HomeMy WebLinkAbout2002.09.17_OPWA AgendaTYPE OF MEETING: Regular
DATE: September 179 2002
TIME: 6:30 p.m.
PLACE: Council Chambers, Owasso Community Center
Notice and agenda filed in the office of the City Clerk and posted at City Hall at 4:00 p.m. on
Friday, September 13, 2002.
MarckaAutwell, Author ty Secretary��
Nufflem,
1. Call to Order f
Chairman Brogdon
2. Flag Salute
3. Roll Call
4. Consideration and Appropriate Action Relating to a Request for Approval of the Consent
Agenda. All matters listed under "Consent" are considered by the Trustees to be routine
and will be enacted by one motion. Any Trustee may, however, remove an item from
consent by request. A motion to adopt the Consent Agenda is non-debatable.
A. Approval of the Minutes of September 3, 2002 Regular Meeting.
Attachment #4-A
Owasso Public Works Authority
September 17, 2002
Page 2
B. Approval of Claims.
Attachment #4-13
bddev%4" o� "i eova
b,5" Report from OPWA Manager.
q,,A Report from OPWA Attorney.
New Business. (New Business is any item of business which could not have been foreseen
at the time of posting of the agenda.)
'IX. Adj ourm-nent.
TYPE OF MEETING: Regular
DATE: September 17, 2002
TIME: 6:30 p.m.
PLACE: Council Chambers, Owasso Community Center
Notice of Addendum filed in the office of the City Clerk and posted on the city hall bulletin
board at 3:00 p.m. on Monday, September 16, 2001
City Cl k
Marci B outwell, Ciiv C41 rk
ADDENDUM TO AGENDA
The following is submitted as an addendum to the Agenda filed on September 13, 2002. Items
numbered I through 4 shall remain the same. Items numbered 5 through 8 are now numbered 6
through 9, and a new item 5 is listed as follows:
5. Consideration and Appropriate Action Relating to Change Order 92, a Change Order to a
Contract Between the Owasso Public Works Authority and Lamar Industries, Shawnee,
OK, for Phase JIB Improvements to the Wastewater Treatment Facility.
Mr. Carr
Attachment #5
The staff will recommend Trustee approval of Change Order #2, utilizing a portion of the
remaining $38,845.01 project allowance to include a $26,646.40 increase in the contract
obligation, and no increase in the contract time.
A
OWASSO PUBLIC WORKS AUTHORITY A
MINUTES OF REGULAR MEETING
Tuesday, September 3, 2002
The Owasso Public Works Authority met in regular session on Tuesday, September 3, 2002 in
the Council Chambers at the Owasso Community Center per the Notice of Public Meeting and
Agenda posted on the City Hall bulletin board at 4:00 p.m. on Thursday, August 29, 2001
ITEM 1: CALL TOO RDER
Chairman Brogdon called the meeting to order at 7:01 p.m.
ITEM 2: FLAG SALUTE
The flag salute was held during the City Council meeting preceding this meeting.
ITEM 2: ROLL CALL
STAFF
Rodney J Ray, City Manager
Ronald D Cates, Authority Attorney
Marcia Boutwell, Authority Secretary
ITEM 4: REQUEST APPROVAL OF THE CONSENT AGENDA.
A. Approval of the Minutes of August 20, 2002 Regular Meeting.
B. Approval of Claims.
The consent agenda included minutes of the August 20, 2002 regular meeting, by reference made
a part hereto. Item B on the consent agenda included the following claims: (1) OPWA
Operating Fund $230,064.67; (2) Debt Service $60,090.92; (3) Capital Improvements Fund
$202,784.41; (4) Sales Tax Fund $137,218.08; (5) Payroll $36,895.80. Mr. Helm moved,
seconded by Mr. Cochran, to approve the consent agenda.
AYE: Helm, Cochran, Kimball, Armstrong, Brogdon
NAY: None
Motion carried 5-0.
Owasso Public Works Authority
September 3, 2002
OPWA FUND BUDGET,
Ms. Bishop presented the item. At the August 20, 2002 OPWA meeting, the Trustees approved
the purchase of a refuse collection vehicle in the amount of $144,701. 'The refuse vehicle was
included in the current fiscal year budget at an estimated amount of $ 130,000, which is $ 14,701
less than the actual purchase price. A budget supplement is needed for the purchase, and will be
funded .from the OPWA reserves. Ms. Armstrong moved, seconded by Mr. Kelm, to approve a
supplemental appropriation in the Defuse Department capital outlay budget in the amount of
$ 14,701.
