HomeMy WebLinkAbout2011.12.20_OPWA AgendaPUBLIC NOTICE OF THE MEETING OF THE
OWASSO PUBLIC WORKS AUTHORITY
TYPE OF MEETING: Regular
DATE: December 20, 2011
TIME: 6:30 p.m.
PLACE: Council Chambers, Old Central Building
109 N. Birch
A Notice of the meeting and agenda filed in the office of the City Clerk and posted at City Hall
at 6:00 p.m. on Friday, December 16, 2011.
Sherry Bishop, &y Clerk
AGENDA
1. Call to Order
Chairman Doug Bonebrake
2. Roll Call
3. Consideration and appropriate action relating to a request for approval of the Consent
Agenda. All matters listed under "Consent" are considered by the Trustees to be routine
and will be enacted by one motion. Any Trustee may, however, remove an item from the
Consent Agenda by request. A motion to adopt the Consent Agenda is non - debatable.
A. Approval of the Minutes of the December 6, 2011 Regular Meeting
Attachment # 3 -A
B. Approval of Claims.
Attachment # 3 -13
C. Acknowledge receipt of the monthly FY 2011-2012 monthly budget status report
Attachment # 3 -C
D. Approval of the sale of surplus Poly Karts to be auctioned on eBay
Attachment # 3 -D
4. Consideration and appropriate action relating to items removed from the Consent Agenda
5. Consideration and appropriate action relating to a request for acceptance of a bid for the
Public Works Roof Replacement Project and approval of Change Order No. 1
Mr. White
Attachment #5
Staff recommends Trustee acceptance of a bid for the Public Works Roof Replacement
Project to Service Solutions Inc. for a bid including Alternate 1 for $43,398.94. City Staff also
recommends the acceptance of Change Order No. 1 for an additional 5 -year warranty of
$150.00 for a total warranty of 15 years. The total cost for this project will be $43,548.94.
Owasso Public Works Authority
December 20, 2011
Page 2
6. Consideration and appropriate action relating to a request for Acceptance of the
Wastewater Treatment Plant Project and Authorization to Issue Final Payment
Mr. Feary
Attachment #6
Staff recommends Trustee acceptance of the Wastewater Treatment Plant Expansion and
117th Street Pump Station Upgrade and authorization to issue final payment to BRB
Contractors of Topeka, KS in the amount of $505,167.23 for a total and completed
contract price of $9,099,116.39
7. Consideration and appropriate action relating to a request for acceptance of the
Meadowcrest Gravity Sewer Relief Line Project and authorization to issue final payment
Mr. Feary
Attachment #7
Staff recommends Trustee acceptance of the Meadowcrest Relief Line Project and
authorization for issuance of the final payment in the amount of $66,333.78 to Ira M. Green
Construction for a total and completed contract price of $443,962.80
8. Consideration and appropriate action relating to a request for approval of an Engineering
Agreement for development of the 2011 Recycle Center Master Plan
Mr. Henderson
Attachment #8
Staff recommends Trustee approval of an Agreement for Engineering Services for the
development of the Recycle Center Master Plan with Science Applications International
Corporation (SAIC) Energy, Environment & Infrastructure, LLC in the amount of $99,400 and
authorization of the Chairman to execute the agreement.
9. Consideration and appropriate action relating to a request for approval of OPWA
Resolution No. 2011 -04, establishing a per acre assessment fee for the 76th Street Sewer
Interceptor per the City of Owasso Code of Ordinances, Section, 17 -302
Ms. Bishop
Attachment #9
Staff recommends Trustee approval of the OPWA Resolution No 2011 -04, establishing an
assessment fee of $1,341 per acre for the 76th Street Sewer Interceptor per the Owasso
Code of Ordinances, Section 17 -302
10. Consideration and appropriate action relating to a request for approval of OPWA
Resolution No. 2011 -05, establishing water rates
Ms. Hess
Attachment #10
Staff recommends Trustee approval of Resolution No. 2011-05 adjusting the water rates to
offset the rate increase from the City of Tulsa.
11. Report from OPWA Manager
12. Report from OPWA Attorney
13. New Business (New Business is any item of business which could not have been foreseen
at the time of posting of the agenda.)
OWASSO PUBLIC WORKS AUTHORITY
MINUTES OF REGULAR MEETING
Tuesday, December 6, 2011
The Owasso Public Works Authority met in regular session on Tuesday, December 6, 2011 in the
Council Chambers at Old Central per the Notice of Public Meeting and Agenda posted on the
City Hall bulletin board at 6:00 p.m. on Friday, December 2, 2011.
ITEM 1. CALL TO ORDER
Chairman Bonebrake called the meeting to order at 7:44 p.m.
ITEM 2. ROLL CALL
PRESENT
Doug Bonebrake, Chairman
Bryan Stovall, Vice Chairman
Steve Cataudella, Trustee
Charlie Brown, Trustee
A quorum was declared present.
STAFF
Rodney Ray, Authority Manager
Julie Lombardi, Authority Attorney
ABSENT
Patrick Ross, Trustee
ITEM 3. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR TRUSTEE
APPROVAL OF THE CONSENT AGENDA
A. Approval of Minutes of the November 15, 2011 Regular Meeting.
B. Approval of Claims.
Mr. Stovall moved, seconded by Mr. Cataudella, to approve items A and B of the Consent
Agenda with claims totaling $843,967.36. Also included for review were payroll payment reports
for pay period 1 1 /19/1 1.
YEA: Stovall, Bonebrake, Cataudella, Brown
NAY: None
Motion carried 4 -0.
ITEM 4. CONSIDERATION AND APPROPRIATE ACTION RELATING TO ITEMS REMOVED FROM
THE CONSENT AGENDA
No action required.
ITEM 5. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR APPROVAL
TO PURCHASE A VEHICLE FOR THE ENGINEERING DIVISION
Mr. Feary presented the item recommending Trustee approval to purchase one 2012 Ford F150
pickup in the amount of $29,429.82 from Bill Knight Ford of Tulsa, Oklahoma per the Oklahoma
State Bid.
Mr. Cataudella moved, seconded by Mr. Stovall, to approve the purchase of a vehicle for the
Engineering Division, as recommended.
Owasso Public Works Authority December 6, 2011
YEA: Bonebrake, Cataudella, Stovall
NAY: Brown
Motion carried 3 -1
ITEM 6. CONSIDERATION AND APPROPRIATE ACTION RELATING TO A REQUEST FOR APPROVAL
TO PURCHASE A BACKHOE EXCAVATOR
Mr. Bludell presented the item recommending Trustee approval to purchase one 2012 John
Deere 310SJ Backhoe excavator in the amount of $88,591 from Yellowhouse Machinery
Company of Sand Springs, Oklahoma, per the Oklahoma State Bid.
Mr. Brown moved, seconded by Mr. Stovall, to approve the purchase of a backhoe excavator.
YEA: Cataudella, Stovall, Bonebrake, Brown
NAY: None
Motion carried 4 -0
ITEM 7. CONSIDERATION AND APPROPRIATE ACTION RELATING TO THE ACCEPTANCE AND
AUTHORIZATION FOR FINAL PAYMENT ON THE US HIGHWAY 169 WATER TANK (RAM
TANK) EXTERIOR REPAINTING PROJECT
Mr. Feary presented the item recommending Trustee approval of the Ram Tank Exterior
Repainting Project and authorization to issue final payment to TMI Coating of St. Paul, MN in the
amount of $69,400.
Mr. Brown moved, seconded by Mr. Stovall, to approve the authorization and final payment of
the Ram Tank Exterior Repainting Project, as recommended.
YEA: Brown, Bonebrake, Stovall, Cataudella
NAY: None
Motion carried 4 -0
ITEM 8. REPORT FROM OPWA MANAGER
Mr. Ray provided a reminder of the Owasso Chamber of Commerce Christmas parade to be
held on Saturday, December loth, at 9:30 a.m.
ITEM 9. REPORT FROM OPWA ATTORNEY
No report.
ITEM 10. NEW BUSINESS
None.
ITEM 11. ADJOURNMENT
Mr. Cataudella moved, seconded by Mr. Brown, to adjourn the meeting.
YEA: Stovall, Bonebrake, Cataudella, Brown
NAY: None
I!
Owasso Public Works Authority
Motion carried 4 -0 and the meeting was adjourned at 7:58 p.m.
Juliann Stevens, Minute Clerk
December 6, 2011
Doug Bonebrake, Chairman
Claims List
12/20/2011
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
OPWA
JAMERICAN MUNICIPAL SERVICES CORP.
1COLLECTION SERVICES
441.69
TOTAL OPWA 441.69
OPWA ADMINISTRATION
AEP /PSO
ELECTRIC BILL
796.63
AT &T
CONSOLIDATED PHONE BILL
296.10
ZEE MEDICAL, INC
REPLENISH FIRST AID KITS
117.78
DOERNER, SAUNDERS, DANIEL & ANDERSO
LEGAL SERVICE - RWD 3
2.80
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
40.00
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
15.58
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
2.65
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
154.16
UNITED STATES CELLULAR CORPORATION
CELL BILL
59.01
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
413.19
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
44.50
STANDLEY SYSTEMS, LLC
SAVIN COPIER
9,496.77
TOTAL OPWA ADMINISTRATION 11,439.17
UTILITY BILLING
JPMORGAN CHASE BANK
GLOBALGOV -HAND SCANNER
127.79
JPMORGAN CHASE BANK
LYMAN -INK PADS /STAMPS
79.90
TECHNICAL PROGRAMMING SERVICES INC
BILLING SERVICES
1,224.11
TECHNICAL PROGRAMMING SERVICES INC
BILLING SERVICES
2,192.92
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
19.36
KATHLEEN A BALSIGER
METER READER
118.80
TODD C. KIMBALL
METER READER
679.50
TODD C. KIMBALL
METER READER
386.55
TYRONE EUGENE DINKINS
METER READER
293.55
JAMES DERRIEL BYNUM
METER READER
202.05
KATHLEEN A BALSIGER
METER READER
413.10
MARK MEYER
METER READER
313.65
TOTAL UTILITY BILLING 6,051.28
WATER
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
51.45
AEP /PSO
ELECTRIC BILL
495.15
JPMORGAN CHASE BANK
HOME DEPOT - RETURN
-19.80
JPMORGAN CHASE BANK
LOWES -REBAR PINS
24.69
CITY GARAGE
LABOR /OVERHEAD NOV. 2011
1,000.00
JPMORGAN CHASE BANK
LOWES- PLYWOOD
18.95
JPMORGAN CHASE BANK
LOWES -PAINT ROLLERS
21.20
JPMORGAN CHASE BANK
LOWES- SUPPLIES
212.24
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
44.43
JPMORGAN CHASE BANK
HOME DEPOT - SUPPLIES
13.98
JPMORGAN CHASE BANK
HOME DEPOT -PAINT
78.97
FLEETCOR TECHNOLOGIES
CITY FUELMAN EXPENSE - NO
11707.12
JPMORGAN CHASE BANK
LOWES -PAINT
99.06
Page 1
Claims List
12/20/2011
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
WATER...
JPMORGAN CHASE BANK
KELLYMOORE -PAINT
64.60
JPMORGAN CHASE BANK
LOCKE SUPPLY - LIGHTS
241.46
JPMORGAN CHASE BANK
LOCKE SUPPLY - SUPPLIES
8.00
JPMORGAN CHASE BANK
ANCHOR PAINT -PAINT
6.63
JPMORGAN CHASE BANK
FASTENAL- SUPPLIES
15.31
JPMORGAN CHASE BANK
ARMOR - GLOVES
28.04
JPMORGAN CHASE BANK
LOWES -PAINT
18.90
JPMORGAN CHASE BANK
LOWES -TOOLS
52.21
JPMORGAN CHASE BANK
HOBBY LOBBY - SUPPLIES
15.98
JPMORGAN CHASE BANK
LOWES -PAINT
100.50
JPMORGAN CHASE BANK
FASTENAL -BOLTS
53.11
JPMORGAN CHASE BANK
RC AUTO- REPAIRS
1,253.36
JPMORGAN CHASE BANK
ANCHOR PAINT -PAINT
63.35
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
54.70
CITY OF TULSA UTILITIES
WATER
125,044.19
CITY OF TULSA UTILITIES
WATER
94,136.26
SHERWOOD CONSTRUCTION CO, INC
CONCRETE
279.00
CITY GARAGE
VEH PARTS & OUTSIDE LBR
943.75
TOTAL WATER 226,126.79
WASTEWATER TREATMENT
CITY GARAGE
VEH PARTS & OUTSIDE LBR
202.91
JPMORGAN CHASE BANK
LOWES -TOOLS
25.91
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
61.82
HACH COMPANY
LAB SUPPLIES
597.95
HACH COMPANY
LAB SUPPLIES
178.33
JPMORGAN CHASE BANK
DEQ- STORMWATER FEE
430.00
JPMORGAN CHASE BANK
NSC- TRAINING
15.95
JPMORGAN CHASE BANK
OFFICE DEPOT- SUPPLIES
16.28
JPMORGAN CHASE BANK
DWYER INSTRUMENTS - GAUGES
467.20
JPMORGAN CHASE BANK
ARMOR -ICE CLEETS
104.65
JPMORGAN CHASE BANK
ARMOR - GLOVES
28.04
JPMORGAN CHASE BANK
WASTE MGMT- SLUDGE REMOVAL
2,688.45
JPMORGAN CHASE BANK
HOME DEPOT - HOSE /FITTINGS
67.26
JPMORGAN CHASE BANK
HOME DEPOT - NOZZEL
8.47
JPMORGAN CHASE BANK
FORT BEND - POLYMER
697.50
JPMORGAN CHASE BANK
ATWOODS- APPAREL
89.99
JPMORGAN CHASE BANK
ATWOODS -COAT
119.99
JPMORGAN CHASE BANK
ATWOODS -WATER NOZZLES
15.87
JPMORGAN CHASE BANK
ATWOODS -CAR JACKS
65.98
FLEETCOR TECHNOLOGIES
CITY FUELMAN EXPENSE - NO
460.44
CITY GARAGE
LABOR /OVERHEAD NOV. 2011
500.00
JPMORGAN CHASE BANK
OFFICE DEPOT - SUPPLIES
17.85
JPMORGAN CHASE BANK
LOWES- FILTERS
15.88
AEP /PSO
ELECTRIC BILL
18,696.28
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
55.11
Page 2
Claims List
12/20/2011
Budget Unit Title
Vendor Name
Payable Description
IPayment Amounl
WASTEWATER TREATMENT..
JAT&T
1CONSOLIDATED PHONE BILL
1 125.44
TOTAL WASTEWATER TREATMENT 25,753.55
WWTP EXPANSION
BRB CONTRACTORS, INC.
WWTP EXPANSION & 117 ST
505,167.23
GREELEY & HANSEN, LLC LBX 619776
1CONSTRUCTION SERVICES
4,418.65
TOTAL WWTP EXPANSION 509,585.88
WASTEWATER COLLECTION:
JPMORGAN CHASE BANK
LOWES -WIRE
2.70
CITY GARAGE
VEH PARTS & OUTSIDE LBR
360.25
JPMORGAN CHASE BANK
WATER PROD - SUPPLIES
487.50
JPMORGAN CHASE BANK
LOWES- SUPPLIES
22.20
JPMORGAN CHASE BANK
WATER PROD -HIP WADERS
56.50
JPMORGAN CHASE BANK
OREILLYS- SWITCHES
42.59
JPMORGAN CHASE BANK
ACCURATE -CLASS D TRAINING
315.00
ONEOK, INC OKLAHOMA NATURAL GAS
NATURAL GAS USAGE
194.70
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
36.20
JPMORGAN CHASE BANK
ARMOR - GLOVES
28.04
JPMORGAN CHASE BANK
LOWES -PVC PIPE
17.05
VERDIGRIS VALLEY ELECTRIC COOP
COFFEE CREEK ELECTRIC
644.04
VERDIGRIS VALLEY ELECTRIC COOP
DOUBLE OAKS ELECTRIC
6.28
YELLOWHOUSE MACHINERY CO OF OK
JOHN DEERE 310SJ BACKHOE
88,591.00
JPMORGAN CHASE BANK
OWASSO LUMBER - CONCRETE
8.92
AT &T
CONSOLIDATED PHONE BILL
40.64
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
36.20
AEP /PSO
ELECTRIC BILL
4,635.17
CITY GARAGE
LABOR /OVERHEAD NOV. 2011
833.33
JPMORGAN CHASE BANK
LOWES- SUPPLIES
133.80
FLEETCOR TECHNOLOGIES
CITY FUELMAN EXPENSE - NO
1,560.48
JPMORGAN CHASE BANK
HOME DEPOT - BATTERIES
56.82
MIKE OZBUN ENTERPRISE INC
SUB PUMP REPAIRS
2,875.00
VERDIGRIS VALLEY ELECTRIC COOP
GARRETT CREEK ELECTRIC
157.13
VERDIGRIS VALLEY ELECTRIC COOP
GARRETT CREEK ELECTRIC
263.18
JPMORGAN CHASE BANK
ATWOODS- ANTIFREEZE
48.45
VERDIGRIS VALLEY ELECTRIC COOP
WATER CONTROL ELECTRIC
25.50
JPMORGAN CHASE BANK
ATWOODS- PROPANE TORCH
34.98
TOTAL WASTEWATER COLLECTIONS 101,513.65
n7m
MEADOWCREST SEWERLINE IRA M GREEN CONTRUCTION IMEADOWCREST GRAVITY SEWER 44,396.28
TOTAL MEADOWCREST SEWERLINE 44,396.28
SANTA FE LIFT STATION IGREELEY & HANSEN, LLC LBX 619776 JENGINEERING SERVICES 848.00
TOTAL SANTA FE LIFT STATION 848.00
Page 3
Claims List
12/20/2011
Budget Unit Title
Vendor Name
Payable Description
Payment Amouni
REFUSE COLLECTIONS
JPMORGAN CHASE BANK
ALSUMA- REPAIRS
1,500.30
JPMORGAN CHASE BANK
ARMOR - GLOVES
28.04
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
42.52
CITY GARAGE
VEH PARTS & OUTSIDE LBR
1,498.32
JPMORGAN CHASE BANK
WASTE MGMT -REF TIP FEES
8,024.03
JPMORGAN CHASE BANK
WASTE MGMT -REF TIP FEES
7,788.22
UNITED STATES CELLULAR CORPORATION
CELL BILL
59.01
THE METROPOLITAN ENVIRONMENTAL TRUS
MET MEMBERSHIP DUES
3,446.47
THE METROPOLITAN ENVIRONMENTAL TRUS
SECOND HALF ASSESSMENT
3,995.25
CITY GARAGE
LABOR /OVERHEAD NOV. 2011
3,333.33
JPMORGAN CHASE BANK
ATWOODS -HOE
6.99
JPMORGAN CHASE BANK
BUMPER TO BUMP - HEADLIGHT
6.99
FLEETCOR TECHNOLOGIES
CITY FUELMAN EXPENSE - NO
6,810.87
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
44.17
AT &T
CONSOLIDATED PHONE BILL
20.91
TOTAL REFUSE COLLECTIONS 36,605.42
RECYCLE CENTER
AT &T
CONSOLIDATED PHONE BILL
20.91
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
11.20
AEP /PSO
ELECTRIC BILL
53.00
NATIONAL WASTE & DISPOSAL, INC.
