Loading...
HomeMy WebLinkAbout2002.08.20_City Council AgendaIMUH, TYPE OF MEETING: Regular DATE: August 20, 2002 TIME: 6:30 p,m. PLACE: Council Chambers, Owasso Community Center Notice and agenda filed in the office of the City Clerk and posted at City Hall 4:00 p.m. on Friday, August 16, 2001 Marcia outwell, City C erk 1. Call to Order Mayor Brogdon 2. Flag Salute 3. Roll Call 4. Consideration and Appropriate Action Relating to a Request for Approval of the Consent Agenda. (All matters listed under "Consent" are considered by the City Council to be routine and will be enacted by one motion. Any Councilor may, however, remove an item from consent by request. A motion to adopt the Consent Agenda is non-debatable.) A. Approval of Minutes of the August 6, 2002 Regular Meeting and August 13, 2002 Special Meeting. Attachment #4-A B. Approval of Claims. Attachment #4-13 Owasso City Council August 20, 2002 Page 2 C. Action Relating to Ordinance #715, an Ordinance Approving and Adopting an Action by the Owasso Public Works Authority, Wherein Rates for the Purchase of Water from the Authority Were Increased. Attachment #4 -C Staff recommends City Council approval of Ordinance #715. D. Action Relating to Acceptance of the Streets and Storm Drainage Systems Constructed to Serve Coffee Creek Phase 1, an Addition to the City of Owasso, Tulsa County, Oklahoma, Attachment #4-D The staff recommends Council acceptance of the infrastructure improvements. E. Action Relating to a Request for the City Council to Authorize the Notice, Equalization and Levy of Assessments Against Properties in Tulsa County Sewer Improvement District #6. Attachment #4-E The staff recommends that the Council authorize notice, equalization and levy of assessments against properties within the District (Pleasant View Estates) sufficient to pay the interest and principal amounts due on the outstanding indebtedness represented by the District Bonds. 5. Consideration and Appropriate Action Relating to a Request to Designate the Mayor at the City's Certifying Officer as Provided for by the National Environmental Policy Act of 1969 for the Purpose of Assuming Overall Responsibility for the Environmental Review Process for #10286 CDBG 01, Small Cities Grant. Mr. Wiles Attachment #5 The staff will recommend that the Council designate the Mayor as the City's certifying official for environmental documents required by the grant and authorized by the Council. Owasso City Council August 20, 2002 Page 3 6. Consideration and Appropriate Action Relating to a Request that a Finding of "No Significant Impact on the Environment" Will Occur as a Result of the #10286 CDBG 01 Program Activity, Mr. Wiles See Attachment #5 The staff will recommend that the Council approve the INCOG report and finding of no significant impact on the environment as a result of the CDBG program activity, and that the Mayor be authorized to execute such document. 7. Consideration and Appropriate Action Relating to a Request for Council Authorization for the Mayor to Execute an Environmental Certificate and Request for Release of Funds for Project #10286 CDBG 01. Mr. Wiles See Attachment #5 The staff will recommend that the City Council authorize the Mayor to execute the Environmental Certificate and Request for Release of Funds as required by the grant conditions. 8. Consideration and Appropriate Action Relating to a Request for Council Approval of an "Antidisplacement Plan" for Project #10286 CDBG 01. Mr. Wiles See Attachment #5 The staff will recommend Council adoption of an Antidisplacement Plan for the project, and that the Mayor be authorized to execute such plan document. Owasso City Council August 20, 2002 Page 4 9. Consideration and Appropriate Action Relating to Resolution #2002-09, a Resolution Committing up to $67,132 as Leverage from the City of Owasso, Oklahoma to Project #10286 CDBG-01. Mr. Wiles See Attachment #5 The staff will recommend Council approval of Resolution #200209. 10. Public Hearing Relating to Community Development Project Activities and Needs Within the City of Owasso, Oklahoma. Mr. Wiles Attachment #10 A public hearing will be held for the purpose of receiving recommendations on community development needs within the City of Owasso, as well as for the purpose of receiving comments on the performance of the City in regard to sidewalk improvements completed under the FY 00 CDBG project. 11. Consideration and Appropriate Action Relating to an Application for Funds from the Oklahoma Department of Commerce (ODOC) for the Small Cities Program. Mr. Wiles See Attachment #10 The staff will recommend approval of Resolution #2002-10, requesting financial assistance from the Oklahoma Department of Commerce, and authorizing the Mayor to execute an application in the amount of $67,132 for the FY 2002 Small Cities Program. Owasso City Council August 20, 2002 Page 5 12. Consideration and Appropriate Action Relating to a Request for Council Approval of a "Citizen Participation Plan" for the FY 2002 Small Cities Program. Mr. Wiles See Attachment #10 The staff will recommend Council approval of the required Citizen Participation Plan and that the Mayor be authorized to execute documents relating to that plan. The staff will recommend Council approval of the requested carryover from FY 2001- 2002 and approval of a supplemental appropriation to the FY 2002-2003 General Fund of $338,835, to the E-911 Fund of $60,000; to the Capital Improvements Fund of $406,774, to the Ambulance Capital Fund of $160,000, and to the Bond Projects Fund of $10,000. Owasso City Council August 20, 2002 Page 6 14. Consideration and Appropriate Action Relating to a Request for Council Approval of Engineering Agreements for Intersection and Roadway Improvements and Phase I Water System Improvements. Mr. Carr Attachment #14 15. Consideration and Appropriate Action Relating to a Request for Annexation of Approximately 1.091 Acres Located on East 76 1h Street North, Immediately West of the SK&O Railroad Property (Ward 4). Mr. Rooney Attachment #15 The Owasso Annexation Committee and the Owasso Planning Commission have conducted hearings on this request and recommend Council approval of the requested annexation. The staff concurs with the recommendation. Owasso City Council .August 20, 2002 Wage % 16. Consideration and Appropriate Action Relating to a Request for City Council Approval of a Final Flat for Eggberts, an Addition to the City of Owasso, Tulsa County, Mate of Oklahoma. Mr. Rooney Attachment #16 The Owasso planning Commission has conducted a hearing on this request and recommends Council approval of the final plat for Eggberts, a one -lot, one -block addition containing 1.35 acres, more or less, and located on Mate Highway 20, immediately east of the newly- constructed QuikTrip. 18. Report from City Manager. 19. Report from City Attorney. Owasso City Council August 20, 2002 Page 8 20. Deport from City Councilors. 21. New business (New business is any item of business which could not have been foreseen at the time of posting of the agenda.) 22. Adjournment OWASSO CITY COUNCIL MINUTES OF REGULAR MEETING Tuesday, August 6, 2002 The Owasso City Council met in regular session on Tuesday, August 6, 2002 in the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, August 2, 2001 ITEM 1: CALL TOO ER Mayor Brogdon called the meeting to order at 6:34 p.m. ITEM 2: INVOCATION Public Works Director Robert Carr offered the invocation. ITEM 3: FLAG SALUTE Vice Mayor Holm led in the flag salute. ITEM 4: ROLL CALL ,IF Marcia Boutwell, City Clerk M-91—M19 Ronald D Cates, City Attorney Mayor Brogdon introduced Cindy Thomas, who explained the "Cool Breeze" program. "Cool Breeze" was a program designed to provide fans to persons in need. Seven business provided discounts on services to persons who donated a new 20" box fan to the program. The fans were then donated by the businesses to Standing in the Gap Ministries to be distributed to the needy. The participating businesses donated $615.00 in services and $400.00 in advertising in exchange for 28 fans. Mayor Brogdon presented certificates of appreciation to James Thomas of Thomas Auto Repair & Detailing, Trish Bailey of A-N-Z Signs, and Dr Daniel Pennington of Complete Care Chiropractic Inc. Other business participating who will receive certificates are Jamie Hoppis of CJ's Hometown Dog Grooming, Denise Barther of Curves for Women, Heather Blevins of Koala Care, and Karl Keeton, Laura Keeton & Vicki Kershey of Sylvan Learning Center. Owasso City Council August 6, 2002 ITEM 6: CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR APPROVAL OF THE CONSENT AGENDA. A. Approval of Minutes of the July 16, 2002 Regular Meeting. B. Approval of Claims. C. Action Relating to Ordinance #714, an Ordinance Providing for the Rezoning of Lot 1, Block 1, Hillside Estates, Located at the Southwest Comer of East 116'1' Street North and North Mingo Road, from OL (Office Light) to CS (Shopping Center) D. Action Relating to Acceptance of the Water and Sanitary Sewer Systems Constructed to Serve Silver Creek, an Addition to the City of Owasso, Tulsa County, Oklahoma. E. Action Relating to Acceptance of the Streets and Storm Water Drainage Systems Constructed to Serve Metro Heights 11, an Addition to the City of Owasso, Tulsa County, Oklahoma. AYE: Helm, Cochran, Kimball, Armstrong, Brogdon NAY: None Motion carried 5-0. Councilor Armstrong asked if all inspections had been completed relating to Item D, water and sanitary sewer systems constructed to serve Silver Creek Village, and Item E, streets and storm water drainage systems constructed to serve Metro Heights II. Mr Carr responded that no items are brought to the Council until all inspections have been completed and all systems have passed the inspections. In addition, all permits and bonds must be in place. -2- Owasso City Council August 6, 2002 Ms .Armstrong moved, seconded by Ms Kimball, to approve Item D on the Consent Agenda, accepting the infrastructure improvements (water and sanitary sewer systems) constructed to serve Silver Creek Village AYE: Armstrong, Kimball, Cochran, Helm, Brogdon NAY: Done Motion carried 5 -0. Ms Armstrong moved, seconded by Mr Cochran, to approve Item E on the Consent Agent, accepting the infrastructure improvements (streets and storm water drainage systems) constructed to serve Metro Heights II. AYE: Armstrong, Cochran, Kimball, Helm, Brogdon NAY: Done i. ITEM 7. (7L�EST TO D NSS THE CITY COICIL. 10109 to] a y M W. J I I e .� e POW_. Deputy Chief Yancey presented the item. The department has 24 vehicles, seven of which are at least eight years old, with over 100,000 miles. The city has 21 patrol officers, with an amount budgeted to hire four more sworn officers. The City currently assigns one vehicle per officer to encourage employee "ownership" of the vehicle and for crime prevention purposes. The FY 02m 03 operating budget provides funds for the purchase of eight fully equipped patrol vehicles, which would allow the department to retire two of the older vehicles and retain two for back up. Staff sought pricing from several dealerships holding governmental agency contracts with the State of Oklahoma and the City of Tulsa. Reynolds Ford in Norman was able to bid the 2003 Ford Crown Victoria police vehicle at a cost below the state bid, saving $ 1261.43 per vehicle. Councilor Kimball said that, although she is in favor of the one person -one vehicle policy and the purchase of the new vehicles, she is concerned about the outlay of so much money at one time. She said that she believes the department needs a policy in place for the systematic replacement of the fleet, as well as preventative maintenance. Chief Yancey said that policies are being developed to address the problem of an aging fleet. Ms Kimball moved, seconded by -3- Owasso City Council August 6, 2002 Ms Armstrong, to approve the purchase of eight 2003 Ford Crown Victoria vehicles from Reynolds Ford, Norman, OK in the amount of $20,496.57 each, and authorization for payment in the total amount of $163,972.56. AYE: Kimball, Armstrong, Cochran, Helm, Brogdon NAY: None Motion carried 5-0. ITEM 9: REPORT FROM CITY MANAGER ITEM 10: REPORT FROM CITY ATTORNEY. No report. ITEM 11: REPORT FROM CITY COUNCILORS. Councilor Cochran thanked everyone for their concerns during his illness. Mayor Brogdon read a letter from ODOT regarding funding received by the city for the 86`" & Main project. ly0fiffis Aymmillaml-I Imm AYE: Kimball, Helm, Cochran, Annstrong, Brogdon NAY: None Motion carried 5-0, and the meeting was adjourned at 7:18 p.m. Marcia Boutwell, City Clerk -4- Randall C Brogdon, Mayor OWASSO CITY COUNCIL MINUTES OF SPECIAL MEETING Tuesday, August 13, 2002 The Owasso City Council met in a special meeting on Tuesday, August 13, 2002 in the Main Conference Room at Owasso City Hall per the Notice of Public Meeting and Agenda posted on the City Hall bulletin board at 4:00 p.m. on Friday, August 9, 2002 ITEM 1: CALL TOG ER. Mayor Brogdon called the meeting to order at 6:05 p.m, STAFF Rodney J Ray, City Manager Marcia Boutwell, City Clerk ITEM 2: PRESENTATION RELATING TO COMMUNITY DEVELOPMENT WEB PAGES. Mr. Rooney, assisted by Ms. Willson, presented a demonstration of the Community Development pages placed on the City's web site, providing information about the department, as well as procedures for obtaining various permits and other items related to the department. Mr. Carr discussed the procedure used to select engineering firms for the intersection and roadway system improvements and water system improvements. Staff is recommending that the firm of C.H. Guernsey be awarded a contract to provide engineering services for widening 86"' Street North from 1291h East Ave to 145th East Ave, and for widening 96'11 Street North from 119'b East Ave to Garnett Rd. Staff also recommends that the contract for intersection improvements at 96'h Street North and 1291h East Ave and widening 1291h East Ave from 76th Street North to 96'h Street North be awarded to CH2MHill. Atkins-Benham is being recommended for the engineering contract for the Phase I Water System Improvements. These items will be on the August 201h City Council agenda for action. Owasso City Council August 13, 2001 ITEM 6: DISCUSSION RELATING TO PARKS & COMMUNITY DEVELOPMENT NPUTPq Mr Rooney said that funds have been budgeted in both the Parks and Support Services departments for the purchase of mowers. Local vendors and suppliers were invited to demonstrate their equipment so that employees could see what is available and how the equipment operates. After testing several different models, and considering the cost, both departments believe the Gravely mowers through Bailey Equipment of Owasso to be the best suited to the task and for the price. The purchase price for each mower is $6749, which is within the City Manager's spending limit. Unless there are concerns from the Council, staff plans to proceed with the purchase. Mr Rooney discussed items that had appeared on the Planning Commission agenda and discussed those items that will be on the next Council agenda. mmajivr�-1,14 UVOIN11101F.110) - Mr Ray reported and discussed several items of interest. Mr Rooney presented a map showing proposed ward redistricting. This item will be discussed again at the September Work Session N Owasso City Council August 13, 2001 Mr Helm moved, seconded by Ms Kimball, to adjoin. Motion carried 4 -0, and the meeting was adjourned at 9055 p.m. Marcia Boutwell, City Clerk I Randall C 13rogdon, Mayor CITY OF OWASSO CLAIMS TO BE PAID 8/20/02 VENDOR NAME DETAIL DESCRIPTION AMOUNTS DEPT TOTAL FUND TOTAL TREASURER PETTY CASH DEPOSIT REFUND 50.00 REFUND 50.00 CARD CENTER CITY MGR EXPENSES 58.72 CARD CENTER REFERENCE MATERIAL 152.60 TREASURER PETTY CASH CITY MGR EXPENSES 64.72 TREASURER PETTY CASH CITY MGR EXPENSE 449.65 ALL COPY SUPPLIES PRINTER TONER 100.00 IPMA INTERVIEW GUIDES 97.00 CITY GARAGE CITY OF OWASSO VEHICLE MAINT 385.10 FUELMAN FUEL 128.49 OKLA TRANSPORTATION AUTHORITY PIKE PASS 0.50 CARD CENTER ICMA MEMBERSHIP 495.00 TREASURER PETTY CASH REIMB PETTY CASH 13.00 TREASURER PETTY CASH REIMB PETTY CASH 13.25 TREASURER PETTY CASH COUNCIL MEETING EXP 47.71 MANAGERIAL DEPT 2,005.74 LANDMARK BUSINESS SYSTEMS INC CALCULATOR GOVERNMENT FINANCE OFFICERS ASSO ACCOUNTING BOOKS HARRIS COMPUTER SYSTEMS SOFTWARE MAINT TREASURER PETTY CASH REIMB PETTY CASH FINANCE DEPT EXECUTIVE COFFEE SERVICES XPEDX OFFICE DEPOT OFFICE DEPOT IKON OFFICE SOLUTIONS CINTAS CORPORATION ST FRANCIS HOSPITAL CARD CENTER OKLAHOMA NATURAL GAS PITNEY BOWES INC PITNEY BOWES INC WORLD PUBLISHING COMPANY NEIGHBOR NEWSPAPER WORLD PUBLISHING COMPANY CARD CENTER SOUTHWESTERN BELL RESERVE ACCOUNT TREASURER PETTY CASH TREASURER PETTY CASH OK SAFETY COUNCIL INC CHARACTER FIRST! TULSA COUNTY CLERK TREASURER PETTY CASH TREASURER PETTY CASH DELL SUPPLIES COPY PAPER OFFICE SUPPLIES OFFICE SUPPLIES COPIER MAINT MAT SERVICES EMPLOYEE ASSIST PROG 7/02 -06/03 SUBSCRIPTION- MCELRATH 07/02 USE EQUIP MAINT POSTAGE METER RENTAL EMPLOYMENT ADS 07/0207/03 EMPLOYMENT ADS 07/02 -07/03 EMPLOYMENT ADS 07/02 -07/03 EBAY -FEES 07/02 PLEXAR POSTAGE POSTAGE POSTAGE MEMBERSHIP DUES 10/02 -09/03 TRAINING MATERIALS FILING FEES LICENSE TAGS PRE -EMP SCREEN COMPUTER /MONITOR -HAYES 189.00 160.00 8,977.50 13.00 23.95 272.50 184.32 55.10 493.91 26.00 492.00 19.95 84.40 209.00 233.24 145.68 23.00 104.20 203.05 210.88 2,000.00 1.80 4.75 215.00 318.09 159.00 28.00 70.00 1,414.00 9,339.50 VENDQR NAME DETAIL DESCRIPTION AMOUNTS MaT TOTAL BUNZOOTAL GENERAL GOVERNMENT DEPT 0.891.82 OFFICE DEPOT CARD PLAN OFFICE SUPPLIES 4320 TREASURER PETTY CASH MAPS 10.00 3»V-ON PR|NT|NG INC. PRINTED FORMS 70.00 DENN|GBUNYARD ABATEMENT MOWING 150u0 NEIGHBOR NEWSPAPER ABATEMENT NOTICE 51.70 FUELMAN FUEL 234.80 nURRKANNADY INSPECTION SERVICES 390.00 8UnRKANNADY MILEAGE 4528 ALL COPY SUPPLIES PRINTER REPAIR 55�00 TULSA COUNTY MIS DIAL UPSERVICE 40.00 METR0Q\LL 06/02 USE 21.95 BAILEY RANCH GOLF FOOD @BEVERAGE BU|LDERS/DEvELOPERSLUNCH 400.00 COMMUNITY DEVELOPMENT DEPT -------- 1.517z7 OFFICE DEPOT OFFICE SUPPLIES 24.97 WAL-MART PRINTER CARTRIDGE 1937 OFFICE DEPOT OFFICE SUPPLIES 13.98 TREASURER PETTY CASH COPY EXPENSE 10.59 MVVM SOFT, INC SYSTEM UPGRADES 2.012.00 GELLC0 SAFETY SHOES BOOTS-oA|N 118.79 CITY GARAGE CITY OP0VN\ S0 VEHICLE Mx|0T 210z$ FUELMAN FUEL 93.22 METRDCALL 06/02 USE 2927 ENGINEERING NEWS RECORD SUBSCRIPTION 82.00 ENGINEERING DEPT -------- 2,621.55 VVALMART OFFICE SUPPLIES 29.84 VVAL-MART OFFICE SUPPLIES 116.12 OFFICE DEPOT SOFTWARE 169.98 OFFICE DEPOT SOFTWARE 249.99 WAL,MART POWER ADAPTER 15.94 VVAL-MART MA|NTGUPPL|E8 4.87 NEW HORIZONS COURSE MATERIALS 720.00 OFFICE DEPOT DIGITAL CAMER/VBELK}NUPS 598.98 -------- INFORMATIONS SYSTEMS DEPT 1,905.74 OFFICE DEPOT INC OFFICE SUPPLIES 4.27 LOVVEO COMPANIES INC REPA|R/MNNTGUPPL|E8 47.04 UM|F|R8TC0RPORAT0N UNIFORM RENTAL 24.72 CITY GARAGE CITY OFVNNSSO VEM|CLEMA|mT 885.83 FUELMAN FUEL 621.40 LELAND8ARTELDBACL|P-N'8N|P CITY HALL MOWING 375.00 L0VVEG COMPANIES INC REPA|R/MA|NTGUpPL|ES 455.08 METROCALL 06/02 USE 14.02 EQUIPMENT ONE INC EQUIPMENT RENTALS 32.51 AT&T WIRELESS SERVICES PHUNEU8E'VVH|TE 5021 US CELLULAR CELL PHONE USE 82.68 SOUTHWESTERN BELL 07/02PLEXAR 103.34 0KLA TRANSPORTATION AUTHORITY PIKE PASS e1.32 -------- SUPPORT SERVICES DEPT 2,914.60 VENDOR NAME MIAILDEaMEDON AMOUNTS DEPT TOTAL EUNDIDTA. iro0lrorailwoji TILE MASTERS WAL-MAR mETROCALL POLICE COMMUNICATIONS DEPT LOvVEG COMPANIES |NC TMOMP3ON'S GENERAL STORE WAL-MART Lovve8 COMPANIES |NC EQUIPMENT ONE |NC FUELMAN STRATHEYETER|MARY CITY OFTULSA SOUTHWESTERN BELL ANIMAL CONTROL DEPT SHOWER CURB CONSTRUCTION PRISONER MEALS 06/02 USE REPAR/MA|wTSUPPLIES SHELTER SUPPLIES SHELTER SUPPLIES nEPAR/MANTOUrPL|28 EQUIPMENT RENTAL FUEL VET SERVICES EUTHANASIA SUPPLIES 07/02 PLEXAR 87.50 87.50 192.00 163.50 151.48 213.98 14.97 69.00 144.94 euA3 12.00 8.51 18.58 62.69 118.87 4,28025 2,037.93 150.00 140.00 49.60 424.90 1.480.94 114.93 76.89 30.63 302.07 170.00 20.10 252.00 91.00 161.00 161.00 200.00 125.66 371.75 382.82 171.78 46.09 29.81 160.00 56.00 VENDOR NAME DETAIL DESCRIPTION WATER PRODUCTS INC HYDRANT TESTING GAUGE HIBBETT SPORTING GOODS UNIFORM SHOES CLASSIC CHEVROLET VEHICLE REPAIR FARM PLAN TIRE FORD OF TULSA REPAIR PARTS MACK TRUCK SALES VEHICLE REPAIR FUELMAN FUEL OVERHEAD DOOR COMPANY DOOR REPAIR INDEPENDENT TESTING LABS LADDER TESTING VISONARY SYSTEMS, LTD LICENSE RENEWAL. LOWERY AIR CONDITIONING INC A/C SERVICING OKLAHOMA NATURAL GAS 07/02 USE WAYEST SAFETY INC OXYGEN SENSOR SOUTHWESTERN BELL 07/02 PLEXAR OKLA TRANSPORTATION AUTHORITY PIKE PASS NATIONAL FIRE PROTECTION MEMBERSHIP DUES-FISHER DELL COMPUTER - FISHER OFFICE DEPOT OFFICE FURNITURE FIRE DEPT UNIFORM RENTAL TREASURER PETTY CASH OFFICE SUPPLIES SAV -ON PRINTING INC. PRINTING SOUTHWESTERN BELL 07/02 PLEXAR EMERGENCY PREPAREDNESS DEPT AMOUNTS DEPT TOTAL FUND TOTAL 49.20 354.79 155.42 72.00 132.73 1,697.63 905.88 906.78 856.25 2,660.00 70.00 '1 04.03 150.00 172.88 1.95 115.00 1,423.00 765.95 29.07 38.00 19.33 10,593.49 86.40 OWASSO STAFFING, LLC TEMP EMPLOYEES 3,039.25 OWASSO STAFFING, LLC TEMP EMPLOYEES 4,109.32 RAINBOW CONCRETE CO CONCRETE 2,880.75 FARM PLAN REPAIR/MAINT SUPPLIES 57.02 SAV ®ON PRINTING INC. PRINTING 38.00 LOWES COMPANIES INC REPAIR/MAINT SUPPLIES 66.84 LOGAN COUNTY ASPHALT ASPHALT 560.00 BROWN FARMS SOD DIRT /SOD 110.00 MILL CREEK LUMBER & SUPPLY REPAIR/MAINT SUPPLIES 197.92 ESTES INC PUMP /NOZZLES 780.96 GEORGE & GEORGE SAFETY PROTECTIVE CLOTHING 59.51 T -SHIRT EXPRESS ETC CAPS 54.00 UNIFIRST CORPORATION UNIFORM RENTAL 123.97 A -OK SIGNS SIGNS 230.85 CITY GARAGE CITY OF OWASSO VEHICLE MAINT 2,399.05 FUELMAN FUEL 650.53 LELAND BARTEL DBA CLIP -N -SNIP MOWING - DRAINAGE 500.00 MARTY TILSON BRUSHHOG SERVICES MOWING - DRAINAGE /EASEMENTS 1,850.00 J B STIGALL EASEMENT MOWINGS 114.00 PSO STREET LIGHTING 2,774.41 S & A CONCRETE CONCRETE PAD 1,550.00 METROCALL 06/02 USE 36.58 SOUTHWESTERN BELL 07/02 PLEXAR 23.33 EQUIPMENT ONE INC AUGER 1,619.00 EQUIPMENT ONE INC AUGER BIT 109.35 STREETS DEPT 23,934.64 HOLLIDAY SAND & GRAVEL SAND 223.30 VENDOR NAME DETAIL DESCRIPTION AMOUNTS DEPT TOTAL FUND TOTAL CINDY SIGNS BANNER 120.00 FUEL TUCKER JANITORIAL RESTROOM SUPPLIES 235.85 1,137.49 MILL CREEK LUMBER & SUPPLY MAINT SUPPLIES 140.39 TRIM RITE INC UNIFIRST CORPORATION UNIFORM RENTAUCLEANING 50.15 REPAIR PARTS CITY GARAGE CITY OF OWASSO VEHICLE MAINT 1,083.89 179.74 FUELMAN FUEL 165.08 B & M OIL COMPANY INC J B STIGALL ATOR PARK MOWINGS 80.00 REPAIR PARTS LELAND BARTEL DBA CLIP-N -SNIP MCCARTY PARK MOWINGS 160.00 174.75 J B STIGALL ATOR PARK MOWINGS 80.00 LOWES COMPANIES INC METROCALL 06/02 USE 42.38 REPAIR PARTS SOUTHWESTERN BELL 07/02 PLEXAR 72.39 32.54 PARKS DEP`i��m 06/02 USE -- 2,453.43 OFFICE DEPOT INC OFFICE SUPPLIES '18.47 CELL PHONE USE XPEDX OFFICE SUPPLIES 27.25 LOWES COMPANIES INC REPAIR /MAINT SUPPLIES 42.63 FUELMAN FUEL 25.83 TERMINIX PEST CONTROL 306.00 TAYLORMADE LOCK & KEY KEYS 72.00 CHEROKEE BUILDING MATERIALS TILE 21.60 OKLAHOMA NATURAL GAS 07/02 USE 79.66 SOUTHWESTERN BELL 07/02 PLEXAR 78.71 US POSTMASTER POSTAGE 800.00 COMMUNITY CENTER DEPT - - -- 1,472.15 OFFICE DEPOT INC OFFICE SUPPLIES 17.07 UNIFIRST CORPORATION UNIFORM RENTAL 64.76 FUELMAN FUEL 18.24 WILLIAMS REFUSE EQUIPMENT CO INC REPAIR PARTS 1,137.49 REGIONS INTERSTATE BILLING REPAIR PARTS 71.07 TRIM RITE INC REPAIR PARTS 72.50 O'REILLY AUTOMOTIVE INC REPAIR PARTS 833.35 LESTER'S GEAR & AUTOMOTIVE REPAIR PARTS 179.74 FRICTION PRODUCTS BRAKE REBUILDER REPAIR PARTS 209.33 B & M OIL COMPANY INC OIULUBRICANTS 378.66 B & M TIRE CENTER INC REPAIR PARTS 111.00 AMERICAN HOSE & SUPPLY REPAIR PARTS 174.75 AMERICAN TRIM & UPHOLSTERY FLOOR MATS /CARPET 58.50 LOWES COMPANIES