HomeMy WebLinkAbout2010.07.06_City Council AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO CITY COUNCIL
TYPE OF MEETING: Regular
DATE: July 6, 2010
TIME: 6:30 p.m.
PLACE: Council Chambers, Old Central Building
109 N. Birch
Notice and agenda filed in the office of the City Clerk and posted at City Hall at 6:00 p.m. on
Friday, July 02, 2010.
Sherry Bisho City Clerk
AGENDA
1. Call to Order
Mayor Doug Bonebrake
2. Invocation
Pastor Shane Cheek, Lighthouse Church of Owasso
3. Flag Salute
4. Roll Call
5. Reading of a statement expressing appreciation of the service and sacrifice of Spc.
Andrew Looney, an Owasso resident, and conveying condolences and sympathy to the
Looney family.
Members of the Owasso City Council
6. Presentation of the Character Trait of Meekness.
Dr. Chris Kelley, Owasso Character Council Member
7. Presentation of the Employee of the Quarter for 2010.
Mr. Ray
8. Presentation from the Oklahoma Science and Engineering Foundation regarding the
FIRST Lego League.
Mr. Craig Shree
9. Consideration and appropriate action relating to a request for City Council approval
of the Consent Agenda. All matters listed under "Consent" are considered by the City
Council to be routine and will be enacted by one motion. Any Councilor may,
however, remove an item from the Consent Agenda by request. A motion to adopt
the Consent Agenda is non - debatable.
A. Approval of Minutes of the June 17, 2010 Special Meeting.
Attachment # 9 -A
B. Approval of Claims.
Attachment # 9 -13
C. Acknowledge receipt of an Agreement for Urban Engineering Services from Massey -
Mann & Associates; and, authorization for the Mayor to execute the agreement.
Attachment # 9 -C
10. Consideration and appropriate action relating to items removed from the Consent
Agenda.
11. Consideration and appropriate action relating to a request for City Council
acceptance of the improvements at North 140th East Avenue and authorization for
final payment.
Mr. Feary
Attachment # 11
Staff recommends City Council acceptance of the improvements at North 1401h East
Avenue and authorization for final payment to Becco Contractors in the amount of
$631,616.42, bringing the total contract sum to $1,388,293.20.
12. Consideration and appropriate action relating to a request for City Council approval
to purchase right of way and easement properties for the East 86th Street North from
Main to Memorial Road Improvement Project; authorization for payment; and
authorization for the Mayor to execute all required documentation.
Mr. Stevens
Attachment # 12
Staff recommends City Council approval to purchase right of way and easement properties,
authorization of payment as follows: Richard Lee and Patty DeBoer in the amount of
$41,000; Charles and Shirley Hess in the amount of $48,000; Dale and Marilee DeBoer in
the amount of $41,000; and, authorization for the Mayor to execute all required documents.
13. Consideration and appropriate action relating to a request for City Council approval
of an agreement between the City of Owasso and the Indian Nations Council of
Government (INCOG) for the purpose of providing matching funds for the Tulsa
Regional Transit System Plan and Alternatives Analyses project, in the amount of
$13,705; authorization for the Mayor to execute the document; and approval of a
carryover budget, increasing the appropriation for expenditures in the General Fund
by $13,705.
Mr. Ray
Attachment # 13
Staff recommends City Council approval of an agreement between the City of Owasso and
INCOG; authorization for the Mayor to execute the document; and approval of a carryover
budget.
14. Consideration and appropriate action relating to a request for City Council approval
of Resolution No. 2010 -08, resolving the necessity of instituting and prosecuting
condemnation procedures to obtain right -of -way and permanent and temporary
construction easement for the East 86th Street North from Main to Memorial Road
Improvement Project.
Mr. Ray
Attachment # 14
Staff recommends City Council approval of Resolution No. 2010 -08, resolving the
necessity of instituting and prosecuting condemnation procedures to obtain right -of -way
and permanent and temporary construction easements for a tract of land known as the Mills
Family Revocable Trust Tract, and a tract of land known as the Julia M. Stokes Revocable
Trust Tract, for the East 86th Street North and Mingo Road Intersection Improvement
Project.
15. Consideration and appropriate action relating to a request for City Council approval
of an extension to the City Manager's authorization to raise funds for the historic
filling station reconstruction and CNG project.
Mr. Ray
Attachment # 15
Staff recommends City Council approval of an extension to the City Manager's
authorization to raise funds for the historic filling station reconstruction and CNG project to
the date of October 1, 2010.
16. Report from City Manager.
17. Report from City Attorney.
18. Report from City Councilors.
19. New Business (New Business is any item of business which could not have been
foreseen at the time of posting of the agenda.)
20. Adjournment.
OWASSO CITY COUNCIL
MINUTES OF SPECIAL MEETING
Thursday, June 17, 2010
The Owasso City Council met in special session on Thursday, June 17, 2010 at Old Central per
the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 6:00 p.m. on
Tuesday, June 15, 2010.
ITEM 1. CALL TO ORDER
Mayor Bonebrake called the meeting to order at 6:01 p.m.
ITEM 2. INVOCATION
The invocation was offered by Assistant City Manager Warren Lehr.
ITEM 3. FLAG SALUTE
No flag salute was held.
ITEM 4. ROLL CALL
PRESENT ABSENT
Doug Bonebrake, Mayor Wayne Guevara, Councilor
Jon Sinex, Vice Mayor (arrives at 6:06 p.m.)
Steve Cataudella, Councilor
Bryan Stovall, Councilor
A quorum was declared present.
STAFF
Rodney Ray, City Manager
Julie Lombardi, City Attorney
ITEM 5. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST
FOR COUNCIL APPROVAL OF THE CONSENT AGENDA
A. Approval of Minutes of the June 1, 2010 Regular Meeting and June 8, 2010
Special Meeting.
B. Approval of Claims.
C. Acknowledgement of receiving the monthly FY 2009 -10 budget status report.
D. Authorization to discharge fireworks and approval of a public fireworks display
to be conducted on July 2, 2010 free of charge to the public and sponsored by
the City of Owasso in celebration of Independence Day.
Owasso City Council
June 17, 2010
E. Authorization to discharge fireworks and approval of a public fireworks display
to be conducted on July 1, 2010 free of charge to the public and sponsored by
Stone Canyon in celebration of Independence Day.
F. Approval of a budget amendment increasing estimated revenues in the
Ambulance Service Fund in the amount of $140,000 and increasing the
appropriation for expenditures by $36,000; and increasing estimated revenues in
the Healthcare Self - Insurance Fund in the amount of $235,000 and increasing
the appropriation for expenditures by $300,000
Mr. Stovall moved, seconded by Mr. Cataudella, to approve the Consent Agenda with claims
totaling $384,722.13. Also included for review were the healthcare self- insurance claims report
and payroll payment report for pay period 06/05/10.
YEA: Bonebrake, Stovall, Cataudella
NAY: None
Motion carried 3 -0.
ITEM 6. CONSIDERATION AND APPROPRIATE ACTION RELATING TO ITEMS
REMOVED FROM THE CONSENT AGENDA
No action was required on this item.
ITEM 7. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR CITY COUNCIL APPROVAL OF RESOLUTION NO. 2010 -06,
A RESOLUTION ADOPTING THE FY 2010 -2011 ANNUAL OPERATING
BUDGET
Ms. Bishop presented the item, recommending City Council approval of Resolution No. 2010-
06.
Mr. Cataudella moved, seconded by Mr. Stovall, to approve Resolution No. 2010 -06, as
recommended.
YEA: Bonebrake, Stovall, Cataudella
NAY: None
Motion carried 3 -0.
Mr. Sinex arrives at 6.06 p.m.
ITEM 8. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR CITY COUNCIL APPROVAL OF A CONTRACT TO
PURCHASE RIGHT OF WAY FOR THE E. 86' STREET WIDENING
PROJECT FROM MAIN TO MEMORIAL; AND AUTHORIZATION FOR
PAYMENT IN THE AMOUNT OF $38,000.
44
Owasso City Council June 17, 2010
Mr. Stevens presented the item, recommending City Council approval to purchase right of way
and compensation for damages from Jody Burtin in the amount of $38,000; and authorization for
final payment.
Mr. Cataudella moved, seconded by Mr. Stovall, to approve the purchase of right of way and
compensation for damages from Jody Burtin in the amount of $38,000; and authorize final
payment, as recommended.
YEA: Bonebrake, Stovall, Cataudella, Sinex
NAY: None
Motion carried 4 -0.
ITEM 9. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR CITY COUNCIL APPROVAL OF AN ENGINEERING
SERVICES AGREEMENT FOR THE STORMWATER ATLAS MAPPING
PROJECT; AND AUTHORIZATION FOR THE MAYOR TO EXECUTE THE
AGREEMENT.
Mr. Albert presented the item, recommending City Council approval of the engineering services
agreement with Meshek & Associates, PLC of Tulsa, Oklahoma in the amount of $153,000 for
the Stormwater Atlas Mapping Project; and authorization for the Mayor to execute the
agreement.
Mr. Stovall moved, seconded by Mr. Cataudella, to approve the engineering services agreement
with Meshek & Associates, PLC of Tulsa, Oklahoma in the amount of $153,000 for the
Stormwater Atlas Mapping Project; and authorize the Mayor to execute the agreement, as
recommended.
YEA: Bonebrake, Stovall, Cataudella, Sinex
NAY: None
Motion carried 4 -0.
ITEM 10. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR CITY COUNCIL TO AWARD A BID FOR THE PURCHASE
OF A SALT BRINE PRODUCTION SYSTEM
Mr. Doyle presented the item, recommending City Council award the bid for the purchase of a
salt brine production system, model DU BPS3000 -SS, to Dultmeier Sales of Omaha, Nebraska in
the amount of $30,086.
Mr. Cataudella moved, seconded by Mr. Sinex, to award the bid for the purchase of a salt brine
production system, model DU BPS3000 -SS, to Dultmeier Sales of Omaha, Nebraska in the
amount of $30,086, as recommended.
YEA: Bonebrake, Stovall, Cataudella, Sinex
3
Owasso City Council
NAY: None
Motion carried 4 -0.
June 17, 2010
ITEM 11. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A
REQUEST FOR CITY COUNCIL APPROVAL OF RESOLUTION NO. 2010 -07,
A RESOLUTION RELATING TO THE CITY'S INTENT TO APPLY FOR THE
2010 TULSA COUNTY URBAN COUNTY PROGRAM COMMUNITY
DEVELOPMENT BLOCK GRANT (CDBG)
Mr. Lehr presented the item, recommending City Council approval of Resolution No. 2010 -07.
Mr. Stovall moved, seconded by Mr. Sinex, to approve Resolution No. 2010 -07, as
recommended.
YEA: Bonebrake, Stovall, Cataudella, Sinex
NAY: None
Motion carried 4 -0.
ITEM 12. REPORT FROM CITY MANAGER
No report.
ITEM 13. REPORT FROM CITY ATTORNEY
No report.
ITEM 14. REPORT FROM CITY COUNCILORS
No report.
ITEM 15. NEW BUSINESS
None
11
Owasso City Council
ITEM 16. ADJOURNMENT
Mr. Cataudella moved, seconded by Mr. Stovall, to adjourn the meeting.
YEA: Bonebrake, Stovall, Sinex, Cataudella
NAY: None
Motion carried 4 -0 and the meeting was adjourned at 6:27 p.m.
Juliann Stevens, Deputy City Clerk
June 17, 2010
Doug Bonebrake, Mayor
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
GENERAL
TREASURER PETTY CASH
OC COST REPLACEMENT /GLORI
-50.00
TREASURER PETTY CASH
CC REFUND /RICHARDSON
50.00
FRIENDSHIP BAPTIST CHURCH
REFUND ZONING & DEV FEES
300.00
JPMORGAN CHASE BANK
PAYPAL -EBAY FEES
213.09
TREASURER PETTY CASH
CC REFUND /ANSTINE
50.00
TREASURER PETTY CASH
OC REFUND/TAMAYO
100.00
TREASURER PETTY CASH
OC REFUND /GLORIA
100.00
TREASURER PETTY CASH
OC REFUND RENTAL FEE
50.00
TREASURER PETTY CASH
ADOPTION REFUND /CANTRELL
110.00
TREASURER PETTY CASH
CC REFUND /HAWS
50.00
TREASURER PETTY CASH
CC REFUND /MEEKS
50.00
TREASURER PETTY CASH
CC REFUND /HILL
50.00
TREASURER PETTY CASH
CC REFUND /GONZALEZ
50.00
TREASURER PETTY CASH
CC REFUND /CHURCH
50.00
TOTAL GENERAL 1,173.09
MUNICIPAL COURT ICHARLES N. ROMANS IBAILIFF SERVICES 350.00
TOTAL MUNICIPAL COURT 350.00
MANAGERIAL
SAV -ON PRINTING & SIGNS LLC
B TABS FOR AGENDA PACKETS
68.50
JPMORGAN CHASE BANK
MEETING EXPENSE
42.62
JPMORGAN CHASE BANK
EMPLOYEE RELATIONS
42.03
ATKINSON, HASKINS, NELLIS, BRITTING
PROF SERVICES /HUCKANS
65.00
JPMORGAN CHASE BANK
COMMUNITY RELATIONS
408.27
JPMORGAN CHASE BANK
EMPLOYEE RELATIONS
33.10
JPMORGAN CHASE BANK
COMMUNITY RELATIONS
32.50
JPMORGAN CHASE BANK
ECONOMIC DEVELOPMENT
35.79
JPMORGAN CHASE BANK
COMMUNITY RELATIONS
23.53
JPMORGAN CHASE BANK
MEETING EXPENSE
79.85
TREASURER PETTY CASH
GOOD TO GREAT VIDEO
12.00
JPMORGAN CHASE BANK
ASFPM- CONFERENCE
250.00
JPMORGAN CHASE BANK
MEETING EXPENSE
31.45
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
29.99
TREASURER PETTY CASH
MEETING EXPENSE
10.40
TOTAL MANAGERIAL 1,165.03
HUMAN RESOURCES
JPMORGAN CHASE BANK
ATWOODS -NYLON TIES
27.98
AMERICANCHECKED, INC ATTN: BILLING
PRE EMP BACKGROUND CHECKS
252.25
LEAGUE OF KANSAS MUNICIPALITIES
ADVERTSING
90.00
JPMORGAN CHASE BANK
PAYPAL- SUPPLIES
13.43
ARKANSAS MUNICIPAL LEAGUE
ADVERTSING
81.90
JPMORGAN CHASE BANK
CHARACTER TRAINING
429.05
JPMORGAN CHASE BANK
USPS- OFFICE SUPPLIES
6.47
JPMORGAN CHASE BANK
WALMART - SAFETY PINS
8.68
Page 1
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
HUMAN RESOURCES...