GLASS ROLL OFF
200.00
JPMORGAN CHASE BANK
WASTE MGMT -REC ROLLOFFS
3,359.10
JPMORGAN CHASE BANK
WASTE MGMT -REC TIP FEES
1,168.39
JPMORGAN CHASE BANK
WASTE MGMT -REC TIP FEES
1,306.11
CITY GARAGE
LABOR /OVERHEAD NOV. 2011
166.66
CITY GARAGE
VEH PARTS & OUTSIDE LBR
40.04
UNIFIRST HOLDINGS LP
UNIFORM RENTAL
11.20
JPMORGAN CHASE BANK
LOCKE SUPPLY - SUPPLIES
214.16
TOTAL RECYCLE CENTER 6,550.77
OPWA DEBT SERVICE ITHE BANK OF NEW YORK TRUST CO ORF -10- 0014 -CW 2011 500.00
TOTAL OPWA DEBT SERVICE 500.00
FUND GRAND TOTAL 969,812.4
OPWA GRAND TOTAL $969,812.48
Page 4
Department
OPWA Administration
Utility Billing
Water
Wastewater
Wastewater Collection
Refuse
Recycle Center
OWASSO PUBLIC WORKS AUTHORITY
PAYROLL PAYMENT REPORT
PAY PERIOD ENDING DATE 12/0512011
Payroll Expenses Total Expenses
8,323.78
4,396.01
10,630.56
11,216.69
6,364.18
10,733.91
927.40
12,428.99
7,124.33
18,083.77
19,181.61
11,506.08
17,309.62
1,777.84
FUND TOTAL 52,592.53 87,412.24
OWASSO PUBLIC WORKS AUTHORITY - OPERATING FUND
FISCAL YEAR 2011 -2012
Statement of Revenues & Expenses
As of November 30, 2011
OPERATING REVENUES:
Water
Wastewater
Refuse & recycle
Otherfees
Interest & other
TOTAL OPERATING REVENUES
OPERATING EXPENSES:
Personal services
Materials & supplies
Other services
Capital outlay
Debt service
TOTAL OPERATING EXPENSES
REVENUES OVER EXPENSES
TRANSFERS IN (OUT)
Transfers in
Transfers out
TOTALTRANSFERS
OWRB PROCEEDS AND EXPENDITURES
Proceeds of OWRB debt
Expenditures of OWRB Debt
TOTAL OWRB PROCEEDS AND EXPENDITURES
NET INCOME (LOSS)
WORKING CAPITAL - Beginning Balance
MONTH
YEAR
PERCENT
TO -DATE
TO -DATE
BUDGET
OF BUDGET
387,636
2,399,380
4,613,000
52.01%
256,448
1,315,213
3,286,600
40.02%
151,083
768,976
1,753,100
43.86%
29,766
171,102
475,700
35.97%
2,146
291,004
299,900
97.03%
827,079
4,945,674
10,428,300
47.43%
171,698
945,505
2,283,411
41.41%
233,945
1,565,114
3,105,110
50.40%
92,689
616,260
1,871,267
32.93%
120,986
236,288
778,225
30.36%
184,178
1,344,407
3,077,036
43.69%
803,496
4,707,573
11,115,049
42.35%
23,583
238,100
(686,749)
- 34.67%
-
131,031
249,900
52.43%
-
(75,000)
(300,000)
25.00%
-
56,031
(50,100)
- 111.84%
383,607
540,677
7,565,432
7.15%
(88,424)
(680,666)
(7,565,432)
9.00%
295,183
(139,989)
-
318,765
154,143
(736,849)
2,973,273 2,973,273
WORKING CAPITAL - Ending Balance 3,127,416 2,236,424
The City Wit aut Limits.
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Warren Lehr
Assistant City Manager
SUBJECT: Establish Minimum Value of Surplus Items and
Authorize eBay Auction
DATE: December 16, 2011
BACKGROUND:
The following Items have been deemed by the Public Works Department as no longer needed
to remain in service due to age and /or condition and are being recommended to be declared
surplus by the City Council:
3,250 - "Poly Kart" 90 gallon Waste Handling Containers, by Ameri -Kart Corp
Typically, when the City of Owasso declares an item surplus, an approximate worth for the
individual items are submitted to the City Manager (if valued at less than $500) or City Council (if
valued at $500 or greater), along with the list for approval. Staff has reviewed the Finance
Department's "Book Value" of the vehicles /items, and auction history to determine a minimum
value for each item. The following is the minimum value that has been determined for the Items:
➢ "Poly Kart" 90 gallon Waste Handling Containers, by Ameri -Kart Corp. - $5.00 each
These containers have been replaced and have little or no value to our organization. This brand
and style of container was purchased from 1992 through 2003 and were used on Refuse Routes
from 1992 through 2009. Beginning in 2003, the Refuse Division began purchasing a new style
container. The change was beneficial for a couple of reasons. Initially the change reduced the
cost per container purchased from $110 each for the "Poly Karts ", to $54 each for the new style
taller containers. Secondly, the change in container style allowed for, in 2009, a transition to
fully automated refuse collection. The change in container style and the purchase of
automated refuse trucks has increased productivity from 500 pickups per day per truck to over
750 pickups per day per truck; has reduced the number of employee injuries; and has assisted
greatly in cost control of the refuse collection service.
eBay AUCTION:
eBay is an online auction tool used by the City to obtain the highest resale or salvage price for
items that have outlived their useful lifespan and have no foreseeable value to the City of
Owasso. Auctioning surplus equipment on eBay has been used periodically since first approved
by the City Council in 2002.
HOW IT WORKS:
➢ City Council declares items surplus and declares a minimum value for each item.
➢ Staff gathers identification information, writes descriptions, and takes digital pictures for
each item to be auctioned.
➢ Staff also determines whether the item can be shipped or will need to be picked up by
the purchaser /buyer. If the City is responsible for shipping, staff will add shipping cost into
the bidding specifications on the auction site.
➢ Items are placed on auction for 10 days (allowing the auction to occur over two
weekends).
➢ When the item is added to the eBay auction site, advertising of the auction is also done
on the City of Owasso's webpage and through other appropriate social media.
➢ During the auction period, prospective bidders may e -mail the designated staff member
to ask any questions they may have about the items being auctioned. The questions
and answers are posted on the item's auction page, and item descriptions can be
amended and /or corrected during the auction.
➢ At the close of the auction, eBay notifies the designated staff member of the highest
bidder and provides their e -mail address.
➢ Staff notifies the highest bidder, and arrangements for payment by credit card, check, or
cash are handled through the Utility Billing Window, and /or through the internet using
"PayPal ".
➢ Arrangements are made for pick -up or shipping of the item once a deposit has been
made. Items are released or shipped once payment is received.
➢ A deposit is normally required within 2 business days; payment in full is required within 7
days; and item removal and /or shipping arrangements must be completed within 21
days of the auction close.
eBay FEES:
Listing Fee
$
2.00
10 day listing
$
.10
Reserve Fee
$
.90
Extra pictures
$
1.00
Estimated total cost
$
+/- 3.00 per listing
(A listing will consist of 50 -100
containers)
RECOMMENDATION:
Staff recommends City Council approval to declare 3,250 "Poly Kart" 90 gallon waste
receptacles as surplus to the needs of the City of Owasso.
ATTACHMENT:
A. Item Description
ATTACHMENT A: ITEM DESCRIPTIONS
90 gallon Wheeled Refuse Containers, Manufactured by - Ameri -Kart Corp. "Poly Kart" Brand,
ID # green 13801, External metal frame two wheels w/ lid and closure strap.
1456 Karts - manufactured between 1992 and 1996
1794 Karts - manufactured between 1997 and 2003
3250 Karts - Total
owl
r
The City Wit�iout Limits.
TO: The Honorable Chairman and Trustees
Owasso Public Works Authority
FROM: Larry White
Support Services Director
SUBJECT: Public Works Roof Replacement Project
DATE: December 16, 201 1
BACKGROUND:
The roof on the Public Works Building is over 13 years old and has numerous leaks. Repairs have
been required frequently during the past few years. The roof requires replacement.
A Notice to Bidders was published in the appropriate manner beginning on Thursday, October
27, 2011. A Mandatory Pre -Bid site visit was conducted with each bidding contractor on
Wednesday, November 16, 2011. Prospective bidders were advised to provide bids for a new
roofing system and any preparatory work required. They were also advised to provide
additional bids for complete tear off of the existing roof. Bids were publicly opened on Monday,
November 28, 2011, at 11:30 a.m. at the Owasso City Hall.
ANALYSIS OF BIDS:
Five (5) bids were received. They were examined for any improper or incomplete bids. Two bids
were incomplete and disqualified. The following three (3) bids were qualified:
Alternate 1
Base Bid Additional Bid Complete
(overlay) Tear Off of Existing Roof Total Bid
CCRS, LLC $61,382.75 $17,861.25 $79,244.00
Type of System: Elastomeric Acrylic Roofing System - Hydro Stop Brand
Warranty: 10 years
Scope of Work: Guttering to be replaced with new PVC pipe; roof coating is a liquid applied
system (multiple coats)over acrylic covering to be overlaid on a new decking - thickness 40 to
45 mil.
Action Roofing Inc. $44,140.00 (tear off of roof included in this amount) $44,140.00
Type of System: Carlisle Sure Weld thermoplastic polyolefin (TPO) Membrane Roofing System
Warranty: 10 year
Scope of Work: Repair existing interior downspouts with installation of PVC pipe to eliminate
leaks; put new insulation between new roof drains to prevent water from ponding in existing
drains; mechanically attached roof coating is a rubber -like thermoplastic covering with seams
heat welded together over new decking - thickness 45 mil.
Service Solutions Inc. $36,810.59 $ 6,588.35 $43,398.94
Type of System: Carlisle Mule Hide thermoplastic polyolefin (TPO) Membrane Roofing System
Warranty: 10 year
Scope of Work: Repair existing interior downspouts with installation of PVC pipe to eliminate
leaks; put new insulation between new roof drains to prevent water from ponding in existing
drains; mechanically attached roof coating is a rubber -like thermoplastic covering with seams
heat welded together over new decking - thickness 45 mil.
Other Warranties Available:
15 -year warranty for an additional $150.00
PROJECT FUNDING:
Funding for this project is included in the FY 2012 Owasso Public Works Authority capital outlay
budget.
RECOMMENDATION:
Staff recommends award of the bid to Service Solutions Inc. for the Public Works Roof
Replacement Project to include Alternate 1 for $43,398.94. City staff further recommends the
approval of Change Order No. 1 to include an additional 5 -year warranty for $150.00 for a total
warranty of 15 years. The total cost for this project will be $43,548.94.
The City Wit aut Limits.
TO: The Honorable Chair and Trustees
Owasso Public Works Authority
FROM: John W. Feary
Project Administrator
SUBJECT: Wastewater Treatment Plant Expansion & 1 17th Street Pump Station Upgrade
Project Acceptance and Authorization to Issue Final Payment
DATE: December 16, 2011
BACKGROUND:
In 2005, the City of Owasso commissioned an update of its 1997 Wastewater Master Plan. The
updated plan provides a 20 -year guide for the prioritization and construction of upgrades to the
City's conveyance and wastewater treatment infrastructure. Among the immediate needs
identified, the plan recommends the investment of approximately $10 million for the upgrade of
the Wastewater Treatment Plant and the 117th Street Pump Station.
These recommended improvements were designed to increase the average treatment plant
capacity to 4.2 MGD, which is anticipated to meet wastewater treatment demands for the next
five to seven years. Similarly, the recommended improvements to the 117th Street Pump Station
were designed to upgrade existing facilities by increasing the pumping capacity to
accommodate present and future needs.
In August 2007, OPWA Trustees approved an Engineering Services Agreement with Greeley and
Hansen for the preparation of construction documents for the Wastewater Treatment Plant
Expansion and 117th Street Pump Station Upgrade for a sum not to exceed $545,000. On
October 7, 2009, the Oklahoma Department of Environmental Quality approved the engineering
design, and issued the required permit to construct the improvements.
Advertisements for bids were published in October 2009 to solicit bids for the construction of the
upgrade. Four bids were received and opened on November 11, 2009. BRB Contractors was
determined to be the lowest responsive, responsible bidder with a bid amount of $8,465,500. The
engineering estimate for construction provided by Greeley and Hansen was $8,835,411
Prior to and during construction, two (2) administrative change orders were necessary to be
compliant with both Federal and State mandates. Change Orders #1 and #2 were for the
inclusion of the Davis Bacon Wage requirements and for the statutory 100% bonding
requirement in the State of Oklahoma. Change order #1 in the amount of $478,395 was
approved by the trustees in conjunction with the bid award in November of 2009. Additionally,
on April 27, 2010, change order #2 in the amount of $19,713 was approved by the trustees.
Change Orders #3 & #4 were field changes discovered during the construction of the upgrade
and necessary to complete the intended design of the plant. Change order #3 in the amount of
$18,452 was approved July 30, 2011 and change order #4 in the amount of $117,055 was
approved by this body on September 2, 2011. The original contract amount summed with the
four change orders results in a revised and final contract amount of $9,099,116.39.
COMPLETION OF PROJECT:
Substantial completion of this project was obtained on September 27, 2011 with final completion
on December 1, 2011. BRB Contractors has completed the project in its entirety and upon
inspection by staff, the design engineering firm, and the inspection firm, the project has been
found to be acceptable and in accordance with the design engineer's intent.
FUNDING:
Funding for this project has been obtained from the Oklahoma Water Resources Board (OWRB)
via a loan from the Drinking Water State Revolving Fund.
RECOMMENDATION:
Staff recommends acceptance of the Wastewater Treatment Plant Expansion and 1 171h Street
Pump Station Upgrade and authorization to issue final payment to BRB Contractors of Topeka, KS
in the amount of $505,167.23 for a total and completed contract price of 9,099,1 16.39.
ATTACHMENT:
A. Location Map
B. Final Pay Request
C. Certification of Project Completion
V%IWTP & 117TH LS
YAl
1" = 752 ft LOCATION MAP
12/07/2011
�I 'In"
I
t
This map represents a visual display of related geographic information. data provided hereon is not a guarantee of actual field conditions. To be sure of complete accuracy,
please contact Owasso staff for the most up -to -date information.
ORF -121A
2/28/00
CERTIFICATION OF PROJECT COMPLETION
This is to certify that:
1.) The Publicly Owned Wastewater Treatment Works known as The Owasso Wastewater
Treatment Plant Expansion & 117th Pump Station Upgrade Project, Project Loan No. ORF- 09 -0003-
CW (2009B WWTP) owned by the Owasso Public Works Authority is fully operable and has been
completed in accordance with the approved Plans and Specifications and applicable laws, rules and
regulations.
2.) The design life of the project is to the year 2022 *.
3.) The date of construction completion for the above referenced project is December 1, 2011.
4.) All items of construction are acceptable to the owner of the treatment works.
5) All requests for Construction loan proceeds have been drawn as shown on Payment Request No.
23.
6) The OWRB is authorized to de- obligate any remaining loan proceeds. [USE THIS PARAGRAPH
ONLY IF ALL LOAN PROCEEDS WILL NOT BE UTILIZED!]
(Authorized Representative)
Signature:
Title:
Chairman, Owasso Public Works Authority
Date:
(* Note: Repayment terms of a loan made from the State Revolving Fund may not exceed the lesser
of 20 years from construction completion, or the useful life of the project.)
