager to execute ODEQ
Consent Order No. 10 -036, establishing a time table for constructing improvements to the
wastewater collection system to eliminate unpermitted bypasses.
8. Report from OPWA Manager.
9. Report from OPWA Attorney.
10. New Business. (New Business is any item of business which could not have been
foreseen at the time of posting of the agenda.)
11. Adjournment.
0: \MANAGERIAL \Agendas \OPWA \2010 \031610 posting.doc
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, February 2, 2010
The Owasso Public Works Authority met in regular session on Tuesday, February 2, 2010 in the
Council Chambers at Old Central per the Notice of Public Meeting and Agenda posted on the
City Hall bulletin board at 6:00 p.m. on Friday, January 29, 2010.
ITEM 1. CALL TO ORDER
Vice Chair Bonebrake called the meeting to order at 7:03 p.m.
ITEM 2. ROLL CALL
PRESENT
Doug Bonebrake, Vice Chair
Bryan Stovall, Trustee
Jon Sinex, Trustee
Wayne Guevara, Trustee
A quorum was declared present.
STAFF
Rodney Ray, Authority Manager
Julie Lombardi, Authority Attorney
ABSENT
Steve Cataudella, Chairman
ITEM 3. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR TRUSTEE APPROVAL OF THE CONSENT AGENDA
A. Approval of Minutes of the January 19, 2010 Regular Meeting.
B. Approval of Claims.
Mr. Sinex moved, seconded by Mr. Stovall, to approve the OPWA Consent Agenda with claims
totaling $723,593.49. The payroll payment report for pay period ending 01/16/10 was included
for review.
YEA: Bonebrake, Sinex, Guevara, Stovall
NAY: None
Motion carried 4 -0.
Owasso Public Works Authority February 2, 2010
ITEM 4. CONSIDERATION AND APPROPRIATE ACTION RELATING TO ITEMS
REMOVED FROM THE CONSENT AGENDA
No action was required on this item.
ITEM 5. REPORT FROM OPWA MANAGER
No report.
ITEM 6. REPORT FROM OPWA ATTORNEY
No report.
ITEM 7. NEW BUSINESS
None
ITEM 8. ADJOURNMENT
Mr. Guevara moved, seconded by Mr. Sinex, to adjourn the meeting.
YEA: Sinex, Stovall, Guevara, Bonebrake
NAY: None
Motion carried 4 -0 and the meeting was adjourned at 7:04 p.m.
Juliann Stevens, Deputy City Clerk
2
Doug Bonebrake, Vice Chair
Claims List
02/16/10
Budget Unit Title
Vendor Name
I Payable Description
jPayment Amouni
DEBT SERVICE - OPWA DEBT
HAWKINS DELAFIELD & WOOD LLP
JARBITRAGE 04 STAX NOTE
4,000.00
TOTAL DEBT SERVICE - OPWA DEBT 4,000.00
FUND GRAND TOTAL 4,000.0
OPWA ADMINISTRATION
JPMORGAN CHASE BANK
TERMINIX -PEST CONTROL
61.00
OFFICE DEPOT INC
OFFICE SUPPLIES
173.49
WAL -MART CORP SAMS CLUB 77150903608
OPERATING SUPPLIES
143.36
JPMORGAN CHASE BANK
LOWES- SUPPLIES
9.25
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
30.90
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
3.55
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
34.90
TOTAL OPWA ADMINISTRATION 456.45
UTILITY BILLING
SAV -ON PRINTING & SIGNS LLC
UTILITY CUT OFF NOTICES
585.00
TECHNICAL PROGRAMMING SERVICES INC
BILLING SERVICES
2,722.88
TODD C. KIMBALL
METER READER
416.70
DAVID R. OLINGHOUSE
METER READER
270.00
KATHLEEN A BALSIGER
METER READER
148.50
TYRONE EUGENE DINKINS
METER READER
308.25
MARK MEYER
METER READER
198.00
TYRONE EUGENE DINKINS
METER READER
573.30
MARK MEYER
METER READER
69.30
TOTAL UTILITY BILLING 5,291.93
WATER
CITY GARAGE
PARTS FOR CITY TRKS & CAR
368.25
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
72.80
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
67.48
CITY GARAGE
C. GARAGE LABOR & OVERHEA
833.33
FLEETCOR TECHNOLOGIES
FUELMAN JAN 2010
1,320.56
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
60.10
JPMORGAN CHASE BANK
CITY OF TULSA -WATER
99,999.00
JPMORGAN CHASE BANK
CITY OF TULSA -WATER
82,066.42
TOTAL WATER 184,787.94
WASTEWATER TREATMENT
JPMORGAN CHASE BANK
NORTH CENTRAL LAB - SUPPLIE
81.54
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
53.56
SCHUERMANN ENTERPRISES, INC
PRESSURE TRANSMITTER
708.51
TERMINIX
PEST CONTROL
51.00
FLEETCOR TECHNOLOGIES
FUELMAN JAN 2010
1,132.02
JPMORGAN CHASE BANK
GREEN COUNTRY - SUPPLIES
120.00
CITY GARAGE
C. GARAGE LABOR & OVERHEA
333.33
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
59.89
Page 1
Claims List
02/16/10
Budget Unit Title
Vendor Name
Payable Description
IPayment Amounl
WASTEWATER TREATMENT..