JPMORGAN CHASE BANK
USPS- SHIPPING
34.25
AMERICANCHECKED, INC ATTN: BILLING
PRE EMP BACKGROUND CHECKS
25.00
URGENT CARE OF GREEN COUNTRY, P.L.L
PRE - EMPLOYMENT DRUG SCREE
250.00
URGENT CARE OF GREEN COUNTRY, P.L.L
RANDOM DRUG SCREENS
280.00
TOTAL HUMAN RESOURCES 1,499.01
HR - CHARACTER INITIATIVE A NZ SIGNS & SHIRTS, INC ICHARACTER INITIATIVE 800.00
TOTAL HR - CHARACTER INITIATIVE 800.00
GENERAL GOVERNMENT
NEWTON, O'CONNOR, TURNER & KETCHUM
LEGAL - COX
96.75
AEP /PSO
ELECTRIC USE
3,391.41
CINTAS CORPORATION
CARPET -MAT CLEANING
30.45
XEROX CORPORATION
COPIER SERVICE & SUPPLIES
8.63
IKON OFFICE SOLUTIONS, INC
COPIER SERVICE
321.55
VMH CORPORATION
LEADERSHIP DEVELOPMENT
1,000.00
JPMORGAN CHASE BANK
ROARK -LAWN MAINTENANCE
1,412.00
CINTAS CORPORATION
CARPET -MAT CLEANING
27.18
XEROX CORPORATION
COPIER SERVICE & SUPPLIES
1,163.88
MAILROOM FINANCE INC
POSTAGE
1,000.00
ALABACK DESIGN ASSOCIATES, INC
TOWN HALL AND NEXT GENERA
2,425.00
O M E CORPORATION
INK CARTRIDGE
224.15
MAIL - FINANCE, INC
POSTAGE MACHINE LEASE
389.00
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
42.33
GRAND GATEWAY ECO. DEV. ASSC.
PELIVAN TRANSIT SERVICES
4,939.30
AT &T
CONSOLIDATED PHONE BILL
732.80
TOTAL GENERAL GOVERNMENT 17,204.43
COMMUNITY DEVELOPMENT
SPRINT
SPRINT CARDS
79.98
TULSA COUNTY MIS
LAND USE RECORDS
30.00
JPMORGAN CHASE BANK
MEETING EXPENSE
42.28
TOTAL COMMUNITY DEVELOPMENT 152.26
ENGINEERING
JPMORGAN CHASE BANK
ASCE - WEBINAR
299.00
JPMORGAN CHASE BANK
GRANTWRITING- WORKSHOP
850.00
JPMORGAN CHASE BANK
ATWOODS- SUPPLIES
3.99
JPMORGAN CHASE BANK
ESRI- SUPPORT RENEWAL
800.00
JPMORGAN CHASE BANK
ESRI- SUPPORT RENEWAL
1,200.00
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
13.20
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
13.20
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
13.20
JPMORGAN CHASE BANK
DEQ- LICENSE RENEWAL
92.00
JPMORGAN CHASE BANK
HALFMOON- TRAINING SEMINAR
717.00
JPMORGAN CHASE BANK
RIDGWAYS -INK CARTRIDGES
722.05
SPRINT
SPRINT CARDS
79.98
Page 2
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
ENGINEERING...
JPMORGAN CHASE BANK
RIDGWAYS -INK CARTRIDGES
50.00
JPMORGAN CHASE BANK
OFFICE DEPOT - OFFICE CHAIR
129.99
JPMORGAN CHASE BANK
JAMAR TECH - SUPPLIES
377.04
TOTAL ENGINEERING 5,360.65
INFORMATION TECHNOLOGY
JPMORGAN CHASE BANK
FEDEX- SHIPPING
96.29
TERRA TELECOM LLC
UB HUNT GROUP ROUTING
98.00
SUNGARD PUBLIC SECTOR INC.
MODIFICATIONS TO SUNGARD
3,375.00
SPRINT
SPRINT CARDS
79.98
JPMORGAN CHASE BANK
SURVEYMONKEY - SURVEYTOOL
300.00
JPMORGAN CHASE BANK
DELL -TAPE BACKUP SYSTEM
4,477.47
JPMORGAN CHASE BANK
BARRACUDA - ANNUAL MAINT
300.00
JPMORGAN CHASE BANK
NEWEGG -RAM
213.41
JPMORGAN CHASE BANK
COX - INTERNET
1,550.00
USA MOBILITY WIRELESS, INC
PAGER USE
8.70
JPMORGAN CHASE BANK
ISSUU- SUBSCRIPTION
228.00
JPMORGAN CHASE BANK
WEBSCRIBBLE - MAINT UPDATE
125.00
JPMORGAN CHASE BANK
HOSTICA- DOMAIN RENEWAL
8.95
JPMORGAN CHASE BANK
HOSTICA- DOMAIN RENEWAL
8.95
TOTAL INFORMATION TECHNOLOGY 10,869.75
SUPPORT SERVICES
JPMORGAN CHASE BANK
HAMBRICK- EXPANSION TANK
865.06
JPMORGAN CHASE BANK
LOWES -PARTS
3.38
JPMORGAN CHASE BANK
LOCKE SUPPLY - SUPPLIES
11.56
JPMORGAN CHASE BANK
OEMA- MEMBERSHIP DUES
70.00
JPMORGAN CHASE BANK
LOWES- SUPPLIES
141.92
JPMORGAN CHASE BANK
LOWES- CREDIT
-0.33
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
19.25
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
1.63
JPMORGAN CHASE BANK
LOWES- SUPPLIES
4.38
JPMORGAN CHASE BANK
LOWES -PARTS
4.17
A PLUS SERVICE INC
A/C REPAIRS AT CITY HALL
569.00
A PLUS SERVICE INC
LIEBERT UNIT REPAIR
200.00
JPMORGAN CHASE BANK
STANDARD SUPPLY -OIL
18.95
JPMORGAN CHASE BANK
LOWES -PARTS
5.06
JPMORGAN CHASE BANK
LOWES -PARTS
7.96
JPMORGAN CHASE BANK
LOWES -LOCK
13.96
AT &T
CONSOLIDATED PHONE BILL
57.69
SPRINT
SPRINT CARDS
119.97
JPMORGAN CHASE BANK
LIGHTING -BULBS
50.55
JPMORGAN CHASE BANK
WALMART- SUPPLIES
20.85
JPMORGAN CHASE BANK
OREILLYS- BATTERY
30.62
PRO -FENCE
PARTS FOR AUTOMATIC GATE
376.00
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
19.25
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
19.25
Page 3
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
SUPPORT SERVICES...
JPMORGAN CHASE BANK
SHOE CARNIVAL -BOOTS
109.98
JPMORGAN CHASE BANK
MAIL THIS -BOXES
30.33
JPMORGAN CHASE BANK
BRAUMS -DOC LUNCHES
52.08
JPMORGAN CHASE BANK
JOHNSTON E-REFRIGERANT
192.86
JPMORGAN CHASE BANK
STANDARD LAWN- SUPPLIES
14.49
JPMORGAN CHASE BANK
STANDARD LAWN- SUPPLIES
13.50
JPMORGAN CHASE BANK
ROBERTSON -SINK PARTS
99.00
JPMORGAN CHASE BANK
LOWES -BULBS
41.41
JPMORGAN CHASE BANK
WALMART- SUPPLIES
14.52
JPMORGAN CHASE BANK
LOWES -PARTS
4.31
TOTAL SUPPORT SERVICES 3,202.61
CEMETERY
JPMORGAN CHASE BANK
BENCHMARK - COMPOUND
35.00
IAEP/PSO
ELECTRIC USE
35.79
TOTAL CEMETERY 70.79
POLICE SERVICES
AEP /PSO
ELECTRIC USE
2,255.61
TREASURER PETTY CASH
PER DIEM & PARKING
49.07
JPMORGAN CHASE BANK
CENTRAL TECH - RETURN
- 247.17
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
42.34
JPMORGAN CHASE BANK
OWASSO FITNESS - FITNESS
210.00
JPMORGAN CHASE BANK
CARTRIDGE WORLD -TONER
139.98
JPMORGAN CHASE BANK
US ACADEMY -RANGE USE
3,532.50
JPMORGAN CHASE BANK
DRY CLEANING - UNIFORMS
1,382.25
JPMORGAN CHASE BANK
PATROL TECH - UNIFORMS
81.00
JPMORGAN CHASE BANK
PATROL TECH - MAGAZINE CASE
22.41
JPMORGAN CHASE BANK
DECATUR -RADAR REPAIR
160.00
SPRINT
SPRINT CARDS
479.88
TREASURER PETTY CASH
WRITE- OFF /JOBE
-22.00
AT &T
CONSOLIDATED PHONE BILL
510.18
JPMORGAN CHASE BANK
FLEET DISTR- BREAKER
58.70
JPMORGAN CHASE BANK
FLEET DISTR- EQUIPMENT
567.01
JPMORGAN CHASE BANK
VCA OWASSO -SHOTS
302.00
JPMORGAN CHASE BANK
VCA OWASSO -FOOD FOR BENY
65.79
JPMORGAN CHASE BANK
VCA OWASSO -FOOD FOR BENY
75.59
JPMORGAN CHASE BANK
VCA OWASSO -FOOD FOR BENY
75.59
JPMORGAN CHASE BANK
VCA OWASSO -FOOD FOR BENY
75.59
JPMORGAN CHASE BANK
PATROL TECH - FLASHLIGHT
14.00
JPMORGAN CHASE BANK
WALMART- EVIDENCE SUPPLIES
24.98
JPMORGAN CHASE BANK
OACP- CONFERENCE
225.00
JPMORGAN CHASE BANK
DELL -PAPER
195.00
USA MOBILITY WIRELESS, INC
PAGER USE
78.30
TOTAL POLICE SERVICES 10,353.60
Page 4
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
IPayment Amouni
POLICE - JUSTICE ASST GRA
ITREASURER PETTY CASH
ITAG
30.00
TOTAL POLICE - JUSTICE ASST GRA 30.00
POLICE COMMUNICATIONS
USA MOBILITY WIRELESS, INC
PAGER USE
34.80
JPMORGAN CHASE BANK
BEST BUY -DVR LCD SCREEN
589.96
WORKS & LENTZ OF TULSA, INC.
CARL ADAMS MEDICAL BILL
2,260.60
JPMORGAN CHASE BANK
WALMART- PRISONER MEALS
135.92
JPMORGAN CHASE BANK
BDU- UNIFORM
79.96
JPMORGAN CHASE BANK
PUBLIC SAFETY -VIDEO
372.23
JPMORGAN CHASE BANK
WALMART- PRISONER MEALS
168.19
JPMORGAN CHASE BANK
LODGING EXPENSE
252.00
JPMORGAN CHASE BANK
PAYPAL - UNIFORM
72.00
TREASURER PETTY CASH
CERTIFICATIONM/ILEMAN
50.00
AEP /PSO
ELECTRIC USE
159.55
TOTAL POLICE COMMUNICATIONS 4,175.21
ANIMAL CONTROL
AEP /PSO
ELECTRIC USE
265.83
JPMORGAN CHASE BANK
LOWES- SUPPLIES
29.02
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
2.13
JPMORGAN CHASE BANK
PETSMART- SUPPLIES
42.28
JPMORGAN CHASE BANK
LOWES- SUPPLIES
20.93
JPMORGAN CHASE BANK
OK POLICE SUPPLY - EARPHONE
13.90
HILL'S PET NUTRITION SALES, INC
SHELTER SUPPLIES
28.00
HILL'S PET NUTRITION SALES, INC
SHELTER SUPPLIES
28.00
JPMORGAN CHASE BANK
DRY CLEANING - UNIFORMS
69.60
JPMORGAN CHASE BANK
VET MED- LICENSE RENEWAL
42.75
JPMORGAN CHASE BANK
VET MED- LICENSE RENEWAL
42.75
AT &T
CONSOLIDATED PHONE BILL
44.67
JPMORGAN CHASE BANK
WALMART- SUPPLIES
120.21
JPMORGAN CHASE BANK
FULLERTON- OXYGEN /CO2
96.02
JPMORGAN CHASE BANK
OREILLYS - BATTERY
67.53
TOTAL ANIMAL CONTROL 913.62
FIRE SERVICES
JPMORGAN CHASE BANK
TRAVEL EXPENSE
54.13
SPRINT
SPRINT CARDS
319.92
AT &T
CONSOLIDATED PHONE BILL
226.32
TREASURER PETTY CASH
WRITE- OFF/TAYLOR
-12.03
JPMORGAN CHASE BANK
TRAVEL EXPENSE
21.68
JOHN D. HORTON
REPAIR THROTTLE ON LADDER
400.00
ATC FREIGHTLINER GROUP
REPAIRS ON AIR BAGS
3,107.03
JPMORGAN CHASE BANK
ADVANCE AUTO - ABSORBENT
11.70
BMI SYSTEMS
RENTAL OF COPIER /MAINTENA
274.15
BMI SYSTEMS
RENTAL OF COPIER/MAINTENA
295.86
JPMORGAN CHASE BANK
OK STATE FF -CONF FEES
250.00
Page 5
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
FIRE SERVICES...