CITY OF t)W ASSO
WASTEWATER TREATMENT PLAUNT EXPANSION
A.NND
1. 17TH STREET PLT-MP STATION UPGRADE
OWASSO, OKL 4:[ TJMA
PAY ESTIMATE NO. 2"1
PERIOI?: Thursday. September 01, 2011. to Friday, September 30, 2011
CONTRACTOR: 3RB Contractors, Inc., P. O. Sox 750490, Topeka, KS 66675
BID AMOUNT OF ORIGINAL CONTRACT:
CONTRACT ADJUSTMENTS:
ADJUSTED SID.AMOUNT:
S8,465,500.00
$633,616.39
K099,116.39
TOTAL COMPLETE WORK: .
$9.,099,11 $0.06.39
MATERIALS STORED (per attached tabulation ): $6.39
$9,099,116.39
TOTAL EARN —ED: $9,099,116.39
PERCENTAGE OF PROJECT COMPLETION: 100.0%
LESS PREVIOUS PAS' 1 NTS: $8,593,949.16
AAMOU€ I T DUE THIS ESTIMATE: $505,167.23
'I'he undersigned Contrmtor certiars that to the best of die Contractor's, knosrledbnc, infortuatiou and belief the Work covered by this
Paynscnt. Fstitnatc has been cornpletLd in accordance utith Contract Dorumeztts, duu all amounts have bern paid by the Contractor for Stork
% -vhich precious Payment Estimates were issued aid payments recei-d from the Owner, and da,-tl current payment showtt herein is u nv
due. 3
BRB CONTRACTORS.. INC. � a
us
P � I
BY. Date: m x
Andrei' R .tar s, Cject a Caber . tt
a
State of: Ka sas R —
County of: Shawnee Notary Pudic
8ubseribed and sworn to before me this Sth davo t7ecetiber, 2011 ;biv Commission. Expires:
R.ecoinrnexided for
Payment by:
f O ,asso
Date
Approved For
ParTne at by:
t :=.tv. of Otia assc�
?a?e
CITY OF OVTASSO
WASTEWATER TREATMENT PLANT EXPANSION
AND
117TH STREET PUMP STATION
PAY ESTIMATE NO. 21
Pav
Iteril
Description
ui
nits
Units
I To Date
---
Esd �t(xt
C 0,,3 t
Amoui
Estim
ffE 0, :ti'x a t c
—
Amount Tliis
ffustill,
mate
I n
Ea r ri ed
To Date
coni pi
Nl0BILIZXrl0N
-altel
I
MOBILIZE
100
PC
100 PC
$280,292.00
$ 280,292,00
$
$
280,292.00
2
DEMOBILIZE
100
PC
100 PC
$10,000,00
$ , 10.000.00
$
It
10,000.00
00,
3
BONDS &- INSURANCE
100
PC
100 PC
$256,341.00
$ 256,341.00
$ -
$
2,56,341,00
4
START-UP
100
PC
100 PC
$25,000.00
$ 22,500.00
$ 2,500.00
$
25,000,00
SITEWORK
5
INSTALL EROSION CONTROL
100
PC
100 PC
$29,295.50
$ 29,295,50
$ -
$
29,295.50
6
EROSION CONTROL INSPECTIONS
18
N10
18 MO
$18,000.00
$ 18,000.00
$
$
18,000.00
7
SITE DEMO (ASPHALT aft CONCRETE)
100
PC
100 PC
$75,500.00
$ 75,500.00
$
$
75,500wo
8
DEMO FENCE
100
PC
100 PC
$2,500.00
$ 2,500.00
$
$
2,500.00
J 00, ";�
%i:
9
INSTALL FENCE
100
PC
100 PC
$5,210.00
$ 5,210.00
$
$
5,21.0.00
1001
:0 ,,;,
10 SEEDING
100
PC
100 PC
$3,000m
$ 1,500-00
$ 1,500.00
$
3x000.00
I
I I CI J R B G UITE R
100
PC
100 PC
$18,000m
$ 18,000.Q0
$ -
$
18,000.00
12 S'I'RI.P/SI'OCKPILE'I'(,)PSOIL
100
PC
100 PC
$29,850.00
$ 29,850.00
$ -
$
29,850.0e,
100,11;-
3 FINE GRADE
100
PC
100 PC
$10,000-00
$ 10,000.00
$ -
$
-
10,000.00
100'x,",
14 SUBGRADE FOR ASPHALT PAVING
100
PC
100 PC
$55,630.00
$ 55,630.00
$ -
$
55,630.00
001;,,,
15 CRUSHE . D ROCX SURFACE
100
PC
100 PC
$4,000.00
$ 4,000.00
$ -
$
4,000.00
I
1
16 AqPHALTPAVfNG
100
PC
100 PC
$68,423.00
$ 68,423.00
$ -
$
68,423,00
10
1 7 SIDEWALKS
100
PC
100 PC
$4,700.00
$ 4,700.00
$ -
$
4,700.00
1)
100,,%
18
BY -PASS PUMPING FOR TIE-INS ON YARD P] PING
1.00
PC
100 PC
$20,000.00
8 20,000-00
$
$
YARD PIPING
-
20,000,00
1
19 3" LINE
493
LF
493 LF
$37,150.00
$ 37,150.00
$ -
$
37, 150.00
I
20 4" LINE
881
LF
881 LF
$65,035.00
$ 65,035.00
$ -
$
65,035.00
100,5
21 6" LINE
690
LF
690 LF
$50,805.00 $
50,805.00
$
$
50,805.00
1.001y,
22 8"
LINE
62S
LF
625 LF
$61,335.00 $
61,335.00 $ -
$
61
100 0/14"
231 10"
LINE,
20
LF
20 LF
$2,480.00 $
2,480.00 $ -
$
,335.00
2,'480.00
10 ("'; t
24 1.21'
LINE
537
LF
537 LF
$59,840.00 $
59,840.00 $ -
$
59,840.00
3
2 -5 16"
LINE
331.
LF
331. LF
$36,095.00 $
36,095.00 $
$
36,095.00
26 18"
LINE
20
LF
20 LF
87.555,00 $
7,555.00 $
$
7,555.00
Page 2 of 12
CITY OF OWASSO
WASTEWATER TREATMENT PLANT EXPANSION
AN .D
1. 17TH STREET PUMP STATION
PAY ESTIMATE NO. 21
Rit y =Cont,-Lac
Units
L �U�ln:
i�ate
Estimated
s
Amount Last Amount This 7 —ri e c I
Description
Description Units
Units
27 20" LINE
To
J'i Date te
Cost
1,
's im�
Esti=te Estimate
timal" Fo P
20 1R
IM I P
dt� I i An Q fin
0 , , 1-11 -- , 1�
28
24"LINE
--
41
1$
11,429,00
1
29
30" LINE
1264
LF
1264 LF
$234,695.00
$
234,69,5.00
$
234,695. 00
30
24" RCP 45
337
LF
337 LF
$96,337.00
$
96,337.00
$
- $
96,337�00
31
30" RCI)PIPE,
100
PC
100 PC
$50o.00
$
500-00
500.00
1 OU'llo
32
STAINLESS STEEL PIPING
440
LF
440 LF
$20,530.00
$
20,530.00
$
- $
20,530.00
1 O(P/
33
YARD HYDRANTS
100
PC
1.00 PC
$80,150-00
$
80, i.50,00
$
- $
80,150,0()
1. 001,11"
34
TTVIANHOLES
10
EA
1.0 EA
$20,000.00
$
20,000.00
$
- $
20,000.00
000
35
OMANI- IOLES
113
Vr,
113 VF
$22,825.00
$
22,825,00
$
- $
22,825.00
36
8'MANI-JOLE
27
VF
27 VF
$12,190.00
$
12,190,00
$
- $
12,190,00
15
VF
15 VF
$1.3,545.00
$
13,54-5.00
$
-
13,545.00
RELIEF PUMP STATION
37
DE,MO./i'LJN;IPS/CO.N-r'l2Ot.,S
100
PC
100 PC
$37000.00
$
3,000.00
$
38
PRECAST INIANI -TOLE PUMP STATION
100
PC
100 PC
$40,150.00
$
40,150-00
$
$
3;000.00
40,1,50j)0
3 9
,
PUNIP STATION EQUIPkIl"N'T
100
PC
100 PC
$37,575.00
$
37,575.00
$
40
EXCAVA-11ON
100
PC
100 PC
$14,500.00
$
14,500.00
$
$
$
37,575.00
1
41
SHORING PROTECTION
100
PC
100 PC
$17,700.00
$
17,700.00
$
$
14,500.00
MAIN FLOW STRUCFURE
17,700.00
42
EXCAVATJONT
100
PC
100 PC
$2,500.00
$
2,500,00
$
- $
2,500.00
43
DENIO
100
PC
100 PC
$3,500,00
$
3,500.00
$
- $
3,500.00
44
CONCRETE
100
PC
100 PC
$10,000.00
$
10,000.00
$
- $
10,000.00
45
BACKFILL
100
PC
1.00 PC
$2,500.00
$
2,500.00
$
- $
2.500.00
46
SLIDE GATES SLG-.rvlPc,-1 TI- RU SLG-NIPS -4
100
PC
100 PC
$35,855,00
$
35,855.00
$
- $
35,855.00
STREET PUMP S-1-ATfON
47
CON(-.*RETrt
30
CY
30 Cy
$24,000.00
24,000,00
$
$
24,000.00
48
DOORS & HARDWARE
100
PC
100 PC
$1.0,100.00
$
10,100.00
$
- $
10,100,00
49
HOIST & CRANE
100
PC
1.00 PC
$1.0,785.00
$
10,785.00
$
- $
10,785.00
70
PIPING & VALVES
100
PC
1.00 PC
$88,500-00
$
881,500.00
$
- $
88,500.00
51
NEW MANSARD ROOF
100
PC
100 PC
$17,500.00
$
17,500.00
$
- $
17,500.00
52
ODOR CONTROL SYSTEM
100
PC
100 PC
$58,300.00
$
58,300.00
$
$
58,300.00
1
53
I)ENTO-GENEI�,-�TOf\/EXI-IAUST
100
PC
100 PC
$2,500.00
$
2,500.00
$
2,500,00
100,
54
DE 00- I" CW SERVICE
100
PC
100 PC
$1,520.00
$
1,520.00
$
.1,520.00
;j
1
Page 3 of 12
CITY OF OWASSO
WASTEWATER TREATMENT PLANT EXPANSION
AND
117TH STREET PUMP STATION
PAY ESTIMATE NO. 21
I t e nm
IM
i l l ct
Unlits
Z
Estimated
Amount Last
t'I' This
Earned
Description
55 PASS PU`-N,1PJNG
UnitsT7O
t,
ost
_
Estimate
�Ain
E stin iate
lo.Dal
$
i on r),-
$
$
13,150.00
P
56 DDYIO-PUNIPS & PIPING
57 INSTALL PUMPS
58 NEW 2" CW
59 NEW WATER mETER/MAINHOLE
60 BUILDING.M.N[ISHES
DIGESTER
EXCAVATION
62 SUBGRADE/SELECT FILL
63 CONCRETE
64 DEMO AREATION IN DEG EI-STER 2
65 AERATION IN NEW DIGESTER & DIGESTER 2
66 STAIR k. LANDING
67 SLIDE GATE
DSO PUMP STATION
68 EXCAVATION
09 NEW PUMP SI'ATION/VAULT
70 CONCRETE PAD
71 BACKFILI,
BLOWER BUILDING
72 CONCRETE
73 PIPING & VALVE:5
74 BLOWER/HOUSING
EXISTING AERATICINTANK
75 DEMC)- PIPING & SPLITFER BOX
76 CONCIkEIT"
77 NEWS7,AIR. ENTENSION/MISC METALS
78 D.E'NIO EXISTING AERA710N
79 NEW AREATION
FINAL CLARIFIER
80 STRUCTURAL, EXCAVATION
- - -
11--,-11---
,
—,—J.uv
P
zl�,
20bbO,00
1. 00",
1.00
PC
100 PC
$13,150m
$
13,150.00
$
$
13,150.00
100
PC
100 PC
$141,286.00
$
141.286.00
$
$
141.286.00
100
PC
100 PC
$1,800.00
$
1,800.00
$
$
1,800.0()
100
PC
100 PC
$4,700.00
$
4,700.00
$
$
4,700.00
100
PC
100 PC
$2,400.00
t
2,400.00
$
$
2,400,00
100
PC
100 PC
$25,500.00
$
25,500,00
$
$
25,500.00
,
100
PC
100 PC
$17,520.00
17,520.00
$
$
17,520,00
i (A ,
366
CY
366 CY
$311,100.()0
$
311,100,00
$
- $
31.1,100.00
JOOIX.:
100
PC
100 PC
$8,500.00
$
8,500.00
$
- $
8,500.00
-,10011
100
PC
100 PC
$488,000.00
$
488,000.00
$
- $
488,000.00
1001!1�-
100
PC
100 PC
$34,145,00
$
34,145,00
$
- $
34,145.00
1 () 0 I'-'o
100
PC
100 PC
$6,500.00
$
6,500.00
$
- $
6,500.00
10o"',
100
PC
100 PC
$5,000.00
$
5,000.00
$
- $
5,0()0.0()
1
100
PC
100 PC
$52,520.00
$
52,520.00
$
- $
52,520,00
1.00
PC
1.00 PC
$3,500.00
$
3,500,00
$
- S
3,500.00
100
PC
100 PC
$3,500.00
$
3,500.00
$
$
3,500.00
100
PC
100 PC
$3,500.00
$
3,500,00
$
- $
3,500.00
100
PC
1.00 PC
$4,100.00
$
4,100.00
$
- $
1,100.00
100
PC
100 PC
$60,641.00
$
60,641.00
$
- $
60,641-00
100
PC
100 PC
$1-8,750.00
$
18,750.00
$
- $
18:750.00
100`11:,
15
Cy
1.5 Cy
$12,750.00
$
12,750,00
$
- $
12,750-00
00"',
1.00
PC
100 PC
$4,685.00
$
42685.00
$
S
4,685 00
100
PC
100 PC
$30,000.00
$
30,000.00
$
$
30,000.00
0
100
PC
100 PC
$586,150-00
$
586,150.00
8,
$
58E7,150.00
100, <,
100
PC
100 PC
$47,960.00
$
47,960.00
$
$
47,960.00
Page 4 of 12
Pay
Item Description
81 BACK FILL
82 CONCRETE,'
83 Cl-ARIFIER EQUIPNIENT
834 TORQUE-OVFELOAT) CON'rROL. PANI L
85 FRP WEIR/SCUNI BAHLES
86 FLANGED PIPING // VALVES
87 GROUT
FLOW STRUCTURE NO. 2
88 STRUCTURAL EXCAVATION
89 BACKFILL
90 CONCRETE
91 MISC METALS
92 SLIDE GATE'S SLG_FC2_j '111RU SLG-F(.'2-3
DRYING BEDS & RETAINING WALL
93 I)EtAO-CONCRETE
94 NEW CONCREFE RETAINING WAU,
UV DISINFECTION & CASCADE AERATOR
95 STRUCTURE EXCAVATION
96 DEN4O-PIPJNTG/CONCRETI,,
97 CONCRETE
98 misc mE'rAL.S/GRATNG
99 UV EQUIPk'iENJ-
100 SLIDE GATES SLG-UV-I 'F.f.IRU SLG-U-\1-4
101 BY-PASS PUMPING
BELT PRESS BUILDING
102 DEMO—PUMPS/PIPING
103 1 NSTALL GRAVITY BEI-TTHICKNER
104 PUMPS GBTEP I & 2
105 PUMPTWASP-1
106 PROCESS PIPING
107 1`01-YN4 ER SYSTETVI
CITY OF OWASSO
WASTEWATER TREATMENT PLANT EXPANSION
AND
117TH STREET PUMP STATION
PAY ESTIMATE NO, 21.
Contract
Units
Units
To Date
Estimated
Estimated
Cost _
Aunoun�tLa'sst._
Estimate
Amount This
Estimate
Earned
-C
To Date
$
100
PC
100 p
$23,000.00
1$ 25,000,00
$
$ 25,OOO.00
—1 '7.
