Loading...
HomeMy WebLinkAbout2006.07.25_City Council Agenda_SpecialPUBLIC NOTICE OF THE MEETING OF THE OWASSO CITY COUNCIL rYPF OF MEETING. Specia DATE: July 25, 2006 'fill E: 6:30 p.m. PLACE: Council Chambers, Old Central 13nilding 109 N. Birch Notice and agenda filed in the office of the City Clerk and posted at City Hall 8:00 a.m. on Friday, July 21, 2006. t Timothy D. oo ey, Assistant City an er 1. Call to Order Mayor Stephen. Cataudella 2.. Invocation Brian Loderhose, Silvercreek Church of the Nazarene 3. Flag Salute 4. Roll Call S vAge,,dasWo61\2006\0725 cja� Owasso City Council July 25, 2006 Page 2 5. Consideration and appropriate action relating to a request for Council approval of the Consent Agenda, All matters listed under "Consent" are considered by the City Council to be routine and will be enacted by one motion. Any Councilor may, however, remove an item from the Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable. A. Approval of Minutes of the July 11, 2006 Special Meeting and. July 18, 2006 Special Meeting, Attachment # 5 -A B. Approval of Claims. Attachment # 5-13 Ca Acknowledgement of receiving the monthly FY 2005-2006 budget status report. Attachment # 5-C PUBLIC HEARING 6. The City Council will conduct a public hearing for the purpose of receiving citizen comments and input regarding Annexation OA 06-10, a staff request to annex ten (10) properties as listed below; and, to solicit public comment regarding the annexation services plan for the territories proposed to be attached. Mr. Wiles Attachment #6 A public hearing will be held for the purpose of receiving citizen comments and input regarding Annexation OA 06-10, a staff request to annex ten (10) properties located at 1) 12919 E. 96th Street North, 2) 12901 E. 96"' Street North, 3) 12937 E 96tn Street North, 4) 9302 N. 129th East Avenue, 5) 9441 N. 1291h East Avenue, 6) 9309 N. 1291h East Avenue, 7) the southeast corner of E. 961h Street North and N. 129th East Avenue (undeveloped tract), 8) the right-of-way of HWY 169 from E. 961h Street North to E. 126th Street North and the right-of-way of HWY 169 from E. 76th Street North to the fenceline at E. 661h Street North, 9) the new Barnes Elementary School, 7809 E. 761h Street North, and 10) Hodson Elementary School, 14500 E. 861h Street North; and, to solicit public comment regarding the annexation services plan for the territories proposed to be attached. S\Agendas\Council\2006\0725,doc Owasso City Council July 25, 2006 Page 3 7. Consideration and appropriate action relating to a request for Council approval of annexation request OA 06-10, a staff request to annex ten (10) properties located at 1) 12919 E. 96th Street North, 2) 12901 E. 96th Street North, 3) 12937 E 96th Street North, 4) 9302 N. 129th East Avenue, 5) 9441 N. 129th East Avenue, 6) 9309 N. 129"' East Avenue, 7) the southeast corner of E. 96th Street North and N. 129th East Avenue (undeveloped tract), 8) the right-of-way of HWY 169 from E. 96th Street North to E. 126th Street North and the right-of-way of HWV 169 from E. 76th Street North to the fenceline at E. 66"' Street North, 9) the new Barnes Elementary School, 7809 E. 76th Street North, and 10) Hodson Elementary School, 14500 E. 86t1' Street North; and a request for Council approval of the annexation services plan for the territories proposed to be attached. Mr. Wiles Attachment #6 Staff will recommend Council approval of annexation request OA 06-10 and the annexation services plan for the territories proposed to be attached. 8. Consideration and appropriate action relating to a request for Council approval of annexation request OA 06-09, containing approximately 78.47 acres, more or less, located on the west side of N. 1291h East Avenue, approximately t/2 mile north of E. 66th Street North, just south of the Baptist Retirement Village. Mr. McCulley Attachment #8 Staff will recommend Council approval of annexation request OA 06-09. 9. Consideration and appropriate action relating to a request for Council approval of rezoning request OZ 06-04, containing two (2) one --acre lots from (AG) Agriculture to (RE) Residential Estate, located west of N. 145t11 East Avenue, south of E. 93rd Place North at 14220 E. 93`d Place North. Mr. McCulley Attachment #9 Staff will recommend Council approval of rezoning request OZ 06-04. S'VAgendasVCouncil\2006A072S.doc Owasso City Council July 25, 2006 Page 4 10. Consideration and appropriate action relating to a request for Council approval of a Final Plat for Kum & Go, L.C., containing approximately 2.17 acres, more or less, located at the northeast corner of N. 1451h East Avenue and E. 86"' Street North. Mr. McCulley Attachment # 10 Staff will recommend Council approval of the Kum & Go, L,C, Final Plat. 11. Consideration and appropriate action relating to a request for Council approval of a Change Order to the FY 2005-2006 Street Repair Project Contract in the amount of $6,651.12; acceptance of the completed construction; and, authorization for final payment to Magnum Construction, Incorporated. Mr. Alexander Attachment # 11 Staff will recommend Council approval of Change Order No. 1 to the FY 2005-2006 Street Repair Project Contract in the amount of $6,651.12; acceptance of the completed construction; and, authorization for final payment to Magnum Construction, Incorporated in the amount of $32,000.29. 12. Consideration and appropriate action relating to a request for Council authorization for payment to Oklahoma Natural Gas Company in the amount of $99,850.07 for the relocation of utilities associated with the E. 961h Street North and N. Garnett Road Intersection Improvement Project. Ms. Stagg Attachment # 12 Staff will recommend Council authorization for payment to Oklahoma Natural Gas Company in the amount of $99,850.07 for the relocation of utilities associated with the E. 961h Street North and N. Garnett Road Intersection Improvement Project. S:\Agendas\Coun61\2006\0725. doe Owasso City Council July 25, 2006 Page 5 13. Consideration and appropriate action relating to a request for Council approval of an Interlocal Agreement between the City of Owasso and Tulsa County for the FY 2006-2007 Street Rehabilitation Program and authorizing the Mayor to execute said Agreement. Ms. Stagg Attachment # 1.3 Staff will recommend Council approval of an Interlocal Agreement between the City of Owasso and Tulsa County for the F Y 2006-200 7 Street Rehabilitation Program, and authorization for the Mayor to execute said Agreement. 14. Consideration and appropriate action relating to a request for Council approval of an Interlocal Agreement between the City of Owasso and Tulsa County to provide improvements to E. 86111 Street North from Main Street to Memorial Road and authorizing the Mayor to execute said Agreement. Ms. Stagg Attachment # 14 Staff will recommend Council approval of an Interlocal A regiment between Tulsa County and the City of Owasso to provide improvements to E. 861 Street North, from Main Street to Memorial Road and authorization for the Mayor to execute said Agreement. 15. Consideration and appropriate action relating to a request for Council approval of an Engineering Services Agreement between C2A Engineering, Incorporated and the City of Owasso in the amount of $180,000 for services relating to the E. 86t" Street North Widening Improvement Project, from Main Street to Memorial Road; and, authorizing the Mayor to execute said Agreement. Ms. Stagg Attachment # 14 Staff will recommend Council approval of an Engineering Services Agreement between C2A Engineering, Incorporated and the City of Owasso in the amount of $180,000 for services relating to the E. 86t" Street North Widening Improvement Project, from Main Street to Memorial Road; and, authorization for the Mayor to execute said Agreement. S\Agendas\Counci I\2006\0725. doc Owasso City Council July 25, 2006 Page 6 16. Consideration and appropriate action relating to a request for Council approval of an Engineering Services Agreement between the City of Owasso and Cobb Engineering Company in the amount of $ 115,752.00 for services relating to the Main Street Streetscape Enhancement Project; and, authorizing the Mayor to execute said Agreement. Ms. Stagg Attachment # 16 Staff will recommend Council approval of an Engineering Services Agreement between the City of Owasso and Cobb Engineering Company in the amount of $ 115,752.00 for services relating to the Main Street Streetscape Enhancement Project; and, authorization for the Mayor to execute said Agreement. 17. Consideration and appropriate action relating to a request for Council approval to award a bid for the construction of a restroom facility located at Centennial Park. Mr. Warren Attachment # 17 Staff will recommend Council approval to award a bid for the construction of a restroom facility located at Centennial Park to Builders Unlimited of Tulsa, Oklahoma in the amount of $73,627.00. 18. Report from City Manager. 19. Report from City Attorney. 20. Report from City Councilors. 21. New Business (New Business is any item of business which could not have been foreseen at the time of posting of the agenda.) S \Agendas\Counci I\2006\0725.doc Owasso City Council July 25, 2006 Page 7 22. Adjournment. S:\Agendas\Counci I\2006\072S.doc OWASSO CITY COUNCIL MINUTES OF SPECIAL MEETING Tuesday, July 11, 2006 The Owasso City Council met in special session on Tuesday, July 11, 2006 in the Council Chambers at Old Central per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 5:00 p.m. on Friday, July 7, 2006. ITEM 1. CALL TO ORDER The meeting was called to order at 6:30 p.m. STEM 2. INVOCATION The invocation was offered by Mike Culbrcath, Rcjoicc Church, ITEM 3. FLAG SALUTE The Flag Salute was led by Councilor Guevara. ITEM 4. ROLL CALL PRESENT ABSENT Steve Cataudella, Mayor Brent Colgan, Vice Mayor D.J. Gall, Councilor Wayne Guevara, Councilor Susan Kimball, Councilor A quorum was declared present. STAFF Rodney J. Ray, City Manager Julie Lombardi, City Attorney ITEM 5. PRESENTATION OF THE CHARACTER TRAIT OF MEEKNESS, FOLLOWED BY A PUBLIC SERVICE ANNOUNCEMENT Mr. Ray Haynes, a member of the Owasso Character Council, presented to the Council `Meekness', the character trait of the month for July, 2006. At this tinge, Mayor Cataudella, presented to Ray Haynes a plaque coin m eni orating Mr. Haynes ' 23 years of service on the City of Owasso's Planning Commission; Mayor Cataudella then introduced Mr. Haynes' wife Janice and fellow Planning Commission member Charles Wiley. Owasso City Council July 11, 2006 ITEM 6. PRESENTATION OF THE CITY OF OWASSO EMPLOYEE OF THE MONTH Mr. Ray introduced to the Council Ginger Williamson, Administrative Assistant for the City's Support Services and Garage Departments, as the City's Employee of the Month for July, 2006. Present with Ms. Williamson was her husband David and children Denny and Stephanie. ITEM 7. CONSIDERATION AND APPROPRIATE ACTION RELATING 'TO A REQUEST FOR COUNCIL APPROVAL OF THE CONSENT AGENDA A. Approval of Minutes of the June 20, 2006 Regular Meeting. B. Approval of Claims. C. Approval of Ordinance No. 866, an ordinance approving annexation request OA 06-07, containing approximately 3.5 acres, more or less, located at the southwest corner of East 100t1i Street North and North 145"' East Avenue. D. Approval of Ordinance No. 867, an ordinance approving an easement closure of the northern one foot of an I V utility easement located on the south side of Lot 2, Block 4 (10106 North 114 East Avenue) in the Sawgrass Park addition. Mr. Colgan moved, seconded by Mr. Guevara, to approve the Consent Agenda with claims totaling $179,316.20, self-insurance medical claims & fees totaling $57,377.59 and payroll claims for two pay periods totaling $624,300.54. YEA: Cataudella, Colgan, Gall, Guevara, Kimball NAY: None Motion carried 5-0. ITEM 8. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR COUNCIL ADOPTION OF RESOLUTION NO. 2006-17, A RESOLUTION ACCEPTING BENEFICIAL INTEREST IN THE TULSA COUNTY VISION AUTHORITY, A PUBLIC TRUST, FOR AND ON BEHALF OF THE CITY OF OWASSO, OKLAHOMA Mr. Ray presented the item. Councilor Kimball and Mayor Cataudella both voiced their disappointment that the City of Owasso, one of the larger contributors to the Vision 2025 hind, had not been meet with or included as a Trust member. Mr. Colgan moved, seconded by Mr. Cataudella, for Council approval of Resolution No. 2006-17 accepting beneficial interest in the Tulsa County Vision Authority. YEA: Cataudella, Colgan, Gall, Guevara, Kimball NAY: None Motion carried 5-0. 2 Owasso City Council July 11, 2006 ITEM 9. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR COUNCIL APPROVAL OF A LETTER OF AGREEMENT BETWEEN THE CITY OF OWASSO AND HEARTLAND CONSULTING INCORPORATED FOR CONSULTING SERVICES IN RELATION TO TRANSPORTATION ISSUES Mr. Ray presented the itern. Ms. Kimball moved, seconded by Mr. Guevara, for Council approval of a Letter of Agreement for consulting services, as stated above. YEA: Cataudella, Colgan, Gall, Guevara, Kimball NAY: None Motion carried 5-0. ITEM 10. REPORT FROM CITY MANAGER. Mr. Ray introduced Todd Singer and Chad Bradley, representatives from Heartland Consulting Inc. Mr. Ray stated that he has spoken to Mr. Hart of the City of Tulsa, who stated that there has been a notice to proceed issued on the water transmission line and the project date has been moved up with anticipated completion in Spring/Summer 2007. Mr. Ray commended Ana Stagg, Roger Stevens, and Joe Nurre for their continued work on increasing the current water pressure in that area until the transmission line can be completed. ITEM 11. REPORT FROM CITY ATTORNEY None ITEM 12. REPORT FROM CITY COUNCILORS Ms. Kimball announced that the 3rd series of Art in the Park, scheduled for July 10, 2006, was cancelled due to inclement weather. The 4.rh and final series of Art in the Park for 2006 is scheduled to take place on Monday, July 20", 2006. Mayor Cataudella praised the Owasso Police Department on their hard work and extra hours on recent cases. ITEM 13. NEW BUSINESS None 3 Owasso City Council July 11, 2006 ITEM 14. ADJOURNMENT Mr. Guevara moved, seconded by Mr. Gall, to adjourn. YEA: Cataudella, Colgan, Gall, Guevara, Kimball NAY: None Motion carried 5-0 and the meeting was adjourned at 7:13 p.m. Stephanie Breitbarth, Minute Clerk Steve Cataudella, Mayor 4 OWASSO CITY COUNCIL MINUTES OF SPECIAL MEETING Tuesday, July 18, 2006 The Owasso City Council met in a special meeting on Tuesday, July 18, 2006 in the Council Chambers at Old Central, 109 N. Birch Street, per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 11:00 AM on Friday, July 14, 2006. ITEM 1: CALL, TO ORDER, Mayor Cataudella called the meeting to order at 6:02 PM. PRESENT ABSENT Steve Cataudella, Mayor None Brent Colgan, Vice Mayor Susan Kimball, Councilor Wayne Guevara, Councilor D.J. Gall, Councilor (arrived at 6:30pm) A quorum was declared present. ITEM 2: DISCUSSION RELATING TO COMMUNITY DEVELOPMENT DEPARTMENT ITEMS A. ANNEXATION (1) B. REZONING (1) C. FINAL PLAT (1) D. ANNEXATION SERVICES PLAN (OA 06-10) Mr. Rooney reviewed the above items (Annexation OA 06-09, Rezoning OZ 06-04, Kum & Go Final Plat, and Annexation OA 06-10) and acknowledged staff s intent to place each item on the July 25, 2006 City Council agenda for action. ITEM 3: DISCUSSION RELATING TO PARKS DEPARTMENT ITEMS A. CENTENNIAL PARK RESTROOM Mr. Rooney reviewed the above item and acknowledged staff s intent to place the item on the July 25, 2006 City Council agenda for action. ITEM 4: DISCUSSION RELATING TO PUBLIC WORKS DEPARTMENT ITEMS A. TULSA COUNTY INTERLOCAL AGREEMENT — 2006-07 STREET REHABILITION PROGRAM B. UTILITY RELOCATION AGREEMENT — E. 86" STREET NORTH and N. MINGO ROAD INTERSECTION IMPROVEMENT PROJECT Mr. Rooney presented the above items and acknowledged staff s intent to place an action item regarding the Interlocal Agreement on the July 25, 2006 City Council agenda. Owasso City Council July 18, 2006 ITEM 5: DISCUSSION RELATING TO POLICE DEPARTMENT ITEMS A. PROPOSED FALSE ALARM CITIZEN'S COMMITTEE Mr. Rooney presented the above item and Council discussion was held regarding the creation of a citizen's committee to examine issues contributing to an increased number of false alarms and recommend possible solutions. ITEM 6: DISCUSSION RELATING TO CITY MANAGER ITEMS A. POLICY RELATING TO CITIZEN'S REQUEST TO .ADDRESS CITY COUNCIL REGARDING AGENDA ITEMS B. ENGINEERING SERVICES AGREEMENT FOR E. 86" STREET NORTH WIDENDING PROJECT FROM MAIN STREET TO MEMORIAL ROAD C. MAIN STREET REDEVELOPMENT PROJECT D. DEVELOPMENT ISSUES E. CITY MANAGER'S REPORT The above items were reviewed by Mr. Ray and Council discussion was held. Topics of discussion in Item E included Rogers County Rural Water District, specifically undeveloped land located at 761h Street North and N. 1291h E Avenue, south of the Baptist Retirement Village; a request from Rogers County Board of Commissioners relating to E911 fees; a status report on the ONG building located on E. 96"' Street North; and a review of the Sales Tax Report for June 2006. ITEM 7: STATUS REPORT PRESENTATION AND DISCUSSION OF ISSUES RELATING TO THE CREATION AND PURPOSE OF THE VISION 2025 TRUST Mayor Cataudella presented the above item and Council discussion was held regarding the creation and purpose of the Tulsa Count Vision 2025 Trust. ITEM 8: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR AN EXECUTIVE SESSION FOR THE PURPOSE OF DISCUSSING PERSONNEL MATTERS RELATING TO THE OFFICE OF THE CITY MANAGER, SUCH EXECUTIVE SESSION PROVIDED FOR IN O S 25 SECTION 307(B)(1). Councilor Kimball moved, seconded by Councilor Colgan, to enter into Executive Session. All were in favor of the motion and the Council entered into Executive Session at 9:10 PM. YEA: Colgan, Guevara, Kimball, Cataudella, Gall NAY: None Motion carried 5-0. The Council exited Executive Session at 10:37 PM. Is Owasso City Council July 18, 2006 ITEM 9e ADJOURNMENT Councilor Colgan moved, seconded by Councilor Call, to adjourn, All were in favor and the meeting was adjourned at 10:37 PM. YEA: Colgan, Guevara, Kimball, Cataudella, Call NAY: Done Motion carried 5-0. Stephen Cataudella, Mayor 3 CITY OF OWASSO CLAIMS TO BE PAID 07/25/06 VENDOR DESCRIPTION AMOUNT AEP/PSO STREET LIGHTS 13.74 GOLDSTE|N'REBECCA SECURITY DEPOSIT REFUND 300.00 REFUND TOTAL -------' 313.74 LAW ENFORCEMENT SYSTEMS CITATION BOOKS 970.00 SUPREME PRINTING &STATIONERY WARNING BOOKS 175.12 TREASURER PETTY CASH MEETING EXPENSE 38.00 TREASURER PETTY CASH MEETING EXPENSE 29.02 0KLATRANSPORTATION AUTHORITY PIKE PASS 8.70 DELL MARKETING L.P. COMPUTER 904.09 MUNICIPAL COURT DEPT TOTAL --------- 2,124.43 TREASURER PETTY CASH CITY MGREXPENSE 131.10 TREASURER PETTY CASH CITY MGRMEETING EXPENSE 19741 DCSCENTRAL PRINTING PROCLAMATION COVERS 24940 0KLAHDk8ABAR ASSOCIATION OBAFORMB0OK 285.00 CITY GARAGE CITY OFOVVASS0 VEH|CLEMA|NT 524.31 FUELMAN FUELJUNE 229.00 C|NGULARVV|RELESS PHONE USE -RAY 84.02 TREASURER PETTY CASH MILEAGE-8OUTVVELL 39.01 OKLATRANSPORTATION AUTHORITY PIKE PASS 1720 WAL-MARTCOMMUN|TY COUNCIL MEETING 44.42 TREASURER PETTY CASH COUNCIL MEETING EXPENSE 33.04 TREASURER PETTY CASH MEETING EXPENSE 33.21 TULSAMETRO CHAMBER 0FCOMMERCE REGISTRATION FEE 30.00 CARD CENTER MUSIC -FIREWORK DISPLAY 0.88 CUSTOM CRAFT AWARDS RECOGNITION PLAQUE 05.00 TREASURER PETTY CASH EOM RECOGNITION 25.00 NE8TRAFFIC SAFETY MESSAGE BOARD 440.00 MANAGERIAL DEPTTOTAL 2'440.18 GLOBAL DOCUGRAPH|XUSA CHECKSTOCK 050.00 OFFICE DEPOT OFFICE SUPPLIES 11.89 TREASURER PETTY CASH SUPPLIES 10.84 TREASURER PETTY CASH K4EET|NGEXPENSE/k4|LEAGE-HESS/B|SHOP 240.18 OKLATRANSPORTATION AUTHORITY PIKE PASS 3.05 A|CPA(C0RP0RAJ|UN) MEMBERSHIP DUES 304.00 0KLAHOMAMUNICIPAL LEAGUE CERTIFICATION FEE 50.00 FINANCE UEPTTOTAL -------- .,-.--- CARD CENTER OSHA 38.49 CARD CENTER REGULATION BOOKS 31.40 DAN|ELJ0HNSTON PGARECORD|NG 711.00 INTEGRITY FOCUS CHARACTER CONSULTATION 375.00 WORLD PUBLISHING COMPANY EMPLOYMENT ADVERTISING 148.23 COMMUNITY PUBLISHERS EMPLOYMENT ADVERTISING 17.00 AMER/CANCHECKED BACKGROUND CHECKS 104.88 REASORS MEETING EXPENSES 7.97 HUMAN RESOURCE DEPTTOTAL 1`433.98 VENDOR DESCRIPTION AMOUNT SILENTWHISTLE SUBSCRIPTION FEE 2006 1,500.00 CHARNEY, BUSS, & WILLIAMS, P.C. PROFESSIONAL SERVICES 31.25 HEARTLAND CONSULTING CONSULTING SERVICES 10,500.00 AMERICAN WASTE CONTROL REFUSE SERVICE 129.00 AEP/PSO 06/06 USE 5,647.38 OKLAHOMA NATURAL GAS 06/06 USE 354.05 COMMUNITY PUBLISHERS ADVERTISING 69.60 TULSA COUNTY CLERK FILING FEES 45.00 COMMUNITY PUBLISHERS LEGAL POSTINGS 336.00 OKLAHOMA MUNICIPAL LEAGUE ANNUAL SERVICES 19,895.68 COMMUNITY PUBLISHERS LEGAL POSTINGS 132.00 GENERAL GOVERNMENT DEPT TOTAL 38,639.96 OFFICE DEPOT OFFICE SUPPLIES 139.99 THE UPS STORE BLUEPRINT COPIES 3.98 HOBBY LOBBY CREATIVE CENTER OPERATING SUPPLIES 43.95 SAV-ON PRINTING & SIGNS LABELS 336.06 SAMS CLUB GB FLASH DRIVES 78.32 CITY GARAGE CITY OF OWASSO VEHICLE MAINT 266.87 FUELMAN FUEL-JUNE 563.31 BENCHMARK SURVEYING & LAND SERVICES LEGAL DESCRIPTIONS 960.00 DENNIS G BUNYARD MOWING 125.00 TULSA COUNTY MIS DIAL UP SERVICE 60.00 DELL MARKETING L.P. COMPUTER 924.42 DELL MARKETING L.P. MONITORS 358.20 COMMUNITY DEVELOPMENT DEPT TOTAL _ 3,860.10 CARTRIDGE WORLD TONER CARTRIDGE 19.00 CARTRIDGE WORLD OFFICE SUPPLIES 61.50 WAL-MART COMMUNITY COFFEE MAKER 27.88 CITY GARAGE CITY OF OWASSO VEHICLE MAINT 235.98 FUELMAN FUEL-JUNE 470.91 LOGOS STAFFING INTERNATIONAL PERMANENT PLACEMENT FEE 16,250.00 US CELLULAR CELL PHONE USAGE 69.01 OKLA STATE BOARD ENGINEERING CENTER ENGINEERING LICENSE-ARZU 50.00 ENGINEERING DEPT TOTAL 17,184.28 OFFICE DEPOT BUSINESS CARD NOTEBOOK 6.48 CARD CENTER ANNUAL RENEWAL 61.12 OKLA TRANSPORTATION AUTHORITY PIKE PASS 6.70 WAL-MART COMMUNITY GRAPHIC CARDS 22.00 DELL MARKETING MONITORS 358.20 ENVIRONMENTAL SYSTEMS RESEARCH MAINTENANCE SERVICES 1,900.00 INFORMATION SYSTEM DEPT TOTAL 2,354.50 SAMS CLUB OPERATING SUPPLIES 82.56 CARD CENTER LINE SPLITTER 4.99 ROBERTSON PLUMBING SUPPLY PHYSICAL PROPERTY SUPPLIES 17.43 LOWES HOME IMPROVEMENT PHYSICAL PROPERTY SUPPLIES 326.79 LOWES HOME IMPROVEMENT CURB SIGN/MULCH 245.30 HOME DEPOT SUPPLIES 2.29 ASSOCIATED PARTS & SUPPLY PHYSICAL PROPERTY SUPPLIES 42.34 LOWES HOME IMPROVEMENT PHYSICAL PROPERTY SUPPLIES 336.72 VENDOR DESCRIPTION AMOUNT AMERIFLEX HOSE & ACCESSORIES PHYSICAL PROPERTY SUPPLIES 48.50 UNIFIRST HOLDINGS UNIFORM RENTAL 16.04 CITY GARAGE CITY OF OWASSO VEHICLE MAINT 368.96 FUELMAN FUEL-JUNE 384.27 CARRIER COMPANY REPAIRS -AIR SYSTEM 262.50 BROADWAY CARPET & TILE CO FLOOR TILE REPLACEMENT 5,771.00 FLYNN'S PEST CONTROL PEST CONTROL 110.00 COX COMMUNICATIONS INTERNET SERVICE-OC 69.95 FUELMAN FUEL-JUNE 296.65 LOWES HOME IMPROVEMENT PLANTS/SHRUBS 241.95 WORLEYS GREENHOUSE & NURSERY LANDSCAPING PLANTS 41.00 SUPPORT SERVICE DEPT TONAL _ _ 8,669,24 MILL CREEK LUMBER & SUPPLY PLYWOOD 451.20 FUELMAN FUEL-JUNE 75.08 VVEC CEMETERY USAGE 12.66 AEP/PSO 06/06 USE 16.74 BAILEY EQUIPMENT MOWER REPAIR SERVICE 148.37 CEMETERY DEPT TOTAL 704.05 OFFICE DEPOT BOOKCASE-JONES 79.99 OFFICE DEPOT OFFICE SUPPLIES 105.97 SAV-ON PRINTING & SIGNS STAMP 19.20 WAL-MART COMMUNITY PCI CARD 14.62 OFFICE DEPOT CHAIR 70.00 GALL'S INC DISPOSABLE CUFF CUTTERS 21.99 GALL'S INC TOOL BACK PACK 109.49 TREASURER PETTY CASH SUPPLIES -FLAGS 90.64 TREASURER PETTY CASH SUPPLIES 19.45 GALL'S INC HAND CUFFS/TROUSERS 55.58 CITY GARAGE CITY OF OWASSO VEHICLE MAINT 5,914.30 FUELMAN FUEL-JUNE 8,759.34 TREASURER PETTY CASH FUEL 25.25 APERTURES EVIDENCE PHOTO COPIES 64.33 OKLAHOMA POLICE SUPPLY BADGE-REFINISH/REPAIR 40.50 TULSA REGIONAL MEDICAL CENTER LAB WORK 25.00 OWASSO FITNESS ZONE PHYSICAL FITNESS PROGRAM 75.00 HOWARD E STAMPER RADIO REPAIR SERVICES 150.00 AEP/PSO 06/06 USE 3,167.08 OKLAHOMA NATURAL GAS 06/06 USE 199.81 YALE CLEANERS UNIFORM CLEANING 2,115.73 CINGULAR WIRELESS PHONE USE 281.20 YANCEY, DAN M. TRAVEL REIMB 410.70 TREASURER PETTY CASH MTG EXPENSE/PER DIEM-DRIVER/DENTON 209.87 TREASURER PETTY CASH PER DIEM-MUTII/BARNES/CLEVELAND 197.10 CARD CENTER CAR RENTAL-YANCEY 197.77 OK SECRETARY OF STATE NOTARY BOND FILING-LYNN 10.00 IPMBA MEMBERSHIP RENEWAL-KITCH 50.00 MURRAY WOMBLE BUILDING MATERIALS 1,232.00 MIKE'S HOME REPAIR & REMODEL DISPATCH WINDOW/WALL 2,475.00 FLEET DISTRIBUTORS EXPRESS EQUIPMENT FOR SUV 4,465.09 POLICE DEPT TOTAL 30,652.00 ONYX CORPORATION WAL-MART COMMUNITY WAL-MART COMMUNITY TOTAL RADIO DEPARTMENT OF PUBLIC SAFETY ALLIANCE MEDICAL WAL-MART COMMUNITY ONYX CORPORATION PATROLTECHNOLOGY FUELMAN STRATHE VETERINARY HOSPITAL_ AEP/PSO NATIONAL FIRE PROTECTION A Z RUBBER STAMP & ENGRAVING OKLAHOMA POLICE SUPPLY FERRARA FIRE APPARATUS CITY GARAGE CITY OF OWASSO ATC FREIGHTLINER GROUP FUELMAN AEP/PSO OKLAHOMA NATURAL GAS TAYLORMADE LOCK & KEY CLASSIC ELECTRIC COMPANY TREASURER PETTY CASH TREASURER PETTY CASH FIRE PROTECTION PUBLICATIONS OSU OKLA TRANSPORTATION AUTHORITY #ESCRIPTION O in INK JET CARTRIDGE 15.95 PANTS -DISPATCH 65.72 PRISONER MEALS 299.82 MAINT CONTRACT 675.00 EQUIPMENT RENTAL. 