JPMORGAN CHASE BANK
LODGING EXPENSE
209.54
JPMORGAN CHASE BANK
LODGING EXPENSE
209.54
JPMORGAN CHASE BANK
TRAVEL EXPENSE
39.68
JPMORGAN CHASE BANK
ADVANCE AUTO -PARTS
6.99
JPMORGAN CHASE BANK
HOME DEPOT - INSECT SPRAY
35.88
USA MOBILITY WIRELESS, INC
PAGER USE
122.70
OWASSO FITNESS ZONE, INC
USE OF GYM AND EQUIPMENT
405.00
JPMORGAN CHASE BANK
BUMPER TO BUMPER -PARTS
1.60
JPMORGAN CHASE BANK
CASCO- UNIFORM APPAREL
241.00
JPMORGAN CHASE BANK
LOCKE SUPPLY -PARTS
20.28
JPMORGAN CHASE BANK
TRAVEL EXPENSE SALTS
20.83
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
15.41
AT &T MOBILITY
WIRELESS SERVICE
22.12
JPMORGAN CHASE BANK
A -Z RUBBER STAMP - NAMETAGS
22.50
JPMORGAN CHASE BANK
EQUIPMENT ONE -PARTS
15.00
JPMORGAN CHASE BANK
LODGING EXPENSE
108.67
JPMORGAN CHASE BANK
AMSAN -PAPER TOWELS
115.44
JPMORGAN CHASE BANK
P & K EQUIPMENT - WEEDEATER
175.10
JPMORGAN CHASE BANK
LOWES -HOOKS
54.24
AEP /PSO
ELECTRIC USE
2,520.30
TOTAL FIRE SERVICES 9,310.58
EMERGENCY PREPAREDNES
AEP /PSO
ELECTRIC USE
104.81
JPMORGAN CHASE BANK
VVEC -STORM SIRENS
61.20
AT &T
CONSOLIDATED PHONE BILL
23.62
SPRINT
SPRINT CARDS
39.99
TOTAL EMERGENCY PREPAREDNESS 229.62
STREETS
JPMORGAN CHASE BANK
OREILLY- JACK/JACK STAND
239.98
JPMORGAN CHASE BANK
LOWES -PAINT
123.75
JPMORGAN CHASE BANK
STUART IRBY CO -FUSES
136.20
JPMORGAN CHASE BANK
EQUIPMENT ONE - PROPANE
122.76
JPMORGAN CHASE BANK
WELSCO -TORCH TIP
13.03
JPMORGAN CHASE BANK
JOHNSTONE SUPPLY -PARTS
33.25
JPMORGAN CHASE BANK
JOHNSTONE SUPPLY -PARTS
25.12
SPRINT
SPRINT CARDS
119.97
JPMORGAN CHASE BANK
OREILLYS -AIR NOZZLE
4.12
JPMORGAN CHASE BANK
VANCE BROS- RAKE /SHOVEL
139.75
JPMORGAN CHASE BANK
OWASSO LUMBER - ROLLERS
9.56
JPMORGAN CHASE BANK
AMERICAN PW- TRAINING
911.95
JPMORGAN CHASE BANK
AASHTO- TRAINING MATERIALS
282.00
JPMORGAN CHASE BANK
STEVES WHOLESALE -TOOLS
136.66
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
34.74
SHERWOOD CONSTRUCTION CO, INC
CONCRETE FOR POLE BARN
445.50
PINKLEY SALES
VIDEO DETECTION SYSTEM
13,287.60
Page 6
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
STREETS...
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
33.04
JPMORGAN CHASE BANK
LOWES -WATER CAN
23.98
JPMORGAN CHASE BANK
TURNKEY -CF -52 POWER CORDS
155.00
JPMORGAN CHASE BANK
FENSCO- SUPPLIES
367.96
SHERWOOD CONSTRUCTION CO, INC
HANDICAP RAMPS CONCRETE
675.50
SIGNALTEK INC
WIRE REPLACEMENT
12,031.60
USA MOBILITY WIRELESS, INC
PAGER USE
71.68
JPMORGAN CHASE BANK
ROADSAFE- TRAFFIC DIVIDERS
3,093.00
JPMORGAN CHASE BANK
TAPCO -SIGNS FOR RAILROAD
14,075.00
TOM'S ELECTRIC
INSTALL ELECTRIC
5,100.00
JPMORGAN CHASE BANK
AMERICAN CONCRETE - MATERIA
332.01
JPMORGAN CHASE BANK
NAPA PUB - TRAINING MATERIA
40.61
JPMORGAN CHASE BANK
MICHAEL TODD -SNOW BLADES
2,847.15
JPMORGAN CHASE BANK
ROADSAFE -PAINT
766.00
JPMORGAN CHASE BANK
OWASSO LUMBER -BOARD
7.06
JPMORGAN CHASE BANK
OWASSO LUMBER - SUPPLIES
63.23
JPMORGAN CHASE BANK
OWASSO LUMBER -BOARD
5.45
TULSA ASPHALT, LLC
POTHOLE REPAIRS
102.04
TULSA ASPHALT, LLC
POTHOLE REPAIRS
70.17
SIGNALTEK INC
MAY MAINTENANCE
1,712.92
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
51.24
AEP /PSO
ELECTRIC USE
1,253.62
JPMORGAN CHASE BANK
LOWES -PVC PIPE CUTTER
5.64
JPMORGAN CHASE BANK
MAXWELL SUPPLY -PAINT
39.58
JPMORGAN CHASE BANK
FULLERTON- OXYGEN BOTTLE
25.50
JPMORGAN CHASE BANK
ARMOR PERSONAL - CLOTHING
50.37
JPMORGAN CHASE BANK
WHITE STAR -TOOLS
98.21
JPMORGAN CHASE BANK
WHITE STAR - LOADER RENTAL
876.00
JPMORGAN CHASE BANK
HARBOR FREIGHT -TOOLS
74.97
JPMORGAN CHASE BANK
VANCE BROS -TACK OIL
126.00
SIGNALTEK INC
VIDEO DETECTION INSTALL
2,660.00
TULSA COUNTY BOCC
RAILROAD CROSSING SIGNAGE
404.40
MILL CREEK LUMBER & SUPPLY
LUMBER
5.66
SIGNALTEK INC
LOOP TEST TRAINING
187.50
HARD HAT SAFETY AND GLOVE LLC
GATORADE
18.80
TOTAL STREETS 63,516.83
STORMWATER
HARD HAT SAFETY AND GLOVE LLC
GATORADE
18.76
JPMORGAN CHASE BANK
P & K EQUIPMENT -PARTS
11.44
JPMORGAN CHASE BANK
ATWOODS- SUPPLIES
29.97
JPMORGAN CHASE BANK
ATWOODS -SPRAY GUN
14.99
JPMORGAN CHASE BANK
ARMOR PERSONAL - CLOTHING
50.38
JPMORGAN CHASE BANK
AMERICAN - BAGGAGE FEE
25.00
JPMORGAN CHASE BANK
P &K EQUIP -SHAFT
175.10
JPMORGAN CHASE BANK
AMAZON- TRAINING MATERIALS
70.46
Page 7
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
STORMWATER...
ANCHOR STONE COMPANY
ROCK
1,441.44
JPMORGAN CHASE BANK
HOME DEPOT - MATERIALS
535.42
ANCHOR STONE COMPANY
LIMESTONE /CRUSHER RUN
1,389.16
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
41.56
LOT MAINTENANCE OF OKLAHOMA, INC.
MOWING
3,887.00
JPMORGAN CHASE BANK
SAMS CLUB - TABLES
1,506.45
JPMORGAN CHASE BANK
SAMS CLUB - TABLES
100.43
JPMORGAN CHASE BANK
AMERICAN - BAGGAGE FEE
25.00
JPMORGAN CHASE BANK
QUALITY TIRE -TIRE
77.95
JPMORGAN CHASE BANK
BENMEDS -INSP SUPPLIES
72.14
JPMORGAN CHASE BANK
BENMEDS- TESTING SUPPLIES
502.20
USA MOBILITY WIRELESS, INC
PAGER USE
110.91
TOM'S ELECTRIC
(RFP) LIGHTING & ELECTRIC
2,230.00
JPMORGAN CHASE BANK
BEST BUY- DVD/VCR PLAYER
309.99
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
41.56
CHANDLER MATERIALS CO, INC.
EMERGENCY REPAIRS @ SS
2,015.25
UNIFIRST HOLDINGS LP
UNIFORM SERVICE
41.56
JPMORGAN CHASE BANK
ROADRUNNER - SHUTTLE
27.00
JPMORGAN CHASE BANK
ATW OWASSO -JACK
29.99
TREASURER PETTY CASH
PER DIEM /DOYLE
390.50
JPMORGAN CHASE BANK
DRUG WAREHOUSE- OINTMENT
4.99
JPMORGAN CHASE BANK
LOWES- REPAIR PARTS
77.13
JPMORGAN CHASE BANK
FINE - PARKING FEE
58.60
JPMORGAN CHASE BANK
TULSA NEW HOLLAND -PARTS
94.43
JPMORGAN CHASE BANK
AMERICAN PW- TRAINING
296.95
JPMORGAN CHASE BANK
GRAINGER- PROTECT CLOTHING
71.64
SPRINT
SPRINT CARDS
119.97
JPMORGAN CHASE BANK
LODGING EXPENSE
501.68
JPMORGAN CHASE BANK
AMAZON- TRAINING MATERIALS
55.05
JPMORGAN CHASE BANK
ARMOR PERSONAL - CLOTHING
37.24
TOTAL STORMWATER 16,489.29
PARKS
SPRINT
SPRINT CARDS
39.99
JPMORGAN CHASE BANK
LOWES- SUPPLIES
149.00
JPMORGAN CHASE BANK
TUCKER JANIT'L- SUPPLIES
330.90
JPMORGAN CHASE BANK
LOWES- SUPPLIES
4.32
JPMORGAN CHASE BANK
LOWES- SUPPLIES
7.02
JPMORGAN CHASE BANK
ATWOODS - BATTERIES
6.49
JPMORGAN CHASE BANK
ATWOODS -GAS CAN
7.99
WASHINGTON CO RURAL WATER DISTRICT
MCCARTY PARK WATER
43.40
JPMORGAN CHASE BANK
ADT- SECURITY SERVICES
53.71
UNIFIRST HOLDINGS LP
UNIFORM RENTAL /CLEANING
14.65
UNIFIRST HOLDINGS LP
UNIFORM RENTAL/CLEANING
14.65
ROGERS COUNTY RURAL WATER DISTRICT
CENTENNIAL WATER SERVICE
141.10
SKYADD, LLC
RESTROOM RENTAL
482.86
Page 8
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
PARKS...
ELAINE WILLSON
PARK RESTROOM CLEANINGS
1,237.50
MARSHALL GROSS
VETERANS PARK MOWING
54.98
AEP IPSO
ELECTRIC USE
1,139.33
AT &T
CONSOLIDATED PHONE BILL
181.49
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
4.11
UNIFIRST HOLDINGS LP
UNIFORM RENTAL /CLEANING
14.65
MARSHALL GROSS
VETERANS PARK MOWING
54.98
KERRY W. METCALF
SKATE PARK MOWING
180.00
TOTAL PARKS 4,163.12
COMMUNITY CENTER
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
1.55
JPMORGAN CHASE BANK
KNOX COMPANY -KNOX BOX
238.00
TREASURER PETTY CASH
BATTERIES
11.39
AEP /PSO
ELECTRIC USE
1,242.94
JPMORGAN CHASE BANK
CHARACTER TRAINING
35.00
AT &T
CONSOLIDATED PHONE BILL
128.28
TOTAL COMMUNITY CENTER 1,657.16
HISTORICAL MUSEUM
AEP IPSO
ELECTRIC USE
156.50
CARR CONSTRUCTION, INC
TREE TRIMMING
500.00
AT &T
CONSOLIDATED PHONE BILL
73.60
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
1.56
TOTAL HISTORICAL MUSEUM 731.66
ECONOMIC DEV
OKLAHOMA STATE UNIVERSITY
2010 ECONOMIC FORECAST
2,000.00
JPMORGAN CHASE BANK
IEDC- MEMBERSHIP DUES
345.00
JPMORGAN CHASE BANK
MEETING EXPENSE
8.68
JPMORGAN CHASE BANK
WEBSCRIBBLE- HOSTING
19.99
SPRINT
SPRINT CARDS
73.30
JPMORGAN CHASE BANK
JOURNAL RECORD - SUBSCRIP
184.00
TOTAL ECONOMIC DEV 2,630.97
FUND GRAND TOTAL 156,049.2
AMBULANCE SERVICE
TREASURER PETTY CASH
WRITE- OFF /KING
-1.90
AMERICAN MUNICIPAL SERVICES CORP.
COLLECTION SERVICES
45.96
UNITED HEALTHCARE
AMBULANCE REFUND
499.80
TOTAL AMBULANCE SERVICE 543.86
AMBULANCE
JPMORGAN CHASE BANK
LOWES -PARTS
9.94
JPMORGAN CHASE BANK
PSI - SUPPLIES
218.25
JPMORGAN CHASE BANK
LOCKE SUPPLY -PLUG
17.69
JPMORGAN CHASE BANK
BLACK & DECKER - SUPPLIES
267.76
Page 9
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
AMBULANCE...