488
CY
488 CY
$414,800,00
$ 414,800.00
$
513 114,800.00
76 CY
100
PC
100 PC
$116,200.00
q; 116,200.00
$
$ 116,200,0()
100
100
PC
100 PC
$34,742.00
$ 34,742.00
$
$ 31,742,00
9'050.00
100
PC
100 PC
$13,900.00
$ 13,900.00
$
$ 13"900,00
1 0
100
PC
100 PC
$26,035.00
$ 26,035.00
$ -
$ 26,035.00
1 11)011
25
CY
25 CY
$6,250.00
$ 6,250.00
$ -
$ 6,250,00
10(.r`,:,
100
PC
100 PC
$7,500.00
$
7,500.00
$
- $
7,500,00
1
100
PC
100 PC
$5,500.00
$
5,500.00
$
- $
5,500-00
1 001'1-;'
76
CY
76 CY
$68,400.00
$
68,400.00
$
- 1$
68,400.00
100 ",i
100
PC
100 PC
$9,050.00
$
9,050.00
$
- $
9'050.00
100
PC
100 PC
$28,010,00
$
28,010,00
- $
28;010,00
100
PC
100 PC.
$75,000.00
$
75,000,00
$
- $
71'5000.00
27
CY
27 CY
$10,000.00
$
10,000.00
$
- $
10,000.00
100
PC
100 PC
$6,500.00
$
6,500.00
$
- $
"5 () c). 0 0
100
PC
100 PC
$3,500.00
$
3,500.00
$
- $
3,500.00
32
CY
32 CY
$27,200.00
t
27,200,00
$
- $
27,200.00
10c,
100
PC
100 PC,
$7,600.00
$
7,600.00
$
- $
7,600,00
100
PC
100 PC
$203,450.00
$
193,277.50
$
10,172.50 $
203,450.00
10044,
1.00
PC
100 PC
$37,565.00
$
37,565.00
$
- $
3'7,;65:00
1
1.00
PC
100 PC
$17,700,00
$
17,700,00
$
- $
17300.00
J U()".lIr
100
PC
100 PC
$2,500.00
$
2,500.00
$
- $
2,500M
1001 o
100
PC
1.00 PC
$226,120.00
$
226,120.00
$
- $
226,120.00
100
PC
100 PC
$16,100.00
$
1.6,100.00
$
- $
16,100.00
100
PC
100 PC
$1.6,100.00
$
1.6,100,00
$
- $
16,100,00
100
PC
100 PC
$4,500.00
$
4,500.00
$
- $
4.500:00
100
PC
100 PC
$41,479,00
$
41,479.00
$
- $
41,479.00
100
Page 5 of 12
CITY OF OWASSO
WASTEWATER TREATMEN,r PLANT EXPANSION
AND
117TH STREET PUMP STATION
PAY ESTIM.A']*'F, NO. 21
Pay
ftem
Description
108 CONCRETE
109 MISC IVIETALSIGRATINCI WALKWAY
ACTIVATED SLUDGE PUMP STATION NO. 2
110 STRUCTURE EXCAVA'IJON
111, BAC.KFILL
112 CONCRETE
113 PRECAST 1-101,1,01,'v'CORE SLABS
114 DAj%,11'-'f'ROOFING
115 ROOF BLOCIQNG
116 ROOFING SYSTENI
117 DOORS & HARDWARE
118 BUILDING FINISHES
119 HOIST & CRANE,
120 INSTALL PL)NJPS RA., P-1 & 2
121 PUMPS BPFP-1
122 P L I N,,.f N-� G BTF P
123 PROCES5 PIPING & VA LVES
124 STAIR & LANDING
CONTROL, BUILDING
1.25 MILLWORK
126 DOORS &- HARDWARE'
127 BUILDING FINISHES
128 DRYWALL/ IMETAL '--,TUDF.RA-kllNG
129 TILE FLOOR
130 ACOUSTICAL CEILING
ACTIVATED SLUDGE PUMP STATION NO. I
131 PUNIPS/R.AILS
132 DEMO- WAS PUh4f-S/PfPING//RAILS
133 NEW FLANGED PIPING
PROCESS EQUIPMENT
Con '1'-t
Contract
t-r LT
T-Trlits
units
Estimated
Estimated
$3,290.00
AmountLast.
Ainou�t Th=i,Ea,,,,,cl
$
- $
—7--
Units
To Date
cost
100 PC
Estim.
ate
Estirri ate
5,180.00
7 Da
To Date
Coll-,I)l
too
PC
100 PC
(In(
$114,0,00
00
$
14,000.00
$
$
114,000.00
- $
1.00
PC
too PC
$1.0,000,00
$
10,000.00
$
3,500,00
10,1000.00
- $
31,500.00
100
PC
100 PC
$2,500.00
$
2,500.00
$
-
100
PC
100 PC
$56,000.00
$
56,000.00
$
$
56,000,0()
- $
100
PC
100 PC
$27,000.00
$
27,
,000.00
$ -
$
27,000.00
100!4)
616
CY
61.6 CY
$554,400.00
$
554,400.00
$ -
2,500.00
554,400.00
10")'; -;,
1.00
PC
100 PC
$19,180.00
$
19,180.00
$ -
$
19,180.00
- $
100
PC
100 PC
$3,300.00
$
3,300.00
$
3,300.0(.-,,
j 01U,,;,
100
PC
100 PC
$1,325.00
$
1,325.00
$
1$
1,325,00
10;01;,,
1,00
PC
100 PC
$9,850.00
$
9,850.00
$
$
9,850.00
loo"41
100
PC
100 PC
$10,750.00
$
10,750,00
$
$
.1.0,7 50.00
100",
100
PC
100 PC
$500.00
$
500.00
$
$
500.00
100
PC
100 PC
$10,750.00
$
10,750.00
$
10'750.00
1.00
PC
100 PC
$3,500.00
$
3,500.00
$
$
3,500,00
100
PC
1.00 PC
$17,500.00
$
17,500.00
$
$
1./"500.00
100
PC
100 PC
$17,500.00
$
17,500.00
$
$
1, 1 � 3500,00
100
PC
100 PC
$36,266.00
$
36,266.00
$
$
36,266,00
100
100
PC
1.00 PC
$23,251.00
$
23,251.00
$
23,25 1.00
100
PC
loo PC
$3,290.00
$
3,290,00
$
- $
3,290.00
t0ull ,,,
100
PC
100 PC
$5,180.00
$
5,180.00
$
- $
5,180.00
i 0011/.
1.00
PC
100 PC
$500.00
$
500.00
$
- $
500.00
00'�
100
PC
100 PC
$3,500.00
$
3,500,00
$
- $
31,500.00
100
PC
100 PC
$2,500.00
$
2,500.00
$
-
2,500.00
j
100
PC
100 PC
$1,500.00
$
1,500.00
$
- $
1,500.00
1.00
PC
100 PC
$45,250.00
$
45,250.00
$
- $
45,250,00
100
PC
100 PC
$2,500.00
$
2,500.00
$
- $
2,500.00
100%11
100
PC
1.00 PC
832,000.00
$
2,000.00
$
- $
2,000.00
J
Page 6 of 12
Pay
Item Description
134 SUB I E RSIB 1, E GBT PIED P U M, P,13 113 08
135 SCREW CENTRIFUGAL PU'v1PS'1 1.312
ELECTRICAL SUB
136 MOBILIZE/ BOND
137 SURNIT•1-I'ALS/CLOSEOUT
138 DEMOLITION
139 TEMP POWER
140 117-111 P UN-I PS"I'ATI ON
141 DIGESTER
142 PINAL Cl..AMFIER
143 EFFLUEN1 UV &, CASCADE AERATOR
.144 SLUDGIl, THICKENING IN,4PROVEMENTS
145 f101VATED SLUDGE PUMP STATION 2
146 CON'.IROL BUILDING
1.47 l3U(.-I*'BANT<I/DIS'1'IZIBU7.1.'ION
148 FIXTURES
1.49 DRIV17 ' S
1.50 SWITCH GEAR
151 GENT ERATORS/ ATS/FUEL
152 RELTE ' F PU&JP I.-)TA'I"ION
153 ACTIVATED SLUDGE PUMP STATION I
PLUMBING & 11VAC
154 BOND
117TH. STREET PUMP STATION
155 EXHAUST
156 HV.AC
157 PIPING
158 SLI•IP PUMPS
159 CONTROLS
BELT PRESS BUILDING.
1110 EXHAU51'
CITY OF OWASSO
WAS'TEWATERTRE ATMENT PLANT EXPANSION
AND
117TH STREET PUMP srxriON
PAY ESTIMATE NO, 21
contract
Units I
Estimated
$3,562,00
Amoort Last
Arna
$
Earned
3,562,00
Units
To D
Cost
I
Estimate
I
Estimate
!L=
$
To Date
cor-l";
100
PC
100 PC
$48,417.00
$11,316.00
48,41.7.00
$
-
q,
18,417.00
i"
1 (g)"
100
PC
100 PC
$50,602.50
$
50,602.50
$
-
$
50,602-90
]
1.00
PC
100 PC
$26,495.00
8,769.00
$26,495,00
$
-
$
26,495.00
PC
100
PC
100 PC
$10,000.00
$
91500.00
$
500.00
$
1.0,000.00
100
PC
100 PC
$6,200.00
$
6,200.00
$
-
$
6,200.00
100"1;1
100
PC
100 PC
$12,000.00
$
12,000.00
$
-
$
12,000.00
100
PC
100 PC
$91,400.00
$
91,400,00
$
-
9.1,400,00
10, - .),
100
PC
100 PC
530,400.00
$
30,400.00
$
-
$
30,400.00
100
PC
100 PC
$9,300.00
$
9,300.00
$
-
$
9,300.00
1,00
PC
100 PC
$14,100,00
$
13,395.00
$
705.00
1:1
14.1,00,00
100`"r:
1.00
PC
100 PC
$47,300.00
$
47,300,00
$
-
$
47,300.00
0C)"5"
1.00
PC
100 PC
$90,600.00
$
90,600.00
$
$
90,600.00
100
PC
100 PC
$13,700.00
$
13,700.00
$
$
1.3,700.00
100
PC
100 PC
$268,360.00
$
268,360.00
$
$
268,360.()o
100
PC
100 PC
$16,600.00
$
16,600.00
$
$
16,600.00
i
100
PC
1.00 PC,
$98-500-00
$
98,500,00
$
-
$
98,500,00
100
PC
100 PC
$122,900.00
$
1.22,900,00
$
-
$
122,900,00
0"
100
PC
100 PC
$256,800.00
$
256,800.00
$
-
$
256,800.00
LO (Y :,
100
PC
100 PC
$8,840.00
$
8,840.00
$
-
$
8,8-1,0,00
1
100
PC
100 PC
$6,200.00
$
5,580.00
$
620.00
$
6,200.00
10o ;'
100
PC
100 PC
$3,562,00
$
3,562.00
$
- $
3,562,00
101,1'
100
PC
1.00 PC
$7,819.00
$
7,819.00
$
- $
7,819.0()
1001"';'
100
PC
100 PC
$11,316.00
$
11,316.00
$
- $
11,316.00
100111f"
100
PC
100 PC
$3,607.00
$
3,607,00
$
- $
3,607-00
100
PC
100 PC
$8,76().00
$
8,769.00
$
$
8,769.00
100
PC
100 PC
$5,300.00
$
5,300.00
$
5 300•(.*)0
100 PC 1.00 PC $5,871.00 $ 5,871.00 $ - $ 5,871,00
Page 7 of 12
CFFYOF OWASSO
WASTEWATER TRENIMENT PLANT EXPANSION
AND
117TH STREET RUMP sTA'nON
PAY ESTIMATE NO, 21
I
Pav
Contract
Units
CONTRm
Units
I of
100
PC
To Date
Corn.-161 I
ACTIVATED SLUDGE PUMP STATION NO. 2
162 EXHAUST
163 HVAC
164 SUMP PUMPS
1(7> EXCAVATION
166 UNDER GROUND PLUMBING
](,-)7 DOMESTIC WATER
168 FIXTURES/DRAINS
169 INSULATION
1.70 CONTROLS
CONTROL BUILDING
7:71 EXHAUST
172 FIVAC
173 EXCAVA11ON
174 UNDER GROUND PLUMBING
175 DOMESTIC WATER
1 '176 FIXTURES fl-)RAINS
177 INSULATION
178 CONTROLS
MASONRY
179 ACTIVATED SLUDGE FUtvIF'STATION NO, 2
180 117TH STREETPUMP S'-FATION
181 CONTROL BUILDING
1.82 STONENIATERIAL
183 PAINTING
INSTRUMENTION
184 OFFICE SCADA SOFTWARE
185 SYSTEN4 PROGRAMMING
2-200,00
I of
100
PC
100 PC
$12,800.00
$
12,800.00
$
$
12,800.00
M()"'
100
PC
1.00 PC
$13,701.00
$
13,701.00
$
$
13,701.00
1001�11
100
PC
100 PC
$17,01.8.00
$
17,018.00
fii
$
17,018.00
1.00
PC
100 PC
$3,300.00
$
3,300.00
$
$
3,300.00
100
PC
100 PC
$16,300.00
$
16,300.00
$
$
16,300.00
100
PC
100 PC
$3,700.00
$
3,700.00
$
$
3,700. 00
100
PC
100 PC
$1,200.00
$
1,200.00
$
$
1,200.00
100
PC
100 PC
$700.00
$
700.00
IS
- $
700.00
1001XI
1.00
PC
100 PC
$7,000,00
$
7,000.00
$
- $
7,000.00
100
PC
100 PC
$6,400.00
$
6,400.00
$
$
6,z] 00.00
100
PC
100 PC
$7,851.00
$
7,851.00
$
$
7,85.1,00
100
PC
100 PC
$700.00
$
700.00
$
$
700.00
100
PC
100 PC
$1,301.00
$
1,301.00
It
$
1,3011.00
100
PC
100 PC
$1,005.00
$
1,005.00
$
11 $
1'005.w
001".
100
PC
100 PC
$I,400.00
$
1,400.00
$
$
1,'100.00
(y-".'
100
PC
100 PC
$400.00
$
400.00
$
400.00
1(%O s,
100
PC
100 PC
$2,800,00
$
2,800.00
',b
2,800.00
100
PC
100 PC
$70,580.00
$
70,580.00
$
70,580.00
1
100
PC
100 PC
$6,000,00
$
6,000,00
$
6,000.00
100
PC
100 PC
$2,500.00
$
2,500.00
$
2.500.00
1 00t":
100
PC
1.00 PC
$27,792.00
$
27,792,00
$
27,792,00
100
PC
100 PC
$134,980.00
$
134,980,00
8
$
134,980.00
(WIX,
1.00
PC
100 PC
$25,000.00
$
25,000.00
$
$
25,000.00
100
PC
100 PC
$26,000.00
$
26,000.00
$
$
26,000.00
1OU; '
Page 8 of 12
CITY OF OWASSO
%VASTEWNrER TREATMENTPLANT EXPAN SION
AND
117TI-I STREET PUMP STATION
PAY ESTIMATE NO, 21
P11131,
Iten:
Contract
Units t,
Es,,thr:;
Amount Last
Amount This
E'.
°( v,
186
Description
FFICE
Units
1
To Date
Data
Cost
Estimate
To D a tc.
�IF 1
Col"'lpl
187
AC ['IVVA-I'ED SLUDGE PLC PANEI,
100
PC
100 PC
$9,000m
$,
9,000,00
$
:
188
ACTIVA".11D SLUDGE REMOTE PLC PANEL
100
PC
100 PC
$35,000-00
$
35,000.00
$
$
35,000.00
1 }0';
189
1117,11-1 LS PLC PANEL
100
PC
100 PC
$15,500.00
$
151500�00
$
$
1.5,500,00
.1. }C3';,,
190
NETWORK HARDIVARE
100
PC
100 PC
$12,500.00
$
12,500.00
$ -
$
12,50000
1.91
MAIN PUJVI PST ATION PANEL
100
PC
100 PC
$8,000.00
$
8,000.00
$ -
$
8,000.00
192
PLC PROGR AMM ING SO MWARE
100
PC
100 PC
$25,250.00
$
25,250.00
$ -
$
25,250.00
193
FIBER MODULES AND SPARES
1.00
PC
100 PC
$9,500,00
$
9,500.00
$ -
$
9,500.0()
194
SYSTEM INTERGRATION AND PROGRAMMING
100
PC
100 PC
$22,250.00
$
22,250.00
$ -
$
22,250.00
195
FE./FIT-205 (PLANT INFLUENT FLOW TO HEADWORKS)
100
1.00
PC
PC
100 PC
100 PC
886,000.00
$32,491.53
$
$
86,000.00
$
$
86,000.00
1 001X
196
FE/ffr-qi.j (I"INTAL CLARIFIER NO. 1-3 EFFLUENT TO UV)
100
PC
100 PC
$32,491.53
$
32,491.53
$
$
32,491,53
1
197
FE/Frl'-912 (FIN A L CLARIFIER 4 EFFLUENT FLOW TO UV)
1.00
PC
100 PC
$32,491.53
$
32,491.53
$
$
32,491.:;3
1,001VI
198
FE/Fr.1--1 170 (DISCI IARGE OF 117TH ST. PUMP STATION)
100
PC
100 PC
$35,654.03
$
32,491-93
$
$
32,491.53
1001<-
199
1'E /Fri . - - 0,553 ( ' FINAL CLARIFIER NO 4 RA,,-, FLOW)
100
PC
100 PC
$6,645.74
$
35,654.03
6,645.74
$
200
FE/FIT-860 (BPF PUMP DISCHARGE LINE 1.0 BELT' PRESS 1)
100
PC
100 PC
$4,389.87
$
$
$
6,645 714
JA
201
FE/FtT-1210 (WAS PUMPS FEED -1-0 GBTN0 1)
100
PC
100 PC
$4,389.87
$
4,389,87
4,389.87
$
202
FE/FIT-124-0 (ItlVASP DISC.HARGE LINE TO DIGESTER)
100
PC
100 PC
$3,938,26
$
$
4389,87
203
FE/ FIT-310 (AIR LINE TO DIGESTER NO 1)
100
PC
100 PC
$8,696,88
$
3,938.26
$
18
3,9..38._•6
100%•
20.1
FT, '/FIT-320 (AIR LINE TO DIGESTER NO 2)
100
PC
8,696,88
$
$
8,696.88
i 0();"
205
FE/FJT-33-0 (AIR LINE.-T'O DIGESTER SLUDGE STORAGE)
100
PC
100 PC
100 PC
$7,527.13
$6,653.90
$
7,527.1.3
$
$
7,527.13
206
AF/ All 7:11. (D](.-,ES'rER NO I AS SHOWN)
100
PC
100 PC
$5,559.68
$
$
6,653.90
5,559,68
$
$
$
6,653.90
1 00111�
207
AE /AI I' -712 (DIGESTER NO 2 AS SHOWN)
100
PC
100 PC
$5,559.68
$
5,559-68
$
$
5,559.68
-1
208
E / 'SIT -713 (DIGFSTERNO 3 AS SHOWN)
100
PC
100 PC
$5,433.18
$
5,433.18
$
5,559.68
1
209
LE/L,171-103(REPLACE I'XISTING AERATION TRANSMITTER)
100
PC
100 PC
$1,977.01
$
1,977.01
$
$
5,433.18
210
LE/LIT-104. (REPLACE EXISTING HOLDING BASIN "TRANS)
1.00
PC
100 PC
$1,977.01
$
1,977.01.