AYE: Armstrong, Helm, Cochran, Kimball, Brogdon
NAY: None
Motion carried 5 -0.
ITEM 6: REPORT FROM OPWA MANAGER
No report.
ITEM 70 REPORT FROM OPWA ATTORNEY.
No report.
I
Ms. Kimball moved, seconded by Mr. Helm to adjourn.
AYE: Kimball, Helm, Armstrong, Cochran, Brogdon
NAY: Done
Motion carried 5 -0, and the meeting was adjourned at 7:04 p.m.
Marcia Boutwell, Authority Secretary
-2-
Randall C. Brogdon, Chair
VE-ND0RN&ME-
&���
DBPITOTALL. BUBl TQ"[AL.
TREASURER PETTY CASH
DEPOSIT REFUND
50.03
REFUND
50.00
XPEDX
COPY PAPER
54.50
OPF|CEDEP0T|NC
OFFICE SUPPLIES
10.10
LOVVE8 COMPANIES INC
REPA|R8NA|NTSUPPL|ES
2031
OKLAHOMA NATURAL GAS
8/02 USE
20.48
IKON OFFICE SOLUTIONS
COPIER MA|NT
91J6
TERM|N|X
PEST CONTROL
38.00
DALE & LEES SERVICE INC
AIR CONDITIONER REPAIR
114.36
US CELLULAR
CELL PHONE USE
30.03
TREASURER PETTY CASH
RBMB PETTY CASH
6.50
ADMINISTRATION DEPT
340.84
OSCxRMcLAUR|N
METER READINGS
131.40
BRANDON HAMILTON
METER READINGS
1$0.20
SHANE HALE
METER READINGS
168.00
TYROwED|wK|NS
METER READINGS
344.25
TEaRxNCER&Y
METER READINGS
185.80
DAVID ROUNGHQUSE
METER READINGS
81.00
MARK MEYER
METER READINGS
675.00
HARRIS COMPUTER SYSTEMS
ANNUAL LICENSE FEE
1.735.00
UTILITY BILLING DEPT
3.520.45
OFFICE DEPOT INC
OFFICE SUPPLIES
21J2
WATER PRODUCTS INC
METER SET SUPPLIES
2.500.05
T-SHIRT EXPRESS ETC
HATS
8320
Uw|F|RSTCORPORAT|ON
UNIFORM RENTAL
154J6
BROWN FARMS SOD
SOD
62.84
MILL CREEK LUMBER & SUPPLY
REPA|R/mA|NTSUPPL|E8
88.25
WATER PRODUCTS INC
METER SET MATERIALS
165a2
CITY GARAGE CITY OFOVVA88O
VEH|CLEMA|NT
2.045.81
TREASURER PETTY CASH
VEHICLE WASH
18.00
FUELMxw
FUVL
375.34
CITY OpTULSA
LEAK DETECTION/WATER TEST
200.00
BAILEY EQUIPMENT
EQUIP RENTAL
15.50
US CELLULAR
CELL PHONE USE
612e
SOUTHWESTERN BELL
wOw'PLExxR
68.30
VERMEER SALES 0F0KLA
BORING MACHINE
5.395.68
WATER DEPT
11.849.03
OFFICE DEPOT INC
OFFICE SUPPLIES
21.72
ROBERTSON PLUMBING SUPPLY INC
TOILET REPAIR KIT
14.52
HACHC0MPANY
LAB SUPPLIES
77.00
C|BA SPECIALTY CHEMICALS CORP
CHEMICALS
2.29320
ZEP MFG CO
CHEMICALS
332.70
T-SHIRT EXPRESS ETC
HATS
81J0
UN|F|RSTC0RPORAT0N
UNIFORM RENTAL
145.68
6ELLCO SAFETY SHOES
SAFETY BOOTS
547J8
CAnLTON'BATeSCOMPANY
FUSES FOR EQUIP
43.15
VEN��&AME
QEjALDEaaRj2jLQN
AMOUNTS
QEPTZOTAL BUNZOOTAL
CITY GARAGE CITY OFVVVA8SO
VEM|CLEMANT
17170
PUELMAN
FUEL
100,38
SHERRY LABORATORIES |NG
SLUDGE ANALYSIS
20.00
RED EARTH EwY|R0~L4BINC
PLAN PREPARATION
2.000.00
RAMEY TESTING LABORATORY
TEST|NG'PLANTCONST
818.7*
WASTE MANAGEMENT