AT &T MOBILITY
WIRELESS SERVICE
81.34
JPMORGAN CHASE BANK
TULSA FREIGHTLINER -PARTS
315.02
OK STATE DEPT OF HEALTH EMERGENCY
EMT LICENSE FEE /POTTER
210.00
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
1,418.70
JPMORGAN CHASE BANK
BUMPER TO BUMPER -PARTS
9.60
JPMORGAN CHASE BANK
ALLMED- SUPPLIES
490.88
JPMORGAN CHASE BANK
ALLMED- SUPPLIES
96.59
JPMORGAN CHASE BANK
ALLMED- SUPPLIES
31.60
JPMORGAN CHASE BANK
ALLMED- SUPPLIES
179.13
SPRINT
SPRINT CARDS
199.95
JPMORGAN CHASE BANK
PHARMACEUTICAL - SUPPLIES
62.59
JPMORGAN CHASE BANK
ZOLL MEDICAL - SUPPLIES
363.75
JPMORGAN CHASE BANK
ALLMED- SUPPLIES
906.79
JPMORGAN CHASE BANK
ALLMED- SUPPLIES
90.54
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
1,789.74
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
477.78
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
34.20
JPMORGAN CHASE BANK
BOUND TREE - SUPPLIES
156.00
MEDICLAIMS INC
BILLING SERVICES
6,102.20
TOTAL AMBULANCE 13,530.04
FUND GRAND TOTAL 14,073.9
E911 COMMUNICATIONS
AT &T
E911 MAPPING FEES - MAY /JUN
710.70
INCOG -E911
E911 ADMIN SVC FEES - JUN
7,591.70
AT &T
CONSOLIDATED PHONE BILL
276.31
TOTAL E911 COMMUNICATIONS 8,578.71
FUND GRAND TOTAL 8,578.7
HOTEL TAX - ECON DEV IMARGIE E RUSSELL MMMFIREWORKS FY11 15,000.00
TOTAL HOTEL TAX - ECON DEV 15,000.00
STRONG NEIGHBORHOODS
SPRINT
SPRINT CARDS
39.99
OWASSO COMMUNITY FOUNDATION INC
NEIGHBORHOOD GRANT FUNDS
2,500.00
TOTAL STRONG NEIGHBORHOODS 2,539.99
FUND GRAND TOTAL 17,539.9
STRM MGMT - GARNETT DET
CHEROKEE BUILDERS
CONSTRUCTION SERVICES
32,238.00
TERRACON CONSULTANTS INC
SOIL TESTING - E 96 ST N
5,424.26
Page 10
Claims List
07/06/2010
Budget Unit Title
I Vendor Name
Payable Description
Payment Amouni
TOTAL STRM MGMT - GARNETT DETN 37,662.26
FUND GRAND TOTAL 37,662.2
AMBULANCE CAPITAL FD
JPMORGAN CHASE BANK
ZOLL - COMPUTER SOFTWARE
2,986.21
JPMORGAN CHASE BANK
DELL -TAPE BACKUP SYSTEM
3,000.00
ZOLL DATA SYSTEMS, INC
TRAINING ON NEW AMBULANCE
2,122.06
TOTAL AMBULANCE CAPITAL FD 8,108.27
FUND GRAND TOTAL 8,108.2
TnT
PARK DEV - MCCARTY RESTF BUILDERS UNLIMITED IMCCARTY PARK RESTROOM 29,680.21
TOTAL PARK DEV - MCCARTY RESTRO 29,680.21
FUND GRAND TOTAL 29,680.2
CI - QUAL OF LIFE INITIAT
RYAN HARRIS LLC WIKIPLANNING WEB PAGE 2,375.00
ALABACK DESIGN ASSOCIATES, INC QUALITY OF LIFE INITIATIV 14,007.00
TOTAL CI - QUAL OF LIFE INITIAT 16,382.00
CI - 86 STIR MAIN - -MEM SEVEN C'S ENTERPRISES, INC I RIGHT OF WAY ACQUISITION 7,200.00
TOTAL CI - 86 STIR MAIN - -MEM 7,200.00
CI - 106 /GARNETT INTERSEIF
SA- DEWBERRY INC
ENGINEERING SERVICES
4,780.00
SA- DEWBERRY INC
DESIGN SERVICES
2,524.50
TOTAL CI - 106 /GARNETT INTERSEC 7,304.50
CI - SPORTSPARK FY09 JJPMORGAN CHASE BANK IWATER PROD - MATERIALS 422.52
TOTAL CI - SPORTSPARK FY09 422.52
FUND GRAND TOTAL 31,309.0
CITY GARAGE
JPMORGAN CHASE BANK
OWASSO LUMBER -REBAR
30.92
AT &T LONG DISTANCE
LONG DISTANCE SERVICE
3.85
T & W TIRE, LP
TIRES
1,046.00
JPMORGAN CHASE BANK
B &M OIL -PARTS RESALE
871.75
JPMORGAN CHASE BANK
CLASSIC CHEV -PARTS RESALE
5.78
AT &T
CONSOLIDATED PHONE BILL
44.68
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
33.27
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
33.27
UNIFIRST HOLDINGS LP
UNIFORM RENTAL FEES
33.27
Page 11
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
CITY GARAGE...
JPMORGAN CHASE BANK
FULLERTON- SUPPLIES
25.50
JPMORGAN CHASE BANK
ENLOW TRACTOR -TIE RODS
239.04
JPMORGAN CHASE BANK
CLASSIC CHEVY -PARTS
276.21
JPMORGAN CHASE BANK
LAND ROVER OF TULSA -PARTS
108.64
JPMORGAN CHASE BANK
CLASSIC CHEVY -PART
17.37
JPMORGAN CHASE BANK
CLASSIC CHEVY -PARTS
54.59
JPMORGAN CHASE BANK
OREILLYS- SUPPLIES
151.02
JPMORGAN CHASE BANK
OREILLYS -PARTS
1,452.28
JPMORGAN CHASE BANK
WELSCO -WIRE
59.40
AEP /PSO
ELECTRIC USE
364.97
JPMORGAN CHASE BANK
UNITED FORD -PARTS
131.49
AT &T MOBILITY
WIRELESS SERVICE
59.68
JPMORGAN CHASE BANK
UNITED FORD -PARTS
390.59
JPMORGAN CHASE BANK
CLASSIC CHEVY -PARTS
269.32
JPMORGAN CHASE BANK
CLASSIC CHEVY -FUEL LEVEL
126.52
JPMORGAN CHASE BANK
FRONTIER -AC FILTERS
120.08
JPMORGAN CHASE BANK
LENOX WRECKER- TOWING
232.00
JPMORGAN CHASE BANK
UNITED FORD -PARTS RESALE
106.33
TOTAL CITY GARAGE 6,287.82
FUND GRAND TOTAL 6,287.8
WORKERS' COMP SELF -INS
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
264.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
264.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
264.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
289.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
289.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
289.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
578.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
578.00
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP
578.00
TOTAL WORKERS' COMP SELF -INS 3,393.00
WORKERS' COMP SELF -INS
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP.
2,293.50
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP.
1,034.46
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP.
819.43
CITY OF OWASSO IMPREST ACCOUNT
WC- CLAIMS RELATED EXP.
1,479.12
TOTAL WORKERS' COMP SELF -INS 5,626.51
FUND GRAND TOTAL 9,019.5
GEN LIAB -PROP SELF INS
TREASURER PETTY CASH
PARKING
20.00
TRAVIS SMITH
TORT CLAIM
265.87
Page 12
Claims List
07/06/2010
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
GEN LIAB -PROP SELF INS...
STREET LAMPS OF AMERICA LLC
RANDALL ALAN RUDD
NEWTON, O'CONNOR, TURNERS, KETCHUM
TORT CLAIM
TORT CLAIM
LEGAL - BUCKLEY
225.00
1,848.29
10,646.07
TOTAL GEN LIAB -PROP SELF INS
13,005.23
FUND GRAND TOTAL
13,005.2
CITY GRAND TOTAL
$331,314.20
Page 13
CITY OF OWASSO
GENERALFUND
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING 06/19/10
Department
Payroll Expenses
Total Expenses
Municipal Court
4,586.31
6,661.11
Managerial
19,302.15
28,152.72
Finance
12,959.52
20,495.25
Human Resources
6,784.61
10,714.25
Community Development
10,426.40
15,360.58
Engineering
12,209.45
19,411.49
Information Systems
9,400.58
15,564.86
Support Services
6,750.26
10,544.86
Police
98,033.49
159,568.19
Central Dispatch
9,675.62
17,743.59
Animal Control
2,258.40
3,946.34
Fire
99,128.90
152,448.47
Emergency Preparedness
2,818.43
4,893.64
Streets
6,638.40
12,251.23
Stormwater /ROW Maint.
8,118.91
13,063.93
Park Maintenance
6,230.02
10,221.17
Community- Senior Center
2,925.70
5,219.47
Historical Museum
2,054.82
3,044.40
Economic Development
3,639.32
5,505.53
General Fund Total 323,941.29 514,811.08
Garage Fund Total 4,103.60 6,971.30
Ambulance Fund Total 20,955.76 32,135.31
Emergency 911 Fund Total 3,225.24 5,914.53
Worker's Compensation Total 2,265.60 2,746.62
Strong Neighborhoods 2,102.12 3,288.35
Stormwater Detention 625.00 710.62
CITY OF OWASO
HEALTHCARE SELF INSURANCE FUND
CLAIMS PAID PER AUTHORIZATION OF ORDINANCE #789 AS OF 7106/10
VENDOR DESCRIPTION
AETNA HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
HEALTHCARE MEDICAL SERVICE
ADMIN FEES
STOP LOSS FEES
HEALTHCARE DEPT TOTAL
DELTA DENTAL DENTAL MEDICAL SERVICE
DENTAL MEDICAL SERVICE
DENTAL DEPT TOTAL
VSP ADMIN FEES
VISION DEPT TOTAL
HEALTHCARE SELF INSURANCE FUND TOTAL
AMOUNT
25,828.27
29,533.32
40,070.89
49, 926.79
592.21
16,126.08
18, 743.46
180,821.02
1,674.80
1,694.60
3,369.40
1,186.02
1,186.02
185,376.44
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: JOHN W. FEARY
PROJECT ADMINISTRATOR
SUBJECT: ACCEPTANCE OF ENGINEER AGREEMENT
DATE: July 2, 2010
BACKGROUND:
At the May 17, 2005 City Council meeting the Engineering Design Criteria, Construction
Standards, and Standard Details were adopted by the City Council. Documents required as a
result of that adoption include two different agreements, one which must be submitted by the
developer and one which must be submitted by the developer's engineer. The agreements are as
follows:
ENGINEER AGREEMENT
The agreement required to be submitted by the developer's engineer is titled "Agreement for
Urban Engineering Services" (Section 0114.1(B)). This agreement requires the engineer to list
all improvements associated with the proposed development, attest that all designs will be in
compliance with City standards (outlined in the design criteria), pay all fees associated with the
plan review, attest that he /she is a Registered Professional Engineer in the State of Oklahoma,
and attest that he /she maintains Professional Liability Insurance in limits directly correlated to
the cost of the project specified in the attached agreement. The liability insurance to project cost
ratio schedule is as follows:
Project Cost
Less than $500,000
$500,000 - $1,000,000
Greater than $1,000,000
Professional Liability Insurance
$250,000
$500,000
$1,000,000
DEVELOPER AGREEMENT
The agreement required to be submitted by the developer is titled "Agreement Guaranteeing
Installation of Improvements" (Section 0114.1(C)). This agreement requires the developer to
submit engineering drawings for the proposed improvements, provide oversight of his /her
construction contractor to assure compliance with the approved plans, and submit "as- built"
drawings upon completion of the construction of improvements.
Since the approval of the Engineering Design Criteria, Construction Standards, and Standard
Details in May 2005, Developers and Engineers alike have complied with the above
requirements and submitted both agreements. The mayor's signature is required on the
"Agreement for Urban Engineering Services" (Engineer Agreement), therefore Council approval
is needed.
RECOMMENDATION:
Staff recommends Council acceptance of the following "Agreement for Urban Engineering
Services" (Engineer Agreement):
1. Massey -Mann & Associates. Tract 3B, a tract of land situated in Lot 3, Block 2, Garrett
Creek Center, an addition to the City of Owasso, Tulsa County, State of Oklahoma.
ATTACHMENTS:
A. 1 signed "Agreement for Urban Engineering Services" with legal description.
AGREEMENT FOR URBAN ENGINEERING SERVICES
THIS AGREEMENT, entered into by and between the CITY OF OWASSO,
OKLAHOMA, a municipal corporation, hereinafter called "City" and
L asseN Aa arrn It hereinafter called "Design Engineer ".
WITNESSETH:
WHEREAS, the Design Engineer has been employed by the Owner /Developer /Subdivider
of the herein described real property to prepare all project plans and specifications and to
provide certain engineering services during the construction of the hereinafter sometimes
referred to as the "Project ", upon easements and rights -of -ways to be owned or controlled by
the City; and
WHEREAS, the Design Engineer is desirous of obtaining the review (and approval) of the
plans and specifications for said project by the City of Owasso Public Works Department; and
WHEREAS, the City is willing to review the plans and specifications prepared by the
Design Engineer under the hereinafter described terms and conditions.
NOW, THEREFORE, in consideration of the foregoing and in consideration of the
hereinafter set forth promises and covenants, the parties hereto mutually agree as follows, to-
wit;
1. The Improvements to be designed by the Design Engineer (pursuant to this Contract)
shall generally consist of the following types of improvements
ya�,c OenAal G %:pie.
t _ ..9 i,
'/
which shall be located on the following described tract of land:
r I r
2. The Design Engineer shall, in conformity with the provisions of the City's Standard
Specifications for Urban Engineering Services, including the City's current Design
Criteria, which are hereby incorporated and made a part of this Contract by reference,
prepare project plans, specifications, and other engineering documents as may be
necessary for the proper construction of the project improvement, and shall perform
all construction layout surveys, and staking and periodic general construction
supervision on the project improvements as they are constructed by the Owner and his
Contractor.
3. The City shall review (and approve) the project plans, specifications, and other
engineering documents for the construction of the project improvements prepared and
submitted to the City by the Design Engineer.
4. The Design Engineer shall compensate the City for reviewing (and approving) plans
and specifications for the project at the rate of One Hundred Dollars ($100.00) for each
plan sheet submitted (other than plan sheet Standard Drawings of the City of Owasso
or of the Oklahoma Department of Transportation), except that the minimum charge
for each project shall be One Hundred -fifty Dollars ($150.00). Payment shall be due
and payable upon presentation of the plans and specifications for the project for review
by the City. PFPI plan review and permit fees are waived for governmental entities.
No fees shall be collected by the City of Owasso on any public work or improvement
performed by or for any city, county, state, or federal governmental entity; provided
however, that this exemption shall not constitute waiver of any ordinance requiring the
issuance of such permits, and it shall apply only to such permits issued directly to the
governmental entity involved.
5. The Design Engineer hereby covenants that he /she is a Registered Professional
Engineer in the State of Oklahoma at the time of execution of this Contract, and should
the Design Engineer cease to be a Registered Professional Engineer prior to
completing performance of the terms and conditions of this Contract, the Design
Engineer shall immediately notify the City and shall engage a Registered Professional
Engineer acceptable to the City to complete performance of the promises and
covenants contained herein.