-
$
$
1,977.01
211
LE/LIT-1171(1171-1-1 ST, PS LEVEL TRANSMITTER)
100
PC
100 PCI
$1,702.12
$
1,702,12
-
$ -
$
$
1,977.01
212
LE/LIT--IJ72(1.1—/Tj-j ST. PS LEVEL IRANSMITTER)
100
PC
100 PC
$1,702.12
$
1,702.12
$
1.702. 12
21.3
LSL-1 174(LEVEL SWITC1 LFLOAT SWITCH)
100
PC
100 PC
$710.93
$
710-93
-
$ -
$
$
1,302.12
710-93
CHANGE ORDERS
214
CT !ANGF ORDERS NO I(DAVIS BACON ACT WAGES)
1.00
PC
100 PC
$478,395.00
$
478,395.00
$
$
478,395.00
Page 9 of 12
CITY OF OWASSO
WASTEWATER TREATMENT PLANT EXPANSION
AND
117TH STREET PUMP STATION
PAY ESTIMATE NO. 21
Pay
t 1Y2
1 1� lact
=Units
Estimate.d
$
Amount Last 1
Amount This
4,421.0 3
Earlied
Description
211l--.)' C:I-IANGEC),RDI.'!',]�1,N,(.)2(BONDINCI.�EASLI,)
Units
3
100
Tr
To Date
Date
C69t
33'
Estimate
Estimate
7;085.29
To Date,
Co 11-1 r)
CHANGE ORDER NO 3 (CO-ST PROPOSALS 1 THRU 8)
I EA
PC
1.00 PC
(3,000,00)
$
9,713.00
100'
8"GBTFEED AND 12" RAS RELOCATION
19,713.00
I EA
DIGESTER GRATING
100
PC
100 PC
(xY ,'20, oa� o.
$
(20,000,00)
$
$
(20,000,00)
FLOOD INSURANCE DEDUCT
100
PC
100 PC
0t26 90f.,, j)())
$
(26,900.00)
$
$
(26.900.00)
$
AER KHON GRIDS CH ANGE IN SCOPE
100
PC
100 PC
($106,83'),01))
$
(106,830.00)
$
$
1,637.44
7. 000"
oi,virr RETAINING WALL AND ADD TO DRYING BED WAL1.1
100
PC
100 PC
3 1.., '50)
$
(7,312.50)
481 .39
f 106,830.00)
1
M ODIFIED SUMP PUMPS IN METER MANHOLES
100
PC
100 PC
$
$
(5,000.00)
$
$
$
(7,312--5-0)
$5,583.47
REMOVAL (.)F BRICK AT ASPS#2
100
PC
100 PC
)
"t
(19,400.00)
$
$
(5,00().()0)
5,583.47
BREAK ROOM CHANGES
100
PC
100 PC
1 EA
1
$
(1,108,00)
$
$
(19,400.00)
1,272.89
CN,']Lj WALL REINFORCEMENT
100
PC
100 PC
$9,480,19
$
9,480.19
$
$
(1,108,00)
SIDEWALK & MOW STRIPS
RELOCATE AERATION LINE
100
PC
100 PC
$5,732.64
$
5,732.64
$
9,480. 19
RELOCATE RPS CP#6
100
PC
100 PC
$120,483.86
$
120,483.86
$
$
1.20,483,86
FLO1,Y'CONTROL STRUCFURE OBSTRUCTIONS
100
PC
100 PC
$12,142.01
$
12,142.01
$
ENLARGED MANHOLES
73.25
VP
73.25 VF
$12,266.65
$
12,266.65
$
$
$
12,14 >2.1) 1
10MI!
DROP MANHOLES
19.7
VF
19.7 VF $
15,625.22
$
15,625.22
-
$
$
12,266.65
ELNI CREEK FORCENIAIN LENGTH
102
LF
102 LF
$29,272.73
$
29,272.73
-
$
$
15,625.22
21.6 CHANGE ORDER 44
-
2'),272.73
FC#6 12" LINE
I EA
I EA
$4,421-63
$
4,421-63
$
4,421.0 3
1 001�1)
PAVING TO EAST GATE
1 EA
I EA
$7,085.29
33'
7.085.29
$
7;085.29
i(.10%
117TH 31? PANEL
I EA
I EA
($3,0' o0,00)
s
(3,000,00)
s
(3,000.001
100'
8"GBTFEED AND 12" RAS RELOCATION
1. EA
I EA
$4,464.80
$
REMOVAL OF' BURIED STRUCTURES
I EA
1 EA
$3,634.99
4,464.80
$
4,464.80'
REMOVE FLANGE AT MAIN PLANT PUMP STATION
1, EA
I EA
$1,637.44
$
3,6 14.99
$
3,634.99
8" DRAIN TO NEW MANHOLE
I EA
1. EA
$481.39
$
1,637.44
$
1,637.44
7. 000"
USE EXISTING 24" FCE TO LTV
1. EA
1 EA
(1; 3,554.00)
$
$
481.39
$
481 .39
BOLT DOWN R&C, 117TH SUCTION BELL, ETC
1 EA
I EA
$10,298.12
(3,5,54.00)
$
(3,554,00)
c
SCADA RECONFIGURE 117TH
I EA
I EA
$5,583.47
$
10,298.1.2
$
10,298,12
0
GUTTER DRAIN
I EA
I EA
$4,272.89
$
5,583.47
$
5,583A7
ADDITIONAL FENCING
1 EA
1 EA
$8,607.07
$
4,272.89
$
It
1,272.89
FIBER OPTIC CABLE
100 PC
100 PC
$37,985.00
$
8,607.07
8,607.07
SIDEWALK & MOW STRIPS
I EA
I F.A.
$22,253.96
$
37,985.00
$
37,985.00
22,253.96
$
22;253.96
100
Page 10 of 12
CITY OF OWASSO
WASTEWATER TREATMENT PLANT EXPA.NSION
AND
I I 7TH STREET PUMP STATION
PAY ESTIMATE NO. 21
I terra
... ...... . - .
ontract
Units
Estimated
Amount Las,
Amount This
1-1-1
Earned
Description
COLLARS M—N
A-, RINGS
Units
I EA
To Date
Cost
Estimate
Estimate
IT—
-Er D
To Date
MODIFY DIGESTER #2 EQUIPMENT
I EA
I EA.
I EA
$ 7 65 , 8.1
$3,507.81
$ 765.81
'44
765,81
REROUTE 8" DRAIN FROM BELTPRE SS BUILDING
I EA
I EA
$8,609.92
3,507,13, 1
3,507.81
$ 8,609�92
$
8,609.92
9,099, t 16.39 8,966,063-30
1.33,053,09
$
%o9q, ...16.39 -1 --
1 00A.)
Page I1 of 12
NVASTU'ArATE, RTRFATMENT PLANT EXPANSION
UPGILADE
.)N
OWASSO, OKIATIOMA
A"-. - i -- - I...
ate:
TIO
31-OCIAl
N nIA'll "I' i:, i�� 1', 11, lj'�' 0 N S F F I
I I IS APPLICATION
TOTAL
0.00
0.00
OM
(Wo
Aft
V
0 The City VYi7 ut Limits.
TO: The Honorable Chair and Trustees
Owasso Public Works Authority
FROM: John W. Feary
Project Administrator
SUBJECT: Meadowcrest Gravity Sewer Relief Line Project Acceptance &
Authorization to Issue Final Payment
DATE: December 16, 201 1
BACKGROUND:
In January of 2011, the Owasso Public Works Authority awarded the construction contract for the
Meadowcrest Gravity Relief Line to Ira M. Green Construction of Claremore, OK. The project was
implemented to facilitate the expected residential and commercial growth in the northwest
section of the city over the next 5 - 15 years. Installation of the line allows sewer access to
approximately 530 acres of undeveloped land, provides sanitary sewer access for future phases
of the sports park and eliminates electrical, mechanical, and maintenance costs associated
with keeping the 35 year old lift station in operation. An added benefit of the project is the
reduced possibility of wet weather sanitary sewer overflows in that part of the city. The project
consisted of the removal of the existing lift station and all equipment associated with it along
with the installation of 5,900 feet of 8 ", 12" & 15" PVC sewer pipe.
The contract was awarded in the amount of $449,337.80 of which Owasso Land Trust would
contribute $180,000 towards the project for the added capacity to the system by the Maple
Glen Subdivision.
FUNDING:
The project is funded through a public /private partnership. Public funding for this project is
available in the Wastewater Collection Budget. Private funding in the amount of $180,000 has
been provided to the Authority. Additionally, a per -acre assessment fee will be administered
once the final project cost is determined upon completion of construction phase.
RECOMMENDATION:
Staff recommends acceptance of the Meadowcrest Gravity Sewer Relief Line Project and
authorization for issuance of the final payment in the amount of $66,333.78 to Ira M. Green
Construction for a total and completed contract price of $443,962.80.
ATTACHMENTS:
A. Pay Request #5
B. Final Pay Request for Retainage
C. Location Map
EXHIBIT "A"
Meadowcrest Gravity Sewer Relief Line Extension Project
PAY ESTIMATE N0. �5_
PERIOD:
CONTRACTOR
BID AMOUNT OF ORIGINAL CONTRACT: $ tl�Eg331.8�
CONTRACT ADJUSTMENTS:
ADJUSTED BID AMOUNT: $ ` � �Mo
TOTAL COMPLETE WORK:
MATERIALS STORED (per attached tabulation):
$ yY3 96a. So
LESS 10% RETAINAGE:
TOTAL EARNED LESS I0% RETAINAGE: $ 399 �G6,5a
PERCENTAGE OF PROJECT COMPLETION:
LESS PREVIOUS PAYMENTS:
AMOUNT DUE THIS ESTIMATE:
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Payment
Estimate has been completed in accordance with contract documents, that all amounts have been paid by the Contractor for Work which previous
Payment Estimates were issued and payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR NAME:
B 1
Project Manager
State of
County of
Subscribed & swo o before me this. 15 day of I`4 0 V. , 20 It
City of Owasso
Date:
ary Public `-
Commission Expires:
Date
Date
1210 AGREEMENT
00300 - Page 8 of I4
CONTINUATION SHEET
Page I_ of
Application and Certification for Payment, containing Contractor's signed Certification is
attached.
Application Number:_ Application Date:
Period to: //-1/- 11
In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where
variable retainage for line items may apply.
A g C D
E (cont)
ITEM DESCRIPTION SCHEDULED WORK COMPLETED
NO. OF WORK VALUE PROM PREVIOUS WORK COMPLETED
APPLICATION THIS PERIOD
IL 3mo .1 Ajo 7-5 �a
for Preyen ` ••
AAO O S
n�re i
5emo� m %goo J
6
V
Sii
4e
.•
(cont) F G 7-25
H I
R E) MATERIALS TOTAL COMPLETED
PRESENTLY STORED AND STORED % BALANCE
(NOT IN D O TO DATE (GEC) TO FINISH RETAINAGE
(D +E +f) (C -G)
NOTE: At bottom of each column, run totals.
1210 AGREEMENT
00300 - Page 10 of 14
CONTINUATION SHEET
Page a_ of ;i
Application and Certification for Payment, containing Contractor's signed Certification is
attached.
Application Number: 5 Application Date:
Period to:
In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where
variable retainage for line items may apply.
A B C D
E (cont)
ITEM DESCRIPTION SCHEDULED WORK COMPLETED
NO. OF WORK VALUE FROM PREVIOUS WORK COMPLETED
APPLICATION THIS PERIOD
�21. 1� r/ ma7�'6n �l✓ r lecJ t .� , ,21,06 `'o o
t of a ,� a 6DO o0
2g rnS 1 e ll�_t on �xt erykP &aaery I do n
/9e ,eo
d9 -- Yoe
10 De /efe !o c.!` a d4" SD 3 a„ mo.mo
! �yo,aa M.
A" Iva 66
NOTE: At bottom of each column, run totals. %D t41 P45 ! 1 a >� / 9, 375
1210 AGREEMENT
00300 - Page 10 of 14
(cont) P
G
H
I
R E) MATERIALS
TOTAL COMPLETED
PRESENTLY STORED
AND STORED
off, BALANCE
(NOT IN D O
TO DATE
(G /C) TO FINISH
RETAINAGE
(D + E + f)
(C -G)
NOTE: At bottom of each column, run totals. %D t41 P45 ! 1 a >� / 9, 375
1210 AGREEMENT
00300 - Page 10 of 14
APPLICATION and CERTIFICATE for PAYMENT
To: City of Owasso
Owasso Public Works Authority
P. O. Box 180 Owasso, OK 74055
From: Ira M. Green Construction
P. O. Box 813
Claremore, OK 74018
Contract For: Sec 7 & S12, T21N, R14E Tulsa Co
Project: Meadowcrest Gravity Sewer
Relief Line Extension Project
Via Architect:
Application No: 5
App. Date: November 11, 2011
Period to: November 11, 2011
Project Nos:
Contract Date: January 18, 2011
Distribution to:
❑ OWNER
❑ CONSTRUCTION MGR.
I] ARCHITECT
❑ CONTRACTOR
❑ OTHER
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,
Application is made for payment, as shown below, in connection with the Contract. information and belief the Work covered by this Application for Payment has been completed
Continuation Sheet, G703, is attached. in accordance with the Contract Documents, that all amounts have been paid by the
Contractor for Work for which previous Certificates for Payment were issued and payments
1. ORIGINAL CONTRACT SUM r�-- received from the Owner, and that current payment shown herein is now due.
I 449 337 8
.0
2. Net Change By Change Orders - 5,375.00
3. CONTRACT SUM TO DATE 443,962.80
4. TOTAL COMPLETED AND STORED TO DATE �— 443,962.80
5. RETAINAGE:
a. 10% of Completed Work
b. of Stored Material
TOTAL RETAINAGE
6. TOTAL EARNED LESS RETAINAGE
44,396.28
C- 0.00
44,396.28
399,566.52
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 377,629.02
8. CURRENT PAYMENT DUE r 21,937.5
9. BALANCE TO FINISH, INCLUDING RETAINAGE �— 44,396.28
CHANGE ORDER SUMMARY
ADDITIONS
DEDUCTIONS
Total changes approved in
previous months by Owner
0.00
0.00
Total approval this Month
0.00
5,375.0
TOTALS
$ 0.0
$ 5,375.00
NET CHANGES by Change Order
-$ 5,375.00
TORGO SOFTWARE http: /Mww.torgo.net 01996 -2007 ALL RIGHTS RESERVED
CONTRACTOR: Ir M. Green Construction
By: Date:
November 11, 2011
Joan Vahoma n,
State of: County of: Rogers
Subscribed and sworn before me this 11th day of November , 2011
Joanne Green, VP, personally appeared before me, the undersigned notary public, and
provided satisfactory evidence of identification to be the person who signed this document iif ��cta Fes%
I. •- oT••.•., y
my presence and swore or affirmed to me that the contents of this document are truthful ail-
accurate to the bes of his/her knowledg and belief. _ 802003422
3 a EXP. 04M14 Q
Notary Public ` y Commission expires: �Lr3�'c,P�o'
ARCHIT CT's CE FI FOR PAYMENT
In accordance with the Contract Documents, based on on -site observations and the data
comprising this application, the Architect certifies to the Owner that to the best of the
Architect's knowledge, information and belief the Work has progressed as indicated, the
quality of the Work is in accordance with the Contract Documents, and the Contractor is
entitled to payment of the AMOUNT CERTIFIED.
AMOUNT CERTIFIED
(Attach explanation if amount certified differs from the amount applied for. Initial all figures
on this Application and on the Continuation Sheet that are changed to conform to the amount
certified.)
ARCHITECT:
By:
Date:
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
Contractor named herein. Issuance, payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
CONTINUATION SHEET G703 PROJECT: Meadowcrest Gravity Sewer
Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing
Contractor's signed Certification is attached.
Use Column I on Contracts where variable retainage for line items may apply.
Ira M. Green Construction Page 1 of 2
APPLICATION NUMBER: 5
APPLICATION DATE: November 11, 2011
PERIOD TO: November 11, 2011
PROJECT NUMBER-
A
B
C
D
E
F
G
H
Item
#
Description of Work
Scheduled
Value
Work Completed
Materials Stored
& Used Prior +
Current
Total Completed
and Stored
To Date
%
Balance
to Finish
Retainage
From Previous
Application(s)
This
Period
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Mobilization /De- Mobilization
Storm Water Pollution Prevention
Construction Staking
Trench Safety System
Traffic Control & Warning Signs
Insurance and Permits
2828 LF 15" SDR26 @ $33 installed
80 LF 15" DI /MJ Sewer line @ $100.
1003 LF 12" SDR26 Sewer Line @ $27.
1967 LF 12" SDR35 Sewer Line @ $24
80 LF 12" DI /MJ Sewer Line @ $95.
28 LF 8" SDR35 Sewer Line @ $35.
248 LF 24" Steel Casing @ $48.
248 LF Bore for 24" Casing @ $296.
Std 4' Dia Dog House Drop Manhole
Std 4' Dia Dof House Manhole
Std 4'Dia Drop Manhole
Std 4' Dia. Manhole 18 Ea @ $1950.