650.00 POLICE COMMUNICATION DEPT TOTAL T706.49 RUBBER GLOVES 82.85 CAT LITTER/KEYS 40.37 INK JET CARTRIDGE 19.95 UNIFORM-HOWARD/BAKER 194.00 FUEL-JUNE '167.63 EUTHANASIA/RABIES TESTING 138.00 06/06 USE 330.57 ANIMAL CONTROL DEPT 973.37 MEMBERSHIP DUES-CLARK 1,246.50 NAME PLATES 156.75 UNIFORM-INGRAM 279.60 TRUCK PARTS 29.33 VEHICLE MAINT 2,628.07 PARTS 42.72 FUEL-JUNE 1,088.07 06/06 USE 996.09 06/06 USE 229.24 REMOVE/REPLACE LOCK 47.50 ELECTRICAL SERVICE 105.00 LODGING-STUCKEY/WAKLEY 273.77 MEETING EXPENSE 105.90 TRAINING MATERIALS 216.00 PIKE PASS 11.90 FIRE DEPT TOTAL ---- 7,456.44 DELL MARKETING PRINTER/TONER 328.99 VVEC STORM SIRENS 24.48 AEP/PSO 06/06 USE 135.73 EMERGENCY PREPAREDNESS DEPT TOTAL 489.20 LOWES HOME IMPROVEMENT EQUIPMENT ONE RENTAL & SALES H & H INDUSTRIES GEORGE & GEORGE SAFETY AND GLOVE ATWOODS LOWES HOME IMPROVEMENT GEORGE & GEORGE SAFETY AND GLOVE GEORGE & GEORGE SAFETY AND GLOVE UNIFIRST HOLDINGS UNIFIRST HOLDINGS GEORGE & GEORGE SAFETY AND GLOVE NES TRAFFIC SAFETY CITY GARAGE CITY OF OWASSO FLEET DISTRIBUTORS EXPRESS FUELMAN FORM BOARDS 6.02 PROPANE 90.68 CROSSWALK BULBS 519.40 GATORADE 13.55 MAINT SUPPLIES 16.91 BARRICADE SECURITY 112.00 REPAIR/MAINT SUPPLIES 8.12 UNIFORMS/PROT CLOTHING 19.95 UNIFORM RENTAL/CLEANING 34.95 UNIFORM RENTAL/CLEANING 33.70 UNIFORM GEAR 21.52 HARDWARE/STREET SIGNS 75.50 VEHICLE MAINT 812.80 STROBE LIGHT KIT 199.95 FUEL-JUNE 1,105.08 VENDOR DESCRIPTION AMOUNT ATVVODDS SMALL TOOLS/MINOR EQUIP 00.98 WHITE STAR MACHINERY & SUPPLY CO. MINOR EQUIP 28.00 AEP/PSO 06/06U3E 1.113.18 AEP/PSO STREET LIGHTS 4.726.88 US CELLULAR CELL PHONE USAGE 3440 TREASURER PETTY CASH CDLL|CENGE-VV00DS 08.50 SPEEDVVAYCHEVROLET CHEVYSERVICE TRUCK 3800088 STREETS DEPT TOTAL LDVVEGHOME IMPROVEMENT TRASH BAGS 5120 EAST J0RDANIRON WORKS FRENCH DRAIN INSTALLATION 2.200.80 ANZSIGNS &SHIRTS DECALS 50.00 GE0RGE&GEORGESAFETY AND GLOVE GATORADE 13.54 ATVVOODS MA|NTGUPPL!E8 4.00 8E0RGE&GEORgESAFETY AND GLOVE REPA/R8NA|NTSUPPL|ES 8.12 ESTE8.|NC CHEMICALS 294.80 8EORGE&GEORGESAFETY AND GLOVE UN|F0RK4S/PROTCL0TH|NG 10.94 UN|F|RSTHOL0NGS UNIFORM RENTAL/CLEANING 35.93 GELLC0UNIFORMS &SHOES BOOTS -HEATH 124.04 UN/F/R8THOLD|NGS UN|FORMRENTAL/CLEAN|NG 35.93 GE0RGE&GE0RGESAFETY AND GLOVE UNIFORM GEAR 21.52 CITY GARAGE CITY OFOVVASSO VEH|CLEMA|NT 347.00 FUELMAN FUEL-JUNE 898.25 LOT MAINTENANCE /NOVV|NG 3'250.00 VVORLEYSGREENHOUSE &NURSERY TREES 22.365.00 |Ck4 LASER LEVEL 348500 STORK0VVATERDEPTTOTAL 33,271.73 LIBERTY FLAGS PLEATED FAN N/GTARO 373.40 LOVVEGHOME IMPROVEMENT HOOKS 2.70 ATVVOODS NUTS/B0LTS/SOCKETGET 21.51 FUELMAN FUEL-JUNE 044.90 D&SONS LAWN CARE LAWN 8ERV/CE-ATURPARK 80.00 D&SONS LAWN CARE LAWN SERVICE -CENTENNIAL PARK 099.00 D&SONS LAWN CARE LAWN SERVICE -VETERANS PARK 00.00 AEP/PSO 06/06 USE 1.514.88 ATYOUR SERVICE RENTALS PORTABLE RE8TR0OKX RENTALS 120.08 AALL ANIMAL CONTROL WATERFOWL RELOCATION 375000 PARKS QEPTTOTAL 7,566.54 VVAL'MARTCOMK8UN|TY SUPPLIES 104.33 CARD CENTER TELEPHONES 89.87 FUELyNAN FUEL-JUNE 180.85 TWIN CITIES READY MIX CONCRETE -SIDEWALK 409.00 LOVVES HOME IMPROVEMENT WAREHOUSE FUSES 14.06 AEP/PSO 0800 USE 1.232.02 0KLAH0K8ANATURAL GAS 0000 USE 70.05 VYAL-MARTCOM&1UN|TY HP PRINTER 58.00 COMMUNITY CENTER DEPTTDTAL 2,247.08 OFFICE DEPOT OFFICE SUPPLIES 134.87 EK4TEC PEST CONTROL TERMITE CONTROL 200.00 AEP/PSO 08/00 USE 304.22 VENDOR DESCRIPTION AMOUNT OKLAHOMA NATURAL GAS 00/00USE 30.30 OKLAHOMAMUSEUMS ASSOCIATION ANNUAL MEMBERSHIP 35.00 CARD CENTER CAMERA 234.30 FIXTURE OUTLET SHOWCASES 262160 HISTORICAL �ANSEUK0DEPT TOTAL ---������ -.--~..~ FUELMAN FUELJUNE 00.30 CROSSROADS COMMUNICATIONS PROFESS |ONAUTECH SERVICES 150.00 B0OKHDUSE GROUP BOOKS 5.19345 C|NGUL4RVV|RELE8S PHONE USE-HAYES 84.03 TREASURER PETTY CASH MEETING EXPENSE 40.07 BUSINESS 2.0 SUBSCRIPTION 14.93 WORLD PUBLISHING COMPANY SUBSCRIPTION 82.80 BUSINESS WEEK SUBSCRIPTION 58.87 |EDC MEMBERSHIP DUES 325.00 CONWAY DATA SUBSCRIPTION 80.00 LONE STAR OVERNIGHT OVERNIGHT DELIVERY 8.06 ECONOMIC DEVELOPMENT DEPTTOTAL 6'150.23 GENERAL FUND TOTAL T2O,�184�1| TACKETT.ETTA REFUND#7844 481.14 8TJ0HN MEDICAL CENTER ECC HANDBOOKS 30.00 STJOHN MEDICAL CENTER ECCHANDB00KS 00.00 TR|-AN|K4 HEALTH SERVICES PATIENT SUPPLIES 20024 S&VVHEALTHCARE CORP CHART PAPER 112.47 MEDICAL COMPLIANCE SPECIALTY B/O-WASTED|GPOSAL 215.00 CITY GARAGE CITY OF OWASSO VEHICLE K4A|NT 022.77 FUELK4AN FUEL-JUNE 2.317.39 K8ED|CLA|MC MONTHLY SERVICES 4.806.47 24-7EM8 GU8SCR|PT|ON'24LESSUNG 157800 AMBULANCE SERVICE FUND TOTAL 10,853�.�48 � SOUTHWESTERN BELL E911 FEES 1,868.68 E911 FUND TOTAL 1,888.��� TREASURER PETTY CASH AC REFUND8'REGG|E/FARRELL 80.00 TREASURER PETTY CASH AC REFUNDS 50.08 ANIMAL STERILIZATION FUND TOTAL ---130.00� ===== C2AENG|NEER|NS ENG|NEER|NGGVS'80/M|NGO 400.00 POE &ASSOCIATES O807C|PSTREET REHAB PROJECT 1.136.05 CHARNEY. BUSS, &VV|LL|AK8S. P.C. PROFESSIONAL SERVICES 125.00 VVORLEYSGREENHOUSE &NURSERY WETLAND MITIGATION 8.030.00 LANDRUNSERV/CES RE6RAD|NG/SODD|NG-NGARNETTRD 750.00 KEYSTONE SERVICES DRAINAGE SITE |K8PROVEMENTO1/7/OO 93,051.42 CAPITAL IMPROVEMENTS FUND TOTAL 103,493.�07 VVAYESTSAFETY SCBA UPGRADE 27,696.00 FIRE CAPITAL FUND TOTAL 2769800 ��� CURRENTS8FTVVARE ANNUAL RENEWAL 500.00 OYRE|LLYAUTOMOT|VE UN!F|RSTHOLD|NSS FUELMAN D'RE|LLYAUTOMOT|VE T&VVT|RE OK TRUCK SUPPLY UNITED FORD B&MOIL COMPANY CUMK4|N8SOUTHERN PLAINS FRICTION PRODUCTS O'RBLLYAUTDk80T|VE AEFYP80 DKLAHOMNNATURAL GAS QUALITY TIRE & AUTO SERVICE DELL MARKETING SELECT ACTUARIAL SERVICE CITY OF0VVA8S0|K4PREGTACCOUNT UNITED SAFETY &CLAIMS 0KTAX COMMISSION SPECIAL TAX UNIT CITY OFOVVASSO|MPRE8TACCOUNT CITY OFOYVASSO|K8PRESTACCOUNT FOSTERS PAINT & BODY SHOP DESCRIPTION AMOUNT SHOP SUPPLIES 2.99 UNIFORM RENTAL 26.08 FUELJUNE 03.47 PARTS FOR RESALE 234.92 TIRES 487.34 PARTS FOR RESALE 00.55 P8RT8FOR RESALE 348.50 OIL FLUIDS 1.909�9H PARTS FOR RESALE 157.14 PARTS -LADDER TRUCK 135.90 PARTS FOR RESALE 1.118.45 00D0USE 583.13 UND8USE 04.98 WHEEL ALIGNMENT 48.95 COMPUTER 117030 CITY GARAGE FUND TOTAL ACTUARIAL SERVICES 3.500.00 WORKERS COMP LEGAL 119.05 THIRD PARTY ADM|NFEES 1.450.00 M|TFVVORKER8 COMP TAX 3.430.23 WORKERS COMPENSATION MEDICAL CLAIMS 695.93 WORKERS COMP TTDCLAIMS 170375 WORKERS COMP FUND TOTAL TORT CLAIM 541.80 SELF INSURANCE FUND TOTAL -541.80 ===== GRAND TOTAL _�_82_,61902 CITY OF OWASO HEALTHCARE SELF INSURANCE FUND CLAIMS PAID PER AUTHORIZATIOfq OF ORDINANCE #71-A AETNA HEALTHCARE MEDICAL SERVICE HEALTHCARE MEDICAL SERVICE HEALTHCARE MEDICAL SERVICE ADM|NFEE STOP LOSS FEE HEALTHCARE DEPT TOTAL DELTA DENTAL DENTAL MEDICAL SERVICE DENTAL MEDICAL SERVICE ADW|NFEE8 DENTAL DEPT TOTAL VGP VISION MEDICAL SERVICES VISION DEPT TOTAL HEALTHCARE SELF INSURANCE FUND TOTAL 14185.61 20,905.58 27,075.43 12,428.78 4 ,441.70 93,037.10 3,923.20 3,097.80 102,726.12 CITY OF OWASSO GENERAL. FUND PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 7/8/2006 Department Overtime Expenses Total Expenses 1 N-1 Human Resourses 0.00 - --- --- 6,699.68 eeneral Fund Total y' 378,,82 Garaqe Fund Ambulance Fund Fund Tofa''b"R111,11 . ... . .... . 067 20 Emergency 911 Fund Workers Compensation CITY 0F0VN\ SO GENERALFUND FISCAL YEAR 20U5-2O0G Statement ofRevenues &Expenditures AaofJune 88.2OU0°° MONTH YEAR --TO-DATE TO -DATE BUDGET REVENUES: Taxes $ 1.225.874 14.378.073 $ 13.982.500 Licenses &permits 20.761 374.115 402.000 Intergovernmental 61.678 584`887 534.728 Charges for services 20.955 218.016 187.300 Fines &forfeits 44.532 405.667 322.500 Other 8.879 210.156 123.428 TOTAL REVENUES — EXPENDITURES: Personal services 633.688 8,129.467 8.341.970 Materials &supplies 101.310 600.170 578.028 Other services 118.490 1.013.344 1.065.704 Capital outlay 162.358 1.063.340 2.023.713 TOTAL EXPENDITURES � REVENUES OVER EXPENDITURES 308,825 TRANSFERS |N(OUT): Transfers in Transfers out TOTALTRANSFERS FUND BALANCE (GAAPBasis) Beginning Balance Ending Balance Beginning Balance Ending Balance I 4,110,132 3118391 3119391 "Note: Report is not final for fiscal year end. Accounts payable are still in process. TO, THE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO FROM: ERIC WILES COMMUNITY DEVELOPMENT DIRECT OR SUBJECT. ANNEXATION OA 06-I0 DATE: July 19, 2006 The staff has studied the possibility of annexing ten different properties in close proximity to the city limits of Owasso. These areas include property that is undeveloped and surrounded by municipal boundaries, the right-of-way of Hwy. 169, two elementary schools, and a church. Specifically, the areas of property are: 1. 12919 East 96"' Street North 2. 12901 East 96t" Street North 3. 12937 East 96t" Street North 4. 9302 North 129"' East Avenue 5. 9441 North 129t" East Avenue 6. 9309 North 129t" East Avenue 7. The undeveloped tract at the southeast corner of East 961" Street North and North 1291" East Avenue 8. The right-of-way of Hwy. 169 from East 96t" Street North to East 126t" Street North, and the right-of-way of Hwy. 169 from East 76t" Street North to the fenecline at East 76t" Street North 9. The new Barnes Elementary School, 7809 East 76t" Street North 10. Hodson Elementary School, 14500 East 86t" Street North The staff arrived at the determination of properties that should be annexed by evaluating recent growth patterns and the level of service that could be provided to the areas of annexation. Particular weight was given to properties that are completely surrounded by corporate limits, and weight was also given to undeveloped acreages. IM-1i71k�AD Within the annexation ordinance, the City of Owasso has the choice of either incorporating the properties as AG Agricultural or as the current zoning classification given by the County. The staff intends to recommend that the properties be annexed with the zoning classification given to them previously by Tulsa County. The 10 acres at 9302 North 1291" East Avenue and the Episcopal Church are each zoned AG Agricultural, as are the two properties at the southeast corner of East 96"' Street North and North 129t" East Avenue. The properties located northeast of the intersection of East 96`" Street North and North 129"' East Avenue are zoned CS Commercial. It should be noted that annexation does not change the current land use of the properties. If a property that is annexed is occupied by a residential structure, that structure may remain and the use of that structure may continue indefinitely. Similarly, if a property is being used for the upkeep of livestock, the keeping of livestock may continue indefinitely. First, the City Council, by adoption of Resolution 2006--1 5 on June 20, 2006 has directed the city staff to prepare and publish notice of two public hearings concerning the annexation. This resolution also directs that an annexation services plan be prepared for the affected properties. The Planning Commission conducted the first public hearing on July 10, 2006 and recommended approval of the annexation to the City Council. The City Council would conduct the second public hearing, followed by its consideration of possible action related to the annexation. Finally, an ordinance effectively annexing the properties would have to be adopted. It is the staff s findings that the ten properties under consideration for annexation are a part of the Owasso community and ought to be a part of the Owasso incorporated area. After all, the two schools serve Owasso residents, the highway right-of-way is sandwiched by Owasso's corporate limits, and the residents who live in this territory shop in Owasso, go to church in Owasso, are part of the Owasso school district, have the Owasso zip code, and in large part consider themselves to be contributing parts of Owasso. This annexation would be another step in a continuing attempt to make the city's boundaries more uniform, and to remove many of the gaps within Owasso's corporate limits. Past decisions by the Tulsa County Board of Commissioners, made contrary to the designs of the Owasso Masten- Plan, have shown that it is reasonable that the City should examine unincorporated parts of the community throughout the area for the purpose of bringing uniformity to the city boundaries. Owasso has prepared an annexation services plan as part of the annexation process, and this plan will have to be implemented as part of the Capital Improvements plan within ten years. The annexation services plan is included as atz attachment to this memorandum. Owasso fire and ambulance service already serve the area. Police and Community Development services will extend to the territory immediately upon annexation. Water lines are in place and currently serve the area. Sewer mains lie in the immediate vicinity of the areas and will be extended to the properties at the owners' request and expense. Refuse collection service will be made available to the properties, but not mandatory; the City of Owasso will not forcibly take over the area from existing refuse collection providers. The roads and stormwater drainage systems within the territory will be maintained to the levels of their current condition. The staff recommends City Council conduct a. Public Hearing for the purpose of gathering citizen comment regarding the proposed annexation. In addition, staff recommends City Council approval of the anncxatio» of the ten subject properties. ATTACHMENTS 1. Case map 2. Annexation services plan o ,zg . ... . .. . . Owasso Con-anu-nify Dovelopinent Dopartmccmt I I I R Main SL Otm9so., OK 74055 918.376.1500 918,376.1597 wunw.city0fowassoxam ANNEXA-TIONS MMWMM-9-10-10a�M- N�t'o Or TME ANNEXATION SERVICES PLAN The City of Owasso proposes to extend the municipal limits of the City to the following areas of property: 1. 12919 East 9e Street North 2. 12901 East 96th Street North 3. 12937 East 96'h Street North 4. 9302 North 129"' East Avenue 5. 9441 North 120'h East Avenue 6. 9309 North 129 th East Avenue 7. The undeveloped tract at the southeast corner of East 96th Street North and North 129P East Avenue 8. The right-of-way of Hwy. 169 from East 96th Street North to East 126 th Street North, and the fight -of -way of Hwy. 169 from East 76th Street North to the railroad overpass 3/4 mile to the south 9. The new Barnes Elementary School, 7809 East 76t" Street North 10. Hodson Elementary School, 14500 East 86"' Street North The plan's implementation will be completed by July 11, 2016, and is considered to be included in the Owasso Capital Improvements Plan. Police Protection — Police services for the area will be available on the date that the annexation becomes available. Fire Protection — The City of Owasso already provides fire protection for the area. Ambulance Service — The City of Owasso already provides ambulance service for the area. Water Service -- Water service is already provided to the area. Sanitary Sewer Service — Sanitary sewer service is available in close proximity to each of the properties. Sanitary sewer set -vice will be extended to the remainder of the properties in the area at the property owners' request and expense. Roads — Public roads in the area will be maintained to their current condition. StojaWater DEdgM -- Storaiwater drainage facilities in the area will be maintained to their current condition. Refuse Collection — The City of Owasso will make refuse collection service available to any properties in the area that desire municipal refuse collection service. The City of Owasso will not forcibly purchase the service area from existing refuse collection providers. This plan is available for public inspection at the Owasso Community Development Department, City Hall, I I I North Main Street, Owasso, OK 74055. mmysnmi ;1 � TO: THE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO FROM: CHIP MCCULLEY CITY PLANNER SUBJECT- ANNEXATION -- (OA-06-02 DATE- July 19, 2006 BACKGROUND The City of Owasso has received request to review and approve the annexation of approximately 78.47 acres, located on the west side of North 129"' East Avenue, approximately % mile north of East 661h Street North, just south of the Baptist Retirement Village. EXISTING LAND USE Undeveloped SURROUNDING LAND USE North: Baptist Retirement Village (Residential Multi -Family) South: Large Lot Residential / Agriculture East: Large Lot Residential / Agriculture West: Large Lot Residential / Agriculture PRESENT ZONING AG (Agriculture District) Tulsa County DEVELOPMENT PROCESS: The first step in the development of a piece of property in Owasso is annexation. Annexation is the method whereby land located outside the City limits is made a part of the City. Property owners and land developers sometimes choose to have their property annexed into Owasso in order to receive Owasso municipal services, such as police and fire protection, refuse collection, and sanitary sewer. The second step in the development of a piece of property in Owasso is rezoning. In order to develop the property, the land must be zoned for particular kinds of uses, such as residential, office, commercial, or industrial. Rezoning decisions are made in accordance with the growth policy displayed in the Owasso Master Plan. The third step in the development of a piece of property in Owasso is platting. A preliminary plat is required for any development that proposes to divide land into two or more lots. Preliminary plats illustrate the development concept for the property, and are often modified significantly after being reviewed by the Technical Advisory Committee (TAC), and the Owasso Planning Commission. Sometimes, difficult development issues such as existing utility lines, wells, or casements are brought to light at the preliminary plat stage and must be remedied prior to development. ANNEXATION REVIEW PROCESS The annexation process is initiated when a property owner submits a petition to the City of Owasso requesting that the City bring the property into the City limits. The applicant must submit as part of the request a signed petition requesting the annexation, an accurate legal description and reap of the property being requested for annexation and a certified 300' radius report so that staff may send legal notices to surrounding property owners. Upon receipt of all appropriate materials the staff initiates the review process which begins with a thorough analysis of the request. The annexation request is then presented to the Owasso Annexation Committee for review and recommendation. The Annexation Committee is made up of staff, elected officials and citizens. The Committee reviews the petition for compliance with the Annexation Policy and establishes a recommendation to the Owasso Planning Commission. The Owasso Planning Commission holds a public hearing to determine if the property is compliant with the Owasso Annexation Policy and establishes a recommendation to the Owasso City Council. The Owasso City Council will make the final determination to annex the property or refuse annexation. If the property is annexed into the City limits an ordinance officially declaring the annexation is written and adopted by the City Council. Once adopted the ordinance is circulated to appropriate regional and national agencies for recording and altering maps. ANALYSIS The applicant is requesting to annex approximately 78.47 acres, located on the west side of North 129th East Avenue, approximately % mile north of East 66th Street North, just south of the Baptist Retirement Village. It is the applicant's intent to develop the property for residential single-family use. Phase one of the development containing approxamently 139 residential lots on 39.06 is in the preliminary stages of development. The preliminary plat will be submitted to the Planning Commission next month with the Rezoning application. The development will be served water by Rogers County Rural Water District and sewer by the City of Owasso. Staff published legal notice of the annexation petition in the Owasso Reporter and letters of notification were mailed to property owners within a 300' radius. ANNEXATION COMMITTEE - The Owasso Annexation Committee reviewed the request at its meeting on June 28, 2006. At that meeting, the committee unanimously recommended approval of the annexation. PLANNING COMMISSION: The Planning Commission considered the annexation request at its meeting on July 10, 2006. At that meeting, the Planning Commission unanimously recommended approval of the annexation. ICECOMMENDATION The staff recommends approval of OA 06-09. ATTACHMENTS: 1. General Area Map 2. Applicants Annexation Petition Owasso Community Development Department I I I N. Main St. Owasso, OK 74055 918.376.1500 918.376.1597 www.cityofowasso.com P'17'752, ITY"!3? t � g J UNE SECTION 32 Unprattod , 30J J t gradford par'K I i o 1 { 1 # Al- 1 R 14 E 0 A TRACT OF LAND IN THE SOUTHEAST QUARTER (SE/4) OF SECTION THIRTY-TWO (32) OF TOWNSHIP TWENTY-ONE (21) NORTH AND RANGE FOURTEEN (14) EAST OF THE INDIAN BASE AND MERIDIAN (I.B.