TIPPING FEES
507.63
WATER ENVIRONMENT FEDERATION
MEMBER8H|P'N|CHOLSON
88.00
TRUK QUIP INC
TOMMY GATE
1.367.00
WASTEWATER TREATMENT PLANT DEPT
8.830.99
OFFICE DEPOT INC
OFFICE SUPPLIES
14.48
VVWGRA|NGERINC
PADLOCKS/SIGN
80.00
T-SHIRT EXPRESS ETC
HATS
78.03
VN|RRGTCDRPOn/T|0m
UNIFORM RENTAL
194.52
VvVvGRA|NGERINC
DEHUMIDIFIERS
331.50
GRxY84R
HEATERS
55.38
CLIFFORD POWER SYSTEMS INC
AIR FILTER '
40.40
BILL 8ASORE TRUCKING &EXCAVATION,
DIRT
400.00
WATER PRODUCTS INC
REPAIR SUPPLIES
30.13
CITY GARAGE CITY OFDWAS8O
VEH|CLEMA|NT
1.457.56
FUELMAN
FUEL
310.46
BAILEY EQUIPMENT
EQUIP RENTAL
15.50
US CELLULAR
CELL PHONE USE
30.63
SOUTHWESTERN BELL
NON'PLEXAR
184.80
--------
WASTEWATER DEPT
3.23945
T-SHIRT EXPRESS ETC
SIGN
110.00
S/A/ON PRINTING INC.
LAMINATED COPY
2.50
OFFICE DEPOT INC
OFFICE SUPPLIES
18.10
T-SHIRT EXPRESS ETC
HATS
8070
UN|F|R8TCORPDRAT|QN
UNIFORM RENTAL
108.68
CITY GARAGE CITY Op0VVA930
VEM|CLEMA|NT
12.287.00
TREASURER PETTY CASH
VEHICLE WASH
3D0
FUELMAN
FUEL
1.382.98
C|8CO'EAGLE|wC
8TORAGEC0NTA|NER/B|m
750.69
WASTE MANAGEMENT
TIPPING FEES
5.060.88
--------
REFUSE DEPT
19.815.33
T-SHIRT EXPRESS ETC
HATS
8.67
UN|F|R8TC0nPOnAT|ON
UNIFORM RENTAL
20.80
WASTE MANAGEMENT
RECYCLE REFUSE
3.508.87
WASTE MANAGEMENT
TIPPING FEES
1.823.88
WASTE MANAGEMENT
RECYCLE REFUSE
2.877.33
ANCHOR PAINT
PAINT/ROLLER
6078
RECYCLE DEPT
8.306.4:
0PVVA OPERATING FUND TOTAL
55.852.32
FIRST BANK OFOvvx3SO
ELM CREEK NOTE
23.000.00
DEBT SERVICES
23.000.00
OPVVA GRAND TOTAL
78.952.32
PAY PERIOD ENDING DATE 09/07/02
DEPARTMENT
OVERTIME ToTAL
EXPENSES EXPENSES
Wastewater 37.80 10,538.16
Refuse 719.12 6,892.96
rATLOJ
if a
TRANSFERS
GENERALFUND
A/P TRANSFER REPORT
DESCRIPTION
TRANSFER FROM OPWA
Uillum
06-
TRANSFERS TOTAL 16,6 .63
SUBJE CT: WASTEWATER TRE AT ANT PLANT IMPROVEMENTS (PHASE 11B)
CHANGE ORDER 92
DATE- September 169 2002
Work in this contract anticipated some unforeseen circumstances would occur that would require
modification to the engineering design drawings and changes in the work to be performed. These
changes were expected to result in additional or deductive costs on the project.
The General Conditions to the contract state such changes require an official Change Order process. A
Change Order is defined as:
A written order to the Contractor authorizing an addition, deletion, or revision in the
work within the general scope of the Contract Documents, or authorizing an
adjustment in the contract price or contract time.