Extra Depth Manhole Wall 129 VF $160.
Connect to Existing MH & plug Existing
16,300.0
14,000.0
10,000.0
11,000.0
5,000.0
5,000.0
93,324.00
8,000.0
27,081.00
47,208.00
7,600.00
980,00
11,904.00
73,408.00
2,500.00
1,700.00
2,500.00
35,100.00
20,640.00
1,500.00
12,225.00
10,500.00
10,000.00
11,000.00
0.00
5,000.00
93,324.00
8,000.00
27,081.00
47,208.00
7,600.00
980.00
11, 904.00
73,408.00
2,500.00
1,700.0
2,500.00
35,100.0
20,640.0
0.0c
4,075.00
31500.0
0.00
0.00
5,000.00
0.0
0.0c
0.0c
0.0
0.0
0.0c
0.00
0.00
0.00
0.0
0.0
0.00
0.00
0.0c
1,500.0q
16,300.00
14,000.00
10,000.00
11,000.00
5,000.00
5,000.00
93,324.00
8,000.0
27,081.00
47,208.00
7,600.00
980.0 -
11,904.0
73,408.0
2,500.0
1,700.00
2,500.00
35,100.00
20,640.00
11500.00
100,00
100.00
100.00
100.00
100.00
100.001
100.00
100.00
100.0
100.00
100.0
100.001
100.00
100.00
100.00
100.00
100.0
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,630.00
1,400.00
1,000.00
1,100.00
500.00
500.0
9,332.40
800.00
2,708.10
4,720.8
760.00
98.00
1,190.4
7,340.80
250.00
170.00
250.00
3,510.00
2,064.0
150.0
21 J213CY
Type "A" Agg Base @ $39.
8,307.0
8,307.00
0.0
8,307,091
100.001
0.001
830.70
PAGE 1 TOTAL: 1 403,052-01 388,977.00 14,075.001_ 403,052.0 100.00 0.00
A =Line Item Number B =Brief Item Description C =Total Value of item D =Total of D and E From Previous Application(s) (If Any) E =Total Work Completed For This Application
F= Materials Purchased and Stored for Project G =Total of All Work Completed and Materials Stored for Project H= Remaining Balance of Amount to Finish 1= Amount Withheld from G
TORGO SOFTWARE http: /A%mw.t0rgo.net 0199&2007 ALL RIGHTS RESERVED
CONTINUATION SHEET G703 PROJECT: Meadowcrest Gravity Sewer
Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing
Contractor's signed Certification is attached.
Use Column I on Contracts where variable retainage for line items may apply.
Ira M. Green Construction Page 2 of 2
APPLICATION NUMBER: 5
APPLICATION DATE: November 11, 2011
PERIOD TO: November 11, 2011
PROJECT Nl1MRFR-
PAGE 2 TOTAL: 40,910-801 30,610.80 10,300.00 40,910.8 100.00 0.00 4,091.08
GRAND TOTAL: 443,962.801 419,587.801 24,375.0 443,962.8 100.0 )-001 44,396.28
A =Line Item Number B =Brief Item Description C =Total Value of Item D =Total of D and E From Previous Application(s) (If Any) E =Total Work Completed For This Application
F= Materials Purchased and Stored for Project G =Total of All Work Completed and Materials Stored for Project H= Remaining Balance of Amount to Finish 1= Amount Withheld from G
TORGO SOFTWARE httP: /Awvw.torgo.net 01998 -2007 ALL RIGHTS RESERVED
CERTIFICATE FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the date
comprising the above application, the �onf,«rr
that to the best of the Ira M. Green Construction certifies to the Owner
the Work has progressed as indicated, the quality of the Work lisoin accordance �with the Contract
Documents, and the Contractor is entitled to payment of the amount certified.
AMOUNT CERTIFIED $,Z4q3Z,5a
(Attach explanation if amount certified differs from the amount applied for.)
Brian J Green
By: Date:
This certificate not negotiable. The AMOUNT CERTIFIED is payable only to the contractor
named herein. Issuance, payment and acceptance of payment is without prejudice to any rights
of the Owner or Contractor under this Contract.
m
1210 AGREEM ENT
00300 - Page 9 of 14
CLAIM OR INVOICE AFFIDAVIT
STATE OF OKLAHOMA )
COUNTY OF )SS
The undersigned (Architect, Contractor, Supplier Ena
age, being first duly sworn, on oath says that this (Invoi eeClaim o Contract) is true and correct.
Affiant fiirther states that the (work, services or materials) as shown by this Invoice or Claim
have been (completed or supplied) in accordance with the Plans, Specifications, orders or
requests furnished to the Affiant. Affiant further states that (
given, nor donated, or agreed to pay, give, or donate s)he has made no payment, nor
, either dixectly or indirectly, to any elected
Official, officer, or employee of the State, County, or City of money or any other thing of value
to obtain payment or the award of this contract.
Ira M. Green Construction
Contractor or pplier
Brian J Green
Subscribed and sworn to before me this 15 day of
Nbvem t6o..� a,aEl .
Notary Public 0
Commission #
My Commission Expires:
Architect, Engineer or other Supervisory Official
Subscribed and sworn to before me this day of
Notary Public
Commission #
My Commission Expires:
1A
�OT9R cti�'3
list
NOTE: Strike out words not appropriate and Sign
Engineer approval is not required for Contrtors or Supplier�AAffffi Affidavit.
me Architect,
1210 AGREEMENT
00300 - Page 1 I of I4
EXHIBIT "A"
Meadowcrest Gravity Sewer Relief Line Extension Project
PAY ESTIMATE NO. g�
PERIOD:
CONTRACTOR
BID AMOUNT OF ORIGINAL CONTRACT: $ ,l14q,337 80
CONTRACT ADJUSTMENTS:
ADJUSTED BID AMOUNT: $
TOTAL COMPLETE WORK: $
MATERIALS STORED (per attached tabulation): $
LESS 10% RETAINAGE: $
TOTAL EARNED LESS 10% RETAINAGE:
PERCENTAGE OF PROJECT COMPLETION:
To �i,�/n Ktceided ¢'3clp, 474.10
LESS PREVIOUS PAYMENTS: Pcty 6151.4 a4. 15 .1. 4A
o
AMOUNT DUE THIS ESTIMATE: �+�-t-a int49� dac $ y939G.a8
The undersigned Contractor certifies that to the best of tiie contractor's knowledge, information and belief the Work covered by this Payment
Estimate has been completed in accordance with contract documents, that all amounts have been paid by the Contractor for Work which previous
Payment Estimates were issued and payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR NAME:
B :
Project Manager
State of(��
County of
Subscribed & swo o before me this. / ?r ay of N Q�L, zo 11
Owasso
Approved for Payment by:
City of Owasso
Date: I
iry Public
Commission Expires:
Date
Date
1210 AGREEMENT
00300 - Page 8 of 14
CONTINUATION SHEET
Page I of 1
Application and Certification for Payment, containing Contractor's signed Certification is
attached.
Application Number: Application Date:
Period to: F,'nn 1
In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where
variable retainage for line items may apply.
A B C D
E (cont)
ITEM DESCRIPTION SCHEDULED WORK COMPLETED
NO. OF WORK VALUE- FROM PREVIOUS WORK COMPLETED
APPLICATION THIS PERIOD
_1
(cont) F
R E) MATERIALS
PRESENTLY STORED
(NOT IN D O
G
TOTAL COMPLETED
ANDSTORED
TO DATE
(D +E +f)
NOTE: At bottom of each column, run totals.
H I
BALANCE
(G /C) TO FINISH RETAINAGE
(C -G)
1210 AGREEMENT
00300 - Page 10 of 14
CLAIM OR INVOICE AFFIDAVIT
STATE OF OKLAHOMA )
COUNTY OF )SS )
The undersigned (Architect, Contractor, Supplier, Engineer or Supervisory Official), of lawful
age, being first duly sworn, on oath says that this (Invoice, Claim or Contract) is true and correct.
Affiant further states that the (work, services or materials) as shown by this Invoice or Claim
have been (completed or supplied) in accordance with the Plans, Specifications, orders or
requests furnished to the Affiant. Affiant hither states that (s)he has made no payment, nor
given, nor donated, or agreed to pay, give, or donate, either directly or indirectly, to any elected
official, officer, or employee of the State, County, or City of money or any other thing of value
to obtain payment or the award of this contract.
Ira M. Green Construction
Contractor o�plier Brian J Green
Subscribed and sworn to before me this — I S� day of... s J e at 6 er
A
otary Public = #02603422
Commission # o p�,3�a 2 ^N P.
""
My Commission Expires:
Architect, Engineer or other Supervisory Official
Subscribed and sworn to before me this day of
Notary Public
Commission #
My Commission Expires:
NOTE: Strike out words not appropriate and sign appropriate signature line. Architect,
Engineer approval is not required for Contractor or Supplier Affidavit.
1210 AGREEMENT
00300 - Page 1 i of 14
CERTIFICATE FOR PAYMENT
In accordance with the contract documents, based on on -site observations and the date
comprising the above application, the
that to the best of the Green Conste7"or certifies to the Owner
the Work has progressed as indicated, the quality oPthe WorkknowIedge. information and belief,
Documents, and the Contractor is entitled to payment of the amount certified Ce with the Contract
AMOUNT CERTIFIED $_t4 y 3 gG _a 8
(Attach explanation if amount certified differs from the amount applied for.)
Brian I Green
J
Date:_ t t�ii /it
This certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the contractor
named herein. Issuance, payment and acceptance of payment is without prejudice to any rights
of the Owner or Contractor under this Contract.
1210 AGREEMENT
00300 - Page 9 of 14
'A.
r.
K 4e
7'
MEADOWCREST RELIEF SEWER
SITE MAP 1/6/11 CITY OF OWASSO
Legend 1 1 1 N. Main Street
P.O. Box 180
MEADOWCREST RELIEF SEWER LINE Owasso, OK 74055
918.376.1500
96
pm
'A.
r.
K 4e
7'
MEADOWCREST RELIEF SEWER
SITE MAP 1/6/11 CITY OF OWASSO
Legend 1 1 1 N. Main Street
P.O. Box 180
MEADOWCREST RELIEF SEWER LINE Owasso, OK 74055
918.376.1500
A.
The City wi 7out Limits.
TO: Honorable Chair and Trustees
Owasso Public Works Authority
FROM: H. Dwayne Henderson, P.E.
City Engineer
SUBJECT: Agreement for Engineering Services
2011 Recycle Center Master Plan
DATE: December 16, 2011
BACKGROUND:
The City of Owasso constructed the original recycle center in 1988 that has provided valuable
services to the citizens of Owasso. The recycle center currently accepts aluminum, paper, glass,
plastics, and several other materials and items. As Owasso has grown, the usage of the recycle
center has grown, but the facilities have not. The center has exceeded capacity on the 0.50
acre site and intends to relocate to a site immediately south of the existing facilities. In FY 2012,
the OPWA initiated funding of a new Recycle Center Master Plan to help plan for and meet the
current and future needs for recycling in Owasso.
Based on the information compiled from 2011 Recycle Center Monthly Reports, the following
traffic counts were generated by the Center:
Month /Year
Vehicales
Avg.
Vehicles Per
Peak
Jan 2011
7,146
231
733
Feb 2011
4,823
172
1,183
Mar 2011
10,216
330
1,070
April 2011
13,325
444
1,339
May 2011
12,003
397
1,135
June 2011
13,380
446
1,093
July 2011
9,176
296
785
Aug 2011
9,035
291
877
Sept 2011
11,262
375
1,180
Oct 2011
10,031
324
918
Nov 2011
8,977
299
764
Monthly Avg.
9,943
328
1007
An average trip through the center is 10 minutes for a customer. If the customer base exceeds
the facility capacity, then 20 minutes is an average time. The existing recycle center can
accommodate 12 cars at a time. Twelve cars X six cycles per hour = 72 cars per hour X 8 hours a
day = 576 cars per day capacity. It is apparent that on peak days, the center exceeds the
current capacity and needs to be expanded.
CUSTOMER SURVEY:
Owasso Public Works asked Owasso citizens to compete an on -line survey to provide opinions
about the existing Recycle Center and Waste Disposal Area services, as well as their opinions on
the future of the Center. The survey was completed by 426 respondents. Following are some
highlights of the survey results:
• When asked for an overall impression about recycling, 91% of respondents were
favorable to recycling. Owasso averages 10,000 customers per month at the Recycle
Center.
• When asked about the familiarity of the benefits of recycling, only 43% of respondents
were very knowledgeable, which indicates more education of the Owasso customer
base is needed.
• When asked if their family recycled at home on a regular basis, 70% of respondents
answered in the affirmative.
The following table lists the frequency of use at the Recycle Center by the respondents:
• The next table summarizes the question of what items are currently recycled at home:
Cooking Oil
How often do
How often do
How often do
Antifreeze
you use the
you use the
you use the
Motor Oil
Recycle
refuse disposal
yard waste
Plastic Bottles
Center?
roll -offs?
area?
Once a year _
23.2%
71.6%
76.5%
Once a month
35.8%
22.4%
14.6%
2 -3 times per
month
30.0%
5.2%
Once a week
9.1%
0.9%
-4.1%
4.4%
2 -3 times per
week
2.0%
0%
0.3%
Once a day
0%
0%
0%
• The next table summarizes the question of what items are currently recycled at home:
Cooking Oil
5.2%
Glass
59.1%
Antifreeze
3.4%
Other Paper
48.7%
Motor Oil
21.0%
Cardboard
65.0%
Plastic Bottles
74.1%
Aluminum
Cans
64.2%
Newspaper
65.3%
Tires
3.1%
Rechargeable
Batteries
9.1%
When asked what factors keep them from recycling, the following responses were
documented:
0 64.5% mentioned lack of curb -side recycling
o 39.3% said that they had no room to store the recyclables at home
o 18.6 % didn't know where to bring the recyclables
0 16.3% said that recycling was too much of a hassle
o 10.1 % said that they didn't have the time to recycle
0 1.5% indicated that recycling wasn't that important to them
When asked which methods respondents would prefer for recycling, opinions were:
0 47.2% like utilizing the free drop -off center
0 19.7% preferred paying for multi- stream curb -side recycling (customer sorted in
multiple containers)
0 33.2% preferred curb -side recycling with all -in -one container disposal
• When asked about remote disposal locations, 70.8% said that they would use such sites.
• Lastly, customers were asked if the City should invest in a larger recycling facility?
o 80.9% were in favor and 19.1% were not in favor.
Based on the results of the survey, support for Recycle Center Expansion and the addition of
curb -side services are a desire of the citizens of Owasso.
LETTERS OF INTEREST:
Letters of Interest were solicited from professional engineering firms around the country that
would be interested in working with Owasso on a Recycling Center Master Plan. The Scope of
Work is the development of a master plan based on a 20 year growth and recommendations for
phased expansion to increase the capacity of the recycling facilities. The project, as a
minimum, shall include a site assessment of the current and future designated site, determine
the ultimate capacity based on the Owasso Comprehensive Plan; discuss regionalization of the
center for adding neighboring communities as customers, the possible addition of curb -side
recycling services, and the incorporation of a materials recovery facility "MR!"' or a dirty
materials recovery facility "dirty MRF" to the center. It would also review the potential for a
composting facility. The master plan will be presented to the Recycle Center Master Plan
Committee, the Owasso Capital Improvement Committee, and a number of public forums for
public input. The firm shall also plan to conduct polls to get additional feedback from the
customers.
The ideal firm(s) would have experience in conducting and assessing solid waste master
planning with emphasis on recycle centers. In addition, the successful team shall be licensed to
practice engineering in the state of Oklahoma.
QUALIFICATIONS BASED SELECTION PROCESS:
In November 2011, Staff received Letters of Interest from three engineering firms. The three firms,
A & M Engineering and Environmental Services, Inc, Tulsa, Oklahoma; SAIC, Inc., Tulsa,
Oklahoma; and Cardinal Engineering, Inc., Norman, Oklahoma submitted responses. A detailed
Request for Proposals was sent to the three firms. All three firms were given a deadline of 5:00
p.m. Central Standard Time (CST) on December 12, 2011 to respond with their proposals and
three proposals were received by the deadline. Each proposal contains extensive
documentation outlining their understanding of the scope of the master plan, strategy for
successfully completing the master plan, experience with similar planning projects, and staff
qualifications. Public Works reviewed the proposals on December 13, 2011, using the criteria
identified in the Request for Proposal. Upon comparison, SAIC was determined to be the most
qualified firm.
Following further scope discussions, SAIC developed staff -hour projections and submitted a fee
proposal in the amount of $99,400.
ENGINEERING SERVICES AGREEMENT:
The proposed work is divided into eight work tasks as follows:
Task 1 - Project Initiation and Management
Task 2 - Current Recycling System and Assessment
Task 3 - Facility Programming for the Existing Recycle Center and Potential New Location
Task 4 - Evaluate Alternative Residential Recycling Collection and Processing Options
Task 5 - Workshop with the Project Task Force and Develop Plan and Schedule
Task 6 - Public Education Strategies
Task 7 - Presentations to the Public
Task 8 - Report Preparation
It is anticipated that the master plan will be complete by May 2012.
FUNDING:
Funding for this service is included FY 2011 -2012, Recycle Center Budget.