&M.) TULSA COUNTY, OKLAHOMA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NE CORNER OF THE SE/4 OF SEC. 32, T-21-N, R-14-E, I.B.&M.; THENCE S 01'05'52" E ALONG THE EAST LINE OF SAID SE/4 A DISTANCE OF 644.94 FEET; THENCE S 88'54'08" W A DISTANCE OF 66.50 FEET; THENCE S 67'20'48" W A DISTANCE OF 286.96 FEET; THENCE S 69'42'09" W A DISTANCE OF 362.08 FEET; THENCE S 87'38'10" W A DISTANCE OF 104.06 FEET; THENCE S 62'56'10" W A DISTANCE OF 261.02 FEET; THENCE S 37'35'57" W A DISTANCE OF 78.55 FEET; THENCE S 18'18'24" E A DISTANCE OF 38.89 FEET; THENCE S 26'44'06" W A DISTANCE OF 60.30 FEET; THENCE S 30'55'33" W A DISTANCE OF 94.86 FEET; THENCE S 33'15'37" W A DISTANCE OF 74.72 FEET; THENCE S 44'54'18" W A DISTANCE OF 343.41 FEET; THENCE S 52'32'43" W A DISTANCE OF 186.51 FEET; THENCE S 39'11'47" W A DISTANCE OF 106.36 FEET; THENCE S 56'29'40" W A DISTANCE OF 199.78 FEET; THENCE S 64'12'17" W A DISTANCE OF 138.36 FEET TO THE NORTHERLY RIGHT-OF-WAY OF A RAILROAD; THENCE N 74'00'28" W ALONG SAID RAILROAD RIGHT-OF-WAY A DISTANCE OF 743.75 FEET TO THE WEST LINE OF SAID SE/4; THENCE N 01'12'25" W ALONG THE WEST LINE OF SAID SE/4 A DISTANCE OF 1574.44 FEET; THENCE N 88'45'01" E A DISTANCE OF 700.00 FEET; THENCE N 01'14'59" W A DISTANCE OF 75.00 FEET TO THE NORTH LINE OF SAID SE/4; THENCE N 88'45'01" E A DISTANCE OF 1946.79 FEET TO THE POINT OF BEGINNING, AND CONTAINING 78.47 ACRES , MORE OR LESS. t \ 1 Benchmark Surveying and Land Services, Inc. P. O. BOX 1078 PHONE: (918) 24-9081 OWASSO' OKLAHOMA 740.71 FAX: P? 8)274-0807 C.A. NO. 2235 EXP. DATE 6/30/06 �01� I �Jff TO: THE HONORABLE MAYOR AND COUNCYL CITY OF OWASSO FROM: CHIP MCCULLEY CITY PLANNER SUBXECT: OZ 06-04 DATE. Ady 19, 2006 BACKGROUND The City of Owasso has received a request to review and approve the rezoning of two one acre lots from (AG) Agriculture to (RE) Residential Estate, located west of North 145h East Avenue, south of East 93d Place North at 14220 East 93'd Place North. Undeveloped SURROUNDING LAND USE North: Large Lot Residential South: Develo aahiq as Resi-, East: Large Lot Residential West: Large Lot Residential PRE SENT ZONING AG (Agriculture District) DEVELOPMENT PROCESS: The first step in the development of a piece of property in Owasso is annexation. Annexation is the method whereby land located outside the City limits is made a part of the City. Property owners and land developers sometimes choose to have their property annexed into Owasso in order to receive Owasso municipal services, such as police and fire protection, refuse collection, and sanitary sewer. The second step in the development of a piece of property in Owasso is rezoning. In order to develop the property, the land must be zoned for particular kinds of uses, such as residential, office, commercial, or industrial. Rezoning decisions are made in accordance with the growth policy displayed in the Owasso Master Plan. Specific development concerns, such as drainage, traffic, water/wastewater services, and stormwater detention are not able to be considered at the zoning stage of the development process. The third step in the development of a piece of property in Owasso is platting. A preliminary plat is required for any development that proposes to divide land into two or more lots. Preliminary plats illustrate the development concept for the property, and are often modified significantly after being reviewed by the Technical Advisory Committee (TAC), and the Owasso Planning Commission. Sometimes, difficult development issues such as existing utility lines, wells, or casements are brought to light at the preliminary plat stage and must be remedied prior to development. After the preliminary plat has been reviewed by the City and various utility companies, construction plans for the development's infrastructure are typically submitted. These plans include specifications and drawings for stormwater drainage, streets and grading and erosion control, waterlines, stormwater detention, and wastewater lines. Often, approval is required of other agencies, such as the Department of Environmental Quality for wastewater collection and the US Army Corps of Engineers for properties that may be development sensitive. Once the property development proposal shows a division of lots that is acceptable to both the developer and the City of Owasso, a final plat application is submitted. A final plat illustrates the layout and dimension of lots included on the final plat, right-of-way widths, easements, and other physical characteristics that must be provided for review by the City. After obtaining approval from the TAC and Planning Commission, the final plat is considered by the City Council. If approved, the final plat is filed with the office of the County Clerk and governs all future development on that property. The fourth step in the development of a piece of property in Owasso is the site plan. Site plans are reviewed by the TAC and Planning Commission. Issues such as building setbacks, parking, access, landscaping, and building footprint are presented in the site plan. Once a site plan is approved, the development is clear to apply for a building permit and to submit construction plans for the building's foundation, plumbing, electrical system, and A.C.14V ANALYSIS The City of Owasso has received a request to review and approve the rezoning of two one acre lots from (AG) Agriculture to (RE) Residential Estate. It is the applicant's intent to donate the two one acre tracts to his children for the future construction of single family residential homes. The request is consistent with the Owasso Land Use Master Plan as it calls for residential development in the area. Letters were mailed to surrounding property owners and the legal advertisement was published in the Owasso Reporter. PLANNING COMMISSION: The Planning Commission considered the rezoning request at its meeting on July 10, 2006. At that meeting, the Planning Commission unanimously recommended approval of the rezoning. RECOMMENDATION Staff recommends approval of OZ 06-04. ATTACHMENTS: 1. General Area Maps 2. Legal descriptions of proposed tracts IM'Iq '7_71 77 Property 'IR Owasso Community Development Department I I I N. Main St. Owasso, OK 74055 918.376.1500 918.376.1597 www. city ofowasso. com U 1 •_, 00' INVOICE NO.: STK 06-28677 CLIENT: DARRELL 6OgD 50' RCb40WAY providing land surveying services since 1940 ®+ a a 9936 E. 55th Place " Tulsa, 01< 741,16 ° 800.262.0682 <918.663,6924-918.664.8366 fax P N 89°53'1 — E wEAST 9.3RD 3.3i• 94" I ro REMAINING `T;FZA.CT 3.0 ACRES4 0 ,ten r M� a I 15' ROAD eASEA1ENP A/ 89 55,J8" E 165.6J° SGIN' OF' BEO/NNING 7rucr ) NORINF,45r CORNER / W SeC 21, TZJN, R1fE � 6 PLACL_ NORM I" 5 89'53'17' W 662.41'_ —. . J PON" of UNDIVIDED TRACT COUNTY J :iml m ) T 21 N A TRACT IN THE EAST HALF OF THE NORTHWEST QUARTER OF HE SOUTHEAST QUARTER OF HE NORTHEAST QUARTER (E/2 NW/4 SE/4 NE/4) OF SECTION TWENTY-ONE (21), TOWNSHIP TWENTY --ONE (21) NORTH, RANGE FOURTEEN (14) EAST OF HE INDIAN BASE AND MERIDIAN, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO HE UNITED STATES GOVERNMENT SURVEY THEREOF, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS, TO -WIT: COMMENCING AT HE NORTHEAST CORNER OF SAID SECTION 21; HENCE SOUTH 00'04'50" W m EAST ALONG THE EAST LINE OF SAID SECTION 21, 1323.53 FEET TO HE NORTHEAST CORNER OF THE SE/4 NE/4 OF SAID SECTION 21; THENCE SOUTH 89'53'17' WEST ALONG THE NORTH LINE OF SAID SE/4 NE/4, 662.41 FEET TO THE NORTHEAST CORNER OF THE E/2 NW/4 SE/4 NE/4 AND HE POINT OF BEGINNING; THENCE SOUTH O'4'19" o EAST, ALONG THE EAST LINE OF SAID E/2 NW/4 SE/4 NE/4, 661.31 FEET TO THE SOUTHEAST CORNER THEREOF; THENCE SOUTH 89'55'38' WEST, ALONG THE SOUTH LINE OF SAID E/2 NW/4 SE/4 NE/4, 331.26 FEET TO HE SOUTHWEST CORNER THEREOF; THENCE NOR 0'03'57' WEST ALONG THE WEST LINE OF SAID E/2 NW/4 HSE/4 661.08 FEET TO E NORTHWEST CORNER Tt r.rFn . ru ca __._... NE/4, 165.62' r CNG INt NUHIH/qL.`.• ..,r„' r'Y�, ri �a5r PO�Nr of OF BEGINNING (CONTAINING FIVE (5) ACRES MORE OR/L.ESST1 19 FEET TO THE POINT OEGINNING 7R(cr 2 REMAINING TRACI' A TRACT OF LAND IN THE EAST HALT' OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE I� TRACT 1 (21) HEAST NORTH, RANGE FOURTEEN N/ (14) DST OF THESIN INDIAN BASE' AND MERIDIAN, TOWNSHIP ICOUYNIY -ONE TRACT 2, ( ) OF N 1.0 ACRESS Z (p 1.0 ACRES± % N COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 21; THENCE SOUTH 00'04'50" EAST ALONG �r THE EAST LINE OF SAID SECTION 21, 1323.53 FEET TO THE NORTHEAST CORNER OF THE SE/4 NE/4 OF SAID SECTION 21; THENCE SOUTH 89'53'17" WEST ALONG THE NORTH LINE OF SAID SE/4 NE/4, 662.41 FEET TO THE NORTHEAST CORNER OF THE E/2 NW/4 SE/4 NE/4 AND THE POINT OF BEGINNING; THENCE SOUTH 00'4'19' EAST, ALONG HE EAST' LINE OF SAID Eft NW/4 SE/4 NE/4, 661.31 FEET TSAID O THE SOUTHEAST CORNER THEREOF; THENCE SOUTH 89'55138 WEST, ALONG THE SOUTH LINE OF 00'O3 57' WEST ALONG4THE WEST LINE6OFFEET SAID E/2 NW/4SOUTHWEST SE/4 NE/4, CORNER 661 OB THEREOF: FEET TO THE NORTHWEST J65.63' _ J6563' CORNER HEREOF; THENCE NORTH 89'53'17" EAST, ALONG THE NORTH LINE OF SAID E/2 NW/4 SE/4 S 89'55J3" W NE/4, 331.19 FEET TO THE POINT OF BEGINNING LESS AND EXCEPT THE SOUTH 263.00 FEET HEREOF. �6° CONTAINING FIVE(3) ACRES MORE OR LESS AND SUBJECT TO A 15 FOOT ROAD EASEMENT ALONG HE WEST AND SOUTH LINE HEREOF.; T ''T 1 Triv. WEST HALF E SOUTH 263,00 FEET OF A OF NORTHEAST QUARTEERH(E/2 NW/4 SE/4 NE/4) OF SECTION TWENTY-ONE TWENTYD'ONE (21N THE �TOHALF SHIP TWENTY-ONE (21) NORTH, QUARTER ORANGE THE FOURTEEN (1 ) EASQUARTER OF THE OF THE INDIANBASE AND MERIDIAN, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO THE UNITED STATES GOVERNMENT SURVEY THEREOF, BEING MORE PARTICULARLY D_ ;RIBED AS FOLLOWS, TO-WfT: C MENCING AT THE NORTHEAST CORNER OF SAID SECTION 21; THENCE SOUTH 00'04'50" EAST ALONG THE EAST LINE OF SAID SECTION 21, 1323.53 F;_.TO THE NORTHEAST CORNER OF THE SE/4 NE/4 OF SAID SECTION 21; THENCE SOUTH 89'53'17" WEST ALONG THE NORTH LINE OF SAID SE/4 NE/4, 662.41 FEET TO HE NORTHEAST CORNER OF THE E/2 NW/4 SE/4 NE/4 AND THE POINT OF BEGINNING; THENCE SOUTH 00'4'19" EAST, ALONG THE EAST LINE OF SAID E/2 NW/4 SE/4 NE/4, 661.31 FEET TO T}{E SOUTHEAST CORNER THEREOF; HENCE SOUTH 89'S5'38° WEST, ALONG THE SOUR LINE 0` SAID E 2 NW/4 SE/4 NE/4, 331.26 FEET TO THE SOUTHWEST CORNER HEREOF; THENCE NORTH 00 03'S7" WEST ALONG HE WEST LINE OF SOUTH LINE N 4 SE� NE/4, 661,08 FEET TO HE NORTHWEST CORNER HEREOF; THENCE NORTH 89'53'17' EAST, ALONG THE NOR LINE OF SAID E/2 NWSAID/4 SE/4 N F, 331.19 FEET TO HE POINT OF BEGINNING (CONTAINING FIVE (1) ACRES MORE OR LESS; TP—T 2 It EAST HALF OF HE SOUTH 263.00 FEET OF A TRACT OF LAND IN HE EAST HALF OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE N( BEAST QUARTER (E/2 NW/4 SE/4 NE/4) OF SECTION TWENTY-ONE (21), TOWNSHIP TWENTY-ONE (21) NOR, RANGE FOURTEEN (14) EAST OF THE INDIAN BASE AND MERIDIAN, TULSA COUNTY, STATE OF OKLAHOMA, ACCORDING TO THE UNITED STATES GOVERNMENT SURVEY HEREOF, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS, TO -WIT: C( AENCING AT THE NORTHEAST CORNER OF SAID SECTION 21; THENCE SOUTH 00'04'50" EAST ALONG HE EAST LINE OF SAID SECTION 21, 1323.53 FE TO THE NORTHEAST CORNER OF THE SE/4 NE/4 OF SAID SECTION 21; THENCE SOUTH 89'53'17' WEST ALONG THE NORTH LINE OF SAID SE/4 NE/4, 61 41 FEET TO HE NORTHEAST CORNER OF THE E/2 NW/4 SE/4 NE/4 AND THE POINT OF BEGINNING; THENCE SOUTH 00'4'19" EAST, ALONG THE EOF AST LINE OF SAID E/2 NW/4 SE/4 NE/4, 661.31 FEET TO HE SOUTHEAST CORNER THEREOF; HENCE SOUTH 89'55'38° _WEST, ALONG HE SOUTH LINE NW14�SEE42NE/44661.08 FEET TO HE NORTHWEST CORN R H R O�31-26 FEET TO THE SOUTHWEST ORNER THEREOF; F, THE CE NORTH 89N53'17" EAST,CE NORTH �ALONG HE NO ONG � 2 NW 4 SE NE , 331.19 FEET TO HE POINT OF BEGINNING (CONTAINING FIVE (1) ACRES MORE OR LESS; �'NE OF S D E�2 CA1098 NO. tO52 Co, ;ght 2006 by WhHo S— in Com VKi �MP of V/hite Surv"ying Com . y Pony. All Riyhls gas"rvod. No port of thln plat mny bo r,produ d, s10 d Ina nitrlevol _ pony, P.O. Box 47t675, 7ulna, Oklahoma. ayotam, or t1n r iltad In any form out prior writlsn parmisslon IMAGE �� S / It TO: THE HONORABLE MAYOR AND COUNCIL CITY OF O IASSO FROM. CHIP MCCULLEV CITY PLANNER SUBJECT- FINAL PLAT (Kum & Go) DATE. July 19, i;ijifn BACKGROUND: The City of Owasso has received a request to review and approve a final plat proposing 1 commercial lot, on approximately 2.17 acres of property zoned CG (Commercial General District), located at the northeast corner of the North 145" East Avenue and East 861h Street North. A general area map is included with this report. EXISTING LAND USE: Undeveloped North: Commercial South: Hodson Elementary East: The Vyne at Preston Lakes Nest: Undeveloped commercial corner PRESENT ZONING: CG (Commercial General) DEVELOPMENT PROCESS: The four primary steps in the development annexation, zoning, platting, and site planning. of commercial property in Owasso include The third step in the development of property is platting. A preliminary plat is required for any development that proposes to divide land into two or more lots. Plats illustrate the development concept for the property, and are often modified significantly after being reviewed by the Technical Advisory Committee (TAC), and the Owasso Planning Commission. Sometimes, difficult development issues such as existing utility lines, wells, or easements are brought to light at the preliminary plat stage and must be remedied prior to development. Once the property development proposal shows a division of lots that is acceptable to both the developer and the City of Owasso, a final plat application is submitted. A final plat illustrates the layout and dimension of lots included on the final plat, right-of-way widths, easements, and other physical characteristics that must be provided for review by the City. After obtaining approval from the TAC and planning Commission, the final plat is considered by the City Council. If approved, the final plat is filed with the office of the County Clerk and governs all future development on that property. ANALYSIS The applicant is requesting this review in order to facilitate a commercial development on 2.17 acres. Since this is a one lot development there is no preliminary plat required. In a regional context, this proposed addition is in conformance with the Owasso 2015 Land Use faster flan, as the area is forecasted for commercial development. The proposed final plat satisfactorily meets the requirements established in the Owasso Zoning Code. The development will be served sewer by the City of Owasso and Water by Rogers County Dural Water District. Utility easements are established throughout the proposed addition so as to adequately accommodate utility services. PLANNING COMMISSION: The Owasso planning Commission considered the application at a public hearing conducted on July 10, 2006. At that public hearing, the Planning Commission unanimously recommended that the City Council approve the final plat. COMMENDATION: ,Staff recommends approval of the Kum &(moo final plat. ATTAC ENTS: 1. Case Map 2. Final Plat 89th ST N E 86 ST N LLl ; Q LU tf) Owasso Community (Development Department 111 N. Main St. Owasso, OK 74055 918.376.1500 918.376.1597 www.cityofowasso.com LU Q: � w hl 67 LO ?. DNASURER'S STAMP DT USE THIS SPACE Q18. a' tlla 9'iAMpix YC:IW LI10(r4'-Wx, Om°5.�roxr rEewu¢r n°�`Nmlic P�oxrx�Mi[n mlrrAw°E.x�'Dr I Grua )oEm Two LCYMr 'v fufn v, 1e n .wa+sr no"ala a1z Ar Pine na. cymn�¢ mwAwr 9a, ivnc1—"iTTOucisiAT cemeu°fr°� am Aw as'xax nw m �r,ue [.u^lla' flLm t0�r(WLIC aYAVi NAiL rrnx,,.Qar em9 1z,a�Apr axo1 NBmP �fF°aL.VUN.�°nTCD wW ltl )���+ax0.v ' omXN( No°, °ofet A PACE 4Da. Cox ) fl OTOMa 3oax. tam�AiwPACEAaea.T loos, Aa T, iw 10 �N'T'�FiL�'LLimauxr 1a, loas, iw oon:«v AT L`m 'DRAFT' FiNAL° Kum & Go #876 A SUBDIVISION OF PART OF THE SW/4 OF THE SW[4 OF THE SW/4 OF SECTION 22, T-21-Na R-14—E CITY OF OWASSO, ROGERS COUNTY, OKLAHOMA R-14—E EAST SWTH 9TRM NORTH z Imzma LAm � � I EAST WITH STREET NORTH 9 An zAB�r¢u2°a �muNr 8000 tl6fOm1 PAacttAT lekST CFS A /J6'A E036E PfWiEi (696) �wdl/�RXV9vunP IIAHTA fE LYPJi 999 9xn11 E1J61 A'At1C alms cf TIPS=A. G1NIm1A TSt20-feih [-4Id. iwiMYN1IA1'q+eiAlrSWY cA. uo, sns Iew. ,cua Io, xm)) F54K P - 7fQRW LAIS3', 'b�01 1MB t1R 4ESIpbT IlS w ALTpN 32 � G�FI/gS'�mq@J fW T48 PLAT SETS .9E'f S[/w.• D3YK1 LLRW PBd tlTN A t¢11O�e GJ 'iRRT! �[TAaaS i lDT d i NYX s axTAac z.rex uTry =z T 1 OF I TO: THE HONORABLE MAYOR AND CITY COUNCIL CITY OF OWASSO FROM. J.B. ALEXANDER PROJECT MANAGER SUBJECT: CHANGE ORDER NO. I AND FINAL PAYMENT FY 2005-2006 STREET REPAIR PROJECT DATE, July 19, 2006 BACKGROUND. In 2002, Public Works Department Engineering Division staff compiled street data pertaining to needed repairs to develop a comprehensive street repair program. Residential streets throughout the entire city were inventoried and evaluated using a street management computer program. Sites identified for repair were prioritized ranging from low, moderate to high priority. In May 2004, this inventory was revised, updated and refined. At that time, a total of 201 sites were rated as high priority (see Attachment A for the top 180 of 201 sites). In June 2005, Council approved production of complete bid documents for the FY 2005-2006 Street Repair Project. As part of the FY05-06 Street Repair Project, ten (10) of the highest rated sites were advertised for repair by contract. The Engineering Estimate prepared by Public Works staff in January 2006 was $80,819.44 (base bid only). The next six (6) highest rated sites were included in this bid as individual alternates (See Attachment B for all 16 locations). The Engineers Estimate for these six (6) alternates totaled $64,397.22. The Engineer's Estimate of total project cost — base bid and alternates — was $145,216.66. On March 21, 2006 Council awarded a contract for the FY 2005-2006 Street Repair project to Magnum Construction, Inc. of Broken Arrow, Oklahoma in the amount of $98,536.00 QUANTITY ADJUSTMENTS - The work was awarded as a unit price contract where the quantities presented in the Bid Form were estimated based on expected conditions and used solely for the purpose of comparison of bids. It was therefore anticipated that a quantity adjustment would be made at final payment to reflect actual quantities provided. Five sites required more work and one site required less work than was anticipated. Total overruns occurred in the amount of $6,651.12. The following chart reflects these changes: Change Order No. 1 and Final Payment FY 2005-2006 Street Repair Project Page 2 of 2 Unit Installed Location Units Price Units Over/Under 400 Block of South Main Street _ . 80 00 _ $74 00 109.55 $2 186.70 8500 Block of the Owasso Expressway (West Side) _ 16 00 $74.00 17.00 . _-__ $74.00 8500 Block of the Owasso Expressway (East side) 100 00 $74 00 _ __. 3rd Street Between Carlsbad & Beaumont 114.00 $74.00 ..... 115..00 _ _. $74.00 80th Place between 80th StreI'llet & 118th E. avenue ....... ........_ 221 00 $74.00 220.00 ... _ _ ...... $74.00 g 400 Block of Do wood -- --- 18.00 $74.00 30. _ 00 $888.00 Total Overrun $6,651.12 FUNDING: An adjustment in the contract will be required to reflect the following (see Attachment C)a Original contract amount $ 98,536.00 plus Change Order No. 1 $ 6,651.12 Revised Contract Total $ 105,187.12 Funds for the Change Order are available in the Streets Division budget (Line Item 01-300- 54213). FINAL PAYMENT; Project funds are included in the FY05-06 Streets Division budget (Line Item 01-300-54213). Progress payments made to date amount to $73,186.83. The contractor has submitted a filial pay request including return of retainage in the amount of $32,000.29 (see Attachment D). FINAL. INSPECTION° A final inspection was conducted on July 5, 2006 and no deficiencies were found. The contractor has provided a one-year maintenance bond for the work as part of the Contract Documents. RECOMMENDATIONS 1. Staff recommends Council approval of Changer Order No. 1 to the contract for FY 2005- 2006 Street Repair project with Magnum Construction, Inc. in the amount of $6,651.12 for a revised contract amount of $105,187.12. 