Page 2
Wastewater Treatment Plant Improvements (Phase I113)
Change Order #2
In accordance with Oklahoma Statutes, contract changes are subject to compliance with provisions of
the Oklahoma Public Completive Bidding Act of 1974, Chapter 61, paragraph 121 entitled 66Change
orders or addendums" indicates the following:
Change orders or addendums to public construction contracts of over One Million Dollars
($1,000,000) shall not exceed the greater of One Hundred Fifty Thousand Dollars ($150,000)
or ten percent (10 %) cumulative increase in the original contract amount. Any change orders
or cumulative change orders which exceed these limits shall require readvertising for bids on
that pant of the contract. Change Orders in any amount shall be formally approved by the
governing body of the public agency involved and the reasons therefore recorded in the
permanent records.
Change Orders are to be processed through the Contractor, Resident Engineer, and the Owner for
authorization. For this project, the Owner is the City Council acting as the Owasso Public Works
Authority; therefore, all Change Orders are to be approved by the Authority.
Typically, due to the nature of this work, it is necessary to make changes as construction proceeds or
with little lead time due to the schedule of construction. The time required to receive, review, and
process a Change Order for approval could take as long as 30 to 45 days, depending on occurrence of
an OPWA meeting. In some cases, conditions such as timing constraints, construction sequencing and
availability of manpower may make it difficult to delay work.
In most cases, it is beneficial to the city to proceed with construction rather than delay and potentially
be faced with higher incremental costs. In addition, costs of making some of the changes can be
expected to be relatively small in relation to the total project cost. Good business practice is to find
means to expedite authorization for these types of changes. Under these conditions, provision has
been allowed in the contract for the use of a "Work Change Directive."
The Work Change Directive was developed for use in situations involving changes in the contracted
work which, if not processed expeditiously, might delay construction. These changes are often
initiated in the field and may affect the contract price or the contract time. The directive provides
authorization to proceed with work that would be included in a subsequent Change Order.
The Resident Engineer initiates requests for work changes, including a description of the tasks
involved and attachments. Based on information transferred between the Engineer and Contractor, the
Engineer will complete and sign a Work Change Directive form and copies are to be sent to the
Owner for authorization. The Engineer alone does not have the authority to authorize changes in price
or time.
Page 3
Wastewater Treatment Plant Improvements (Phase IIB)
Change Order 42
Once the work covered by the directive is completed or a final cost and time is determined, the
Contractor will submit documentation for inclusion in a Change Order. The Change Order will be
submitted to the Trustees for review and consideration.
On June 17, 1997, the Authority approved authorization for the Public Works Director to act as a
representative of the Authority for Work Change Directives not to exceed $5,000. A maximum
cumulative total of $20,000 was also authorized prior to submittal of a Change Order for the
Directives.
Once work covered by the directive is completed or a final cost and time determined, the Contractor
will submit documentation for inclusion in a Change Order. The Change Order will be submitted to
the Trustees for final review and consideration,
Change Order Dumber 1 in the amount of $23,163.40 was submitted and approved by the Trustees
on May 21, 2001. A $60,000.00 66Project Allowance" was included in the total construction contract
award for the project; therefore, following authorization of the Change Order, a total of $38,845.01
remained in the project allowance should other changes be needed.
CHANGE ORDER NUMBER 2:
A Change Order has been submitted for Trustees approval representing the summary of authorized
Work Change Directives numbers 2-6, 2 -7 and 2 -11, as shown below:
Work Directive No. 2 ®6 Provide and install emergency lights and exit signs
$1,015.00
at Blower Building (safety /code compliance issue)
(No additional days)
Work Directive No. 2 ®7 Add disconnects on existing VFD on sludge return
PUMPS
$2,492.00
Provide disconnect and conduit as needed
(No additional days)
(operation, maintenance and safety /code issue)
Work Directive No. 2 -11 Re-route electrical circuits to aeration basin lights
$4,537.00
as required that were disconnected during
(No additional days)
installation of air piping (safety and maintenance
issue)
TOTAL WORK CHANGE DIRECTIVES $8,044.00
(No additional days)
Each of these directives is below the maximum for individual work change directives established for
authorization by the Public Works Director.