RECOMMENDATION:
Staff recommends Trustee approval of an Agreement for Engineering Services for the
development of the Recycle Center Master Plan with Science Applications International
Corporation (SAIC) Energy, Environment & Infrastructure, LLC in the amount of $99,400 and
authorization of the Chairman to execute the agreement.
ATTACHMENTS:
A -F. Agreement for Engineering Services
G. Scope of Services
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
THIS AGREEMENT, made and entered into this day of December, 2011 between the
City of Owasso, Oklahoma, a Municipal Corporation, of Oklahoma, hereinafter referred to
as CITY, and Science Applications International Corporetion (SAIC) Energy, Environment
& Infrastructure, LLC, hereinafter referred to as ENGINEER;
WITNESSETH:
WHEREAS, CITY intends to develop a long -term plan that establishes where the recycling
program will be in 20 years and to achieve zero waste to landfill in 25 years, hereinafter
referred to as the PROJECT; and,
WHEREAS, CITY requires certain professional services in connection with the PROJECT,
hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES;
WHEREAS, funding is available for the PROJECT through the Recycle Budget;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
SCOPE OF PROTECT. The scope of the PROJECT is described in Attachment A,
SCOPE OF PROTECT, which is attached hereto and incorporated by reference as part
of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBILITIES OF THE CITY, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D,
COMPENSATION, and further described in Attachment E, FEE /HOUR
BREAKDOWN, which are attached hereto and incorporated by reference as part of
this AGREEMENT.
5. SCHEDULE. ENGINEER shall perform the SERVICES described in Attachment B,
SCOPE OF SERVICES, in accordance with the schedule set forth in Attachment F,
SCHEDULE, attached hereto and incorporated by reference as part of this
AGREEMENT.
STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with
the applicable laws and regulations published and in effect at the time of
performance of the SERVICES. The PROJECT shall be designed and engineered in a
good and workmanlike manner and in strict accordance with this AGREEMENT.
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C -1
All engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by CITY. Other
than the obligation of the ENGINEER to perform in accordance with the foregoing
standards, no warranty, either express or implied, shall apply to the SERVICES to be
performed by the ENGINEER pursuant to this AGREEMENT or the suitability of
ENGINEER'S work product.
7. LIMITATION OF RESPONSIBILITY.
7.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
7.2. The presence of ENGINEER's personnel at a construction site is for the
purpose of providing to the CITY a greater degree of confidence that the
completed construction work will conform generally to the construction
documents and that the integrity of the design concept as reflected in the
construction documents has been implemented and preserved by the
construction contractor(s).
7.3. In soils, foundation, groundwater, and other subsurface investigations, the
actual characteristics may vary significantly between successive test points
and sample intervals and at locations other than where observations,
exploration, and investigations have been made. Because of the inherent
uncertainties in subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total PROJECT cost
and/or execution. These conditions and cost/ execution effects are not the
responsibility of ENGINEER.
7.4. Record drawings will be prepared, in part, on the basis of information
compiled and furnished by others, and may not always represent the exact
location, type of various components, or exact manner in which the
PROJECT was finally constructed. ENGINEER is not responsible for any
errors or omissions in the information from others that are incorporated into
the record drawings.
7.5. ENGINEER's deliverables, including record drawings, are limited to the
sealed and signed hard copies. Computer - generated drawing files furnished
by ENGINEER are for CITY or others' convenience. Any conclusions or
information derived or obtained from these files will be at user's sole risk.
8. OPINIONS OF COST AND SCHEDULE.
8.1. Since ENGINEER has no control over the cost of labor, materials, equipment,
or services furnished by others, or over contractors', subcontractors', or
vendors' methods of determining prices, or over competitive bidding or
market conditions, ENGINEER'S cost estimates shall be made on the basis of
qualifications and experience as a Professional Engineer.
8.2. Since ENGINEER has no control over the resources provided by others to
meet construction contract schedules, ENGINEER'S forecast schedules shall
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C -2
be made on the basis of qualifications and experience as a Professional
Engineer.
9. LIABILITY AND INDEMNIFICATION.
9.1. ENGINEER shall defend and indemnify CITY from and against legal liability
for damages arising out of the performance of the SERVICES for CITY,
including but not limited to any claims, costs, attorney fees, or other
expenses of whatever nature where such liability is caused by the negligent
act, error, or omission of ENGINEER, or any person or organization for
whom ENGINEER is legally liable. Nothing in this paragraph shall make the
ENGINEER liable for any damages caused by the CITY or any other
contractor or consultant of the CITY.
9.2. ENGINEER shall not be liable to CITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
10. CONTRACTOR INDEMNIFICATION AND CLAIMS.
10.1. CITY agrees to include in all construction contracts the provisions of Articles
7.1, and 7.2, and provisions providing contractor indemnification of CITY
and ENGINEER for contractor's negligence.
10.2. CITY shall require construction contractor(s) to name CITY and ENGINEER
as additional insureds on the contractor's general liability insurance policy.
11. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any construction unless such responsibilities
are specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
12. INSURANCE.
12.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
12.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the
aggregate, and with property damage limits of not less than $100,000
for each occurrence and not less than $100,000 in the aggregate.
12.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each
accident and with property damage limits of not less than $100,000
for each accident.
12.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not
less than $100,000 for each occurrence.
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C -3
12.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions
coverage to be for a minimum of $1,000,000, deductibles subject to
approval by CITY.
12.2. ENGINEER shall furnish CITY certificates of insurance which shall include a
provision that such insurance shall not be canceled without at least 30 days
written notice to the CITY.
13. OWNERSHIP AND REUSE OF DOCUMENTS.
13.1. All documents, including original drawings, estimates, specifications, field
notes and data shall become and remain the property of the CITY.
13.2. CITY'S reuse of such documents without written verification or adaptation
by ENGINEER for the specific purpose intended shall be at CITY'S risk.
14. TERMINATION OF AGREEMENT.
14.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
14.2. CITY shall have the right to terminate this AGREEMENT, or suspend
performance thereof, for CITY'S convenience upon written notice to
ENGINEER; and ENGINEER shall terminate or suspend performance of
SERVICES on a schedule acceptable to CITY. In the event of termination or
suspension for CITY'S convenience, CITY shall pay ENGINEER for all
SERVICES performed to the date of termination in accordance with
provisions of Attachment D, COMPENSATION. Upon restart of a
suspended project, ENGINEER's contract price and schedule shall be
equitably adjusted.
15. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: SAIL, Energy, Environment & Infrastructure
One West 3rd Street, Suite 100
Tulsa, OK 74103 -3513
Attention: Mr. Adam West
To CITY: CITY OF OWASSO
301 W 2nd Avenue
Owasso, Oklahoma 74055
Attention: Roger Stevens, Public Works Director
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C-4
15.1. Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and CITY.
16. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considered
to be in default of this AGREEMENT if delays in or failure of performance shall be
due to forces which are beyond the control of the parties; including, but not limited
to: fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance,
sabotage; inability to procure permits, licenses, or authorizations from any state,
local, or federal agency or person for any of the supplies, materials, accesses, or
services required to be provided by either CITY or ENGINEER under this
AGREEMENT; strikes, work slowdowns or other labor disturbances, and judicial
restraint.
17. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
18. INTEGRATION AND MODIFICATION. This AGREEMENT includes Attachments
A, B, C, D, E, and F and represents the entire and integrated AGREEMENT between
the parties; and supersedes all prior negotiations, representations, or agreements
pertaining to the SCOPE OF SERVICES herein, either written or oral. CITY may
make or approve changes within the general Scope of Services in this AGREEMENT.
If such changes affect ENGINEEXs cost of or time required for performance of the
services, an equitable adjustment will be made through an amendment to this
AGREEMENT. This AGREEMENT may be amended only by written instrument
signed by each of the Parties.
19. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the CITY over the interpretation or application of the terms of this
AGREEMENT, the matter shall be referred to the City's Director of Public Works for
resolution. If the Director of Public Works is unable to resolve the dispute, the
matter may, in the Director's discretion, be referred to the City Manager for
resolution. Regardless of these procedures, neither party shall be precluded from
exercising any rights, privileges or opportunities permitted by law to resolve any
dispute.
20. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
21. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the Public Works
Department of the City of Owasso, and any plans or specifications not meeting the
terms set forth in this AGREEMENT will be replaced or corrected at the sole expense
of the ENGINEER. The ENGINEER will meet with the City staff initially and
monthly thereafter and will be available for public meetings and City of Owasso
presentations.
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C -5
22. KEY PERSONNEL. In performance of the SERVICES hereunder, ENGINEER has
designated Scott Pasternak as Project Manager for the PROJECT. ENGINEER agrees
that no change will be made in the assignment of this position without prior
approval of CITY.
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Mayor of the City of Owasso.
APPROVED:
ENGINEER
Date
CITY OF OWASSO, OKLAHOMA
City Clerk Mayor
Date
APPROVED AS TO FORM:
City Attorney
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTUREAOC C -6
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
Scope of Project
Attachment A
SCOPE OF PROJECT. The PROJECT shall consist of civil engineering SERVICES
described as follows:
Develop a long -term plan that establishes where the recycling program will be in 20 years
and to achieve zero waste to landfill in 25 years.
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C_7
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
Scope of Services
Attachment B
The services to be performed by the ENGINEER under this AGREEMENT will consist of
providing civil engineering services for the SERVICES presented in Attachment A, as
directed by the City by a noice to proceed or in a work order.
Further, it is understood and agreed that the date of beginning, rate of progress, and the
time of completion of the work to be done hereunder for each assignment are essential
provisions of this AGREEMENT; and it is further understood and agreed that the work
embraced in this AGREEMENT shall commence upon execution of this AGREEMENT and
receipt of Notice to Proceed. It is further understood that all reviews and conceptual
designs will be prepared in accordance with the City of Owasso design criteria and
specifications for construction.
SEE ATTACHED SCOPE OF SERVICES
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTUREBOC C -8
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
Responsibilities of the City
Attachment C
RESPONSIBILITIES OF THE CITY. The CITY agrees:
C.1 Reports, Records, etc: To furnish, as required by the work, and not at the expense of
the ENGINEER:
C.1.1 Records, reports, studies, plans, drawings, and other data available in the
files of the CITY that may be useful in the work involved under this
AGREEMENT
C.1.2 Standard construction drawings and standard specifications
C.1.3 ENGINEER will reasonably rely upon the accuracy, timeliness, and
completeness of the information provided by CITY.
C.2 Access: Provide access to public and private property when required in
performance of ENGINEER's services.
C.3 Staff Assistance: Designate the City Engineer (or another individual designated in
writing) to act as its representative in respect to the work to be performed under this
AGREEMENT, and such person shall have complete authority to transmit
instructions, receive information, interpret and define CITY'S policies and decisions
with respect to materials, equipment, elements and systems pertinent to the services
covered by this AGREEMENT.
C.3.1 Furnish staff assistance in locating, both horizontally and vertically, existing
CITY owned utilities and in expediting their relocation as described in
Attachment B. Further, CITY will furnish assistance as required in obtaining
locations of other utilities, including excavations to determine depth.
C.3.2 Furnish legal assistance as required in the preparation of bidding,
construction and other supporting documents.
CA Review: Examine all studies, reports, sketches, estimates, specifications, drawings,
proposals and other documents presented by ENGINEER and render in writing
decisions pertaining thereto within a reasonable time so as not to delay the services
of ENGINEER.
AGREEMENT WITH SAIC, ENERGY, ENVIRONMENT & INFRASTRUCTURE.DOC C -9
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
Compensation
Attachment D
COMPENSATION. The CITY agrees to pay, as compensation for services set forth in
Attachment B, the following fees, payable monthly as the work progresses; and within 30
calendar days of receipt of invoice. ENGINEER shall submit monthly invoices based upon
actual hours or work, invoiced according the Rate Schedule provided in ATTACHMENT E,
completed at the time of billing. Invoices shall be accompanied by such documentation as
the CITY may require in substantiation of the amount billed.
D.1 Total Compensation
For the work under this project the total maximum billing including direct costs and
subconsultant services shall be $99,400 which amount shall not be exceeded without
further written authorization by CITY.
D.2 Subconsultants and Other Professional Associates: Services of subcontractors and
other professional consultants shall be compensated for at actual cost. Use of sub -
consultants must be authorized in advance by CITY.
D.3 Other Direct Costs
D.3.1 Travel and subsistence shall be compensated for at actual cost. Local travel
by personal or firm automobile shall be compensated for at the rate currently
allowed by the IRS.
D.3.2 Printing expenses shall be compensated for as shown in ATTACHMENT E.
D.3.3 Any other direct costs shall be compensated for at actual when authorized in
advance by CITY.
D.4 Additional Services: Unless otherwise provided for in any accepted and authorized
proposal for additional services, such services shall be compensated for on the same
basis as provided for in Attachment D.
D.5 Terminated Services: If this AGREEMENT is terminated, ENGINEER shall be paid
for services performed to the effective date of termination.
D.6 Conditions of Payment
D.6.1 Progress payments shall be made in proportion to services rendered and
expenses incurred as indicated within this AGREEMENT and shall be due
and owing within thirty days of ENGINEER'S submittal of his progress
payment invoices.
10
D.6.2 If CITY fails to make payments due ENGINEER within sixty days of the
submittal of any progress payment invoice, ENGINEER may, after giving
fifteen days written notice to CITY, suspend services under this
AGREEMENT.
D.6.3 If the PROJECT is delayed, or if ENGINEER'S services for the PROJECT are
delayed or suspended for more than ninety days for reasons beyond
ENGINEER'S control, ENGINEER may, after giving fifteen days written
notice to CITY, request renegotiation of compensation.
m
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
Billing Sheet
Attachment E
CITY SHALL REPLACE THIS PAGE WITH PROJECT FEE SCHEDULE
Task 1 - Project Initiation and Management
$5,700
Task 2 - Current Recycling System Review and
Assessment
$8,300
Task 3 - Facility Programming for the Existing
Recycle Center and Potential New Location
$29,400
Task 4 - Evaluate Alternative Residential Recycling
Collection and Processing Options
$23,700
Task 5 - Workshop with the Project Task Force and
Develop Implementation Plan and Schedule
$6,000
Task 6 - Public Education Strategies
$5,700
Task 7 - Work- Sessions and Presentations to the
Public
$11,600
Task 8 - Report Preparation
$9,000
Total
$99,400
12
AGREEMENT FOR ENGINEERING SERVICES
RECYCLE CENTER MASTER PLAN
FOR THE CITY OF OWASSO, OK
Schedule
Attachment F
F. SCHEDULE. The schedule for general engineering services for the PROJECT is
provided as follows:
F.1. Notice to Proceed: January 10, 2012
F.2. Substantial Completion: April 30, 2012
13
ATTACHMENT G
Project Understanding, Scope of Services
and Fee
Project Understanding
As a leading solid waste planning and recycling consultant, our firm has assisted communities in
designing, implementing, and evaluating sustainable solid waste programs. Working with some of the
most sophisticated integrated solid waste management systems in the country, our professionals bring
notable experience ranging from an understanding of collection, processing, and economic impacts of
various operations for refuse and recycling. We assist communities in getting to the next level of
recycling, including implementing curbside single- stream collection and processing systems.
We also recognize that the City is interested in developing a roadmap for where the recycling program
will be in 20 years and achieving zero waste to landfill in 25 years. Therefore, we have structured the
following approach to focus on evaluating the feasibility of multiple recycling options (including the
fixture use of the existing recycle center), as opposed to only and specifically developing designs to
change the existing recycle center. For example, we have recently worked with the City of Tulsa to
assist the City with implementing a new residential and recycling collection system that is expected to
result in single -stream recycling processing services being available in the metropolitan area.
Therefore, a scenario could evolve where the City of Owasso may have an interest to utilize a public -
private partnership for recycling processing. Along these lines, we would recommend that the City not
complete tasks typically associated with design and construction (e.g. geotechnical, surveys, soil
evaluations, design) until the initial planning work is conducted. Rather, this scope of would could
compare the feasibility of the City developing its own recycling facility to other viable options. Again,
we would welcome the opportunity to discuss these issues with the City and to develop a specific
scope of services.
Scope of Services
Task 1 - Project Initiation and Management
Initial Data Request and Review
Following receipt of the Notice to Proceed, SAIC will provide the City with a detailed preliminary data
request that will encompass data needs for completing the study. The data request will itemize our
needs for understanding the operational and financial considerations that must be addressed. The
Request for Information (RFn will primarily focus on data related to the City's on -going recycling
programs and other solid waste programs. This task also includes organization and preliminary
SAIC Energy, Environment & Infrastructure, LLC 1 1
Project Understanding, Scope of Services and Fee
analysis of all data received. We recognize that the City may not have all information requested readily
available or may track information differently than requested. We will work with the appointed Project
Manager to arrive at reasonable substitutes for the key data, if needed.
Establish a Project Task Force
Completion of a recycling master planning study requires input from multiple staff within the City. In
order to get the best information possible and increase buy -in for the outcomes of this project, we
recommend that the City establish a Project Task Force (PTF) to participate throughout the process.
The PTF would ideally include 6 — 8 key representatives from diverse roles and levels of responsibility
within the City. Based on experience applying this approach with other cities, it is our general
recommendation that participants include:
■ Solid Waste and /or Public Works Director
■ Recycling Manager
■ Financial Managers (Auditor or Finance Director)
■ 1 — 2 City Council Commissioners (or their designee) (optional)'
■ 1 — 2 Additional key solid waste and recycling staff
The PTF would participate in the kick -off meeting, help facilitate data collection, provide feedback on
preliminary findings, and provide support to our Project Team throughout the project. By involving a
variety of individuals with a wide range of skills and responsibilities, a complete picture of the solid
waste system can be developed more quickly. The diverse experience and concerns of the participants
will help identify problem areas and contribute meaningful input to the solutions. Full participation
from the PTF members should also be expected to increase buy -in and would speed implementation
of the project findings.