INC REPAIR/MAINT SUPPLIES 41.04 TREASURER PETTY CASH REPAIR PARTS 10.00 OKLAHOMA NATURAL GAS 07/02 USE 32.54 METROCALL 06/02 USE 21.94 SOUTHWESTERN BELL 07/02 PLEXAR 73.47 US CELLULAR CELL PHONE USE 79.04 VENDQ&R NAME MILEAGE MASTERS TIRE REPAIRS LEN0X WRECKER SERVICE |NC TOWING FEES LESTER'8 GEAR QAUTOMOTIVE VEHICLE REPAIR CITY GARAGE FUND pELDMAN.FR4NDEN.VV0OD&RD. C06109 FxRR|S &TAYL0R AMBULANCE SUPPLIES FELDMAN'FRANOEM.VVOVDARD. C01 150 pxRR|S8TAYLOR B0-WASTE D|SPO8AL FELDMAN.FRANDEN.VV00DARD. E02141 FARR|S8TAYLOR L0DG|NG4w0FF0RD FELDMAN.FRANDEm.VVOQD&RU. D07301 FARn|S&TAYLOR SMART CORPORATION WORKERS COMP CHARGES EASTERN 0KORTHOPEDIC CENTER M04232 NE0 NEUROSURGERY, PC WORKERS COMP CHARGES TREASURER PETTY CASH J06173 VV0RKERS'C0MPFUND WORKS &LENTZ|NC COLLECTION FEES ALLIANCE MEDICAL |NC AMBULANCE SUPPLIES ALLIANCE MEDICAL |NC AMBULANCE SUPPLIES MEDICAL COMPLIANCE SPECIALITY |NC B0-WASTE D|SPO8AL CLASSIC CHEVROLET ENGINE REPLACEMENT RAMADA|NN L0DG|NG4w0FF0RD TREASURER PETTY CASH M|LEAGE'ATYVELL AMBULANCE SERVICE FUND SOUTHWESTERN BELL E-911 E-911 FUND TREASURER PETTY CASH VVOODDO0R FHC|NC DESIGN SERVICES OKLAHOMA NATURAL GAS GAS VALVE REL0C/Q[|ON-2/19/O2 BOND PROJECTS FUND AMOUNTS DEPT DOTAL BUNITOOAL 110.00 /8.67 15.00 16.00 160.00 168.00 291.80 4.45 /48.91 18110 14.59 183.20 226.24 500.01 8,81876 mat moo I0�� CITY OF OWASSO PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 08/10/02 DepartmQnt verfta Ex p enses Total E Xmenses Q - General Fund Managerial 0.00 14,154.21 -Community Development 0.00 11,164.93 Information Systems 0.00 2,857.28 Police 702.35 69,073.25 Animal Control 121.08 1,644.78 Streets 303.30 10,209.72 -Community-Senior Center 0.00 4,406.52 General Fund Total $3,433.23 $207,221.07 Garage Fund Garage Fund Total $0.00 $5,803.94 APPROVED: August 20, 2002 LOT07 CITY OF OWASSO PAYROLL PAYMENT REPORT PAY PERIOD ENDING DATE 08/10/02 Ambulance Fund ,: ` m 3r. Overtime Expenses Total Expenses Uff - - APPROVED: August 20, 2002 � -0 TO: HONORABLE MAYOR AND CITY COUNCIL CITY OF OWASSO FROM: SHERRY BISHOP FINANCE DIRECTOR SUBJECT: WATER RATE INCREASE DATE: August 16, 2002 The Owasso Public Works Authority purchases treated water from the City of Tulsa. Notice was received from the City of Tulsa that, effective October 1, 2002, water rates will increase from $1.86 to $1.98 per 1000 gallons. In order to maintain an adequate operating budget in the OPWA, that twelve-cent rate increase should be passed on to the OPWA water customers. The last water rate increase was two years ago. At that time, Tulsa increased rates by fourteen cents and the OPWA increased rates by twenty-eight cents providing additional operating funds for the OPWA. The proposed new rate would change the base minimum fee for 1000 gallons of water from $7.50 to $7.65. The volume charge per 1000 gallons of water would change from $3.20 to $3.35. In 1999, the City Council and OPWA Trustees established water rates to customers residing outside the Owasso city limits at 20% more than the rate inside the city. Staff will recommend maintaining that 20% difference. The proposed new rate for rural customers would change the base minimum fee for 1000 gallons of water from $9.00 to $9.18. The volume charge per 1000 gallons of water would change from $3.84 to $4.02. The monthly cost of the proposed rate increase to the average customer who uses 7000 gallons of water per month is $1.05. The annual increase would be $12.60. The total utility bill from the OPWA to an average customer for water, wastewater, refuse and ambulance would increase from $57.33 to $58.38. (Based on an average customer using 7000 gallons of water and 5000 gallons of sewer per month.) Rate changes require the approval of the OPWA Trustees and the approval of the City Council. They are enacted by Trustee Resolution and by City Council Ordinance. Staff recommends City Council approval of Ordinance No. 715 increasing water rates. ATTACHMENTS: Ordinance No. 715 i EVAL61010-11I.NKLAW 4M BE IT ORDAINED BY THE CITE' COUNCIL OF THE CITY OF OWASSO, O KLAHOMA THAT: SECTION ONE: The water rates hereinafter set forth as established by the Owasso Public Works Authority, an Oklahoma public Trust having the City of Owasso, Oklahoma as it beneficiary, are hereby adopted, approved and directed to be implemented in accordance with Resolution #2002-04 of the Owasso public Works Authority dated August 20, 2002. SECTION TWO: The provisions of the City of Grasso Code of Ordinances, referenced as Dart 17, Utilities, Chapter 1 Water, Sewer and Sanitation Systems, Section 17109 Mater Rates shall be amended as follows: Section 17-109 WATER RATES A. There hereby are established the following uniform rates for the volume of water delivered during each calendar month at each connection to the water system serving one household or business located within the corporate limits of the City, as shown by the water ureter at such connection; provided that, regardless of amount of water metered, the monthly charge for water for each connection shall not be less than the "minimum charge" set forth. WATER TES�NTIHLY) 1. First 1000 gallons $7.65 (minimum charge); and, 2. Each additional 1000 gallons $3.35 B. 'There are hereby established the following uniform rates for the volume of water delivered during each calendar month at each connection to the water system serving one household or business, located outside the corporate limits of the City, as shown by the water meter as such connection; provided that, regardless of the amount of water metered, the monthly charge for each such connection shall not be less than the "minimum charge" set forth: 1. First 1000 gallons $9.18 (minimum charge); and, 2. Each additional 1000 gallons $4.02 Marcia Boutwell, City Clerk Jay C. Baker, Attorney By. Randall C. Brogdon, Mayor D TO- HONORABLE MAYOR AND CITY COUNCIL CITE OF OWASSO FROM- PHIL L T , P.E. ENGINEERING PROJECT MANAGER SUBJECT. ACCEPTANCE OF S f RE E TS AND STORM DRAINAGE SYSTEMS, COFFEE CREEK I ♦. •.. M Final inspections for the streets and storm drainage systems were conducted on May 22, 2002. All items identified at the final inspection requiring correction to meet city standards have been completed. The contractors have provided a one-year maintenance bond for the storm drainage and a two - year maintenance bond for the streets (see attached). RECOMMENDATION: Staff recommends Council acceptance of the Coffee Creek I streets and storm drainage systems. 1. Location map 2. Maintenance Bonds H OKUHOMA SURETY COMPANY Box 1409 TULSA9 OKLAHOMA 74101 BOND NUMBER 0K-0035480 KNOW ALL MEN BY THESE PRESENM.- THAT WE, and OKLAHOMA SURETY COMPANY, an Oldahoma corpuraft, having Its PdndPW place Of businass in the City of Tulsa and State of Oldahoma, One Hundred Fifteen Thousand, Five as Obligee, in the penal sum of Dollars (S ko"AMM-nnn'"" M, successors and assigns, jointly and smrally, firmly aamunstrators by than prownts. our neirs, execmrs, , Storm Drainage System, Coffee Creek, 145th E. Ave. & 96th Ste Noa Owasso, Oklahoma w �21#1101' �Tl The Obligee, by and through Us proper mpresentatW, shall 9W the Principal and Me Surety written notice of all repairs required to fulfill the terms of this maintenance guarantee; and the said Princild and Surety vfWjj� to make any such repairs. SIGNED, sealed and dated this 12th — day of February —�w —22Q 2 President Jac 0 OMA SURETY COMPANY y e V . Brow Atto MID-CONTINENT .; O Oklahoma Know all Men by these presents: That the MID - CONTINENT CASUALTY COMPANY, a corporation of the State of Oklahoma, having its principal ollice in the city of Tulsa, Oklahoma, pursuant to the following By -Law, which was adopted by the Stockholders of the said Company on March 13th, 1947, to -wit: "Article IV, Section 7. -- The Executive Officers of the Company shall have power and authority to appoint, for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, one more Resident Vice President, Resident Assistant Secretaries and Attorneys -in -Fact and at any time to remove any such Resident Vice President, Resident Assistant Secretary, or Attorney -in -Fact and revoke the power and authority given him. None of such appointees need be Directors of the Company." The Company does hereby constitute and appoint Jacque V. Brown and Michael Tedford, individually of CLAR MOR , Old its trite and lawful attorney(s)win -fact, to execute, seal and deliver for and on its behalf as Surety, and as its act and deed, Any and all bonds and undertakings of Suretyship And the execution of such instruments) in pursuance of these presents, shall be as binding upon the said MID - CONTINENT CASUALTY COMPANY, as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at its principal office in Tulsa, Oklahoma. IN WITNESS WHEREOF, MED- CONTINENT CASUALTY COMPANY has executed and attested these presents this 03 day of January 2000 ATTEST: �A ,_ A— ,—, ,_ — SARA ANDS SON ASSISTANT SECRETARY ( ®f D TA VICE PRESIDENT On this 03 day of January 2000 before me, a Notary Public of the State of Oklahoma in and for the County of Tulsa, came the individual to me personally known to be the officer described in, and who executed the preceding instrument, and he acknowledged the execution of the same, and being by me duly sworn, said that he is the therein described and authorized officer of the MID - CONTINENT CASUALTY COMPANY aforesaid, and that the seal affixed to the preceding instrument is the corporate of said Company, and the said corporate seal and his signature as such officer were duly affixed to the said instrument by the authority and direction of the said Company, and that Article 1V, Section 7, of the By -Laws of said Company, referred to in the preceding instrument, is now in force. ..®td ®giBP &i�e9 ®�,e ®,e "' ®",W& OF, I have hereunto set my hand and affixed my official seal at the City of Tulsa, the day and year first above written. ST T My Commission expires 11-14-00 iN ANb FOR SS CO �. At4 ® ® FAY SCOTT Notary Public 1, SARA Atgb9SON Assistant Secretary of MID - CONTINENT CASUALTY COMPANY do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of this corporation, and of a Power of Attorney issued pursuant thereto, are true and correct, turd that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect. This certifies that any fancsimile or nnechanieally- produced signature of any officer of the Company and Company seal, wherever appearing upon a power of attorney issued by the Company, shall be valid and binding upon die Company with the wine force and efTeet .rs though manually affixed. IN WITNESS WHEREOF, I have hereunto set my hand raid atlixed the facsimile seal of said corporation ® b'° yo EW i ��, ' this ^ � day of 'Fp'hriinry 2002 a0— JA_� d;L� Assistant Secretary t3N03600 98 Any Correspondence in relation to this I)oiid should be directed to: BOND DEPT WAUSAU INSURANCE COMPANIES PO BOX 8017 WAUSAU WI 54402-8017 1-800-435-4401 Boii(INo. 005033872 Maintenance and KNOW ALL MEN BY THESE PRESENTS; that we, ARROW CONCRETE COMPANY A DIVISION OF TULSA DYNASPAN, INC. 1601 E HOUSTON BROKEN ARROW OK 74012-4407 W as Principal, and EMPLOYERS INSURANCE OF WAUSAU A Mutual Company, a corporation organized under the laws of the State of Wisconsin and authorized to do a surety business in the State of OKLAHOMA as Surety, are held and firmly bound unto the KOURTIS PROPERTIES LLC PO BOX 419 OWASSO OK 74055 as Obligee, in the sum of FIVE HUNDRED FORTY-FOUR THOUSAND EIGHT HUNDRED SEVENTY-FIVE AND 97/100 DOLLARS ($544,875.97) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, on this 12 th day of December, 2 0 0 0 , the said Principal, entered into a contract for PAVING - COFFEE CREEK, OWASSO, OK. for the sum of $544,875.97 ; and, WHEREAS, under the terms of the specifications for said work, the said Principal is required to give a bond for FIVE HUNDRED FORTY-FOUR THOUSAND EIGHT HUNDRED SEVENTY-FIVE AND 97/100 DOLLARS ($544,875.97) to protect the Obligee against the result of faulty materials or workmanship for a period of 2 YEARS from and after the date of the completion and acceptance of same, namely, until the 7th day of February, 2003 NOW, THEREFORE, if the said Principal shall for a period of 2 YEARS from and after the date of the completion and acceptance of same by said Obligee replace any and all defects arising in said work whether resulting from defective materials or defective workmanship, then the above obligation to be void; otherwise to remain in full force and effect. SEALED with our seals and dated this 2nd day of January, 2001 ARROW CONCRETE COMPANY A DIVISION OF TULSA D'.RT MPAN., INC. By David G. Markle Tttle President EMPLOYERS INSURANCE OF WAUSAU A Mutual Company S('0020 F. E. COOLEY 12-98 EMPLOYERS INSURANCE OF WAUSAU A Mutual Company OT — I r WN - 0 KNOW ALL MEN BY THESE PRESENTS: That the EMPLOYERS INSURANCE OF WAUSAU A Mutual Company, a corporation duly organized and existing under the laws of the State of Wisconsin, and having its principal office in the City of Wausau, County of Marathon, State of Wisconsin, has made, constituted and appointed, and does by these presents make, constitute and appoint F. E . COOLEY its true and lawful attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, seal, acknowledge and deliver ANY OR ALL BONDS, UNDERTAKING, RECOGNIZANCES OR OTHER WRITTEN OBLIGATIONS IN THE NATURE THEREOF NOT TO EXCEED THE PENAL SUM OF TEN MILLION DOLLARS ($10,000,000) and to bind the corporation thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal of the corporation and duly attested by its secretary hereby ratifying and confirming all that the said attorney -in -fact may do in the premises. This power of attorney is granted pursuant to the following resolution adopted by the Board of Directors of said Company at a meeting duly called and held on the 18th clay of May, 1973, which resolution is still in effect: "RESOLVED, that the President and any `dice President - elective or appointive - of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company be, and that each of them hereby is authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute on behalf of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company bonds, undertakings and all contracts of suretyship; and that any secretary or assistant secretary be, and that each or any of them hereby is, authorized to attest the execution of any such power of attorney, and to attach thereto the seal of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company." "FURTHER RESOLVED, that the signatures of such officers and the seal of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures and facsimile seal shall be valid and binding upon the EMPLOYERS INSURANCE OF WAUSAU A Mutual Company when so affixed and in the fixture with respect to any bond, undertaking or contract of suretyship to which it is attached." IN WITNESS WHEREOF, EMPLOYERS INSURANCE OF WAUSAU A Mutual Company has caused these presents to be signed by the vice president and attested by its assistant secretary, and its corporate seal to be hereto affixed this 1st day of February 2000 EMPLOYERS INSURANCE OF WAUSAU A Mutual Company d�e �QRO094 )! By SEAL r+ Timothy C. Mull Vice President Attest: On this 1st day of February 2000 , before me personally came Timothy C. Mulloy, to me known, who being by me duly sworn, did depose and say that tie is a vice president of the EMPLOYERS INSURANCE OF WAUSAU A Mutual Company, the corporation described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to said instrument is such corporate seal and that it was so affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year herein first above written. ..-z - Judith"Rheinschmidt Notary Public NOTARY PUBLIC �gNPLaSC STATE OF WISCONSIN na�nv MY COMMISSION EXPIRES JUNE 30, 2002 STATE of WISCONSIN > CITY OF WAUSAU ) ss. CERTIFICATE sops ��r COUNTY OF MARATHON ) I, the undersigned, assistant secretary of EMPLOYERS INSURANCE OF WAUSAU A Mutual Company, a Wisconsin corporation, do hereby certify that the foregoing and attached power of attorney remains in full force had has not been revoked; and furthermore that the resolution of the Board of Directors set forth in the power of attorney is still in force. Signed and sealed in the City of Wausau, Marathon County, State of Wisconsin, this 2nd d y of January, 2001 � t; t SEA AL : i — - - ---- - -- — - -- " Robert J. Bcstcwan Assistant Secretary NOTE: Fill- CONTRACT BOND NBR 005033872 (n PAVING - COFFEE CREEK, OWASSO, OK. U uA IF Y011 IIAVE, ANY L, UESTIoNS Rl,' eAR DIN(, TINS VALIDITY OR 4VOIMIN(s 0F THIS P(DVIE,12 (DE ATTORNEY, CALL TOLL FREF, (800) 820 -1001. (IN ®V'ISCON81N. CALL (7100) 472- 0041). W 0 RIF M11 TO: HONORABLE MAYOR AND CITY COUNCIL CITY OF OWASSO FROM- SHERRY BISHOP FINANCE DIRECTOR SUBJECT- ASSESSMENT OF SEWER IMP ROVEP4ENTS DISTRICT ATE,® August 16, 2002 - ri: t I �-- �- I In 1995, homeowners in the Pleasant View Estates Addition approached staff concerning the ability to connect to City sewers in order to alleviate septic system problems in their subdivision. The addition is outside the current City limits, but collection lines were designed in conformance with established city criteria. The homeowners elected to form a Sewer Improvement District (Tulsa County Sewer Improvement District No. 6) and issue bonds to finance construction. On February 18, 1997, Council agreed to accept, operate and maintain the system contingent upon the vote of the District. In March 1997, the District held an election to consider the transfer and conveyance of the sewer system to the city. The District agreed to the consolidation. The "Agreement for Consolidation of Sewer Improvement District with City of Owasso and for Connection of Sanitary Sewer Systems to Existing Excess Capacity Sanitary Sewer System" was approved by Council on April 21, 1998. That agreement provided that the City would: 1. Accept the sewer system and consolidate the District with the City, and 2. Collect a reimbursement from properties subsequently connected to the system that utilize excess capacity. Reimbursements to be in the amount of $1,338.58 per acre and be applied solely to amortization and satisfaction of the bonded indebtedness. 3. Give notice, equalization and levy of assessments for satisfaction of bonded indebtedness. On August 6, 1998, the District transferred all assets of the District, to the City of Owasso. The amount received from the District paid the first payments of bonds and interest, which were due November 1, 1998. Each year, the City Council authorizes the assessment of the consolidated Sewer District for each property owner. The last assessment paid the bonds and interest due on May 1, 2002 and will pay for the interest payment on November 1, 2002. Staff recommends Council authorize notice, equalization and levy of assessments against properties within the Tulsa County Sewer Improvement District #6 sufficient to pay the interest, principal and reserve due on the outstanding indebtedness represented by the District Bonds. Notice of Assessment Amortization Schedule for Payment of Bonds and Interest August 21, 2002 TULSA COUNTY SEWER IMPROVEMENT DISTRICT NO. 6 (Consolidated with the City of Owasso) 111 N. Main Owasso, Oklahoma 74055 The Board of Directors has levied the following annual assessments on your property, according to Oklahoma law: Interest Principal Reserve $259.09 $454.55 $0.00 Enclosed is an amortization schedule, showing the accrual of interest on the bonds and the schedule for the payment of principal and interest. SHERRY BISHOP Finance Director City of Owasso for the Consolidated Tulsa County .29a - "I LPIJIAI "I'll 14 - W AMORTIZATION SCHEDULE FOR PAYMENT OF BONDS AND INTEREST Total Payments !� iill II �• _II II II II The above amortization schedule is subject to change contingent upon the development of Johnson properties north of 96th St. t If developed, developers will reimburse the District at a rate of $1,338.50 per acre. Any reimbursments will be applied to the payoff of the bonds. Note: $27,000 was received for Johnson properties and applied toward bond payoff May 2001. Payment Principal Bond Total Clue Date Balance Call Principal Interest Payment 100, 000.00 11/01/913 07,000.00 #3-5 3,000.00 15,000.00 13,000.00 1993 assessment 05/01/99 92,000.00 #6-10 5,000.00 2,910.00 7,910.00 11/01/99 92,000.00 0.00 2,760.00 2,760.00 1999 assessment 05/01/00 92,000.00 0.00 2,760.00 2,760.00 11/01/00 37,000.00 #99-15 5,000.00 2,760.00 7,760.00 2000 assessment 05/01/01 55,000.00 #96-47 32,000.00 2,610.00 34,610.00 11/01/01 55,000.00 0.00 1,650.00 1,650.00 2001 assessment 05/01/02 55,000.00 0.00 1,650.00 1,650.00 11/01/02 50,000.00 #48 -52 5,000.00 1,650.00 6,650.00 SFCrIw #"Sa 'iY <+W}L9V(3 ...:.i ?iiiii: iii ...:....:................. F/}W( Fd}'S�i}V� "Y jSJ4[:�f�V. .):: ...`.�::::::y::,t:: SRs"�7P' Y .... 'i:::::.`:: :} : <:::::::: isir i::J) .V,.,vV :3i3>ii :::::::} ?:::;�:p[::i .'{:��:{'.(:jj•`:y:�:� :::�::::i: } ? ?iii:a:4 .V.. ?>�: }:?iii >iiiiiii3i3 :::::. ::., i ':.�: :.{'�'�i :..i iii..' iisi w JV ii z:::>:<:::>: 5:<' F. A'%;C ikF 'X::::::: >::::::::::::�'F:}cii> ........... ............................... ,..... Chi+' J.>:::>:::::<::> )................... ::::::::::::::::::::)i ::::::::::::::::::::::: ::: »i::i: >..'...::::;�.'i iii >i }ii:':i:- ii:i::viii: !� {{}} s'::::::::::::::»:::::::::::..'..:.';::. ........V.............. iii:: iiiiiii:ii....:.......... lryj (('�� :,;::i::::::::::::<:::' Yii3................ _.................... +f >::'.'.. {. A.iSdifi�t .V.. 2003 assessment 05/01/04 45,000.00 0.00 1,350.00 1,350.00 11/01/04 40,000.00 #58 -62 5,000.00 1,350.00 6,350.00 2004 assessment 05/01/05 35,000.00 #63 -67 5,000.00 1,200.00 6,200.00 11/01/05 35,000.00 0.00 1,050.00 1,050.00 2005 assessment 05/01/06 35,000.00 0.00 1,050.00 1,050.00 11/01/06 30,000.00 #68-72 5,000.00 1,050.00 6,050.00 2006 assessment 05/01/07 25,000.00 #73 -77 5,000.00 900.00 5,900.00 11/01/07 25,000.00 0.00 750.00 750.00 2007 assessment 05/01/03 25,000.00 0.00 750.00 750.00 11/01/03 20,000.00 #78 -82 5,000.00 750.00 5,750.00 2003 assessment 05/01/09 15,000.00 #83 -87 5,000.00 600.00 5,600.00 11/01/09 15,000.00 0.00 450.00 450.00 2009 assessment 05/01/10 15,000.00 0.00 450.00 450.00 11/01/10 10,000.00 #88 -92 5,000.00 450.00 5,450.00 2010 assessment 05/01/11 5,000.00 #93 -97 5,000.00 300.00 5,300.00 11/01/11 5,000.00 0.00 150.00 150.00 2011 assessment 05/01/12 5,000.00 0.00 150.00 150.00 11/01/12 0.00 #98 -902 5,000.00 150.00 5,150.00 Total Payments !