2. Staff recommends Council acceptance of the FY 05-06 Street Repair Project and authorization for final payment to Magnum Construction, Inc. in the amount of $32,000.29. ATTACHMENTS A. Street Repair Project Priority Listing B. FY 2005-2006 Street Repair Project Map C. Change Order No. 1 D. Final Pay Request Public Works Department 301 West 2T,d Avenue Priority Location OCI 1 Main Street 31 2 Main Street 31 3 Owasso Expressway 42 4 Owasso Expressway 44 5 Owasso Expressway North 45 6 E 83rd St 45 7 E 90th St 46 8 E 90th St 46 9 N 121st E Ave 47 10 N 121 st Ct 47 11 W 3rd St 47 12 W 3rd St 47 13 E 80th PI 48 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Dogwood N 125th E Ave N 126th E Ave 4th St E 83rd P1 N N 121st E Ave N 125th E Ave N 125th E Ave E 83rd St N E 80th St N 9th St 9th St N 118th E Ave E 80th St N 1 st Ave Birch St Birch St N 112th E Ave N 121st E Ave 16th St E 89th St N E 89th St N N 117th E Ave N 117th E Ave E 120th Ct N N 121st E Ave N 121st E Ave N 121st E Ave N 121st E Ave N 124th E Ave E 87th St N 50 50 50 50 50 50 51 51 51 51 51 51 52 52 52 52 52 53 53 54 54 54 54 54 55 55 55 55 55 55 55 } The City Without Limits. Deficiency (918) 272-4959 FAX (918) 272-4996 Rutting, 7x17, 7x17, 7x55, 4x5, 5x12 ,5x9, 6x40, 4x7, 6x16, 6x15, 12x28 Rutting, I lx51, 2x3, 7x9, 4x9, 6x8 Rutting, 8x17 Rutting, 503, 5x45, 400, 6x65 Rutting, Advance Cracking, 120, 8x40 Rutting, 7x30 Rutting, 8x23, 4.x10, 2307 Rutting, 8x24, lOxl7, 6x30,12x24 Rutting, 11x22, 12x13 Rutting, Advanced Cracking, 12x10 Rutting, Advanced Cracking, 1002, 4x28 Rutting, Club Failure, 5x158, 3x23, 3x56 Rutting, Curb Failure, Advance Cracking, 9x40, 23x40, 3xl5, 6x10, 9x67 Severe Rutting, 8x20 Utility Trench Failure, 4x17 Rutting, Advanced Cracking, 12x17, 11xl I Edge Rut, 7x15 Potholes 5x5, 4x5 Rutting in culdesac 3x45 Pothole (2x5) Rutting 3.5x31, 5x50, 3x15 Pothole (IOx2) Pothole (30) Advanced Cracking, Multiple Potholes 12x86 Rutting 5x11 Advanced Cracking 8x8 Rutting @ Intersection 3x24 Alligator Cracking 5x13, 5xl5,15xl5 Advanced Cracking 7x40, 1 Ox76, 800, 19x29 Alligator Cracking 13x6 Advanced & Alligator Cracking 4x8, 12x15 Potholes (20x4 Multiple) Pothole Multiple 12xl2 Pothole2x2 Rutting 3x12 Alligator Cracks 4x8 Pothole 3x5 Pothole 3x2, 2x2 Failing Utility Patch 3x24 Heaving 25x1 Potholes ixl, lx2, 2x1, 30, 3x4, 20, 2x2 Rutting 25 x3 Rutting 3x22, 2x5 Pothole ( 2x5) Street Repair Project Priority Listing Page 2 of 4 Priori Location OCI Deficiency 45 E 87th St N 55 Rutting 30x6, 27x9 46 E 83rd PI N 55 Potholes (4x2) 47 N 121st E Ave 55 Potholes (2x2,lxl,lxl) 48 Birch St 55 Advanced Cracking 60 49 Elm St 56 Alligator & Advanced Cracking l Ox100 50 Elm St 56 Alligator Cracking & Rutting 24x50 51 E 90th St N 56 Advanced Cracking 14x2O 52 N 124th E Ave 56 Rutting 20x3 53 N 127th E Ave 56 Potholes 2x2, 6x4 54 Atlanta 56 Advanced cracking 6x30 55 Atlanta 56 Cracking & Settling around patches 5x8, 3x8 56 5th Ave 56 Pothole 8x4 57 N 124th E PI 57 Rutting 1Ox10 58 E 82nd St N 57 Alligator Cracks & Settling 3x5 59 E 82nd St N 57 Chicken Wire Cracks (4-5x5) 60 Atlanta 57 Rutting & Heaving 4x40 61 Atlanta 57 Rutting 3x100 62 N 110th E Ave 58 Potholes 30, 4x2 63 N 110th E Ave 58 Rutting 3x45 64 E 87th St N 58 Pothole ( 2x5) 65 E 87th St N 58 Rutting (2) 5x5, 5x20 66 Cedar St 58 Alligator Cracking 24x50 67 3rd Ave 58 Pothole 30 68 3rd Ave 58 Settling 1Ox10 69 E 90th St N 59 Pothole 2x2 70 E 114th St N 60 Potholes Multiple 1Ox10 71 E 87th St N 60 Pothole ( lx5) 72 E 87th St N 60 Rutting & Advanced Cracking 3x30 73 E 88th St N 60 Potholes (1x2, 3x8) 74 E 77th St N 60 Potholes (Multiple) 8x22, 14x11 75 E 77th St N 60 Rutting 3x200 76 N 120th E PI 61 Potholes (2-3x2) 77 4th St 61 Advanced Cracking 4x61 78 4th St 61 Potholes Multiple 1 Ox3 79 Atlanta 61 Rutting 3x116 80 E 87thStN 62 Potholes lxl, lxl, 2x1, 1x1, 2x2, 2x2, lxl, 3x1 81 E 87th St N 62 Rutting 300, 2x20 82 E 88th St N 62 Rutting At Intersections 290, 27x3 83 E 93rd St N 62 Alligator Cracks 8x10, 8x12 84 N 119th E Ave 63 Potholes 4x9 85 N 132nd E Ave 63 Advanced Cracking 2400 86 Cedar St 63 Alligator Cracking 1Ox20 87 1st Ave 63 Advanced Cracking & Rutting 12x20 88 lst St 63 Advanced Cracking 20x24 89 3rd Ct 63 Alligator Cracking 6x30 90 3rd Ct 63 Rutting 3x60 91 Birch St 63 Alligator Cracking 5x30 92 Birch St 64 Alligator Cracks 4x25 93 E 109th St N 65 Potholes 30, 2x4 94 3rd St 65 Alligator Cracking 5x12 95 3rd St 65 Potholes Multiple 12x20 Street Repair Project Priority Listing Priority Location OCI Deficiency 96 Dogwood St 65 Pothole (Multiple) 1Ox10 97 Dogwood St 65 Rutting @ Curb Failure 3x10 98 Atlanta 66 Rutting 3x15 99 4th St 66 Alligator & Advanced Cracking 24x65 100 Ash 66 Advanced Cracking 20 101 Birch St 66 Advanced Cracking @ 6th intersection 6x18 102 Cedar St 66 Alligator Cracking 1Ox18, 6x10 103 Cedar St 66 Rutting 3x20 104 Elm St 66 Rutting 32x8, 3XIO, 100, lOx2 105 Elm St 67 Advanced Cracking 12x10 106 Elm St 67 Alligator Cracking 9x27, 1Ox10 107 E 88th PI N 67 Pothole 3x7 108 E 86th Ct N 67 Rutting 3x20, IOx2 109 4th St 67 Alligator & Advanced Cracking 24x8 7 110 2nd St 67 Potholes Multiple IOx2 III 3rd St 67 Potholes Multiple 1Ox12 112 3rd St 67 Rutting & Heaving 3x5 113 N 127th E Ave 68 Potholes 3x12 114 6th St 68 Alligator Cracking 3x24 115 Atlanta 68 Rutting 305 116 3rd St 68 Alligator Cracking 1Ox12 117 3rd Ct 68 Potholes Multiple 2400 118 19th St 69 Advanced cracks 24x36 119 Elm St 69 Advanced Cracking & Rutting 900 120 4th St 69 Advanced Cracking 305 121 4th St 69 Pothole IOx5 122 1Ith St 69 Rutting 5x12 123 1 lth St 69 Advanced Cracking 24x24 124 Ash 69 Advanced Cracking & Rutting 350x2 125 Birch St 69 Alligator Cracking 5x12 Around Manhole 126 Dogwood St 69 Rutting 150, 20x2 127 14th St 70 Advanced Cracking 12x24 128 E 92nd St N 71 Multiple Potholes 129 Elm St 71 Advanced Cracking 8x12 130 Elm St 71 Pothole Multiple 100, 2xI, 2xl 131 E 88th St N 71 Potholes 2x3, 2x2 132 E 90th St N 71 Pothole (Multiple) 1Ox12 133 E 90th St N 71 Settling Utility Trench 4x24 134 5th St 71 Advanced Cracks 17xIO 135 N 102nd E Ave 71 Alligator Cracking &. Settling 4x4 136 8th St 71 Alligator Cracking 24xl20, 12x5, IOx4 137 8th St 71 Pothole 3xl 138 N 103rd E PI 72 Pothole 2x2 139 22nd St 72 Advanced Cracking 20x120 140 17th St 72 Advanced Cracking 14x12 141 E 89th St N 72 Potholes lx1, 20 142 E 89th St N 72 Rutting 3x5O 143 N 100th E Ave 72 Rutting & Advanced Cracking 6x35 144 4th St 72 Advanced Cracking 5x2 145 18th St 73 Potholes Multiple IOx2, 8x2, lOx5 146 N 102nd E Ave 73 Rutting 4x22 Page 3 of 4 Street Repair Project Priority Listing Page 4 of 4 Priority Location OCI Deficiency 147 Cedar St 74 Advanced Cracking 5x30 148 Cedar St 74 Potholes 2x4, 2x1 149 8th St 74 Pothole 3x2 150 E 90th St N 75 Alligator Cracking 1 Ox15 Open Ravel 151 N 138th E Ave 75 Rutting 20x2 152 Birch St 78 Advanced Cracking @[Manhole 5x5 153 20th Ct 79 Potholes 4x2, lxl, 3x2 154 20th Ct 79 Potholes iMutliple 1000 155 N 120th E Ave 80 Alligator Cracking / Heaving .5x5, 70 156 E 89th St N 80 Potholes 30, 3x2 157 N 120th E Ave 82 Rutting 2x10 @ 2+96 158 N 135th E Ave 82 Rutting 3x12 159 E 87th Ct N 82 Rutting 1Ox15 160 E 89th PI N 82 Settling 12x25 161 N 120th E Ave 83 Potholes 2x2, 2x2 162 N 120th E Ave 85 Rutting (2) 3x20 163 N 120th E Ave 85 Small Pot Hole lx1, 1x2, 2x2, Ix2, 2x2 164 E 89th PI N 85 Pothole 2x2 165 N 139th E Ave 85 Advanced Cracking 2x15 166 E 84th St N 85 Advanced Cracking 140 167 N 139th E Ave 88 Alligator Cracking 24x31 168 E 89th St N 89 Advanced Cracking 1Ox12 169 E 89th St N 89 Pothole (2x2) 170 N 120th E Ave 90 Pothole 2x2 171 E 99th St N 92 Rutting & Heaving Yx50' Near Knuckle 172 N 127th E Ave 93 Heaving 2x24 173 N 118th E Ave 94 1000 Patch Failure 174 N 117th E Ave 95 Cracking & Settling 50 175 N 117th E Ave 95 Potholes 2x2, 20 176 N 118th E Ave 96 Pothole 30 177 N 120th E Ave 96 Settling 5x9 178 E 100th St N 97 Pothole 30 179 E 100th St N 97 Chicken Wire Cracks 5x10 180 E 100th St N 97 Pothole 4x4 ATTACHdMENT B ,Ji-fc)NF 2005, REPAH-- LC D Cl T1 EET REPAIR-2ii, FY 2006-2006 Cl TY OF OWASSO, OKLAHIOMA PUBILIC WORKS DEPARTMENT ENGINEERING DIVISION SHEET I OF 10 SECTION 00600 ATTACHMENT C CHANGE ORDER PROJECT: r Y CIfA\,IGF OkDF-R NUMBER - DATE, CONTRACT DATE: ?h"f166 TO CON'TRACTOR- CONTRACTFOR: (In LA Vtom 1"-4" -ta' 31 -7 D-7 Tev,ke,,, K V10 13 The Contract is 6anged as followG: 6.) U0. �b �/ The original, contract hum was Net change by P7VviGu-';fY muthodzcd Change, Orders The COViTact Sum prior to this Change Carder was The Contract Sum will be ( asreased (dxmaled) (unchanged) by this Change Order in the arnou.nt of The "cw COW". ct Slim including this Change Order will be The Collirract Time will lie (increased) Ocermsed) tmchfm ed by The date orSub�sjjjntiaj Complerjan as of the dam IV ge of t Order therefore k (w) days. No'rL-; ThiS Surmnary docs not reflect clgngcs in urn ime Directive. file COW(act S T t"hich have beftl outhorizcd by Construction C%angc OWNER i!T' 0 ADDR-PSS -) 5-6 m- DATE DATr-, 1-7 tEj"e�s-r — V- 100 Y I F 00600 - 2 Or 1 ATTACHMENT APPLICATION AND CERTIFICATE FOR PAYMENT Page One of 7 TO: (Ow er) Contract Dater < d Application Dater G. 4 0 FROM: (Contractor) Period To:� _ W 0— Distribution To: Owner �5b r--- tA UK _111,0 V36 Architect PROJECT: Contractor L um Engineer CONTRACT FOR: CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation sheet is attached. 1. Original Contract Sum $ a (� 2. Net Change by Change Orders $ 3. Contract Sum to Date (Line 1 & 2) $(6® 4. Total Completed & Stored to Date `z- (Column G on Continuation Sheet) 5. Retainage: a. (D ' % of Completed Work $ (Column D & E on Continuation Sheet) - FINAL b. % of Stored Material $ (Column F on Continuation Sheet) Total Retainage (Line 5a & 5b) 6. Total Earned Less Retainage (Line 4 less Line 5 Total) 7. Less Previous Certificates for Payment — 0 $ -- AGREEMENT 0206 00300 m Page 7 of 14 _a VA CURRENT PAYMENT DUE -32-,000 — 9. Balance to Finish, Plus, Retainage (Line 3 less Line 6) CHANGE ORDER SUMMARY: ADDITIONS DEDUCTIONS Change Orders approved in previous months by OWNER TOTALS $ Approved this month, Number Date Approved TOTALS Net Change by Change Orders The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief, the WORK covered by this Application for payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: STATE OF OKLAHOMA )SS COUNTY OF ) Subscribed and sworn to before me this k' day of Ilia, pJN_ (SEAL) Notary Public 983 My Commission Expixes:1 Q_ Commission -AGREEMENT 0206 00300 - Page 8 of 14 ARCHITECT'S / ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the contract documents, based on on -site observations and the date, -9 comprising the above application, the Architect/Engineer certifies to the Owner that to the best Jof the Architect/s/Engineer's knowledge, information and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the amount certified. J 31 , AMOUNT CERTIFIED $ 0 06 (Attach explanation if a unt certified differs from the amount applied for.) ARCHITECT/ ENGINEER: By: Date: This certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the contractor named herein. Issuance, payment and acceptance of payment without prejudice to any rights of the Owner or Contractor under this Contract. 0206 --AGREEMENT --- 00300 - Page 9 of 14 CONTINUATION SHEET Page of Application and Certification for Payment, containing Contractor's signed Certification is attached. Application Number: Application :Date: - a 0(P Period to: In tabulations below, amounts are stated. to the nearest dollar, TJse Column. I on Contracts where variable retainage for line items may apply. A B C D E (cont) ITEM DESCRIPTION SCHEDULED _ WORK COMPLETED WORK COMPLETED NO. OF WORK VALUE FROM PREVIOUS THIS PERIOD APPLICATION (cont) F G H I R E) MATERIALS PRESENTLY STORED (NOT IN D O TOTAL COMPLETED AND STORED TO DATE (D + E + I) aka BALANCE (G/C) TO FINISH RETAINAGE (C G) NOTE: At bottom of each column, run totals. AGREEMENT 0206 00300 - Page 10 of 14 CLAIM OR INVOICE AFFIDAVIT STATE OF OKLAHOMA ) )SS _�� - COUNTY of - The undersigned. (A+ehitoet, Contractor, Suppli"r-or , of lawful age, being first duly sworn, on oath says that this (Invoice, Claim-o r^ o�) is true and. correct, -� Affiant further states that the (work, as shown by this Invoice or Claire have been (completed in accordance with the Plans, Specifications, orders or requests famished to the Affiant. Affiant further states that (s)he has made no payment, nor given, nor donated, or agreed to pay, give, or donate, either directly or indirectly, to any elected official, officer, or employee of the State, County, or City of money or any other thing of value to obtain payment or the award of this contract. Contractoe or Supplier . bscribed ans sworn to before me this , ` £ �; clay of b_ Notary Public My Commission Expires: 9° _ Op010023 $ o s Commission 04 Architect, Engineer or other Supervisory Official Subscribed and sworn to before me this day of Notary Public My Commission Expires: Commission #: NOTE: Strike out words not appropriate and sign appropriate signature line, Architect, Engineer approval is not required for Contractor or Supplier Affidavit. �J AGREEMENT 0206 00300 -Page 11 of 14 FY 2006-2006 Street Repairs Pagel of 2 Pages at Various Locations City of Owasso, OK PERIODICAL ESTIMATE FOR PARTIAL PAYMENT -Two (2) -CONTRACT For the period 61912006 to - 612912006 _--inclusive. Description of Contract: FY 2005-2006 Street Repairs at Various Locations Mci Project No. 0606 Contractor's Name Magnum Construction, inc. and Address P.O. Box 707--__ Broken Arrow, OK 74013-0707 Contract Price 98,536.00 (Unit Price) Estimated Cost (Force Account) WORK PERFORMEI Project No. Description of item um er of Units Unit Price Number of Estimated Cost Units Amount Earned to Date . Com- plete Base Bid 312AS12 Type 1 Pavement Repair 171 g $ 74.00 $ 12,654.00 171.00 $ 12,654.00 100% 312ASI 1 302AS66 Ty 1 Pavement Repair Type Pavement Repair 80 sy 16 sy $ 74.00 $ 74.00 $ ��,920.00 $ 1,184.00 109.55 17.00 $ 8,106.70 $ 1,258.00 137% 106% 291AS42 Type Pavement Repair 100 sy $ 74.00 $ 7,400.00 147.33 $ 10,902.42 147% 291AS01 Type 1 Pavement Repair 24 sy $ 74.00 $ 1,776.00 24.00 $ 1,776.00 100% 203AS30 Type Pavement Repair 45sy $ 74.00 $ 3,330.00 45.00 $ 3,330.00 100% 20_3AS16 Type 1 Pavement Repair 93 sy $ 74.00 6,882.00 _93_.00 _$ 6,882.00 100% 203AS13 Type 1 Pavement Repair 120 sy $ 74.00 $ 8,880.00 120.00 $ 8,880.00 100% 203AS06 Type I Pavement Repair 45 sy $ 74.00 $ 3,330.00 45.00 $ 3,330.00 100% 203AS17 Type Pavement Repair $ 74.00 $ 1,036.00 14.00 $ 1,036.00 100% 303AS03 Type 1 Pavement Repair -ILSY 93sy $ 74.00 $ 6,882.00 93.00 $ 6,882.00 100% 303AS04 Type Pavement Repair 114 sy $ 74.00 $ 8,436.00 115.00 8,510.00 101% 303AS04 Concrete Curb & Gutter 214 If $ 30.00 $ 6,420.00 214.00 $ 6,420.00 100% 293AS27 Type 1 Pavement Repair 221 sy $ 74.00 $ 16,354Z0 220.00 $ 16,280.00 100% 293AS27 Concrete Curb & Gutter 113 If $ 30.00 $ 3,390.00 113.00 $ 3,390.00 100% 302AS62 Type 1 Pavement Repair --i- 8 sy $ 74.00 $ 1,332.ob 30,00 $ 2,220.00 -% 167 292AS31 Type I Pavement Repair 8 sy $ 74.00 $ 592.00 8.00 $ 592.00 100% Type 1 Pavement Repair 37 sy $ 74.00 $ 2,738.00 37.00 $ 2,738.00 100% TOTAL 98,536.60 $ 105,187.12 1107% Page 2 of 2 Pages To the best of my knowledge and belief. I certify that all :ems, unit quantities and prices of work and material shown on the face of Sheet No. 1 of this Periodical Estimate are correct: that all work has been performed and materials supplied in full accordance with the terms and conditions of the corresponding construction contract documents between City of Owasso, Oklahoma and Magnum Construction, inc. (Contractor) dated 21 -Mar-06 and all authorized changes thereto: that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this Estimate and that no part of the "total amount due" has been received: (a) Total amount earned (b) Retained percentage 0% (o) Total earned less retained percentage (d) Total previously paid (e) Amount due this estimate 105,187.12 105,187.12 73.186.83 32, 000.29 I further certify that all claims outstanding against _ magnum € onstructinn ine. ___ (Contractor) for labor, materials, and expendable equipment employed in the performance of said contract have been paid in full in accordance with the requirements of said contract, except such outstanding claims as are listed below or on the attached sheet, which statement contains all claims against the contractor which are yet paid, including all disputed claims and any claims to which the contractor has or will assert any defens Magnum construction, inc. K�",&6 __ J \� (Contractor) (Date (By) (Title) CERTIFICATE OF THE CONSULTING ENGINEERS We certify that we have verified this Periodic -at Estimate, and that to the best of our knowledge and belief it is a true and correct statement of work performed and materials supplied by the contractor, and that the contractor's certified statement of his account and the amount due is correct and just, and that all work and materials included in this Periodical Estimate have been performed in full accordance with the terms and conditions of the corresponding construction contract documents and authorized changes thereto. (Name) (Date) (fay) (Date) (gy) (Title) (Title) (Name) (Date) (By) (Title) TOa THE HONORABLE MAYOR AND CITY COUNCIL CITY OF O ASSO FROM: ANA C. STAGG, P.E. PUBLIC WORKS DIRECTOR SUBJECTUTILITY RELOCATION m OKLAHOMA NATURAL GAS COa EAST 96TH STREET E`I' NORTH AND NORTH GARNETT ROAD INTERSECTION IMPROVEMENTS DATE: July 19, 2006 BACKGROUND In December 2004, Council authorized the execution of an Agreement for the relocation of utilities by Oklahoma Natural Gas Company (ONG). The work included the relocation of approximately 1,755 linear feet of low and medium pressure distribution pipelines. Of the total length, however, only 1,440 linear feet were located outside the public ROW and within a privately owned easement. This portion was agreed to be relocated at an estimated cost to the City of $87,842.00 including material, labor, and contract administration. On June 28, 2006, ONG submitted a final invoice in the amount of $99,850.07 (as compensation for the agreed 82.05% of total costs of $121,694.18). According to the Agreement, the City is to reimburse ONG within 30 days of completion of work. FUNDING: Sufficient funds remain in the Capital Improvements Fund for this project. RE COMMENDATION: Staff recommends Council authorization for payment to Oklahoma Natural Gas Company in the amount of $99,850.07. ATTACHMENTS: A. ONG Agreement and estimate B. ONG Final Invoice Oklahoma Natural Gas Company, a Division of ONEOK, Inc., hereinafter called "Company," ovas various medium - pressure and low-pressure distribution natural gas pipelines within the construction limits of the referenced project in the City of Owasso, Tulsa County, Oklahoma, which Company utilizes in the discharge of its duties as a public service corporation. City of Owasso, Oklahoma, a municipal corporation, hereinafter called "City," has requested Company to relocate these facilities to accommodate the proposed construction of the referenced project as shown on plans therefore, the latest of which were received electron ical lyby Company on September 21, 2004. City agrees to reimburse Company in the extent and manner hereinafter stated for that portion of the cost of relocating said facilities which is for the benefit of City. Company proposes to perform the necessary relocation of its facilities in substantial accordance with the eight plan sheets and the three -page cost estimate, all dated October 15, 2004, of which four copies each are attached. Company will bear the cost of relocating the portions of the facilities which do not occupy private rights -of -way. The City's share of the estimated cost of the necessary relocation will be $87,842, all of which is to be reimbursed to Company by City. City by accepting the proposal agrees that City shall reimburse Company for its share of the total actual relocation costs, said costs being arrived at in the same manner as used in Company's estimated cost of the project attached hereto. Such relocation costs will be based upon, but not necessarily limited to, material suppliers', work contractors', and equipment -rental invoices; and at then -current rates and prices, company's transfer and stores expense charges for warehoused materials; payroll time sheets; indirect labor charges; auto, truck, and equipment use records; expense statements; and standard allocated overhead charges. Company's award of and payment for contracted work will be based upon competitive bids or continuing contract, whichever appears to the Company will be most practical and economical. It is further understood, and City by accepting this proposal agrees, that City will reimburse the Company in accordance with this agreement within thirty (30) days after the said relocationwork has been completed and Company's statement for City's costs thereof has been submitted. Company agrees that in the event Company should determine prior to commencement of construction that the revised estimated amount of the reimbursement by the City may exceed the estimated cost as stated herein, Company shall notify the City of such determination in writing. City shall have the right to term inate th is agreementwithin ten (10) days of receipt of such said written notice. If City elects to so terminate, City steal I pay Company the City's share of any engineering cost incurred to date of termination. If the City does not terminate the agreement within the ten (10) days, it shall remain in full force and effect. The Company by agreeing to or by abandoning, relocating, or modifying any of its facilities pursuant to this agreement shall not thereby be deemed to have abandoned, modified, released, or otherwise destroyed any of its rights existing at the time of the execution of this agreement under valid and subsisting private right-of-way easements granted to, obtained by or through condemnation, or otherwise vested in the Company unless the Company shall have released same by written instrun�cnl. Page; I of 3 Further, should the Company in the course of relocating the above described facilities relocate any of such facilities presently located on private right-of-way onto public right-of-way, the Company shall be deemed in respect to such facilities to have retained sufficient casement and other rights such that if said facilities are encompassed within any future governmental project requiting relocation, adjustment, or abandonment of such facilities, that the Company shall be entitled to reimbursement for the cost of such relocation, adjustment, or abandonment from the governmental agency requiring the same; provided, however, this provision shall not be construed as requiring reimbursement by the City of Owasso except when such relocation, adjustment, or abandonment is required for a project of the City of Owasso. Any changes made by the City in this proposal as submitted by the Company shall be subject to the written acceptance thereof by the Company before there is any binding contract between the parties, City by accepting this proposal warrants that it now has or will have unencumbered funds available with which to pay the relocation costs to the extent herein above provided. If this proposal is not adcepted by the City within one (1) year from the date of this letter, this proposal shall automatically terminate and thereafter shall not be subject to acceptance by the City unless the proposal is reinstated by Company. Company respectfully requests that the City of Owasso agree to the terms of this proposal by signing in the space provided below and returning one executed copy to us. ATTEST: OKLAHOMA NATURAL GAS COMPANy, A DI"SION OF ONEOIC, Inc. re Dated: By: D. C. Walker Vice President ® Operations Page 2 of 3 APPROVED as to form and legality this -_ day of ____ 1 2004. City Attorney CITY OF OWASSO, OKLAHOMA Mayor City Clerk This _day of 2004. Page 3 of 3 OKLAHOMA NATURAL GAS COMPANY 044�-"*--? E. 96TH ST. N. AND N. GARNETT RD CITY OF OWASSO INSTALLATION J.0. 