6. The Design Engineer further covenants and agrees that he /she maintains and is covered
by Professional Liability Insurance in limits of not less than those indicated in the
following schedule:
Project Cost Professional Liability Insurance
Less than $500,000 $250,000
$500,000 - $1,000,000 $500,000
Greater than $1,000,000 $1,000,000
(Project Costs to be as defined in Section I of the attached Specifications for Urban
Engineering Services) and that he /she will maintain same in continuous force and effect
for a period of not less than three years from and after final acceptance of the project
herein.
7. The Design Engineer further covenants and agrees to comply with Section I, Section II
and Section III of the attached Standard Specifications for Urban Engineering Services
and that these specifications become a part this contract.
IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be
executed by their duly authorized officers or representatives on the dates set for the below.
Executed by the City of Owasso, Oklahoma, on the day of , 20
Executed by the Design Engineer on the day of AaL4 20M.
CITY OF OWASSO, OKLAHOMA
a municipal corporation
ATTEST:
Mayor
City Clerk
APPROVED AS TO FORM:
DESIGN ENGINEER
BY/��,���:
ATTEST:
Se ary
4� SS. /'0
t_ GREG
ne SEY
Tract 3B
A tract of land situated in Lot 3, Block 2, Garrett Creek Center, an addition to the City of
Owasso, Tulsa County, State of Oklahoma, more particularly described as follows:
Beginning at the Northeast corner of said Lot 3, Block 2; thence along the east property line of said
Lot3 and along a curve to the left having a central angle of 07 °48'49 ",radius of 1,220.92 feet, chord
bearing of S09 °45'24 "W, chord distance of 166.37 feet and a distance of 166.50 feet; thence
S 13 °39'49 "E continuing along east line of said lot 3, a distance of 43.83 feet to the Southeast corner
of said Lot 3; thence S49 °33'49 "W,adistance of 56.30feet; thence along the south line of said Lot 3
and along a curve to the left having a central angle of 20 °51 '04 ", radius of 430.00 feet, chord
bearing of N50 °51 '43 "W, chord distance of 155.62 feet and a distance of 156.49 feet; thence
N28 °42'45 "E, a distance of 25.00 feet; thence North, a distance of 122.91 feet to a point on the North
property line of said Lot 3; thence East along the North property line, a distance of 113.00 feet to the
Point of Beginning, containing 26,154.43 square feet or 0.60 acres, more or less.
AtEc RV CERTIFICATE OF LIABILITY INSURANCE OP ID 06 DATE(MM /DD/YYYY)
MASSE -3 05420410
PRODUCER HIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATIOP
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
INSURICA HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
P. O. Box 25928 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
Oklahoma City OK 73125
Phone: 800 - 880 -0291 Fax: 405 - 556 -2332 INSURERS AFFORDING COVERAGE NAIC #
INSURED
INSURER A: Hartford Casualty Insurance Co 29424
! INSURER B: _Travelers Indemnity Co of Amer_ _ _ _ 25666
Massey -Mann & Associates, LLC I INSURER C Evanston Insurance Company 35378
2933 S. Bryant Ave. INSURER D:
Edmond OK 73034
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS
OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR
NSR
TYPE OF INSURANCE
POLICY NUMBER
ATE Y ID CTIVE
DATE MM /DD/YYYY
DATE MI DRAT Y)
DATE MM/DD/YYYY
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
A
X
X COMMERCIAL GENERAL LIABILITY
38SBAUG7641
08/01/09
08/01/10
PREMISES(Eaoccurence)
$ 300,000
CLAIMS MADE F' OCCUR
MED FYP (Any one person)
$ 10,000
PERSONAL & ADV INJURY
$1,000,000
GENERAL AGGREGATE
s2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP /OP AGG
$2,000,000
POLICY 7 PRO-
JECT LOC
AUTOMOBILE
LIABILITY
B
X
X
ANY AUTO
BA5551M303
08/01/09
08/01/10
COMBINED SINGLE LIMIT
(Ea accident)
1 000
$ ,000
ALL OWNED AUTOS
BODILY INJURY
$
SCHEDULED AUTOS
(Per person)
X
HIRED AUTOS
X
1
NON -OWNED AUTOS
BODILY INJURY
(Per accident)
$
PROPERTY DAMAGE
$
(Per accident)
GARAGE LIABILITY
AUTO ONLY - EA ACCIDENT
$
ANY AUTO
OTHER THAN EA ACC
$
AUTO ONLY: AGG
$
EXCESS I UMBRELLA LIABILITY
EACH OCCURRENCE
$
OCCUR 17 CLAIMS MADE
AGGREGATE
$
$
DEDUCTIBLE
$
RETENTION $
$
WORKERS COMPENSATION
SIAIU
AND EMPLOYERS' LIABILITY YIN
_
X TORY LIMITS ER
B
OFFICER/MEMBEREXCLUDED? ECUTIVF-1
UB5594M770
08/01/09
08/01/10
E. L. EACH ACCIDENT
$ 100000
(Mandatory yes, d be under L--I
If yes, describe under
E.L. DISEASE - EA EMPLOYE
S 100000
E.L. DISEASE - POLICY LIMIT
$ 500000
SPECIAL PROVISIONS below
OTHER
C
Professional E &O
AE817759 1 08/01/09
08/01/10
Ea Claim 1,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
Engineering services - The City of Owasso, Oklahoma is shown as an
Additional Insured, with wavier Of subrogation under the General Liability
and Auto Liability, for the work of the insured.
CERTIFICATE
HOLDER CANCFI I ATInN
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATI(
OWASSO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
CITY OF OWASSO IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
111 N MAIN REPRESENTATIVES.
OWASSO OK 74055 AUTHORIZ9"EPRESENTATIVE
(2009101)
I ne AuuKiij name ana logo are registered marks of ACORD
rese
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: JOHN W. FEARY
PROJECT ADMINISTRATOR
SUBJECT: ACCEPTANCE OF NORTH 140TH EAST AVENUE ROADWAY
EXTENSION AND AUTORIZATION FOR FINAL PAYMENT
DATE: July 2, 2010
BACKGROUND:
The new Tulsa Technology Center (TTC) campus will be located on the east side of the Highway
169 frontage road between East 106th Street North and East 116th Street North. The school site is
currently under design, with construction work scheduled to begin this summer and construction
estimated to be completed in time for Fall 2012 classes.
This project area consisted of the North 140th East Avenue frontage road between East 106th
Street North and East 116th Street North. The new 3 -lane arterial roadway pavement extends
3,997 feet north from East 106th Street North to the 1,324 foot long segment already constructed
from East 116th Street North to the south. The existing segment serves QuikTrip, Eggbert's
restaurant and future development parcels.
In July of 2009, City staff opened bids from five (5) contractors and presented a recommendation
to City Council that the contract be awarded to Becco Contractors in the amount of $1,566,682,
which included a $200,000 project allowance. The City Council awarded the construction
contract on July 21, 2009.
Public Works staff, along with the contractor, has worked diligently to ensure a quality product
with limited increase of materials. Becco Contractors has presented city staff with a final pay
request of $631,616.42 which will bring the total, completed, contract price in at $1,388,293.20
resulting in an under run of approximately $178,389.
FUNDING SOURCE:
Funding for this project is included in the Capital Improvements Fund budget.
RECOMMENDATION:
The Staff recommends City Council acceptance of the improvements at North 140th East Avenue
and authorization for final payment to Becco Contractors in the amount of $631,616.42 bringing
the total contract sum to $1,388,293.20.
ATTACHMENTS:
A. Final Pay Request
ATTACHMENT A
APPLICATION AND CERTIFICATE FOR PAYMENT , Page One of
TO: (Owner) UI A S s a Contract Date: 7- Z -.0!2
FROM: (Contractor) c d c*-0,1JT24 171 -r-S
PROJECT: AJ. 14- ov'� E. A✓E. Eurv.w s,o,J
CONTRACT FOR: RO `•' � c E /HP✓
Application Date: (P -d - / o
Period To: 5- 31- /0
Distribution To: Owner
Department
Contractor
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below, in connection with the Contract.
Continuation sheet is attached.
1. Original Contract Sum
2. Net Change by Change Orders $
3. Contract Sum to Date (Line 1 & 2) $ /, 3 8 80-2-9 3. a.o
4. Total Completed & Stored to Date $ 8., a 43. o
(Column G on Continuation Sheet)
5. - Retainage: a. ___ _ % of Completed -Work
(Column D & E on Continuation Sheet) - FINAL
b. % of Stored Material $
(Column F on Continuation Sheet)
Total Retainage (Line Sa & 5b)
6. Total Earned Less Retainage
(Line 4 less Line 5 Total)
7. Less Previous Certificates for Payment
$ -�-
$
$ 7570, 67!0.76
AGREEMENT
0609 00300 - Page 8 of 15
8. CURRENT PAYMENT DUE
9. Balance to Finish, Plus Retainage
(Line 3 less Line 6)
CHANGE ORDER SUMMARY:
Change Orders approved in previous
months by OWNER
TOTALS
Approved this month
Number
Date Approved
ADDITIONS
E!
TOTALS $
Net Change by Change Orders
$ X31, 6., 16 - 4 a
R
DEDUCTIONS
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information
and belief, the WORK covered by this Application for payment has been completed in
accordance with the Contract Documents, that all amounts have been paid by the Contractor for
Work for which previous Certificates for Payment were issued and payments received from the
Owner, and that current payment shown herein is now due.
CONTRACTOR:
STATE OF OKLAHOMA )
) SS
COUNTY OF 7TU— 454 )
Date: (— 3 - /0
Subscribed and sworn to before me this .--:�L day of 5,0l0
Maria K. Carter
ZMV ta y ruNic In and for th*
>'rtaM Of Oklahoma
(SEA Ommi. awn » Oa00a +7t
nind aalor+ Eupiras tld/a�HRQ7t
My Commission Expires: (P / %3��,'Z
tw I V j �-4�M
ZYM-M-SM
Notary Public
AGREEMENT
0609 00300 - Page 9 of 15
CERTIFICATE FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the date
comprising the above application, the certifies to the Owner
that to the best of the knowledge, information and belief,
the Work has progressed as indicated, the quality of the Work is in accordance with the Contract
Documents, and the Contractor is entitled to payment of the amount certified.
Lo
AMOUNT CERTIFIED $
(Attach explanation if amount certified differs from the amount applied for.)
Date:
This certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the contractor
named herein. Issuance, payment and acceptance of payments is without prejudice to any rights
of the Owner or Contractor under this Contract.
' -'n -,;Pald
AGREEMENT
0609 00300 - Page 10 of 15
CONTINUATION SHEET Page of
Application and Certification for Payment, containing Contractor's signed Certification is
attached.
Application Number: Application Date:
Period to:
In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where
variable retainage for line items may apply.
A
B
C
D
E (cont) ❑
ITEM
NO.
DESCRIPTION
OF WORK
SCHEDULED
VALUE
WORK COMPLETED
FROM PREVIOUS
APPLICATION
WORK COMPLETED
THIS PERIOD
❑ (cont) F
G
H
I
R E) MATERIALS
PRESENTLY STORED
(NOT IN D O
TOTAL COMPLETED
AND STORED TO DATE
(D + E + f)
(G /C)
BALANCE
TO FINISH
(C -G)
RETAINAGE
NOTE: At bottom of each column, run totals.
AGREEMENT
0609 00300 - Page I 1 of 15
CLAIM OR INVOICE AFFIDAVIT
STATE OF OKLAHOMA )
)SS
COUNTY OF 7-u L s,a )
The undersigned (Architect, Contractor, Supplier, Engineer or Supervisory Official), of lawful
age, being first duly sworn, on oath says that this (Invoice, Claim or Contract) is true and correct.
Affiant further states that the (work, services or materials) as shown by this Invoice or Claim
have been (completed or supplied) in accordance with the Plans, Specifications, orders or
requests furnished to the Affiant. Affiant further states that (s)he has made no payment, nor
given, nor donated, or agreed to pay, give, or donate, either directly or indirectly, to any elected
official, officer, or employee of the State, County, or City of money or any other thing of value
to obtain payment or the award of this contract.
ontractor or Supplier
Subscribed and sworn to before me this ,I day of AJ6 Z.
Notary Public
Commission # 0 boa(J& /
My Commission Expires:
Architect, Engineer or other Supervisory Official
Subscribed and sworn to before me this day of
Notary Public
Commission #
My Commission Expires:
Marla K. caner
MsgMY Pue��a n� and for the
�aM of OMahoMa
COnMMealon 0 06006471
MY COMnftsion Expires 06/23/2014
NOTE: Strike out words not appropriate and sign appropriate signature line. Architect,
Engineer approval is not required for Contractor or Supplier Affidavit.
AGREEMENT
0609 00300 - Page 12 of 15
CONTINUATION SHEET AIA DOCUMENT G 703 PAGE 2 OF 2
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, CONTAINING APPLICATION NO: #8 FINAL
CONTRACTOR'S SIGNED CERTIFICATION IS ATTACHED.
IN TABULATIONS BELOW, AMOUNTS ARE STATED TO THE NEAREST DOLLAR.
USE COLUMN 1 ON CONTRACTS WHERE VARIABLE RETAINAGE FOR LINE ITEMS MAY APPLY.
APPLICATION DATE: 6/1/2010
PERIOD TO: 6/1/2010
CONTRACTOR PROJ. NO: 355
A
B C
D I E
F
G
H
I
ITEM
NO.