� iill II �• _II II II II The above amortization schedule is subject to change contingent upon the development of Johnson properties north of 96th St. t If developed, developers will reimburse the District at a rate of $1,338.50 per acre. Any reimbursments will be applied to the payoff of the bonds. Note: $27,000 was received for Johnson properties and applied toward bond payoff May 2001. TO: TBE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO FROM: ERIC WMES C0Np&jN1Ty DEvELOPMENT DIRECTOR SUBJECT: COMMUNITy DEvELOPAIENT BLOCK GRANT SIDEWALK 1[MpRO,,VEMFNT IDROGRAM - FY'01- ® August 12, 2002 A series of steps must be taken in order for the ODOC to release the Small Cities grant funds for t h e sidewalk i m p r o v e m e n t project. E a c h step requires f o r m a l a c t i o n by a l e Council, however, these steps are generally considered to be "house cleaning" type actions. The City is also required to adopt a resolution pledging an equal match of $67,132 towards the completion of the project. This match has been budgeted by the City of Owasso. it is anticipated that future actions may have to be taken by the Council to complete other grant requirements not directly related to environmental concerns. However, at this point the following is a specific explanation of each current request by agenda item. AGENDA ITEM #5 DESIGNATION OF MAYOR AS CERTIFYING 0 M4CER Federal and state regulations require that each grant recipient designate a certifying official, 'nis official is typically the mayor when the recipient of a grant is a municipality. The certifying official (through use of the staff and contractually with IN COG) assumes responsibility for the environmental review process, making findings, and signing certifications. RECOMMENDA'HON: The staff recommends Council designation of the Mayor as the City's certifying official for doctunents required by the grant and authorized by the Council. AGENDA ITEM #6 FINDING OF NO sIGNIFICANT IMPACT ON THE ENVIRONM[ENT The staff recommends that the Council approve the INCOG reports and finding of no signifi. impact on the environment as a result of the Sidewalk Improvement Program, and that the May be authorized to execute the documents. I AGENDA ITEM #7 ENVIRONMENTAL CERTIFICATE AND IM REQUEST FOR FAI,4� WTI' RELEASE OF FUNDS ffll �'110-101 1k Ju 11 11 The staff recommends that the City Council authorize the Mayor to execute the Environmental Certificate and the "Request for Release of Funds" as required by grant conditions. AGENDA YrEM #8 ANUDISPLACEMENT PLAN BACKGROUND- The Antidisplacement Plan addresses the actual or unexpected demolition of low/moderate income dwelling units. There will be no demolition of dwelling units because of this project. However, it is requirffl that a plan be approved that states that demolition is not planned and, if unexpected demolition should occur, all federal regulations would be followed to mitigate any adverse impact. The staff recommends Council adoption of an Antidisplacement Plan for the Sidewalk Improvement Program, and that the Mayor be authorized to execute the plan document. En order to receive the CDBG funds, the City of Owasso must commit $67,132 as a matching amount. This pledge equals the amount of the grant itself. The City will meet this requirement with additional paving and sidewalk improvements completed by the Public Works Department. VIE, V K 1TW! ! Ty WA Designate the City's Chief Executive Officer, the Mayor, as the certifying officer under the National Environmental Policy Act of 1969 to assume overall responsibility for the environmental review process. I NOM -.0,0102YO] 01 W-11643 ER, U.77THI I En H 151 FERTU-4 a a 170 a I am 191#10111 WANY W1 I 3) Authorize the Mayor to sign the Environmental Certification and Request for R» . : w : ofF unds Request. Approve an Antid isp la cement Plan for the 410286 CDBG Sidewalk Improvement Program. 2 ) Approve a Resolution committing up to $67,132 t4 the CD■G project. OWASSO #10286 CDBG 01 CDBG SMALL CITIES IMPROVMENT PROGRAM FINDING OF NO SIGNIFICANT IMPACT ENVIRONMENTAL REVIEW FINDING On the basis of the environmental assessment of the above project, I have made the following finding. X A FINDING OF NO SIGNIFICANT IMPACT I find that this project is not a major federal action that will have a significant effect on the quality of the human environment and is consistent with the provisions of 24 CFR, Part 58. Subpart E. and that these activities are in compliance with the environmental requirements of related federal authorities. A request to the State for the release of project funds will not require an Environmental Impact Statement. Date REQUEST FOR RELEASE OF FUNDS AND RE, QUIREMENTS COMMUNITY DEVELOPMENT Contractor Name: Contract No. City of Owasso 10286 CDBG 01 Address: Date of Request: P.O. Box 180, Owasso, OK 74055 Au ust 20, 2002 Project Description: (Brief) CDBG Small Cities Sidewalk Improvement and Street Overlay Program in the City of Owasso Consultant Name and Address: Andy Armstrong, INCOG, 201 W. 5th Street, Suit 600, Tulsa, OK 74103 No Consultant REQUIREMENTS Items lncl`udcd State Use Only A. Categorically Excluded From RROF Publication I hereby state CDBG Form 403-A has been completed & the activity has been determined to be exempt. A Finding of Categorical Exclusion/Exemption (Sample 4033), Historical Clearance. & Archeological Clearance are attached B Categorically Excluded Activity I hereby state CDBG Form 403-A has been completed. Environmental Certification (Form 403-13), proof of Notice of Intent Publication (Sample 403-6),or Proof of Posting, Historical Clearance, Archeological Clearance and Finding of Categorical Exclusion (Sample 403-5) are attached. C, Assessment Activity I hereby state Forms 403-A & 403C have been completed and X no EIS is required, the Finding in (Form 403-C, Attachment 9) is attached. Environmental Certification (Form 403-3), Proof of Concurrent Notice of Publication (Sample 403-8), or Proof of Posting, Historic & Archeological Clearance are attached. 2. Leverage/Commitment A. CDBG Projects I hereby certify that a resolution and/or an escrow account has X been established committing the leveraged funds toward the completion of the project. (Form 401-B, Attachment 1) is attached. 3. Insurance & Bonding Submit evidence of general liability insurance and city/county X bonding. 4. Anti Displacement Plan A. I hereby certify an anti-displacement plan has been adopted. X Attach Plan. Attachment 3 or 4 5. Minority /Women® A. Copy of response from Ken Tally signed by ODOC. Owned Business 10/19/01 Solicitation 6. Other A. Any special conditions Including Grant/Loan Special Conditions, specified in Section 11 of the contract between ODOC and the Contractor have been met. X B. Audit Accepted by ODOC. C. Attendance at CDBG Train!n Z Session. ... NAME and TITLE of Signature of Authorized Official Date Authorized Official Randall C. Brogdon, Mayor Items included Zode: NA Not Applicable to this program. ENVIRONMENTAL CERTIFICATION With reference to the above Program Activity/Project, 1, the undersigned officer of the recipient, certify that: I. The recipient has fully carried out its responsibilities for environmental review, decision-making and action pertaining to the project named above 1 The recipient has complied with the National Environmental Policy Act of 1969, as amended, and with the environmental procedures, permit requirements and statutory obligations of the laws cited in 24 CFR 58.5. 1 The recipient has taken or will take into account the environmental criteria, standards, permit requirements and other obligations applicable to the project or program activity under other Federal, State, and local laws that the recipient has the direct responsibility to comply with. 4. For UDAG projects only, the recipient has provided the State Historic Preservation Officer and the Secretary of the Interior an opportunity to act with respect to properties which the recipient believes are affected by the project and are eligible for the National Register of historic Places (Section I I 9(m), HCD Act of 1974, as amended). 5. After considering the type and degree of environmental effects identified by the environmental review completed for the proposed project described in Part I of this request, I have found that the proposal _-- did — X._ did not require the preparation and dissemination of an environmental impact statement. 6. The recipient has, prior to submitting this request for the release of funds and certification, published in the manner prescribed by 24 CFR 58.43 a notice to the public in accordance with 24 CFR 58.70 and as evidenced by the attached copy (copies). 7. The dates upon which all statutory and regulatory time periods for review, comment or other action are indicated below and are in compliance with the procedures and requirements of 24 CFR 58. Item Commence Expire Item d Commence Expire " Notice of Finding of Notice of Intent to No Significant Impact Publication Date: Prepare an EIS Publication Date:: Comment Period Comment Period Combined Notice: Draft EIS Finding of No Significant Publication Date: 8/21/02 Publication Date: Impact and Intent to 8/21/02 9/25/02 Request Release of Funds Comment Period: Comment Period Notice of Intent to Final EIS Publication Date: Request Release of Funds Publication Date: Comment Period: Comment Period: Other (specify) (specify) Request for Release of HUD or State Request for HUD or State Funds Decision Period: Release of Funds Decision Period: (Minimum period for (Minimum period Estimated by Recipient approval) Actual by HUD or for approval) State As the duly designated certifying official of the recipient, I also certify that: I. I am authorized to and do consent to assume the status of responsible federal official under the National Environmental Policy Act of 1969 and each provision of law designated in 24 CFR 58.5 list of NEPA - related authorities insofar as the provisions of these laws apply to file HUD responsibilities for environmental review, decision making and actions that have been assumed by the recipient. 2. By so consenting, I have assumed the responsibilities for the conduct of environmental review, decision making and actions as to environmental issues, preparation and circulation of draft, final and supplemental environmental impact statements, and lead agency or cooperating agency responsibilities for preparation of such statements on behalf of federal agencies including HUD, when these agencies consent to such assumptions. 3. 1 am authorized to and do accept, on behalf of the recipient and personally, the jurisdiction of the federal courts for the enforcement of all these responsibilities, in my capaLity as certif in officer of the recipient. Signature of Certifying Officer of the Recipient Address I City of Owasso, P.O. Box 180, Owasso, OK 74055 Date HUD will crosecute false claims and statements. Conviction may result in criminal and/or civil penalties (18 U.S.C. 1001, 1010, 1012.: 31 USC Form 403-B PLAN 1. A description of proposed assisted activity; 2. The location on a map and number of dwelling units by size (number of bedrooms) that will be demolished or converted to a use other than as low/moderate-income dwelling units as a direct result of the assisted activity; A time schedule for commencement and completion of the demolition or conversion; 4. The location on a map and number of dwelling units by size (number of bedrooms) that will be provided as replacement dwelling units; 5. The source of funding and a time schedule for the provision of replacement dwelling units.- 6. The basis for concluding that each replacement dwelling unit will remain a low/moderate-income dwelling unit for at least 10 years from the date of initial occupancy, and; 7. Information demonstrating that any proposed replacement of dwelling units with smaller dwelling units is consistent with the housing needs of low/moderate- income households in the jurisdiction. If displacement of low/moderate-income households occurs in conjunction with the community development activities funded with CDBG funds, the City will provide relocation assistance, as described in 570.496(b)(2) to each low/moderate-income household displaced by the demolition of housing or by the conversion of a low/moderate- income dwelling to another use as a direct result of assisted activities. For: City of Owasso Attest: 0 .0 111A City Clerk RE, SOLUTION NO. 2002-09 A RESOLUTION RELATING TO A COMMUNITY DEVELOPMENT BLOCK GRANT (10286 CDBG 01) FOR SIDEWALK IMPROVEMENT AND STREET OVERLAY PROJECT ACTIVITIES COMMITTING UP TO $67,132 AS LEVERAGE FROM THE CITY OF OWASSO WHEREAS, the City of Owasso has entered into a project consisting of a sidewalk improvement and street overlay program in the City of Owasso, State of Oklahoma with proceeds of Community Development Block Grant Funds; and, WHEREAS, as a condition to the funding of the Community Development Block Grant (10286 CDBG 01), the Oklahoma Department of Commerce has required adoption of a resolution by the City Council of the City of Owasso, Oklahoma, to commit funds in the amount of $67,132 to the project, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Owasso, Oklahoma, that, SECTION 1: The City of Owasso, through the Cities General Fund Account, agrees to commit up to $67,132 as the required match for the proposed CDBG Small Cities Program in the City of Owasso. City of Owasso, Oklahoma � M City Clerk Jay C. Baker, Attorney TO: THE HONORABLE MAYOR AND COUNC CITY OF OWASSO FROM: ERIC WMES CONEwUNITY DEVELOPMENT DIRECTOR SUBJECT- COMMUNITY DEVELOPMEN'T BLOCK GRANT SIDEWALK U"ROVEMENT PROGRAM -- EY 102 DATE: August 14, 2002 BACKGROUND: It is anticipated that future actions will have to be taken by the Council to complete other grant requirements as the program progresses. However, at this point the following is a specific explanation of each current request by agenda item. The public hearing will serve two purposes. The first purpose will be to receive recommendations and any citizen input on community development needs within the City of Owasso for the FY-02 project. The second purpose will be to receive public comments on the performance of the City in regard to sidewalk improvements completed under the FY-00 project. The public hearing must be held to satisfy the requirements of the CDBG program for FY-00 ani FY-02. No action is required for the public hearing. W'" 1111141"NXIMIXIM, HIMMURVE I BACKGROUND: Resolution 2002-10 requests ODOC to assist the City of Owasso with. the Community Development project, Further, the resolution affirms that the City will abide by all federal and state, rules atlached to the CD BG program. RECOMAUNDAT'10M. The staff recommends that Lhe Council approve Resolution 2002-10. M � � M-M MMMMM'E'MIKIVAmmmmuffailm �= - M As part of its contract to administer the CDBG program with the City of Owasso, INCOG has prepared a Ci&en Participation Plan for the project. The plan provides for mid encourages citizen participation, particularly by low and moderate-income persons who reside in areas where CDBG funds are proposed to be used. It also ensures that citizens will be given reasonable and timely access to local meetings, information, and records relating to proposed and actual use of funds. �M 1 11 ill I F Wilil III Ill i! llpisinr��M DATE: AUGUST 9, 2002 The Oklahoma Department of Commerce (ODOC) has issued an invitation to the City of Owasso to apply for funding under the State's 2? 02 CDBG program. A Small Cities Application Workshop was held on May 1, 2002 at ODOC in Oklahoma City. I attended the workshop on behalf of the cities that we represent and received the application materials. Funding in the amount of $67,132 has be>»« ,<«<:» for the City of Owasso in the FY 2002 CDBG State Plan. A Resolution requesting funding from ODOC has been prepared and is attached for your use. Approval of this Resolution will allow the CDBG Application to be submitted for review by ODOC. Also attached for approval is a Citizen Participation Plan that will be incorporated as part of the application package to be submitted to ODOC. A separate public hearing should also be scheduled on the August 20'h City Council meeting agenda. The City will also receive comments on the performance of' City in regard to sidewalk improvements that have been completed under the FY 00 CDBG Program. The City is preparing to submit closeout documents to ODOC on that project. Citizens are requested to participate in the Hearing and express their views on community development needs. The Owasso City Council will incorporate any comments or proposals, where feasible, in the FY 02 CDBG Application to be submitted to the Oklahoma Department of Commerce by October 31, 2002. Posted: �0 Date By: City Clerk' RESOLUTION NO 200210 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OWASSO, OKLAHOMA REQUESTING FUNDING FROM THE OKLAHOMA DEPARTMENT OF COMMERCE UNDER THE STATE'S FY-02 CDBG PROGRAM. ADOPTED this 200' day of August, 2002 by the City Council of the City of Owasso, Oklahoma at a regularly scheduled meeting, in compliance with the Open Meeting Act, 25 O.S. § et seq. ia-ndaliC, Brogdon, Mayor Marcia Boutwell, City Clerk Jay C. Baker, Attorney CITY OF OWASSO CITIZEN PARTICIPATION PLAN lijb/karenMedif/citpandoc ddze�W Aartid ation Plan� Page 2 the proposed CDBG project will be available for public review after the City Council has made its final selection. Meet the needs of non-English speaking residents in those instances where a significant number of non-English speaking residents can reasonably be expected to participate. The City of Owasso does not currently have a significant population of non-English speaking citizens. However, every effort will be made to accommodate the needs of any non-English speaking citizens who wish to participate. Provide citizens with reasonable advance notice of, and opportunity to comment on, proposed activities not previously described in the City of Owasso's fanding request and on activities that are proposed to be deleted or substantially changed in terms of purpose, scope, location or beneficiaries. 2 h Jb /karen /98edif/citpar.doc P Aao0tW this 20th day of August, 2002, by the City Council of the City of Owasso. Moxcia Boutwell, City Clerk h.jb/karen/98edif/citpar.doc I TO: HONORABLE MAYOR AND CITY COUNCII CITY OF OWASSO FROM: SHERRY BISHOP FINANCE DIRECTOR SUBJECT- PROPOSED CARRYOVER BUDGET DATE: August 16, 2002 In 1993, the City Council adopted a "Carryover Budget Policy." Each year since then, the City Council has approved a "carryover" supplemental appropriation. A "carryover" budget is a concept wherein budgeted, but unexpended, funds from one fiscal year may be re-budgeted (appropriated) to the next fiscal year. The goal of a carryover budget is to encourage economy and efficiency in the use of public funds. Traditional public sector budgets "reward" the expenditure of all of the funds under a manager's control and "justify" an increasing level of appropriations in subsequent fiscal years. Efforts to be efficient and save money often are "rewarded" by a reduction in future budgets. The carryover budget promotes a philosophy of "save and invest it" rather than "spend it or lose it." Managers who save money from last year's budget are rewarded by the possibility of a carryover appropriation to the new fiscal year budget. This is the tenth year for the City's managers to operate under a carryover budget concept. The General Fund has a total of $887,822 in budgeted but unexpended funds remaining from the 2001-02 budget. Of that amount, $568,734 is eligible for carryover budget requests. (Funds from personal services line items normally are not eligible for carryover.) Requests from sixteen departments are included in the recommendation for the carryover budget supplement of $338,835 in the General Fund. The E-911 Fund request for a $60,000 carryover budget supplement for radio and communications center improvements is recommended. Five existing projects budgeted in the Capital Improvements Fund of FY 2001-02 are expected to continue into this fiscal year. Requests in the Capital Improvements Fund of $406,774 are recommended in the carryover budget supplement. The new ambulance was budgeted in the Ambulance Capital Fund for FY 2002, but was delivered during FY 2003. The request in the Ambulance Capital Fund for a $160,000 carryover budget supplement is recommended. The Bond Projects Fund request for a $10,000 carryover budget supplement to finalize outstanding contracts on the City Hall construction project is recommended. A listing by department and fund of the requests for carryover budget supplements is attached. The listing includes a brief description of the projects or purchases to be funded by the carryover budget. RECOMMENDATION. Staff recommends City Council approval of a $975,609 supplemental appropriation as follows. General Fund - Municipal Court 4,000 Managerial 3,000 Finance 5,000 General Government 79,600 Community Development 6,506 Engineering 15,643 Information Systems 6,000 Support Services 42,575 Police 22,000 Animal Control 6,550 Fire 25,134 Emergency Preparedness 7,000 Streets 58,000 Parks 12,000 Community Center 39,827 Economic Development 69000 Total General Fund $338,835 E -911 Fund $60,000 Capital Improvements Fund $406,774 Ambulance Capital Fund $160,000 Bond Projects Fund $10,000 ATTACHMENT: Schedule of Carryover Budget Recommendations City of Owasso Schedule of Carryover Budget Recommendations August 16, 2002 General Fund a� Totals Description Amount Municipal Court 4,000 Lap -top computer 4,000 Managerial 3,000 Special projects 3,000 Finance 5,000 Furniture, file cabinets, records storage 5,000 General Government 79,600 Garage parking lot & Golf restrooms 79,600 Community Development 6,506 Future vehicle 6,506 Engineering 15,643 Traffic count equipment 7,500 CPS expansion 3,443 Plotter repair 1,500 Software technical services 2,500 Deference manuals 700 Information Systems 6,000 Salaries 5,000 WART installation expenses 1,000 Support Services 42,575 Vehicle 18,800 Maintenance of city hall & other properties 23,775 Police 22,000 Training 19,000 Vehicle equip, prisoner transport cages, shot gun racks, etc. 3,000 Animal Control 6,550 Facility project currently in progress 6,550 Fire 25,134 Replace carpeting 10,984 Replace beds 8,500 Day room furniture 2,000 Materials to build storage area 2,000 Power washer 450 Materials to build trailer shelving 1,200 Emergency Preparedness 7,000 Training & equipment 7,000 Streets 58,000 Traffic striping 15,000 Vibratory drum roller 15,000 Sidewalks 18,000 Street improvements 10,000 Parks 12,000 Bridge & rail replacement at Elm Creek & Ater Parks 12,000 Community Center 39,827 Window replacement (grant funds) 24,451 Parking lot improvements 2,160 Repair or replace HVAC units 13,216 Economic Development 6,000 Marketing materials 6,000 General Fund 338,835 338,835 E ®911 Fund 60,000 Trunk system monitoring software 15,000 Portable radios 30,000 Radios for communications center 15,000 Capital Improvements Fund 406,774 Computerization project 131,185 Hwy 169 enhancement (grant match) 13,634 Street improvements 151,955 Sidewalks 60,000 Drainage projects 50,000 Bond Projects Fund 10,000 $ 975,609 City mall /Police Station construction Total Carryover Bridget Requests �1 -tl 1T SUBJECT- AWARD OF ENGINEERING SERVICE AG RE EMENTS - INTERSECTION AND ROADWAY IMPROVEMENTS AND PHASE I WATER SYSTEM IMPROVEMENTS DATE. August 15, 2002 The following process has been used by the City of Owasso for selection of firms to perform engineering services: Develop/advertise and distribute a Request for Qualifications Specific to the project Rank responding firms based on predetermined rating criteria. (Reviewer/rater team is typically composed of 2-3 Engineering Division staff and 1-2 Owasso area resident engineers.) Determine short list of "Qualified and Hi lily Responsive Firms" Distribute a Request for Proposals from short listed firms (including a man-hour projection and price proposal) - Rank proposal responses based on predetermined rating criteria - Conduct fee negotiation (if necessary) with top ranked firm. (Should it not be possible to negotiate an acceptable fee with the top ranked firm, negotiations with the next highest ranked firm may be conducted.) ® Recommend selection to City Council Requests for Qualifications Qualification statements were received from the following firms for the indicated projects: Intersection and Roadway System Improvements (received on June 7, 2002) Atkins-Benham Breisch and Associates CH2MHill Crafton, Tull and Associates Craig and Kcithline Dewberry Design Group Incorporated Dudley Engineering FHC, Inc. Garver, Inc. C.H. Guernsey & Company Mcshck and Associates TranSystcrns Corporation Wallace Engineering Structural Consultants, Inc. Page 2 Engineering Services Agreements