021.055.2108.010016 g1-ty-C-09 !2�c 3t 'Total-C-29 $87,842 $19,217 $107,059 82.05% 17.95% Percent of Actual Replacement Cost Attributable to Betterment SUMMARY - Actual Replacement Cost Loss Betterment @ 23.71% City Share @ 82.05% ONG Share @ 17.95% Total Estimated ONG Cost ONG Cost + Cost of Betterment $19,217 + $33,279 Eastern Region Engineering (Randy Stalcup) Utility Design Services Inc. (Gerald Noll) 10/15/2004 Estimated host of Actual Repl���nle�it $140,338 Estimated $140,338 1132-79 $107,059 $87,842 $19,217 Total $52,496 Slit. I of 3 E911mated 99921-R�� $33,279 23.71% OKLAHOMA NATURAL GAS COMPANY ESTIMATED OAS FACILITIES RELOCATION COST E. 96TH ST. N. AND N. GARNETT RD CITY OF OWASSO INSTALLATION J.0.021.055.2108.010016 Replacement with like kind & size MA1ERIAL C-fd��ST 4 9 2" PIPE- STEEL, LINE, .168 WALL, 7.24#/FT, API-5L, X-42, ERW 4" PIPE- PE 206.395 WALL, SDR 11.5 YELLOW 320 ft, 2.53 2 3/8" PIPE- STEEL. SETTINGS, .154 WALL, 3.66#fF7, API-5L, A-53-B 1,200 ft. 1.19 2" PIPE- PE 2408, .216 WALL, SDR 11, YELLOW 640 ft. 2.72 4" TEE- 1M5, STOP, 3-WAY, SCFD, WD, FLANGED 40 ft. 0.41 2" TEE- WD, STOP, 3-WAY, SCFD WD THIRD CAP 1 ea. 171.99 4"X2"" TEE- TAPPING, BUTT FUS10N, MD, PE 2408, 1.88 CUTTER, LESS SLEEVE 2 ea. 1 45.03 2"X2" TEE- TAPPING, ELECTROFUSION, MD, PE, 2406, HIGH VOLUME ea. 36.80 4" VALVE- BALL, PLASTIC, 2406, BUTT FUSION, IPS SDR 11 1 ea. 43.53 2- VALVE- BALL, P/E MEDIUM DENSITY 2406, SDR 11 2 ea. 272.87 4" ELBOW- BUTT FUSION, 90 DEG, MD PE 2406 1 ea. 65.01 4" ELBOW- BUTT FUSION, IPS, 45 DEG, MD, PE 2406, SDR 11 16 ea. 7.00 2" ELBOW- ST WELD 90 DEG LR STD GRADE B, SMLS 4 ea. 9.92 2" ELBOW- SOCKET FUSION, 90 DEG, MO PE 2406 2 ea. 3.19 4"X2" REDUCER- ST CONCENTRIC WELD STD 2 ea. 1.56 4- CAP- BUTT FUSION, IPS, MD PE 2406 3 ea. 6.67 2" CAP- STEEL- WELD STD 12 ®a. 4.84 2" CAP- SOCKET FUSION, MD PE 2400 2 ea. 3.84 19 4 X4" SADDLE- ELECTROFUSION, MD, PE 2406, LESS SLEEVE 2 ea 0 84 4" FITTING- TRANSITION, ST-PL, WELD COATED WITH TRACER 6 ea 70.13 34"X54" BOX- VALVE, PL, SCREW TYPE 2 ea. 19.21 *101MRE- TRACER, FOR BORING, SOLID COPPER, 910 AWG PER ASTM B-1 2 ea. 1,200 ft. 47.83 179 ANODE- MAGNESIUM, PACKAGED, 10 FT LEAD, D3 HIGH POT 0.06 5# ANODE- MAGNESIUM, PACKAGED. 10 FT LEAD 1 ea 41.59 MISC. MATERIAL 7 ea 17.85 ESTIMATED MATERIAL COST INSTALLATION COST - Stores Expense Contract Construction Labor Contract Design & Drafting Services Company Labor Indirect Labor, Payroll, Insurance, and Taxes Automotive Expense Right of Way Damages TOTAL Administrative and General Expense Omissions and Contingencies ESTIMATED INSTALLATION COST ESTIMATED MATERIAL COST ESTIMATED ABANDONMENT COST TOTAL ESTIMATED RELOCATION COST FINANCIAL RESPONSIBILITY Total within Private Right of Way = 1440 Total within Public Right of Way = 315 Cily Share 1440 ft within additional required R/W 82 05% = $87 842 1755 ft, within total required RAN QNG Share 315 ft within present p Wk- R/W 17 95% - $19 217 1755 ft. within total required R/W Eastern Region Engineering (Randy Stalcup) Utility Design Services Inc. (Gerald Noll) 10/15/2004 AM-QVM. $810 $1,428 $1,741 $17 $172 $91 $37 $44 $546 $66 $112 $40 $7 $4 $21 $59 $7 $2 $421 $39 $96 $72 $42 $125 1 113 $7,012 AMOUNT $1,242 $50,072 $8,709 $7,511 $2,594 $1,127 15,000 $83,267 $12,715 $9, 598 $98,568 $7.012 $1,479 107 059 E. 96TH ST. N. AND N. GARNETT RD CITY OF OWASSO INSTALLATION J.0. 021.055.2108.010016 Actual Roplacemont Sht. 3 of 3 MATERIAL, CAST, Afy- -MC-COST AMOUNT 6- PIPE- PLASTIC, 2406, .576- WALL, SDR 11.6 840 ft. 3.00 $2,520 4" PIPE- PLASTIC 2406_395 WALL, SDR 11.5 1,320 ft. 1.19 $1,571 2- PIPE- PLASTIC, 2406..216- WALL, SDR 11 40 ft. 0.41 $17 2" TEE- WD, STOP, 3-WAY, SCFD WD THIRD CAP I ea. 45.03 $46 6"X2'TEE- T APPING, ELECTROFUSION, MD, PE 2406, HIGH VOLUME I ea. 5,980,00 $5,980 4'Y2'TEE- TAPPING, ELECTROFUSION, MD, PE 2406, HIGH VOLUME 1 ea. 53.17 $54 2"Y2'TEE- TAPPING, ELECTROFUSION, MD, PE 2406, HIGH VOLUME 1 ea. 43.53 $44 4" VALVE- BALL, PLASTIC, 2406, BUTT FUSION, IPS, SDR 111 2 ea. 27.Z87 $546 2" VALVE- BALL, PLASTIC, 2406, MEDIUM DENSITY, SDR 11 '1 ea. 65.01 $66 4" ELBOW- BUTT FUSION, 90 DEG., MD PE 2406, SDR 11 16 ea. 2.00 $32 4" ELBOW BUTT FUSION, 45 DEG., MD PE 2406, SDR 11 4 ea. 9.92 $40 2" ELBOW- BUTT FUSION, 90 DEG, MID PE 2406 2 ea. 2.26 $5 6" TEE- BUTT FUSION, MD PE 2406, SDR 11 2 ea. 26.64 $54 6"X4'REDUCER- BUTT FUSION, MD PE 2406, SDR 11 2 ea. 14.97 $30 2" CAP- STEEL- WELD, STD 2 ea. 3.19 $7 6" CAP- BUTT FUSION, MD PE 2406 1 ea. 15.35 $16 4" CAP- BUTT FUSION, MD PE 2406 12 ea. 4.84 $59 2" CAP- BUTT FUSION, MD PE 2406 2 ea. 0.84 $2 4'X4' SADDLE- ELECTROFUSION, MD PE 2406, LESS SLEEVE 6 ea. 70.13 $421 2" FITTING- TRANSITION, ST-PL, WELD COATED W/ TRACER WIRE I ea. 7.65 $8 34"X54" BOX- VALVE, PL, SCREW TYPE 3 ea. 47.83 $144 010 WIRE- TRACER, FOR BORING, SOLID COPPER 2,200 ft. 0.06 $132 5# ANODE- MAGNESIUM, PACKAGED, 10 FT. LEAD 10 ea. 17.85 $179 17# ANODE- MAGNESIUM, PACKAGED, 10 FT. LEAD, D3 HIGH POT I ea. 41.59 $42 MISC. MATERIAL $2,359 ESTIMATED MATERIAL COST $14,374 INSTALLATION COST.- Stores Expense AMOUNT Contract Construction Labor $2,545 Contract Engineering Services $63,404 Company Labor $8,709 Indirect Labor, Payroll, Insurance, and Taxes $9,511 Automotive Expense $3,285 Right of Way Damages $1,427 TOTAL $5,000 $108,255 Administrative and General Expense Omissions and Contingencies $16,531 $12,479 ESTIMATED INSTALLATION COST ESTIMATED MATERIAL COST $122,891 ESTIMATED ABANDONMENT COST $14,374 $3,073 TOTAL ESTIMATED RELOCATION COST 1140,338 Eastern Region Engineering (Randy Stalcup) Utility Design Services Inc. (Gerald Noll) 10/15/2004 ATTACHMENT A DIVISION OF ONEOK June 28, 2006 City of Owasso Attn: Ana Stagg Public Works Director 301 W. 2°d Ave. Owasso, OK 74055 Dear Ms. Stagg: RE: CITY OF OWASSO ROADWAY IMPROVEMENT PROJECT AT 96"" ST NORTH & GARNETT ROAD INTERSECTION ONG JOB ORDER NO, 021.055.2108.010016 Enclosed are three copies of the claim and supporting papers for the Final Billing against the City of Owasso, in the amount of $99,850.07 for cost incurred on the referenced project. Please mail payment with a separate check (please do not include with utility bill payment) to Oklahoma Natural Gas Company, ATTN: Bob Dempster, Property Accounting, P.O. Box 401, Oklahoma City, OK 73101-0401 Sincerely, kobert E. Dempster, Manager Property Accounting and Reporting Enclosures 401 North Harvey Avenue Oklahoma City, OK 73102-3470 P. 0. Boa 401 Oklahoma City, OK 73101-040 t (405) 551-6500 E x (405) 551-6779 WW 011c".Co(Il AFFIDAVIT STATE OF OKLAHOMA ) Ss COUNTY OF' TULSA The undersigned (Architect, Contractor, Supplier, or Engineer), of lawful age, being first duly sworn, says that this invoice or claim is true and correct. Affiant further states that the work, service, or materials as shown by this invoice or claim have been completed or supplied in accordance with the plans, specifications, orders, or requests furnished the affiant. Affiant further states that (s)he has made no payment directly or indirectly or to any elected official, officer, or employee of the State of Oklahoma, any county or local subdivision of the State, or money or any other thing of value to obtain payment. Subscribed and sworn to before me this Z A �_6_ 2=;, - - R. E. Dempsfe-r, Manager Property Accounting and Reporting day o f My Commission Expires: q '­C)-Notary Public (or Clerk �orJ dge) %0 __ 0 sera 0 A H 0 C Architect or Engineer OUN jo Subscribed and sworn to before me this day of 19 My Commission Expires: Notary Public (or Clerk or Judge) [OKLAHOMA NATURAL GAS LINE RELOCATION FOR CITY OF OWASSO 96TH ST NORTH & GARNETT ROAD INTERSECTION ITULSA COUNTY 021.055.2108.010016'. MATERIAL COSTS. QUANTITY UNIT ;$/UNIT AMOUNT '4" Whiteskin Foam Pig for Plastic Plpe 12- EA $ 1.0000 $12 00' ANODE-MAGNESIUN,I, PACKAGED 17 LB, 10 FT LEAD, 4 EA IT 46.9100 $187.64i ANODE -MAGNESIUM, PACKAGED 5 LB, 10 FT LEAD 11 EA $ 17.5082 $192.59' APAC-OKLAHOMA / 1" CRUSHER RUN 462.74 EA $ 1.0000 $462.741 BOLT -SPLIT, CONNECTOR, RANGE 16STR-10STR 127 EA $ 0.6200 $78.74' BOX -VALVE, ABS POLY MATERIAL, SCREW TYPE, APP 1 EA $ 47.4300 $47,43 BRUSH -PAINT, 2" 4 EA $ 0.3000 $1.20': CAP -BUTT FUSION, 2", MD PE 2406 0 EA $ - $0.00: CAP -BUTT FUSION, 4" IPS, MD PE 2406 2 EA $ 2.4250 $4.85''. CAP -BUTT FUSION, 6" IPS, MD PE 2406 1 EA $ 10.3000 $10.30'. CAP -SOCKET FUSION, .75" (3/4"] IPS, MD PE 2406 12 EA $ 0.5400 $6.48i CAP -STEEL -WELD 2" STD 2 EA $ 4.6700 $9,34, '.COLLAR -MALLEABLE IRON, 1", BLACK, 4 EA $ 1.3000 $5.20'. 'COUPLING-ELECTROFUSION, 4" 1PS, MD PE 2406 8 EA $ 15.3288 $122.63, .COUPLING-ELECTROFUSION, 6", PLASTIC, 5 EA $ 72.0000 $360.00-. COUPLING -SOCKET FUSION, .75" [3/4"), MD PE 2406 24 EA $ 0,3500 $8.40' ELBOW -BUTT FUSION, 2", 0 EA $ - $0.01' ELBOW -BUTT FUSION, 4" IPS 4 EA $ 67000 $26.80; ELBOW -BUTT FUSION, 4", 22 EA $ 6.6286 $145.83. ELBOW -MALLEABLE IRON, V, BLACK, THREAD 4 EA $ 1.0625 $4.251 ELBOW -SOCKET FUSION, .75" [3/4 IN] 10 EA $ 0.7100 $7.10'. FITTING -TRANSITION, 2" ST-PL, 1 EA $ 8.6300 $8.63' FITTING -TRANSITION, 2" ST-PL, 1 EA $ 8.5700 $8.57. FITTING -TRANSITION, REDUCER, 1" X .75" [1" X 3/4"], 0 EA $ - $0.00" LID -VALVE BOX, 12", NUMBER 212 2 EA $ 86.6300 $173.26'. METER -SET, PREFABRICATED, 1" DOMESTIC SERVICE 3 EA $ 45,0300 $135.09'. NIPPLE -BLACK, 1" X 10", STEEL, THREADED, STD 2 EA $ 1.9900 $3,98' NIPPLE -BLACK, 1" X 12", STEEL, THREADED, STD 2 EA $ 2.2850 $4.57'I NIPPLE -BLACK, 1"X 24", STEEL, THREADED, STD 2 EA $ 5.2700 $10.54' NIPPLE -BLACK, 1" X 4", STEEL, THREADED, STD 2 EA $ 0.7350 $1.47'. NIPPLE-BLACK,1"X6",STEEL, THREADED, STD 2EA $ 1.0400 $2.08' NIPPLE -BLACK, 1" X 8", STEEL, THREADED, STD 2 EA $ 1.7000 $3.40 NIPPLE-BLACK, 1"XALL, STEEL, THREADED 4 EA $ 0.5200 $2.08 :PAINT- METER & SETTING MAINTENANCE, 1 EA $ 11 5000 $11.50' (PAINT -MARKING, YELLOW 2 EA $ 2.0000 $4,00' PIPE -PE 2406, .75" (3/4"] IPS, .095" WALL, 500 FT $ 0.1189 $59.45I PIPE -PE 2406, 2" IPS, .216" WALL, 25 FT $ 0.3568 $8.92'. PIPE -PE 2406, 4" IPS, .395" WALL, SDR 11.5, YELLOW, 311 FT $ 1.4564 $452.94'. PIPE -PE 2406, 4" IPS, .395" WALL, SDR 11.5, YELLOW 1200 FT $ 1.3312 $1,597.44' 'PIPE -PE 2406, 6" IPS, .576" WALL, SDR 11.5, 500 FT $ 2.8894 $1,444.70' PIPE -PE 2406, 6" IPS, .576" WALL, SDR 11.5, YELLOW, 340 FT $ 3.0343 $1,031.65 REDUCER -BUTT FUSION, 4" X 2", MD PE 2406 1 EA $ 3.7700 $3.77' REDUCER -BUTT FUSION, 6" IPS X 4" IPS, PE 2406 3 EA $ 14.4567 $43.37 REDUCER -SOCKET FUSION, 1.25" IPS X .75" [1 1/4" IPS 2 EA $ 1.7900 $3.58 REDUCER -TRANSITION, 1" X .75" [1" X 3/4"], THREADEI 1 EA $ 5.1900 $5.19I RISER -SERVICE, .75" (3/4"], COATED 6 EA $ 8.2900 $49.74'. SADDLE-ELECTROFUSION, 4" X 4", MD PE 2406, 0 EA $ - $0.00. '.SIGN -MARKER, PIPELINE, (ONG), 66" TALL, 4 EA $ 9.4800 $37.921 SIGN -MARKER, PIPELINE, (ONG), 84" TALL, 6 EA $ 11.9400 $71.64' iSTOP-IRON, 1", BRASS CORE, SCREW, 100# '.SWIVEL 4 EA $ 6.3450 $25.38'. -METER, WASHER, 1", 20 LT. 4 EA $ 0.0725 $0.29'. 'TAPE -ELECTRICAL, PUTTY, 1.50" 6 EA $ 7.6433 $45.86-- TEE -BUTT FUSION, 6", MD PE 2406, SDR 11 4 EA $ 19.2400 $76.96i TEE-ELECTROFUSION, 6" X 2", 1 EA $ 53.5100 $53.51'. (TEE -SOCKET FUSION, 2" IPS, 2 EA $ 2.1400 $4.28I TEE -TAPPING, ELECTROFUSION, 4" X 2", 1 EA $ 43.8600 $43.86' 'TEE -TAPPING, ELECTROFUSION, 2" X 2", 0 EA $ - $0.00 TEE -TAPPING, SOCKET FUSION, 4" X .75" IPS 5 EA $ 2,5400 $12.70: TEE-WD STOP, 2", 3-WAY, SCFD WD THRD CAP 1 EA $ 46,4700 $46.47 VALVE -BALL, 2", P/E MEDIUM DENSITY #2406, 1 EA $ 51.6000 $51.60' VALVE -BALL, 4", PLASTIC, 2 EA $ 157.2100 $314.42i VALVE -EXCESS FLOW, .75" [314"] IPS, MED CAP. 2 EA $ 5.2500 $10.501 WIRE -TRACER, DIRECT BURIAL, SOLID COPPER #12 A 500 FT $ 0.0829 $41.43 WIRE -TRACER, FOR BORING, SOLID COPPER, #10 4000 FT $ 0.0925 $370.07'. TOTAL MATERIAL COSTS $7,970.34 INSTALLATION COSTS 'ADMINISTRATIVE AND GENERAL EXPENSE $13,672.46: -AUTOMOTIVE EXPENSE $609.72. 'COMPANY LABOR $4,740,52: CONTRACT CONSTRUCTION LABOR $73,092.28 CONTRACT DESIGN & DRAFTING SERVICES $8,409.35'. MISCELLANEOUS (DIRECT PURCHASE) $1.59' LABOR ATTENDS- OVERHEADS $1,931.78-. -: MISCELLANEOUS $287.5& .STORES EXPENSE $2,191.92' jSTORES EXPENSE $162.98: TOTAL INSTALLATION COSTS $105,100.16� '.TOTAL MATERIAL AND INSTALLATION COSTS $113,070.50 RETIREMENT COSTS ADMINISTRATIVE AND GENERAL EXPENSE $1,042.64 CONTRACT LABOR $7,456.38' MATERIAL $21.17: MISC AP INVOICES $100.00, ,STORES EXPENSE $3.497 TOTAL RETIREMENT COSTS $8,623.68' .TOTAL COST FOR PROJECT $121,694.18' LESS: ONG COMPANY SHARE (17.95%) •$21,844.11'. AMOUNT DUE -FINAL BILLING $99,850.07 TO: TIDE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO � l l /i FROM: AMA C. STAGG, P,E,. PUBLIC WORKS DlI C OIL 00 t STREET REHABILITATION DATE: July 19, 2006 BACKGROUND Included in FY 2006-2007 Budget, the Capital Improvements Fund allows for the expenditure of $1 million in the repair and/or resurfacing of residential and non-residential roadways throughout the City. Rehabilitation sites are currently under evaluation and will be selected based on a comprehensive assessment of roadways conditions (both residential and non-residential). The selection process is aimed at maximizing return on investment by increasing roadway lifecycle and minimizing future maintenance costs while enhancing overall roadway driving conditions and public safety. Seeking to further maximize return, on April 2006, the City of Owasso formally requested assistance from Tulsa County in the completion of several roadway projects. Specifically, the request included the use of County labor and equipment for the paving and/or resurfacing of approximately eight lane -miles (or 6,400 tons of asphalt) of roadway surface (see Attachment A for preliminary locations). The use of such equipment and labor is anticipated to reduce overlay costs by as much as fifty percent. On June 2006, Tulsa County submitted an Agreement to provide an asphalt overlay. In order to formalize responsibilities (pending the selection and approval of sites), an Agreement has been drafted with Tulsa County (see Attachment B) that includes the following: W The City of Owasso shall provide all required materials; ® Tulsa County shall provide all necessary labor and equipment to complete the projects; and ® Duration of the Agreement shall be for a period equal to the time necessary to complete the projects. Tulsa County Interlocal Agreement 2006-2007 CIP Street Rehabilitation Page 2 of 2 Elf iIlil l�A Funding for the materials to be used by Tulsa County for the projects is included in the FY 2006- 2007 Capital Improvements Fund budget (Line Item 40-300-54210-042). Staff recommends Council approval of the Interlocal Agreement with Tulsa County for paving assistance and authorization of the Mayor to execute the Agreement. A. Preliminary Overlay Sites B. Tulsa County Agreement Owasso Public Works Department 301 West 2"d Street Owasso, OK 74055 918.272.4959 918.272.4996 www.cityofowasso.com Street Rehabilitation Project (2006-2007) ATTACHMENT e PRELIMINARY L• O N; N w ® E S THIS AGREEMENT, made the - day of ---, 2006, by and between the Board of County Commissioners of Tulsa County, Oklahoma, hereinafter called "County" and the City or' Owasso, Tulsa County, Oklahoma, hereinafter called "City". WITNESSETH. I ='JUMN streets of such municipalities, and; WRERE AS, the County is desirous of participating in projects and the provision of services mutually advantageous to the County and other units of government; 7MEREFORE, in consideration of the covenants and conditions hereinafter contained, the parties hereto agree as follows: 1. The duration of this Agreement shall be from the date of execution of this Agreement until the project is complete. 2. The purpose of this Agreement shall be to provide an asphalt overlay on certain City of Owasso street surfaces. Street locations to be provided by the City of Owasso. 3. The City shall provide all materials, do any rnilfing, spot repairs and assist with traffic control. 4. The County shall provide the necessary labor and equipment to complete the project. This Agreement shall be effective from and after the date of execution hereof and is intended only for the purpose described in section 2 above. 6. The rights, duties and obligations under or arising from this Agreement shall not be assigned by either party hereto without the express written consent of the other party. IN WITNESS WHEREOF, the parties have hereunto set their hands and seal this __ day of CITE" CLERK i •' • U CITY OF O ASSO I TO: THE HONORABLE MAYOR AND CITY COUNCIL CITY OF OWASSO I+ROMa ANA C. STAGC, P.E. PUBLIC WORDS DIRECTOR SUBJECT, E. 86TH STREET NORTH (MAIN TO MEMORIAL ROAD) TULSA COUNTY AGREEMENT C2A ENGINEERING, INC. AGREEMENT DATE- July 19, 2006 BACKGROUND: In 2005, Tulsa County voters approved a million dollar expenditure (under the "4-to-Fix the County" program) as matching funding for the widening of E. 86th Street North between Main Street and US Highway 75. Following the award, city staff began discussions with Tulsa County to better define the scope of improvements due to the limitations in funding. Initial discussions included enhancements to the road between Main Street and N. Mingo Road, serving to complete improvements to E. 861h Street North between US Highway 169 and N. Mingo Road. Discussions led to the possibility of obtaining additional funding for this project from the Oklahoma Department of Transportation (ODOT) through other program sources allocated for Tulsa County projects. One example of a potential funding source is the ODOT's Urbanized Area Surface Transportation Program which is currently administered by the Indian Nations Council of Govenlments. Only members of the defined "Urbanized Area" may apply for such funding, disqualifying the City of Owasso from seeking assistance on its own. In June 2006, however, Tulsa County agreed to sponsor the E. 86th Street North and Mingo Road Intersection Improvements on behalf of the City of Owasso. Following approval of the project by INCOG, funding for the work is being proposed under "FFY 2006 Transportation Improvement Program (TIP) Amendment" for submittal to ODOT for inclusion in the Statewide TIP. The allocation of additional TIP funding for E. 861h Street North may enable the construction of improvements west of N. Mingo Road, extending the widening project from Main Street to N. Memorial Road. Further, staff is optimistic that in the next three to five years additional ODOT funding — programmed for Tulsa County projects — may become available to Owasso for the completion of widening improvements to US 75. To enable timely use of ODOT funding, it is recommended that Engineering Design Services begin immediately for the portion of roadway between Main Street and Memorial Road (Attachment A). The design fees will be funded by Tulsa County "4-to-Fix" allocation. An Agreement has been crafted to enable the use of such funding for this purpose. Tulsa County and C2A Engineering Agreements E. 86"' Street North (Main Street to N. Memorial Road) Page 2 of 3 TULSA COUNTY AGREEMENT: On June 23, 2006, Tulsa County submitted an Agreement (Attachment B) to provide improvements on E. 86"' Street North, from Main Street to Memorial Road. Per the Agreement, the City of Owasso consents to provide right-of-way, utility relocation and engineering services. The County, in exchange, agrees to provide $1,000,000 in matching federal highway funding and assist in the application for such federal funds and financing of engineering services. DESIGN SERVICES AGREEMENT. Following concurrence by Tulsa County and City of Owasso staff, C2A Engineering, Inc. submitted a proposal for the performance of design work associated with improvements to E. 86th Street North between Main and Memorial. It is worth noting that the aforementioned Engineer completed the design work for E. 861h Street North and N. Mingo Road and facilitated discussions with ODOT, Tulsa County and INCOG which made possible the award of additional funding. In July 2006, C2A Engineering, Inc. submitted an Agreement for Engineering Services (Attachment C) in the amount of $180,000 for the performance of engineering design work to include preparation of documents for the construction of a four -lane roadway, complete with sidewalk, curb and gutter and drainage improvements from Main Street to N. Memorial Road, Tulsa County and Owasso staff have reviewed the proposal and found such fee to be fair and reasonable for the performance of the scoped work. FUNDING: Funding is provided by Tulsa County 4-to-Fix Program in the amount of $1,000,000 and ODOT. Matching City funding has been included in FY 2006-2007 Capital Improvements Fund (Line Item 40-300-54210-013) in the amount of $300,000, RECOMMENDATIONS Item 1: Staff recommends Council approval of the Interlocal Agreement with Tulsa County to provide improvements on E. 861h Street North, from Main Street to Memorial Road, and authorization of the Mayor to execute the Agreement. Item 2: Staff recommends City Council approval of an Agreement for Engineering Services (E. 86th North between Main Street and Memorial Road) with C2A Engineering in the amount of $ i 80,000 for the completion of documents for construction of E. 861h Street North Widening Improvements and authorization of the Mayor to execute the Agreement. ATTACHMENTS A. Site Map B. Tulsa County Agreement C. Agreement for Engineering Services, C2A Engineering, Inc. 12 eg cog ------------ I 1 � !F 1t I Owasso Public Works NORTH Department rH N 301 West 2nd Street WIDENING PROJECT Owasso, OK 74055 W 918.272.4959 918.272.4996 SITE MAP www.ci.tyofowasso.com S AGREEMENT r THIS A E EMENT, made the =�'_ day of 2006, by and between the Board of County Commissioners of Tulsa County, Oklahoma, hereinafter Oklahoma, called "County" and the City of Owasso, Tulsa County, Oklahoma, hereinafter called "City". IT I" SET WHEREAS, by virtue of 69 0.S., 1951, Section 1903, the Board of County Commissioners is authorized to enter into agreements with municipalities to construct, improve, and repair- any of the streets of such municipalities, and; WHEIZEAS, the County is desirous of participating in projects and the provision of services mutually advantageous to the County and other units of government; THEREFORE, in consideration of the covenants and conditions hereinafter contained, the parties hereto agree as follows: 1. The duration of this Agreement shall be from the date of execution of this Agreement until the project is complete. 2. The purpose of this Agreement shall be to provide roadway improvements on 86`ri Street N. from Main Street to Memorial Drive. 3. The City shall provide right-of-way, utility relocation, and engineering services. 4. The County shall provide $ 1,000,000.00 for snatching federal highway funds, make application for said federal highway funds and assist with engineering services. 5. This Agreement shall be effective from and after the date of execution hereof and is intended only for the purpose described in section 2 above. 