DESCRIPTION OF WORK
SCHEDULED
VALUE
WORK COMPLETED
MATERIALS
PRESENTLY
STORED TO DATE
(NOT IN D OR E)
TOTAL
COMPLETED AND
STORED TO DATE
(D +E +F)
%
(G /C)
BALANCE
TO FINISH
(C -G)
RETAINAGE
FROM PREVIOUS
APPLICATION
(D + E)
THIS PERIOD
1
CLEARING & GRUBBING
$ 10,000.00
$10,000.00
$0.00
$ 10,000.00
100.0%1
$ -
$ 1,000.00
2
UNCLASS EXC SITE BALANCING)
$ 25,000.00
$25,000.00
$0.00
$ 25,000.00
100.0%
$ -
$ 2,500.00
3
UNCLASS EXC (REMV FROM SITE )
$ 25,000.00
$22,500.00
$2,500.00
$ 25,000.00
100.0%
$ -
$ 2,500.00
4
ROCK EXC
$ 5,000.00
$5,000.00
$0.00
$ 5,000.00
100.0%
$ -
$ 500.00
5
MUCK EXC
$ 2,000.00
$2,000.00
$0.00
$ 2,000.00'100.0%
$ -
$ 200.00
6
SELECT BORROW MUCK / SBGR REPL
$ 1,000.00
$1,000.00
$0.00
$ 1,000.00
100.0%
$ -
$ 100.00
7
TYPE A SALV TOPSOIL REMV & REPL
$ 20,000.00
$10,000.00
$10,000.00
$ 20,000.00
100.0%
$ -
$ 2,000.00
8
TOPSOIL REMOVED FROM SITE
$ 5,000.00
$5,000.00
$0.00
$ 5,000.00
100.0%
$ -
$ 500.00
9
STABILIZED CONST ENTRANCE
$ 3,462.00
$3,462.00
$0.00
$ 3,462.00
100.0%
$ -
$ 346.20
10
BLOCK & AGGREGATE INLET FILTER
$ 1,400.00
$1,400.00
$0.00
$ 1,400.00
100.0%
$ -
$ 140.00
11
SILT DIKE
$ 380.00
$380.00
$0.00
$ 380.00
100.0%
$ -
$ 38.00
12
SILT FENCE
$ 6,060.00
$11,685.00
- $5,625.00
$ 6,060.00
100.0%
$ -
$ 606.00
13
DITCH LINER PROTECTION
$ 1,560.00
$1,560.00
$0.00
$ 1,560.00
100.0%
$ -
$ 156.00
14
SOLID SLAB SOD
$ 5,668.00
$6,400.00
- $732.00
$ 5,668.00
100.0%
$ -
$ 566.80
15
SEEDING METHOD A
$ 1,600.00
$0.00
$1,600.00
$ 1,600.00
100.0%
$ -
$ 160.00
16
AGG BASE TYPE A
$ 91,590.00
$91,590.00
$0.00
$ 91,590.00
100.0%
$ -
$ 9,159.00
17
LIME TREATED SUBGRADE
$ 45,810.00
$45,810.00
$0.00
$ 45,810.00
100.0%
$ -
$ 4,581.00
18
SEPARATOR FABRIC
$ 18,397.00
$18,397.00
$0.00
$ 18,397.00
100.0%
$ -
$ 1,839.70
19
CLSM BACKFILL
$ 11,200.00
$2,700.00
$0.00
$ 2,700.00
24.1%
$ 8,500.00
$ 270.00
20
HANDRAILS
$ 4,000.00
$0.00
$4,000.00
$ 4,000.00
100.0%
$ -
$ 400.00
21A
36" RCP CLASS 3
$ 20,160.00
$20,160.00
$0.00
$ 20,160.00
100.0%
$ -
$ 2,016.00
22
CLASS A CONC FLUMES
$ 68,000.00
$68,000.00
$0.00
$ 68,000.00
100.0%
$ -
$ 6,800.00
23
PLAIN RIPRAP
$ 4,000.00
$4,000.00
$0.00
$ 4,000.00
100.0%
$ -
$ 400.00
24
GROUTED RIPRAP
$ 3,750.00
$3,750.00
$0.00
$ 3,750.00
100.0%
$ -
$ 375.00
25
HANDICAP RAMP
$ 2,000.00
$0.00
$2,000.00
$ 2,000.00
100.0%
$ -
$ 200.00
26
CONC SIDEWALK
$ 5,330.00
$0.00
$5,330.00
$ 5,330.00
100.0%
$ -
$ 533.00
27
TRAFFIC RATED MH FRAME & COVER
$ 350.00
$350.00
$0.00
$ 350.00
100.0%
$ -
$ 35.00
28
DES 2 INLET
$ 30,000.00
$30,000.00
$0.00
$ 30,000.00
100.0%
$ -
$ 3,000.00
29
DES 2 INLET W/ MH
$ 50,000.00
$50,000.00
$0.00
$ 50,000.00
100.0%
$ -
$ 5,000.00
30
4' MANHOLE
$ 4,500.00
$4,500.00
$0.00
$ 4,500.00
100.0%
$ -
$ 450.00
31
MH ADJ TO GRADE
$ 3,000.00
$3,000.00
$0.00
$ 3,000.00
100.0%
$ -
$ 300.00
32
15" RCP CLASS 3
$ 91,350.00
$91,350.00
$0.00
$ 91,350.00
100.0%
$ -
$ 9,135.00
33
18" RCP CLASS 3
$ 53,700.00
$53,700.00
$0.00
$ 53,700.00
100.0%
$ -
$ 5,370.00
34
21" RCP CLASS 3
$ 24,765.00
$24,765.00
$0.00
$ 24,765.00
100.0%
$ -
$ 2,476.50
35
REMV OF STR & OBSTRUCTIONS
$ 15,000.00
$15,000.00
$0.00
$ 15,000.00
100.0%
$ -
$ 1,500.00
36
REMV OF PERM TYPE 3 BARRICADE
$ 10.00 1
$10.00
$0.00
$ 10.00
100.0%
$ -
$ 1.00
37
REMV OF EXISTING FLUME
$ 1,890.00
$1,890.00
$0.00
$ 1,890.00
100.0%
$ -
$ 189.00
38
ASPH REMOVAL & DISPOSAL 1
$ 660.00 1
$0.00
$660.001
1$
660.00
100.0%
$ -
$ 66.00
Page 1 of 2
CONTINUATION SHEET AIA DOCUMENT G 703 PAGE 2 OF 2
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, CONTAINING
CONTRACTOR'S SIGNED CERTIFICATION IS ATTACHED.
IN TABULATIONS BELOW, AMOUNTS ARE STATED TO THE NEAREST DOLLAR.
USE COLUMN 1 ON CONTRACTS WHERE VARIABLE RETAINAGE FOR LINE ITEMS MAY APPLY.
APPLICATION NO: #8 FINAL
APPLICATION DATE: 6/1/2010
PERIOD TO: 6/1/2010
CONTRACTOR PROJ. NO: 355
A
B C
D I E
F
G
H
I
ITEM
NO.
DESCRIPTION OF WORK
SCHEDULED
VALUE
WORK COMPLETED
MATERIALS
PRESENTLY
STORED TO DATE
(NOT IN D OR E)
TOTAL
COMPLETED AND
STORED TO DATE
(D +E +F)
%
(G /C)
BALANCE
TO FINISH
(C -G)
RETAINAGE
FROM PREVIOUS
APPLICATION
(D + E)
THIS PERIOD
39
VINYL FENCE WHITE
$ 62,673.00
$0.00
$62,673.00
$ 62,673.00
100.0%
$ -
$ 6,267.30
40
MOBILIZATION
$ 50,000.00
$50,000.00
$0.00
$ 50,000.00
100.0%
$ -
$ 5,000.00
41
STAKING
$ 5,000.00
$5,000.00
$0.00
$ 5,000.00
100.0%
$ -
$ 500.00
42
STOP SIGN
$ 800.00
,$0.00
$800.00
$ 800.00
100.0%
$ -
$ 80.00
43
SHEET ALUM SIGNS
$ 1,200.00
$0.00
$1,200.00
$ 1,200.00
100.0%
$ -
$ 120.00
44
SPEED LIMIT SIGN
$ 2,400.00
$0.00
$2,400.00
$ 2,400.00
100.0%
$ -
$ 240.00
45
STREET NAME SIGN
$ 100.00
$0.00
$100.00
$ 100.00
100.0%
$ -
$ 10.00
46
24" WHITE THERMO STOP BAR
$ 216.00
$0.00
$216.00
$ 216.00
100.0%
$ -
$ 21.60
47
8" SOLID WHITE CROSSWALK
$ 138.00
$0.00
$138.00
$ 138.00
100.0%
$ -
$ 13.80
48
8" YELLOW GORE TRAFF STRIPE\
$ 95.00
$0.00
$95.00
$ 95.00
100.0%
$ -
$ 9.50
49
4" YELLOW THERMO
$ 5,153.50
$0.00
$5,153.50
$ 5,153.50
100.0%
$ -
$ 515.35
50
4" WHITE THERMO
$ 844.00
$0.00
$844.00
$ 844.00
100.0%
$ -
$ 84.40
51
THERMO TURN ARROW RIGHT
$ 200.00
$0.00
$200.00
$ 200.00
100.0%
$ -
$ 20.00
52
THERMO TURN ARROW LEFT
$ 200.00
$0.00
$200.00
$ 200.00
100.0%
$ -
$ 20.00
53
THERMO WORDS
$ 300.00
$0.00
$300.00
$ 300.00
100.0%
$ -
$ 30.00
54
TRAFFIC CONTROL
$ 2,000.00
$1,700.00
$300.00
$ 2,000.00
100.0%
$ -
$ 200.00
55
DES 2, ALTERNATE
$ 7,000.00
$7,000.00
$0.00
$ 7,000.00
100.0%
$ -
$ 700.00
56
DES 3
$ 18,000.00
$18,000.00
$0.00
$ 18,000.00
100.0%
$ -
$ 1,800.00
57
CONC HEADWALL
$ 20,000.00
$20,000.00
$0.00
$ 20,000.00
100.0%
$ -
$ 2,000.00
58
CONC SLOPE WALL END TREATMENT
$ 7,000.00
$7,000.00
$0.00
$ 7,000.00
100.0%
$ -
$ 700.00
59
SAWCUT ASPHALT
$ 489.00
$489.00
$0.00
$ 489.00
100.0%
$ -
$ 48.90
60
SOIL TESTING / CONSULTING
$ 15,000.00
$12,750.00
$2,250.00
$ 15,000.00
100.0%
$ -
$ 1,500.00
61
REMV & RELOCATE XING SIGNS
$ 250.00
$0.00
$0.00
$ -
0.0%
$ 250.00
$ -
62
CONSTRUCTION FENCE
$ 11,018.00
$0.00
$0.00
$ -
0.0%
$ 11,018.00
$ -
63
STEEL CASING 12"
$ 4,200.00
$6,000.00
- $1,800.00
$ 4,200.00
100.0%
$ -
$ 420.00
64
REMV 478 TONS OF GRAVEL & TEMP CULVERT
$ 1,000.00
$1,000.00
$0.00
$ 1,000.00
100.0%
$ -
$ 100.00
65
COMMERCIAL DRIVE ENTRANCE
$ 22,500.00
$0.00
$22,500.00
$ 22,500.00
100.0%
$ -
$ 2,250.00
66
TACK COAT
$ 2,757.00
$0.00
$2,757.00
$ 2,757.00
100.0%
$ -
$ 275.70
67
S5 ASPH 70 -28
$ 131,184.00
$0.00
$131,184.00
$ 131,184.00
100.0%
$ -
$13,118.40
68
S3 ASPH 64 -22
$ 245,970.00
$0.00
$245,970.00
$ 245,970.00
100.0%
$ -
$24,597.00
69
2'2" CURB & GUTTER
$ 86,402.50
$46,020.70
$40,381.80
$ 86,402.50
100.0%
$ -
$ 8,640.25
$ -
$0.00
$0.00
$ -
0.0%
$ -
$ -
71
PROJECT ALLOWANCE
$ 200,000.00
$0,001
$41,379.20
$ 41,379.20
20.7%
$ 158,620.80
$ 4,137.92
101AL $ 1,565,682.UU $ 8U9,318.7U $578,9/4.5U $
Page 2 of 2
$1,388,293.2U $ 1 /8,388.80
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: ROGER STEVENS
PUBLIC WORKS DIRECTOR
SUBJECT: RIGHT OF WAY ACQUISITION FOR THE EAST 86TH STREET
NORTH FROM MAIN TO MEMORIAL ROAD IMPROVEMENT
PROJECT
DATE: July 2, 2010
BACKGROUND:
City staff is currently involved in the acquisition of right of way and easement properties
for the East 86th Street North from Main to Memorial Road Improvement Project. As a
part of those acquisitions, negotiations for the purchase of land from Richard Lee and
Patty DeBoer (3,647.36 square feet), Charles and Shirley Hess (3,648.02 square feet), and
Dale and Marilee DeBoer (3,647.72 square feet) have been successfully completed.
DESCRIPTION /PURCHASE PRICE:
• Richard Lee and Patty DeBoer — The proposed contract (See Attachment A) is
based on the appraised value and a negotiated compensation for damages. The
appraised land value for the needed right of way is 61 cents per square foot, for a
land purchase of $2,218. In addition, the right of way is within 35 feet of the
residential dwelling. Therefore, a compensation for damages in the amount of
$38,782 is included for a total contract amount of $41,000.
• Charles and Shirley Hess — The proposed contract (See Attachment B) is based on
the appraised land value and a negotiated compensation for damages. The
appraised land value for the needed right of way is 56 cents per square foot, for a
land purchase of $2,050. In addition, the right of way is within 30 feet of the
residential dwelling. Therefore, a compensation for damages in the amount of
$45,950 is included for a total contract amount of $48,000.
• Dale and Marilee DeBoer— The proposed contract (See Attachment C) is based on
the appraised land value and a negotiated compensation for damages. The
appraised land value for the needed right of way is 57 cents per square foot, for a
land purchase of $2,066. In addition, the right of way is within 30 feet of the
residential dwelling. Therefore, a compensation for damages in the amount of
$38,934 is included for a total contract amount of $41,000.
Right of Way Acquisition -
E. 86 Street North From Main to Memorial
FUNDING:
Funding for this purchase is available from the Capital Improvements Fund.
RECOMMENDATION:
Staff recommends City Council approval to purchase right of way and easement
properties and authorization of payment as follows: Richard Lee and Patty DeBoer in the
amount of $41,000; Charles and Shirley Hess in the amount of $48,000; Dale and Marilee
DeBoer in the amount of $41,000; and, authorization for the Mayor to execute all
required documentation.