Phasg_l �Wqter Water system (received on June 12, 2002) Atkins-Benharn Bums & McDonnell Craig and Keithline Dewberry Design Group Incorporated FHC, lnce Garver, Inc. C.H. Guernsey & Company MWI-I (Montgomery Watson Harza) Professional Engineering Consultants, Inc. Wallace Engineering Structural Consultants, Inc. CH2MHil1 was contacted to discuss scope of work elements and the submitted fee. Some modifications to the scope were made to include identified additional work elements, reduce some manhours consistent with project needs and revise the resulting fee calculation. The initial fee proposal submitted was in the amount of $290,370. Following discussion, the proposed fee has been adjusted to a total of $274,986. Widening - E. 86"' Street North (N. 129" E. Avenue to N. 145`h E. Avenue) - E. 96" Street north (N. 119"' E. Avenue to N. Garnett Road) C.H. Guernsey was contacted to discuss scope of work elements and the Submitted fee. Page 3 Engineering Services Agreements Some modifications to the scope were made to include identified additional work elements, reduce some manhours consistent with project needs and revise the resulting fee calculation. The initial fee proposal submitted was in the amount of $291,810, Following discussion, the proposed fee has been adjusted to a total of $273,661. Phase I Water System Improvements Atkins -B enhaYn FHC, Inc. Garver, Inc. MVM (Montgomery Watson Harza) FUNDING SOURCE: Funds for these projects are included in the FY02 -03 budget. A summary of budgeted funds and proposed projects budgets is shown below: Project FY02 -03 Budget Proposed Engineering Firm En ineerin $325,000 a, E. 86 Street North Engineering (includes right -of- $135,128 C.H. Guernsey way acquisition and utilities relocation 96`h Street North (Owasso Market to $150,000 $138,533 C.H. Guernsey Garnett ) - Preliminar En ineerin 129`x' E. Avenue (76`h to 96`x') and 96`h Street North/Owasso Expressway - $300,000 $274,986 CH2MHill Preliminary engineering Water System Improvements (Phase I) $575,000 $431,840 Atkins - Benham - En ineerin only TOTALS $1,350,000 $1,055,359 Page 4 Engineering Services Agreements C MMENDATI ®N Staff recommends approval of each of the following engineering service agreements: Intersection and Roadway System Improvements: Widening E. 46"' Street North (N. 129"' E. Avenue to N. 145 "' E. Avenue) and E. 96"' Street north (N. 119 " E. Avenue to N. Garnett Road) in the amount of $273,661 with C.H. Guernsey Company ® Intersection and Roadway System Improvements: E. 96 "' Street North and 129 "' E. Avenue (U.S. Highway 169 interchange) and widening North 129 "' E. Avenue (E. 76 "' Street North to E, 96 "' Street North) in the amount of $274,986 with CH2MHi11 ® Phase I Water System Improvements in the amount of $431,840 with Atkins - Benham, Inc. ATTACIIIMENTS - 1 C.I. Guernsey Company Agreement 1 CH2MI-I111 Agreement 3. Atkins-Benham, Inc. Agreement C.H. set Agreement Auree ent for Engineering Services Street Improvements East 6 "' Street North from 129" "East Avenue to 145"' East Avenue Street and Intersection Improvements East 96"' Street North from Barnett Road to 119'' East Avenue. THIS AGREEMENT, made and entered into this day of 2002 between the CITE" OF OWASSO, OKLAHOMA, a municipal corporation of the State of Oklahoma, hereinafter referred to as CITY, and C. H. Guernsey & Company, hereinafter referred to as ENGINEER; WHEREAS, CITE'" intends to construct improvements, hereinafter referred to as the PROJECT; and, WHEREAS, CITY requires certain professional services in connection with the PROJECT, hereinafter referred to as the SERVICES; and, NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree as follows: 3.0. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D, COMPENSATION, and further described in Exhibits D -1, D -2, D -3 and D -4, FEE / MANHOUR BREAKDOWN, which are attached hereto and incorporated by reference as part of this AGREEMENT. 4.0. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES undertaken in a iiianner consistent with the pi- evading accepted standard for similar services \vith respect to projects of`cornparable filnction and complexity and with the applicable iiivVS and 1- egulatlotls published and In el feet at the time of pcl'Iormance of the (0"' 20 U' ) t iUt'IIIsC% titcth- c >t,th S I I :\ rctrmctit dok 5.0. LIMITATION OF RESPONSIBILITY. 5.1. ENGINEER shall not be responsible for construction means, methods, techniques, sequences, procedures, or safety precautions and programs in connection with the PROJECT. 6.1 Since ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over contractors', subcontractors, or vendors' methods of determining prices, or over competitive bidding or market conditions, ENGINEER's cost estimates shall be made on the basis of qualification and experience as a Professional Engineer. 6.1 Since ENGINEER has no control over the resources provided by others to meet construction contract schedules, ENGINEER'S forecast schedules shall be made on the basis of qualification and experience as a Professional Engineer. 7.1. ENGINEER shall defend and indemnify CITY from and against legal liability for damages to the proportionate extent arising out of the performance of the SERVICES for CITY including but not limited to any claims, costs, attorney fees, or other expenses of whatever nature where such liability is caused by the negligent act, error, or omission of ENGINEER or any person or organization for whom ENGINEER is legally liable. Nothing in this paragraph shall make the ENGINEER liable for any damages caused by the CITY or any other Contractor of the CITY. 7.2. ENGINEER shall not be liable to CITY for any special, indirect or consequential damages, such as, but not limited to, loss of revenue, or loss of anticipated profits. 8.0. COMPLIANCE WITH LAWS. 8.1. In pci-f'ormance oFtlie SERVICES, ENGINEER shall comply Nvitli applicable regulatory requirements ilICILIdiffil tC(ICI-al, state, and local laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall procure the permits, certificates, and licenses (OX M ()-' ) ( i I W1 115C)' \(i1 11 S I I CC I A 1 I LTI I WI II I I OC necessary to allow ENGINEER to perform the SERVICES. ENGINEER shall not be responsible for procuring permits, certificates, and licenses required for any construction unless such responsibilities are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES. 9.0. INSURANCE. 9.1. During the performance of the SERVICES under this AGREEMENT, ENGINEER. shall maintain the following insurance: 9.1.1. General Liability Insurance with bodily injury limits of not less than $1,000,000 for each occurrence and not less than $1,000,000 in the aggregate, and with property damage limits of not less than $ 100,000 for each occurrence and not less than $ 100,000 in the aggregate. 9.1.2. Automobile Liability Insurance with bodily injury limits of not less than $1,000,000 for each person and not less than $1,000,000 for each accident and with property damage limits of not less than $100,000 for each accident. 9.13. Worker's Compensation Insurance in accordance with statutory requirements and Employers' Liability Insurance with limits of not less than $ 100,000 for each +MU two 9.1.5. ENGINEER shall furnish CITY certificates of insurance, which shall include a provision that such insurance shall not be canceled without at least 30 days written notice to the CITY. 10.0. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in Attachment C, RESPONSIBILITES OF THE CITY, which is attached hereto and incorporated by reference as part of this AGREEMENT. 11.1. All documents, includimg original drawings, estimates, specifications, field notes and data shall become _ nd remain the property of the CITY. 11.2. CITY'S reuse of such dOClllllents without written verification or adaptation by ENGINEER for the specific purpose intended shall beat CITY'S risk. (08-20 02) 1. iI Icl IIsc.y ti6111-Omh \11'ccI Ajf Icclll"111 floc 12.0. TERMINATION OF AGREEMENT. 12.1. The obligation to continue SERVICES under this AGREEMENT may be terminated by either party upon fifteen days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. 110. NOTICE. 131. Any notice, demand, or request required by or made pursuant to this AGREEMENT shall be deemed properly made if personally delivered in writing or deposited in the United States mail, postage prepaid, to the address specified below. 13.1.1. To ENGINEER: C. H. Guernsey & Company 4870 South Lewis Ave, Suite 203 Tulsa, Oklahoma 741055153 Attention: Rob Haskins 13.1.2. To CITY: CITY OF OWASSO Department of Public Works P.O. Box 180 301 W. 2"" Avenue (E. 76 "' Street N.) Owasso, Oklahoma 74055 13.2. Nothing contained in this Article shall be construed to restrict the transmission of routine communications between representatives of ENGINEER and CITY. 14.0. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considered to be in default of this AGREEMENT if delays in or failure of perfoilnance shall be due to forces which are beyond the control of the parties including, but not limited to: Fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage; inability to procure permits, licenses, or authorizations from any state, local, or federal agency or person for any of the supplies, materials, accesses, or services required to be provided by either CITY or ENGINEER under this AGREEMENT; strikes, work slowdowns or other labor disturbances, and judicial restraint. (08 -20 02) kiuctwwy 8wh -` oth Street A;trccniriu 110L 15.0. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court of compctent jurisdiction as unenforceable, such portion shall be severed herefrom, and the balance of this AGREEMENT shall remain in full force and effect. 16.0. INTEGRATION AND MODIFICATION, This AGREEMENT includes Attachments A, B, C, D, and E, and represents the entire and integrated AGREEMENT between the Panties; and supersedes all prior negotiations, representations, or agreements pertaining to the SCONE OF SERVICES herein, either written or oral. This AGREEMENT may be amended only by a written instrument signed by each of the Parties. 18.0. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to this AGREEMENT, provided that nothing contained in this paragraph shall prevent ENGINEER from employing such independent consultants, associates, and subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the performance of the SERVICES hereunder. 20.0. KEY PERSONNEL,. In performance of the SERVICES hereunder, ENGINEER has designated Robert D. Haskins, P.E., as Project Manager and Lead Design Engineer for the project, Joe Nurre, P.E., as Drainage System Design Engineer for the project, and J. Steven Almon, P.E., as Lead Quality Assurance /Quality Control Engineer for the project. ENGINEER agrees that no change will be made in the assignment of these positions without prior approval of CITY. iUL'I Ii Sr \hlll -') IIII S I I C C t : \;lI n u'IIt IN WITNESS WHEREOF, the pal-tics have executed this AGREEMENT in multiple copies on the respective dates hcreinbclow reflected to be effective on the date executed by the Mayor of the City of Owasso, Oklahoma. APPROVED: CITY OF OWASSO, OKLAHOMA (SEAL.) City Clerk City Attorney (SEAL) ATTEST: Assistant Secretary RECOMMENDED: Director 01'PUblic Works (0"" "0 0,11 ;t I "t sh I I I -0ot h St I At' Mayor Date C. H. Guernsey & Company Date Street Improvements East 86"' Street North from 129t"East Avenue to 1451" East Avenut Street Intersection Improvements East 96"' Street North from Garnett Road to as Avenue. ATTACHMENT A A.0, SCOPE C)1-' PROJECT". The PROJEC T' shall consist of collecting and quantifying field data for street and signalization improvement contracts at the intersections and streets identified, including a detailed planimetric survey, and preparation of plans, specifications, and contract documents. It is expected that there shall be a construction and service contract, which must be entered into in order to bring this PROJECT into being. Included will be services and/or construction contracts for engineering, utilities relocations, construction, equipment, etc. The PROJECT shall consist of arterial street improvements at the following locations: 1. The widening of East 86 "' Street North from 129 "' East Avenue to 145 " East Avenue. 2. The widening of East 96 "' Street forth from North Garnett Road to 119 "' East Avenue including widening and intersection improvements for the intersection of North Garnett Road and East 96 "' Street North. iHL'I 111['y K(�I�l -`>hlh S11LYI :A,'_fCCI11CnI (10C A - 01`r.. Street Improvements East i' Street North 1 o . 129"'East Avenue to !. East Avenue Street and Intersection Improvements East 96"' Street North I' Garnett Road to 119"' East Avenue. SCOPE OF SERVICES ATTACHMENT E.O. SCOFF OF SERVICES. The services to be performed by the ENGINEER under this Prior to submittal of the final plans, the ENGINEER shall verify that the site conditions indicated on the plans adequately address the conditions in the field. B.1. Basic Services of ENGINEER. The basic services of the ENGINEER shall include, but are not limited to, the following tasks; B.1.1. Designate a representative to coordinate all exchange of information between the ENGINEER and the CITY. B.1.2. Designate a Quality Review Team. Team shall consist of, as a minimum, a principal in the firm not associated with day - today design work of this project. B.1.3. Document all meetings, conferences, coordination, etc., and send documentation to the CITY within five working days. B.1.4. Attend meetings with CITY, other CITY consultants, utility companies, and other administrative and / or regulatory agencies to review PROJECT requirements and discuss scheduling of the PROJECT. B.1.5. Attend all scheduled public meetings for the PROJECT as directed by the CITY. B.1.0. Perform all necessary surveys and investigations for the PROJECT. B.1.7. Prepare all drawings in conformance with the drafting standards set forth in the Oklahoina Depart riciit of Trailsportatloll Desig11 Criteria MallLial. Drawings shall be 22" \ 34" size. EAST 80"' STIZEET NOWNI FIROM 129i' EAST AVENUE TO 145"1 EAST AVENUE (US 'U 0.1) ( iUi9lIs" 8h111- 116 111 till eel : l_'WeIIleIlLedne 13 B.2. Phase No. 1. PRELIMINARY DESIGN. Within 90 calendar days after the Notice to Proceed, prepare a set of preliminary contract plans, together with all appropriate specifications and related bidding documents required for the construction of each contract module of the PROJECT, in accordance with applicable standards and detailed specifications. The Contract plans will include functional plans, preliminary cost estimates, and recommendations. The Preliminary Design shall include; 1321. Initial meeting between CITY and ENGINEER to establish critical design parameters. 1322. Initial contact with other CITY Departments, and other administrative and regulatory .Agencies. B.2.3. Perform `6drive -by99 survey documenting all driveways; visible utility appurtenances (water and gas valves, manholes, fire hydrants, etc.); sidewalk conditions, locations, and widths; significant pavement deterioration (cracks, potholes, depressions, swelling, etc.); and street material (typical sections, if known). B.2.3.1. Confirm and update (as warranted) scope of improvements provided by CITY. B.2.3.2. Note existing street width, surface type, sidewalk, location/width where necessary, and any other pertinent information. 13.2.3.3. Verify and identify on plans all utility castings, all driveway locations, and material. B.2.3.4. Collect field data to determine bid quantities for 9. Asphalt Overlay 10. Leveling Course 11. Replacement of existing Inlet Grates with New Bicycle -Safe Grates (as required) 12. Wheelchair Ramps 13. Storm Sewer Upgrades 14. Other Items as Required 13.2.3.5. ENGINEER shall determine the approximate horizontal and vertical location (if possible) of all known utilities within the PROJECT area. Locations shall be tied where possible to survey data and delineated on the construction drawings. investigation may include the coordination of 'potholing' to determine the actual location of the utility. (()5- 't) -U_'1 ( iUrrt75CY 86111 -')hl1) tilrrrl :\ rrcn It'll i.dLIC 13 - 2 13.2.4 ENGINEER shall be responsible for identifying all necessary Rights-of-Way, including, but not limited to existing recorded Rights-of-Way, and Rights-of-Way needed for the construction of the PROJECT. For purposes of this Agreement, Right of Way shall mean: Fee Simple (a.k.a. Permanent Right of Way), Permanent Easement, Deed of Dedication, Plats, and any property acquired through public and private judicial action. ENGINEER shall: 13.2.4.1 Research and document all existing Right of Way within the project limits, including Fee Simple (a.k.a., Permanent Right of Way), Permanent Easements, Platted Dedications and Deeds of Dedications, whether private or public. B.2.4.2 Prepare a Right of Way map showing all existing Right of Way and including the type of easement or conveyance, the recorded Grantee, Book and Page(s) for all instruments and /or the Plat Number. The Right of Way map shall also show all the proposed additional Right of Way required for the construction of the project. B.2.5. Engineer shall employ the services of a registered land surveyor to perform a detailed B.2.6. Coordinate necessary geotechnical testing to verify existing pavement structure or base stability with ENGINEER's contract testing firm. B.2.7. Establish limits for each contract module. B.2.8. ENGINEER shall furnish three (3) copies of the Preliminary Plans and other documents listed in B.1 at no additional cost to the CITY. Additional copies will be furnished, upon written request by the CITY, at rates provided under Attachment D.5, Other Engineerinv Services. Q.3. Phase No. 2. FINAL DESIGN. Final design shall include the preparation of final plans for the Project together with all specifications and related contract documents required for the construction of the PROJECT by the CITY's construction contractor; all in accordance with CITY's Standards, detailed specifications, and approved Preliminary Plans prepared as Phase No. 1., and shall be completed within 90 calendar days after Notice to Proceed. The Final Design shall include: (08 0 -01) e iuernsry 80111 -001h tihret Agreement.doc 13 - 3 B .3. 1. Final field investigations. 133.1 Final detailed design of process, components, structures, and appurtenances, which includes the following: B.3.2.1. Contract plans shall include as a minimum: I. Cover Sheet 5. Plan and Profile Sheet(s) 6. Joint Layout Sheet(s), if required 7. Detailed Construction Drawings for all special drainage structures, retaining walls, architectural details, landscaping plans, detention facilities, or any other special items required for the PROJECT. B.3.2.2. Prepare estimate of cost for each contract module. 1333. ENGINEER shall furnish three (3) half size (I I x 17) copies of final plans and specifications for review. Additional copies will be furnished, upon written request by the CITY, at rates provided under Attachment D.7, Other Direct Costs. B.3.3.1. Perform Plan-In-Hand review with CITY. 1111111 1511 B.3.4. Prepare related bidding documents for each contract module of the PROJECT, including Estimate of Quantities, Proposal, Special Conditions, and Special Specifications on 8-1/2" x 11" plain white bond paper. All documents shall be suitable for original camera-ready copy. B.3.4.1. Submit documentation that a quality review has been performed by the quality Review Team. This documentation shall consist of check prints and a letter signed by a principal stating, that the quality review has been completed. B.3.4.2 Furnish three (3) half-size (11 "X17 ") copies of the final plans and specifications for one final review. Additional full-size copies of the plans and specifications may be provided at a cost of $35.00 each. B.3.4.3 Incorporate final review comments into the contract plans and specifications. 13.3.5. ENGINEER shall furnish 35 copies of final Contract DOCLIMCIItS, including prints, printing, binding and miscellaneous expenses. Additional copies Documents, be furnished, 1 1-1 W,X-20-02) (;I I c I 11scy 86111-00111 Streit A glee I Ile I It' doe 13 - .1 upon written request by the CITY, at rates provided under Attachment D.7, Other Direct Costs. B3 3.6. .Assist the CITY with construction bidding. 1. Advertisement for Kids. CITY shall be responsible for publishing Advertisement for Bids. E.4 ENGINEERING SERVICES DURING CONSTRUCTION .4.1. Attend the Pre-Work Conference. 13.4.2. Despond to construction questions from CITY personnel exclusive from site visits, submittal reviews, preparation or review of change orders, and preparations of partial and final pay estimates which may be provided upon written request as an additional service. 13.43. Prepare record drawings on original construction mylars utilizing the construction information supplied by the CITY. Submit record drawings on the original construction mylars and on 3 -1/2" diskette in digital format. ENGINEER's deliverables, including record drawings, are limited to the sealed and signed hard copies. Computer - generated drawing files furnished by ENGINEER are for CITY's or other's convenience. Any conclusions or information derived or obtained fi -om these files will be at user's sole risk. E.5. Phase No. 1. PRELIMINARY DESIGN. Within 90 calendar days after the Notice to Proceed, prepare a set of preliminary contract plans, together with all appropriate specifications and related bidding documents required for the construction of each contract module of the PROJECT, in accordance with City Standards and detailed specifications. The Contract plans will include functional plans, preliminary cost estimates, and recommendations. The Preliminary Design shall include: 13.5.1. initial meeting between CITY and ENGINEER to establish critical design parameters. ((11- '()-()' ) ( iuernsc. XMI1 -` 0tII St ect AgrcenlenI.Joc 13 - 5 B. 5.2. Initial contact with other CITY Departments, and other administrative and regulatory Agencies. 13.53. Perform "drive-by" survey documenting all driveways; visible utility appurtenances (water and gas valves, manholes, fire hydrants, etc.); sidewalk conditions, locations, and widths; significant pavement deterioration (cracks, potholes, depressions, swelling, etc.); and street material (typical sections, if known). B.5.3.1. Confirm and update (as warranted) scope of improvements provided by CITY. B.5.3.2. Note existing street width, surface type, sidewalk, location/width where necessary, and any other pertinent information. 13.5.3.3. Verify and identify on plans all utility castings, all driveway locations, and material. 13.5.3.4. Collect field data to determine bid quantities for B.5.3.6. ENGINEER shall determine the approximate horizontal and vertical location (if possible) of all known utilities within the PROJECT area. Locations shall be tied where possible to survey data and delineated on the construction drawings. Investigation may include the coordination of 'potholing' to determine the actual location of the utility. E.5.4 ENGINEER shall be responsible for the coordination with the CITY for the acquisition of the necessary Right of Way, including, but not limited to existing recorded Rights- of-Way, and Rights-of-Way needed for the construction of the PROJECT. For purposes of this Agreement, Right of Way shall mean: Fee Simple (a.k.a. Permanent I Right of Way), Permanent Easement, Deed of Dedication, Plats, and any property 1-1 acquired through public and private judicial action. ENGINEER shall: B.5.4.1 Research and document all existing Right of Way within the ng project limits, including ID 1-,'cc Simple (a.k.a., Permanent Right of Way), Permanent Easements, Platted �0',­20 02) (;ucrnscy 8001-1)('111 Street Agrectnelit'doc 13 - 6 Dedications and Deeds of Dedications, whether private or public. 