Page 4
Wastewater Treatment Plant Improvements (Phase IIB)
Change Order #2
Construction of the improvements is nearing completion. As a result, five (5) additional items are
included in the Change Order that have not been previously authorized as a Work Change Directive.
Each item individually is below the maximum established for authorization by the Public Works
Director for individual work change directives established; however, when combined with the items
listed above would exceed the $20,000 authorization for Work Change Directives. These items are as
follows
Item 2 -1. Modify area settled between the existing clarifiers $4,780.00
to drain (to prevent surface water from ponding (No additional days)
and draining through the backfill area)
Item 2 -4 Provide and install a work platform at the Blower $2,060.80
Building to enable filter removal/maintenance (No additional days)
(filters are inaccessible)
Item 2 -8A Relief Lift Station piping modifications to replace
4 -inch with 6 -inch discharge piping and
X3,469.20
appurtenances (increase pumping capability of lift
(No additional days)
station)
Item 2-813 Add crossover piping and valve to Relief Lift
$3,417.40
Station discharge to enable in back - flushing
(No additional days)
pumps for cleaning
Item 2 ®8C Spare pump for Relief Lift Station (serves as back-
$4,875.00
up in high flow conditions)
(No additional days)
TOTAL PROPOSED ADDITIONAL TI'EMS
$18,602.40
(No additional days)
The total cost of Change Order Number 2 is $26,646.40.
(Some proposed items 2 -2, 2 -3, 2 -9A, 2 -9B and 2 -10 were eliminated from consideration during
processing of the Work Change Directives. These items are not included in the total authorization
being requested.)
Funding for construction is included in a loan from the Oklahoma Water Resources Board. A
$60,000.00 "Project Allowance" was included in the total construction contract award for the project.
All change order costs are proposed to be included under the project allowance for this contract;
therefore, there is no increase in the contract amount.
Page 5
Wastewater 'Treatment Plant Improvements (Phase IIB)
Change Order #2
A total of $38,845.01 remains in the project allowance following Change Order dumber 1. Staff
proposes the Trustees authorize the use of a portion of the project allowance in the amount of
$26,646.40 for items included in Change Order No, 2. Funds in the amount of $12,198.61 will still be
included in the project allowance.
At the present time, funds have been obligated on the project in the amount of $1,826,179.40 (the total
contract award of $1,838,37.00 less the $12,198.61 remaining project allowance following Change
Order Flo. 2).
RECOMMENDATION-
Staff recommends the Trustees authorization to use a portion of the remaining $38,845.01 project
allowance for the Wastewater Treatment Plant Phase 1113 Improvements to pay for Change Order loo.
2 to include a $26,646.40 increase in the contract obligation and no increase in the contract time.
ATTACHMENTS:
1. Change Order Number 2
2. Work Change Directives with supporting costs documentation
3. OPWA Resolution 9701
TO CONTRACTOR:
Lamar Industries
P.O. Box 3078
Shawnee, OK 74802
The Contract is changed as follows:
CONTRACT DATE: October 6, 2001
CONTRACT FOR: Phase 1113
Incorporate Work Change Directives 2-1, 2-4, 2-6, 2-7, 2-8A, 2-8B, 2-8C, 2-11
Not valid until signed by the Owner and Contractor
The original Contract Sum $1,838,378.00
Net change by previously authorized Change Orders $0.00
The Contract Sum prior to this Change Order was $1,838,378.00
The Contract Sum will be unchanged by this Change Order in the amount of $0.00
The new Contract Sum including this Change Order will be $1,838,378.00
The Contract Time will be increased by 0 days
The date of Substantial Completion as of the date of this Change
Order therefore is still November 5, 2002
Note: This summary does not reflect changes in the Contract Sum which have been authorized by Construction Change Directive.
Lamar Industries
CONTRACTOR
P.O. Box 3078 Shawnee OK 74802
ADDRESS
PIM
Owasso Public Works Authority
OWNER
P.O. Box 180 Owasso-OK , 74405
ADDRESS
191614
DATE DATE
OWNER OWASSO PUBLIC WORKS AUTHORITY
ENGMER- GARVER ENGINEERS ITjQ
CONTkACTOR: LAMAR INDUSTRIES
The follo
,,)ying work or other -items. are requested for implementation in accordance with:
S
SM
OWNER OWASSO PUBLIC WORKS AUTHORITY
ENGINEER: GARVER ENGINEERS INC.