ATTACHMENT:
A. Contract — Richard Lee and Patty DeBoer
B. Contract — Charles and Shirley Hess
C. Contract — Dale and Marilee DeBoer
ATTACHMENT A
June 15, 2010
Lee & Patty DeBoer
8622 East 86d' Street North
Owasso, OK 74055
RE: City of Owasso Road Widening Project
Job No. 24037(04)
86th Street North, Main to Memorial — Parcel 17 & Parcels 13, 14 & 18
Dear Mr. & Mrs. DeBoer:
I appreciated the time you took to review the offer and how is affects your property. The
City of Owasso agrees that your property will be impacted and they also reviewed your
counter offer.
The City of Owasso has agreed to increase the amount for all the needed right of way and
easements to $41,000.00. In addition, the City of Owasso will provide the you the
answers to your questions from your original offer letter.
If this offer meets with your approval, I would request that you acknowledge with your
signature below. I will need to obtain this signed letter and the enclosed W -9 so the check
can be processed. It will take about three weeks in order to obtain the check.
If you have any questions please feel free to contact me at the number listed above to
discuss this project.
Sincerely,
Mike R. Craddock
Terra Acquisition Services
Cc Roger Stevens, Public Works Director
City of Owasso
Agr d to:
;PchardLee DeBoer %Date
Patty J De er Date
mike@terraacquisition.com 918.605.1436 • 918.745.0609 fax • 1703 E Skelly Dr. Ste. 105 • Tulsa OK 74105
ATTACHMENT B
June 8, 2010
Charles & Shirley Hess
8526 East 86th Street North
Owasso, OK 74055
RE: City of Owasso Road Widening Project
Job No. 24037(04)
86th Street North, Main to Memorial — Parcel 16 & Parcels 13, 14 & 18
Dear Mr. & Mrs. Hess:
I appreciated the time you took to review the offer and how is affects your property. The
City of Owasso agrees that your property will be impacted and they also reviewed your
counter offer.
The City of Owasso has agreed to increase the amount for the needed right of way and
easements to $48,000.00.
If this offer meets with your approval, I would request that you acknowledge with your
signature below. I will need to obtain this signed letter and the enclosed W -9 so the check
can be processed. It will take about three weeks in order to obtain the check.
If you have any questions please feel free to contact me at the number listed above to
discuss this project.
Sincerely,
Mike R. Craddock
Agreed to:
Charles Hess Date
Terra Acquisition Services
Cc Roger Stevens, Public Works Director '
City of Owasso Shirle ss Date
mike@terraacquisition.com 918.605.1436 • 918.745.0609 fax • 1703 E Skelly Dr. Ste. 105 • Tulsa OK 74105
ATTACHMENT C
June 8, 2010
Dale W. & Marilee DeBoer
8510 East 86h Street North
Owasso, OK 74055
RE: City of Owasso Road Widening Project
Job No. 24037(04)
86'' Street North, Main to Memorial — Parcel 15 & Parcels 13,
Dear Mr. & Mrs. DeBoer:
I appreciated the time you took to review the offer and how is affects your property. Th
City of Owasso agrees that your property will be impacted and they also reviewed your
counter offer.
The City of Owasso has agreed to increase the amount for all the needed right of way and
easements to $41,000.00.
If this offer meets with your approval, I would request that you acknowledge with your
signature below. I will need to obtain this signed letter and the enclosed W -9 so the check
can be processed. It will take about three weeks in order to obtain the check.
If you have any questions please feel free to contact me at the number listed above to
discuss this project.
Sincerely,
Mike R. Craddock
Terra Acquisition Services
Cc Roger Stevens, Public Works Director
City of Owasso
mike@terraacquisition.com 918.605.1436
918.745.0609 fax
1703 E Skelly Dr. Ste.
104 1010 M IM-1011 111J1�1
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: RODNEY J. RAY
CITY MANAGER
SUBJECT: RAIL TRANSIT SYSTEM PLAN /ALTERNATIVES ANALYSES
LOCAL MATCH FUNDING
DATE: July 2, 2010
BACKGROUND:
In October 2008, the INCOG Board of Directors adopted the Rail Transit Strategic Plan as a
framework for the initial planning, design, and ultimate funding of a future regional transit
system for the Tulsa metropolitan area. That plan is based upon the recommendation of an Ad
Hoc Committee formed for the purpose of reviewing rail transportation possibilities for the Tulsa
Metropolitan Area.
In order to gather more specific information to address questions of rail modes, alignments,
costs, user data, benefits, impacts, and sustainable operation of a rail transit system, INCOG
began seeking funding for a process known as Systems Planning and Alternatives Analyses.
Developing a regional systems plan and analyzing the priority corridors in the Tulsa region is
expected to cost $2,000,000. After exploring various funding options INCOG concluded that the
most timely initial funding approach would be to utilize Federal Highway Administration
(FHWA) Urbanized Area Surface Transportation Program (Urbanized Area) funds. INCOG
subsequently submitted an application for Urbanized Area funds to develop a system plan and
conduct an alternative analysis of transit corridors identified in the Rail Transit Strategic Plan.
This funding requires a 20% local match which will total $400,000.
PREVIOUS COUNCIL ACTION:
On August 18, 2009, the Owasso City Council unanimously approved a letter of commitment to
contribute $19,579 toward the matching requirements for the Regional Transit Alternatives
Analyses. Since that time, INCOG has been able to allow in -kind matches to count toward the
local match, thus reducing the share for which Owasso is responsible to $13,705.
REQUESTED ACTION:
The initial phase of the Tulsa Regional Transit System Plan and Alternatives Analyses Project
includes a Transit System Plan and Public Involvement Program which will identify and
prioritize corridors where high capacity transit would be a rational addition to the regional
transportation system. In order to move forward with the first phase, the INCOG Board of
Directors must first approve the contract with the consultants, as well as an agreement with the
City of Owasso and all other participating cities. The attached agreement confirms matching
funds of no more than $13,705 from the City of Owasso for the entire project. If the proposed
agreement is approved by City Council, an action item will be placed on the August 5, 2010
INCOG Board of Directors Agenda, approving both the contract with the project consultants and
the agreement with the City of Owasso.
Following INCOG approval, an invoice for 50% of the project budget ($6,853) will be mailed to
the City for the initial phase of the project, with payment due by August 2010. The remaining
portion of the City of Owasso's required matching funds will be payable in Spring 2011.
FUNDING:
Funding for matching funds for the Tulsa Regional Transit System Plan and Alternatives
Analyses Project were appropriated in the FY 2009 -2010 Budget. Given that funds for this
project were not included in the FY 2010 -2011 Budget, it is necessary for these funds to be
carried forward to the current fiscal year.
RECOMMENDATION:
Staff recommends City Council approval of an agreement between the City of Owasso and the
Indian Nations Council of Government (INCOG) for the purpose of providing matching funds
for the Tulsa Regional Transit System Plan and Alternatives Analyses project, in the amount of
$13,705; authorization for the Mayor to execute the document; and approval of a carryover
budget, increasing the appropriation for expenditures in the General Fund by $13,705.
ATTACHMENTS:
1. Letter from INCOG regarding the Transit System Plan/Alternatives Analyses Project and
local match funding.
2. Metro Area Cost Allocation
3. Proposed Agreement
CCI
COGRegional Partners - Regional Solutions
June 16, 2010
Rodney Ray
City of Owasso, City Manager
111 N Main Street
Owasso, OK 74055
2 West Second Street Suite 800 1 Tulsa, OK 74103 1 918.584.7526 1 www.INCOG.org
Re: Transit System Plan/Alternatives Analyses (TSP /AA) Local Match Funding
Dear Mr. Ray:
The Oklahoma Department of Transportation (ODOT) has notified INCOG of the availability of funding
for the Tulsa Regional Transit System Plan and Alternatives Analyses project. On August 18, 2009 the
City of Owasso passed a resolution authorizing $19,579 to be allocated to this project. Since that time,
INCOG was able to allow in -kind match to count towards the local match and reduce the Owasso share to
$13,705. Consistent with ODOT policy, the matching funds will be required up front based on the final
contract amount negotiated with the consultant over the coming weeks, but will not exceed $13,705.
The first phase of the project will include a Transit System Plan and Public Involvement which will
identify and prioritize corridors where high capacity transit would be a rational addition to the regional
transportation system. In addition, it will include an analysis of an appropriate institutional structure for a
regional transit authority. Upon successful completion of the first phase, the Alternatives Analysis phase
will begin under a separate Notice to Proceed as an option should the TSP /AA Steering Committee
choose to retain Jacobs as the consultant for the next phase.
We have included an agreement for your review that establishes the financial consideration procedure for
the project. It would be helpful to have the attached agreement returned approved no later than July 23
so that we may move forward with an agenda item for the August 5 INCOG Board of Directors to
approve the contract with the consultants and the agreement with the City of Owasso. An invoice for the
per capita share will be sent as soon as the executed agreement has been approved and the contract with
the consultant finalized. We expect the first phase of the project to be no more than 50 percent of the total
project budget for a total of $6,853 match required from the City of Owasso for deposit with ODOT by
August. The remaining portion would be needed for the second phase of the project, likely in Spring
2011.
If you have any questions, please contact James Wagner or Viplav Putta at 584 -7526.
Sincerely,
l-
Tim Armer
Manager, Transportation Division
Enclosure
cc: Viplav Putta, INCOG
Rich Brierre, INCOG
James Wagner, INCOG
Allocation of Local. Matching Funds
Local Match Source Population Pop % Local Match Amount
ODOT In -Kind Match Credit
$120,000
Broken Arrow
92,931
16.56%
$46,370
Bixby
20,678
3.68%
$10,318
Jenks
15,590
2.78%
$7,779
Owasso
27,467
4.89%
$13,705
Sand Springs
18,849
3.36%
$9,406
City of Tulsa
385,635
68.72%
$192,422
TOTAL
561,150
1000/0
$400,000
*Population information is based on the 2008 Census estimate.
AN AGREEMENT BY AND BETWEEN
THE INDIAN NATIONS COUNCIL OF GOVERNMENTS
AND THE CITY OF OWASSO FOR
A REGIONAL TRANSIT SYSTEM PLAN AND ALTERNATIVES ANALYSES
This AGREEMENT is made by and between the Indian Nations Council of Governments,
hereinafter referred to as INCOG, and the City of Owasso, hereinafter referred to as THE CITY.
WITNESSETH:
WHEREAS, the Rail Transit Strategic Plan, adopted by the INCOG Board of Directors in
November 2008, directs further analysis of Tier I corridors defined as "corridors that have the
most immediate potential for success in providing transit service to the most people, that have
the most potential for creating economic development opportunities near future rail stations and
corridors, and that would provide the best service to members of the community with the highest
level of need for quality transit service." These corridors were defined as 1) Central Corridor, 2)
Broken Arrow, 3) Bixby /Jenks, 4) Owasso, and 5) Sand Springs; and,
WHEREAS, on September 10, 2009, the INCOG Board of Directors approved the use of
Urbanized Surface Transportation Program funds to conduct a Transit System Plan and
Alternatives Analyses for the corridors identified in the Rail Transit Strategic Plan; and,
WHEREAS, a twenty percent local match is required for Surface Transportation Program
Federal funds as defined by 23 USC 133 and the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA -LU) [Public Law 109 -59]; and,
WHEREAS, THE CITY comprises 4.89% of the population contained in the affected
communities for this study; and,
WHEREAS, The Oklahoma Department of Transportation (ODOT) requires the twenty percent
local match to be remitted to ODOT upon execution of the contract and the financing agreement;
and,
WHEREAS, THE CITY participated in a consultant selection process beginning with a Request
for Proposal solicitation on March 2, 2010, and ending with interviews of consultant teams on
May 18, 2010; and,
WHEREAS, discretionary funding grants for transit capital projects through programs such as
Section 5309 New Starts are available, but require Alternatives Analysis to be completed with
and adopted Locally Preferred Alternative before federal funding may be considered; and,
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree
as follows:
1 of 5
I. Purpose of the Agreement
a) This AGREEMENT is between INCOG and THE CITY for required local matching
funds for the Tulsa Regional Transit System Plan and Alternatives Analyses Project
[Project #STP- 172E(504)IG, State Job # 27884(04)]. A minimum of twenty percent
local matching funds are required for Federally funded Surface Transportation Program
projects as defined by 23 USC 133 and the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA -LU) [Public Law 109 -59].
b) INCOG has secured Federal Surface Transportation Program funding for 80 percent of
the project cost. The remaining 20 percent from local sources must be remitted to the
Oklahoma Department of Transportation (ODOT) so that the Federal Highway
Administration may release the federal funds for the project.
II. General Terms
a) THE CITY will provide a portion of the local matching funds for the project in an
amount not to exceed THIRTEEN THOUSAND SEVEN HUNDRED AND FIVE
DOLLARS ($13,705) for THE CITY's per capita share of project costs.
b) INCOG will manage the project and provide regular progress reports to THE CITY
regarding budget and work progress.
c) INCOG will invoice THE CITY for the appropriate per capita share not to exceed
$13,705 and remit the payment to the Oklahoma Department of Transportation for
deposit of the required local match. Invoicing will be done in two phases, the first for
the Transit System Plan, and the second for Alternatives Analysis at a later date. The
first invoice will be no more than 50 percent of the amount in Part II.a. The second
invoice will be for the second phase of the project, but not to exceed the amount in Part
II.a less the first invoice.
III. Effective Date
The provisions of this AGREEMENT shall become effective from the date of the INCOG Board
of Directors Chairman's signature on the fully executed agreement. This AGREEMENT shall be
effective until all funding provided in Section II have been expended but in no event shall the
term of this AGREEMENT be extended beyond three (3) years from the effective date.
IV. Records
INCOG shall maintain accounting records and other evidence pertaining to the costs incurred
under this AGREEMENT. These data will be made available for inspection by THE CITY, at all
reasonable times at the respective offices during the contract period and for three years after the
date of final payment.
2of5
V. Amendments or Modifications of Agreement
No changes, revisions, amendments, or alteration in the manner, scope, or type of work or
compensation to be paid by THE CITY shall be effective unless reduced to writing and executed
by THE CITY with the same formalities as are observed in the execution of this AGREEMENT.