6. The rights, duties and obligations under or arising from this Agreement shall not be assigned by either party hereto without the express written consent of the other party. IN WITNESS HE +"O , the parties have hereunto set their hands and seal this _ day of -- - 2006 ,,l CITY CLERK 1 i , Llq l j • jklrj FA. �� /� ► ►[ Gil �a ► '► i1C;RE,t?MI NT FOR ENGINEERING SERVICES EAST 86 " 1 ' STREET NORTH MAIN STREET TO MEMORIAL DRIVE THIS/�GREEMENT, made and entered into this day of 2006 between the City of Owasso, a Municipal Corporation of the State of r0 lahoma, hereinafter referred to as CITY, and C2A Engineering Inc., liereinaftet- eferred to as ENGINEER; WITNESSETH: WHEREAS, CITY intends to construct certain improvements on East 86th Street North, from Main Street to Memorial Drive, hereinafter referred to as the PROJECT; and, WHEREAS, CITY requires -certain professional services in connection with the PROJECT, hereinafter referred to as the SERVICES; and WHEREAS, CITY has financing for said PROJECT; and, WHEREAS, ENGINEER is prepared to provide such SERVICES; and NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree as follows: 1.0 SCOPE OF PROJECT: The scope of this PROJECT is described in Attachment A, SCOPE OF PROJECT, which is attached hereto and incorporated by reference as part of this AGREEMENT. 2.0 SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached hereto and incorporated by reference as part of this AGREEMENT. 3.0 COMPENSATION: CITY shall pay ENGINEER in accordance with Attachment D, COMPENSATION, which is attached hereto and incorporated by reference as part of this AGREEMENT. 4.0 STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES undertaken in a manner consistent with the prevailing accepted standard for similar services with respect to projects of comparable function 1 <ua(1 con)plcxily and with the applicable laws and regulations published and in ellcct at tllc time of pcHbrmancc of the SERVICES. The PROJECT shall be designed and engineered in a good and workmanlike manner and in strict accordance with this AGREEMENT. All engineering work shall be performed by or under the supervision of Professional Engineers licensed in the State of Oklahoma, and properly qualified to perform such engineering services, which qualification shall be subject to review by CITY. Other than the obligation of the ENGINEER to perform in accordance with the foregoing standard, no warranty, either express or implied., shall apply to the SERVICES to be performed by the ENGINEER pursuant to this AGREEMENT or the suitability of ENGINEER'S work product. 5.0 LIMITATIONS OF REPSONSIBILITY, 5.1 ENGINEER shall not be responsible for construction means, methods, techniques, sequences, procedures, or safety precautions and programs in connection with the PROJECT. 6.1 Since ENGINEER has no control over the cost of labor, materials, equipment or services furnished by others, or over contractors', subcontractors', or vendors' methods of determining prices, or over competitive bidding or market conditions, ENGINEER'S cost estimates shall be made on the basis of qualification and experience as a Professional Engineer. 6.2 Since ENGINEER has no control over the resources provided by others to meet construction contract schedules, ENGINEER'S forecast schedules shall be made on the basis of qualification and experience as a Professional Engineer. 7.0 LIABILITY AND INDEMNIFICATION. 7.1 ENGINEER shall indemnify CITY from and against legal liability for damages arising out of the performance of the SERVICES for CITY including but not limited to any claims, costs, attorney fees, or other expenses of whatever nature where such liability is caused by the negligent act, error, or omission of ENGINEER or any employee, sub -consultants or agents for whom ENGINEER is legally liable. 7.2 ENGINEER shall not be liable to CITY for any special, indirect or consequential damages, such as, but not limited to, loss of revenue, or loss of anticipated profits. 8.0 COMPLIANCE WITH LAWS. 2 8.1 In performance of the SERVICES, ENGINEER will comply with applicable regulatory requirements including federal, state, and local laws, rules, regulations, orders, codes, criteria and standards. ENGINEER. shall procure the permits, certificates, and licenses necessary to allow ENGINEER to perform the SERVICES. ENGINEER shall not be responsible for procuring permits, certificates, and licenses required for any construction unless such responsibilities are specifically assigned to ENGINEER in Attachment 13, SCOPE OF SERVICES. 8.2 The ENGINEER shall take steps within. its authority to ensure the project is in compliance with the requirements of the Americans With Disabilities Act. It is understood that the program of the ENGINEER is not a program or activity of the CITY OIL OWASSO. The ENGINEER agrees that its program or activity will comply with the requirements of the Americans With Disabilities Act. Any cost of such compliance will be the responsibility of the ENGINEER. Under no circumstance will ENGINEER conduct any activity which it deems to not be in compliance with the Americans With Disabilities Act. 90 INSURANCE. 9.1 During the performance of the SERVICES under this AGREEMENT, ENGINEER shall maintain the following insurance; 9.1.1 General Liability Insurance with bodily injury limits of not less than $1,000,000 for each occurrence and not less than $1,000,000 in the aggregate, and with property damage limits of not less than $100,000 for each occurrence and not less than $100,000 in the aggregate. 9.1.2 Automobile Liability Insurance with bodily injury limits of not less than $1,000,000 for each person and not less than $1,000,000 for each accident and with property damage limits of not less than $100,000 for each accident. 9.1.3 Worker's Compensation Insurance in accordance with statutory requirements and Employer's Liability Insurance with limits of not less than $100,000 for each occurrence. 9.1.4 professional Liability Insurance in the amount of $1,000,000 per claim and annual aggregate. 9.2 ENGINEER shall furnish CITY certificates of insurance which shall include a provision that such insurance shall not be cancelled without at least 30 days written notice to the CITY. 3 0.0 CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in Attachment C, RESPONSIBILITIES OF THE CITY, which is attached hereto and incorporated by reference as part of this AGREEMENT. 11.0 OWNERSHIP AND REUSE OF DOCUMENTS 11.1 All documents, including original drawings, estimates, specifications, field notes and data shall become and remain the property of the CITY. 11.2 CITYS reuse of such documents without written verification or adaptation by ENGINEER for the specific purpose intended will be at CITYS risk, 12.0 TERMINATION OF CONTRACT. 12.1 The obligation to continue SERVICES under this AGREEMENT may be terminated by either party upon fifteen days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. 12.2 CITY shall have the right to terminate this AGREEMENT, or suspend performance thereof, for CITY'S convenience upon written notice to ENGINEER; and ENGINEER shall terminated or suspend performance of SERVICES on a schedule acceptable to CITY. In the event of termination or suspension for CITYS convenience, CITY shall pay ENGINEER for all SERVICES performed in accordance with provisions of Attachment D, COMPENSATION. Upon restart of a suspended project, payment shall be made to ENGINEER in accordance with Attachment D, COMPENSATION. 13.0 NOTICE. 13.1 Any notice, demand, or request required by or made pursuant to this AGREEMENT shall be deemed properly made if personally delivered in writing or deposited in the United States mail, postage prepaid, to the address specified below. 13.1.1 To ENGINEER: C2A Engineering Inc. 5516 South Lewis Ave., Suite 201 Tulsa, OK 74105 13.1.2 To CITY: CITY OF OWASSO Department of Public Works P.O. Box 180 Owasso, OK 74055 11 13.2 Nothing contained in this Article shall be construed to restrict the transmission of routine communications between representatives of ENGINEER and CITY. 14.0 UNCONTROLLED FORCES. Neither CITY nor ENGINEER shall be considered to be in default of this AGREEMENT if delays in or failure of performance shall be due to forces which are beyond the control of the parties; including, but not limited to: fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage, inability to procure permits, licenses, or authorizations from any state, local, or federal agency or person for any of the supplies, materials, accesses, or services required to be provided by either CITY or ENGINEER under this AGREEMENT; strikes, work slowdowns or other labor disturbances, and judicial restraint. 15.0 SEVERABUITY. If any portion of the AGREEMENT shall be construed by a court of competent jurisdiction as unenforceable such portion shall be severed here from, and the balance of this AGREEMENT shall remain in full force and effect. 16.0 INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments A, E, C, and D, Exhibits A and l3, and Exhibit C; and represents the entire and integrated AGREEMENT between the Parties; and supersedes all prior negotiations, representations, or agreements pertaining to the scope of services herein, either written or oral. This AGREEMENT maybe amended only by a written instrument signed by each of the Parties. 17.0 DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the Architect/Engineer and the CITY over the interpretation or application of the terms of this AGREEMENT, the matter shall be referred to the City's Director of Public Works for resolution. If the Director of Public Works is unable to resolve the dispute, the matter may, in the Director's discretion, be referred to the Mayor for resolution. Regardless of these procedures, neither party shall be precluded from exercising any rights, privileges or opportunities permitted by law to resolve any dispute. 18.0 ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to this AGREEMENT, provided that nothing contained in this paragraph shall prevent ENGINEER from employing such independent consultants, associates, and subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the performance of the SERVICES hereunder. 19.0 APPROVAL. It is understood and agreed that all work performed under this AGREEMENT shall be subject to inspection and approval by the Public Works Department of the City of Owasso, and any plans or specifications not meeting the terms set forth in this AGREEMENT will be replaced or 5 corrected at the sole expense of the ENGINEER. Tlic ENGINEER will meet with the CITY staff initially aml monthly thereafter and will be available for public hearings and/or City Council presentations. IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies on the respective dates herein below reflected to be effective -on the date executed by the Mayor of the CITY or Contracting Authority. THE CITY OF OWASSO, OKL,AHOMA A MUNICIPAL, CORPORATION Mayor Date: City Clerk APPROVED AS TO FORM: City Attorney (SEAL,) C2A ENGINEER INC. ATTEST: President Date: Segetary 6 A G R I -`E M 1-,'N T FOR ENGINEERING SERVICES EAST 86""' STREET NORTH MAIN STREET TO MEMORIAL DRIVE SCOPE OF PROJECT NWUMNIB�U- A. SCOPE OF PROJECT. The PROJECT shall consist of providing professional engineering services to the City of Owasso for the preliminary and final design phases, and preparation of construction plans for improvements to East 86 1h Street North from Main Street to Memorial Drive. The improvements include the construction of a four lane arterial street with all necessary work, It is expected that there shall be a number of construction and service contracts, which must be entered into in order to bring this PROJECT into being. Included may be services and/or construction contracts for engineering, utility relocations, construction, equipment, etc. 7 AGREEMENT FOR ENGINEERING SERVICES EAST 86""' STREET NORTH MAIN STREET TO MEMORIAL DRIVE SCOPE OF -SERVICES ATTACHMENT B B. SCOPE OF SERVICES. The SERVICES to be performed by the ENGINEER under this AGREEMENT will consist of Three (3) phases, as stated below. Further, it is understood and agreed that the date of beginning, rate of progress, and the time Of Completion of the work to be done hereunder are essential provisions of this AGREEMENT; and it is further understood and agreed that the work embraced in this AGREEMENT shall commence upon execution of this AGREEMENT and after receipt of a Notice to Proceed. The Basic Services of ENGINEER include, but are not necessarily limited to, the following tasks: ® Designate a representative to coordinate all information between ENGINEER and CITY. ® Document all meetings, conferences, coordination, etc., and send documentation to CITY within two (2) working days. ® Attend initial conferences with CITY and other administrative and regulatory agencies, including ODOT and utility companies, to review PROJECT requirements and discuss scheduling of the PROJECT. * Attend all public meetings for the PROJECT. ® Determine drainage requirements for the PROJECT. ® Prepare all applications for Watershed Development Permits for the PROJECT. ® Perform all necessary surveys and investigations for the PROJECT. ® Prepare all drawings in conformance with the drafting standards set forth in the Oklahoma Department of Transportation requirements, as necessary. Drawings shall be 22" x 34" in size. B. 1. Phase No. 1. PRELIMINARY DESIGN. Work with the CITY appointed Personnel to evaluate and develop a preliminary design to construct a four lane arterial street on East 86'1' Street North from Main Street to Memorial Drive. 0 .1, 1Zcvicw all existing reports, record plans and/or other plans pertinent to the PROJECT and the City Policy of the City of Owasso regarding the need for the improvements. B.1.2. Provide a ground survey of the entire length of the PROJECT with enough detail_ and at such a scale that a map may be prepared for the entire length showing the proposed alignment and the impact the PROJECT will have on surrounding Property, structures, and utilities. B.1.3. Based on the following general design criteria, establish an alignment along the present alignment, showing the features of the proposed improvements and listing all obstructions to the alignment. B.1.4. DESIGN REPORT. Prepare a DESIGN REPORT, including roadway design criteria to be used, sketch specifications, cost estimates and recommendations., and submit with the preliminary plans. The DESIGN REPORT shall include, but not necessarily be limited to: B.1.4.1. Information fi-om search of existing plans and records. B.1.4.2. Soils investigations, including test borings and geotechnical report. Every effort shall be made to restore grassing, irrigation and related items damaged by the test holes. B.1.4.3. Right-of-way and ownership information. B.1.4.4. A written discussion on utilities, their possible conflicts, and possible relocation requirements. B.1.4.5. A summary of hydrologic studies, Master Drainage Studies, or Basin Studies, used to preliminarily determine elevations of any stream crossings. B.1.4.6. Architectural, landscape, and landscape architectural studies and designs that will enhance the PROJECT'S compatibility with the surrounding environment. B.1.4.7. Cost estimate for the plan discussed. B.1.5. Prepare PRELIMINARY PLANS, in accordance with CITY standards within 150 calendar days after the date specified in the Notice to Proceed with the PRELIMINARY PLANS. B.1.6. PRELIMINARY PLANS shall include as a minimum: ® Cover Sheet indicating "PRELIMINARY PLANS" ® Summary Sheet including: .01 ® Pay Quantities and Pay Item Notes ® Roadway Quantities Bridge/Structure Quantities ® Storm Sewer Design Storm Inlet Design Drainage Structures ® Drainage Map ® Right -of -Way Map "Typical Section Sheet Survey Data Sheet Flan and Profile Sheets Erosion Control Sheets Preliminary construction drawings for all bridges, special drainage structures, retaining walls, architectural details, landscaping plans, or any other special items required for the PROJECT Traffic Control Details * Traffic Control/Construction Phasing sheets) Cross -Sections indicating existing ground lines, proposed sidewalk template, proposed storm sewers and existing utilities within the PROJECT area. B.1.7. ENGINEER shall furnish twenty (20) sets of PRELIMINARY PLANS as half- size black -line, for review by the CITY, ODOT, and the Utility Companies. ENGINEER shall furnish one (1) set of an estimate of construction costs for the PROJECT to the CITY and ODOT. B.2. Phase II. FINAL DESIGN. Prepare FINAL PLANS, documents and cost estimates following the comments from the PRELIMINEARY PLAINS review meeting, together with all specifications and related bidding documents required for the construction of the PROJECT, in accordance with CITY standards, detailed specifications within 150 calendar days after the date specified in the Notice to Proceed with the FINAL DESIGN. The following tasks shall be included as required: B.2.1. Verification of comments and recommendations from the PRELIMINARY PLAN review meeting. B.2.2. Furnish legal descriptions of all right-of-way and permanent and temporary easements. Descriptions shall be furnished in an approved format on approved forms. All existing easements of record and verified present ownership of any parcel will be provided by an abstractor. B.2.2.1. Provide one time right-of-way staking in the field for appraisals and/or - acquisition agents. In 132.3. Additional research, including, but not liruited to, field -verified horizontal locations and vertical locations of all buried utilities to verify compatibility of tlhc PROJECT with existing utilities. B.2.3.1. Review plans and agreements submitted by the utility companies and the CITY and, when complete to the satisfaction of the ENGINEER, submit the relocation plans and agreements to the CITY for execution. B.2.d. Finalize all details and refine quantity calculations based on PRELIMINARY PLANS review meeting and meeting with CITY staff. B3 2.5. Preparation of related bidding documents for the PROJECT, including Estimate of Quantities, Proposal, Special Conditions, Special Provisions and Special Specifications, on 8-1/2" x I V plain white bond paper. All documents shall be suitable for original camera-ready copy. B.2.6. Plans and construction drawings in enough detail to verify constructability of PROJECT. B.2.7. FINAL PLANS shall include as a minimum: • Cover Sheet indicating "FINAL PLANS" ® Summary Sheet including: Pay Quantities and Pay Item Notes ® Roadway Quantities ® Traffic Quantities Storm Sewer Design ® Storm Inlet Design ® Drainage Structures Any other Summary Table needed. Drainage Map ® Right -of -Way Map ® Typical Section Sheet ® Survey Data Sheet * Plan and Profile Sheets. ® Erosion Control Sheets Structural Details Sheet Construction Sequencing Sheet Miscellaneous Details Sheet Pavement Striping and Traffic Sign Sheets ® Cross Section Sheet ® All applicable Oklahoma Department of Transportation Standard Drawings. B.2.8. ENGINEER shall furnish twenty (20) sets of FINAL PLANS as black -line, for review by the CITY, ODOT and Utility Companies. ENGINEER shall 11 incorporate CITY and ODOT review comments along with a final estimate of construction costs for the PROJECT to the CITY and ODOT. 13.2.9. Prepare bid documents from approved FINAL PLANS, including CONSTRUCTION PLANS as required by ODOT, Estimate of Quantities, Special Conditions, Special Provisions, and Special Specifications as required by ODOT. B.2.9.1. Provide one (1) set of bidding documents (either half size or full size) to ODOT for advertising purposes. B.2.9.2. Bidding documents shall consist of plans and required contract documents. B.2.9.3. ODOT shall be responsible for publishing the Advertisement for Bids. B.2.9.4. Additional bidding documents shall be prepared for an additional cost based on actual reproduction cost plus cost for labor, binding and delivery to the CITY. 13 2.9.5. Attend the Pre -bid Conference. B.2.9.6. Prepare any addenda. 13.2.9.7. Answer questions to the CITY or to registered plan holders during the bidding phase. B.3. Phase III. SERVICES DURING CONSTRUCTION. SERVICES DURING CONSTRUCTION shall include all necessary tasks to take the PROJECT through the construction phase. Tasks shall include: 13.3.1. Review and approve shop drawings or submittals by the Contractor for general compliance with contract documents. B.3.2. Attend the Pre -Work Conference. 13.3.3. Respond to construction questions from CITY and ODOT personnel. B.3.4. Make periodic site visits, when requested by CITY personnel, during construction to verify interpretation of the plans. On -site inspection is not a part of this work. B.3.5 Prepare at the conclusion of the construction AS RECORDED drawings based on corrected sets of plans provided to the ENGINEER from the CITY, ODOT and/or the contractor. The ENGINEER shall make every effort to produce a final set of drawings representative of the actual construction record including all notations appropriate to the project made on the corrected sets. The ENGINEER shall produce the AS RECORDED drawings and present one (1) set of Mylar IN rcproducihle of all sheets to the CITY within 60 days of delivery of the corrected sct(s) of plans from the CITY and/or the contractor. 