I CITY GARAGE
PARTS FOR CITY TRKS & CAR
1,585.49
TOTAL WASTEWATER TREATMENT 4,125.34
WASTEWATER COLLECTION:
CITY GARAGE
PARTS FOR CITY TRKS & CAR
1,170.35
JPMORGAN CHASE BANK
AEP- RELOCATING LINES
11,794.50
CITY GARAGE
C. GARAGE LABOR & OVERHEA
666.66
VERDIGRIS VALLEY ELECTRIC COOP
GARRETT CREEK ELECTRIC
129.52
VERDIGRIS VALLEY ELECTRIC COOP
GARRETT CREEK ELECTRIC
241.89
VERDIGRIS VALLEY ELECTRIC COOP
WATER CONTROL ELECTRIC
25.50
VERDIGRIS VALLEY ELECTRIC COOP
COFFEE CREEK ELECTRIC
319.40
JPMORGAN CHASE BANK
ANCHOR STONE -ROCK
419.33
FLEETCOR TECHNOLOGIES
FUELMAN JAN 2010
1,027.78
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
34.37
VERDIGRIS VALLEY ELECTRIC COOP
DOUBLE OAKS ELECTRIC
7.80
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
34.37
TOTAL WASTEWATER COLLECTIONS 15,871.47
REFUSE COLLECTIONS
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
37.43
FLEETCOR TECHNOLOGIES
FUELMAN JAN 2010
4,460.36
CITY GARAGE
C. GARAGE LABOR & OVERHEA
3,333.33
JPMORGAN CHASE BANK
LENOX WRECKER- TOWING
350.00
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
37.43
CITY GARAGE
PARTS FOR CITY TRKS & CAR
1,379.56
TOTAL REFUSE COLLECTIONS 9,598.11
RECYCLE CENTER
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
13.48
JPMORGAN CHASE BANK
NAT'L WASTE -GLASS ROLLOFF
400.00
CITY GARAGE
C. GARAGE LABOR & OVERHEA
166.66
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
13.48
TOTAL RECYCLE CENTER 593.62
FUND GRAND TOTAL 220,724.8
OPWA GRAND TOTAL $224,724.86
Page 2
Department
OPWA Administration
Utility Billing
Water
Wastewater
Wastewater Collection
Refuse
Recycle Center
E 76th St San Interceptor
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 01/30/10
Payroll Expenses Total Expenses
75.00
9,306.56
4,619.20
11,097.35
12,138.27
9,174.32
9,022.50
1,046.40
4,067.58
12,228.96
11,149.60
18,322.97
16,612.94
14,214.63
9,776.47
1,056.68
FUND TOTAL 56,479.60 87,429.83
OWASSO PUBLIC WORKS AUTHORITY - OPERATING FUND
FISCAL YEAR 2009 -2010
Statement of Revenues & Expenses
As of January 31, 2010
OPERATING REVENUES:
Water
Wastewater
Refuse & recycle
Other fees
Interest & other _
TOTAL OPERATING REVENUES
OPERATING EXPENSES
MONTH
294,800
258,008
120,989
28,613
2,466
704,876
YEAR
184,046
PERCENT
TO -DATE
BUDGET
OF BUDGET
1,668,705
2,793,515
2,477,911
4,000,000
61.95%
1,838,067
3,021,600
60.83%
961,943
1,636,720
58.77%
230,263
366,000
62.91%
581,119
19,554,894
2.97%
6,089,303
28,579,214
21.31%
Personal services
184,046
1,335,014
2,310,462
Materials & supplies
211,035
1,668,705
2,793,515
Other services
110,124
645,124
1,786,150
Capital outlay
35,390
732,414
18,097,862
Debt service
111,798
1,550,719
2,351,393
TOTAL OPERATING EXPENSES
652,394
5,931,977
27,339,382
REVENUES OVER EXPENSES
TRANSFERS IN (OUT)
Transfers in
Transfers out _
TOTALTRANSFERS
NET INCOME (LOSS)
WORKING CAPITAL - Beginning Balance
WORKING CAPITAL - Ending Balance
52,483
157,326
114,850
- 114,850
52,483 272,176
1,298,242
1,239,832
299,184
(2,000,000)
(1,700,816)
(460,984)
600,000
1,570,418 139,016
57.78%
59.73%
36.12%
4.05%
21.70%
12.69%
38.39%
►� I u � : _ �I 1 1►I
TO: THE HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: ROGER STEVENS
PUBLIC WORKS DIRECTOR
SUBJECT: SANTA FE LIFT STATION AND FORCE MAIN IMPROVEMENT
PROJECT
DATE: February 12, 2010
BACKGROUND:
In accordance with the 2005 Wastewater Master Plan, the Santa Fe Lift Station and Force Main
Improvement Project will provide adequate pumping capacity and conveyance for current and future
wastewater flows from the Ranch Creek Interceptor.