8.5.4.2 Prepare a Right of Way map showing all existing Right of Way and including the type of casement or conveyance, the recorded Grantee, Book and Pagc(s) for all instruments and/or the Plat Number. The Right of Way map shall also show all the proposed additional Right of Way required for the construction of the project. B.5.5. Perform a detailed topographical and planimetric survey along the streets identified for B.5.6. Coordinate necessary gootechnical testing to verify existing pavement structure or base stability with ENGMER's contract testing firm. B,5.7. Establish limits for each contract module. 8.5.8. ENGINEER shall furnish three (3) copies of the Preliminary Plans and other documents listed in B.1 at no additional cost to the CITY. Additional copies will be furnished, upon written request by the CITY, at rates provided under Attachment D.7, Other Direct Costs. 8.6. Phase No. 2. FINAL DESIGN. Final design shall include the preparation of final plans for the Project together with all specifications and related contract documents required for the construction of the PROJECT by the CITY's construction contractor; all in accordance with CITY's Standards, detailed specifications, and approved Preliminary Plans prepared as Phase No. L, and shall be completed within 90 calendar days after Notice to Proceed. The Final Design shall include: 8.6.1 ENGINEER shall be responsible for the identification, coordination, preparation, negotiation, and acquisition of all necessary Rights-of-Way for the construction of the PROJECT. ENGINEER shall: B.6. 1. 1. Research and develop master addendum based on verified land sales in the general area to determine fair market value of land within the project area. 13.6.1.2 Establish per parcel monetary offer to acquire easement based on master addendum. 13.6.1.3 Maintain ownership /status report and agents 1`Cp01-t dUriffly, the negotiation stage. (08-20-02) ( ik I el-I Is Cy sw I I S I reet Ag, I cc I Ile I It. t I oc 13 - 7 E.6.1.4. If appraisals arc required by client on specific properties exceeding client guidelines, an OK State Certified General Appraiser shall be contracted to complete appraisals appropriate to the'acquisition as determined by the client. The cost for this appraisal shall be considered additional expense and shall be provided under Attachment D.6, Subconsultants and Other Professional Associates. 13.6.1.5 Drive project to verify if encroachments have been removed, special circumstances of the property, possible damages, and determine if new encroachments have been placed within the existing right of way B.6.1.6. Mail initial contact letter and deed of dedication instrument along with property rights brochures and other information the owner may need to assess the proposed changes to their property B.6.1.7. Begin initial personal contacts of the affected owners. Discuss offer as established and determine if the owner has any needs unforeseen during the drive out. 13.6.1.8. Negotiations and right of entry letters to begin. 13.6.1.9. Filing of executed legal documents as required by the client 13.6.1. 10. Completion of acquisition: Includes parcel folders containing correspondence, agent reports, offer letters, legal documents, and other pertinent information that will be turned over to client B.62 Final field investigations. 13.63. Final detailed design of process, components, structures, and appurtenances, which includes the following: B.6.3.1. Contract plans shall include as a minimum: 1. Cover Sheet 2. Summary sheets for: a. Pay Quantities and Pay Item Notes b. Roadway Quantities c. Drainage Structures (Storm Sewer and Storm Inlet Design), if required 3. Typical Section Sheet(s) 4. Miscellaneous Construction Details Sheet(s) 5. Plan and Profile Sheets) 6. Joint Layout Sheet(s), if required 7. Detailed Construction Drawings for all special drainage structures, retaining walls, architectural details, landscaping plans, detention Facilities, or any other special items required for the PROJECT. 13.63.2. Prepare estimate of cost for each contract module. (08-20-02) Guemscy 86lh-9oth 1,ticct AgIccment.doc 13 - 8 B.6.4. ENGINEER shall furnish three (3) half size (I Ix 17) copies of final plans and specifications for review. Additional copies will be furnished, upon written request by the CITY, at rates provided under Attachment D.7, Other Direct Costs. B.6.4.1. Pei-form Plan-In-Hand review with CITY, B.6.4.2. Incorporate CITY's Plan-In-Hand comments. 13.6,5. Prepare related bidding documents for each contract module of the PROJECT, including Estimate of Quantities, Proposal, Special Conditions, and Special Specifications on 8-1/2" x I I" plain white bond paper. All documents shall be suitable for original camera-ready copy. B.6.5.1. Submit documentation that a quality review has been performed by the quality Review Team. This documentation shall consist of check prints and a letter signed by a principal stating that the quality review has been completed. B.6.5.2 Furnish three (3) half-size (I F'XIT') copies of the final plans and specifications for one final review. Additional full-size copies of the plans and specifications may be provided at a cost of $35.00 each. B.6.5.3 Incorporate final review comments into the contract plans and specifications, B.6.6. ENGINEER shall furnish 35 copies of final Contract Documents, including prints, printing, binding and miscellaneous expenses. Additional copies will be furnished, upon written request by the CITY, at rates provided under Attachment D.7, Other Direct Costs. B.6.7. Assist the CITY with construction bidding. 1. Advertisement for Bids. CITY shall be responsible for publishing Advertisement for Bids. 2. Pre-Bid Conference. Conduct the Pre-Bid Conference. 3. Addenda. Prepare and issue all addenda. 4. Bid openings. Attend bid opening. 5. Bid tabulations. Review all bids and prepare a bid tabulation. 6. Recommendation for award. Prepare a recommendation for award of the construction contract. 7. Contract preparation. Coordinate the preparation and execution of construction documents. B.7 ENGINEERING SERVICES DURING CONSTRUCTION B.7.1. Attend the Pre-Work Conference. B.7.2. Respond to construction questions From CITY Personnel CXCILISIVC 11-0111 Site Visits, submittal reviews, preparation or review of change orders, and preparations of partial (it W[ I I SeY Sot I I -,)(,t I I S I I cc I Al-, I ec I Ile I I I. doc 13 - 9 and final pay estimates which may be provided upon written request as an additional service. B.7.3. prepare record drawings on original construction mylars utilizing the construction information supplied by the CITY. Submit record drawings on the original construction mylars and on 3 -1/2" diskette in digital format. ENGINEER's deliverables, including record drawings, are limited to the sealed and signed hard copies. Computer - generated drawing files furnished by ENGINEER are for CI`3 Y's or other's convenience. Any conclusions or information derived or obtained from these files will be at user's sole risk. (02 - 0 O- ) t lurrnscy hth- path Strccl ccI Ile III.,Ioc B - 10 Street I inprovernents East 86" Street North from 129"East Avenue to 145"' East Avenue Street and Intersection Improvements East 96"' Street North from Garnett Road to 1191" East Avenue. RESPONSIBILITIES OF THE CITY ATTACHMENT C C.O. R_ESpONSIBILrEEs ®F _THE CITY. The CITY agrees: C.1. ReVorts Records. _etc. To furnish, as required by the work, and not at expense to the ENGINEER. C.1.1. Provide records, reports, studies, plans, drawings, and other data available in the files of the CITY which may be useful in the work involved under this AGREEMENT. C.1.2. Provide standard drawings and standard specifications. C.2. -Access. To provide access to public and private property when required in performance of ENGINE ER' s services. C.3. staff _Assistance. Designate in writing a person to act as its representative in respect to the work to be performed under this AGREEMENT, and such person shall have complete authority to transmit instructions, receive information, interpret and define CITY's policies and decisions with respect to materials, equipment, elements and systems pertinent to the services covered by this AGREEMENT. C.3.1. Furnish legal assistance as required in the preparation, review and approval of construction documents. C.3.2. Furnish staff assistance in locating existing utilities and in expediting their relocation as described in Attachment B. CA. Review. Examine all studies, reports, sketches, estimates, specifications, drawings, proposals, and other documents presented by ENGINEER and render in writing decisions pertaining thereto within a reasonable time, so as not to delay the services of ENGINEER. (0 \- 'U -U') ( kici I isc), Swli -')(,I h Surer A g, ice I lieW d0c C- I Street Improvements East 86"' Street North from 129""East Avenue to 145"" East Avenue Street and Intersection Improvements East 96"' Street North from Garnett Road to 119"' East Avenue. COMPENSATION ATTACHMENT D D.1. Total ComMnsatioij. D.2. EAST 86h STREET NORTH FROM 129"' EAST AVENUE TO 145"' EAST AVENUE D.2.1. For the work under Phase No. 1, PRELIMINARY DESIGN, Attachment B.2., the total maximum billing shall be $57 305.45, which amount shall not be exceeded without J- further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules. D.2.2. For the work under Phase No. 2, FINAL DESIGN, Attachment 13.3., the total maximum billing shall be $68,798.95,which amount shall not be exceeded without further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules. D.2.3. For the work under Phase No. 3, CONSTRUCTION PHASE SERVICES, Attachment BA., the total maximum billing shall be $9 023.45,which amount shall not be exceeded without further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules. D.2.4. For the work tinder D.2.1, D.2.2 and D.2.3., the total maximum billing shall be $135,,127.84, which amount shall not be exceeded without further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules. D.3. EAST 96"' STREET NORTH FROM GARNET ROAD TO 119`1 EAST AVENUE D.3.1. For the \\,oi-k under Phase No. 1, PRELIMINARY DESIGN, Attachment B.5., the total niaxinlUni billing shall be $52.,426.02, which aniOUnt shall not be excccded Without further Nvi-itten authorization by the CITY. A breakdown of the costs is shown in the attached NlanlIOL11- SCI1CdUICS- (08-20-02) (ik1C1 I ISCY gh1h-')(1111 Sit cc I A gi cc it lei It d0t: D-[ D.3.2. For the work under Phase No. 2, FILIAL DESIGN, Attachment 13.6., the total maximum billing shall be $77,083.989which amount shall not be exceeded without further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules. D.3.3. For the work under Phase No. 3, CONSTRUCTION PHASE SERVICES, Attachment 13.7., the total maximum billing shall be $9,023,45,which amount shall not be exceeded without further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules, D.3.4. For the work under D.3.1, D.3.2 and D.3.3, the total maximum billing shall be $1384533.44, which amount shall not be exceeded without further written authorization by the CITY. A breakdown of the costs is shown in the attached Manhour Schedules. DA. Raw Labor Costs. Raw Labor costs shall be compensated for as actual hourly rates for personnel assigned to the PROJECT for each hour of service rendered. D.5. Overhead_ Costs. Overhead costs shall be compensated for as a percentage applied to raw labor cost. The overhead cost shall be calculated as 164% of raw labor costs. D.6. Subconsultants and Other Professional Associates. Services of subcontractors and other professional consultants shall be compensated for at actual cost. D.7. Other Direct Costs. D.7.1. Travel and subsistence shall be compensated for at actual cost. Local travel by personal or firm automobile shall be compensated for at $0.365 per mile. D.7.2. Printing expenses shall be compensated for at actual cost. D.7.3. Any other direct costs shall be compensated for at actual cost. D.8. Profit. Profit shall be compensated for at 11 percent of raw labor plus overhead. D.9. Additional Services. Unless otherwise provided for in any accepted and authorized proposal for additional services, such services shall be compensated for on the same basis as provided for in D.2, D.3, DA, D.5, D.6, D.7 and D.8. D.10. Terminated Services. If this AGREEMENT is terminated, ENGINEER shall be paid for services performed to the effective date of termination as follows: D.10.1. For personal services as presented in DA. D.10.2. For overhead costs as presented in D.5. D.10.3. For services of Subconsultants and other profcssional associates, their invoiced lees to ENGINEER, li D.10.4. For other direct costs, the actual cost of other direct reimbursable expenses incurred to the effective date of termination. D.10.5. F'or profit as presented in D.8. D.11. Conditions of Payment. D.11.1. Progress payments shall be made in proportion to work completed as indicated within this AGREEMENT and shall be due and owing within thirty days of ENGINEER's submittal of his progress payment invoices. D,11.1 If CITY fails to make payments due ENGINEER within sixty days of the submittal of any progress payment invoice, ENGINEER may, after giving fifteen days written notice to CITY, suspend services under this AGREEMENT. D.11.3. If the PROJECT is delayed, or if ENGINEER's services for the PROJECT are delayed or suspended for more than ninety days for reasons beyond ENGINEER's control, ENGINEER may, after giving fifteen days written notice to CITY, request renegotiation of compensation. (Uti- 2U -02) ( jlICI I19CY 80tII- `)0lI) SIrcC1 :AL!fCCi I W1 I IA I OC 1 )-3 Street Improvements East 86" Street North from 129t"East Avenue to 145"' East Avenue Street and Intersection Improvements East 96"' Street North from Garnett Road to 119"' East Avenue. TIME FOR COMPLETION ATTACHMENT E E.I. EAST S6"' STREET NORTH FROM 129"' EAST AVENUE, TO 145"' EAST AVENUE E.1.1. PHASE I — PRELIMINARY DESIGN. The ENGINEER shall complete the SERVICES provided under Section B.2. of ATTACHMENT B within 90 calendar days after Notice to Proceed. A breakdown of the tasks is shown in the attached Schedule, Exhibit E-1. E.1.2. PHASE 2 — FINAL DESIGN. The ENGINEER shall complete the SERVICES provided under Section B.3 of ATTACHMENT B within 90 calendar days after Notice to Proceed to be set when the CITY directs ENGINEER to perform the SERVICES. A breakdown of the tasks is shown in the attached Schedule, Exhibit E-1. E.1.3. PHASE 3 — CONSTRUCTION PHASE SERVICES. The ENGINEER shall complete the SERVICES provided under Section BA of ATTACHMENT B according to the direction of the CITY. A breakdown of the tasks is shown in the attached Schedule, Exhibit E-1. E.2. EAST 96"' STREET NORTH FROM GARNETT ROAD TO 119"' EAST AVENUE E.2. 1. PHASE I — PRELIMINARY DESIGN. The ENGINEER shall complete the SERVICES provided Wider Scctiori B.5. of ATTACHMENT B within 90 calendar days after Noticc to Proceed. A breakdown of the tasks is shown in the attached Schedule, Exhibit E-2. F-2.2. Il IASE 2 - FINAL DESIGN. The ENGINEER shall complete the SERVICES provided tiiidcr Section B.6 ofATTACI-IMENT B within 90 calendar days after Notice to Proceed to be set when CITY directs ENGINEER to perform the SERVICES. A breakdown of the tasks is shown in the attached Schedule, Exhibit E-2. E.2.3. PHASE 3 — CONSTRUCTION PHASE SERVICES. The ENGINEER shall complete the SERVICES provided under Section B.7 of ATTACHMENT B according to the direction of the CITY. A breakdown of the tasks is shown in the attached Schedule, Exhibit E-2. (08-20 ()') (it I CI I ISCV 8W I 1-')(, 111 Strect A gicement. d oc F-2 I D &l 8 0 N 1 s 3; Ft e m"pany C. H. Gueamlsey & C a, 85th Weet Fi � fm—mNcdb 12ft East Avenue go Nogib 14M East Avenue S�T E-1 PC Task porne Llteld� Shej DWnm —5 days sod ---f.e 0 1 —QWj Fhth —IAZj—oZ—CM 2003 2DU Aug Sep Od Nov D ayn Feb aur AV li;! ........... t i .---4- iD T- -T— ID . .... .. ------ ... .. .. ....... --- --- l< F - ------ . ......... co : mmmm t co .. . . ....... T T 76 CmtstAeeios Decaft 3 days TUOU1114AD3 Ttwwlaw Stro -.g Lay-A CRY -f 0-- S—t�ldld G;F-i 2 days I�ueOM4M3 79 Crosz Sections 5 d-Ifs li�o OIJOSM 3 —7 — ��,,d 0,,,'Vo3 84 DAPOC —Pzvew d-Y-1 FO —02J84M3 ToeOVIN3 rnftMp wilh City 62 days I?Jlaw Thu 03/I3?03 Final Pfau RibmA21 (.,sets, 112 toze) City ra+w DesV Resv(eam 0 &rp lodays --Tut 021-1 e/D3 weo2l?OM3 —7ae 0-2118M Tue o3v4vj ---fUe —O3l1 IM Rev" design to CWVy wM CIV MYS —Wed —01'%M Sub(W W&V docuff"t set (5 sets, IR *e. f 0 days Tue 0311 IM Toe 03H 1103 91 Cky Apprayaf W A&&W br ej�b 0 d4s 38 days Tue OV25M --f-e —Ovnmi rue 0302503 —WedGSf%QZ li-I —pt.-a Reproduce M Dams) (25 sets, fuj-SLe) -A"omsam S days 04101M3 —03a3.'03 PutOM for Sida' 0 days Tue &,T2—M DiskWe ft 0,4umerAs to biddem arul adverti Sday. VT-i—melw Quostiof* kum bo(Mm 10 days ollays --VFai—o4m= 8ttta05,G4tiK3 '--Tu—e045R3 Tog -im Prepare and &Mne adder. r OPM BIVS VVWO'UMM --Te —ovi'm 95 Tabvbte and e+'attrafe 0&s —5 days —1 day 0 days —';;Ted 04/3QI-03 --Tw —05=3 Mae mmmDendatim for MNW4 coostmum C"aa amold —W;�—O.WZM ftdf DW14M —Wi.-T—OW7103 Kqm i-o-i �I'mi &f"s phase 2 Ser0ces ouriog Construction 220itays TN,05/22M3 ---7ii-o Re- SVZP DMWAVS 5 days FrIM13.M3 Thu 06119M tU ATIeM Pre-WOrk n*MW I day Thu 05129103 Thu Q5 R4603 106 Respond 2o questions Prom ray and C&*acim I day Thu Mme3 —Thuoacm Im SLAC conh-d for Contractor (I linx) 6 days, Fd M6/03 Tate 06192,E TOT ConWncAm —ilO days Th. MM3 —7�—(O,.V17M TOT— Prepare Recoril 012m (dgiial and ) a days Wed 0311 TAX MdMIAW pmea 86ot SL Task ROW Up Task RoSed QD pmrsss -tasks Dat-: Wed M14i Progress mmmmmom &MWY �oAedePfl wl Page 3 s f� s I �:1i I 96th Suet North from 1I9th Ent Avenue to Gamett Road EXH2FT E -z � M3 i aD 3a5c @tarns Duration Start Fktish Aug SeP £9a tD::� ,daro Pea Agar A �4ay Aass .Bad9 S� 6}ca RSav es� Jan F� Pic A AaaY Joss g,t dWg oW F.a 75 Ccas,e0cn of acgjswn 3 days Nsat D52663 YyetB 05d2&' - _. FS Fl,al Plan Sal Pwaradon 756agas Taae07tet�3 'x91684 S t `_ �Qq T7 a;aser siie Y day 1.07101M 'Fate 07M4l03 - s 73 R Ptan 2 days Fri G711 aM3 07x6193 0. ---r _ � � N1 79 Typrw Seak- 3 days F d D7f9aPfa3 3aae 08 ?103 - Geane= Data 3 days Wed 07/23!43 Fri OIF6103 _y - - a9 soumary Sheets 2 days 1V40A 072aM3 Tt� 0 129/x3 . �L Y C Sy OuarAt9YE5 anO tdWeS 3 days Thu 0624163 R5aY14a 3 f e 83 f$ainage Area P&P 3 days ABA t7BP96103 Wed ' L_g _....- ...E _ .... at pests an0 PnA-— 45 days MW DFf2aiO3 Flt 49195!03 e g5 SbBet Shwls 5 days mon OW191x3 Fd Ox845/03 as sin st eRgc t day D8146103 .d - -- 97 CAnstrucaon DemG —_�— 3 dsy5 Ads 49/28/03 4rVeB O713M3 88 S" Layout 2 dills Thu 97134M Fri 001E � a9 Ldy o6 s4a edatd Deis 2 d;; a4an 48tsero3 Tue 0WtS%3 - 9t7 CMSS Sews 5 clays filed 0723!43 Tue 07f291D:44 S 9'H + � EJOCUr�+Ns (Pro sal, S��t�ts) 5 d?YS Tt6e dAon 63Rltlp3 gl QNdaC 3 days Sue D8t6?J(b3 Thu OW041U3 93 ✓? Sdee(ey5evrtteCi4y 45d ays Thu07110M 'NeWIY143 �$ D days Tem 0964dD3 TZ&. OS194143 Q$ 98 UY Fow Ix-sgn F?L-, w 90 days FdOWS03 7hv OVIS ID3 99 ' Revise deson to v y-K4 City CWWraent5 5 days Fri D414N3 This OVZSt03 3tD St�ttgt hddc�9 tarot sea {5 aces. tC1 a¢e. hs&Size ed 0 t�yg BheP OS72�O"� ga 09%ZS/D3 lot City AOWW4toAdve4wfbrBk`s 0days ThuiaV6.? Ts3tt1S0PJ4/D3 -� tD2 kiwi Nsq 36 dAys %U I � Fd 112 -g - - - 9&BQ3 g _�- E 403 Re�odascg 93id t) tas (35 sets. hug-size) s a�ys An W10103 Thu IWISW03 ; - -- - - fotB£ds° D6ay5 TSttt'4016g103 Thaa44f09f43 - 404 Pubish' 545 DiSk$u9® 9b Dnm, (s 10 bWdddfs and advf+R9 W 5 day's Fri f0140ax3 T4sae 4¢ut6f03 Y05 Araww 0a&' -� from bet 22 days Fri i0f17R)3 dote 19117893 947 Pa ..O c3s4 Me - %-da, aeRu red 40 days Fn 40/3410 Th. t f /13!03 408 E�edt Bids — -- -- 0 days 7?w f f/I. 03 s§�Ct E 8183,03 -- - .......... -- - - - > 949 Tabulate w1d enwaas G%BS 5 days Fns 41114M Star 1112W3 T -- t 10 A4 recnc�0aa1 for at+�rd 8 Bay Fri 14129/03 Fn S t7d4gj3 t t 1 Conseruadaa Com"d award 0 days Fd 4 92W3 sd 4 8/28103 T: ASs'�ctAse Rapdd TBR Bask Ro9ted up Prmt7aess TaE>� qq Proja : SM o'l. 68 Date: we90an 4! Press Susn,rzaN RaYt®d QJye h4iias4on ®Q s�'9P .......<.. .... .. S1ecra�e Sueteee ry page Ofith Skeet Noith fmm I 19th East Avenue to Gamen Road E)Q-GW E,2 0 T24 Ka M Maranon Smn 200 Finish Aug Sep Oa Nov Dm ,tea Feb JM -W Aug Sep Od N13V T— Ja$1 Feb & 4 A4V Sep a a2 Pflase 3 • So-vices DurkV comu=ftn 206 days Em I zmm vzn Claim Mon GIV-W E 7 Men 12J1 5103 Mon 12122ID3 �-7 ii;;t 12MM3 Mon =13104 Mm M7104 mat —OW1304 FT- 73 P4%t.W -qwp aa"Vs 5 da)s t day I day Tue 12rJ"Z Mon %F2tI5fO3 Mon 12raM $is Anand Pie-Work mftCinQ Respond to gheldlors knm Cily aid Cm*a= sLzka cmDd for cobac" (I tum) Clays, im IVISW 117 196 days Mon 12JIS03 ITS Pf-pare Record plans (digital and MyLV Cawnicbm wakp4le 11� days TueOVIVU 119 0 days mm Agreement Z SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached hereto and incorporated by reference as part of this AGREEMENT. 3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in Attachment C, RESPONSIBILITIES OF THE CITY, which is attached hereto and incorporated by reference as part of this AGREEMENT. 4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D, COMPENSATION, and further described in Attachment E, FEE/ MANHOUR BREAKDOWN, which are attached hereto and incorporated by reference as part of this AGREEMENT. 5. SCHEDULE. ENGINEER shalt perform the SERVICES described in Attachment B, SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F, SCHEDULE, attached hereto and incorporated by reference as part of this AGREEMENT. OWASSOCON I PACI IOC 7.3. In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect total PROJECT cost and /or execution. These conditions and cost/ execution effects are not the responsibility of ENGINEER. 7.4. Record drawings will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. 7.5. ENGINEER's deliverables, including record drawings, are limited to the sealed and signed hard copies. Computer - generated drawing files furnished by ENGINEER are for CITY or others' convenience. Any conclusions or information derived or obtained from these files will be at user's sole risk. OPINIONS OF COST AND SCHEDULE. OWASSW ONMACI uuc 8. 1. Since ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over contractors', subcontractors', or vendors' methods of determining prices, or over competitive bidding or market conditions, ENGINEER'S cost estimates shall be made on the basis of qualifications and experience as a Professional Engineer. 8.2. Since ENGINEER has no control over the resources provided by others to meet construction contract schedules, ENGINEER'S forecast schedules shall be made on the basis of qualifications and experience as a Professional Engineer. 9. LIABILITY AND INDEMNIFICATION. 92. ENGINEER shall not be liable to CITY for any special, indirect or consequential damages, such as, but not limited to, loss of revenue, or loss of anticipated profits. 10. CONTRACTOR INDEMNIFICATION AND CLAIMS. 10.1° CITY agrees to include in all construction contracts the provisions of Articles 7.1, and 7.2, and provisions providing contractor indemnification of CITY and ENGINEER for contractor's negligence. 10.2. CITY shall require const ruction contractor(s) to name CITY and ENGINEER as additional insureds on the contractors general liability insurance policy. 11. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall comply with applicable regulatory requirements including federal, state, and local laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall procure the pern-dts, certificates, and licenses necessary to allow ENGINEER to perform the SERVICES. ENGINEER shall not be responsible for procuring permits, certificates, and licenses required for any construction unless such responsibilities are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES. 12. INSURANCE. 12.1. During the performance of the SERVICES under this AGREEMENT, ENGINEER shall maintain the following insurance: 12.1.1. General Liability Insurance with bodily injury limits of not less than $1,000,000 for each occurrence and not less than $1,000,000 in the aggregate, and x�•ith property damage limits of not less than $100,000 for each occurrence and not less than $100,000 in the aggregate. (MASWCON 11 �AC HOC 12.1.2. Automobile Liability Insurance with bodily injury limits of not less than $1,000,000 for each person and not less than $1,000,000 for each accident and with property damage limits of not less than $100,000 for each accident, 12.1.3. Worker's Compensation Insurance in accordance with statutory requirements and Employers' Liability Insurance with limits of not less than $100,000 for each occurrence, 12.1.4. Errors and Omissions Insurance to remain in effect during the PROJECT and the term of any legal liability. Errors and Omissions coverage to be for a minimum of $1,000,000, deductibles subject to approval. 12.2. ENGINEER shall furnish CITY certificates of insurance which shall include a provision that such insurance shall not be canceled without at least 30 days written notice to the CITY, 13. OWNERSHIP AND REUSE OF DOCUMENTS. 111. All documents, including original drawings, estimates, specifications, field notes and data shall become and remain the property of the CITY. 13.2. CITY'S reuse of such documents without written verification or adaptation by ENGINEER for the specific purpose intended shall be at CITY'S risk. 14. TERMINATION OF AGREEMENT, 15. NOTICE. 15.1. Any notice, demand, or request required by or made pursuant to this AGREEMENT shall be deemed properly made if personally delivered in writing or deposited in the United States mail, postage prepaid, to the address specified below. To ENGINEER: CH2M HILL, Inc. 502 South Main, Suite 400 Tulsa, Oklahoma 74103 Attention: Kelly Fincannon MA!�!;OCON I PAC I DOC To CITY: CITY OF OWASSO, OKLAHOMA P.O. box 180 Owasso, Oklahoma 74055 Attention: F. Robert Carr, Jr. 15.2. Nothing contained in this Article shall be construed to restrict the transmission of routine corrrrnunications between representatives of ENGINEER and CITY. 19. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the ENGINEER and the CITY over the interpretation or application of the terms of this AGREEMENT, the matter shall be referred to the City's Director of Public Works for resolution. If the Director of Public Works is unable to resolve the dispute, the matter may, in the Director's discretion, be referred to the City Manager for resolution. Regardless of these procedures, neither party shall be precluded from exercising any rights, privileges or opportunities permitted by law to resolve any dispute. 20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to this AGREEMENT, provided that nothing contained in this paragraph shall prevent ENGINEER from employing such independent consultants, associates, and subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the performance of the SERVICES hereunder. 21. APPROVAL. It is understood and agreed that all work performed under this AGREEMENT shall be subject to inspection and approval by the Public Works [)epartment of the City of Owasso, and arty plans or specifications not meeting the OM;GOCON i RACT DOC terms set forth in this AGREEMENT will be replaced or corrected at the sole expense of the ENGINEER. The ENGINEER will meet with the City staff Initially and monthly thereafter and will be available for public meetings and /or City of Owasso presentations. 22. ICEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has designated. Kelly S. Fincannon, P.E., as Project Manager for the PROJECT. ENGINEER agrees that no change will be made in the assignrrrent of this position without prior approval of CITY. IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies on the respective dates herein below reflected to be effective on the date executed by the Mayor of the City of Owasso. - City Cleric City Attorney owASSUCr>N I RAC I .DOC. CH2M HILL Inc< Murry L. Fleming, Vice President !im CITY OF ®MASS® OKLAHOMA Mayor Date SCOPE QF.VR.QLE,�Tw The PROJECT shall consist of the project described as: ATTACK ACH A-SCOPE OF DOC A-1 The Basic Services of ENGINEER include, but are not necessarily limited to, the following tasks: -2 Intersection - East 96th Street North and North 129th East Avenue (US Highway 169 Interchange) Improvements Widening ® North 129th East Avenue (East 76th Street North to East 96th Street North) CH2M HILL proposes to furnish the CITY OF OWASSO the following professional engineering services for the proposed intersection, interchange, signalization and street widening improvements project: M A.1. Attend initial design workshop with CITY to review general requirements, establish critical design parameters, and discuss scheduling for the project. The initial design workshop will include ODOT for input and requirements for the US-169 Interchange portion of the project. A.2. Collect and review available documents pertaining to the project and site, including but not limited to record drawings, utility plans, accident records and other pertinent documents provided by the CITY. A.3. Existing right-of-way and abutting ownerships will be researched and information provided on the drawings. Per square foot costs for right-of-way purchases will be researched. Al 1A(',1i-0-S(',0J1t: OV SFINVICES,C)OC B-1 A.4. Design and topographic surveys will be performed to establish design/ construction horizontal and vertical control points. Surveys will also include ground and aerial surveys to reflect planimetrics, utilities, drainage structures, and right-of-way. The horizontal and vertical control will be set in a manner to allow the contractor to use these same points during construction. Mapping of the interchange areas will not be completed until after an interchange alternative is recorrunnended and approved. High level mapping available from the Corps of Engineers will be utilized for interchange alternative analysis to reduce unnecessary mapping outside the project limits and allow a sooner start date. A.5. provide and coordinate geotechnical investigations, including soil and pavement borings. The results will be presented in a report consisting of subsurface exploration, laboratory testing data, and pavement design recommendations. A.8. Review accident history. Accident records will be furnished by CITY. B. Predesign 13.1. Develop conceptual alternative layouts of the US -169 interchange improvements necessary to meet projected traffic demands. The conceptual layouts will be single -line drawings overlaying the existing interchange. B.2. A US --169 interchange alternative analysis report will be prepared and presented to the CITY and ODOT with a recommended alternative. With approval from the CITY and ODOT, the agreed upon alternative will be used for design. It is anticipated that ODOT will require modifications to the alternative analysis report and one additional meeting to discuss the final agreed upon alternative will be conducted. It should be noted that the fees and ratan -hour estimate to complete the design of the US -169 interchange improvements should be negotiated after this report is developed and recommendations have been agreed upon by CITY, ODOT, and ENGINEER. The improvements could range from widening existing streets, adding a IIn/AIi At' 1its -scui> OFSERVIcESDOC B -2 coordinated signal bocompletely new interchange design and therefore it is not practical toaccurately scope this portion o/the project and determine fees at this time. However for the purpose of this proposal it will be assumed that only o signal and minor street modifications oug6db Street will be required. D.5. Develop conceptual layout of ultimate 129tbStreet widening improvements necessary to meet projected ba{ficdeozands.Iheconceptna will bea o�xrk*-B�edrawing overlaying t�ee�io6onmtrm�tan�depict Uzeuoozbernf " -aand limits of construction. Current CITY codes, regulations and design criteria and standards will be used for design. C. Preliminary Design C.I. Additional aerial and ground surveys n{the approved US-169 interchange design area will be determined and performed aanecessary. [.2. Modifications to the recommended layouts resulting from the Prodemign Meetings and alternative analysis will be incorporated into the prelin-dnary design drawings for plao-in-baud review. The preliminary design will • Typical Pavement Sections Sheet '^ • Intersection and Interchange Geometry • Horizontal and Vertical Alignments • Grading Plan w Drainage Plan * Traffic Signal Plan w Wiring Diagrams * Phasing Diagrams/Timing Schedule v Preliminary Signing and Pavement Marking Plan Imm//wouor/Twmxvnc0000 o3 • Utility Plan • Right-of-way Plan • Construction Sequence/ Traffic Control Plan • Preliminary Pay Quantities and Pay Item Notes Sheet C.3. Preliminary design of signals including layout, phasing sequence, timing schedules, OPTICOM priority control system, which provides right-of-way pre-emption for emergency vehicles, signing and striping. CA, Preliminary design storm sewer/ drainage system within the project limits. The adequacy of existing drainage systems upstream and downstream of this project will not be evaluated. C.9. A construction packaging report will be developed with input from CITY to break project into logical phases in accordance with anticipated funding constraints. C.10. Prepare a detailed cost opinion for each construction package including construction, utilities, and right-of-way. C.11. Meet with CITY staff as requested. C.12. Conduct an internal Quality Assessment/ Quality Control (QA/QC) review. Following this review and any resulting modifications, the preliminary plans will be submitted to the CITY for review along with a preliminary cost opinion. C.13. Representatives of the project team including the project manager will be present during the preliminary review meeting and field review with the CITY. ENGINEER will prepare minutes of the meeting and disseminate to all attendees. Phase 2 ® Final Design D. Public Meeting D.1. At the CITY's request, CH2M HILL will conduct (or assist, at the CITY's option) a public meeting to present an overview of the projects and answer questions. Displays of the projects will be prepared for the presentation that show the major aspects of the projects. A summary of the meeting will be transcribed and provided to the CITY. It It /A f I ACII-B-SCOPE OF qHV1(',E,9J)OC B-4 E. final Design E.1. Due to time passed between preliminary phase and final phase of the design, a final design workshop with CITY to review general requirements, critical design parameters, and scheduling for the project will be conducted. The final design workshop will include ODOT for input and requirements for the US -169 Interchange portion of the project E2. Conduct additional field investigations, including field surveys, as required to complete final Design. E.. Following the preliminary review and the final design workshop, Final Design will be prepared. Modifications and comments from the preliminary review will be incorporated into the final design and final construction plans. The following drawings will be developed, as a minimum. • 6 M ODOT standard construction details as required will be referenced on the Title Sheet. EA. Prepare detailed traffic control plans for each phase of construction for each project. Access to businesses and residences will be maintained at all times. E.5. Legal descriptions of any right- of-way needs for the project will be prepared and submitted to the CITY. Proposed permanent and temporary rights -of- way ,will be shown on the plans. Legal descriptions and parcel reaps of proposed rights-of-way will be prepared and provided to the CITY for acquisition. Copies of the deeds for such properties will also be provided. E.6. Prepare a utility plan identifying utilities that have a potential for conflict with construction of the proposed improvements. E.7. Assist CITY in coordinating the relocation of those utilities in conflict with the proposed construction. ENGINEER will provide utility plans to utility I I II /A I ACI b H& OH 01 S I:VWIF S POC Q -5 companies and conduct a meeting of affected utility providers to receive input in regard to the relocation of facilities and projected schedule. E.8. ODOT specifications will be referenced for use on this project. Technical specifications for items of work and materials not covered by ODOT will be prepared. E.9. Prepare contract documents for bidding purposes that include bidding requirements, contract forms, contract conditions and special provisions, technical specifications and drawings. (CITY's option) E.10. Prepare an updated cost opinion, E.11. Meet with CITY staff as requested. E.12. An internal QA/QC review will be conducted by a senior engineer of ENGINEER. Following this review and any resulting modifications, the construction plans and contract documents will be submitted to the CITY for review. F. Final Revision F.1. Following receipt of final review comments, final revisions to the construction plans and technical specifications will be made as appropriate. F.2. Prepare an updated cost opinion. Phase 3 - Construction Administration G.2. Answer questions from prospective bidders and suppliers and issue clarifications and interpretations by addenda to plan holders. G.3. Conduct the pre-bid conference with CITY staff and prospective bidders to present project requirements and answer project related questions. GA. Attend the bid opening and prepare a tabulation of the bid proposals received. Analyze the bids and low apparent bidder and provide a recommendation to the CITY for awarding contracts for construction. G.5. Assist the CITY in preparing final construct-Ion contracts. H. Construction H.I. Furnish sufficient number of sets of drawings and specifications to the CITY and contractor. I U1 /A I I ACI 11.1 SCOPI OF S1 RVIKISDOC B-6 H.6. Upon request by the contractor and after confirmation by CITY staff that the project is complete, the ENGINEER will conduct a final inspection with CITY staff and the contractor to examine all construction and prepare a punch list of items to be corrected or completed. Provide copies of the punch list to the contractor and CITY. H- 7. ENGINEER will furnish the CITY one set of "Record" drawings on mylar reproducible media and the electronic files on CD-ROM in AutoCAD Release 13 format. "Record" drawings shall reflect all changes in the plans as directed through change orders, and other changes recorded by the CITY resident project representative and the contractor. I Ul /A( I A01-11-SCOPEOF St RVICI SDOC B-7 RESPONSIBILITIES OF THE CITY, The CITY agrees: A. ARqp9ojrjtss Records, etc. To furnish, as required by the work, and not at expense to the ENGINEER: AJ. Records, reports, studies, plans, drawings, and other data available in the files of the CITY that may be useful in the work involved under this AGREEMENT. A.3. ENGINEER will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by CITY. B. Access. To provide access to public and private property when required in performance of ENGINEER's services. C. Staff Assistance. Designate in writing a person to act as its representative in respect to the work to be performed under this AGREEMENT, and such person shall have complete authority to transmit instructions, receive information, interpret and define CITY'S policies and decisions with respect to materials, equipment, elements and systems pertinent to the services covered by this AGREEMENT. C.1. Furnish staff assistance in locating, both horizontally and vertically, existing CITY owned utilities and in expediting their relocation as described in Attachment B. Further, CITY will furnish assistance as required in obtaining locations of other utilities, including "potholing". C.2. Furnish legal assistance as required in the preparation of bidding, construction and other supporting documents. D. Review. Examine all studies, reports, sketches, estimates, specifications, drawings, proposals and other documents presented by ENGINEER and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of ENGINEER. E. Construction Administration Phase. Review and take appropriate action on contractor shop drawings and material submittals, and review of contractor P11y estimates. AI I ACI i C RESPONSIBILITIES OF (',I I Y.1)0(,' C-1 The CITY agrees to pay, as compensation for services set forth in Attachment B, a total lump sum fee of Two Hundred Seventy-four Thousand Nine Hundred Eighty-six Dollars ($274,986) for the services described in Attachment B. ENGINEER shall submit monthly invoices based upon the proportion of the total services actually completed at the time of billing. Invoices are due and payable within 30-calendar days of receipt by the CITY. A breakdown of the lump sum amount to be billed for each of the projects is shown as follows: Capital Improvement Projects (FY 02-03) City of Owasso, Oklahoma E. 96th St. N. & N. 129th E. Ave. Intersection and N. 129th E. Ave. Widening (76th to 96th) [115M. 11 :11 . . . 1 11 " _-MV MM Al I A0 11) COMIT-NSAI IONAVC D-1 ATTACH-E-FEE MANHOUR.)ds E-I ATTACHMENT E Man-Hour Breakdown East 96th Street North and North 129th East Avenue intersection (US 169 interchange) North 129th East Avenue Widening (East 76th Street North to East 96th Street North) I Estimated Hours Total Ctassificalion of Employee _-7—project Manager Lead Engineer Staff Engineerill Staff Engineer 9 Traffic Engineer.. Senior Designer Sr. Eng. Technician Engineering Technician Adminl clericai Total Direct Salary lost IDirect Saktry Cost 46.90 42.00 28.20 20.45: 47.50 30.35 26.30 16.40 Phase I - Prefirninag Design _18.70 Iffivestigation IM. Design Worksh 8 8 2 2 2 2 2 2 4 32 SI.120 JA,2. Collect and review data 1 2 4 a 6 4 25 S585 A 3, ROW research 1 2 4 a 2 17 5395 !A 4, Coordinate Surveys / In ut data 2 2 8 2 2 2 is S543 A,5. Coordinate Geotechnical investigation 2 1 2 2 7 S206 JA 6. Evaluate traffic counts and turning movements 1 2 4 16 2 25 S653 A.7. Coordinate "potholing' of utilities 2 1 0 8 2 2 15 S370 A.S. Review accident history lPredesign 1 2 2 2 7 5259 Subtotal - Investigation is 20 6, 22 a 10 4 38 20 146 54,131 B.1. US-169 AftemaWes 2 4 4 is 2 20 2 74 S2.429 B.2. US-169 Alternatives Report and 2 Meetings 12 12 .24 4 24 0 2 20 4 78 52,781 .6.3. 96tt1I29th Intersection Conceptual Layout 2 6 8 16 4 12 2 20 70 $1,879 B.4- Traffic Projections 1 4 2 7 S270 B.5. 129th Widening Conceptual Layout 4 12 8 16 40 8 16 10.4 SZ968 8.6. Conceptual Cost Opinion 2 6 is 16 2 42 51.005 B.7. Predesign Report 8 16 a 4 4 4 2 12 4 62 52,009 6.8. Predpsign Presentation Meeting 8 6 2 2 18 S697 Subtotal - Predesign 39 62 24 60 60 72 16 106 16 455 S14,038 Preliminary Design C.1. Coordinate Addtional Survey 2 4 2 2 10 $332 C.2. Develop Preliminary Base Plans 4 16 32 60 4 I 24 40 100 4 284 56,895 C.3. Preliminary Signal Design 2 8 20 20 3 10 8 6 2 79 $2.204 CA Prefirrinary Drainage Desi2n 2 6 32 40 10 16 4 110 $2.735 C-5. Prefirrinary Street Design 4 16 4 10 80 20 6 140 54,243 C.& Prefirrinary ROW Plans 2 4 4 24 10 16 2 62 $1,501 C.7. Prefirronary Mirty Plans 2 4 4 24 10 16 60 $1.468 C.B. Preliminary Const. Phasing and Traffic Control Plans 2 16 2 4 16 2 42 $1,397 C.9. Construction Packaging Report 4 8 4 4 4 24 $746 C.10. Prefirrinary Cost Opinion 2 4 2 8 3 26 5664 C.11. Pr ress Meetings (6) 12 6 6 6 3 6 6 6 _2 6 57 $1,800 C.12. PrelirrinaryQA/QC Review 20 4 2 2 2 2 4 2 2 40 $1,534 C.13. Plan-in-Hand Review Meetin2 8 8 2 2 20 $781 Subtotal - Preliminary Design 66 104 108 12 156 94 194 32 954 $26,301 Subtotal - Phase I - P—rLqiminary Design 123 186 138 280 80 238 114 328 68 1555 544 .469 ATTACH-E-FEE MANHOUR.)ds E-I AT TACH-E-FEE MANHOUR.As E-2 ATTACHMENT E Man-Hour Breakdown East 96th Street North and North 129th East Avenue intersection (US 169 interchange) North 129th East Avenue Widening (East 76th Street North to East 96th Street North) Estimated Hours Total Classification of Employee J Project Manage staff Engineer 11 if EnSqtaff r I Inee a c E.Tnqlffeeir Senior I Designe r Sr. Eng. n Technician I I Engineering Technician Admlnf Clericai Total Direct Salary Direct Salary Cost 46.90 42.00 28.20 20.45 47.50 30.35 26.30 1 18.70 15.40 Cost Phase 2 -Final Design (US-169, only Signal and Minor Street I provement Public Meeting DA. Public Meeting (1) 4 2 4 4 14 S412 lFinal Design JEA. Final Design Workshop 6 6 2 2 2 2 2 2 2 26 5909 1E.2. Coordinate Final Reid Investigations 2 2 2 6 S164 E,3. Develop Final Drawings 10 12 16 20 2 40 60 120 2 282 S6,997 E 4. Traffic Contrd Plans 2 8 2 2 4 18 8 2 46 S1,304 �E.5. Final ROW Plans 2 4 6 2 1 2 24 4 45 6 $1,069 �E.6, Final Utility Plans 2 4 2 16 1 2 16 43 $1,028 JE.7. Llti[O Relocation Meeting 6 6 4 2 18 S641 E.8. Technical SDecifications 2 a 2 4 16 $552 E.9. Contract Documents 2 a 4 4 IS S608 E.10. Update Cos4 Opinion 2 4 - 4 2 12 5369 E.11. Progress Meetings (4) 8 4 4 4 4 - 4 4 4 36 $1.105 E.12. Final QA/QC Review 16 3 4 4 4 4 4 4 2 50 S1.805 Final Revision F.1 Final Revisions 4 2 1 2 6 s 2 17 5486 F2 Final Cost U to 1 2 1 2 6 $200 ubtotal - Final Deslan Phase 69 78 44 :54 8 Be 92 198 36 635 $17 649 JPhase 3 - Construction Administration (11 Project, 12 Month Construction) Biddimq G.I Disburse Plans to Bidders IG.2. Bidder Questions, Clarifications, Addenda - �G-3. Pre-Bid Conference 1 5 4 2 a 2 4 4 4 4 i 4 4 11 21 14 S271 $711 S41]2 A G Bid Opening and Recommendation 6 2 4 12 G.6. Assist City with Contracts 2 4 4 IG _S431 $327 Construction H.1. Disburse Plans and Secifications to Contractor 2 4 4 2 12 $314 H-2. Conduct Pre - Constriction Conference 8 4 2 4 2 20 $692 H.3. Coordinate Construction Surve y Controls 4 1 1 6 $203 HA Material Subrninal Review 3 4 8 1 1 12 29 S770 H.5. RFI's/Change Orders/Pedodic Site Visils (3) 6 12 40 6 4 9 76 $2,242 H.6. Final Inspection 8 4 2 k 2 16 5613 H.7- Record Drawings 2 2 2 4 8 24 2 44 $1,008 Subtotal Services During BiddinglConstruction 47 48 54 13: p 0 8 52 49 171 $7,995 TOTAL-LABOR 239 3S2 236 347 88 -- ----- 294 214 -I-- 578 153 2461 AT TACH-E-FEE MANHOUR.As E-2 Aerial Survey, Ground Survey, and Geotechnicai) Universal Field Services -ROW Costs) ATTACH-E-FEE MANHOUR.As E-3 ATTACHMENT E Man-Hour Breakdown East 96th Street North and North 129th East Avenue Intersection (US 169 Interchange) North 129th East Avenue Widening (East 76th Street North to East 96th Street North) I Estimated Hours Total classification of Employee Project Manager Lead E En sneer S Senior Staff Traffic En E staff r Designer gineer III nginee Engineer Sr. Eng. � Technician ET: Engineering Technician Total Direct Salary Direct Salary Cost 46.90 42.00 28.20 20.45 47.50 30.35 26.30 18.70 16.40 Cost Direct Project Expenses -Reproduction 53.600 Cornputer/CorrymnicationsfService Center $13,659 Travel (Varbus Trips to City/FieldtODOT) S750 ADS - Aerial Survey w/o interchan2e 523,000 Sack & Assoc. - Ground Survey w/o interchange $10,000 Terracon - Geotechnical w/o interchange $6,300 pUniversal Feild Services - ROW Cost �Total Direct Project Expenses 559 809 ubtotal All Moses 1. Direct Salary Cost $70,113 2- Overhead 1.79 3. Profit 10% $19,562 4. Direct Expenses 559 809 Total Contract Amount $274,986 Aerial Survey, Ground Survey, and Geotechnicai) Universal Field Services -ROW Costs) ATTACH-E-FEE MANHOUR.As E-3 I m1f, SCHEDULE. `Ihe schedule for the preliminary design, final design, and construction administration phases of the East 96th Street North and North 179th East Avenue Intersection (U.S. 169 Interchange) and :North 179th East Avenue Widening project are provided as follows: ® The proposed schedule assumes the project will be coordinated as a single projects ATTACH -F- SCHEDULE. DOG F -1 SCHEDULE. The schedule for the preliminary design, final design, and construction administration phases of the East 96th Street North and North 129th East avenue Intersection (U.S. 169 Interchange) and North 129th East Avenue Widening project are provided as follows: 0 The proposed schedule assumes the project will he coordinated as a single project. A I I ACI I I -SCI 11 UUI EDOC F �ld(3TICE;TO PROCEED r ± Notwce to Proceed SE I PRELIMINARY DESIGN 4 +Pre4mmary Investigation z +;Predesign _ ,+ Preliminary Design r BOND ISSUE +Bond I ELECTION "slue Electron PHASE 2 - FINAL DESIGN t `6 PHASE 4, 'CONSTRUCTION ADMINISTRATION: a Start Date 05AUG02 w — Early Bar umo Sheet 1 of 1 Finish Date f 0 Progress Bar CITY OF OWASSO a Date 05AUG02 Run Date 0 96th/129th n cf, " i Street Widening SummM Schedule @--P(imavera Systems, Inc. Activity Activity ®rig �MAR93 APR May ID Description Dur _Jl._�+U�_1_. -_ .I J- _ -1 _- 1- _J - -..I- _.I -J_J -. _1- 1_ -L_J 10 Awrard of Contract 0 4 Award of Contract 20 a ! Design Workshop Design Workshop 0 30 Collect Data 3 Collect Data 40 R.O.W. Research 2 11MR.O.W. Research - -- 50 - -- Survey 6 MEEMEMSurvoy 60 Geotechnical 6 Geotechnical - - 70 Traffic Data -- - - — - - - -2 Traffic Data -- 80 Utility Potholing 3 Utility Potholing 90 Review Accident History - 2 Review Accident History 100 Conceptual Layouts for U.S. 169 3 REMConcebtual Layouts for U.S. 960 110 Interchange Analysis Report 2 111111111111111interchange Analysis Report 120 Intersection Layouts 2 Intersection Layouts 130 Traffic Projections 1 Traffic Projections 140 Street Widening Layouts 3 111AMMStreet Widening Layouts 150 _ Conceptual Cost Estimates 1 Conce teal Cos - _ p t Estimates 160 Predesign Report 3 MEMPrGdosign Repoa 170 Predesign Meeting 0 Predesign Meeting, 180 City Review 4 NEEMCity Review 200 Survey Interchange 2 1111111111113urvey Interchange 210 Develop Base Plans 12 MONEEMEMEMEMEMDevelop Base Plans 220 Signal Design 3 Signal Design 230 Drainage Design 5 Drainage Design 240 Street Design 12 MMMMMM=Street Design 250 R.O.W. Plans 3 R.O.W. Plans 260 Utility Plans 3 Utility Plans 270 Construction Phasing/Traffic 2 Construction Phasingrrraffic Control Control 280 Construction Packaging Report 2 Construction Packaging Report 290 Cost Estimate 2 1111111111111INCost Estimate 310 QA/QC Review & Fix -up 4 OAIQC Review & Fix-upMOMEM 320 Preliminary Review Meeting 0 Preliminary Review Meeting (Plan -in -Hand) (Plan -in -Hand) 330 City Review 4 City ReviewMEOMM Start Date 05AUG02 Early Bar OWAS Sheet 1 of 1 Finish Data Data Date 91MAY03 05AUG02 Progress Bar CITY OF OWASSO Run Date 05AUG02 14:56 Critical Activity 96th/129th Intersection 129th Street Widening Preliminary Design Schedule Cc) Primavera Systems, Inc. Activity Activity 0 Description 395 Bond Issue Election 01 TBond Issue Election 400 Design Workshop C 410 Public Meeting C 420 Incorporate Preliminary Design Comments 1 4 430 -7 Final Field Investigations j 4 440 Develop Final Drawings 10 445 Side Street & Driveway Details 3 450 Traffic Control Plans 2 460 Utility Plans 2 470 Utility Meeting i 0 480 !Technical Specifications 3 490 j Contract Documents 2 500 ',Update Cost Estimate I 520 QA/QC Review & Fix-up 2 530 'Release Plans for Util. Reloc. &I R.O.W. Purchase 0 600 City Review 4 610 Review Meeting 0 620 Final QA/QC & Fix-up 4 630 Final Cost Estimate 2 Start Date 29SEP03 Finish Date 02MAY04 11111MIJIMMEENE= Early Bar Data Date 29SEP03 MENESEEMEM Progress Bar Run Date 05AUG02 15:03 Critical Activity @ Primavera Systems, Inc. CITY OF OWASSO Sheet 1 of I I Atkins-Benham Agreement City of Owasso, Oklahoma 5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment E, SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F, SCHEDULE, attached hereto and incorporated by reference as part of this AGREEMENT. 6. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES undertaken in a manner consistent with the prevailing accepted standard for similar services with respect to projects of comparable function and complexity and with the applicable laws and regulations published and in effect at the time of performance of the SERVICES. The PROJECT shall be designed and engineered in a good and workmanlike manner and in strict accordance with this AGREEMENT. All engineering work shall be performed by or under the supervision of Professional AGRHMGNr 7, LIMITATION OF RESPONSIBILITY. 7.4. Record drawings will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. ENGINEER is not responsible for any errors or omissions in the information from others that are incorporated into the record drawings. 7.5. ENGINEER's deliverables, including record drawings, are limited to the sealed and signed hard copies. Computer-generated drawing files furnished by ENGINEER are for CITY or others' convenience. Any conclusions or information derived or obtained from these files will be at user's sole risk. 8. OPINIONS OF COST AND SCHEDULE. 8.1. Since ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over contractors', subcontractors', or vendors' methods of determining prices, or over competitive bidding or market conditions, ENGINEER'S cost estimates shall be made on the basis of qualifications and experience as a Professional Engineer. 8.2. Since ENGINEER has no control over the resources provided by others to meet construction contract schedules, ENGINEER'S forecast schedules shall ACRI FMFNT AGRI I MI NI 12.1.4. Errors and Omissions Insurance to remain in effect during the PROJECT and the term of any legal liability. Errors and Omissions coverage to be for a minimum of $1,000,000, deductibles subject to approval. 12.2. ENGINEER shall furnish CITY certificates of insurance, which shall include a provision that such insurance shall not be canceled without at least 30 days written notice to the CITY. 11 OWNERSHIP AND REUSE OF DOCUMENTS. 13.1. All documents, including original drawings, estimates, specifications, field notes and data shall become and remain the property of the CITY, 13.2. CITY'S reuse of such documents without written verification or adaptation by ENGINEER for the specific purpose intended shall be at CITY'S risk. 14. TERMINATION OF AGREEMENT. 15. NOTICE. Any notice, demand, or request required by or made pursuant to this AGREEMENT shall be deemed properly made if personally delivered in writing or deposited in the United States mail, postage prepaid, to the address specified below. To ENGINEER: Atkins Benham, Inc. 2488 East 81st Street, Suite 6000 Tulsa, Oklahoma 74137 Attention: Mr. David A. Dollar To CITY: CITY OF OWASSO, OKLAHOMA P.O. Box 180 Owasso, Oklahoma 74055 Attention: F. Robert Carr, Jr. 15.1. Nothing contained in this Article shall be construed to restrict the transmission of routine communications between representatives of ENGINEER and CITY. AGRI IM N I 20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to this AGREEMENT, provided that contained in this paragraph shall prevent ENGINEER from employing such independent consultants, associates, and subcontractors as ENGINEER may deem appropriate to assist ENGINEER bzthe performance of the SERVICES hereunder. 21. APPROVAL. It is understood and agreed that all work performed under this AGREEMENT shall be subject to inspection and approval bn the Public Works Department of the City of Owasso, and any plans or specifications not meeting the terms set forth in this AGREEMENT will be replaced or corrected at the sole expense of the ENGINEER. The ENGINEER will meet with the City staff initially and monthly thereafter and will be available for public meetings and/or City of Owasso presentations. 22. KEY PERSONNEL. lo performance of the SERVICES hereunder, ENGINEER has designated David A. Dollar, I`.E.an Project Manager for the PROJECT. ENGINEER agrees that no change will be made in the assignment of this position without prior approval o[CITY. AGRI /»m w/ IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies on the respective dates herein below reflected to be effective on the date executed by the Mayor of the City of Owasso. City Clerk APPROVED AS TO FORM: AGRITIVIEW Atkins Benham,_ Inc. Ron Coker, Jr. Managing Director Bate--- CITY OF CH AS OKLAHOMA I= Date Water System Components Design City of Owasso, Oklahoma i 3 i 1 j A. Scope of project. The Water System Components Design project (herein after refered to as "PROJECT") T ") shall Consist of the design of a grater booster pump station., approximately 16,000 linear feet of transmission main and a two (2) mi.11ion gallon grater storage tank. The PROJECT shall be divided into two (2) primary phases as generally described below and further defined in ATTACHMENT B of this AGREEMENT: ATTACHMENT Water eSystem '. City of Owasso, Scope of Services Attachment B.1 Basic Services. The Basic Services of the ENGINEER include the following: B.2 Phase 1- Design Report. Prepare a Design Report consisting of a conceptual study of design alternatives for the construction of a water booster pump station, transmission main and two (2) million gallon water storage tank, The basis for the Design Report shall be the CITY`s Water Master Plan Report dated December 2000. The Design Report shall also include the development of estimates of probable construction costs, construction duration and recommendations indicating the most favorable design alternatives. The Design Report shall be submitted for CITY for review and comment within 75 days of the date specified in the written Notice-to-Proceed. The specific tasks necessary to complete the Design Report includes B.2.1 Transmission Main Alignment .Analysis: It is likely that this PROJECT will be sensitive to transmission main routing. To optimize in this area the ENGINEER will consider three (3) alternative routes. Existing right -of- ways /easements, probable land values, environmental aspects, geological conditions and other topographical features will be studied for each alternative. The ENGINEER will provide estimates of probable construction cost and duration for each route. Recommendations will be made for the most favorable route. B.2.2 Hydraulic Analysis / Booster Pump Station: The design layout and hydraulic characteristics of the booster pump station will be studied. Specific tasks include; ATTACHMENT B D.2.2.1 Tulsa Water Main Connection Details: The ENGINEER will review the CITY'mwater purchase agreement with the City of Tulsa and assess the connection details and water quantity requirements for this connection with the City Vf Tulsa's engineering otaff. The goal of this task will be to formalize the design requirements for this connection and identify any special conditions the CITY must operate under. I}.Z2.5 Surge Conditions : The ENGINEER will perform a review mf potential water hammer d.c., surge) conditions for the pumping and conveyance system. The analysis will include identifying the surge conditions that will prevail iu the proposed system- and the design requirements for proper surge control features. B.2.2.4 Pine Alternatives: The ENGINEER will review the latest technology bo pipe materiaImand to identify any opportunities toincrease water transfer efficiency and/or lower initial capital construction and operations cost. B.2.3 Water Tower: The ENGINEER will review, and where appropriate develop design criteria for the proposed two (2) million gallon water tower. Options for tank materials and configurations will be reviewed. The ENGINEER will also assess the design requirements for site grading/ drainage and utilities; structural foundations; electrical; instrumentation and controls; and architectural features. D.2'4Design Report: The Design Report will be prepared summarizing all the activities performed during the Phase l portion of the PROJECT. The results ofeach sub-task will be documented and included in the report along with all field-generated information. D�'�I Ibe[) � aozroozariretbe conclusions from . . Design Report z/zxuo�8�� r�couu/uuu^uuv/u^ this task and will include the following sections: D Executive Summary ca Project Overview [] Connection Requirement aodI}etails ' D Geological Investigation o Development of Alternative Design Concepts O Hydraulic Review and System Design Considerations o Surge Review and Analysis O Economic Evaluation of Alternative Design Concepts o Estimate of Probable Construction Cost o Project Construction Schedule u Conclusions Lind Recommendations u Appendix: Vendor Quotes; Field Notes and Photographs B.2.4.2 The ENGINEER shall submit five (5) copies of the "Draft" Design Report to the CITY for review and comment. CITY comments will be incorporated into the "Final" version of the Design Report and five (5) copies will be submitted to the CITY. The findings, conclusions and recommendations from the development of the Design Report will be presented to the City Council for final approval, B.3.4.1 Construction specifications will be developed for use in bidding. A final estimate of probable construction cost for each bid package will be prepared. An anticipated construction schedule will be prepared with a detailed cash flow projection for the CITY's use in planning the financing for the Project. All the documents prepared in the final design phase of the Project will be provided to the CITY in both electronic and hard copy format. AI I ACHM[Nrn B.3.5 Permits: The ENGINEER will prepare documents for governmental approvals and permits. It is anticiYs_ ed that approvals will be required from the Oklahoma Department of Environmental Quality (DEQ), South Kansas and Oklahoma Railroad, Tulsa County and the Corp of Engineers, B.3.6 Bidding Services: The ENGINEER will assist the City in obtaining and evaluating bids from prospective bidders to perform the construction on the three (3) construction contracts. Specific tasks include: B.3.6.7 Assemble Final Contract Documents: The ENGINEER shall assemble the final contract documents for each construction contract. B.3.7 Construction Adminstration Services: The ENGINEER shall provide construction adn-Linstration services. The estimated manhours for these services have been documented in ATTACHMENT E to this contract. Specific tasks include: B.3.7.1 Change Order Reviews: The ENGINEER shall assist the CITY in reviewing change orders. The CITY will provide for all the required documentation to facilitate the change order processing. The ENGINEER will provide comments and recommendations on each change order. B.3.7.2 Site Visits: The ENGINEER shall visit the construction site twice monthly during the construction phase. It is anticipated that all three (3) projects will be under construction simultaneously and each site trip will include a visit to each project. A maximum of 12 site visits have been anticipated for this contract. At I ACHMI-W B B.3.7.3 Shop Drawing Review/ Approval, The ENGINEER shall review and comment shop drawing submittals for each construction contract. The shop drawings shall be approved and/or rejected and returned to the CITY for final distribution. I B0307.5 Record Drawings: The ENGINEER shall prepare record drawings for each construction contract. '1he record drawings shall be based on plan markups provided by the CITY. One (1) set of record drawings shall be provided to the CIT'Y. Al TACI MW 13 ............ Water System Components Design City of Owasso, Oklahoma City's Responsibilities Attachment C C. QVLResp _q nsibijities. The CITY agrees: — — C-1 (departs, -Recor(f s etq. To furnish, as required by the work, and not at the expense to the ENGINEER: A F I ACHMENT C a!lAE,+«B ATTACHMENT E CITY OF OWASSO, OKLAHOMA (1) Basic Services - refer to page 2 for detailed breakdown. (2) Design Report - refer to page 3 for detailed breakdown. (3) Final Design/Bidding Services - refer to page 4 for detailed breakdown. 8/15/2002 7:33 AM Page 1 ATTACHMENT E BASIC SERVICES 8/15/2002 7:29 AM Page 2 DISCIPLINEIPROJECTED MANHOURS PHASE AND TASK PROJECT SENIOR ENGR S B MANAGER ENGINEER ENGINEER TECHNICIAN CLERICAL CONSULTANT SUBTOTAL HRS 110.00 HRS 95.00 HRS 75.00 HRS 55.00 HRS 1 35.004 EXPENSE HRS T s BASIC SERVICES Project Kickoff Meeting 4 12 -40" 8 $(300 4 $14f= 28 $2,320 Progress Meetings with City (Anticipate 8 meetings @ 2 hours each) 32 24 14080" 24 ,80p 41- $0 1 8 $280 88 $7 880 Pubilc Meetings (Anticipate 2 pubic meetings @ 2 hours each) 8`$880 8,$760 8 $600 , 8 $440 $0 32 $2,680 Data Collection/Review/Site Visits 4 48 1 $4,56. ` 12 TOTALS => 212, $I 8/15/2002 7:29 AM Page 2 PHASE AND TASK DISCIPLINEIPROJECTED MANHOURS PROJECT MANAGER SENIOR ENGINEER ENGINEER ENGR SUE TOTALS TECHNICIAN CLERICAL CONSULTANT HRS 540.00 HRS 95.00 FIRS 75.00 FIRS 55.00 HRS 35.00 HRS PHASE 1: DESIGN REPORT Transmission Main Alignment Analysis Mapping $o,'::" 16 $8'813 �- $t€ _ i6 $880 Develop Typical Sections/Details 8 $,890,`; 12 $660;x: $0 ! 20 $3.2 Select Alternative Alignments 2,$190 Alignment Analysis and Selection 2 $190 r 40 $3;000 , 40 $2 200 ` $0':' Property Values for Three (3) Corridors 2 $226'- $0 °- $o $o.; -' < $0 $6,000 2 $6220 Environmental Assessment 2 $220 -< 32 $3,040. 40 $3;000'< $o i' _ 4 $140:' 78 $6,400 CosU Construction Duration Estimates $760 16 $1,200 ; 8 $440 so 32_. $2,400 Hydraulic Analysis /Booster Pump Station Connection Details @Tulsa $0;:�' 4 $380" 8 $600 =, 16 $880. $0 ;' 28 $1,860 Pump Station Location/Water Main Sizing 4 24 $1800 16 $880 ,; °.$o' X44: $3,060 Off Peak Pumping/Water Tower Capacity so, 4 :$3'80',`; 12 $$o0 z $0' 16. r= x $1;280 Surge Conditions Analysis /Design $0,;; ,' 4 $380�,a 24 $1;808 28_" $2,180 Booster Pump Station Mech /Arch. Layout $0 "" 8 x$76, .` 16 $11206 24 $1-,320 $o 48 $3,280 Pipe Materials /Design Alternatives $0 '! 4. $380 .> 8 $600 _ $0 s $0- 12 $980 Water Tower Tank Materials Review $p . ;= 2 ,$190 ° - 20 $1 500;; $03 .: $o =- 22 $1,690 Tank Configuration Review $0 2 ;$190 16 $d;0o, 8 �$44D $0 26 $4,830 Civil/Structural Site Planning Review $0 „� 4 $380 16 $1;2oQ. 16 $686;:: $o - -` x.36 $2,460' EledricaUl &C Review 2e $1SO(3 4 $22ti "! $0 36 $2,780 Architectural Review $o. "_z 2 $190 g 16 0 26 $1,670 Design Report Write Report 4 , $440e= 24 z:$428t)> 48 "- $3;600:; 24 $1,320 52 $420 :< 442 x$8,060' Submit "Draft" Report for Comments 2 $220 ,` 6 $570 ;' $o.._; $0 ", ,` 4 $140 ; 12. ;'$930 Incorporate Final Comments 1 0 24 $1;800' 8 '$440�;`_ 4 $140-. 62'" .,$3,960 ` Submit "Final' Re Report P 2 $220x' 6 $570? :$0,:«30 ^ = 4 $140' S2' 6930- Page 3 8/15/2002 7:33 AM Page 4 8/15/2002 7:33 AM Page 4 (1) Reproduction expenses based on $0.10 per square foot for bond; $0.06 per sheet of 8.5 "x11'; Estimate based on 200 pages per Spec Book; Plan sheet count as shown herein. 8/15/2002 Page 4 7:33 APB g Specifications 1 $110 4 $380'.. 16 $1,200:. $0 4 : "$140'. 25 $1,830 Civil Structural 1 : $110'; 4 $380 ' 16 S1,200; $0 4 S140 11,25 $1.830 Mechanical 1 $110 ` 4 $380 'I' 16 $1,200 $0 4 1$14 - 0 25 $1.830 Electrical 1 $110 :` 4 $380 '; 16 $1,200, $0 4 ' ' $14 25 $1.830 Plan Reviews and Final 50% Submittal 4 ,$440,<.' 8 `$760;?! 16 $1200.'. 16 4680 ;'$0 ;, 44 $3280 95% Submittal 4 x$440 , 8 $760':,: 16 51,200'`, 16 ' $680: , $0 ` 44 $328tF Provide Final Set (Reproducible) 4 $440 $0 8 ;.4600 .ill" 16 $88D;, 2G$70.,3it; Sub -Total Water Transmission Main => 16 $1,760' 102 ,- $9,680;' 642 1$48,150,! 880 ,$48,400. 18 ; $630 $0 1658 ,$108630 Permits ODEQ Engineehng Report 1 $110 . 2 : $990 v S 8 _ $600 - 4 $220 'j 1 ODEQ 401 Water Quality Certifications 1 $190> 2$990 = 8 4 $220.x;; 3 335. 16 $1.155 ODEQIEPA Stomnvater Pollution Prevention Plan 1 $110; 2 4 $224; $1,155 Railroad Crossing Permit 1$110 2 $19D": 8 :4600;4 4 $22013. 1 x$35''16 -. ..$1.155 COE Nationwide Permit for Utility Line Activities 1 $110;: 2 �� x$190,- , 8;$BOt1;: 4 Le6.? - $1,155 Sub -Total Permits - 5 $560 ^ 10 1$960, ' 40 $3�O000,,i- 20 $1 100 : 6 ^'$176 � $0 80, i;.$5.775 Bidding Services for Three (3) Contracts Reproduction for Bidding"' Water Transmission Main ( Estimated based on 25 Sets of Plans and S ecifications 1 $110 :' - $0 2 $150 $0 4 1,$140 $800 P,:. X41200 Water Tower( Estimated based on 25 Sets of Plans and Specifications 1 $110 § $0 2 $150 ' $0 ;. = 4 $140 $550 17 i $950 Booster Pump Station ( Estimated based on 25 Sets of Plans and Specifications) 1 $110 $0 2 $150 ! $0 4 $140- $625 7 $1.025 Attend pre -bid conferences 2 ', $220 ":.: 12 $1,140 !. $0. $0 . $0 .. 14 $1,360 Respond 4o questions during bidding $0 ° 16 $1,520: $0 $0 $0 16 $1.520 Issue addendums as required $0 ' 8 :$760 8 $600 4 $220 i; 4 $140, 24 $1.720 Attend bid openings 2 , '$220 i 12 '- :$1,140 $0,: -: ; so' "' $0 4: -:14 $1;360 Prepare bid tabulation/award recommendation 2 $220 8 $760 i 12 $900 '> $0 12 $420 - 34 $2.300 Assist City in ne ofiations 2 $220: 8 $760 - $'0 $0 ' $0 - q0 $980 Assemble Final Contract Documents 2 a .; $760 .` 16 $1;200 =1. $0 ' 16 ,:. $560 - '42 $2,740 Sub -Total Bidding Services => 13 $1,43.0. 72 'x$6,840 ` 42 4 $220- :,: 44 :`.$1nb40 $1,975 154 515,155 Construction Admin Services for Three (3 ) Contracts Change Order Reviews $0 , -t 4: $380 4 -- $300:: $0 . '" $0 '.'. 8:. 5680 Site Visits - Twice Each Month during Construction - 12 Site Vists at 4 hours each 48 $3,6ND0'<'$0 = '� !' $0 :" 48 :$3,600 Shop Drawing Review/Approval $0 i - °' -SO ° �'- $0,' $0 (? $o'', Water Transmission Main �$0', ;',. °$O r 8 $'800: $0. ". -" $0.2BI $600 - Water Tower $0 + 8 ', °`$78D' "" 8 $600' - $0:: -:, $0 _- 96 $1,360 Booster Pump Station $0 "i i6 16 $12D0?i• $0 . E $0 - 32 "$2,T20 Final Inspections :$0'� 12 .57;140,x:. 12 $900 '; $0�: ( $0 124' - :$2,040 Record Drawings $0,�= $Oi,'. 24 <: $1,800; 80 . $4,400 { $0 :104 ?$6,200 Sub -Total Construction Admin Services => 0 '$0 "'- 40 ,$3;800 ; 120 $9,000 i 80 $4,400 0 $0 $0 240 _:317;200 TOTALS => 71 $7,810 388 $36,860 1552 $116,400 1878 $103,290 111 $3,885 $84,525 3974 $352,770 (1) Reproduction expenses based on $0.10 per square foot for bond; $0.06 per sheet of 8.5 "x11'; Estimate based on 200 pages per Spec Book; Plan sheet count as shown herein. 8/15/2002 Page 4 7:33 APB I ATTACHMENT F CITY OF OWASSO WATER SYSTEM COMPONENTS DESIGN PROJECT PROJECT SCHEDULE 1 2003 12004 ID Task Name Duration Start Finish Jul I Aug I Sep I Oct Nov Dec Jan Feb Mar Apr May Jun JuB JAu q JSep J Oct Nov Dee Jan lFeb l Mar Ape I Ma Jun I Phase I - Design Report 86 days Fri 8/23/02 1 Fri 12/20/02 2 Project Kickoff Meeting 0 days Fri 8/23102 1 Fri 8/23/02 I-R/92 3 Data Collection/Review/Site Visits 10 days Mon 8/26/021 Fri 916/02 4 Transmission Main Alignment Analysis 60 days Mon 919/021 Fri 11/29102 5 Hydraulic Analysis/Booster Pump Station 60 days Mon 9/9/021 Fri 11/29/02 6 Water Tower 60 days Mon 9/9/021 Fri 11129/02 7 Submit "Draft" Design Report 0 days Fri 11/29/02 Fri 11/29-/-02 8 City Review Period 15 days Mon 12/2/02 Fri 12/20/02 9 Submit "Final" Design Report 0 days Fn 12/20/02 Fri 12/20102 10 Phase 11 - Final Design/Bidding Services 190 days Mon 12/23/02 Fri 91�1203 11 Field Surveys 45 days 45 days 45 Mon 12123/02 Fri 2/21/03 12 Geotechnical Investigations 30 days Mon 1/13/03 Fri 2/21/03 13 Plans/Specifications 100 days Mon 1/131031 Fri 5/30/03 14 Plan Review Period 15 days Mon 6/2/03! 