13 AGREEMENT FOR ENGINEERING SERVICES EAST 86"'-1 STREET NORIIT MAIN STREET TO MEMORIAL DRIVE SCONE OF SERVICES RESPONSIBILITIES OF THE CITY ATTACHMENT C C. RESPONSIBILITIES OF THE CITY. The CITY agrees: C.1. Reports, Records etc. To furnish, as required by the work, and not at expense to the ENGINEER: C.1.1. Records, reports, studies, plans, drawings, and other data available in the files of the CITY which may be useful in the work involved under this AGREEMENT. C.1.2. Standard drawings and standard specifications. C.2. Access. To provide access to public and private property when required in performance of ENGINEER'S services. C.3. Staff Assistance. Designate in writing a person to act as its representative in respect to the work to be performed under this AGREEMENT, and such person shall have complete authority to transmit instructions, receive information, interpret and define CITY' S policies and decisions with respect to materials, equipment, elements and systems pertinent to the services covered by this AGREEMENT. C.3.1. Furnish legal assistance as required in the preparation, review and approval of construction documents. C.3.2. Furnish assistance in locating existing underground utilities and in expediting their relocation as described in Attachment B. CA. Review. Examine all studies, reports, sketches, estimates, specifications, drawings, proposals and other documents presented by ENGINEER and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of ENGINEER. AGRLEM1 N'l' FOR .ENGINEERING SERVICES EAST 86'1'E-1 STREET NORTH MAIN STREET TO MEMORIAL, DRIVE SCOPE OF SERVICES ATTACHMENTI) D. COMPENSATION, The CITY agrees to pay, as compensation for services set forth in Attachment B, the following fees on a lump sum basis, said Cost shall include all direct salary expenses, overhead expenses, and other non salary expenses as shown on Exhibit A related to the design of the PROJECT. This total estimated Cost can not be exceeded without written consent of the CITY. The ENGINEER shall submit statements no more than once each month. The statements shall indicate each Phase currently authorized for work, the percentage of work completed and the direct pass through costs being requested for each Phase as based upon the ENGINEER'S estimate of the proportion of the total services actually completed at the time of the billing. All statements shall be accompanied by such documentation as the CITY requires. CITY agrees to make payment within 30 calendar days of the receipt of the ENGINEER'S invoice. D.I. For the work under Phase I, PRELIMINARY DESIGN, Attachment B.1 and Exhibit A, the CITY shall pay the ENGINEER a lump sum Cost of Ninety Five Thousand Five Hundred Seventy-seven dollars and Zero Cents ($95,577.00), payable as the work progresses. D,2. For the work under Phase II, FINAL DESIGN, Attachment B.2 and Exhibit A, the CITY shall pay the ENGINEER a lump sum Cost of Seventy Thousand One Hundred Thirty-six dollars and Zero Cents ($70,136.00), payable as the work progresses. D.3. For the work under Phase III, SERVICES DURING CONSTRUCTION, Attachment B.3 and Exhibit A, the CITY shall pay the ENGINEER a lump sum Cost of Twelve Thousand Six Hundred Twenty-six dollars and Zero Cents ($12,626.00), payable as the work progresses. DA. SCHEDULE OF RATES. At the request of the CITY, the ENGINEER will negotiate fees for any additional work not covered by this AGREEMENT, which may be required by the CITY. Alternatively, additional work will be performed 15 at the written request oF the CITY based on the hourly rates contained herein. Rates arc subject to change on the First clay of- January of each calendar year. Rates to be charged shall be the rates in affect at the time such services are requested and approved. ENGINEER IV 91.00/hr. ENGINEER III $ 78.00/hr. ENGINEER II $ 67.60/hr. TECHNICIAN ICI $ 57.20/hr. TECHNICIAN III $ 49.40/hr. TECHNICIAN 1 $ 33.80/hr. SURVEY TEAM (2 mien) $100.00/hr. CLERICAL I $ 31.20/hr. Rates include overhead and profit. In I xhihil A - I Jim,ite of Ice East 86th Street North, nliain Street in Owasso to Memorial Drive Labor Related Expenses - Preliminary Plans: Std Hourly Rate Engineer IV 189 MH @ $ 91.00 = $ 17,199.00 Engineer III 83.5 MH @ $ 78.00 = $ 6,513.00 Engineer it 180 MH @ $ 67.60 = $ 12,168.00 Technician III 416 MIT @ $ 49A0 = $ 20,550.40 Technician 1 12 MH @ $ 31.20 - $ 374.40 Clerical 1 16 M1-1 @ $ 31.20 = $ 499.20 Subtotal Labor 896.5 MH $ 57,304.00 Total Direct Labor Expenses $ 57,304 Other Pass -through Expenses: Mileage Initial Site Visit 100 Miles @ $ 0.485 $ 48.50 Public Mtg, 100 Miles @ $ 0.485 $ 48.50 Progress Mtg. 400 Miles @ $ 0.485 $ '194.00 - Review Mtg. 100 Miles @ $ 0,485 $ 48.50 $ 339.50 Reproduction Plan -In -Hand Plans 1/2 2090 Sheets @ $ 0.20 $ 418.00 - Full Size Plans 516 Sheets @ $ 1.00 $ 516.00 Abstracting 200 Hours @ $ 50.00 $ 10,000.00 Survey $ 17,000.00 Geotechnical $ 10,000.00 $ 37,934.00 Total of Other Pass -through Expenses: $ 38,273.50 Labor Related Expenses -final Plans: Std. Hourly Rate Engineer IV 232 MH @ $ 91.00 = $ 21,112.00 Engineer III 151.5 MH @ $ 78.00 - $ 11,817.00 Engineer II 166 MH @ $ 67.60 - $ 11,221.60 Technician III 470 MH @ $ 49.40 - $ 23,218.00 Technician 1 24 MH @ $ 31.20 $ 748.80 Clerical 1 28 MH @ $ 31.20 = $ 873.60 Subtotal Labor 1071.5 MH $ 68,991.00 Total Direct Labor Expenses $ 68,991 Other Pass -through Expenses: Mileage Progress Mtg. 400 Miles @ $ 0.485 $ 194.00 Review Mtg. 100 Miles @ $ 0.485 $ 48.50 $ 242.50 Reproduction Half Size Plans 3046 Sheets @ $ 0.20 $ 609.20 Full Size Plans 126 Sheets @ $ 1.00 $ 126.00 Plan Mylars 126 Sheets @ $ 6.00 $ 756.00 - Contract Documents 100 Sheets @ $ 0.20 $ 20.00 $ 902.00 Total of Other Pass -through Expenses: $ 1,144.50 Labor Related Expenses -Services During Construction: Std. Hourly Rate Engineer IV 60 MH @ $ 91.00 = $ 5,460.00 Engineer III 18 MH @ $ 78.00 = $ 1,404.00 Engineer 11 56 MH @ $ 67.60 = $ 3,785.60 Technician III 40 MH @ $ 49.40 = $ 1,976.00 Technician 1 0 MH @ $ 31.20 = $ - Clerical 1 0 MH @ $ 31.20 = $ - Subtotal Labor 174 MH $ 12,625.60 Total Direct Labor Expenses $ 12,626 Design Fee 178,339 Estimated number of total sheets: 126 7/14/2006 R AND CCTV COUNCIL M SUBJEcr— AGREEMENT I1OR`PROF'ESSIONAL SERVICES MAIN STREET STREETSCAPE ENHANCEMENTS DATE, July 19, 2006 BACKGROUND As part of Vision 2025 Downtown/Neighborhood Rehabilitation Program, Tulsa County voters have endorsed a $1.1 million expenditure to promote community beautification and economic vitality in the Owasso Downtown area. The proposal — which is in accordance with the Owasso Downtown Developinent Plan (2001) — calls for the burial of overhead utilities, construction of streetscaping, and installation of ornamental lighting and signs along Main Street between E. 76 Street North and 3`d Street North (see Attachment A). Public Service Company (AEP), Southwestern Bell (SBC) and Cox Cable have engineered the relocation of utilities to accommodate underground installation. Although the exact cost of relocation will not be known until such is completed, the utilities have submitted the following estimates for consideration.: - American Electric Power $ 262,701.00 (Attachment B) -AT&T $ 36,300.00 (Attachment C) - Cox $ 80,000.00 Total $ 379,001.00 Utility relocation coordination is currently undergoing. Based on recent discussions between utilities and staff, it is estimated that the work will be advertised for bids in 2006 with a project duration of 180 days. All utility relocation work is anticipated to be completed by early 2007. To make the most of the remaining funding (approximately $700,000), it is recommended that a conceptual plan be developed outlining the design concepts and applicable theme for the area. Such plan would involve a "phased approach" for the implementation of improvements to the area; where Phase 1 will be constructed as part of this work. Other phases will follow as funding becomes available. DESIGN SERVICES AGREEMENT: On May 16, 2006, following a request by city staff, Cobb Engineering Company submitted a proposal for the performance of design work associated with improvements to Main Street. The Agreement For Professional Services Main Street Streetscape Enhancements Page 2 of 3 proposal includes fees for the performance of conceptual and final design and bidding and construction services as follows: Task Description Proposed Fee Conceptual Design Develop conceptual plan for enhancements $ 26,933.00 (i.e. decorative paving, lighting and landscaping) to Main Street and cost estimates and assist in the marketing of such to the community. Construction Drawings Prepare construction drawings and $ 49,844.00 speeifications for selected enhancement projects. Develop an engineering opinion of cost. Bidding Administer bidding process in accordance $ 13,591.00 with regulatory requirements to include advertisement, reproduction/distribution of documents, pre -bid meeting, evaluation of bids and recommendation for award. The work includes the performance of such tasks for both the Streetscaping Enhancement and Utility Relocation projects. Construction services Assist in the coordination of construction and $ 13,384.00 inspections for the Streetscaping Enhancement and Utility Relocation projects. Survey Perform professional survey to enable the $ 12,000.00 development of conceptual and final plans. Total $11.5,752.00 Cobb Engineering has successfully designed several streetscape enhancement projects, including the redevelopment of downtown Oklahoma City. Additionally, Cobb contracted the services of Alaback Design Associates — the consultants for the 2001 Downtown Owasso Plan — to ensure continuity with previously performed work. Agreement For Professional Services Main Street Streetscape Enhancements Page 3 of 3 FUNDING: Funding is provided in its entirety by Tulsa County Vision 2025. RECOMMENDATIONS Staff recommends City Council approval of an Agreement for Engineering Services in the amount of $115,752 for the Main Street Streetscape Enhancement project and authorization of the Mayor to execute the Agreement. ATTACHMENTS. A. Site Map B. American Electric Power Estimate C. AT&T Estimate D. Agreement for Engineering Services, Cobb Engineering Company Owasso Public Works Department 301 West 2 d Street Owasso, OK 74055 918.272.4959 918.272.4996 www.citvofowasso.co Enhancements N E S ATTACHMENT 1" An—ierican Electric Powex Distribution Project Design Engineering _ Distribution Line Estimate Project Name: Owasso Main Street Conversion Project Location: 76th St. N. to 3rd St. on Main St. Description of Work: Convert existing Overhead to Underground Estimator: Steve Williams Work Bequest No. Date of Estimate: 6/26/2006 OpCo / Company: PSO Length of Line (Miles): ESTIMATED COST OF WORK TO BE APPROVED. �.gF. $262,701.00 �y �n 2Length of Line (Feet): City of Owasso PSO Cost to install and reroute overhead lines 0 $298,274.08 Cost to install underground lines $213,992 $64,197.60 Cost to install decorative light fixture - 14 Lights $34,706 Cost to Reroute Fiber $14,002.58 $4,200.60 TOTAL ESTIMATED COST OF WORK TO BE APPROVED, $262,701 $366,672 This estimate is good for 90 days. Actual cost to covert facilities may exceed this estimate and will be the responsibility of the homeowners. BE June 23, 2006 CW073 Number. 773-06 Custonn, r Billing Telephone Number. BILL TO: CITY OF OWASSO WORK SITE LOCATION. E 76 N to E Y'4 Si on in t® Ormoso, OK DESCRIPTION OF CUSTOM WORKo Remove all aerial plant frmn E 76 N to E 3 St on Maill for City of Owasso beautification project. ESTIMATED LABOR$23,iff.25; ESTIMATED MATERIALS. $5,19514; ESTIMATED OVERHEAD EXPENSE: $8,067.47; TARIFFILICENSE AGREEMENT EXPENSE: COST OF MONEY EXPENSE. $849.47 CHARGE FOR CUSTOM WORK. ES71MATED COST: $ 36,300.03 (Actual charges may exceed this estimated cost) Should concealed conditions exist, including conditions that may exist below the surface of the ground, or if conditions exist that could not have been anticipated by Southwestern Ml Telephone, L.P. at the time of this agreement, Southwestern Bell Telephone, L.P., will be entitled to additional funds and/or additional time to complete the work. Southwestern Bell Telephone, L.P. will request such additional funding and/or additional time through a request for a change order. K''- Oft Wit' iWid AGREEMENT FOR PROFESSIONAL SERVICES For This Agreement between Oklahorna corporation; 4516 NW 36t Street, Okla homac ity, OK 73122-2426, is effective as of The parties agree that COBB is to provide professional engineering services to design and prepare plans, specifications and bid documents for a contractor to bid and construct tho MAIN STREET STREETSCAPE ENHANCEMENTS, referred to as the PROJECT, so that the CITY can receive bids and construct the designed improvements. ART|CLEf— The Scope ofServices (^Sen/ioea'')inset forth inAttachment Atothis Agreement. Changes in conditions, including, without limitation, changes in laws or regulations occurring after the budget is established or other circumstances beyond C )B8'o oonbn| shall be a basis for equitable adjustments inthe budget and schedule, ARTICLE U - . Compensation and payment shall be as set for inAttachment B to this Agreement. CITY shall pay undisputed portions ofeach progress invoice within thirty /30)days ofthe duba of receipt of the invoice. If payment is not maintained on o thirty (30) day current b'oia. COBB may suspend further performance until payments are current. CITY shall noti ,(�O8Bofanydiuputedomount within fifteen (15) days from date of receipt of the invoice, give reasons 'for the nbjantion, and promptly pay the undisputed amount. CITY shall pay anadditional charge ufone and one-half percent (1.5%}per amount. In the event ofa legal action for invoice amounts not poid, attorneys' feea, court costs, and other related expenses shall bepaid tothe prevailing party. ARTICLE U| —ServicesCOBB'a services will be completed in accordance with Attachment C. Completion of COB8'o services is dependent upon timely parfonnanoe, decisions and reviews byCITY staff. If COBB's services are delayed or suspended in whole or in part by CITY, COBB shall be entitled to equitable adjustment of the time for pedbmnanoa and rates and amounts of compensation provided for elsewhere in this Agreement to reflect reasonable costs incurred by COBB in connection vvith, among other things, such delay or suspension and reactivation and the fact that the time for performance under this Agreement has been revised. ARTICLE |V - Professional Responsibility. COBB is obligated to comply with applicable standards of professional oupy in the performance of the Services. CITY recognizes that opinions relating to environmental, geologic, and geotechnical conditions are based on limited data and that actual conditions may vary from those encountered at the times and locations where the data are obtained, despite the use of due professional care. ARTICLE V . COBB ahoU be responsible to CITY for COBB Services and the services of its subcontractors. COBB shall not be responsible for the acts or omissions of other parties engaged by CITY nor for their construction meuno, methodo, toohniquea, sequanoau, or procedures, ortheir health and safety precautions and programs. ARTICLE V| - Risk Allocation. The liability of COBB. its emp|nyoau, agents and subcontractors (referred to collectively in this Article an "COBB"), for C|TY'a claims of |osu, injury, deuth, dumage, or expense, including, without |imitsbon. C|TY'o claims of contribution and ind.mnifioation, express o/ imp|iud, with respect to third party claims relating to services rendered or obligations imposed under this Agreement, shall not exceed inthe aggregate: (1) The total sum of$250.U00for claims arising out ofprofessional negligence, including ennrn, omiuoiono, nrother professional acts, and including unintentional breach of contract; and any actual or potential environmental pollution or noniaminabon, including, without |imitytion, any oduo| or threatened release of boxio, irhLsnt, poUuLsnt, or wmaba gases, |iquidn, or solid muh*/ia|a, or failure to detect or properly evaluate the pnaaonoe of such oububanoeu, except to the extent such release, threatened release, or failure to detect or evaluate is caused by the willful misconduct of COBB; or Main otmetotmetscopr Enhancements Agreement Cobb Engineering CompnnyK}wnsoo.Oklahoma l (2) The total sum of$1.OU0.000 for claims arising out of neg|iOence, breach of contract, nrotheroousenforvvhinhC0BBhnsany|ega||iabi|ity.oUha/thunas|imibsdby(1)above. ARTICLE \U| - Insurance. COBB agrees to maintain during the podbnnanue of the Services: (1) statutory Workers' Compensation coverage; (2) Employer's Liability; (3) General Liability; and (4) Automobile Liability insurance coverage each in the sum of$1.000.O00. ARTICLEV|Ki - . Neither Party shall be liable &rthe other for consequential dzmugen, including, without limitation, loss of use or loss of profitn, incurred by one another or their subsidiaries or successors, regardless of whether such damages are caused by breach of contract, willful misconduct, negligent act or omission, or other wrongful act of either of them. ARTICLE IX - City es onsibLlity, The CITY shall provide the information and services oodescribed in Attachment D in a manner that causes no undue delays in the performance of the services by COBB. In the event that COBB is requested by CITY or is required by subpoena to produce documents or give testimony in any action or proceeding to which CITY is a party and COBB is not pady. CITY shall pay COBB for any time and expenses required in connection therewith, including reasonable attorney's fees. CITY shall reimburse COBB for all taxes, duties and levies such as Sales, Use, Value Added 'Taxes, Deemed Profits Taxes, and other similar taxes which are added to or deducted from the value of COBB Services. For the purpose of this Article such taxes shall not include taxes imposed on COBB net income, and employer or employee payroll taxes levied by any United States taxing authority, or the taxing authorities of the countries or any agency or subdivision thereof in which COBB is permanently domiciled. |tisagreed and understood that these net income, employer or employee payroll taxes are included in the fee to be paid COBB under this Agreement. ARTICLE X- Force Maieure. COBB shall not be responsible for damages or delays in performance caused byforce majeure.acts ufGod, o/other events beyond its control. ARTICLE X| - Right qLgnt�y. CITY grants to COBB. and, if the project site is not owned by C|TY, warrants that permission has been granted for, a right of entry from time to time by COBB, its employees, agents and auboontractoro, upon the project site for the purpose of providing the Services. CITY recognizes that the use of investigative equipment and practices may unavoidably alter the existing site conditions and affect the environment in the area being studied, despite the use of reasonable care. ARTICLE X|| -Documents. Provided that COBB has been paid for the San/icao. CITY shall have the right to use the documents, maps, photographs, drawings and specifications resulting from COBB efforts on the project. Reuse of any such materials by CITY on any extension of this project or any other project without the written authorization of COBB shall be atC|TY's sole risk. COBB shall have the right to retain copies of all such materials. COBB retains the right ofownership with respect to any patentable concepts u/oopyrightab|o materials arising from its Services. Notice. Any notice, demand orrequest required byo/made pursuant tothis agreement uho|| be deemed properly made ifpersonally delivered in writing or deposited in the United States mail, postage, prepaid, tothe address specified below: ENGINEER: Cobb Engineering Company ATTN:J.Cartha|Cobb, P.E.—Project Manager 4G38South Sheridan Road, Suite 208 Tulsa, OK74145'1128 Phone (918)883 9401 Nothing contained in this article shall be construed to restrict the transmission of routine communications between representatives o(COBB and CITY orC|TY'sdesignee. Main Street otrew,mprEnhancements Agreement Cobb Engineering Compa^yx]waono.Oklahoma ARTICLE XIV m Termination. CITY may terminate this Agreement, in whole or in part, for the CITY's convenience by delivery of a notice to COBB. Either party can terminate this Agreement or a Work Order for cause if the other commits a material, uncured breach of this Agreement or becomes insolvent. Termination for cause shall be effective twenty (20) days after receipt of a Notice of Termination, unless a later date is specified in the Notice. The Notice of Termination for cause shall contain specific reasons for termination and both parties shall cooperate in good faith to cure the causes for termination stated in the Notice. Termination shall not be effective if reasonable action to cure the breach has been taken before the effective date of the termination. City shall pay COBB upon invoice for Services performed and charges incurred prior to termination, plus reasonable termination charges. In the event of termination for cause, the parties shall have their remedies at law as to any other rights and obligations between them, subject to the other terms and conditions of this Agreement. ARTICLE XV - No Third Patly Ri hts. This Agreement shall not create any rights or benefits to parties other than CITY and COBB. No third party shall have the right to rely on COBB opinions rendered in connection with the Services without the written consent of COBB and the third party's agreement to be bound to the same conditions and limitations as CITY. ARTICLE XVI a Assignments. Neither party to this Agreement shall assign its duties and obligations hereunder without the prior written consent of the other party. ARTICLE XVII ® Venue. In the event of any dispute between the parties to this Agreement, the venue for the dispute resolution shall be any state or federal court in the United States having jurisdiction over the parties. If the project is located outside the United States, the laws of the State of Oklahoma shall govern. In such event any dispute under the Agreement not resolved amicably shall be resolved under the binding rules of the American Arbitration Association. ARTICLE XVIII Integrated Writing and Enforceakiility. This Agreement, including Attachments A, B,C and D, constitutes the final and complete repository of the agreements between CITY and COBB relating to the Services and supersedes all prior or contemporaneous communications, representations, or agreements, whether oral or written. Modifications of this Agreement shall not be binding unless made in writing and signed by an Authorized Representative of each party. The provisions of this Agreement shall be enforced to the fullest extent permitted by law. If any provision of this Agreement is found to be invalid or unenforceable, the provision shall be construed and applied in a way that comes as close as possible to expressing the intention of the parties with regard to the provisions and that saves the validity and enforceability of the provision. THE PARTIES ACKNOWLEDGE that there has been an opportunity to negotiate the terms and conditions of this Agreement and agree to be bound accordingly. CITY OF OWASSO COBB ENGINEERING COMPANY Signature Signature / Mayor Martin P. HeDD / President Typed Name/Title Typed Name/Title Date of Signature Date of Signature Main Street Streetscape Enhancements Agreement Cobb Engineering Company/Owasso, Oklahoma War, 9,T �, To AGREEMENT FOR PROFESSIONAL For MAIN STREET STREETSCAPE U, SCOPE OF SERVICES AASCOPEOF SERVICES. Cobb Engineering Company will furnish professional engineering and landscape architectural services, through a landscape architect subconsultant, to develop conceptual plans for the PROJECT. It is understood and agreed that the date of beginning, rate of progress, and the time of completion of the work to be done hereunder are essential provisions of this AGREEMENT. AGREEMENT shall be performed in phases and that said work shall commence upon execution of this AGREEMENT and after receipt of a Notice to Proceed to each phase described herein. A.2. BASIC SERVICES. The Basic Services of COBB include, but are not necessarily limited to, the following tasks: 1. Description of proposed work to be completed: Streetscape of Main Street from 76th Street North to Third Street. The conceptual phase will include a phasing plan which will allow the City of Owasso to construct selected portions of the overall plan according to available funds. The proposed services will include overall program management involving bidding and construction administration for relocation of existing above -grade electrical, telephone, and television cable facilities underground as well as for the proposed Streetscape project. 