SCOPE OF WORK:
The improvements will increase the pumping capacity from its current rate of 2.7 mgd (million
gallons per day) to 9 mgd — which is anticipated to meet pumping capacity needs for the next 10 years.
The project includes replacing the existing lift station with a new submersible style pump station with
odor control facilities, replacing the standby power facilities, upgrading existing electrical and
instrumentation equipment, and upgrading the existing 12" force main to a new 24" diameter. The
estimated project cost is $2,000,000 excluding legal and administration fees.
FUNDING SOURCE:
Funding for the construction of these improvements will be obtained from the Oklahoma Water
Resources Board (OWRB) via a loan from the Clean Water State Revolving Fund.
RECOMMENDATIONS:
Staff recommends Trustee approval of the Santa Fe Pump Station and Force Main Improvement
Project.
ATTACHMENTS:
A. Location Map
a
v
4
F
i5
ATTACHMENT A
T �f ,
l 'Ill
y
i
5 _
SANTA FE LIFTSTATION / FORCEMAIN UPGRADE
2/2/10
Legend 0
North
THIS MAP IS FOR INFORMATION PURPOSE ONLY AND IS NOT INTENDED TO
REPRESENT AN ACCURATE AND TRUE SCALE. USE OF THIS MAP IS WITHOUT
WARRANTY OR REPRESENTATION SY CITY OF OVVASSO OF ITS ACCU R.ACY.
CITY OF OWASSO
111 N. Main Street
P.O. Box 180
Owasso, OK 74055
918.376.1500
MEMORANDUM
TO: THE HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: ROGER STEVENS
PUBLIC WORKS DIRECTOR
SUBJECT: AGREEMENT FOR ENGINEERING SERVICES
SANTA FE LIFT STATION AND FORCE MAIN IMPROVEMENTS
DATE: February 12, 2010
BACKGROUND:
The Owasso Public Works Authority commissioned the update of its 1997 Wastewater Master
Plan in 2005. The update provides a 20 -year guide for the prioritization and construction of
upgrades to the City's conveyance and treatment infrastructure. Among the current needs, the
plan recommends the investment of approximately $2 million for the upgrade of the Santa Fe
Lift Station and Force Main. Specifically, the recommended improvements are outlined as
follows:
• Replace existing lift station with a new submersible style pump station with odor control
facilities
• Replace standby power facilities
• Upgrade existing electrical and instrumentation equipment
• Upgrade existing 12" force main to a new 24" diameter
The recommended improvements will increase the pumping capacity to 9 million gallons per
day, which is anticipated to meet pumping capacity needs for the next ten years.
ENGINEERING SERVICES AGREEMENT:
Based on past performance, staff is recommending the engineering firm of Greeley and Hansen
due to their qualifications, proven track record, and familiarity with the project. Engineering
Services to be performed under this agreement include:
• Preparation of a preliminary engineering report (PER) to qualify the proposed project
for OWRB State Revolving Fund financing
• Preparation of preliminary and final design for the Santa Fe Lift Station and Force
Main (including design survey, mapping and geotechnical investigation)
• Preparation of contract documents including drawings, specifications, and permit
applications for the project
• Bid related assistance
Agreement for Engineering Services
Santa Fe Lift Station and
Force Main Improvements
Page 2 of 2
Following several discussions concerning fee schedules and the scope of work, Greely and
Hansen submitted a fee proposal in the amount of $145,874 for engineering services related to
this improvement project.