VI. Responsibility for Claims and Liability
In any agreement with any subcontractor or vendor, INCOG will specify that such subcontractor
or vendor shall hold harmless the Federal Government, ODOT and THE CITY and their agents,
officers and employees for all the hereinbefore described expenses, costs, claims, actions or
amounts.
VII. No Agency Relationship Created
Nothing in this agreement shall be construed to create an agency relationship between INCOG
and THE CITY or any subcontractor or vendor. In no event will THE CITY incur obligation on
the part of INCOG, nor will INCOG incur obligation on the part of THE CITY except for as
described in this agreement.
VIII. Termination or Suspension
This AGREEMENT was entered into by the participants because of their mutual accord that the
continuing, cooperative, and comprehensive transportation planning process was necessary.
Either INCOG or THE CITY may terminate its interest and its obligation under this
AGREEMENT by giving thirty (30) days notice in writing to the other participant, it being
understood that such termination may be adverse to the interests of the other participant.
In the event of termination or suspension initiated by THE CITY, INCOG shall be entitled to
payment for otherwise valid and allowable obligations incurred in good faith prior to notice of
termination or suspension. THE CITY should make all necessary efforts to mitigate the damages
caused by the termination or suspension.
IX. Conflict of Interest
INCOG and THE CITY represent that none of its employees or members of its governing board
have or will obtain an interest in any subcontractor or vendor that will benefit from this
agreement.
X. Prior Understanding
This AGREEMENT incorporates and reduces to writing all prior understandings, promises,
agreements, commitments, covenants or conditions, and constitutes the full and complete
3 of 5
understanding and contractual relationship of the participants for the Tulsa Regional Transit
System Plan and Alternatives Analyses Project.
XI. Binding Effect
This AGREEMENT shall be binding upon and inure to the benefit of THE CITY and INCOG
and shall be binding upon their successors and subject to the limitation of Oklahoma Law.
XII. Notices
All notices, demands, requests, or other communications which may be or are required to be
given, served, or sent by either party to the other pursuant to the AGREEMENT shall be in
writing and shall be deemed to have been properly given or sent:
a) If intended for INCOG, by mailing by first class mail or, if sender prefers, by registered
or certified mail, return receipt requested, with postage prepaid, addressed to:
INCOG
Transportation Planning Division
Two West Second Street, Suite 800
Tulsa, OK 74103 -3116
b) If intended for THE CITY, by mailing by first class mail or, if sender prefers, by
registered or certified mail, return receipt requested, with postage prepaid, addressed to:
City of Owasso
Office of the City Manager
111 N Main Street
Owasso, OK 74055
XIII. Severability
If any provision, clause or paragraph of this contract or any document incorporated by reference
shall be determined invalid by a court of competent jurisdiction, such determination shall not
affect the other provisions, clauses, or paragraphs of this contract which is not affected by the
determination. The provisions, clauses or paragraphs and any documents incorporated by
reference are declared severable and the invalidation of any such provision, clause, paragraph or
document incorporated by reference shall not affect the remaining provisions, clauses,
paragraphs and documents incorporated by reference which shall continue to be binding and of
full legal efficacy.
4of5
IN WITNESS WHEREOF, the parties have executed this AGREEMENT on the respective dates
herein below reflected to be effective on the date executed by the INCOG Board of Directors
Chairman.
Reviewed and Approved
As to Legality and Form
Attorney
(SEAL)
APPROVED:
City Clerk
ATTEST:
(1, ].� t ", W'.U"
ty Attorney
Indian Nations Council of Governments
John Selph, Board of Directors Chairman
Date
CITY OF OWASSO, OKLAHOMA
Doug Bonebrake, Mayor
Date
RECOMMENDED:
5 of 5
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: RODNEY J. RAY
CITY MANAGER
SUBJECT: EAST 86" STREET NORTH WIDENING PROJECT;
CONDEMNATION PROCEEDINGS
RESOLUTION NO. 2010-08
DATE: July 2, 2010
INTRODUCTION:
Presented for the Council's consideration is proposed Resolution No. 2010 -08, which authorizes
by necessity the filing of two condemnation actions to acquire easements needed for completion
of the East 86th Street North widening project. A copy of the Resolution is attached for the
Council's review.
BACKGROUND:
For the past few months, staff has communicated with landowners along 86th Street North
between Main and Memorial in an effort to purchase right -of -way and permanent and temporary
easements for the street widening project. Specifically, the City obtained an appraisal for each
property on East 86th Street North between Main and Memorial where right -of -way is required.
Offers were made to each of the owners of those parcels and in most cases the necessary right -of
way and easements have been or are being purchased. However, the owner of parcel 25, Hazel
Rowena Mills, Trustee of the Mills Family Revocable Trust, and the owner of parcels 20 and 21,
Julia M. Stokes, Trustee of the Julia M. Stokes Revocable Trust, rejected the City's offer. Staff
submits that acquisition of the requested rights -of -way and permanent and temporary
construction easements from these parcels is critical to completion of the East 86th Street North
widening project and condemnation actions are necessary to obtain the land needed in both
cases.
Based upon the foregoing, it is submitted that at this time condemnation is the sole available
mechanism to obtain the needed rights -of -way and permanent and temporary easements on the
Mills and Stokes properties. The rights -of -way and easements will be utilized solely for a public
purpose and condemnation actions are both necessary and appropriate. The representatives of the
City have offered the landowners a fair price for the property interests sought based on an
appraisal obtained by the City. In neither case have the landowners expressed a willingness to
accept the City's offer and it is not believed that an agreement can be reached through continued
negotiation. Therefore, staff submits that a resolution of necessity authorizing the institution and
prosecution of a condemnation action for each of the two properties is appropriate and
warranted.
RECOMMENDATION:
Staff recommends City Council approval of Resolution No. 2010 -08, resolving the necessity of
instituting and prosecuting condemnation procedures to obtain right -of -way and permanent and
temporary construction easements for a tract of land known as the Mills Family Revocable Trust
Tract, and a tract of land known as the Julia M. Stokes Revocable Trust Tract, for the East 86th
Street North and Mingo Road Intersection Improvement Project.
ATTACHMENTS:
1. Resolution No. 2010 -08
CITY OF OWASSO, OKLAHOMA
RESOLUTION No. 2010 -08
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF OWASSO, OKLAHOMA, RESOLVING THE
NECESSITY OF INSTITUTING AND PROSECUTING
CONDEMNATION PROCEDURES TO OBTAIN RIGHT -
OF -WAY, PERMANENT AND TEMPORARY
CONSTRUCTION EASEMENTS
WHEREAS: The City of Owasso, by and through officers and agents thereof, has endeavored
to obtain right -of way and permanent and temporary construction easements, the legal
descriptions of same attached hereto and marked Exhibit "A," deemed necessary for the 86th
Street North widening project from the respective landowners, to -wit:
Hazel Rowena Mills, Trustee of the Mills Family Revocable Trust, Parcel 25
Julia M. Stokes, Trustee of the Julia M. Stokes Revocable Trust, Parcels 20, 20A, 21,
21A, and 21.1
WHEREAS: In connection with such efforts to obtain the needed right -of -way and permanent
and temporary construction easements consensually, the City of Owasso, by and through officers
and agents thereof, has made bona fide good faith offers to purchase same; and,
WHEREAS: The above - referred landowners have not accepted such offers and by reason
thereof, condemnation proceedings, as provided for under the Constitution and Statutes of the
State of Oklahoma, are necessary.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
OWASSO, OKLAHOMA, THAT: Officers and agents of the City of Owasso, Oklahoma, are
hereby authorized to initiate and prosecute to the conclusion thereof condemnation proceedings
against any or all of the above -named landowners to obtain the necessary right -of -way and
permanent and temporary construction easements as set forth in Exhibit "A" hereto, as well as
any additional relief to which the City of Owasso, Oklahoma, may, by law, be entitled to.
APPROVED AND ADOPTED this 6th day of July, 2010, by the City Council of the City of
Owasso, Oklahoma.
Doug Bonebrake, Mayor
Attest:
Sherry Bishop, City Clerk
Approved As To Form:
Julie Trout Lombardi, City Attorney
Exhibit A
Resolution No. 2010 -08
Parcel 20 (Julia M. Stokes Revocable Trust Tract)
Beginning at the NW corner of the NE /4 of Sec.25, T -21 -N, R -13 -E, I.B. &M.; Thence N
88 °41'28" E along the north line of said NE/4 a distance of 655.53 feet; Thence S 01 °46'07" E a
distance of 140.00 feet; Thence S 88 °41'28" W a distance of 60.28 feet; Thence N 01 °18'32" W
a distance of 80.00 feet; Thence S 88 °41'28" W a distance of 595.93 feet to the west line of said
NE/4; Thence N 01 °44'06" W a distance of 60.00 feet to the Point of Beginning, and containing
33,313.31 square feet, (0.765 acres), more or less, of new right -of -way, the remaining area
included within this description being present right -of -way.
Parcel 20A (Julia M. Stokes Revocable Trust Tract)
Commencing at the NW corner of the NE /4 of Sec.25, T -21 -N, R -13 -E, I.B. &M.; Thence N
88 °41'28" E along the north line of said NE/4 a distance of 342.37 feet; Thence S 01 °18'32" E a
distance of 60.00 feet to the Point of Beginning; Thence N 88 °41'28" E a distance of 254.00
feet; Thence S 01 °18'32" E a distance of 10.00 feet; Thence S 88 °41'28" W a distance of 254.00
feet; Thence N 01 °18'32" W a distance of 10.00 feet to the Point of Beginning, and containing
2540.01 square feet, (0.058 acres), more or less.
Parcel 21 (Julia M. Stokes Revocable Trust Tract)
Commencing at the NW corner of the NE /4 of Sec.25, T -21 -N, R -13 -E, I.B. &M.; Thence N
88 °41'28" E along the north line of said NE/4 a distance of 655.53 feet to the Point of
Beginning; Thence N 88 °41'28" E along the north line of said NE/4 a distance of 655.53 feet;
Thence S 01 °51'23" E a distance of 60.00 feet; Thence S 88 °41'28" W a distance of 615.26 feet;
Thence S 01 °18'32" E a distance of 80.00 feet; Thence S 88 °41'28" W a distance of 39.72 feet;
Thence N 01 °46'07" W a distance of 140.00 feet to the Point of Beginning, and containing
31,721.45 square feet, (0.728 acres) more or less, of new right -of -way, the remaining area
included within this description being present right -of -way.
Parcel 21A (Julia M. Stokes Revocable Trust Tract)
Commencing at the NW corner of the NE /4 of Sec.25, T -21 -N, R -13 -E, I.B. &M.; Thence N
88 °41'28" E along the north line of said NE/4 a distance of 696.37 feet; Thence S 01 °18'32" E a
distance of 60.00 feet to the Point of Beginning; Thence N 88 °41'28" E a distance of 615.26
feet; Thence S 01 °51'23" E a distance of 60.00 feet; Thence S 88 °41'28" W a distance of 170.06
feet; Thence N 01 °18'32" W a distance of 50.00 feet; Thence S 88 °41'28" W a distance of
445.78 feet; Thence N 01'18'32" W a distance of 10.00 feet to the Point of Beginning, and
containing 14,644.15 square feet, (0.336 acres), more or less.
Parcel 21.1 (Julia M. Stokes Revocable Trust Tract)
Commencing at the NW corner of the NE/4 of Sec.25, T -21 -N, R -13 -E, I.B. &M.; Thence N
88 °41'28" E along the north line of said NE/4 a distance of 917.37 feet; Thence S 01 °18'32" E a
distance of 70.00 feet to the Point of Beginning; Thence N 88 °41'28" E a distance of 224.78
feet; Thence S 01 °18'32" E a distance of 70.00 feet; Thence S 88 °41'28" W a distance of 224.78
feet; Thence N 01'18'32" W a distance of 70.00 feet to the Point of Beginning, and containing
15,734.44 square feet, (0.361 acres), more or less.
Parcel 25 (Mills Family Revocable Trust Tract)
Commencing at the SW corner of the SW/4 of Sec.19, T -21 -N, R -14 -E, I.B. &M.; Thence N
88 °56'25" E along the south line of said SE /4 a distance of 1366.75 feet to the Point of
Beginning; Thence N 01 °17'04" W a distance of 50.00 feet; Thence N 88 °56'25" E a distance of
1328.87 feet; Thence S 01 °17'16" E a distance of 20.00 feet; Thence S 88 °56'25" W a distance
of 99.74 feet; Thence S 01 °17'18" E a distance of 30.00 feet; Thence S 88 °56'25" W a distance
of 1229.14 feet to the Point of Beginning, and containing 43,170.92 square feet, (0.991 acres),
more or less of new right -of -way, the remaining area included within this description being
present right -of -way.
MEMORANDUM
TO: THE HONORABLE MAYOR AND CITY COUNCIL
CITY OF OWASSO
FROM: RODNEY J. RAY
CITY MANAGER
SUBJECT: HISTORIC FILLING STATION AND CNG PROJECT
FUNDRAISING COMMITTEE
DATE: July 2, 2010
BACKGROUND:
At the January 19, 2010 Regular Meeting of the Owasso City Council, Council members
approved the concept to reconstruct a historic filling station on Main Street and gave
authorization for the City Manager to form a fundraising committee for the reconstruction
project. Such authorization was given until June 30, 2010, pending the City Council did not
extend the authorization to a later date.
Since January, City staff has been successful in securing commitments from members of the
Owasso community and have found significant support for the reconstruction of the Main Street
filling station and CNG project. While proceedings with the current site landowner have taken
longer than initially expected, these delays have not affected the City's fundraising efforts or
lessened support within the community. To date, donations from two large corporations are in
the final stages of negotiation and are expected to be finalized within the next 30 days.
Additionally, several individual donors are waiting for the announcement of these two corporate
donations prior to finalizing their own personal donations.
REQUESTED ACTION:
Given that two major corporate donations are in the final stages of negotiation, City staff is
requesting an extension of the initial June 30, 2010 deadline for fundraising activities. Such
extension would allow staff to finalize both corporate donations, as well as pledged donations
from individual members of the community.
RECOMMENDATION:
Staff recommends City Council approval of an extension to the City Manager's authorization to
raise funds for the historic filling station reconstruction and CNG project to the date of October
1, 2010.