2. Designate a representative to coordinate all information between COBB and the CITY. 3. Document meetings, conferences, coordination, etc., and send documentation to the CITY within five (5) working days. 4. Attend meetings with the CITY, other CITY consultants, and other administrative and/or regulatory agencies, including utility companies. 5. Coordinate geotechnical investigations for the roadway and structures, if required. 6. City Involvement: Since the proposed project is the implementation of the Owasso Downtown Development District plan approved by the City of Owasso in 2001, public involvement will primarily consist of presenting specific design concepts/plans to the City for approvals. This component of the project will involve the Cobb/Alaback team assisting City staff in presenting proposed design concepts to the City directly in up to three (3) meetings and will include performing the following tasks: a. Preparation of a rendering(s) along Main Street. b. Conceptual Layout of the planned facilities along Main Street from 76th Street North to Third Street. c. Calculation of budget for various components of the project d. Developing a phasing plan in accordance with City desires and budget. e. Presentation(s) to City Council. A.3. PHASE 1 — CONCEPTUAL DESIGN. Cobb Engineering Company, with Alaback Design Associates, will prepare conceptual designs for the entire project, to include a. Overall conceptual plan for the project from 76th Street north to Third Street. b. Conceptual Landscape design along both sides of Main Street from 76th Street North to Third Street Main Street Streetscape Enhancements Agreement Cobb Engineering Company/Owasso, Oklahoma u. Conceptual design nfdecorative paving atthe 76 1»Street North/Main Street Intersection and possibly the Main & First Street |nharsacUon, and along Main Street. d. Connaphua|deeignofmikaameniUena|ongMainStraethnm78mStreetnodhtoThindSheeL e. Develop conceptual level coat estimates for |andscape, and engineering portions of the project. f. Develop presentations for presentation to the City and attend City meetings. A.4, PHASE 2—CONSTRUCTION DRAWINGS. Cobb Engineering Company, with /UabackDesign Associates, will prepare landscaping and civil drawings and specifications for select portions of the project according to available funds and City of Owasso guidance, ;Including g. Prepare preliminary (65%) and final plans for select portions of the poojouL, as determined to meet approximately $600.000construction budget. h. Prepare plans and details for apnoiu| (decorative) paving, particularly at 76m Street North /Main Street and Main St/eeV1"'Stoaat Intersections. i Develop preliminary and final estimates for |andurape, and engineering portions of the project. j. Select lighting fixtures and accessories for use of electrical provider to design and construct aaapart ofits work. k. Recommend geubxdhnioa|testing plan. i Provide all designs consistent with The City ofOwasso standards. m. Design water/wastewater modifioutiun/re|ouubona.ifnecessary. 7. Participate in office and field review of plans and documents as required during the design phase and make revisions inFinal Plans asrequired bythe CITY. 8. Conduct review sessions as needed with the CITY to discuss design concepts. 0. Submittals o. Submit up to five (5) bound copies of Conceptual Plans and Preliminary Plans, on 11 " x 17" paper, tothe CITY for review and approval. b. Incorporate appropriate comments into the Final Plans. o. Submit five (5) up to five copies of Final Plans and Cost Estimates, on 11 " x 17" paper, to the CITY for review. A.5. PHASE 3-BIDDING AND CONTRACTING (LANDSCAP|NG): Assist City inbidding cfoverhead electrical, telephone, and TV cable ro|ooaUona, and of the proposed ohoetsoape p|an, including vvuter/wastowote/uU|ity modifioation/ne|ouationa. a. Distribute plans to potential bidders. b. Answer Contractor's questions during bidding. o. |fnecessary, prepare and distribute addenda. d. Conduct poebidmeoting. e Attend bid opening and prepare bid tabulation. f. Review bids and recommend award ofconstruction contract. g. Assemble contract documents for final execution byCITY. A.G. ADDITIONAL SERVICES. Additional Services of COBB, provided at the option of the CITY, include, but are not necessarily limited to, the following tasks: 1. Phase 4 Construction Administration: Assist City in construction administration of the proposed straetsoope p|an, including water/wastewater utility mod ificati on/relocation s. Main Street atmemoa»oEnhancements Agreement Cobb Engineering CompanvK}waono.Oklahoma � u. Conduct preuonotrucdonmaaUng(n). b. Provide periodic inspections onsite. o. Review submittals. d. Prepare construction change orders/field changes. e. Review contractor's pay request and recommend payment. f. Produce record drawings. Q. Provide resident project inspection, ifauthorized bythe City. 2. Topographic Survey: Ab/pogcaphicz| survey will be completed from 76m Street North to Third Street. The east and west boundaries of survey will be the right-of-way line or bui|dinga, whichever iaclosest hothe centerline. a. Establish u minimum of control points. b. Establish eminimum of4benchmarks. o. All topographic features within the area would be located horizontally and vertically including existing rurbs, aidewa|ko, drainage atruotunaa, dhvea, parking metem, building oornera, porches, steps, trees, parking lots, and floworbeds.etc. d. All visible utilities will be identified. (]kie will be contacted to have utilities underground marked. e. Sanitary and storm sewer rims and inverts will beshot. i Finished floor elevations established on all building thresholds. g. Ground shots with odensity tnestablish aone-foot contour accuracy. h� All survey shall bedrawn inAutoCad.version 2O04. A.7 PHASE 6-BIDDING AND CONTRACTING (OVERHEAD UTILITY RELQCAT|ON): Assist City in bidding ofoverhead electrical, telephone, and TVcable relocations. a. Assemble bid documents and plans into sets for contractors to use in bidding the work. b. Distribute plans topotential bidders. o. Secure, from electrical provider, answers to Contractor's questions during bidding. d. If necessary, prepare and distribute addenda, based on information received from electrical provider. e. Conduct pnebid meeting. f. Attend bid opening and prepare bid tabulation. g. Review bids and recommend ovvurd of construction contract. h. Assemble contract documents for final execution byCITY. Main Street a/=etsonpoEnhancements Agreement Cobb Engineering Compunyx}wnusn.Oklahoma 6 ATTACHMENT To AGREEMENT FOR PROFESSIONAL SERVICES For ROA/M STREET STREETSCAPE ENHANCEMENTS COMPENSATION &1 COMPENSATION, The CITY agrees to pay, as compensation for services set forth in Attachment A, a bda| lump sum fee for Basic Design and Bidding Sen/ioea, including typical direct costs, not to exceed $115,752, ( which includes $34,319 of optional services in addition to the fee for basic design and bidding oanviman). The project iabroken into phases, each ofwhich must be approved prior to commencing the work of that phase. The kaa is payable monthly based upon completion of each phase of the work; and within 30 calendar days o/ receipt of invoice. COBB shall submit monthly invoices based upon estimate of the proportion of the total services actually completed atthe time of billing. Invoices shall be accompanied by such documentation as the CITY may require insubstantiation ofthe amount billed. B.2 For the work under Phase No. 1, CONCEPTUAL DESIGN, a Fee of TWENTY-SIX THOUSAND NINE HUNDRED TW_IRTY-THW�E Dollars (). ����---- B.3 For the work under Phase No. 2, CONSTRUCTION DRAWINGS, o Fee of THOUSAND EIGHT HUNDRED FORTY-FOUR Dollars ( ). B.4 For the work under Phase No. 3, BIDDING & CONTRACTING -STREETSCAPE.aFee ofFOUR THOUSAND FIFTY�§IX DoUono ( ). B.5 For the OPTIONAL ADDITIONAL WORK, PHASE 4, SERVICES DURING CONSTRUCTION, a Fee of THIRTEEN THOUSAND THREE HUNDRED EIGHTY-FOUR DnUano ( ). G.G For the OPTIONAL ADDITIONAL VVDRK, PHASE 5, TOPOGRAPHICAL SURVEY. a Fee of TWELVE THOUSAND Dollars ( ). B7 For the OPTIONAL ADDITIONAL VVORK, PHASE 8, OVERHEAD UTILITY RELOCATION ASSISTANCE, aFee of Dollars ( ) Main Street StrxemoapeEnhancements Agreement Cobb Engineering Companyx}wnsx^.Oklahoma ATTACHMENT To AGREEMENT FOR PROFESSIONAL SERVICES For MAIN STREET STFlEETSCAPE ENHANCEMENTS TIME FOR COMPLETION C.1 TIME FOR COMPLETION. It is understood and agreed that the date of beoinning, roba of prognena, and the time of completion of the SERVICES under this AGREEMENT one essential provisions of this AGREEMENT. It is further understood and agreed that the SERVICES under this AGREEMENT shall cornmence upon execution of this AGREEMENT by the Mayor of the City of Owasso and after receipt of a written Notice to Proceed. COBB agrees to provide the SERVICES for each phase of the PROJECT as stated in ATTACHMENT A of this AGREEMENT within the times stated herein and as shown on the Exhibit C-1, Project Schedule. C.2 COBB shall complete the SERVICES provided under Section /\.3ofATTACHMENT Awithin GOcalendar days after the date ofthe Notice tnProceed. C.3 COBB shall complete the SERVICES provided under Section /\A ofATTACHMENT Avvithin 60 calendar days after after the date of the Notice to Proceed. C.3 COBB uho|| complete the SERVICES provided under Section 8.5 uiATTACHMENT Awithin appnoximute|yG0 calendar days after the date ofthe Notice toProceed. C.3 PHASE 2, SERVICES DURING CONSIRUCTION, COBB shall complete the SERVICES provided under Sect/on /\.h of ATTACHMENT A in accordance with the contractor's construction schedule. Main Street Svvots;avo Enhancements Agreement Cobb Engineering Companyx]wa,00.Oklahoma ATTACHMENT D To AGREEMENT FOR PROFESSIONAL SERVICES For MAIN STREET STREETSCAPE ENHANCEMENTS CITY RESPONSIBILITIES DA RESPONSIBILITIES OF THE CITY, The CITY shall provide the information and services as provided herein in a manner that causes no undue delays in the performance of the SERVICES by COBB. D.2 INFORMATION. The CITY shall furnish, as requested and required by COBB and at no expense to COBB, information relative to the design and construction of the PROJECT, including records, reports, studies, plans, drawings, and other data available in the files of the CITY which may be useful in the work involved under this AGREEMENT. D.3. RIGHT OF WAY ACQUISITION. If needed, the CITY shall secure project rights of way utilizing easement descriptions and plats prepared by COBB. D.A. STAFF ASSISTANCE. The CITY shall designate in writing a person to act as its representative in respect to the work to be performed under this AGREEMENT, and such person shall have complete authority to transmit instructions, receive information, interpret and define the CITY's policies and decisions with respect to materials, equipment, elements and systems pertinent to the services covered by this AGREEMENT. D.5. DOCUMENT REVIEW. The CITY shall examine all studies, reports, sketches, estimates, specifications, drawings, proposals and other documents presented by COBB and the CITY shall render in writing decisions pertaining thereto in accordance with Exhibit C-1, Project Schedule. D.6. GEOTECHNICAL INVESTIGATION. If required, the CITY shall hire a geotechnical engineer and testing firm to perform sampling and testing of subsurface materials and prepare a report of the results and recommendations for the pavement and other designs. Report shall be prepared by a professional engineer. COBB shall coordinate the geotechnical investigation to be performed. Main Street Streetscape Enhancements Agreement Cobb Engineering Company!Owasso, Oklahoma U 1 ask Name 1 PHASE 1 - CONCEPTUAL DESIGN 2 CONCEPTUAL. LAYOUTS & DESIGNS 3 CONCEPTUAL COSTS & REPORT PHASING PLAN / SELECT FINAL ALTERNATE 5 OVERHEAD RELOCATIONS (BY OTHERS) 6 CITY REVIEW / APPROVAL 7 PRASE 2 - CONSTRUCTION DRAWINGS PRELIMINARY PLANS 9 PRELIMINARY COST ESTIMATES 10 CITY REVIEW % APPROVAL DESIGN SURVEY 2 GEOTECHNICAL INVESTIGATION 3 FINAL PLANS AND SPECIFICATIONS 14 FINAL COST ESTIMATES CITY REVIEW APPROVAL PHASE 3 - BIDDING & CONTRACTING 17 BID ? CONTRACT OVERHEAD RELOCATIONS 8 BID i CONTRACT STREETSCAPING 19 CITY REVIEW / APPROVAL - PHASE 4 - CONSTRUCTION 21 CONSTRUCT OVERHEAD RELOCATIONS CONSTRUCT STREETSCAPING 23 FINAL INSPECTION / PROJECT CLOSEOUT EXHIBIT C-1 PROJECT DESIGN SCHEDULE MAIN STREET S T REETSCAPE ENHANCEMENTS OWASSO, OKLAHOMA Duration Start Finish Predecessors 60 days Tue 8/15/06 Fri 10/13/06 45 days Tue 8/15/06 Thu 9/28/06 14 days Fri 9/15/06 Thu 9/28/06 14 days Fri 9/15/06 Thu 9/28/06 60 days Tue 8/15/06 Fri 10/13/06 14 days Fri 9/29/06 Thu 10/12/06 2,3,4 96 days Fri 10/13/06 Tue 1/16/07 40 days Fri 10/13/06 Tue 11/21/06 6 7 days Wed 11/15/06 Tue 11/21/06 14 days Wed 11/22/06 Tue 12/5/06 9 21 days Wed 12/6/06 Tue 12/26/06 10 30 days Wed 12/6/06 Thu 1/4/07 10 30 days Wed 12/6/06 Thu 1/4/07 10 7 days Fri 12/29/06 Thu 1/4/07 12 days Fri 1/5/07 Tue 1/16/07 14 59 days Sun 1/21/07 Tue 3/20/07 30 days Mon 1/22i07 Tue 2/20/07 15 45 days Sun 1/21/07 Tue 3/6/07 15 14 days Wed 3/7/07 Tue 3/20/07 17.18 182 days Wed 3/21/07 Tue 9/18/07 90 days Wed 3/21/07 Mon 6/18/07 19 175 days Wed 3/21/07 Tue 9/11/07 19 7 days Wed 9/12/07 Tue 9/18/07 22,21 Task �� Milestone External Tasks Picien StreetscapeEnharice ments Da ic. Thu 6/29 06 Split Summary External Milestone Progress Project Summary Deadline Page 1 2007 1. > IN D.__..J F _I`ll. A M J J` A S ESTIMATE & FEE DERIVATION MAIN STREET STREETSCAPE ENHANCEMENTS Owasso, Oklahoma SUMMARY t! Iv L Y )' 1391 $ 12 955.00 $ 429 00 $ 25,384.00 TOTAL, BASIC + ADDITIONAL SERVICES (STREETSCAPE ONLY) 1096 $ 92,700.00 $ 2,117.00 $ 106,817.00 PHASE 6 ® OVERHEAD UTILITY RELOCATION ASSISTANCE CIVIL ENGINEERING 92 $ 8,535.00 $ 400.00 $ 8,935.00 LANDSCAPE ARCHITECTURE 0 $ $ $ SUBTOTAL, PHASE 3 92 $ 8,535.00 $ 400.00 $ 8,935,00 MANHOUR ESTIMATE & FEE DERIVATION MAIN STREET STREETSCAPE ENHANCEMENTS Owasso, Oklahoma CIVIL, ENGINEERING DIRECT COSTS MAIN STREET STREETSCAPE ENHANCEMENTS Owasso, Oklahoma TRAVEL Vehicle No. Miles Unit Cost No. c t Pi C?_ ,:{ n Cost i h 2 C }. -iz3 t?3> No. Cost BA No t o .;3 t Cost -- Ph No Cost Office to Client Office Office to Project site 22 23 $0.445 $0.445 4 4 Subtotal $39.00 $41.00 $80.00 4 4 _ Subtotal $39.00 $41.00 $80.00 2 _ Subtotal $20.00 $0.00 $20.00 6 12 Subtotal $59.00 $123.00 $182.00 Meals Unit Cosy $25.00 0 $0.00 0 $0.00 1 $25.00 0 $0.00 Lod inc Unit Cost No Days No Days No Days No Days Cost $90.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Automobile Lease Vehicle Cost TOTAL, TRAVEL PRINTING 22x34 Sheets 11 X1 7 Concept. 11X17 Prelim. 1 1x1 7 Final 11x17 Mylars Rendering 8.5 x 11 Report/Specs 8.5x11 Miscell Copies TOTAL, PRINTING1 SURVEYING GPS Crew Total Station Crew Technician TOTAL, SURVEYING No. Sheets 16 6 8 10 10 2 200 1 Unit Cost $50.00 Unit Cosy $2.00 $1.00 $1.00 $1.00 $30.00 $10.00 $0.10 $0.10 i Unit Cost $160 $120 $60 No Days 0 $0.00 $80.00 h i t oncep Da>sign ENoSets Cost 6 $192.00 6 $36.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 200 $20.00 $248.00 No Hours Cost 60 $9,600 0 $0 40 $2,400 $12,000 No Days 0 $0.00 $80.00 Ph 2 Cor-,tr flans No Sets Cost $0.00 $0.00 8 $64.00 10 $100.00 1 $300.00 $0.00 $0.00 300 $30.00 $4 44.00 No Hours Cost 0 $0 0 $0 0 $0 $0 No Days 0 $0.00 $45.00 soh 3 Bid & Contract No Sets Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8 $160.00 500 $50.00 $210.00 No Hours Cost 0 $0 $0 $0 $0 No Days 0 $0.00 $182.00 Ph 4 Cons, street cpe 770 Sets Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 500 $50.00 $50.00 No Hours Cost 0 $0 $0 $0 $0 GEOTECHNICAL Lump Sum, per Subcontractor $0 $0 $0 EXPENSE TOTAL $12 328 $574 $255 $232 MANHOUR ESTIMATE & FEE DERIVATION MAIN STREET STREETSCAPE ENHANCEMENTS Owasso, Oklahoma LANDSCAPE ARCHITECTURE MANHOURS Prin./Sr. Landscape Landscape TOTAL DIRECT WORK TASK DESCRIPTION Architect Architect Cadd Tech Clerical FIRS FEE COST TOTAL FEE PHASE 1 -CONCEPTUAL DESIGN Kickoff Meeting Site Analysis / Review of Existing Conditions Base Map Preparation w Development of Conceptual Plan - (76th St. w u u to 3rd Street) -Plan View/Character Sketches Cost Estimate for Conceptual Plan Development of Presentations / 2 Meetings (max.) with City to approve Coordination / Meetings w/ City and Design DIRECT COSTS 6 10 4 60 12 12 12 0 8 20 0- 8� 4 6 ^� _ 6 10 12 80 18 20 '16 $ _ 540.00 $ 900.00 $ 880.00 $ 6,700.00 $ 1.410.00 $ 1,600.00 $ 1,340.00 _ $ 540.00 $ 900.00 �$ 880.00 $ 6 7v 0 $ 1,410,00 $ 1,600.00 $ 1.340.00 $ - Travel $125.00 $ 125.00 Reproduction $200.00 $ 200.00 SUBTOTAL, PHASE 1 116 40 6 0 0 162 $ 13,370.00 $ 325.00 $ 13,695.00 PHASE 2 -CONSTRUCTION DRAWINGS Development of 65 % Level Plans 80 30 60 170 $ 12,450.00 $ 12,450.00 Development of 95 % Level Plans 60 40 50 150 $ 10,750.00 $ 10,750.00 Incorporate Final Comments / Prepare 100 % 16 8 16 40 $ 2,840.00 $ 2,840.00 CDs for Bid Specifications 12 W _ 12 $ 1,080.00 $ 1,080.00 Cost Estimate (65%, 95%, 100%) 16 8 24 $ 1,880.00 $ 1,880.00 Meetings / Coordination with City & Team 20 0 20 $ 1,800.00 $ 1,800.00 throughout CD Phase (60 days) DIRECT COSTS $ Travel $125.00 $ 125.00 Reproduction $50.00 $ 50.00 SUBTOTAL, PHASE 2 204 78 134 0 0 416 $ 30,800.00 $ 175.00 $ 30,975.00 PHASE 3 - BIDDING & CONTRACTING Prebid Meeting / Clarifications through Bidding 8 8 $ 720.00 $ 720.00 Bid Tabulations / Meetings 0 0 $ - $ - DIRECT COSTS $ _ Reproduction $11.00 $ 11.00 Travel $20.00 $ 20.00 SUBTOTAL, PHASE 3 8 0 0 0 0 8 $ 720.00 $ 31.00 $ 751.00 TOTAL, DESIGN & BID SERVICES, (STREETSCAPE ONLY) 212 78 134 0 0 424 $ 31,520.00 $ 206.00 $ 31,726.00 OPTIONAL ADDITONAL SERVICES: PHASE 4 - SERVICES DURING CONSTRUCTION Review Shop Drawings / Submittals 12 12 $ 1,080.00 $ 1,080.00 Gen. Coordination w/ City / Contractor / RFIs 12 12 $ 1,080.00 $ 1,080.00 On -site Observation / Punch Lists 24 24 $ 2,160.00 $ 2,160.00 DIRECT COSTS Reproduction $30.00 $ 30.00 Travel $167.00 $ 167.00 SUBTOTAL, PHASE 4 48 0 0 0 0 48 $ 4,320.00 $ 197.00 $ 4,517.00 TOTAL, ADDITIONAL SERVICES (STREETSCAPE ONLY) 48 0 0 0 0 48 $ 4,32=00$.00 $4,517.00 TOTAL PROJECT 260 78 134 0 0 472 $ 35,840.00 $ 403.00 $ 36,243.00 Labor Rate 1 $90.00 1 $65.00 1 $55.00 DIRECT COSTS MAIN STREET STREETSCAPE ENHANCEMENTS Owasso, Oklahoma No. o' d Cost $5600 1 9 00 I -RAVEL Miles Unit Cost No. ost No. Cost-Nj-- Cost Vehicle Office to Client Office 25 $0.445 5 $56.00 1 $11.00 7 $78.00 - -" I' :::-:Cost �0 Office to Project site 25 $0,445 47 - $45.00 0 $0.00 8 $89.00 Subtotal $101-00 Subtotal $11.001 Subtotal 167.00 Meals. Unit Cost $1 $25.00 6 $150.00 0 $0.00 0 $0.00 Lodging Unit Cost No Days No Days No Days Cost $90.00 0 $0.00 0 $0.00 0 $0.00 Automobile Lease Unit Cost No Days No Days No Days Vehicle Cost $50.00 0 $0.00 0 $0.00 0 $0.00 TOTAL, TRAVEL $251.00 $11.00 $167.00 PRINTING T WM-No. Ph 1 Design J ii 2 1--aid < Ceont,-�,,ct Ph 3 corist.rAdrn Sheets Unit Cost No -Sets -Cost No -Sets -Cost No -Sets -Cost 22x34 Sheets 8 $2.00 1-0 -$160.00 - -$0.00 --$0.00 11 X1 7 Concept. 6 $1.00 4 $24.00 $0.00 $0.00 11 X1 7 Prelim. 6 $1.00 4 $24.00 $0.00 $0.00 11 x1 7 Final 6 $1.00 4 $24.00 $0.00 $0.00 8.5 x 11 Report/Specs 200 $0.10 0 $0.00 $0.00 $0.00 8.5x11 Miscell Copies 1 $0.10 20 $20.00 200 $20.00 300 $30.00 ,-..TOTAL PRINTING $25200 $20.00 $30.00 EXPENSE TOTAL f t$ 5JO J3_ $31 $197 MEMORANDUM TO. THE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO FROM- DAVID WARREN PARKS DIRECTOR SUBJECT- BID AWARD CENTENNIAL PARK RESTROOM DATE,- July 19, 2006 BACKGROUND The FY 2005-06 Budget included funding for several different projects throughout the City of Owasso. Included in that project list was funding to provide improvements to Centennial Park. A total of $125,000.00 was budgeted in the Park Development Fund for this purpose. In April, the Parks Department began the process of advertising for bids in order to provide the Centennial Park restroom. The bid packet was developed with a base bid specification. The base bid included the installation of a handicapped accessible restroom at the Centennial Park, a restroom which would match the existing restroom located at Elm Creek Park and The Skate Park. All bids were to be received by July 17, 2006 at 2:00 PM. Due to this restroom being identical to the existing restrooms located at the Elm Creek Park, no pre -bid meeting was conducted. A total of four bid packets were obtained following advertisement and a total of four companies submitted bids. A copy of the bid tally sheet is attached for your information and review. A review of the bids submitted indicates that all bid received were in compliance with specifications. Staff is prepared to recommend the award of the final restroom to Construction to Builders Unlimited of Tulsa, OIL, as they were qualifying low bidder at $73,627. Although not previously awarded a contract with the City of Owasso for any type of construction project, a review of the references included within the submitted bid were positive in nature. Incidentally, this bid is $1,000 less than the bid received on the recently completed Skate Park restroom which is identical in size and scope. FUNDING: Funds for the restroom improvements were included within the Park Development Fund Projects budget in the amount of $125,000.00. RECOMMENDATION: Staff recommends Council award construction of the restroom at Centennial Park to Builders Unlimited of Tulsa, OK in the amount of $73,627. Please note that the remaining funds budgeted for this project will be utilized to extend water and sanitary sewer to this facility. ATTACHMENTS 1. Bid Tally Sheet 2. Restroom Floor Plan and Elevation Profile CITY OF OWASSO I I I N. Main PO Box 180 Owasso, OK 74055 (918) 376-1500 Opening Date: Council/Trustee Approval: Item: Number of Bids: Bids Opened By: Witness: Certification: EIRIKI Of Centennial Park Restroom Facility 4 Marcia Boutwell David Warren BIDDER TOTAL BID Builder's Unlimited, Tulsa, OK $73,627.00 Tri-Star Construction, Claremore, OK $81,750.00 Barton Construction, Tulsa, OK $84,173.00 Vista Construction, Sapulpa, OK $86,419.00 1, Marcia Boutwell, Contract Administrator do hereby certify that, to the best of my correct. Signature: Date: 00 on is true and SRI Vhd[M-uoi"lM Wo Imow . mom tII , a.) � mom kirk x�anmrx same MEN