PROJECT SCHEDULE:
If approved by Trustees, it is anticipated the design work could be completed by September,
2010, enabling the start of construction by April, 2011. The proposed schedule is as follows:
• Notice to Proceed to Greeley & Hansen from OPWA — March, 2010
• Complete Design Process — September, 2010
• OPWA Review — October, 2010
• OWRB /ODEQ Review — December, 2010
• Advertise for Bids — January, 2011
• Receive Bids — February, 2011
• Request for OPWA Approval/Notice to Proceed — April, 2011
FUNDING:
Funding for engineering services is included in the FY 2009 -2010 Wastewater Collection
Operating Budget.
RECOMMENDATION:
Staff recommends Trustee approval of an Agreement for Engineering Services for the Santa Fe
Lift Station and Force Main Improvements with Greeley and Hansen, LLC (Chicago, Illinois) in
the amount of $145,874 and authorization for the Chairman to execute the agreement.
ATTACHMENTS:
A. Site Map
B. Proposed Engineering Services Agreement with Greeley and Hansen
0
0
0
0
0
0
x
4
Z
F
a
8
ATTACHMENT A
It
SANTA FE LIFTSTATION / FORCEMAIN UPGRADE
2/2/10
Legend 0
North
THIS MAP IS FOR INFORMATION PURPOSE ONLY AND IS NOT INTENDED TO
REPRESENT AN ACCURATE AND TRUE SCALE. USE OF THIS MAP IS WITHOUT
WARRANTY OR REPRESENTATION BY CITY OF OWASSO OF ITS ACCURACY_
CITY OF OWASSO
111 N. Main Street
P.O. Box 180
Owasso, OK 74055
918.376.1500
ATTACHMENT B
Agreement for Professional Engineering Services
between
Owasso Public Works Authority
Owasso, Oklahoma
and
Greeley and Hansen LLC
THIS AGREEMENT, made and entered into this February J 2010 between the Owasso
Public Works Authority, Owasso, Oklahoma, a Municipal Corporation, of Oklahoma,
hereinafter referred to as AUTHORITY, Greeley and Hansen LLC, an Illinois Limited
Liability Company with its principal office at 100 South Wacker Drive, Chicago, Illinois,
60606 -4004, hereinafter referred to as ENGINEER,
WITNESSETH:
WHEREAS, AUTHORITY intends to design the Santa Fe Lift Station and Force Main
Replacement, hereinafter referred to as the PROJECT; and,
WHEREAS, AUTHORITY requires certain professional services in connection with the
design services of the PROJECT, hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROTECT. The scope of the PROJECT is described in Attachment A,
SCOPE OF PROTECT, which is attached hereto and incorporated by reference as part
of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. AUTHORITY'S RESPONSIBILITIES. AUTHORITY will be responsible for all matters
described in Attachment C, RESPONSIBILITIES OF THE AUTHORITY, which is
attached hereto and incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. AUTHORITY will pay ENGINEER in accordance with
Attachment D, COMPENSATION, and further described in Attachment E,
FEE /MANHOUR BREAKDOWN, which are attached hereto and incorporated by
reference as part of this AGREEMENT.
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B,
SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F,
SCHEDULE, attached hereto and incorporated by reference as part of this
AGREEMENT.
6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with the
applicable laws and regulations published and in effect at the time of performance of
the SERVICES. The PROJECT shall be completed and engineered in a good and
workmanlike manner and in strict accordance with this AGREEMENT. All
engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by AUTHORITY.
Other than the obligation of the ENGINEER to perform in accordance with the
foregoing standards, no warranty, either express or implied, shall apply to the
SERVICES to be performed by the ENGINEER pursuant to this AGREEMENT or the
suitability of ENGINEER'S deliverables.
7. LIMITATION OF RESPONSIBILITY.
7.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
7.2. The presence of ENGINEER's personnel at a construction site is for the
purpose of providing to the AUTHORITY a greater degree of confidence that
the completed construction work will conform generally to the construction
documents and that the integrity of the design concept as reflected in the
construction documents has been implemented and preserved by the
construction contractor(s).
7.3. In soils, foundation, groundwater, and other subsurface investigations, the
actual characteristics may vary significantly between successive test points
and sample intervals and at locations other than where observations,
exploration, and investigations have been made. Because of the inherent
uncertainties in subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total PROJECT cost
and /or execution. These conditions and cost /execution effects are not the
responsibility of ENGINEER.
7.4. Record drawings will be prepared, in part, on the basis of information
compiled and furnished by others, and may not always represent the exact
location, type of various components, or exact manner in which the PROJECT
was finally constructed. ENGINEER is not responsible for any errors or
omissions in the information from others that are incorporated into the
record drawings.