CONTRACTOR- LAMAR INDUSTRIE- S
in accordance with:
Date to begin work:
Add'l Calendar Days:
ITEM
DESCRIPTION COST TOTAL TO DATE
Materials
Previous WDC
Labor
Equipment
Total with this WD
Payroll Additive &
Overhead @ 30%
Subtotal
Profit 10%
TOTAL
REQUESTED BY:
- -------
LANLAR INDUSTRIES DATE
RECOMMENDED BY:
GARVER ENGINEERS, INC. DATE
APPROVED BY:
OWASSO PUBLIC WORKS AUTHORITY DATE
WORK DIRECTIVE CHANGE NO.
DATE: '7-//
PROJECT, S - PHASE IM
OWNER OWASSO PUBLIC WORKS AUTHORITY
FN(3
M, E R o GARVER ENGINEERS, INC.
CONTRACTOR, LAMARINDUSTEffi-
The followingiWOrk Or Other itcms are requested for implementation in accordance with-
Justification or Goal:
OWNER OWASSO PUBLIC WORKS AUTHORITY
.LNG ER: GARVER ENov NEERS Q.
CONTRACTOR: LAMARIND UST RIES
The following wo)k orothcr items are requested for ini&xnegtation in accordance with:
Date to begin work-, Add'I Calendar Days:
rM, 'Ur /-M �M
Will 1, L,W-JWAg- -,%
WORK DIRECTIVE CHANGE N(,,.,? �4
DATE:
W—I—rz-
Date t® begin work: AddI Calendar Days:
LAN4AR INDUSTRIES DATE
GARVER ENGINEERS, IN-C. DATE
OWASSO PUBLIC WORKS AUTHORITY DATE
Date t® begin work:
Add'l Calendar Days:
mmm .� .M
LAMAR INDUSTRIES DATE
OWASSO PUBLIC WORKS AUTHORITY DATE
OWNER OWASSO PUBLIC WORKS AUTHORITY
ENGINEER: GARVER ENGINEERS INC
CONTRACTOR: LAMAR INDUSTRIES
The following work or other items are requested for implementation in accordance with:
0%
Date to begin work:
Add'l Calendar Days:
ITEM
DESCRIPTION COST TOTAL TO DATE
Materials
Previous WDC
Labor
Equipment
Total with this WD
Payroll Additive &
Overhead @ 30%
Subtotal
Profit 10%
TO TAL
REQUESTED BY:
LAMAR INDUSTRIES DATE
RECOMMENDED BY:
GARVER ENGINEERS, INC. DATE
APPROVED BY:
OWASSO PUBLIC WORKS AUTHORITY DATE
OWNER OWASSO PUBLIC WORKS AUTHORITY
ENGINEER: CARVER ENGINEERS,, INC.
CONTRACTOR: L,AMAR I%ID S'TRIES
The following work or other items are requested for imple nentation in accordance with:
Q INDUSTRIES, INC.
eL p
@9 T® I
WOW DIRECMVE T G H T
�T
B�
4cY
8—
Z
4
1
li,
4
i
a
c
r
� c
.R
CL
a
,..
.. � vet::..' '• y;;a 'a � :( ,. . ;, ry �;;1n. =: 7t'
k
� ��
.;i
r
jpr tr e�, • t ►a �. tia
�.
► ►r -.�. ,.. i t . t o-, WIN
w'? �
' ..... .,: �_. .., x, .. _... .ter . '.M<•+u- +N,Yro,. +sA'�ak+nrfm/vn4 -=,. =� .2ti:;[anG:w :.,. w,. M...
� :.�,w.c_. >Sai �v'^.L"+'.k
>ib'�>�h.�,;
_.., ._.
„... ...,
r
6�
i
a
c
r
� c
.R
CL
a
OPWA RESOLUTION NO 97-01
BE IT RESOLVED BY THE TRUSTEES OF THE OWASSO PUBLIC WORKS AUTHORITY
THAT;
APPROVED AND ADOPTED this 17th day of June, 1997 by the Trustees of the Owasso Public
Works Authority.
MO
alci D Cates, Trust Attorney