Kick -off Meeting and Project Management
Prior to commencing the study, members of the Project Team would conduct a kick -off meeting with
key City staff. At this kick -off meeting we would discuss the project work plan, key issues to be
addressed, key findings from previous engagements as well as confirm the timing associated with the
various project tasks.
We would discuss our initial data request (as previously described) that we would have provided to the
City staff 7 to 14 days prior to the kick -off meeting. SAIC will provide the agenda and any handout
materials at least two days in advance.
During the meeting, we will also identify primary contacts for our Project Team and the City and
establish protocol for the exchange of information and the resolution of issues that arise in the normal
1 Due to the important decisions that will need to be made during the course of this project, the City may consider having 1 -
2 City Council members directly involved in the project. This approach has worked effectively for other recent projects
completed by SAIC. Participation of the City Council members (or their designee) will be at the complete option of the City.
SAIC Energy, Environment & Infrastructure, LLC 1 2
Project Understanding, Scope of Services and Fee
course of this engagement. To ensure effective communication between Project Team members and
the City throughout the course of this project, it is proposed that SAIC will:
■ Schedule and participate in periodic conference calls as needed to discuss project matters (as
identified in the specific tasks of this scope of work)
■ Be available for other communication(s) as needed
Task 1 Deliverables
■ Preliminary data request
■ Electronic copies of the kick -off meeting agenda, handouts, and follow -up summary
■ Participation of SAIC Project Manager and key technical staff in kick -off meeting
Task 2 - Current Recycling System Review and Assessment
Key to the development of a recycling master planning study is gaining a solid understanding of the
current system and developing a baseline to which options to be evaluated can be compared. SAIC
will conduct the following activities in order to develop the assessment of each service and program.
• Data review and analysis — SAIC will summarize data received from the City for each program
(e.g., composition of recyclable materials, annual pounds per household of residential refuse and
recyclables, and other similar data).
• Field observations and Interviews — Field observations allow us to obtain a true feel for the
challenges faced, productivity levels achieved, successes, and areas needing improvement. SAIC
will perform field observations at the processing facility and for collection operations. This
analysis will include one -on -one interviews with key personnel. We will spend time in the field
observing collection practices, which will include documenting staff practices as well as customer
activity. We will also visit the existing recycle center to gain an understanding of its capabilities
and limitations.
SAIC will establish a baseline of the operational and financial requirements for the current recycling
program. A baseline of the existing system will assist SAIC evaluating the multiple options that will be
considered in Task 3. Examples of issues to address for the collection system will include but not be
limited to: pros /cons, annual operating expenses, customer fees, cost per household served, recycling
quantities, public education and outreach and collection efficiency data.
For the existing recycling center, we would recommend that the initial review focus on the following
efforts:
■ Evaluate preliminary building layout based on the previous plan prepared by the City
■ Determine the capacity of the existing recycle center with regard to population
■ Project when the existing system will be undersized
SAIC Energy, Environment & Infrastructure, LLC 1 3
Project Understanding, Scope of Services and Fee
■ Review existing equipment
■ Determine current and potential processing capabilities
■ Estimate the ongoing operations and capital cost for the recycle center
Task 2 Deliverables
■ Draft report section for the current system review and assessment
Task 3 - Facility Programming for the Existing Recycle Center and
Potential New Location
SAIC will develop a facility programming statement for the facilities needed at the Recycle Center over
time based on the evaluation of the current facility (as described in Task 2) and projected future needs
for the City. SAIC will conduct a meeting with City staff to determine the future needs for the facility.
Potential future use for the facility could include drop -off recycling for municipal solid waste,
electronic waste, bulky items and brush. The City would like for the center to be regarded as a
"recycling showcase" for the community and would have educational features, such as a class room.
Processing capabilities at the facility would be limited to the use of a baler, and will not include sorting
processes or equipment.
SAIC will collect data about the existing recycle center site and one alternative site designated by the
City. Data to be collected will include site maps depicting topographic and planimetric features; site
utilities (water, sewer, surface water, electrical) available at each site; existing geotechnical and soils
information available from the City.2
SAIC will prepare conceptual level layouts for a new recycle area based on the facility program
statement and the site information for each of the two sites. In addition, SAIC will prepare a 3D
rendering of one of the two site arrangements that will facilitate discussion of the proposed facility
improvements with stakeholders. SAIC will prepare planning level construction cost estimates, pros
and cons assessment, and a narrative construction phasing plan for each of the two sites.
Task 3 Deliverables
■ Draft report section describing the facility programming and cost estimates.
■ The report section will also include conceptual layouts for the two sites and one rendering for one
site.
2 For the initial facility programming efforts, SAIC not conduct surveys or geotechnical and soil testing.
We will advise the City regarding whether these types of tasks should be conducted in future phases.
SAIC Energy, Environment & Infrastructure, LLC 1 4
Project Understanding, Scope of Services and Fee
Task 4 - Evaluate Alternative Residential Recycling Collection and
Processing Options
Evaluate Collection and Processing Options
The City's RFQ identifies several processing and collection options that could be evaluated for the
City. In this section, we have identified the primary options that we would recommend that the City
consider. If requested, we can advise the City regarding the potential feasibility of each option in case
there is an interest in refining the options to be considered.
SAIC will help Owasso understand the how residential recycling services could be provided in the
future, based on the following collection options:
• Drop -off (status quo)
• Curb -sort
• Dual stream (collection vehicle has separate compartments for fiber and containers)
• Single stream (all material is placed into the collection vehicle together)
For each of these collection options, SAIC will collaborate with the City to determine preference on
key alternatives such as container type (e.g carts, bins, bags), collection frequency (e.g. weekly, every
other week) and participation requirements (e.g. optional, automatic enrollment, mandatory
participation).
Regarding the processing of material, we will complete our analysis based on the following options
based on a 20 year planning horizon:
• Expansion of the existing recycle center or new recycle center based on results from Task 3
• Use of multiple, smaller centers around the City
• Public - private partnerships for single and dual stream recycling processing
We will also review options for the City to consider regional alternatives based on the above options.
SAIC will expect to provide the City with a comparative understanding of these options based on the
following factors:
• Pros and cons
• Cost effectiveness of the proposed system (e.g. annual operating costs for collection and
processing, customer fees and cost per household)
• Cost per ton of material recycled
• Recycling rate
• Types of material collected
• Contamination levels
SAIC Energy, Environment & Infrastructure, LLC 1 5
Project Understanding, Scope of Services and Fee
• Disposal cost and cost avoidance (e.g. impact on the landfill)
• Value of commodities
SAIC will specifically evaluate the projected cost of service based on our proprietary
Recycling Collection Model and MRF Model. We have successfully used these models on behalf of
other clients to help them understand the potential cost of services and to evaluate collection and
processing options. The collection model will provide an understanding of factors to included but not
be limited to the following types of costs:
• Rolling Stock
• Labor
• Facilities (e.g. maintenance, building, parking, fueling, offices)
• Fuel
• Containers
• Maintenance
With regard to the MRF, the models will account for the following types of factors:
• Land acquisition
• Rolling Stock
• Labor
• Facilities (e.g. MRF, parking, offices)
• Equipment
• Disposal for residue
Based on the analyses completed in this task, SAIC will provide the City with an understanding of how
the various options compare financially. To analyze costs associated with each of the recycling
alternatives, SAIC will develop a financial model that will summarize the costs for each
alternative in a format similar to the table shown on the following page.
SAIC Energy, Environment & Infrastructure, LLC 1 6
Project Understanding, Scope of Services and Fee
This will include a variety of collection and processing scenarios
Collection scenarios:
• Curb -sort
• Dual Stream
• Single Steam
Processing Scenarios:
• Existing Recycle
Center
• Multiple, small
recycling centers
• Construction of a
local MRF
• Public- private
Partnership
Task 4 Deliverables
• Draft report section that evaluates recycling options (status quo, single stream and dual stream)
• Comparative table(s) regarding potential recycling options
Task 5 - Workshop with the Project Task Force and Develop
Implementation Plan and Schedule
Workshop with the Project Task Force
It is envisioned that a working group meeting would be held to present the key findings and
recommendations of from Tasks 1 - 4. The working group meetings will provide an opportunity to
SAIC Energy, Environment & Infrastructure, LLC 7
Project Understanding, Scope of Services and Fee
present our findings and ensure buy -in for our recommendations. SAIC will develop power point
presentations, handouts, and agendas, and other materials to use during the work session. Information
and decisions made during these workshops will be key drivers for the implementation plan described
below, as well as for recommendations that will be included in the draft and final reports.
Develop Implementation Plan and Schedule
During the workshop described above, SAIC will collaborate with the Project Task Force to evaluate
each of the options being considered. Based on the preferred option, we will provide a planning level
implementation plan that will describe the specific activities associated with implementing the
preferred option. This will provide a prioritization and timing for each of the strategies. Based on the
workshop, we will develop a recommended implementation plan and schedule that Owasso can use to
implement the preferred option. This action plan will include roles, responsibilities, schedules,
and costs.
Task 5 Deliverables
• Power point presentations, handouts, and agendas, and other materials to use during the work
session
• Report section that summarizes the key activities to be accomplished in support of successfully
implementing each strategy and option.
Task 6 - Public Education Strategies
The City recognizes the importance of developing a public education strategy that can serve as the
basis that will be distributed to the City's solid waste and recycling customers. Since SAIC has assisted
numerous other cities regarding their residential solid waste and recycling programs, we have a first-
hand understanding of how cities can effectively communicate this message to their residents.
During this task, SAIC will review the City's existing public education program. Following the review
of the existing program, we will discuss the City's needs for a public education strategy. During these
discussions, SAIC will seek to understand and evaluate the following:
• Identify the targeted audience
• Determine the types of materials that could be provided as a part of the public education strategy
• Identify key messaging that should be included in the public education strategy
• Develop fundamental concepts and content that would be foundation for the public education
strategy.
We could then develop a public education strategy that the City can implement. As a part of the effort
to develop the strategy for the City, we can share how other cities have addressed similar situations,
and provide recommendations for the City. In fact, several SAIC consultants are former local
government public works /solid waste staff /directors, and have been responsible for similar strategy
SAIC Energy, Environment & Infrastructure, LLC 1 8
Project Understanding, Scope of Services and Fee
developments. Furthermore, we have a library of public education materials utilized by other SAIC
clients that we can share with City staff to provide ideas for effective communication so that the City
Task 6 Deliverables
■ Report section that describes public education strategy examples (e.g. marketing collateral)
Task 7 - Work- Sessions and Presentations to the Public
Based on conversations with the City, SAIC understands that gaining input from City Council and the
public is critical to the development of a Master Plan. With this in mind, we have included within our
budget three meetings with the City Council and /or public. This could include any combination of
meetings with the City Council (work session or formal meeting) or public. The timing of this
particular task is flexible and we will work with the City throughout the project to determine the
appropriate use and scheduling of the meetings described in this task.
It is envisioned that the meetings would be held to present the key findings and recommendations of
completed tasks. The meetings will provide an opportunity to present our findings and ensure buy -in
for our recommendations. SAIC will develop power point presentations, handouts, and agendas, and
other materials to use during the work session.
Task 7 Deliverables
■ Presentation(s) by the Project Manager, including the development of Power Point presentations
Task 8 - Report Preparation
SAIC will prepare a report summarizing our findings. The draft report will comprise all of the report
sections that will be submitted during each task, as well as an executive summary. A draft report will
be provided to the City for review and comment. Comments received from the City will be
incorporated, as appropriate, and a Final Report will be delivered.
Task 8 Deliverables
■ Draft report — submittal of one PDF and printed copies
■ Final report — submittal of one PDF and printed copies
SAIC Energy, Environment & Infrastructure, LLC 1 9
Project Understanding, Scope of Services and Fee
Fees
The table shows the total fees, inclusive of professional services and out -of- pocket expenses.
Task 1 - Project Initiation and Management
$5,700
Task 2 - Current Recycling System Review and Assessment $8,300
Task 3 - Facility Programming for the Existing Recycle Center and Potential New $29,400
Location
Task 4 - Evaluate Alternative Residential Recycling Collection and Processing Options $23,700
Task 5 - Workshop with the Project Task Force and Develop Implementation Plan and $6,000
Schedule
Task 6 - Public Education Strategies $5,700
Task 7 - Work- Sessions and Presentations to the Public $11,600
Task 8 - Report Preparation $9,000
Total
SAIC Energy, Environment & Infrastructure, LLC 1 10
$99,400
The City Wim'c ut Limits.
TO: The Honorable Chair and Trustees
Owasso Public Works Authority
FROM: Angela Hess
Finance Director
SUBJECT: Resolution No. 2011 -04
East 76th Street North Sanitary Sewer Interceptor Assessment Fee
DATE: December 16, 2011
On January 6, 2009, the Owasso City Council approved City Ordinance No. 935 which provided
for the following:
• Establishment of the 76th Street Sewer Interceptor Assessment Area
• Assessment of a mandatory fee for connection to the 76th Street Sewer Interceptor
• Authorization of an assessment fee to be established by Resolution of the OPWA upon
completion of the project and after final costs were known
The drainage basin to be served by the sewer interceptor and specified in the ordinance per
Exhibit "A" included 3,843 net acres, 2719 net acres were designated as undeveloped and 1,124
net acres were designated as previously developed with access to sewer through the 76th Street
Sewer Interceptor.
A review of the assessment area determined that some of the acreage within the basin area
could never be developed. This analysis resulted in a total deduction of 307 acres. Deductions
taken into consideration include 147 acres of land included in the golf course area, 121 acres of
the Stone Canyon Lake and 39 acres located in the basin that are part of the quarry mining
operation.
The final net acres of the assessment area are 3,536 acres, which are reflected as 1,124
previously developed acres and 2,412 undeveloped acres.
Additionally, properties not located within the Assessment Area, were authorized by Ordinance
No. 935 to have the ability to request connection to the 76th Street Sewer Interceptor. Properties
which have already been developed and that are approved to tie into the interceptor will be
required to pay the same assessment fee upon connection.
SANITARY SEWER SERVICE:
The interceptor line was designed and installed to facilitate the growth in northwest Rogers
County and the southeastern region of Owasso which includes the highway 169 corridor to 193rd
East Avenue.
During the late 1970's and early 1980's, city staff had a strategic plan in place which allowed for
construction of the Elm Creek Interceptor and Ranch Creek Interceptor. As a result of such
foresight, the City of Owasso had the ability to grow from 3,000 residents to our 29,000 in the past
30 years. In addition, commercial construction has grown throughout the City.
In the last 2000's, city staff had the same foresight to realize the need for a sewer interceptor that
could potentially service over 2,400 acres of non - developed property within the basin, which in
turn puts the city in a position to provide service access to an additional 8,000 new residents.
Increases in population within the city will ultimately attract larger retailers and businesses to the
City of Owasso while generating additional sales fax for the city.
The 76th Street Sewer Interceptor has been designed to gravity flow all connections from the
structure (home /building) to the sanitary sewer interceptor. Long term, this design will provide
the most cost effective method for the City of Owasso and users of the sewer interceptor far into
the future. Gravity flow does not require any mechanical and /or electrical components.
Therefore, reducing the overall maintenance cost by 70% over the next 50 years.
There are approximately 650 existing households who could potentially tap in to this sewer line.
These households are currently on septic or aerobic systems which generally require a 1,000
gallon septic tank and approximately 300' of field line. Prices for these systems can vary widely
depending on location and the current cost of materials.
Installing /replacing a conventional septic system (including the tank) averages $2,000 - $5,000.
Enhanced, engineered or alternative septic systems that use mounds, sand /peat filters, aerobic
systems can cost $10,000 to $20,000 or more. Aerobic system pumps generally need to be
replaced every three to seven years.
Residents in the interceptor assessment area will now have a viable alternative to their current
septic system should they choose to pay the assessment fee and tap into the 76th Street Sewer
Interceptor. By choosing this option, the resident is no longer responsible for the costly ongoing
maintenance and operation of a private sewer system.
In considering the differences of sanitary sewer and storm water drainage, it is important to
understand that sanitary sewer drains are designed to drain waste water and sewage from
inside our homes. The sanitary sewer drains lead to the sanitary sewer system and ends up at a
wastewater treatment plant. Unlike storm water runoff from yards, streets, parking lots, etc.,
sanitary sewer in this system is treated before being discharged into a natural water body which
is a comparatively costly process.
PROPOSED ACTION:
The construction phase of the 76th Street Sewer interceptor project was completed on October
12, 2011. Final acceptance of the project was approved by Council on October 18, 2011.
The OPWA Trustees are being asked to approve the following payback calculation for properties
that are within the Assessment area, and approved to tie into 76th Street Sewer Interceptor.
Payment of this assessment upon approval will be mandatory and assessment fees will be due
upon the approval of a final plat or connection to the sanitary sewer system
The total number of acres included in the Assessment Area is 3,536 acres, with the total cost of
the project coming to $4,741,293. Total costs include acquisition of land, construction costs,
professional fees, interest and all other lawful and authorized fees per the approved Ordinance.
As such, the mandatory assessment fee has been calculated to be $1,341 per acre.