7.5. ENGINEER's deliverables, five (5) hard copies of record drawings are to be
provided upon the completion of the project. Computer - generated drawing
files furnished by ENGINEER are for AUTHORITY or others' convenience.
Any conclusions or information derived or obtained from these files will be
at user's sole risk.
SCHEDULE.
8.1. Since ENGINEER has no control over the cost of labor, materials, equipment,
or services furnished by others, or over contractors', subcontractors',
vendors' methods of determining prices, or over competitive bidding or
market conditions, ENGINEER'S cost opinion of probably construction cost
shall be made on the basis of qualifications and experice as a Professional
Engineer.
8.2. Since ENGINEER has no control over the resources provided by others to
meet construction contract schedules, ENGINEER'S forecast schedules shall
be made on the basis of qualifications and experience as a Professional
Engineer.
9. LIABILITY AND INDEMNIFICATION.
9.1. ENGINEER shall defend and indemnify AUTHORITY from and against legal
liability for damages arising out of the performance of the SERVICES for
AUTHORITY, including but not limited to any claims, costs, attorney fees, or
other expenses of whatever nature where such liability is caused by the
negligent act, error, or omission of ENGINEER, or any person or organization
for whom ENGINEER is legally liable. Nothing in this paragraph shall make
the ENGINEER liable for any damages caused by the AUTHORITY or any
other contractor or consultant of the AUTHORITY.
9.2. ENGINEER shall not be liable to AUTHORITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
10. CONTRACTOR INDEMNIFICATION AND CLAIMS.
10.1. AUTHORITY agrees to include in all construction contracts the provisions of
Articles 7.1, and 7.2, and provisions providing contractor indemnification of
AUTHORITY and ENGINEER for contractor's negligence.
10.2. AUTHORITY shall require construction contractor(s) to name AUTHORITY,
Greeley and Hansen LLC and Klein and Hoffman, Inc. as additional insureds
on the contractor's general liability insurance policy.
11. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any construction unless such responsibilities
are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
12. INSURANCE
12.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
12.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the aggregate,
and with property damage limits of not less than $100,000 for each
occurrence and not less than $100,000 in the aggregate.
12.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each accident
and with property damage limits of not less than $100,000 for each accident.
12.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not less than
$100,000 for each occurrence.
12.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions coverage
to be for a minimum of $1,000,000, deductibles subject to approval.
12.2. ENGINEER shall furnish AUTHORITY certificates of insurance which shall
include a provision that such insurance shall not be canceled without at least
30 days written notice to the AUTHORITY.
13. OWNERSHIP AND REUSE OF DOCUMENTS.
13.1. All documents, including record drawings, field notes and data shall become
and remain the property of the AUTHORITY.
13.2. AUTHORITY'S reuse of such documents without written verification or
adaptation by ENGINEER for the specific purpose intended shall be at
AUTHORIY'S risk.
14. TERMINATION OF AGREEMENT.
14.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
14.2. AUTHORITY shall have the right to terminate this AGREEMENT, or
suspend performance thereof, for AUTHORITY'S convenience upon written
notice to ENGINEER; and ENGINEER shall terminate or suspend
performance of SERVICES on a schedule acceptable to AUTHORITY. In the
event of termination or suspension for AUTHORITY'S convenience,
AUTHORITY shall pay ENGINEER for all SERVICES performed to the date
of termination in accordance with provisions of Attachment D,
COMPENSATION. Upon restart of a suspended project, ENGINEER's
contract price and schedule shall be equitably adjusted.
15. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: Paul J. Vogel, P.E.
Attn: Joseph M. Gorgan
Greeley and Hansen LLC
100 S. Wacker Drive, Suite 1400
Chicago, Illinois 60606
To AUTHORITY: Owasso Public Works Authority
P.O. Box 180
Owasso, Oklahoma 74055
Attention: Roger Stevens
15.1. Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and AUTHORITY.
16, UNCONTROLLABLE FORCES. Neither AUTHORITY nor ENGINEER shall be
considered to be in default of this AGREEMENT if delays in or failure of
performance shall be due to forces which are beyond the control of the parties;
including, but not limited to: fire, flood, earthquakes, storms, lightning, epidemic,
war, riot, civil disturbance, sabotage; inability to procure permits, licenses, or
authorizations from any state, local, or federal agency or person for any of the
supplies, materials, accesses, or services required to be provided by either
AUTHORITY or ENGINEER under this AGREEMENT; strikes, work slowdowns or
other labor disturbances, and judicial restraint.
17. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
18. INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments
A, B, C, D, E, F and represents the entire and integrated AGREEMENT between the
parties; and supersedes all prior negotiations, representations, or agreements
pertaining to the SCOPE OF SERVICES herein, either written or oral. AUTHORITY
may make or approve changes within the general Scope of Services in this
AGREEMENT. If such changes affect ENGINEER's cost of or time required for
performance of the services, an equitable adjustment will be made through an
amendment to this AGREEMENT. This AGREEMENT may be amended only by
written instrument signed by each of the Parties.
19. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the AUTHORITY over the interpretation or application of the terms
of this AGREEMENT, the matter shall be referred to the AUTHORITY's Director of
Public Works for resolution. If the Director of Public Works is unable to resolve the
dispute, the matter may, in the Director's discretion, be referred to the AUTHORITY
Manager for resolution. Regardless of these procedures, neither party shall be
precluded from exercising any rights, privileges or opportunities permitted by law
to resolve any dispute.
20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
21. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the AUTHORITY, and
any plans or specifications not meeting the terms set forth in this AGREEMENT shall
be replaced or corrected at the sole expense of the ENGINEER. The ENGINEER shall
meet with the AUTHORITY staff initially and periodically thereafter and will be
available for public meetings and/or AUTHORITY presentations.
22. KEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has
designated Ryan M. Christopher as Project Manager for the PROJECT. ENGINEER
agrees that no change will be made in the assignment of this position without prior
approval of AUTHORITY.
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Chair of the AUTHORITY.
Greeley and Hansen LLC
APPROVED:
Paul J. Vogel, .
Executive Vice President
Date —/ 2
-, �rl
foseph M. Gorgan
Date 2/211`
OWASSO PUBLIC WORKS AUTHORITY
Authority Clerk Chair
Date
APPROVED AS TO FORM:
Authority Attorney
Attachment A
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Scope of Project
Greeley and Hansen LLC
February 2, 2010
SCOPE OF PROTECT. The PROJECT consists of the Santa Fe Lift Station and Force Main
Replacement as described. Final engineering design services include providing detailed
design drawings and specification and provide bidding services for the lift station and force
main replacement.
The Santa Fe Lift Station and Force Main Replacement will incorporate information from the
following studies as well as past design projects:
• Wastewater Master Plan, May 2005, prepared by Greeley and Hansen LLC
• Wet Weather Study, April 2007, prepared by Greeley and Hansen LLC
• Wastewater Treatment Plant Expansion and 117th Street Pump Station Upgrade,
September 2009, prepared by Greeley and Hansen LLC
The execution of the services will be broken up into four major tasks:
1. Detailed Design
2. Detailed Specifications
3. Soils Exploration and Geotechnical Report
4. Ground Survey
5. Bid Assistance
A more detailed description of each work task is provided as part of Attachment B.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT A.DOC A -1
Attachment B
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Scope of Services
Greeley and Hansen LLC
February 2, 2010
The services to be performed by the ENGINEER, Greeley and Hansen LLC, under this
AGREEMENT consists of designing the Santa Fe Lift Station and Force Main Replacement,
execution of the work will be broken into five major work tasks, as stated below. Further, it
is understood and agreed that the date of beginning, rate of progress, and the time of
completion of the services to be done hereunder are essential provisions of this
AGREEMENT; and it is further understood and agreed that the services embraced in this
AGREEMENT shall commence upon execution of this AGREEMENT and receipt of Notice
to Proceed.
Scope of Services
Greeley and Hansen LLC will furnish the AUTHORITY the following professional
engineering services for the Santa Fe Lift Station and Force Main Replacement:
1. Detailed Design
1.1 Meetings - Meet once every other month with the wastewater staff to review
technical aspects of the project.
1.2 Project Management - Project management activities include preparing the
monthly invoices and project status reports for City of Owasso review.
1.3 Drawings - Prepare Construction Drawings for the Santa Fe Lift Station and
Force Main Replacement project.
2. Detailed Specifications
2.1 Detailed Specifications - Prepare Construction Specifications for use, together
with the Construction Drawings, in taking competitive bids and entering into
a construction contract with an experienced and competent contractor for the
Santa Fe Lift Station and Force Main Replacement project. Specifications will
include bid information and contract terms as required by the Engineers Joint
Contract Documents Committee documents and will be in CSI format.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT B.DOC B - 1
3. Soils Exploration and Geotechnical Report
3.1 Soils Exploration and Geotechnical Report - Arrange for and provide soil
borings for the force main replacement and lift station design. Prepare a
geotechnical report for the design of the lift station and force main
replacement using information from the subsurface evaluation portion of the
work.
4. Surveying
4.1 Ground Survey-Arrange for, as needed, a survey of the lift station and force
main. The survey shall consist of:
• Establish a temporary benchmark on the site from an established
existing monument.