1 Fri 6120/03 15 Bidding 5days Mon 6/23103 Fri 8/22/03 16 Award Construction Contracts 0 days Fri 9/12/03 Fri 9/12/03 17 Construction ---185 days Mon 9115103 Fri 5/28/0-4 18 Booster Pump Station 150 days Mon 9/15103 Fri 49—/0-4 19 9 Water Tower T 180 days Mon 9/15103 Fri 5121104 20 I Transmission �Maln 185 days Mon 9/15/03 Fri 5/28104 Project: Owasso Water System Comp Task Progress EM I Summary External Tasks Date: Thu 8/15/02 Split Milestone Project Summary External Milestone Deadline Page 1 MEMORANDUM TO- THE HONORABLE MAYOR AND COUNCII CITY OF OWASSO FROM: TIMOTHY ROONEY ASSISTANT CITY MANAGER SUBJECT- ANNEXATION REQUEST BY THE OWASSO SEATO CLUB PORTION OF THE SOUTHWEST QUARTER OF SECTION 30 DATE- August 12, 2002 BACKGROUND The subject property is currently zoned AG (Agricultural) and would remain zoned AG upon annexation. All property annexed by the City of Owasso is required to be zoned the lowest zoning classification (AG) or may maintain the zoning classification obtained in Tulsa County. In this case, the zoning of the property in Tulsa County is AG (Agriculture). If annexation is approved, the subject property would have to go through all platting requirements of the City of Owasso prior to any development. The Owasso Zoning Code classifies this type of use as a Use Unit 4, which is permitted by right in an (AG) Agriculture district. A copy of the City of Owasso's annexation policy is attached for your information and review. The subject property meets all of the requirements included within the policy with the exception of tract size. Note, however, that the annexation policy is a guideline and not an "inflexible" document and staff would recommend that the Planning Commission exercise that flexibility, especially when considering that the request to annex is from a civic club within our community. The Owasso Annexation Committee reviewed the annexation request at their July 319 2002, special meeting and unanimously recommended approval, The Planning Commission reviewed this request at their August 12, 2002, regular meeting and unanimously recommended approval, If approved by the City Council, the subject property would be located in Ward 4, Staff received no phone calls or letters of concern regarding the requesc RECOMMENDATION: Staff recommends approval of the annexation request. I Subject map 2 Copy of legal advertisement (contains annexation petition and legal description) 3 o City of Owasso Annexation Policy 4. City of Owasso Procedures for Annexation 0 RS3 RS PUD-9 107 AG OWASSO CITY LIMITS IL I rc oil I PARK a REC. CT R. AG VA ml ml u BEFORE THE HONORABLE CITY COUNCIL OF TJJOKLA Q JITY OF OWAJSO QMA The undersigned, constituting not less than three-fourths of the registered voters and being owners of not less than three-fourths (in value) of the hereinafter described real estate situated in Tulsa County, Oklahoma, to-wit: A TRACT OF LAND SITUATED IN THE SOUTHWEST QUARTER (DS /4) OF SECTION 30, TOWNSHIP 21 NORTH, RANGE 14 EAST, TULSA COUNTY, STATE OF OKLAHOMA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS, TO WIT: being territory adjacent and contiguous to the incorporated City of Owasso, Oklahoma, and not presently embraced within the Limits thereof, hereby petition the City Council of the City of Owasso, Oklahoma, to annex the aforementioned real estate into the City Limits of said City. Of mi You are hereby advised that the above petition for annexation was filed with the Community Development Department of the City of Owasso on the 8th day of July, 2002, and that said petition will be presented to the Owasso City Council at the Owasso Community Center, 301 South Cedar, Owasso, Oklahoma at 7:00 PM on the 19th day of August, 2002. All persons interested in this matter may be present at the hearing and give their objections to or ,?.rguments for the proposal. The Planning Commission will submit its recommendation to the City Council of the City of Owasso for its consideration and action, as provided by law. See the attached map for property location. For more information on the proposed annexation contact the Community Development Department, City Hall, 111 N Main, Owasso, Oklahoma, 74055 or phone (918) 376-1509. Timothy D. Rooney Assistant City Manager While there is no minimum tract size, properties of larger than 20 acres are preferable, 2 All properties should be contiguous to existing city limits. 3. All properties should be annexed into the city limits as the lowest zoning classification, that is, AG, agricultural. Landowners may then petition for rezoning if they desire further development of their property. All legal uses annexed into the city will be legal, but non-conforming, which means they may continue but cannot be expanded without proper zoning. 4. All public infi-astTuctures that do not meet city standards will not be improved by the city until brought to the city standard and accepted by the City Council. Such public facilities must be improved at owners expense,by the establishment of a special assessment district or some other financing method. 5 a Where a city limit boundary ends at a dedicated street, the boundary will not include the street right-of-way. This policy will establish consistence and allow city employees and citizens to Imow where the city boundaries are. 6, Properties that are rejected for annexation should not be considered for annexation for a six month period after rejection by the City Council. Adopted by Council on March 1, 1988. , , I � , 11,11, 111111111P11. 1. City Council direction to study the annexation of property. 5. Notice published two consecutive weeks in the Owasso Reporter of a City Council Hearing which will include a map and text of the proposed annexation. 6. City Council hearing and action on the proposal. 7. If the proposal is approved by the City Council, an Ordinance will be prepared, approved, published, and filed of record with the office of the County Clerk, with a map of the property annexed. i Submission to the City Planner of an application and petition and an administrative fee as prescribed by Ordinance. 2. Review by a Standing Annexation Committee and recommendation to the Planning Commission and City Council. 3. Notice published once in the Owasso Reporter at the applicant's expense of a Plannirfl Commission Hearing which will include a map and text of the proposed annexation. I 4. Planning Commission Hearing on the proposal and recommendation to the City Council. 5. Notice published two consecutive weeks in the Owasso Reporter at the applicant's expense of a City Council Hearing which include a map and text of the proposed annexation. 6 City Council Hearing and action on the proposal. 7. If the proposal is approved by the City Council, an Ordinance will be prepared, approved, published, and filed of record with the office of the County Clerk, with a map of the property annexed. Adopted by City Council on March 1, 1998. TO: THE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO FROM. TIMOTHY ROONEY ASSISTANT CITY MANAGER SUBJECT: FINAL PLAT EGGBERTSRESTAURANT DATE: August 14, 2002 There are no construction plans regarding this subdivision as development on the site will be tapping into existing infrastructure as a result of the Coffee Creek and Quik Trip Additions. There are, however, additional requirements regarding this plat and they are listed below: 1. Sidewalks will need to be added along the N. 140' E. Avenue frontage. 2. The Elm Creek Interceptor payback fee would need to be paid by the applicants prior to obtaining signatures on the final plat. The Elm Creek Interceptor payback fee is $1,580 per acre, or $2,133.00 for the subject property. 3. In addition to the Elm Creek Interceptor payback fee, the applicants must also address a payback fee to Owasso Land Trust, the entity that extended the sewer lines from the Elm Creek Interceptor. The applicable fee for that payback is $1,000 per acre, or $1,350 for the subject property. 4. There is a Storm Siren Fee of $16 per acre that would need to be paid by the applicants. This foe would amount to $21.60. Again, duo to the nature of the plat being a one Plot, one -block addition, staff is requesting the City Council act on this plat as a final plat in nature, The planning Commission unanimously approved the final plat at their August 12, 2002 regular meeting. RECOMMENDATION ,Staff recommends Council approval of the final plat for Eggberts Restaurant, i M ENCLOSURES 10 final plat for Eggberts Restaurant TO. THE HONORABLE MAYOR AND COUNCIL CITY OF OWASSO FROM: TIMOTHY D. ROONEY ASSISTANT CITY MANAGER RE - CENTENNIAL PARK — PRESTON LADS AGREEMENT DATE- August 14, 2002 LOCATION- The proposed Preston Lakes Centennial Park is located 1/2 mile cast of E. 86" Street North and N. 145`'' East Avenue and contains 59 acres, more or less. The area contained within the proposed park consists of a drainage area that drains north to south. The following are the scheduled improvements to occur at Preston Lakes Centennial Park, along with the negotiated costs of those improvements: • Asphalt walk trail — 7' wide by 3" thick (approx 3 miles in length) $ 100,8 00. 00 • Dirt work and Grading $ 8,700.00 • Signage $ 3,000.00 • Play park equipment (4 play areas) $ 50,000.00 • Landscape Timbers and wood chips for play park $ 8,000.00 • Lighting (Provided by PSO) FREE • Seed 20,000.00 • Walk Bridges (2) $ 22,000.00 • Parking Lot $ 34,000.00 • Fence and Entry $ 12,000.00 • Park Shelter $ 65,000.00 • General Overhead/Admin. of construction (Owasso Land Trust) FREE • Land Cost for 59+ acres (Donated by Preston Lakes, L.L.C.) FREE TOTAL $3239 Changes that have been incorporated into the proposed schedule of improvements based upon concerns expressed by both staff and the City Council include the following: The asphalt walking trail, after discussion held the last time it was presented, has been widened from 5 feet to 7 feet. Several Council members had concerns regarding the width of the trail FUNDING SOURCE: The proposed agreement between the City of Owasso and Preston Lakes, LLC, establishes the total cost of all improvements at $323,500. The city would pay the $323,500 in two payments, with $150,000 being paid to the developers upon completion of the improvements and the remaining $173,500 would be paid on July 1, 2003. k neg yja 'I'k The proposal, if approved by the City Council, would provide Owasso residents with a new regional park with the longest walking trails outside of the River Parks park system. The following items would also be addressed: ® Two issues incorporated into the 2010 Land Use Master Plan would be addressed. (1) The lack of passive recreational parks for activities like nature studies, walking, picnicking, fishing, and relaxing rather than active parks for organized team sports; and (2) Lack of greenway areas with trails linking the community together. The 2010 Land Use Master flan was adopted by the City Council in January of 2000 after significant public input. Item #11 of the Owasso Strategic Priorities included in the FY 2001 -2002 Annual Budget. Both the Council and Staff identified Trails and Massive Park Areas as a Strategic Priority to be addressed this fiscal year. If the agreement is approved by the City Council, the developers intend to begin work on the improvements immediately. The goal is to have the park improvements completed within 90-120 days. A copy of the proposed Centennial Park Preston Lakes Agreement is attached for your information and review. A large copy of the site plan will be available Tuesday evening which shows the locations of all improvements, as well as floodway boundaries. RECOMMENDATION. Staff recommends Council approval of the Preston Lakes Centennial Park Agreement, allowing for the donation of 59 acres, more or less, for public park use. Additionally, the agreement defines scheduled improvements and a payment schedule for those improvements. ATTACHMENTS: 1. Proposed Preston Lakes Centennial Park Agreement 2. Legal Description of Park Area t This agreement is dated this day of 2002, by and between Preston Lakes Development Group, L.L.C., (hereinafter referred to as "Seller ") and the City of Owasso, Oklahoma, (hereinafter referred to as "the City" or as "Buyer "). �a WIT NESSET H: WHEREAS, Seller is in the process of developing real estate within the corporate limits of the Buyer, sub development consisting of single - family residential and duplex as well as multi - family residential and being popularly known as Preston Lakes, WHEREAS, Seller, in conjunction with development of such residential properties is developing an improved park land area consisting of approximately 59.47 acres, more or less. Said park land is more specifically described on Exhibit A, attached hereto and made a part hereof. The improvements that are to be made and the approximate amounts thereof are as follows, to -wit: 1. Asphalt walk trail ® 7 feet wide by 3 inches thick $100,500.00 (approx. 3 miles in length) 2. Dirtwork and Grading $ 5,700.00 3. Signage $ 3,000.00 4. Play park equipment (4 play areas) $ 50,000.00 5. Landscape Timbers and wood chips for play park $ 5,000.00 6. Lighting (Provided by PSO) —FREE- 7. Seed, Sod, Irrigation $ 20,000.00 5. Walk Bridges (2) $ 22,000.00 9. Parking Lot $ 34,000.00 10. Fence and Entry $ 12,000.00 11. Park Shelter $ 65,000.00 12. General Overhead/Admin. of construction (provided by Owasso Land Trust) -FREE- 13. Land Cost for 55 + acres (Donated by Preston Lakes Development Group, L.L.C.) - FREE- TOTAL $ 3239500.00 Such improvements will be made in accordance with City of Owasso, Oklahoma Building Standards as well as any National Park and Recreational Standards applicable thereto; WHEREAS, Seller is desirous of donating such park land to the City of Owasso in order to benefit the City, and WHEREAS, Buyer is desirous of obtaining such improved park land to continue its policy of improvement of the quality of life of Buyer's citizenry by providing more recreational amenities to the existing park and recreation inventory of the Buyer. NOW THEREFORE, in consideration of the foregoing as well as the following conditions, covenants, and terms, the parties hereto agree as follows: DONATION OF PARK LAND Seller, upon completion of the improvements to the park land set forth above, shall on the date set forth below, convey by donation unto Buyer by General Warranty Deed that park land described on Exhibit A hereto free and clear of any and all encumbrances, liens, mortgages or claims whatsoever that would adversely affect the marketability of Buyer's fee simple title in and to the park land described on Exhibit A, or the improvements thereto, as recognized by the Title Examination Standards of the Oklahoma Bar Association. II SALE OF IMPROVEMENTS UPON DONATED PARK LAND PURCHASE PRICE TERMS OF PAYMENT The total purchase price for the improvements upon the donated park land property described on Exhibit "N9 hereto, (such improvements as are outlined above) shall be Three Hundred Twenty -tbree Thousand, Five Hundred Dollars and No /100 ($323,500.00). The purchase price for the improvements shall be paid as follows to -wit: 1, One Hundred Fifty Thousand Dollars and No /100 ($ 150,000.00) from the City of Owasso, Oklahoma, Park Development Fund, upon the closing hereof as hereinafter provided for and, 2. One Hundred Seventy -three Thousand, Five Hundred Dollars and No /100 ($173,500.00) payable on July 1, 2003. It is specifically understood and agreed that the One Hundred Seventy -three Thousand, Five Hundred Dollars and No /100 ($ 173,500.00) shall bear no interest. Is further specifically understood and agreed that the One Hundred Seventy -three Thousand, Five Hundred Dollars and No /100 ($ 173,500) shall be payable solely from the Park Development Fees collected from the building permits issued by the City of Owasso in any subdivision where such Park Development Fees are collected. It is expressly understood by Seller that, despite Seller's gifting of the underlying park land, all of the residential building permits hereafter issued by the City within the entire Preston Lakes Planned Unit Development (whether such permits be multi - family, duplex or single - family in nature), shall be subject to such Park Development Fees. The estimated Six Hundred Sixty -Eight (668) single family residential and duplex building permits in the Preston Lakes P.U.D. will contain such Park Development Fees in the amount of One Hundred Fifty Dollars and No /100 ($150.00) each and the estimated Two Hundred Twenty (220) multi- family building permits to be issued in the Preston Lakes P.U.D. shall also be subject to a Park Development Fee. It is neither intended nor shall Seller consider any other source of payment, especially sales tax or general ad valorem taxes, except from the Park Development Fees. This is a special limited source obligation intended to be in compliance with the provisions of Oklahoma Constitution, Article 10, Section 26. The Buyer shall pay no more and no less than the purchase price set forth above regardless of any cost overruns or cost savings that the Seller may experience as a result of constructing the improvements described above. f1l1J MARKETABILITY OF TITLE Seller shall fia °nish Buyer title evidence covering the Property, which shows marketable title vested in Seller according to the title standards adopted by the Oklahoma Bar Association. (a) Such title evidence shall be in the form of (check one) � ,e Commitment for Owners Title Insurance Policy, or __ Abstract of Title. b) Seller shall snake Seller's existing title evidence (base abstract of title or Owner's Title Insurance Policy) available to the escrow closing agent within a reasonable time after the date of acceptance of this Contract. (c) When title evidence in the form of a Commitment for Owner's Title Insurance Policy is furnished, the cost of such policy and a loan survey shall be paid 50% by Seller and 50% by Buyer. Seller shall pay any abstracting costs in excess of the title insurer's average abstracting cost. Such Owner's Title Insurance Policy shall insure Buyer to the extent of the total purchase price. When a survey satisfactory to the title insurer is furnished showing no encroachment and /or boundary disputes, such policies shall provide usual encroachment coverage. In the event the survey discloses any encroachment(s) and /or boundary dispute(s), such policies shall provide encroachment coverage with exception(s) for matters disclosed by such surrey which exception(s) shall be subject to acceptance by Buyer in writing. (d) When title evidence in the forge of an abstract of title is furnished, then a duly certified abstract of title (including current Uniform Commercial Code Certification) shall be provided at Seller's expense and Buyer shall, at Buyer's expense, obtain either a title opinion or an Owner's Title Insurance Policy. (e) Upon delivery to Buyer of a current Commitment for Owner's Title Insurance Policy or the abstract, certified to date, as the case may be, Buyer shall have a reasonable time, not to exceed 10 days, to examine the same and return the same to Seller with any written objections concerning the marketability of the title or such right to object shall be deemed waived. Seller shall have 60 days from such notice of objection to correct such defects, unless such time is further extended by written agreement of the parties. C��Cr7a'�f�C4f This transaction shall be closed on or within thirty (30) days after completion of the improvements by Seller's delivery to Buyer a General Warranty Deed to the park land and improvements set forth on Exhibit "A" hereto duly executed and in recordable form as well as any Bills of Sale or Warranty relating to equipment installed on the park land as well as the Buyer's payment unto the Seller of the One Hundred Fifty Thousand Dollars and No /100 ($150,000.00) provided for above. The provisions relating to payment of installments shall survive the closing and shall to the extent as provided for herein, constitute a continuing contractual obligation. V MWIM The park land property shall be named by the City of Owasso, Oklahoma as Preston Lakes Centennial Park. SPECIAL CONDITIONS It is intended by the Seller that this park be a "passive-use" park and is not to be used by the City or by organized leagues for use as athletic fields for baseball, softball, soccer, etc. However, it does riot violate Seller's intent of such "passive uses" to allow construction, at a later date, by the City of a basketball court or a sand - volleyball court. It is hoped that this park will be primarily used by all Owasso citizens for uses such as hiking, strolling, nature - walking, bicycling, Jogging, kite - flying and picnicking. The vision is for the playground equipment to emphasize a friendly, relaxed atmosphere where all age groups can enjoy the outdoors. `III RESERVATION OF CERTAIN RIGHTS Seller hereby reserves all rights, if any, associated with the subject real property that may now exist or hereafter arise relating to said real property's status as an undisturbed or undeveloped wetland or drainage area, including the rights to receive benefits relating to what is commonly referred to as "banking" such property. In no event, however, will Seller's exercise of such rights interfere with the City's use of such property for the purposes set forth herein. The foregoing represents the entire agreement existing between the parties. No prior oral or written communications relating hereto or subsequent discussions pertaining Hereto shall serve to vary the terms hereof unless specifically reduced to writing or dually executed by the parties hereto. SELLER: o Preston flakes, L.L.C. BUYER: City of Owasso, Oklahoma David B. Charney, Managing Member Randy Brogdon, Mayor Pete Kotutis, Member Greg A. Simmons, Member ATTEST: Marcia Boutwell, City Clerk APPROVED AS TO FORM: Attorney (NE/4) AND THE SOUTHEAST QUARTER (SE/4) AND THE EAST HALF (E/2) OF THE SOUTHWEST QUARTER (SW/4) OF SECTION 22, TOWNSHIP 21 NORTH, RANGE 14 EAST, OF THE I, B. Et M., ROGERS COUNTY, STATE OF OKLAHOMA. BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS; COMMENCING FROM THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER (NE/4), THENCE N 0- 12'02" W AND ALONG THE EAST LINE OF SAID NE/4 A DISTANCE OF 492007 FEET; THENCE N 89'59'02" W AND PARALLEL WITH THE SOUTH LINE OF SAID NE/4 A DISTANCE OF 50.00 FEET TO THE "POINT OF BEGINNING". THENCE S 75'16'45" WA DISTANCE OF 151.96 FEET; THENCE S 55'28'47" W A DISTANCE OF 172073 FEET; THENCE S 85'19'37" W A DISTANCE OF 119035 FEET; THENCE N 75'47'50" W A DISTANCE OF 107.26 FEET; THENCE S 52'01'22" W A DISTANCE OF 69.21 FEET; THENCE S 12 °39'0199 W A DISTANCE OF 78.27 I I i I 19AIN00m, willil wl-I&I'miu-31111 f, 11 i plywiff W-11rik lemil Ki 1-01 g P'll Mo loll, I W, I I wl I THE SE/4 A DISTANCE OF 438.35 FEET TO A POINT ON THE WEST LINE OF SAID SE/4; THENCE N 0'06935" W AND ALONG SAID WEST LINE OF THE SE/4 A DISTANCE OF 582.01 FEET; THENCE S 58'56955" W A DISTANCE OF 771.23 FEET; THENCE S 0'05931 " E A DISTANCE OF 184067 FEET TO A POINT LYING 50.00 FEET NORTH OF THE SOUTH LINE OF SAID SE/4; THENCE S 89'57'35" W AND PARALLEL WITH SAID SOUTH LINE OF THE SE /4 A DISTANCE OF 263.29 FEET; THENCE N 0'02925" W A DISTANCE OF 25.00 nTK#j Ke m M, &-#j Kgom, a M 15.00 FEET; THENCE N 41'18'48" E A DISTANCE OF 228.80 FEET; THENCE N 73'08'10" E A DISTANCE OF 99.76 FEET; THENCE N 40'18948" E A DISTANCE OF 245.45 FEET; NE1,71mill �w SIR i I i IN IN 163M I MY Orm. A 04111fil M�l �01 - illllrq��� AND ALONG SAID NORTH LINE OF THE S /2, S/2, NE /4 A DISTANCE OF 627007 FEET TO A POINT 50.00 WEST OF THE NORTHEAST CORNER OF SAID S /2, S /2, NE /4y THENCE S 012'02" E AND PARALLEL WITH SAID EAST" DINE OF THE NE /4 A DISTANCE OF 168046 FEET TO THE APPOINT OF BEGINNING". SAID TRACT CONTAINING 59.47 ACRES MORE OR Em