• Verify elevations of structures as needed.
5. Bid Assitance
5.1 Bidder Inquiries - Respond to bidder inquiries during the bidding process.
5.2 Addenda - Prepare addenda as needed to clarify the Contract Documents.
5.3 Pre -Bid Meetings - Attend pre -bid meeting and prepare meeting notes.
5.4 Bid Report - Tabulate bids and prepare bid report including recommendation
on award of contract.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT B.DOC B-2
Attachment C
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Responsibilities of the AUTHORITY
Greeley and Hansen LLC
February 2, 2010
RESPONSIBILITIES OF THE AUTHORITY. The AUTHORITY agrees:
A. Scheduling. Provide notice to proceed at least 14 days prior to actual project start
date.
B. Reports, Records, etc. To furnish, as required by the work, and at no expense to the
ENGINEER:
Records, reports, studies, plans, drawings, and other data available in the
files of the AUTHORITY that may be useful in the work involved under this
AGREEMENT. ENGINEER may reasonably rely upon the accuracy,
timeliness, and completeness of the information provided by AUTHORITY.
C. Access. To provide access to public and private property when required in
performance of ENGINEER's services.
D. Staff Assistance. Designate in writing a person to act as its representative in respect
to the work to be performed under this AGREEMENT, and such person shall have
complete authority to transmit instructions, receive information, interpret and define
AUTHORITY'S policies and decisions with respect to materials, equipment, elements
and systems pertinent to the services covered by this AGREEMENT.
E. Review. Examine all sketches, cost opinions, specifications, drawings, proposals
and other documents presented by ENGINEER and render in writing decisions
pertaining thereto within a reasonable time so as not to delay the services of
ENGINEER.
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT C.DOC C_1
Attachment D
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Compensation
Greeley and Hansen LLC
February 2, 2010
The AUTHORITY agrees to pay, as compensation for services set forth in Attachment B, a
total lump sum fee of one hundred forty five thousand and eight hundred seventy four
dollars ($145,874.00) for the services described in Attachment B.
ENGINEER shall submit monthly invoices based upon the proportion of the total services
actually completed at the time of billing. Invoices are due and payable within 30- calendar
days of receipt by the AUTHORITY. A breakdown of the not to exceed amount to be billed
for each of the tasks is shown as follows:
Work Tasks
Estimated Fee
1. Detailed Design
$ 97,601
2. Detailed Specifications
$ 24,289
3. Soils Exploration and Geotechnical Report
$ 6,000
4. Ground Survey
$ 9,500
5. Bid Assistance
$6,384
Subtotal:
$143,774
Printing
$ 300
Travel
$1,800
Total:
$145,874
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT D.DOC D -1
ATTACHMENT E
OWASSO PUBLIC WORKS AUTHORITY
SANTE FE LIFT STATION AND FORCE MAIN REPLACEMENT
Estimated Professional Engineering Services Fee
SUMMARY
Greeley and Hansen LLC
February 2010
DESCRIPTION
PROJECT
DIRECTOR
PROJECT
MANAGER
PROJECT
ENGINEER
CADD
TECH
WORD
PROCESS.
TOTAL
DESIGN ENGINEERING
Task l - Detailed Design
Task 2 - Detailed Specifications
Task 3 - Soils Exploration and Geotechnical Report
Task 4 - Ground Survey
Task 5 - Bid Assistance
Subtotall
$
$
$
3,413
3,769
1,944
$
$
$
39,547
12,288
4,080
$
$
$
28,493
8,232
-
$
$
26,147
360
$ -
$ -
$
$
$
$
$
97,601
24,289
6,000
9,500
6,384
$ 9,126
1 $ 55,915
1 $ 36,725
1 $ 26,507
1 $ -
1 $
143,774
OTHER DIRECT COSTS
Printing
Travel
Subtotal
$
$
300
1,800
$
2,100
TOTAL FEE
$
9,126
$
55,915
$
36,725
$
26,507
$ -
$
145,874
2/2/201011:45 AMOwasso Santa Fe LS and Force Main Attachment E.xls
Attachment F
Owasso Public Works Authority
Santa Fe Lift Station and Force Main Replacement
Schedule
Greeley and Hansen LLC
February 2, 2010
SCHEDULE: The design of the Santa Fe Lift Station and Force Main Replacement will be
conducted in a single phase. It is anticipated that the project will require approximately
eleven months to complete. The schedule below illustrates a start date of March 1, 2010 and
an approximate completion date of February 21, 2011. The schedule is as follows:
• Notice to Proceed is provided to ENGINEER from the AUTHORITY -March 1, 2010.
• Complete Design Process - September 1, 2010
• AUTHORITY Review - October 1, 2010
• ODEQ Review - December 1, 2010
• Advertisement for Bids Date - January 3, 2011
• Receive Bids - February 7, 2011
• Submit Bid Review Report - February 21, 2011
OWASSO SANTA FE LS AND FORCE MAIN ATTACHMENT F.DOC F -1
MEMORANDUM
TO: THE HONORABLE CHAIR AND TRUSTEES
OWASSO PUBLIC WORKS AUTHORITY
FROM: ROGER STEVENS
PUBLIC WORKS DIRECTOR
SUBJECT: ODEQ CONSENT ORDER NO. 10 -036
DATE: February 12, 2010
BACKGROUND:
The Owasso Public Works Authority (OPWA) received notification on November 30, 2009 of a
notice of violation issued by the Oklahoma Department of Environmental Quality (ODEQ) as a result
of wastewater bypasses during a time period between February 21, 2007 and January 16, 2010.
After receiving the administrative notice, the City of Owasso requested a hearing with ODEQ
officials. The hearing was held on December 15, 2009 and was attended by Warren Lehr, Assistant
City Manager; Roger Stevens, Public Works Director; Travis Blundell, Utilities Superintendent; and
representatives of Greeley and Hansen, Engineering Consultants. During the meeting, representatives
of each party agreed to waive the filing of a petition and further agreed that it is beneficial to all parties
to resolve the matter promptly and by agreement. Further discussion was held regarding the City's
Wastewater Masterplan and previous action taken by the OPWA to begin implementation of the
recommendations included in the masterplan to improve the City's wastewater collection system and
remedy the requirements of the anticipated consent order. Subsequent to that discussion,
representatives of ODEQ agreed that all necessary remedies were, in fact, included in the City's plan,
and that those plans correctly and appropriately addressed the issues rose in the notice of violation. It
was further noted by ODEQ that initial remedies are now under contract for construction.
CONSENT ORDER:
On January 27, 2010, the OPWA received Consent Order No. 10 -036, which closes and supersedes
the Notice of Violation received November 30, 2009. The consent order establishes a time table for
constructing improvements to the wastewater collection system to eliminate the unpermitted bypasses,
but contains no items which our staff had not already planned as priority projects. Attached for your
review is a detailed outline of each task listed in the consent order, along with the estimated cost of the
improvements and the date in which such improvements are to be completed. It is important to note
that with the exception of the Meadow Crest Relief Line and the Supplemental Environment Project,
all corrective tasks listed within the consent order are projects previously outlined and planned for in
the Owasso Wastewater Masterplan.
REQUESTED ACTION:
This request is for Trustee authorization for the OPWA Manager to execute the consent order as a
method of enforcing the terms and conditions agreed to by both the ODEQ and OPWA. Additional
action items specific to each improvement project will be forthcoming in the next two to three years.
RECOMMENDATION:
Staff recommends Trustee authorization for the OPWA Manager to execute Consent Order No. 10-
036.
ATTACHMENTS:
A. Task Outline
CITY OF OWASSO
PUBLIC WORKS DEPARTMENT
2010 Wastewater Collection Consent Order Tasks
2/12/10
Task Description
Complete CMOM (Capacity, Management, Operation and Maintenance Program) Self Evalution Checklist
+ Submit an enginneering report that decribes options that will eliminate chronics SSO's
Engineering and Construction of the supplemental environmental project
0 • Complete Construction of the improvements at the Relief Pump Station
0 Engineering and Construction of the Santa Fe Pump Station
0 Engineering and Construction of the Ranch Creek Interceptor
Engineering and Construction of the Meadow Crest Relief Line
Total
Cost Estimate Date
In -house Labor 7/1/2010
$20,000 8/1/2010
$500 1/1/2011
$150,000 2/1/2011
$2,300,000 1/1/2013
$2,000,000 1/1/2013
$410,000 1/1/2013
+ Per the Wastewater Master Plan, upgrades to the Santa Fe Pump Station are needed. The staff anticipates placing an action item on
the February 16, 2010 agenda requesting approval of the Engineering Agreement. The required Engineering Report will be provided as
part of Santa Fe Lift Station Engineering Agreement. However, it is worth noting that additional analysis will be required to determine
other options that will eliminate chronic bypasses.
• The 2010 Wastewater Treatment Plant Upgrade approved by City Council December 1, 2009 contains provisions for the upgrade of the
Relief Pump Station. The cost estimate of $150,000 is not an additional expenditure.
0 Improvements recommended per the Wastewater Master Plan.